KR101520407B1 - A rail Guard fixing structure for prventing derailment and its procedure - Google Patents

A rail Guard fixing structure for prventing derailment and its procedure Download PDF

Info

Publication number
KR101520407B1
KR101520407B1 KR1020140119055A KR20140119055A KR101520407B1 KR 101520407 B1 KR101520407 B1 KR 101520407B1 KR 1020140119055 A KR1020140119055 A KR 1020140119055A KR 20140119055 A KR20140119055 A KR 20140119055A KR 101520407 B1 KR101520407 B1 KR 101520407B1
Authority
KR
South Korea
Prior art keywords
fixture
angle
rail
guard
vertical
Prior art date
Application number
KR1020140119055A
Other languages
Korean (ko)
Inventor
송수종
Original Assignee
송수종
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 송수종 filed Critical 송수종
Priority to KR1020140119055A priority Critical patent/KR101520407B1/en
Application granted granted Critical
Publication of KR101520407B1 publication Critical patent/KR101520407B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B5/00Rails; Guard rails; Distance-keeping means for them
    • E01B5/18Guard rails; Connecting, fastening or adjusting means therefor

Abstract

The present invention relates to a railway derailment which is easy to repair and which is constructed so as to fix a guard angle by easily assembling three fixed structures to the lower part of a base rail and to replace only the damaged part when a part of the fixed structure is broken, The present invention relates to a fixing structure for fixing a guard angle which is fixed to a basic rail of a curved section railway and prevents derailment of a railway train. The fixed structure includes a lower fixed body 10 and a vertical fixed body 10, One end of the lower fixture 10 is fixed to one side of the rail lower portion 1-1 of the basic rail 1, And the other end of the lower fixture 10 is detachably fixed to the lower end of the vertical fixture 20 so that the vertical fixture 20 fixes the other side of the lower rail 1-1, 20, the guard angle 5 is positioned at the upper end of the angle fixture 30, And is fixed to the vertical fixture 20 while being fixed thereto.

Description

Technical Field [0001] The present invention relates to a rail guard fixing structure for railway derailment prevention,

The present invention relates to a rail guard fixing structure for preventing railway derailment which can be easily repaired, and more particularly, to a rail guard fixing structure for easily fixing a guard angle by fixing three fastening structures, And more particularly, to a rail guard fixing structure for easily repairing a railway and a method for fixing the rail guard, which can be used by replacing only a damaged portion when a part of the fixed structure is broken.

The upper rail is provided with a flat upper plate on the lower side of the rail, which is provided on a generally curved portion of a known railway line. A rail brace for supporting and fixing one end of the rail is supported and fixed by a pen- And the guard rail is provided on the other side with a predetermined distance therebetween and is provided with a pen-and-roller clip.

In the conventional rail guard portion having such a configuration, a base rail is provided on an upper portion of a railway track, and a rail brace is disposed on one side of the rail, And the rail brace is fixed to the upper plate using a pen-and-roller clip.

On the other hand, the guard rail is located on the opposite side to the rail brace on the other side of the base rail and is spaced apart from the base rail by a predetermined distance, and then fixed with the pen rail clip. The wheels of the train are guided to the guard rails, and the basic rails, which receive a great deal of load and pressure, are held by the rail braces.

However, the speed and centrifugal force of the train are relatively strong at the curved portion of the line, and the train is pushed to the outside of the basic rail by the lateral pressure by the centrifugal force, thereby causing derailment and overturning of the train There are disadvantages.

Particularly, in order to stably guide the railway wheels of such a line-like curved portion, a separate guard rail is provided at one side of the basic rail, and the guard portion is complicated due to the rail brace being fastened to one side surface of the basic rail. It is difficult to manufacture and install the same, and the installation cost is increased.

In order to solve such a problem, in the Utility Model Registration Application No. 20-2000-0011580, it is not necessary to provide a separate guardrail on the curved portion of the railroad track, and the guard for preventing derailment of the train is installed and installed by installing the angle for the guardrail So that the installation cost can be reduced. In addition, the basic rail in contact with the wheels of the train is coupled and fixed in a rigid state so that the rail can be easily fixed to the rail by the centrifugal force of the train passing through the steep- The present invention provides a guard fastening apparatus for preventing derailment of a train which can prevent the train from being pushed outside of the curve and reduce the noise and vibration generated when the train is running, thereby improving ride comfort.

The guard fastening device will be described in detail. A rail fastening protrusion is formed on one side of a guard upper plate on which a curved rail is fixed. A clip fastening protrusion is provided on one side of a rail fastening protrusion, A guard rail is provided on the other side of the guard top plate with a guard body portion spaced apart from the rail by a predetermined distance. An angle for guard rails is provided on one side surface of the guard main portion by a coupling bolt, As shown in Fig.

