KR101604221B1 - Debris Barrier - Google Patents

Debris Barrier Download PDF

Info

Publication number
KR101604221B1
KR101604221B1 KR1020150031348A KR20150031348A KR101604221B1 KR 101604221 B1 KR101604221 B1 KR 101604221B1 KR 1020150031348 A KR1020150031348 A KR 1020150031348A KR 20150031348 A KR20150031348 A KR 20150031348A KR 101604221 B1 KR101604221 B1 KR 101604221B1
Authority
KR
South Korea
Prior art keywords
dam
screen
shoulder
support
groove
Prior art date
Application number
KR1020150031348A
Other languages
Korean (ko)
Inventor
최낙현
장중기
Original Assignee
장중기
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 장중기 filed Critical 장중기
Priority to KR1020150031348A priority Critical patent/KR101604221B1/en
Application granted granted Critical
Publication of KR101604221B1 publication Critical patent/KR101604221B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02Fixed barrages
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02Fixed barrages
    • E02B7/04Dams across valleys
    • E02B7/08Wall dams
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B5/00Artificial water canals, e.g. irrigation canals
    • E02B5/08Details, e.g. gates, screens
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02Fixed barrages
    • E02B7/04Dams across valleys
    • E02B7/08Wall dams
    • E02B7/14Buttress dams
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B8/00Details of barrages or weirs ; Energy dissipating devices carried by lock or dry-dock gates
    • E02B8/02Sediment base gates; Sand sluices; Structures for retaining arresting waterborne material
    • E02B8/023Arresting devices for waterborne materials

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Revetment (AREA)

Abstract

The present invention relates to a debris barrier comprising: a barrier bottom surface part which is formed on the bottom surface of a river; a pair of barrier shoulder parts which are standing on the barrier bottom surface part to be separated in a widthwise direction of a river and respectively form supporting surfaces in opposing areas; and a screen part which is installed between the barrier bottom surface part to be disposed along a direction of connecting the supporting surfaces. A pair of barrier shoulder parts have shoulder supporting grooves which start from the top of the supporting surfaces and have lengths shorter than the heights of the supporting surfaces towards the barrier bottom surface part. The barrier bottom surface part has multiple bottom supporting grooves to be aligned in the widthwise direction of a river. The screen part has a wide width screen part which is connected to the top of a narrow width screen part to protrude to both sides of the narrow width screen part. The narrow width screen part has a longitudinal rod member and a transverse rod member coupled to each other to form the shape of a lattice. The top of the longitudinal rod member which belongs to the narrow width screen part is inserted into the bottom supporting grooves. Both sides of the wide width screen part are installed in the shoulder supporting grooves from an upper side. Therefore, the screen part can be supported by the barrier shoulder part and the barrier bottom surface part, and easily form shoulder supporting grooves.

Description

사방댐{Debris Barrier}Debris Barrier

본 발명은 사방댐에 관한 것으로서, 보다 상세하게는 나무, 암석 등이 하천 하류로 이동하는 것을 방지하기 위해 하천 상류에 설치되는 댐에 관한 것이다.More particularly, the present invention relates to a dam installed upstream of a river to prevent trees, rocks, and the like from moving downstream.

집중호우 등에 의해 하천 상류의 물이 갑자기 증가하게 되면 나무, 암석 등이 유실되어 하천하류로 이동하게 된다. Sudden increase in the water upstream of the river caused by heavy rains causes trees, rocks, etc. to be lost and move to the downstream of the river.

나무, 암석 등이 유실되어 하천하류로 이동하면, 하천 주위의 건축물, 교통망, 농경지에 피해가 발생할 염려가 있기 때문에 나무, 암석 등이 하천 하류로 이동하는 것을 방지하기 위해 하천 상류에 사방댐을 설치하는 방법이 안출되어 사용되고 있다.Trees, rocks, etc. are lost and moving to the downstream of the river, there is a risk of damage to buildings, transportation networks and agricultural lands around the river. Therefore, in order to prevent trees and rocks from moving to the downstream of the river, Methods have been used and are being used.

도13은 종래 사방댐의 사시도이고, 도14는 종래 사방댐의 분해사시도이고, 도15는 종래 사방댐의 설치상태도이다.FIG. 13 is a perspective view of a conventional four-way dam, FIG. 14 is an exploded perspective view of a conventional four-way dam, and FIG.

종래의 사방댐은, 이들 도면에 도시된 바와 같이, 하천바닥면에 형성된 댐바닥면부(121)와, 하천의 폭방향을 따라 이격되도록 댐바닥면부(121)에 기립 형성된 한 쌍의 댐어깨부(110)와, 댐어깨부(110) 사이영역에 설치된 스크린부(130)를 갖고 있다.As shown in these drawings, the conventional four-way dam has a dam bottom surface portion 121 formed on a bottom surface of a river and a pair of dam shoulder portions 121 formed on the dam bottom surface portion 121 so as to be spaced apart along the width direction of the river 110 and a dam portion 130 provided in the area between the dam shoulder portions 110. [

댐바닥면부(121)는 콘크리트구조물 형태로 형성될 수 있다.The dam bottom surface portion 121 may be formed in the form of a concrete structure.

한 쌍의 댐어깨부(110)는 대향영역에 지지면(111)이 형성되어 있다.The pair of dam shoulder portions 110 are formed with support surfaces 111 in opposite areas.

지지면(111)은 상부영역에 배치된 경사지지면(111')과, 하부영역에 배치되고 댐바닥면부(121)에 대하여 대략 수직을 이루는 수직지지면(111")으로 분할되어 있다.The support surface 111 is divided into an inclined support surface 111 'disposed in the upper region and a vertical support surface 111' 'disposed in the lower region and substantially perpendicular to the dam bottom surface portion 121.

댐어깨부(110)는 콘크리트구조물 형태로 형성될 수 있다.The dam shoulder 110 may be formed in the form of a concrete structure.

