KR101635529B1 - Composite pile construction method - Google Patents
Composite pile construction method Download PDFInfo
- Publication number
- KR101635529B1 KR101635529B1 KR1020150161184A KR20150161184A KR101635529B1 KR 101635529 B1 KR101635529 B1 KR 101635529B1 KR 1020150161184 A KR1020150161184 A KR 1020150161184A KR 20150161184 A KR20150161184 A KR 20150161184A KR 101635529 B1 KR101635529 B1 KR 101635529B1
- Authority
- KR
- South Korea
- Prior art keywords
- steel pipe
- support layer
- head
- pipe body
- perforation hole
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
- E02D5/80—Ground anchors
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/24—Prefabricated piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/62—Compacting the soil at the footing or in or along a casing by forcing cement or like material through tubes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/26—Placing by using several means simultaneously
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/003—Injection of material
Abstract
The present invention relates to a composite pile construction method capable of improving the load resistance performance of an earth surface section using an outer pipe while securing the tip endurance of the micro pile by means of an inner pipe and a steel bar and securing workability and workability. The outer steel pipe and the inner steel pipe 122 are integrated by using an outer steel pipe end closing member so as to surround the inner steel pipe so as to extend to the toe layer G1 on the head of the steel pipe, The steel pipe body and the lower steel pipe body are integrated, and the upper steel pipe body is formed into a double pipe shape.
Description
The present invention relates to a composite file construction method. More specifically, the present invention relates to a composite pile construction method capable of improving load resistance performance of an earth surface section by using an outer pipe while securing the end support force by an inner pipe and a steel rod in a micro file, and securing workability and workability.
FIG. 1A is a construction cross-sectional view of a composite pile capable of securing a conventional end support force and a main surface friction force.
A
In other words, by providing a composite file that exploits the advantages of conventional micro-files and small-diameter steel pipe files using conventional steel bars, it is possible to provide a composite file in which, in contrast to designs based on double use of steel materials such as micro- It is possible to construct a small-diameter pile construction which is more economical. Further, the present invention can drastically reduce the installation amount of the small-diameter piles required for securing frictional force on the main surface as the leading end supporting force can be secured.
Further, FIG. 1B shows an example of using a double tube in a conventional compound file.
That is, the
Particularly, the
However, there is a problem in that the microfiles constructed in the conventional compound file format are subjected to a process of separately constructing each of the microfiles so that there is a limit in workability and workability. Also, the
Accordingly, it is an object of the present invention to provide a composite file construction method capable of sufficiently securing a leading end supporting force in the construction of a microfilm in the form of a double pipe, improving the workability and minimizing the work in the field, do.
In order to solve the above problems,
(a) forming a perforation hole in the soil layer G1 and inserting the steel pipe as a lower steel pipe body first; (b) Connect the inner steel pipe to the toe layer (G1) at the top of the exposed steel pipe at the top of the surface of the earth, and wrap the outer steel pipe with the inner steel pipe. The upper steel pipe and the lower steel pipe are integrated so that the upper steel pipe has a double pipe shape; (c) drilling the support layer G2 by inserting the drill bit into the inner steel pipe and the lower steel pipe, and inserting the integrated lower steel pipe body so as to extend to the inside of the hole formed in the support layer G2; (d) inserting the micropile into the upper steel pipe and the lower steel pipe so as to extend to the perforation hole (H2), and installing the injection pipe so as to extend to the perforation hole of the support layer (G2); (e) The grouting material G injected through the injection pipe is injected into the space between the perforation hole H2 of the support layer G2, the inner steel pipe of the upper steel pipe body, the inner steel pipe and the outer steel pipe, step; And (f) setting a top surface of an outer steel pipe and an inner steel pipe, that is, a top surface of an upper steel pipe, with a steel pipe head reinforcement plate so that the micropile extends upward, Provided is a method for constructing a composite pile, in which reinforced concrete is laid and a foundation is laid by placing foundation concrete.