However, since the angle for the guard rail is fixed to the guard main body fixed to the guard top plate directly fixed to the railroad tie, the fixing means is complicated and the rail is also fixed to the guard top plate. There is an inconvenience to do.

Generally, in the case of a subway line, a curved section with a radius of curvature of less than 200 meters, a curve section with a radius of curvature of less than 300 meters in the case of a railroad line, a point where a straight line and a curved line overlap, or a railroad derailment due to a high festival In places where the damage is considered to be large, where the curve and the longitudinal curve overlap, a safety guard rail is installed to prevent derailment. At this time, when the safety guard rail for the basic rail is installed, the width of the flangeway is required to be 80 mm, and the safety guard rail for the basic rail is required to maintain a height of 10 mm.

A base plate is fixed on a neck tie with a screw spike, and then one end of a clip having a predetermined shape is inserted into a groove formed in the base plate in a state where the base rail is seated on the base plate, The inside and outside of the rail are pressed and fixed.

At this time, a safety guard rail for preventing derailment is provided inside the base rail at a predetermined interval. The inner and outer sides of the safety guard rail are fixed directly to the neck tie by spikes of a predetermined shape pushed by a hammer or the like .

In the case of installing the safety guard rail for preventing derailment as described above, there is a problem that cost cost is increased by using a separate safety guard rail which is the same as that of the basic rail, and a problem that a predetermined height of the safety guard rail with respect to the basic rail, The safety guard rail can not be constructed in a concrete sleeper, and a problem in that the safety guardrail can not be installed in a concrete sleeper, (MTT) is used at the time of dismantling the safety guard rail.

Fig. 6 is a state view showing the state of use of the folding safety guard rail fastening device according to another prior art. As shown in the figure, a plurality of base plates are closely attached to the neck of the needle bar, and the screw spikes are respectively fixed at predetermined positions. Then, the base rail and the safety guard rail for preventing derailment located inside the base rail are mounted on a plurality of base plates One end of a clip having a predetermined shape is inserted into a groove formed in each base plate, and then the inner and outer sides of the base rail and the safety guard rail are respectively pressed and fixed.

In addition, since a plurality of base plates are fixed to the neck tie, there is a problem that workability is poor, and it is difficult to install the base rail so as to maintain a prescribed height and a predetermined interval of the safety guard rail with respect to the base rail, There is a problem that the safety guard rail can not be installed in the concrete sleepers.

FIG. 6 is a view showing another conventional state of use of a curved safety guard rail fastening device. FIG. As shown in the figure, the base plate is fixed to a predetermined position using a screw spike having a predetermined shape so that the base rail can be seated on the base rail with the safety guard rail for preventing the derailment from being distanced from the base rail, And the safety guard rail are placed on the base plate, one end of the clip having a predetermined shape is inserted into the groove formed in the rail and the base plate, and then the outer side of the base rail and the safety guard rail are pressed and fixed.

At this time, a groove is formed in the base plate at a position where the base rail inner side and the safety guard rail are in contact with each other. Then, the base rail and the inner guard of the safety guard rail are fixed by using a clip.

In addition, since the base rail and the safety guard rail are fixed by engaging the grooves formed in the base plate, workability is lowered due to an increase in the number of workings, a problem that the safety guard rail can not be constructed in the concrete sleepers , It is difficult to install the safety guard rail so as to maintain a prescribed height and a predetermined gap with respect to the base rail, thereby making it impossible to ensure safety.

In order to solve this problem, a safety guard angle fastening device of a patent application No. 12429 curve of 1999 and a place where a derailment of a train is feared was filed and disclosed.

In this application, as shown in FIG. 12, an engaging groove is formed in which a curved section having a predetermined radius of curvature and an inner bottom portion of a basic base rail 1 to be installed in a place where derailment of a train is likely to be fitted are fitted, A fastening holder 2 fixed to the basic base rail 1 by a fastening member for pressing and fixing the outer bottom of the base rail 1 is provided.

A safety guard angle (5) is provided inside the basic rail (1) and is coupled to the rail (2) so as to maintain a predetermined height and spacing with respect to the basic rail (1) The holder cup 4 is fixed by a fastening member so as to closely support the guard angle 5 against the fastening holder 2 and prevents the guard angle 5 from being detached from the fastening holder 2. [

The safety guard angle 5 for detachment prevention is detachably mounted in a prefabricated manner after the basic base rail 1 is applied on a neck tie or a concrete sleeper and the whole of the bottom surface of the tightening holder 2 And a grid-like rib having a direction perpendicular to the rail and an orthogonal direction to the rail are provided.

The fastening holder 2 is fixed such that the horizontal portion 2-2 of the basic base rail 1 is wrapped around the bottom portion and one end of the fastening holder 2 is formed with the protruding portion 2-3, And the other side of the fastening holder 2 is formed with a vertical part 2-1 and a guard angle 5 is positioned on the upper part of the fastening holder 2 so that the holder cup 2 4).