한 쌍의 댐어깨부(110)에는 수직지지면(111")의 상단으로부터 시작하는 어깨지지홈(112)이 댐바닥면부(121)를 향해 형성되어 있다.The pair of dam shoulder portions 110 are formed with shoulder support grooves 112 starting from the upper end of the vertical support surface 111 " toward the bottom surface portion 121 of the dam.

어깨지지홈(112)은 수직지지면(111")의 상단으로부터 시작하여 댐바닥면부(121)에 인접하게 도달하는 길이구간을 갖는 프레임삽입홈부(112a)와, 프레임삽입홈부(112a)로부터 연장 형성된 네트통과홈부(112b)를 갖고 있다.The shoulder support groove 112 has a frame insertion groove portion 112a starting from the upper end of the vertical support surface 111 " and having a length section adjacent to the dam bottom surface portion 121, and a frame insertion groove portion 112b extending from the frame insertion groove portion 112a And has a net passage groove portion 112b formed therein.

네트통과홈부(112b)는 프레임삽입홈부(112a)보다 좁은 폭을 갖도록 상대방 어깨지지홈(112)을 향해 연장 형성되어 있다.The net passage groove portion 112b is formed so as to extend toward the other side shoulder support groove 112 so as to have a narrower width than the frame insertion groove portion 112a.

스크린부(130)는 상호 나란하게 배치된 한 쌍의 직선프레임(131)과, 한 쌍의 직선프레임(131)에 고정구(123)를 통해 두변이 고정되어 있는 스크린네트(132)를 갖고 있다.The screen unit 130 has a pair of linear frames 131 arranged side by side and a screen net 132 having two sides fixed to the pair of linear frames 131 through the fixing unit 123.

이러한 구성을 갖는 스크린부(130)는 한 쌍의 직선프레임(131)이 한 쌍의 댐어깨부(110)에 형성된 프레임삽입홈부(112a)에 삽입되고, 스크린네트(132)가 네트통과홈부(112b)를 통과하도록 설치된다.The screen unit 130 having such a configuration is configured such that the pair of linear frames 131 are inserted into the frame insertion groove portion 112a formed in the pair of dam shoulder portions 110 and the screen net 132 is inserted into the net passage groove portion 112b.

한편 종래의 사방댐은 도16에 도시된 바와 같이 하천의 폭이 큰 경우 한 쌍의 댐어깨부(110) 사이에 중간어깨부(110')를 하나 이상 설치하고 중간어깨부(110')에 어깨지지홈(112')을 형성하여 복수개의 스크린부(130)를 설치하는 방법으로 구성할 수 있다.As shown in FIG. 16, the conventional four-way dam has a structure in which at least one middle shoulder 110 'is provided between a pair of dam shoulder portions 110 when the width of the stream is large and a shoulder portion 110' And a plurality of screen units 130 may be provided by forming the support grooves 112 '.

그런데 종래의 사방댐에 따르면, 한 쌍의 직선프레임(131)이 한 쌍의 댐어깨부(110)에 형성된 프레임삽입홈부(112a)에 삽입되고 스크린네트(132)가 네트통과홈부(112b)를 통과하도록 스크린부(130)가 설치되기 때문에, 스크린부(130)는 한 쌍의 댐어깨부(110)에만 지지되고 댐바닥면부(121)에 지지되지 않는다는 문제점이 있었다.However, according to the conventional four-way dam, a pair of linear frames 131 are inserted into the frame insertion groove portion 112a formed in the pair of dam shoulder portions 110, and the screen net 132 passes through the net passage groove portion 112b The screen unit 130 is supported only by the pair of dam shoulders 110 and is not supported by the bottom surface 121 of the dam.

스크린부(130)가 댐바닥면부(121)에 지지되지 않으면 스크린부(130)에 가해지는 부유물과 하천수의 압력에 의해 스크린부(130)가 변형되거나 초기설치상태를 안정적으로 유지하기 어렵게 된다.Unless the screen unit 130 is supported on the bottom surface 121 of the dam, the screen unit 130 may be deformed or the initial installation state may not be stably maintained due to the pressure of the suspended water and the river water applied to the screen unit 130.

그리고 프레임삽입홈부(112a)보다 좁은 폭을 갖는 네트통과홈부(112b)를 상대방 어깨지지홈(112)을 향해 연장 형성해야 하고 댐바닥면부(121)에 인접하게 도달하는 길이구간을 갖도록 형성해야 하기 때문에 어깨지지홈(112)의 형성작업이 어렵다는 문제점이 있었다.The net passage groove portion 112b having a smaller width than the frame insertion groove portion 112a should be formed so as to extend toward the other side shoulder support groove 112 and have a length section that reaches the dam bottom surface portion 121 Therefore, there is a problem that it is difficult to form the shoulder support grooves 112.

관련 선행문헌으로는 대한민국 특허공개공보 2011-0045823호(공개일자: 2011년 5월 4일, 발명의 명칭 : 와이어네트 사방댐)가 있으며, 상기 선행 문헌에는 위에서 설명한 종래의 사방댐에 관한 기술이 개시되어 있다.As a related prior art, there is Korean Patent Laid-Open Publication No. 2011-0045823 (public date: May 4, 2011, entitled: Wire net Sambang Dam). In the above-mentioned prior art, have.

따라서 본 발명의 목적은, 스크린부가 한 쌍의 댐어깨부와 댐바닥면부에 지지될 수 있고 어깨지지홈을 용이하게 형성할 수 있도록 한 사방댐을 제공하는 것이다.SUMMARY OF THE INVENTION It is therefore an object of the present invention to provide a four-sided dam in which a screen portion can be supported on a pair of dam shoulder portions and a bottom surface portion of a dam, and a shoulder support groove can be easily formed.