Also,
(a) connecting a steel pipe as an upper steel pipe body and an outer steel pipe as an upper steel pipe body to each other; (b) inserting a drill bit into the lower steel pipe and the upper steel pipe integrated with each other to penetrate the support layer G2 to reach the upper surface of the support layer G2 while forming the perforation hole H2; (c) In order to reinforce the ground surface area, the upper inserted steel pipe is further inserted into the outer steel pipe to extend to the ground layer G1, the micro pile is inserted into the upper inserted steel pipe up to the supporting layer G2, (G2); (d) The grouting material G injected through the injection pipe is injected and hardened into the space between the inner hole of the lower steel pipe body and the upper steel pipe body, the upper steel pipe body and the upper inserted steel pipe, ; And (e) setting a steel pipe head reinforcement plate on the upper surface of the upper and lower steel pipes so that the micropile extends upward. After the steel pipe is laid so that the head of the micropile is embedded, The present invention provides a method of constructing a composite pile, in which concrete is laid so that a foundation is constructed.
delete
delete
The composite file according to the present invention is constructed in the form of a double pipe near the earth surface so that the load can be calculated by the following equation (1): the tip end load (P1) of the micropile, the frictional force (T) between the compound file and the surrounding ground, It is possible to effectively support the bending moment due to the earth pressure near the earth surface, the earthquake force, etc., while ensuring the integrity with the foundation effectively.
FIG. 1A is a construction sectional view of a composite file capable of securing a conventional end support force and a main surface friction force
FIG. 1B is a cross-sectional view of a composite pile construction,
FIG. 2A is a construction cross-sectional view and an extracted perspective view of a composite file according to Embodiment 1 of the present invention,
FIG. 2B is a construction sectional view and an extracted perspective view of a composite file according to Embodiment 2 of the present invention, FIG.
FIG. 2C and FIG. 2D are a construction cross-sectional view, an exploded perspective view, and an installation cross-sectional view of an inner steel pipe connector according to a third embodiment of the present invention,
Figs. 3A and 3B are installation sectional views of the head reinforcement means of the present invention,
FIGS. 4, 5, and 6 are flowcharts of the construction of the compound file according to the first, second, and third embodiments of the present invention.
Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings, which will be readily apparent to those skilled in the art. The present invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. In order to clearly illustrate the present invention, parts not related to the description are omitted, and similar parts are denoted by like reference characters throughout the specification.
Throughout the specification, when an element is referred to as "comprising ", it means that it can include other elements as well, without excluding other elements unless specifically stated otherwise.
[Compound file (100) of the present invention]
FIGS. 2A, 2B, and 2C are partial cross-sectional views of a construction file of the
The
[Embodiment 1: Compound File (100)]
As shown in FIG. 2A, the
First, the
2A, the perforation hole H previously formed in the ground penetrates through the soil layer G1 and extends to the support layer G2.
Accordingly, the
The top
The
The
The
The
The
The lower end of the
At this time, the space between the inner side surface of the
The upper
Next, the lower
2A, it can be seen that the lower
The grouting material G is disposed in the perforation hole H2 of the support layer G2, in the lower
Therefore, the
[Embodiment 2: Compound File (100)]
As shown in FIG. 2B, the
First, the
As shown in FIG. 2B, the perforation hole H previously formed in the ground penetrates through the soil layer G1 and extends to the support layer G2 as well.
The extension length of the
The top
Next, the upper
The
In the second embodiment, the
Thus, the steel pipe
The upper
That is, in the second embodiment, it can be seen that the
Next, the
Referring to FIG. 2B, it can be seen that the
The inner connecting
The
The lower end of the
2b, it can be seen that the lower
The grouting material G is injected into the perforation hole H of the support layer, the
Thus, the
[Embodiment 3: Compound File (100)]
As shown in FIG. 2C, the
First, the
As shown in FIG. 2C, the perforation hole H previously formed in the ground penetrates through the soil layer G1 and extends to the support layer G2 as well.