However, since the wheels of the train touch the guard angle 5 to prevent the guard angles 5 from being released, the load applied to the guard angle 5 is transmitted to the clamping holder 2, thereby causing a problem that the clamping holder 2 is damaged.

A crack may be generated in the stress concentration portion a which is a portion where the horizontal portion 2-2 of the fastening holder 2 and the vertical portion 2-1 meet and is damaged as shown in Fig. When the fastening holder 2 is broken in this way, the fastening holder 2 is damaged and needs to be replaced. However, it is difficult to separate the fastening holder 2 from the basic base rail 1 by the guard angles 5 fixed by the adjacent fastening holders There is a problem that it takes much time to replace.

Since the fastening holder 2 is made of a weight of the fastening holder 2 but is often broken due to a part of the fastening holder 2 which is frequently broken, there is a problem that the maintenance cost is increased. In addition, there is a problem that the workability is poor since the bolt nuts must be fastened on both sides of the fastening holder 2 with the basic base rail 1 interposed therebetween.

SUMMARY OF THE INVENTION It is an object of the present invention to solve the above-mentioned problems, and it is an object of the present invention to improve workability by fixing the guard-angle fixing structure to the basic rail only by one side of the basic rail.

In addition, if the load is applied to the fixed structure, even if the load is damaged, it is required to replace only the damaged part, thereby reducing the maintenance cost and reducing the material cost.

The fixed structure is divided into the lower fixed body and the vertical fixed body, and the concentrated portion of the stress is separated so as to reduce the damage. In addition, the portion where the stress is concentrated is fastened with the high tension bolt and the nut to reinforce the strength .

The reinforcing ribs of the lower fixture are formed by means of fixing the bolt head so as to have an excellent workability.

And the position of the perforation hole formed in the guard angle can be easily captured.

In addition to this, it is an object of the present invention to provide a method for easily working a structure by the above-mentioned object.

In order to achieve the above-mentioned object, the present invention provides a fixing structure for fixing a guard angle which is fixed to a basic rail of a curved railway to prevent derailment of a train, wherein a lower fixed body and a vertical fixed body One end of the lower fixture 10 is fixed to one side of the rail lower portion 1-1 of the basic rail 1 and the lower fixture 10 is fixed to the lower rail 1 of the rail 1. [ The other side end of the vertical fixing body 20 is detachably fixed to the lower end of the vertical fixing body 20 so that the vertical fixing body 20 fixes the other side of the lower rail 1-1, And the angled fixing body 30 is fixed to the vertical fixing body 20 while the guard angle 5 is positioned and the lower fixing body 10 is fixed to both ends of the horizontal portion 11, The vertical part 12 is formed with a latching groove 12-1 so as to be hooked to one side of the lower rail part 1-1 inwardly and the inclined part 13 And the vertical fixing body 20 is formed so that the fastening portion 22 is inclined at the same angle as the inclined portion 13 at the lower end of the body 21 so as to abut the inclined portion 13 And a fastening protrusion 22-2 is formed at the upper end of the fastening portion 22 so as to be in contact with the upper surface of the horizontal portion 11 of the lower fixture 10, And a guard groove 23 is formed on the outer surface of the main body 31 of the angle fixing body 30 so that the guard angle 5 is formed at the upper end of the main body 31 of the angle fixing body 30, And the insulating member 50 is provided between the rail lower portion 1-1 of the base rail 1 and the lower fixed body 10 and the vertical fixed body 20 The present invention provides a rail guard fixing structure for preventing railway derailment which is easy to repair.

The protrusion 33 is formed in the angle fixture 30 and the protrusion 33 is fitted in the perforation hole 5-1 formed in the guard angle 5 to fix the position of the guard angle 5, (40) is provided between a pair of reinforcing ribs (14) formed in the longitudinal direction on the bottom surface of the horizontal portion (11) on the right side of the lower fixture body (10) A gap between the reinforcing ribs 14 is formed such that the reinforcing ribs 14 are inserted and not rotated.