상기 목적은, 본 발명에 따라, 하천바닥면에 형성된 댐바닥면부와, 하천의 폭방향을 따라 이격되도록 상기 댐바닥면부에 기립 형성되고 대향영역에는 지지면이 각각 형성되어 있으며 상기 지지면의 상단으로부터 시작하고 상기 지지면의 높이보다 작은 길이구간을 갖는 어깨지지홈이 상기 댐바닥면부를 향해 형성되어 있는 한 쌍의 댐어깨부와, 협폭스크린부와 상기 협폭스크린부의 양측으로 돌출되도록 상기 협폭스크린부의 상단에 연결된 광폭스크린부를 가지고 상기 지지면을 연결하는 방향을 따라 배치되도록 상기 댐어깨부 사이영역에 설치된 스크린부를 갖는 사방댐에 있어서, 상기 댐바닥면부는 상면에 복수개의 바닥지지홈이 상기 어깨지지홈에 하천 폭방향을 따라 정렬되도록 형성되어 있고; 상기 어깨지지홈은 상기 광폭스크린부가 상방향으로부터 진입할 수 있는 폭을 갖는 삽입홈부와, 상기 삽입홈부를 통과한 광폭스크린부가 하류측으로 이동할 수 있는 공간을 제공하도록 상기 삽입홈부로부터 상기 댐바닥면부를 향해 연장 형성된 안착홈부를 포함하고; 상기 협폭스크린부는 세로봉부재와 가로봉부재가 격자형태를 이루도록 상호 결합되어 형성되고; 상기 광폭스크린부는 적어도 하나의 가로봉부재를 갖도록 형성되고; 상기 스크린부는 상기 협폭스크린부에 속하는 세로봉부재의 하단이 상기 바닥지지홈에 삽입되고 상기 광폭스크린부의 양측이 상기 삽입홈부에 상방향으로부터 삽입된 후 상기 안착홈부에 안착되도록 설치되며; 상기 광폭스크린부에 속하는 가로봉부재를 하류측을 향해 가압하도록 상기 안착홈부의 각각에 설치되는 유동방지구를 포함하는 것을 특징으로 하는 사방댐에 의해 달성된다.According to an embodiment of the present invention, there is provided a dam bottom surface portion formed on a bottom surface of a river, an upstanding surface formed on the bottom surface portion of the dam so as to be spaced apart along the width direction of the river, And a shoulder support groove having a length section that is smaller than the height of the support surface is formed toward the bottom surface portion of the dam, and a pair of dam shoulder portions starting from the narrow screen portion and the narrow screen portion, And a screen portion provided in the area between the shoulders of the dam so as to be disposed along a direction connecting the support surfaces, wherein the bottom surface of the dam has a plurality of bottom support grooves on the upper surface thereof, The grooves being formed to be aligned along the stream width direction; Wherein the shoulder support groove has an insertion groove portion having a width allowing the wide screen portion to enter from the upper direction and a shoulder support portion extending from the insertion groove portion to the bottom surface portion of the dam so as to provide a space through which the wide- And a mounting groove portion extending toward the base portion; Wherein the narrow screen portion is formed by mutually joining the vertical bar member and the horizontal bar member to form a lattice shape; Wherein the wide screen portion is formed with at least one horizontal bar member; Wherein the screen unit is installed such that a lower end of a vertical bar member belonging to the narrow screen unit is inserted into the bottom support groove and both sides of the wide screen unit are inserted into the insertion groove unit from above and then seated in the seating groove unit; And a fluidized-bed area provided in each of the seating recessed portions so as to press the horizontal rod member belonging to the wide screen portion toward the downstream side.

삭제delete

삭제delete

또한 스크린부의 설치작업이 용이하고 스크린부를 용이하게 철거할 수 있도록, 상기 바닥지지홈은 상기 협폭스크린부에 속하는 세로봉부재보다 큰 단면적을 갖도록 형성되고; 일단이 밀폐된 관형태로 형성되고, 관내표면이 상기 바닥지지홈에 삽입된 협폭스크린부에 속하는 세로봉부재의 외표면에 접촉되도록 상기 바닥지지홈에 설치되는 지지관을 더 포함하고; 상기 지지관의 둘레영역에는 몰탈채움되는 것이 바람직하다.The bottom support groove is formed to have a cross sectional area larger than that of the vertical bar members belonging to the narrow screen portion so that the installation of the screen portion is easy and the screen portion can be easily removed; Further comprising: a support tube formed in the bottom support groove such that one end thereof is formed in a closed tube shape and the inner surface of the tube is in contact with the outer surface of the vertical bar member belonging to the narrow screen portion inserted into the bottom support groove; It is preferable that the peripheral region of the support tube is filled with molten metal.

또한 사방댐 설치영역의 하천폭에 맞추어 설치현장에서 스크린부를 조립할 수 있도록, 상기 스크린부는 다수개의 분할스크린부분을 형성한 후 상기 분할스크린부분 상호간을 볼트체결하여 형성되는 것이 바람직하다.In addition, it is preferable that the screen portion is formed by forming a plurality of divided screen portions and then bolting the divided screen portions to each other so that the screen portion can be assembled at the installation site in accordance with the river width of the installation area of the square.

