KR101504120B1 KR20140176937A KR20140176937A KR101504120B1 KR 101504120 B1 KR101504120 B1 KR 101504120B1 KR 20140176937 A KR20140176937 A KR 20140176937A KR 20140176937 A KR20140176937 A KR 20140176937A KR 101504120 B1 KR101504120 B1 KR 101504120B1
Authority
KR
South Korea
Prior art keywords
distribution line
pair
power distribution
tension
gears
Prior art date
Application number
KR20140176937A
Other languages
Korean (ko)
Inventor
이호성
Original Assignee
이호성
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이호성 filed Critical 이호성
Priority to KR20140176937A priority Critical patent/KR101504120B1/en
Application granted granted Critical
Publication of KR101504120B1 publication Critical patent/KR101504120B1/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/02Devices for adjusting or maintaining mechanical tension, e.g. take-up device
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H59/00Adjusting or controlling tension in filamentary material, e.g. for preventing snarling; Applications of tension indicators
    • B65H59/38Adjusting or controlling tension in filamentary material, e.g. for preventing snarling; Applications of tension indicators by regulating speed of driving mechanism of unwinding, paying-out, forwarding, winding, or depositing devices, e.g. automatically in response to variations in tension
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H59/00Adjusting or controlling tension in filamentary material, e.g. for preventing snarling; Applications of tension indicators
    • B65H59/40Applications of tension indicators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/04Arrangements or devices for relieving mechanical tension
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/05Suspension arrangements or devices for electric cables or lines
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/20Spatial arrangements or dispositions of lines or cables on poles, posts or towers

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

The present invention provides a tension clamp for a power distribution line, which comprises: a fixing unit installed in the set position of an electric pole; a support unit installed in the fixing unit and disposed to pass a power distribution line therethrough; and a tension adjustment unit to maintain the tension of the power distribution line at a set tension by adjusting the tension of the power distribution line.

Description

배전선로 인장 클램프{CONNECTION CLAMP OF AN ELECTRIC POWER DISTRIBUTION LINE}BACKGROUND OF THE INVENTION 1. Field of the Invention [0001] The present invention relates to a tension clamp,

본 발명은 배전선로 인장 클램프에 관한 것으로서, 보다 상세하게는 배전선의 인장력이 일정하게 유지될 수 있도록 할 수 있는 배전선로 인장 클램프에 관한 것이다.
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a tensioning clamp with a distribution line, and more particularly, to a distribution line tensioning clamp capable of maintaining a constant tension of a distribution line.

일반적으로, 전력선은 발전소로부터 각 수용가에 이르기까지 지상 내지는 지하를 통해 다양한 형태로 설치되는데, 지상구간에서의 설치방법으로는 전주를 사용하는 방법이 주로 사용되고 있다.Generally, power lines are installed in various forms from ground to underground, from power plants to individual customers. As a method of installation in the ground section, a method using a pole is mainly used.

전주를 사용하여 전력선을 지지하는 방법에 의하면 일정구간마다 전주를 설치하고 전주에 의해 전력선을 지지함으로써 전력선의 설치상태를 안정적으로 유지하게 된다. According to the method of supporting a power line using a pole, a pole is installed at every predetermined interval, and a power line is stably supported by a pole by supporting the power line.

이때, 전주에 부착되어 동력선을 직접 고정하는 금구류가 전력선 인장 클램프이며, 그리고 상기의 인장 클램프는, 점차 폭이 좁아지는 케이스부와 일단에 구성된 커넥팅부를 가지는 본체와, 상기 케이스부에 설치되는 탄성수단인 스프링과, 상기 스프링에 의해 작동되도록 설치된 지지판과, 상기 지지판에 연동되어 상기 케이스부내에서 슬라이딩 가능토록 설치된 한쌍의 조임턱으로 구성하였다. In this case, the gold clamp which is attached to the electric pole and fixes the power line directly is a power line tensile clamp, and the tensile clamp includes a case having a gradually narrower width portion, a body having a connecting portion formed at one end, And a pair of tightening jaws interlocked with the support plate and slidably installed in the case part.

여기서, 스프링의 이탈을 방지하기 위하여 상기 스프링의 내부에 고정핀이 끼워지고, 고정핀의 일부와 스프링은 케이스부 바닥에 형성된 스프링홈에 끼워지도록 하였다.In order to prevent the release of the spring, a fixing pin is fitted in the spring, and a part of the fixing pin and the spring are inserted into the spring groove formed in the bottom of the case part.