A method of fixing a rail guard comprising the lower fixture (10), the vertical fixture (20) and the angle fixture (30) (S1) of inserting the insulating member (50) so as to surround a part of the upper surface of both ends; One end of the rail lower portion 1-1 provided with the insulating member 50 is inserted into the engagement groove 12-1 of the lower fixture 10 and the head of the bolt 40 is inserted into the lower fixture 10, A lower fixture mounting step (S2) of bringing the horizontal portion (11) of the lower fixture (10) into close contact with the lower portion (1-1) of the rail while being sandwiched between the reinforcing ribs (14) The vertical fixture 20 is fixed to the lower fixture 10 closely attached to the rail lower portion 1-1 with the bolts 40 and the nuts and the retaining tab 22-2 of the vertical fixture 20 is fixed to the rail A vertical fixture fixing step S3 for pressing and fixing the other end of the lower portion 1-1;

The guard angle 5 is positioned in the guard seating groove 22-3 of the vertical fixture 20 and the angle of the guard angle 5 is set to be vertical An assembling step of an angle fixture (S4) for joining the fixture (20); The guard angle 5 is formed in the guard angle 5 so as to engage with the projection 33 of the angle fixture 30 and then the guard angle fixes the angle fixture 30 completely to the vertical fixture 20 The guard angle fixing step S5 includes a step of fixing the guard angle 5 between the lower fixture 10 and the vertical fixture 20 to temporarily fix the guard angle 5, Angle mounting step S51; A guard angle marking step (S52) of marking the guard angle (5) through a marking groove (23) formed on the upper end of the body (21) of the vertical fixture (20); A guard hole 5-1 is formed on the guard angle 5 in a vertical line at the marked position by separating the installed guard angle 5 and the length is measured from the lower end of the guard angle 5, A guard angle drilling step (S53) of forming a perforation hole (5-1) at a position where the protrusion (33) of the protrusion (33) is located; A guard angle in which the drilled guard angle 5 is put back between the vertical fixture 20 and the angle fixture 30 and the bolts passing through the angle fixture 30 and the vertical fixture 20 are fixed, An angle fixing step (S54); The present invention provides a rail guard fixing method for preventing easy railway derailment which is easy to repair.

In the present invention, when fixing the guard-angle fixing structure to the base rail, the fixing structure is divided into the lower fixing member and the vertical fixing member, and the portion with the highest load is separated, .

In addition, since the bolt fastening operation is performed at the portion having the vertical fixing body, the workability is increased.

Even if the load is applied to the fixed structure, it is not necessary to replace the entire fixed structure. Instead, it is possible to replace the damaged portion of the lower fixed body and the vertical fixed body in which the load is concentrated, .

Since the fixed structure is formed by dividing the lower fixed body and the vertical fixed body so that the portion where the stress is concentrated is separated and the inclined face is formed in the direction in which the stress is progressed in the separated portion, the damage of the fixed structure is reduced, The high tensile strength bolt and the nut are fastened to reinforce the strength against the fatigue strength and the stress load.

The bolt head is fixed to the reinforcing rib of the lower fixture, so that bolt fastening is easy even if there is no separate bolt head fastening means, and the fastening operation is completed at one side of the rail.

When the marking groove is formed at the upper end of the vertical fixture, the marking is performed in the marking groove, and if the marking is performed downward by the distance calculated by the vertical line, the perforation hole can be easily formed and the perforation hole can be formed.

A fastening method using such a fixing structure is provided, so that fastening and repairing are easy.

BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a perspective view showing a rail guard fixing structure for preventing railway derailment in accordance with the present invention. FIG.
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to rail guards,
FIG. 3 is an exploded perspective view of a rail guard fixing structure for preventing easy repairing of railway derailment according to the present invention, viewed from another direction. FIG.
4 is a sectional view showing a rail guard fixing structure for preventing easy repairing of railway derailment of the present invention.
FIG. 5 is a perspective view showing a final joined state of a rail guard fixing structure for preventing easy repairing of railway derailment of the present invention. FIG.
FIG. 6 is a perspective view showing a final engagement state of a rail guard fixing structure for preventing railway derailment which is easy to repair according to the present invention, in another direction. FIG.
FIG. 7 to FIG. 10 are perspective views sequentially showing a rail guard fixing method for preventing easy repairing of railway derailment according to the present invention. FIG.
11 is a flowchart showing a rail guard fixing method for preventing easy repairing of railway derailment according to the present invention.
Fig. 12 is a cross-sectional view showing a guard angle fastening holder of a conventional railway

Hereinafter, the structure and operation of the present invention will be described in more detail with reference to the accompanying drawings. In describing the present invention, terms and words used in the present specification and claims are to be construed in accordance with the principles of the present invention, on the basis that the inventor can properly define the concept of a term in order to best explain his invention It should be construed as meaning and concept consistent with the technical idea of.

The present invention relates to a fixing structure for fixing a guard angle which is fixed to a basic rail of a curved railway to prevent derailment of a train. The fixing structure of the present invention includes a lower fixture 10, a vertical fixture 20, The fixing body 30 is divided into three parts.

The lower fixture 10 and the vertical fixture 20 are fixedly coupled to each other at the rail lower inner end 1-1 and the outer end 1-2 of the base rail 1, Is fixed to the rail lower inner end (1-1) of the base rail (1).

The other end of the lower fixture 10 is detachably fixed to the lower end of the vertical fixture 20 so that the vertical fixture 20 fixes the lower end of the rail 1-2 and the vertical fixture 20 The guard angle 5 is fixed to the vertical fixed body 20 while the angle fixed body 30 is fixed to the vertical fixed body 20.