The extension length of the
The top
The
The
The
The steel pipe
Further, the
The diameter of the
FIG. 2D illustrates an example of the
That is, as shown in FIG. 2D, the
First, a
Also, as shown in FIG. 2D,
The grouting material is injected through the through hole formed in the horizontal plate in the form of a
Also, as shown in FIG. 2D,
A grid structure (154) orthogonal to the inner side and the inner side of the inner steel pipe (122) is formed in the center of the inner steel pipe so as to set the micro pile, and the grouting material is injected into the inner steel pipe. Also, the
Also, as shown in FIG. 2D,
And a
At this time, grouting material G may be injected into the space between the inner surface of the
The upper
Next, the
It is also understood from FIG. 2C that the
The inner connecting
The
2C, the lower end of the upper
2c, it can be seen that the lower
The grouting material G is injected into the perforation hole H of the supporting layer, the
The
[Head reinforcement means 300 of the present invention]
Figures 3A and 3B show the head reinforcement means 300 of the present invention.
3A, a vertical reinforcement rod 310 (see FIG. 3A) is inserted between the
At this time, it can be seen that the
At this time, the
Further, it is understood that the vertical reinforcing
Further, the vertical reinforcing
In this case, a plate or ring-shaped rod fixing device (not shown) for connecting a plurality of vertical reinforcing rods is provided under the vertical reinforcing rods, thereby facilitating the installation of the vertical reinforcing rods and enhancing the integrated effect with the grout.
3B, in particular, the steel pipe
And it can be formed in the form of an
Further, it can be seen that the steel
It can be seen that such a downwardly-inserted connector can be easily installed in a simple manner and can be securely fixed with a horizontal bolt. Such downwardly-inserted
[Compound file construction method]
FIGS. 4, 5, and 6 show flowcharts of a composite file construction method. This is according to Examples 1, 2, and 3.
[Method of constructing a composite file according to Embodiment 1]
First, as shown in FIG. 4A,
The
Next, as shown in FIG. 4B, the
As a result, the upper and lower
4C, a drill bit or the like not shown is inserted into the
As a result, the integrated upper and lower
Next, as shown in FIG. 4D, the
4E, the grouting material G injected through the
Next, as shown in FIG. 4F, the steel pipe
At this time, the top
As shown in FIG. 4F, after the foundation reinforcement is laid so that the head of the
3A and 3B may be further installed on the head of the
Further, the vertical reinforcing
In this case, a plate or ring type rod fixing device for connecting a plurality of vertical reinforcing rods is provided under the vertical reinforcing rods, thereby facilitating the installation of the vertical reinforcing rods and enhancing the integrated effect with the grout.
As described above, the
[Method of constructing the composite file according to the second embodiment]
The composite file construction method according to the second embodiment, as shown in FIG. 5A,
And the
5A shows a case where the
As shown in FIG. 5B, the lower
Next, as shown in FIG. 5C, the upper inserted
5D, the grouting material G injected through the
Next, as shown in FIG. 5E, the steel pipe
At this time, the top
As shown in FIG. 5E, after the foundation steel is laid so that the head of the
3A and 3B may be further provided on the microfiber head portion. The head reinforcement means 300 may be formed by, for example, passing through the steel tube
Further, the vertical reinforcing
In this case, a plate or ring type rod fixing device for connecting a plurality of vertical reinforcing rods is provided under the vertical reinforcing rods, thereby facilitating the installation of the vertical reinforcing rods and enhancing the integrated effect with the grout.
Thus, the
[Method of constructing the composite file according to the third embodiment]
First, in the composite file construction method according to the third embodiment,
6A, a perforation hole H1 is formed so that an
Next, as shown in FIG. 6B, the lower
It can be seen that the upper
Next, as shown in FIG. 6C, the
6D, the grouting material G injected through the
It can be seen that the grouting material G injected into the grouting material G is hardened and the construction of the
Next, as shown in FIG. 6E, a steel pipe
At this time, the top
As shown in FIG. 6E, after the foundation reinforcement is laid so that the head of the
3A and 3B. The head reinforcement means 300 may be formed by, for example, passing through a steel tube
Further, the vertical reinforcing
In this case, a plate or ring type rod fixing device for connecting a plurality of vertical reinforcing rods is provided under the vertical reinforcing rods, thereby facilitating the installation of the vertical reinforcing rods and enhancing the integrated effect with the grout.
The
It will be understood by those skilled in the art that the foregoing description of the present invention is for illustrative purposes only and that those of ordinary skill in the art can readily understand that various changes and modifications may be made without departing from the spirit or essential characteristics of the present invention. will be. It is therefore to be understood that the above-described embodiments are illustrative in all aspects and not restrictive. For example, each component described as a single entity may be distributed and implemented, and components described as being distributed may also be implemented in a combined form.