이와 같은 종래의 인장 클램프의 작동을 설명하면, 작업자가 손잡이를 통해 조임턱을 잡아당겨 후진시킴으로써 지지판이 스프링을 압축시키도록 한다. 이때 상기한 쌍의 조임턱은 케이스부 내에서 이동하면서 점차 서로 간의 간격이 멀어지게 되고, 상기 지지판은 한 쌍의 조임턱과 서로 맞물려 스프링의 팽창력을 받는 상태로 각 조임턱을 임시 고정하도록 하였다. To explain the operation of such a conventional tension clamp, an operator pulls the tightening jaw through the handle and moves backward so that the support plate compresses the spring. At this time, the pair of tightening jaws gradually move away from each other as they move in the case, and the support plate is interlocked with the pair of tightening jaws to temporarily fix the tightening jaws in a state of receiving the expansion force of the spring.

이 상태에서 전력선을 상기 양 조임턱 사이에 삽입하고, 조임턱과 지지판의 물림상태를 해제하면 스프링의 팽창력에 의해 상기 양 조임턱이 케이스부를 따라 이동하게 되며, 상기 케이스부가는 점차 폭이 좁아지는 형태이기 때문에 한 쌍의 조임턱이 점차 밀착되면서, 전력선을 압착 고정하도록 하였다.In this state, when the power line is inserted between the two clamping jaws, and the clamping jaw and the support plate are released from the engagement state, the two clamping jaws are moved along the case part by the expansion force of the spring, Because of the shape, a pair of tightening jaws were tightly adhered, and the power line was crimped and fixed.

상기와 같은 종래의 인장 클램프는 조임턱이 안치되어 전후방 이동하게 되는 케이스부가 일체형으로 되어 있어서, 조립 과정에 있어서 조임턱을 케이스부 내에 안치시키는 작업이 용이하지 않고 수작업에 의존할 수밖에 없는 구성이어서 제조 효율상 문제점이 지적되고 있다. 즉, 케이스부의 상면이 굴곡져 있으므로 조임턱을 케이스부내에 안치시킬 때 케이스부 상방에서 넣지를 못하고 케이스부의 후방쪽으로부터 전방으로 밀어넣듯이 삽입을 해야 하는 번거로움이 있었다.The above-described conventional tension clamp has a structure in which the fastening jaw is placed and the case part is moved in the front and rear direction so that the fastening jaw can be easily put in the case part in the assembling process. There is pointed out a problem in efficiency. That is, since the upper surface of the case portion is curved, when the fastening jaw is placed in the case portion, it is difficult to insert the upper portion of the case portion from the rear side of the case portion.

본 발명과 관련된 선행문헌에는 대한민국 등록특허 제10-0904917호(2009년 06월 19일)가 있으며, 상기 선행문헌에는 전기안전사고 방지형 지중배전선로 접속구조물에 대한 기술이 개시된다.
A prior art related to the present invention is Korean Registered Patent No. 10-0904917 (June 19, 2009), and the prior art discloses a technique for preventing electric safety accidents by connecting a ground distribution line.

본 발명의 목적은, 안정적으로 배전선의 인장력이 일정하게 유지될 수 있도록 할 수 있는 배전선로 인장 클램프를 제공함에 있다.
It is an object of the present invention to provide a tensioning clamp with a distribution line that can stably maintain the tension of the distribution line.

바람직한 양태에 있어서, 본 발명은 전주의 설정된 위치에 설치되는 고정부와; 상기 고정부에 설치되며, 배전선이 관통되도록 배치되는 지지부와; 상기 지지부에 설치되며, 상기 배전선의 장력이 설정된 장력을 유지하도록 조절하는 장력 조절부를 포함하는 배전선로 인장 클램프를 제공한다.In a preferred aspect of the present invention, the present invention provides a fixing device comprising: a fixing part installed at a predetermined position of a pole; A support part installed at the fixing part and arranged so as to allow a power distribution line to pass therethrough; And a tension adjusting unit installed on the support unit and adjusting the tension of the power distribution line to maintain a predetermined tension.

상기 배전선의 상기 두 군데의 외면에는, 외면에 나사산이 형성되는 한 쌍의 길이 조절 부재가 설치된다.On the outer surfaces of the two power distribution lines, a pair of length adjusting members having threads on the outer surface are provided.

상기 장력 조절부는, 상기 지지부의 양단부에 설치되는 한 쌍의 제 1기어와, 상기 제 1기어에 기어 물림되는 한 쌍의 제 2기어와, 상기 한 쌍의 제 2기어 각각을 회전시키는 한 쌍의 회전 모터와, 상기 배전선의 장력을 측정하는 센서와, 측정된 장력이 기설정된 기준 장력을 이루도록 상기 한 쌍의 회전 모터를 구동시키는 제어기를 구비하는 것이 바람직하다.Wherein the tension adjusting portion includes a pair of first gears provided at both ends of the support portion, a pair of second gears meshed with the first gear, and a pair of second gears A sensor for measuring the tension of the power distribution line, and a controller for driving the pair of rotation motors so that the measured tension has a predetermined reference tension.