1 to 6, the lower fixture 10 includes a vertical portion 12 and an inclined portion 13 at both ends of the horizontal portion 11, and the vertical portion 12 is formed at an inner side And an engaging groove 12-1 is formed in the engaging groove 12-1 so as to be engaged with the lower rail inner end 1-1.

It is preferable that the inclined portion 13 is integrally formed to be inclined downward in the horizontal portion 11, and the inclination angle is inclined by 30 to 60 degrees in the horizontal direction. However, it does not have to belong to this range. The inclined portion 13 closely contacts the inclined portion 13 to disperse the load applied to the vertical fixture 20 to be fixed to the lower fixture at the lower end of the vertical fixture.

A pair of reinforcing ribs 14 are formed on the bottom surface of the horizontal portion 11 of the lower fixture 10 in the longitudinal direction and the reinforcing ribs 14 are formed so as to correspond to the force of the inclined portion 13 being pushed back, (13) is prevented from being broken. The reinforcing ribs 14 are used as bolt fastening means to form the gap between the reinforcing ribs 14 so that the heads of the bolts 40 are inserted between the reinforcing ribs 14 and are not rotated. These intervals can be designed according to the size of the bolt head used.

The vertical fixing body 20 is formed with a fastening portion 22 at the lower end of the body 21 and the fastening portion 22 is inclined at the same angle as the slanting portion 13 so as to abut the slanting portion 13 And is fixed with the bolt 40 and the nut.

The engaging step 22-2 is formed at the upper end of the fastening part 22 so as to abut the upper surface of the horizontal part 11 of the lower fixture 10 so that when the inclined part 13 and the fastening part 22 come into contact with each other, Thereby preventing the fixture 20 from sliding downward.

When the lower fixing body 10 and the vertical fixing body 20 are engaged with each other by forming the rail engaging protrusions 21-1 at the upper part integrally with the locking protrusions 22, (1 - 2) of the lower rail (1).

The guard seating groove 22-3 is formed on the outer surface of the upper end of the body 21 of the vertical fixed body 20 so that the lower end of the guard angle 5 is positioned and fixed to the angle fixed body 30. [
As described above, the inclined portion 13 and the fastening portion 22 of the present invention are arranged to face the lower rail outer end portion 1-2 of the base rail 1 and are inclined downward, And is detachably connected by a nut.
When the railway vehicle passes through the basic rail 1 of the curved section railway, the load is likely to be damaged by concentrating the load on the portion of the basic rail surrounding the rail lower outer end portion 1-2 by the centrifugal force. The lower fixing body 10 and the vertical fixing body 20 are provided so as to surround the lower rail outer end portion 1-2 of the base rail 1 by the holding body 10 and the vertical fixing body 20, (13) and a fastening portion (22).
Therefore, when the railway car passes through the basic rail 1 of the curved railway, the connecting portion between the lower fixed body 10 and the vertical fixed body 20, where loads are concentrated, can be separated and replaced, And can be replaced.

A marking groove 23 is formed at the upper end of the main body 31 of the angle fixture 30 so that the puncturing position of the guard angle 5 can be easily marked. That is, the guard angle 5 is a force to push the train in the traveling direction of the train while colliding with the train. To prevent this, the guard angle 5 is a means for fixing the position of the guard angle 5.

For this purpose, a perforation hole 5-1 is formed in the guard angle 5, and a protrusion for fixing the position of the guard angle 5 inserted into the perforation hole 5-1 is formed. Is formed in the angle fixing body (30) so as to prevent a part of the fixing structure from being broken and uncomfortable when being replaced.

The protrusion is formed on the angle fixture 30 and the guard angle 23 which is a means for forming the perforation hole 5-1 in the guard angle 5 is separately formed.

The method of forming the perforation hole in the guard angle 5 is lowered in a vertical line at the mark marked by the marking groove 34 and the perforation hole 5-1 is formed in the guard angle 5. At this time, the position where the perforation hole is formed on the vertical line is measured from the lower end of the guard angle 5 to form the perforation hole 5-1 at the position where the projection 33 of the angle fixture 30 is located.

Since the bolt hole 21-2 of the vertical fixing body 20 and the bolt hole 32 of the angle fixing body 30 are simultaneously passed through the bolt hole at the position where the projection 33 is positioned, . The length from the top of the bolt hole 32 to the protrusion 33 is measured and a value obtained by subtracting the length from the bolt hole 21-2 of the vertical fixture 20 to the guard seating groove 22-3 is determined . It is only necessary to perforate the guard angle 5 at a position vertically upwards from the lower end thereof.