The scope of the present invention is defined by the appended claims rather than the detailed description and all changes or modifications derived from the meaning and scope of the claims and their equivalents are to be construed as being included within the scope of the present invention do.
100: Compound file 110: Micro file
120: upper steel pipe body 130: lower steel pipe body
140: head fixing device 150:
160: pipe connection device 200: foundation
300: head reinforcing means 400: upper inserted steel pipe
Claims (9)
(b) The inner steel pipe 122 is connected to the head of the steel pipe 131 exposed to the upper surface of the earth surface so as to extend to the toe layer G1, and the outer steel pipe 121 is wrapped around the inner steel pipe 122, The upper steel pipe 120 and the lower steel pipe 130 are integrated by integrating the outer steel pipe 121 and the inner steel pipe 122 by using the closing port 124. The upper steel pipe 120 has a double pipe shape ;
(c) A drill bit is inserted into the inner steel pipe 122 and the lower steel pipe 131 to penetrate the support layer G2 and the integrated lower steel pipe body 130 is inserted into the perforation hole formed in the support layer G2 ;
(d) inserting the micro pile 110 into the upper steel pipe and the lower steel pipe so as to extend to the punch hole H2, and installing the injection pipe 300 to the punch hole of the support layer G2;
(e) The grouting material G injected through the injection pipe 300 flows through the perforation hole H2 of the support layer G2, the inside of the lower steel pipe body 130, the inner steel pipe 122 of the upper steel pipe body 120, So as to be injected into a space between the inner steel pipe (122) and the outer steel pipe (121); And
(f) installing a steel pipe head reinforcement plate 123 on the upper surface of the outer steel pipe 121 and the inner steel pipe 122, that is, on the upper surface of the upper steel pipe 120 so that the micro pile 110 is extended upward Wherein the base (200) is constructed by placing a foundation reinforcing bar so that a head of the microfilm (110) is embedded and then a foundation concrete is laid.
(b) A drill bit is inserted into the lower steel pipe body 130 and the upper steel pipe body 120 integrated with each other to penetrate the support layer G2 to reach the upper surface of the support layer G2 while forming the perforation hole H2 ;
(c) The upper inserted steel pipe 400 is further inserted into the outer steel pipe 121 to extend to the toe layer G1 for reinforcement of the ground surface area, Installing the injection tube (300) so as to extend to the perforation hole of the support layer (G2) while inserting the injection tube (110);
(d) The grouting material G injected through the injection pipe 300 penetrates the perforation hole H2 of the support layer G2 and the inside of the lower steel pipe body 130, the upper steel pipe body 120 and the upper steel pipe body 120 ) And the upper inserted steel pipe (400); And
(e) installing a steel pipe head reinforcement plate 123 on the upper surfaces of the upper and lower outer steel pipes 400 and 121 so that the micro pile 110 is extended upward; And the foundation 200 is installed by placing the foundation concrete after the foundation reinforcement is laid.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020150161184A KR101635529B1 (en) | 2015-11-17 | 2015-11-17 | Composite pile construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020150161184A KR101635529B1 (en) | 2015-11-17 | 2015-11-17 | Composite pile construction method |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020160045492A Division KR101855458B1 (en) | 2016-04-14 | 2016-04-14 | Composite pile |
Publications (1)
Publication Number | Publication Date |
---|---|
KR101635529B1 true KR101635529B1 (en) | 2016-07-04 |
Family
ID=56501631
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020150161184A KR101635529B1 (en) | 2015-11-17 | 2015-11-17 | Composite pile construction method |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101635529B1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107237319A (en) * | 2017-06-20 | 2017-10-10 | 中冶天工集团有限公司 | A kind of pile tube with post jacking Grouting Pipe and its construction method |
WO2018221781A1 (en) * | 2017-05-31 | 2018-12-06 | 한국전력공사 | Pile and construction method therefor |