상기 한 쌍의 제 1기어 각각에는 상기 한 쌍의 길이 조절 부재가 관통되어 상기 나사산과 나사 결합되는 중공이 형성된다.Each of the pair of first gears is formed with a hollow through which the pair of length adjusting members penetrate and are screwed with the threads.

상기 한 쌍의 제 1기어는 상기 지지부의 양단부에 형성되는 수용홈에 일부가 수용되어 회전된다.The pair of first gears are partially received in the receiving grooves formed at both ends of the supporting portion and rotated.

상기 한 쌍의 회전 모터는 서로 역방향으로 회전 구동되고, 역방향으로 구동되는 상기 한 쌍의 회전 모터의 구동에 따라, 상기 한 쌍의 제 2기어는 서로 역방향으로 회전되고, 상기 한 쌍의 제 1기어는, 상기 한 쌍의 제 2기어의 회전에 연동되어 서로 역방향을 따라 회전되어, 상기 배전선은 회전되는 상기 제 1기어의 중공에 나산 결합된 상태로 당겨지거나 늘어지도록 유동된다.Wherein the pair of rotary motors are rotated in opposite directions to each other and the pair of second gears are rotated in opposite directions in accordance with the driving of the pair of rotary motors driven in the reverse direction, Is rotated in a direction opposite to each other in conjunction with the rotation of the pair of second gears so that the power distribution line is pulled or squeezed into a hollow of the first gear to be rotated.

상기 지지부의 양단부 사이에는, 배전선 수용 공간이 형성되는 것이 바람직하다.Preferably, a distribution line accommodating space is formed between both ends of the support portion.

상기 배전선 수용 공간에는, 배전선의 이동을 안내하는 다수의 안내 롤러와, 상기 배전선을 탄성적으로 안내 하는 텐션 롤러가 설치되는 것이 바람직하다.Preferably, a plurality of guide rollers for guiding the movement of the power distribution line and a tension roller for elastically guiding the power distribution line are provided in the power distribution line accommodation space.

상기 지지부는, 설치각도의 조절이 가능하도록 다관절로 형성되는 것이 바람직하다.
It is preferable that the support portion is formed as a polygonal joint so that an installation angle can be adjusted.

본 발명은, 전주의 고소 위치에서 배전선의 두 군데를 기어 연결하고, 배전선을 장력을 실시간으로 측정하여 요구되는 장력을 유지할 수 있도록 하는 효과를 갖는다.The present invention has the effect of gearing two distribution lines at the elevation position of the pole and measuring the tension of the distribution line in real time to maintain the required tension.

또한, 본 발명은, 배전선의 장력을 조절하는 경우 발생되는 잔류 배전선이 늘어지는 등의 문제로 인해 전선이 끊어지는 사고를 미연에 방지할 수 있는 효과를 갖는다.
Further, the present invention has an effect of preventing an accident that a wire is cut off due to a problem that a residual distribution line generated when controlling the tension of a distribution line is stretched.

도 1은 본 발명의 배전선로 인장 클램프를 보여주는 도면이다.
도 2는 본 발명에 따르는 장력 조절부의 구성을 보여주는 도면이다.
도 3은 도 2의 장력 조절부를 확대 도시한 도면이다.
도 4 및 도 5는 본 발명에 따르는 텐션 롤러, 보조 텐션 롤러의 작용을 보여주는 도면이다.
BRIEF DESCRIPTION OF THE DRAWINGS Fig. 1 is a view showing a tensile clamp with a distribution line of the present invention. Fig.
2 is a view showing a configuration of a tension adjusting unit according to the present invention.
Fig. 3 is an enlarged view of the tension adjusting portion of Fig. 2. Fig.
4 and 5 are views showing the operation of the tension roller and the auxiliary tension roller according to the present invention.

이하, 첨부된 도면을 참조하여 본 발명의 배전선로 인장 클램프를 설명한다.BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a perspective view of a tensile clamp according to an embodiment of the present invention; FIG.

도 1은 본 발명의 배전선로 인장 클램프를 보여주는 도면이고, 도 2는 본 발명에 따르는 장력 조절부의 구성을 보여주는 도면이고, 도 3은 도 2의 장력 조절부를 확대 도시한 도면이다.FIG. 1 is a view showing a tensioning clamp with a distribution line according to the present invention, FIG. 2 is a view showing a configuration of a tension adjusting part according to the present invention, and FIG. 3 is an enlarged view of the tension adjusting part of FIG.