An insulating member 50 is provided between the lower rail 1-1 of the basic rail 1 and the lower fixed member 10 and the vertical fixed member 20. The insulating member 50 is made of rubber, You can use one of those sold on the market.

The protrusion 33 formed on the angle fixture 30 is fitted in the perforation hole 5-1 formed in the guard angle 5 to fix the position of the guard angle 5 and the protrusion 33 is fixed to the angle fixture 5 When the angle fixture 30 formed on the upper surface 30 and separated easily is separated, the protrusion 33 does not interfere with assembly or replacement.

When the guard angle is fixed by such a fixed structure, the lower fixture 10 or the vertical fixture 20 is damaged by continuous force. In this case, only the damaged portion is replaced without replacing the entirety do.

That is, when the vertical fixture 20 is broken, the angle fixture 30 is released and separated from the guard angle 5, and then some surrounding portions of the broken portion are loosened to secure the flow distance of the guard angle 5 The bolts 40 joining the lower fixture 10 and the vertical fixture 20 are loosened. When the vertical fixture 20 is damaged by a wooden hammer or the like, the vertical fixture 20 can be removed from the guard angle 5 and replaced with a new component.

In the prior art, it is very inconvenient that the guard angles can be separated and replaced.

A method of installing the guard angle 5 on the base rail 1 using such a fixing structure is shown in Fig. 7 to Fig. 10 in sequence, and Fig. 11 is a flowchart thereof.

A lower fixture (10), a vertical fixture (20), and an angle fixture (30) according to claim 1 are provided, and the rail guard is fixed.

The insulating member 50 is installed so as to surround the lower rail inner end portion 1-1, the rail lower outer end portion 1-2 and the lower rail bottom of the basic rail 1 in the insulating member mounting step S1.

In the lower fixture mounting step S2, the lower rail inner end portion 1-1 provided with the insulating member 50 is inserted into the engagement groove 12-1 of the lower fixture 10, and the bolts 40 The horizontal portion 11 of the lower fixture 10 is brought into close contact with the lower rail inner end portion 1-1 and the lower rail bottom surface while the head of the lower fixture 10 is sandwiched between the reinforcing ribs 14 of the lower fixture 10 .

The vertical fixing body 20 is fixed to the lower fixing body 10 which is in close contact with the lower rail inner end 1-1 and the lower rail bottom of the rail by bolts 40 And the fixing jaw 22-2 of the vertical fixing body 20 presses and fixes the lower rail outer end portion 1-2.

The guard angle 5 is placed in the guard seating groove 22-3 of the vertical fixed body 20 and the guard angle 5 is moved in the guard seating groove 22-3 Thereby temporarily bonding the angle fixture 30 and the vertical fixture 20 without deviation. At this time, the angle fixture 30 is not completely fixed but the guard angle 5 is inserted and the position is fixed.

A hole 5-1 is formed in the guard angle 5 in the guard angle fixing step S5 so as to engage with the projection 33 of the angle fixing body 30 and then the angle fixing body 30 is fixed to the vertical fixing body 20 ). The guard angle fixing step S5 includes a guard angle setting step S51, a guard angle marking step S52, a guard angle punching step S52, (S53), and a guard angle and an angle fixture fixing step (S54).

The guard angle 5 is temporarily fixed between the plurality of lower fixtures 10 and the vertical fixture 20 in the guard angle mounting step S51 and the vertical fixture 20 And the marking groove 23 formed on the upper end of the body 21 of the main body 21. At this time, a nail or the like is inserted along the marking groove 23 and the marking is performed by lightly hitting it with a hammer or the like. Marking may be performed using a planetary writing instrument.

A guard hole 5-1 is formed in the guard angle 5 in a vertical line on the marked position by separating the guard angle 5 installed in the guard angle piercing step S53. The guard angle 5-1 is formed from the lower end of the guard angle 5 The perforation hole 5-1 is formed at a position where the projection 33 of the angle fixture 30 is located.

The guard angle 5 punctured in the guard angle and angle fixation step S54 is put back between the vertical fixture 20 and the angle fixture 30 and the angle fixture 30 and the vertical fixture 20 are fixed.

1: Basic rail 2: Fastening holder
2-1: vertical part 2-2: horizontal part
2-3: protrusion 3: rail cup
4: Holder cup 5: Guard angle
a: stress concentration part 10: lower fixture
11: horizontal part 12: vertical part
12-1: Retaining groove 31:
13-1: bolt hole 14: reinforcing rib
20: vertical fixture 21: body
21-1: Rail jaw 21-2: Bolt hole
22: fastening part 22-1: bolt hole
22-2: latching jaw 22-3: guard seating groove
23: Marking groove 30: Angle plate
31: body 32: bolt hole
33: Projection 1-1: Lower part of the rail
S1: Installation step of insulating member under the rail
S2: Lower fixture installation step
S3: Vertical clamping step
S4: Angle fixing assembly step
S5: Fixing step of guard angle
S51: Guard angle installation step
S52: Guard angle marking step
S53: Guard angle drilling step
S54: Guard angle and angle fixing step