KR20230042867A (en) * | 2021-09-23 | 2023-03-30 | 박진규 | Helical pile construction method using extension boring |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0617315B2 (en) * | 1986-05-19 | 1994-03-09 | 花王株式会社 | Medicinal composition and cosmetic containing the same |
KR20090089559A (en) * | 2008-02-19 | 2009-08-24 | 홍지기술산업주식회사 | Micro pile having dual diameter and foundation construction method using the same |
JP4617315B2 (en) * | 2004-10-08 | 2011-01-26 | 独立行政法人土木研究所 | Micropile and its construction method |
KR20110077713A (en) * | 2009-12-30 | 2011-07-07 | 재단법인 포항산업과학연구원 | Double steel pipe foundation and construction method thereof |
KR101413593B1 (en) * | 2013-04-15 | 2014-07-04 | 이강수 | Composite pile with end bearing capacity, friction capacity and construction method therefor |
-
2015
- 2015-11-17 KR KR1020150161184A patent/KR101635529B1/en active IP Right Grant
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0617315B2 (en) * | 1986-05-19 | 1994-03-09 | 花王株式会社 | Medicinal composition and cosmetic containing the same |
JP4617315B2 (en) * | 2004-10-08 | 2011-01-26 | 独立行政法人土木研究所 | Micropile and its construction method |
KR20090089559A (en) * | 2008-02-19 | 2009-08-24 | 홍지기술산업주식회사 | Micro pile having dual diameter and foundation construction method using the same |
KR20110077713A (en) * | 2009-12-30 | 2011-07-07 | 재단법인 포항산업과학연구원 | Double steel pipe foundation and construction method thereof |
KR101413593B1 (en) * | 2013-04-15 | 2014-07-04 | 이강수 | Composite pile with end bearing capacity, friction capacity and construction method therefor |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018221781A1 (en) * | 2017-05-31 | 2018-12-06 | 한국전력공사 | Pile and construction method therefor |
CN107237319A (en) * | 2017-06-20 | 2017-10-10 | 中冶天工集团有限公司 | A kind of pile tube with post jacking Grouting Pipe and its construction method |
KR20230042867A (en) * | 2021-09-23 | 2023-03-30 | 박진규 | Helical pile construction method using extension boring |
KR102595736B1 (en) * | 2021-09-23 | 2023-10-31 | 박진규 | Helical pile construction method using extension boring |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101413593B1 (en) | Composite pile with end bearing capacity, friction capacity and construction method therefor | |
KR101928054B1 (en) | Construction method of retaining wall for underground structures with narrow edge space | |
JP4599384B2 (en) | Embankment structure and construction method thereof | |
KR101635529B1 (en) | Composite pile construction method | |
KR101855458B1 (en) | Composite pile | |
JP4901593B2 (en) | Underground bite type anchor and its anchor method | |
KR101377019B1 (en) | Reactive forcing device using guide rail and foundation reinforcing method therewith | |
KR101466068B1 (en) | Complex pile with improved end bearing capacity and piling method of complex pile using the same | |
JP2010121288A (en) | Pile rotating press-in method, and rotary press-in pile for use in the method | |
KR101489387B1 (en) | End supporting multi micro pile and method for constructing the same | |
JP5291578B2 (en) | Penetration anchor and its fixing method | |
KR101341176B1 (en) | Offshore pile-type support structure and construction method thereof | |
KR101138298B1 (en) | Anchor typed concrete filled pile and construction method using the same | |
KR101448145B1 (en) | Column Integrated Footing | |
KR101731535B1 (en) | Pre-loading apparatus for pile and pre-loading method using the same | |
KR102113859B1 (en) | Pile with head reinforcing device and method therefor | |
KR101473704B1 (en) | Soilnail with spring | |
JP5232601B2 (en) | 1 pillar 1 pile type foundation structure and its construction method | |
KR102018140B1 (en) | A micro-pile and the method | |
KR101362173B1 (en) | Fold type anchor reactive device and pile construction method therewith | |
KR101395828B1 (en) | Pile anchoring apparatus using support pipe and foundation reinforcing method therewith | |
KR101118318B1 (en) | Helix pile using stopper and construction method using the same | |
KR101148815B1 (en) | Composite pile connected inner connecting member and composite construction method using the same | |
JP2014020017A (en) | Pile head structure and construction method for the same | |
KR20180131042A (en) | Pile and method for constucting same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20190612 Year of fee payment: 4 |