따라서 본 발명에 따르면, 지지면의 상단으로부터 시작하고 지지면의 높이보다 작은 길이구간을 갖는 어깨지지홈을 한 쌍의 댐어깨부에 형성하고 복수개의 바닥지지홈을 어깨지지홈에 하천 폭방향을 따라 정렬되도록 댐바닥면부에 형성하는 한편, 협폭스크린부와 협폭스크린부의 상단에 연결된 광폭스크린부를 갖도록 스크린부를 형성하고 협폭스크린부에 속하는 세로봉부재의 하단이 바닥지지홈에 삽입되고 광폭스크린부의 양측이 어깨지지홈에 삽입되도록 스크린부를 설치함으로써, 스크린부가 한 쌍의 댐어깨부와 댐바닥면부에 지지될 수 있고 어깨지지홈을 용이하게 형성할 수 있게 된다. 스크린부가 댐바닥면부에 지지되면 스크린부에 가해지는 부유물과 하천수의 압력에 의해 스크린부가 변형되는 것을 방지할 수 있고 초기설치상태를 안정적으로 유지할 수 있게 된다.Therefore, according to the present invention, a shoulder support groove starting from the upper end of the support surface and having a length smaller than the height of the support surface is formed in a pair of dam shoulder portions, and a plurality of bottom support grooves are formed in the shoulder support groove The screen portion is formed so as to have the narrow screen portion and the wide screen portion connected to the upper end of the narrow screen portion, the lower end of the vertical bar member belonging to the narrow screen portion is inserted into the bottom support groove, By providing the screen portion to be inserted into the shoulder support groove, the screen portion can be supported by the pair of dam shoulder portions and the bottom surface portion of the dam, and the shoulder support groove can be easily formed. When the screen is supported on the bottom surface of the dam, it is possible to prevent the screen from being deformed by the pressure of the suspended water and the river water applied to the screen, and the initial installation state can be stably maintained.

도1은 본 발명의 실시예에 따른 사방댐의 사시도,
도2 및 도3은 각각 본 발명의 실시예에 따른 사방댐의 스크린부와 유동방지구를 도시한 도면,
도4는 본 발명의 실시예에 따른 사방댐의 유동방지구를 도시한 도면,
도5는 본 발명의 실시예에 따른 사방댐의 종단면도,
도6은 본 발명의 실시예에 따른 사방댐의 설치상태도,
도7, 도8, 도9, 도10, 도11 및 도12는 각각 본 발명의 실시예에 따른 사방댐의 스크린부를 설치하는 방법을 도시한 도면,
도13은 종래 사방댐의 사시도,
도14는 종래 사방댐의 분해사시도,
도15는 종래 사방댐의 설치상태도,
도16은 종래의 다른 사방댐의 사시도이다.
1 is a perspective view of a four-way dam according to an embodiment of the present invention,
FIG. 2 and FIG. 3 are diagrams illustrating a screen portion and a fluidizing chamber of a four-way dam according to an embodiment of the present invention, respectively;
4 is a view showing a fluidized-bed district of a four-way dam according to an embodiment of the present invention,
5 is a longitudinal sectional view of a four-way dam according to an embodiment of the present invention,
Fig. 6 is an installation state of the four-way dam according to the embodiment of the present invention,
7, 8, 9, 10, 11, and 12 are views showing a method of installing a screen portion of a four-way dam according to an embodiment of the present invention,
13 is a perspective view of a conventional four-
14 is an exploded perspective view of a conventional four-
Fig. 15 is a state in which the conventional four-
16 is a perspective view of another conventional four-way dam.

이하에서, 첨부도면을 참조하여 본 발명을 상세히 설명하기로 한다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

도1은 본 발명의 실시예에 따른 사방댐의 사시도이고, 도2 및 도3은 각각 본 발명의 실시예에 따른 사방댐의 스크린부와 유동방지구를 도시한 도면이고, 도4는 본 발명의 실시예에 따른 사방댐의 유동방지구를 도시한 도면이고, 도5는 본 발명의 실시예에 따른 사방댐의 종단면도이고, 도6은 본 발명의 실시예에 따른 사방댐의 설치상태도이다.FIG. 1 is a perspective view of a four-way dam according to an embodiment of the present invention. FIG. 2 and FIG. 3 are views showing a screen portion and an upward flow region of a four-way dam according to an embodiment of the present invention, FIG. 5 is a vertical sectional view of a four-way dam according to an embodiment of the present invention, and FIG. 6 is an installation state view of a four-way dam according to an embodiment of the present invention.

본 발명의 실시예에 따른 사방댐은, 이들 도면에 도시된 바와 같이, 하천바닥면에 형성된 댐바닥면부(21)와, 하천의 폭방향을 따라 이격되도록 댐바닥면부(21)에 기립 형성된 한 쌍의 댐어깨부(10)와, 댐어깨부(10) 사이영역에 설치된 스크린부(30)와, 댐바닥면부(21)에 설치된 지지관(24)과, 댐어깨부(10)에 설치된 유동방지구(40)를 갖고 있다.As shown in these figures, the four-way dam according to the embodiment of the present invention includes a dam bottom surface portion 21 formed on a bottom surface of a river, and a pair of standing portions formed on the bottom surface portion 21 of the dam so as to be spaced apart along the width direction of the river A screen 30 provided in the area between the dam shoulder 10 and the dam shoulder 10, a support pipe 24 provided on the dam bottom 21, And an east region 40.

댐바닥면부(21)는 상면에 복수개의 바닥지지홈(21a)이 후술하는 어깨지지홈(12)에 하천 폭방향을 따라 정렬되도록 형성되어 있다.The bottom surface portion 21 of the dam is formed with a plurality of bottom support grooves 21a on the upper surface thereof so as to be aligned with the shoulder support grooves 12 described later along the stream width direction.

댐바닥면부(21)는 콘크리트구조물 형태로 형성될 수 있다.The dam bottom surface portion 21 may be formed in the form of a concrete structure.

바닥지지홈(21a)은 후술하는 협폭스크린부(31)에 속하는 세로봉부재(33)보다 큰 단면적을 갖도록 형성되어 있다.The bottom support groove 21a is formed to have a cross sectional area larger than that of the vertical bar member 33 belonging to the narrow screen portion 31 described later.

그리고 바닥지지홈(21a)에는 일단이 밀폐된 관형태의 보호관(23)이 설치되어 있다. 보호관(23)의 설치는 생략할 수 있다.The bottom support groove 21a is provided with a tube-shaped protection tube 23 which is closed at one end. The installation of the protective pipe 23 may be omitted.

한 쌍의 댐어깨부(10)는 대향영역에 지지면(11)이 형성되어 있다.A pair of dam shoulder portions (10) has a support surface (11) formed in an opposite region.

댐어깨부(10)는 콘크리트구조물 형태로 형성될 수 있다.The dam shoulder 10 may be formed in the form of a concrete structure.