Claims (6)

A fixed structure for fixing a guard angle fixed to a basic rail of a curved section railway to prevent derailment of a train,
The lower fixture 10 and the vertical fixture 20 are joined and fixed to the rail lower inner end 1-1 and the outer end 1-2 of the base rail 1 and the lower fixture 10, And the other end of the lower fixture 10 is detachably fixed to the lower end of the vertical fixture 20. The other end of the lower fixture 10 is fixed to the vertical lower end of the vertical fixture 20, (20) fixes the other end portion (1-2) below the rail,
The guard angle 5 is positioned at the upper end of the vertical fixture 20 so that the angle fixture 30 is fixed while being coupled to the vertical fixture 20,
The lower fixture 10 has vertical portions 12 and inclined portions 13 at both ends of the horizontal portion 11 and vertical portions 12 are engaged with the lower rail inner end portion 1-1 inwardly The inclined portion 13 is formed to be inclined downward,
The inclined portion 13 is opposed to the lower rail outer end portion 1-2 and the inclined portion 13 is inclined at an angle of 30 to 60 degrees from the horizontal,
The vertical fixture 20 is formed at the lower end of the body 21 so that the fastening portion 22 is inclined at the same angle as that of the inclined portion 13 so as to abut the inclined portion 13 so that the bolt 40 and the nut And a locking protrusion 22-2 is formed at the upper end of the coupling part 22 so as to be in contact with the upper surface of the horizontal part 11 of the lower fixture 10. The locking protrusion 22-2 is formed on the upper surface of the upper part of the body 21 22-3 are formed at the lower end of the guard angle 5,
A marking groove 23 is formed at the upper end of the body 21 of the vertical fixture 20 so that the puncturing position of the guard angle 5 can be easily marked,
An insulating member 50 is provided between the lower rail inner end portion 1-1 of the base rail 1, the lower rail outer end portion 1-2, the lower fixed body 10 and the vertical fixed body 20,
The gap of the reinforcing ribs 14 is formed so that the head of the bolt 40 is inserted between the pair of reinforcing ribs 14 formed in the longitudinal direction on the bottom surface of the horizontal portion 11 of the lower fixture 10,
Wherein the reinforcing rib (14) is formed in a triangular shape so as to connect the bottom surface of the horizontal portion (11) and the bottom surface of the inclined portion (13).
delete The method according to claim 1,
The protrusion 33 is formed in the angle fixture 30 and the protrusion 33 is fitted in the perforation hole 5-1 formed in the guard angle 5 to fix the position of the guard angle 5, 33), so as to prevent interference with the assembly.
delete A method of fixing a rail guard comprising the lower fixture (10), the vertical fixture (20), and the angle fixture (30) according to claim 1,
(S1) for inserting the insulating member (50) so as to surround the lower rail inner end (1-1), the lower rail outer end (1-2) and the lower rail bottom of the rail of the basic rail (1);
The lower rail inner end portion 1-1 provided with the insulating member 50 is inserted into the engagement groove 12-1 of the lower fixture 10 and the head of the bolt 40 is inserted into the lower fixture 10 A lower fixture mounting step (S2) in which the horizontal portion (11) of the lower fixture (10) is brought into close contact with the lower rail bottom surface while being sandwiched between the reinforcing ribs (14);
The vertical fixture 20 is fixed to the lower fixture 10 closely attached to the lower rail inner end portion 1-1 and the lower rail bottom with the bolts 40 and the nuts, 22-2) is pressed and fixed to the lower outer end portion (1-2) of the rail;
The guard angle 5 is positioned in the guard seating groove 22-3 of the vertical fixture 20 and the angle of the guard angle 5 is set to be vertical An assembling step of an angle fixture (S4) for joining the fixture (20);
The guard angle 5 is formed in the guard angle 5 so as to engage with the projection 33 of the angle fixture 30 and then the guard angle fixes the angle fixture 30 completely to the vertical fixture 20 Step S5,
The vertical fixture fixing step S3 is arranged to face the lower rail outer end portion 1-2 so as to surround the lower rail outer end portion 1-2 and the inclination angle is set to be inclined by 30 to 60 degrees from the horizontal The inclined portion 13 and the fastening portion 22 are fixed to the inclined portion 13 of the fixture 10 with the bolts 40 and nuts after the fastening portions 22 of the vertical fixture 20 are closely contacted with each other under,
In the guard angle fixing step S5,
A guard angle setting step (S51) for temporarily fixing the guard angle (5) between the plurality of lower fixtures (10) and the vertical fixture (20);
A guard angle marking step (S52) of marking the guard angle (5) through a marking groove (23) formed on the upper end of the body (21) of the vertical fixture (20);
A guard hole 5-1 is formed on the guard angle 5 in a vertical line at the marked position by separating the installed guard angle 5 and the length is measured from the lower end of the guard angle 5, A guard angle drilling step (S53) of forming a perforation hole (5-1) at a position where the protrusion (33) of the protrusion (33) is located;
A guard angle in which the drilled guard angle 5 is put back between the vertical fixture 20 and the angle fixture 30 and the bolts passing through the angle fixture 30 and the vertical fixture 20 are fixed, An angle fixing step (S54); The method of any one of claims 1 to 5,
`
delete
KR1020140119055A 2014-09-05 2014-09-05 A rail Guard fixing structure for prventing derailment and its procedure KR101520407B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020140119055A KR101520407B1 (en) 2014-09-05 2014-09-05 A rail Guard fixing structure for prventing derailment and its procedure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020140119055A KR101520407B1 (en) 2014-09-05 2014-09-05 A rail Guard fixing structure for prventing derailment and its procedure