지지면(11)은 상부영역에 배치된 경사지지면(11')과, 하부영역에 배치되고 댐바닥면부(21)에 대하여 대략 수직을 이루는 수직지지면(11")으로 분할되어 있다.The support surface 11 is divided into an inclined support surface 11 'disposed in the upper region and a vertical support surface 11' 'disposed in the lower region and substantially perpendicular to the bottom surface 21 of the dam.

그리고 한 쌍의 댐어깨부(10)에는 경사지지면(11')의 상단으로부터 시작하고 지지면(11)의 높이보다 작은 길이구간을 갖는 어깨지지홈(12)이 댐바닥면부(21)를 향해 형성되어 있다.In the pair of dam shoulder portions 10, a shoulder support groove 12 starting from the upper end of the inclined support surface 11 'and having a length smaller than the height of the support surface 11 is directed toward the dam bottom surface portion 21 Respectively.

어깨지지홈(12)은 삽입홈부(12a)와, 삽입홈부(12a)로부터 댐바닥면부(21)를 향해 연장 형성된 안착홈부(12b)를 갖고 있다.The shoulder support groove 12 has an insertion groove 12a and a seating groove 12b extending from the insertion groove 12a toward the bottom surface 21 of the dam.

삽입홈부(12a)는 광폭스크린부(32)가 상방향으로부터 진입할 수 있는 폭을 갖는다.The insertion groove portion 12a has a width allowing the wide screen portion 32 to enter from above.

안착홈부(12b)는 삽입홈부(12a)를 통과한 광폭스크린부(32)가 하류측으로 이동할 수 있는 공간을 제공하도록 형성된다. 이에 따라 안착홈부(12b)와 삽입홈부(12a)와의 사이에는 스크린부(30)가 바닥지지홈(21a)으로부터 이탈하는 것을 방지할 수 있는 걸림턱이 형성된다.The seating groove portion 12b is formed to provide a space through which the wide screen portion 32 having passed through the insertion groove portion 12a can move to the downstream side. Thus, a latching protrusion is formed between the seating groove portion 12b and the insertion groove portion 12a to prevent the screen portion 30 from separating from the bottom support groove 21a.

스크린부(30)는 협폭스크린부(31)와, 협폭스크린부(31)의 양측으로 돌출되도록 협폭스크린부(31)의 상단에 연결된 광폭스크린부(32)를 갖고 있다.The screen unit 30 has a narrow screen unit 31 and a wide screen unit 32 connected to the upper end of the narrow screen unit 31 so as to protrude from both sides of the narrow screen unit 31.

협폭스크린부(31)와 광폭스크린부(32)를 형성하는 과정을 설명하면 다음과 같다.The process of forming the narrow screen portion 31 and the wide screen portion 32 will be described below.

먼저 세로봉부재(33)와 가로봉부재(34)를 사용하여 다수개의 분할스크린부분(35)을 형성한다. 분할스크린부분(35)은 직경을 달리하는 두 종류의 가로봉부재(34)와 하나의 직경을 갖는 세로봉부재(33)를 사용하고 있다. 가로봉부재(34)와 세로봉부재(33)는 강관 등을 사용할 수 있다.First, a plurality of divided screen portions 35 are formed by using the vertical bar member 33 and the horizontal bar member 34. [ The divided screen portion 35 uses two kinds of bar member 34 having different diameters and a vertical bar member 33 having one diameter. Steel pipe or the like can be used for the bar member 34 and the vertical bar member 33.

그리고 각 분할스크린부분(35)은 연결플랜지(35a)를 갖도록 형성된다.And each divided screen portion 35 is formed with a connecting flange 35a.

다음에 연결플랜지(35a) 상호간을 볼트체결한다.Next, the connection flanges 35a are bolted together.

지지관(24)은 일단이 밀폐된 관형태로 형성되어 있다.The support tube 24 is formed in a closed tube shape at one end.

지지관(24)은 관내표면이 바닥지지홈(21a)에 삽입된 협폭스크린부(31)에 속하는 세로봉부재(33)의 외표면에 접촉되도록 바닥지지홈(21a)에 설치된다.The support tube 24 is installed in the bottom support groove 21a such that the inner surface of the support tube 24 contacts the outer surface of the vertical bar member 33 belonging to the narrow screen portion 31 inserted into the bottom support groove 21a.

그리고 지지관(24)의 둘레영역, 즉 지지관(24)과 보호관(23)의 사이에는 몰탈채움된다.And is buried in the peripheral region of the support pipe 24, that is, between the support pipe 24 and the protective pipe 23.

유동방지구(40)는 상호 나란하게 배치된 4개의 가압판(41)과, 4개의 가압판(41)을 연결하는 수평지지판(42), 수직지지판(43) 및 보조지지판(44)을 갖고 있다.The fluidized-bed district 40 has four pressing plates 41 arranged in parallel to each other and a horizontal supporting plate 42 connecting the four pressing plates 41, a vertical supporting plate 43 and an auxiliary supporting plate 44.

가압판(41)에는 원호형태의 압착면이 형성되어 있다.A pressing surface of an arc shape is formed on the pressure plate (41).

이러한 구성을 갖는 유동방지구(40)는 가압판(41)에 형성된 압착면이 광폭스크린부(32)에 속하는 최상위 가로봉부재(34)에 수평지지판(42)을 통해 볼트결합된다.In the fluidized-bed district 40 having such a configuration, the pressing surface formed on the pressing plate 41 is bolted to the uppermost bar member 34 belonging to the wide-width screen unit 32 through the horizontal supporting plate 42.

여기서 유동방지구(40)의 결합은 광폭스크린부(32)에 속하는 가로봉부재(34)를 하류측을 향해 가압하도록 이루어진다.Here, the engagement of the fluidized-bedward region 40 is made to press the bar-shaped member 34 belonging to the wide-width screen portion 32 toward the downstream side.

전술한 구성을 갖는 스크린부(30), 유동방지구(40), 보호관(23) 및 지지관(24)을 설치하는 방법을 도7 내지 도11을 참조하여 설명하면 다음과 같다.The method of installing the screen unit 30, the fluidized-bed 40, the protective tube 23, and the support tube 24 having the above-described configuration will be described with reference to FIGS. 7 to 11. FIG.

먼저 바닥지지홈(21a)에 보호관(23)을 설치한다(도7 참조).First, a protective pipe 23 is installed in the bottom support groove 21a (see Fig. 7).

다음에 협폭스크린부(31)에 속하는 세로봉부재의 하단에 지지관(24)을 삽입한다(도8 참조).Next, the support tube 24 is inserted into the lower end of the vertical bar member belonging to the narrow screen portion 31 (see Fig. 8).

다음에 협폭스크린부(31)에 속하는 세로봉부재의 하단에 삽입된 지지관(24)이 바닥지지홈(21a)의 바닥면에 지지되고 광폭스크린부(32)의 양측이 삽입홈부(12a)에 상방향으로부터 삽입되도록 스크린부(30)를 설치한다(도8 참조). 여기서 스크린부(30)의 설치는 크레인 등을 사용할 수 있다.The support tube 24 inserted into the lower end of the vertical bar member belonging to the narrow screen portion 31 is supported on the bottom surface of the bottom support groove 21a and both sides of the wide screen portion 32 are inserted into the insertion groove portion 12a, The screen unit 30 is installed so as to be inserted upwardly (see Fig. 8). Here, a crane or the like can be used for the installation of the screen unit 30. [

다음에 삽입홈부(12a)를 통과한 광폭스크린부(32)를 하류측으로 이동시킨다(도9 참조).Next, the wide screen portion 32 having passed through the insertion groove portion 12a is moved to the downstream side (see Fig. 9).

다음에 유동방지구(40)를 광폭스크린부(32)에 속하는 최상위 가로봉부재(34)에 결합한다(도10 참조).Next, the moving diaphragm 40 is joined to the uppermost bar member 34 belonging to the wide screen portion 32 (see Fig. 10).

마지막으로 지지관(24)과 보호관(23) 사이 영역에 몰탈(22)을 채운다(도11 참조).Finally, the mortar 22 is filled in the area between the support pipe 24 and the protective pipe 23 (see FIG. 11).

그리고 유지보수 등을 위해 스크린부(30)를 철거하는 방법을 도12를 참조하여 설명하면 다음과 같다.A method of removing the screen unit 30 for maintenance or the like will be described with reference to FIG.

먼저 유동방지구(40)를 제거한다.First, the moving diaphragm 40 is removed.

다음에 광폭스크린부(32)와 협폭스크린부(31)와 광폭스크린부(32) 사이에 있는 연결플랜지(35a)의 볼트체결을 해체한다.Next, the bolt fastening of the connection flange 35a between the wide screen portion 32 and the narrow screen portion 31 and the wide screen portion 32 is disassembled.

다음에 광폭스크린부(32)를 상방향으로 들어올려 철거한다.Next, the wide screen unit 32 is lifted up and removed.

마지막으로 협폭스크린부(31)를 상방향으로 들어올려 철거한다.Finally, the narrow screen portion 31 is lifted upwards and removed.

한편 전술한 실시예에서는 한 쌍의 댐어깨부(10) 사이에 하나의 스크린부(30)를 설치하고 있으나, 도16에 도시된 종래의 사방댐과 같이 하천의 폭이 큰 경우 한 쌍의 댐어깨부(10) 사이에 중간어깨부를 하나 이상 설치하고 중간어깨부에 어깨지지홈을 형성하여 복수개의 스크린부(30)를 설치하는 방법으로 구성할 수 있다.On the other hand, in the above-described embodiment, one screen portion 30 is provided between the pair of dam shoulder portions 10. However, when the width of the river is large as in the conventional four- A plurality of screen portions 30 may be provided by providing at least one middle shoulder portion between the upper and lower portions 10 and forming a shoulder holding groove in the middle shoulder portion.

그리고 전술한 실시예에서는 광폭스크린부(32)를 격자 형태로 형성하고 있으나, 하나의 가로봉부재(34)만을 갖도록 광폭스크린부(32)를 형성하여 본 발명을 실시할 수 있다.Although the wide screen unit 32 is formed in a lattice form in the above-described embodiment, the present invention can be implemented by forming the wide screen unit 32 so as to have only one bar member 34.

상술한 바와 같이 본 발명의 실시예에 따르면, 지지면(11)의 상단으로부터 시작하고 지지면(11)의 높이보다 작은 길이구간을 갖는 어깨지지홈(12)을 한 쌍의 댐어깨부(10)에 형성하고 복수개의 바닥지지홈(21a)을 어깨지지홈(12)에 하천 폭방향을 따라 정렬되도록 댐바닥면부(21)에 형성하는 한편, 협폭스크린부(31)와 협폭스크린부(31)의 상단에 연결된 광폭스크린부(32)를 갖도록 스크린부(30)를 형성하고 협폭스크린부(31)에 속하는 세로봉부재(33)의 하단이 바닥지지홈(21a)에 삽입되고 광폭스크린부(32)의 양측이 어깨지지홈(12)에 삽입되도록 스크린부(30)를 설치함으로써, 스크린부(30)가 한 쌍의 댐어깨부(10)와 댐바닥면부(21)에 지지될 수 있고 어깨지지홈(12)을 용이하게 형성할 수 있게 된다.As described above, according to the embodiment of the present invention, the shoulder support groove 12 starting from the upper end of the support surface 11 and having a length smaller than the height of the support surface 11 is divided into a pair of dam shoulder portions 10 The plurality of bottom support grooves 21a are formed in the bottom surface portion 21 of the dam so as to be aligned with the shoulder support grooves 12 along the stream width direction while the narrow screen portion 31 and the narrow screen portion 31 The lower end of the vertical bar member 33 belonging to the narrow screen portion 31 is inserted into the bottom support groove 21a and the wide screen member 32 is inserted into the wide screen portion 32. [ The screen portion 30 can be supported by the pair of dam shoulder portions 10 and the dam bottom surface portion 21 by providing the screen portion 30 so that both sides of the dam portion 32 are inserted into the shoulder support groove 12. [ So that the shoulder support groove 12 can be easily formed.