Publications (1)

Publication Number Publication Date
KR101520407B1 true KR101520407B1 (en) 2015-05-18

Family

ID=53394755

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020140119055A KR101520407B1 (en) 2014-09-05 2014-09-05 A rail Guard fixing structure for prventing derailment and its procedure

Country Status (1)

Country Link
KR (1) KR101520407B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IT201600033357A1 (en) * 2016-08-30 2018-03-02 P A L Italia S R L BARRIER WITH ADDITIONAL FUNCTION OF LUBRICATION OF THE RAILWAY ARMOR
KR20210024335A (en) * 2019-08-22 2021-03-05 주식회사 지앤아이 Dustproof suspension device
KR20240029360A (en) 2022-08-26 2024-03-05 남양트랙엔지니어링(주) Espansion guide device for guard-angle to prevent derailment

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200319313Y1 (en) * 2003-04-15 2003-07-07 (주)알.티.코리아 safety guard fixing device
KR20110089993A (en) * 2010-02-02 2011-08-10 (주)신성엔지니어링 Railroad overpass fastener for train derailment prevention

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200319313Y1 (en) * 2003-04-15 2003-07-07 (주)알.티.코리아 safety guard fixing device
KR20110089993A (en) * 2010-02-02 2011-08-10 (주)신성엔지니어링 Railroad overpass fastener for train derailment prevention

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IT201600033357A1 (en) * 2016-08-30 2018-03-02 P A L Italia S R L BARRIER WITH ADDITIONAL FUNCTION OF LUBRICATION OF THE RAILWAY ARMOR
KR20210024335A (en) * 2019-08-22 2021-03-05 주식회사 지앤아이 Dustproof suspension device
KR102260604B1 (en) * 2019-08-22 2021-06-09 주식회사 지앤아이 Dustproof suspension device
KR20240029360A (en) 2022-08-26 2024-03-05 남양트랙엔지니어링(주) Espansion guide device for guard-angle to prevent derailment

Similar Documents

Publication Publication Date Title
ES2361534T3 (en) SUPPORT AND HOLDING POINT FOR RAILS ON A WOOD CROSS.
KR101520407B1 (en) A rail Guard fixing structure for prventing derailment and its procedure
US8302877B2 (en) Wheel guard device
JP2018523772A (en) Equipment for installing plane intersections
KR101409637B1 (en) A clamp for safety stanchion type
CN208650536U (en) Steel column operating platform
KR101588228B1 (en) Derailment prevention apparatus for railway vehicles
KR200473880Y1 (en) Rail fastening apparatus
KR100349055B1 (en) fixing apparatus of sharp curve safety guard angle
KR200459502Y1 (en) installation structure of railway
CN208562997U (en) A kind of trapezoidal nylon baffle seat of railway
KR200319313Y1 (en) safety guard fixing device
JP5932559B2 (en) Derailment prevention guard for non-floor track
JP2009013738A (en) Device for taking emergency measure for rail
JP5002775B2 (en) Rail safety fence post members
KR20160084948A (en) Hydraulic cylinder fixing Apparatus for derailed train
KR101590629B1 (en) Equipment to fix sleeper for railroad bridge and method to fix sleeper using the same
KR101203904B1 (en) Tie for railroad bridge
KR200256805Y1 (en) Apparatus for connecting railroad bridge
JP2020007784A (en) Rail fastening device for steel bridge direct-coupled track
KR20100006555A (en) Rail fixing apparatus
JP2018104966A (en) Anti-derailment guard angle support apparatus
KR100881600B1 (en) Support apparatus for installing direct fastening device on rail
KR20160124437A (en) Rail sleeper fastening structure
KR20130031397A (en) T-bolt fixture for bridge

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20180423

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20191105

Year of fee payment: 5