스크린부(30)가 댐바닥면부(21)에 지지되면 스크린부(30)에 가해지는 부유물과 하천수의 압력에 의해 스크린부(30)가 변형되는 것을 방지할 수 있고 초기설치상태를 안정적으로 유지할 수 있게 된다.When the screen unit 30 is supported on the bottom surface 21 of the dam, it is possible to prevent the screen unit 30 from being deformed by the pressure of the suspended matters and the river water applied to the screen unit 30, .

그리고 광폭스크린부(32)가 하류측으로 이동할 수 있는 폭을 갖는 안착홈부(12b)를 갖도록 어깨지지홈(12)을 형성함으로써, 스크린부(30)가 바닥지지홈(21a)으로부터 이탈하는 것을 방지할 수 있게 된다.The shoulder support groove 12 is formed so as to have a seating groove 12b having a width capable of moving the wide screen portion 32 to the downstream side to prevent the screen portion 30 from separating from the bottom support groove 21a .

또한 광폭스크린부(32)에 속하는 가로봉부재(34)를 하류측을 향해 가압하도록 유동방지구(40)를 설치함으로써, 안착홈부(12b)에 설치된 광폭스크린부(32)의 초기설치상태를 안정적으로 유지할 수 있게 된다.It is possible to stably maintain the initial installation state of the wide screen section 32 provided in the seating groove section 12b by providing the moving diaphragm 40 to press the bar member 34 belonging to the wide screen section 32 toward the downstream side . ≪ / RTI >

또한 관내표면이 바닥지지홈(21a)에 삽입된 협폭스크린부에 속하는 세로봉부재(33)의 외표면에 접촉되도록 지지관(24)을 설치하는 한편 지지관(24)의 둘레영역에 몰탈채움함으로써, 스크린부(30)의 설치작업이 용이하고 스크린부(30)를 용이하게 철거할 수 있게 된다.The support tube 24 is provided so that the inner surface of the tube is in contact with the outer surface of the vertical bar member 33 that belongs to the narrow screen portion inserted into the bottom support groove 21a, The installation of the screen unit 30 is facilitated and the screen unit 30 can be easily removed.

또한 다수개의 분할스크린부분(35)을 형성한 후 분할스크린부분(35) 상호간을 볼트체결하는 방법으로 스크린부(30)를 형성함으로써, 사방댐 설치영역의 하천폭에 맞추어 설치현장에서 스크린부(30)를 조립할 수 있게 된다.In addition, by forming the screen portion 30 by forming a plurality of divided screen portions 35 and bolt-fastening the divided screen portions 35 to each other, the screen portion 30 Can be assembled.

10, 110 : 댐어깨부 11, 111 : 지지면
12, 112 : 어깨지지홈 21, 121 : 댐바닥면부
22 : 몰탈 30, 130 : 스크린부
31 : 협폭스크린부 32 : 광폭스크린부
33 : 세로봉부재 34 : 가로봉부재
24 : 지지관 40 : 유동방지구
131 : 직선프레임 132 : 스크린네트
10, 110: dam shoulder portion 11, 111: support surface
12, 112: shoulder support grooves 21, 121: bottom surface of the dam
22: mortar 30, 130: screen portion
31: Narrow screen portion 32: Wide screen portion
33: vertical bar member 34:
24: Support tube 40: Milky way
131: Linear frame 132: Screen net

Claims (5)

삭제delete 삭제delete 하천바닥면에 형성된 댐바닥면부와, 하천의 폭방향을 따라 이격되도록 상기 댐바닥면부에 기립 형성되고 대향영역에는 지지면이 각각 형성되어 있으며 상기 지지면의 상단으로부터 시작하고 상기 지지면의 높이보다 작은 길이구간을 갖는 어깨지지홈이 상기 댐바닥면부를 향해 형성되어 있는 한 쌍의 댐어깨부와, 협폭스크린부와 상기 협폭스크린부의 양측으로 돌출되도록 상기 협폭스크린부의 상단에 연결된 광폭스크린부를 가지고 상기 지지면을 연결하는 방향을 따라 배치되도록 상기 댐어깨부 사이영역에 설치된 스크린부를 갖는 사방댐에 있어서,
상기 댐바닥면부는 상면에 복수개의 바닥지지홈이 상기 어깨지지홈에 하천 폭방향을 따라 정렬되도록 형성되어 있고;
상기 어깨지지홈은 상기 광폭스크린부가 상방향으로부터 진입할 수 있는 폭을 갖는 삽입홈부와, 상기 삽입홈부를 통과한 광폭스크린부가 하류측으로 이동할 수 있는 공간을 제공하도록 상기 삽입홈부로부터 상기 댐바닥면부를 향해 연장 형성된 안착홈부를 포함하고;
상기 협폭스크린부는 세로봉부재와 가로봉부재가 격자형태를 이루도록 상호 결합되어 형성되고;
상기 광폭스크린부는 적어도 하나의 가로봉부재를 갖도록 형성되고;
상기 스크린부는 상기 협폭스크린부에 속하는 세로봉부재의 하단이 상기 바닥지지홈에 삽입되고 상기 광폭스크린부의 양측이 상기 삽입홈부에 상방향으로부터 삽입된 후 상기 안착홈부에 안착되도록 설치되며;
상기 광폭스크린부에 속하는 가로봉부재를 하류측을 향해 가압하도록 상기 안착홈부의 각각에 설치되는 유동방지구를 포함하는 것을 특징으로 하는 사방댐.
A bottom surface portion of the dam formed on the bottom surface of the river and a supporting surface formed on the bottom surface portion of the dam so as to be spaced apart from each other along the width direction of the river and starting from the top of the supporting surface, A pair of dam shoulder portions having shoulder support grooves having a small length section formed toward the bottom surface portion of the dam; a wide screen portion connected to an upper end of the narrow screen portion so as to protrude from both sides of the narrow screen portion; And a screen portion provided in an area between the dam shoulder portions so as to be disposed along a direction connecting the support surfaces,
Wherein the bottom surface of the dam is formed with a plurality of bottom support grooves on the upper surface thereof aligned along the stream width direction in the shoulder support grooves;
Wherein the shoulder support groove has an insertion groove portion having a width allowing the wide screen portion to enter from the upper direction and a shoulder support portion extending from the insertion groove portion to the bottom surface portion of the dam so as to provide a space through which the wide- And a mounting groove portion extending toward the base portion;
Wherein the narrow screen portion is formed by mutually joining the vertical bar member and the horizontal bar member to form a lattice shape;
Wherein the wide screen portion is formed with at least one horizontal bar member;
Wherein the screen unit is installed such that a lower end of a vertical bar member belonging to the narrow screen unit is inserted into the bottom support groove and both sides of the wide screen unit are inserted into the insertion groove unit from above and then seated in the seating groove unit;
And a moving directional region provided in each of the seating groove portions so as to press the horizontal bar member belonging to the wide screen portion toward the downstream side.
제3항에 있어서,
상기 스크린부는 다수개의 분할스크린부분을 형성한 후 상기 분할스크린부분 상호간을 볼트체결하여 형성되는 것을 특징으로 하는 사방댐.
The method of claim 3,
Wherein the screen portion is formed by forming a plurality of divided screen portions and then bolting the divided screen portions to each other.
제4항에 있어서,
상기 바닥지지홈은 상기 협폭스크린부에 속하는 세로봉부재보다 큰 단면적을 갖도록 형성되고;
일단이 밀폐된 관형태로 형성되고, 관내표면이 상기 바닥지지홈에 삽입된 협폭스크린부에 속하는 세로봉부재의 외표면에 접촉되도록 상기 바닥지지홈에 설치되는 지지관을 더 포함하고;
상기 지지관의 둘레영역에는 몰탈채움되는 것을 특징으로 하는 사방댐.
5. The method of claim 4,
Wherein the bottom support groove is formed to have a larger cross-sectional area than the vertical bar members belonging to the narrow screen portion;
Further comprising a support tube formed in the bottom support groove such that one end is formed in a closed tube shape and the inner surface of the tube is in contact with the outer surface of the vertical bar member belonging to the narrow screen portion inserted into the bottom support groove;
And the peripheral region of the support pipe is filled with mortar.
KR1020150031348A 2015-03-06 2015-03-06 Debris Barrier KR101604221B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020150031348A KR101604221B1 (en) 2015-03-06 2015-03-06 Debris Barrier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020150031348A KR101604221B1 (en) 2015-03-06 2015-03-06 Debris Barrier

Publications (1)

Publication Number Publication Date
KR101604221B1 true KR101604221B1 (en) 2016-03-17

Family

ID=55651684

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020150031348A KR101604221B1 (en) 2015-03-06 2015-03-06 Debris Barrier

Country Status (1)

Country Link
KR (1) KR101604221B1 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007277972A (en) * 2006-04-10 2007-10-25 Nippon Steel & Sumikin Metal Products Co Ltd Erosion control dam bank and method of constructing it
JP2011214298A (en) * 2010-03-31 2011-10-27 Kobe Steel Ltd Permeable sand-preventing sluice

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007277972A (en) * 2006-04-10 2007-10-25 Nippon Steel & Sumikin Metal Products Co Ltd Erosion control dam bank and method of constructing it
JP2011214298A (en) * 2010-03-31 2011-10-27 Kobe Steel Ltd Permeable sand-preventing sluice

Similar Documents

Publication Publication Date Title
KR101648008B1 (en) Temporary bridge using precast truss assembly construction method
KR101518682B1 (en) Stripping Deck
JP2009174233A (en) Form device for rectangular column-shaped concrete structure, and construction method of rectangular-column-shaped concrete structure using it
MX2007008487A (en) Composite energy absorbing structure.
KR101808909B1 (en) Method for constructing connection structure of steel beam
KR101604221B1 (en) Debris Barrier
KR101388823B1 (en) Form device
KR100969429B1 (en) H beam wale
KR101539412B1 (en) Bridge disassemble method
KR101561262B1 (en) PSC I-type girder for easy maintenance and fall prevention
JP2014190116A (en) Construction method of concrete slab
JP5547269B2 (en) Split arch culvert and its construction method
KR200385967Y1 (en) main girder Structure of a temporary bridge
KR20180093360A (en) A quadrilateral lattice girder having high strength Spider
KR20130017378A (en) Earth plate of reformed sheet plate
KR100581386B1 (en) Truss combination equipment of knockdown light weight fabric
KR102055233B1 (en) Debris barrier and method for installing the same
JP7053222B2 (en) Installation structure of driftwood capture work
JP6285745B2 (en) Support structure for relocated brick wall
KR20140050813A (en) A terrace-revetment assembly and a construction process thereof
JP7211809B2 (en) Driftwood catcher, method for constructing driftwood catcher, and installation structure for driftwood catcher
KR101170256B1 (en) Floor Beam Connecting Structure for Protective Wall in Bridge
CN113174857B (en) Arched bridge is with construction hanging flower basket
KR101085674B1 (en) Steel lattice girder and constructing method using the same
KR20110060316A (en) Hanger-type steel pedestal

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
AMND Amendment
E601 Decision to refuse application
X091 Application refused [patent]
AMND Amendment
X701 Decision to grant (after re-examination)
N231 Notification of change of applicant
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20200305

Year of fee payment: 5