도 1 내지 도 3을 참조 하면, 본 발명의 배전선로 인장 클램프는 전주(1)의 설정된 위치에 설치되는 고정부(100)와; 상기 고정부(100)에 설치되며, 배전선(10)이 관통되도록 배치되는 지지부(200)와; 상기 지지부(200)에 설치되며, 상기 배전선(10)의 장력이 설정된 장력을 유지하도록 조절하는 장력 조절부(300)로 구성된다.1 to 3, a tension cable clamp according to the present invention includes a fixing part 100 installed at a predetermined position of a pole 1; A supporting part 200 installed in the fixing part 100 and arranged to penetrate the power distribution line 10; And a tension adjusting unit 300 installed in the support unit 200 for adjusting the tension of the power distribution line 10 to maintain a predetermined tension.

상기 지지부(200)의 양단에는 배전선(10)이 관통되는 홀(H)이 형성된다.At both ends of the support part 200, a hole H through which the power distribution line 10 passes is formed.

상기 배전선(10)의 상기 두 군데의 외면에는, 외면에 나사산(S)이 형성되는 한 쌍의 길이 조절 부재(20)가 설치된다.A pair of length adjusting members 20 are formed on the outer surfaces of the power distribution line 10 so as to form threads S on the outer surface thereof.

상기 배전선의 두군데 외면에 설치되는 길이 조절부재에는 배전선이 끼워지고, 그 양단에서는 볼트가 관통하여 배전선의 피복에 일부 삽입되어, 상기 길이 조절 부재가 배전선의 외면에 고정된다.The length adjusting members provided on the two outer surfaces of the power distribution lines are fitted with power distribution lines, and at both ends of the length adjustment members, the bolts penetrate and are partially inserted into the cover of the power distribution line, and the length adjustment member is fixed to the outer surface of the power distribution line.

도면에 도시되지는 않았지만, 길이 조절 부재는 배전선의 전체 외면에 설치되며, 비전도성 물질로 형성될 수도 있다.Although not shown in the drawings, the length adjusting member is provided on the entire outer surface of the power distribution line, and may be formed of a nonconductive material.

상기 장력 조절부(300)는, 상기 지지부(200)의 양단부에 설치되는 한 쌍의 제 1기어(310)와, 상기 제 1기어(310)에 기어 물림되는 한 쌍의 제 2기어(320)와, 상기 한 쌍의 제 2기어(320) 각각을 회전시키는 한 쌍의 회전 모터(330)와, 상기 배전선(10)의 장력을 측정하는 센서(340)와, 측정된 장력이 기설정된 기준 장력을 이루도록 상기 한 쌍의 회전 모터(330)를 구동시키는 제어기(350)로 구성된다.The tension adjusting unit 300 includes a pair of first gears 310 provided at both ends of the support unit 200 and a pair of second gears 320 meshed with the first gears 310, A pair of rotation motors 330 for rotating the pair of second gears 320, a sensor 340 for measuring the tension of the power distribution line 10, And a controller 350 for driving the pair of rotary motors 330 so as to form the pair of rotation motors 330.

상기 한 쌍의 제 1기어(310) 각각에는 상기 한 쌍의 길이 조절 부재(20)가 관통되어 상기 나사산(S)과 나사 결합되는 중공(311)이 형성된다.Each of the pair of first gears 310 is provided with a hollow 311 through which the pair of length adjusting members 20 are inserted and threadedly engaged with the threads S, respectively.

상기 한 쌍의 제 1기어(310)는 상기 지지부(200)의 양단부에 형성되는 수용홈(201)에 일부가 수용되어 회전된다.The pair of first gears 310 are partially received in the receiving groove 201 formed at both ends of the support portion 200 and rotated.

제 2기어(320)는 회전 모터(330)의 회전축(331)에 연결되어 회전된다.The second gear 320 is connected to the rotation shaft 331 of the rotation motor 330 and rotated.

상기 한 쌍의 회전 모터(330)는 서로 역방향으로 회전 구동되고, 역방향으로 구동되는 상기 한 쌍의 회전 모터(330)의 구동에 따라, 상기 한 쌍의 제 2기어(320)는 서로 역방향으로 회전되고, 상기 한 쌍의 제 1기어(310)는, 상기 한 쌍의 제 2기어(320)의 회전에 연동되어 서로 역방향을 따라 회전되어, 상기 배전선(20)은 회전되는 상기 제 1기어(310)의 중공(311)에 나산 결합된 상태로 당겨지거나 늘어지도록 유동된다.The pair of rotary motors 330 are rotated in opposite directions to each other and the pair of second gears 320 are rotated in opposite directions And the pair of first gears 310 rotate in a direction opposite to each other in conjunction with rotation of the pair of second gears 320 so that the power distribution line 20 is rotated by the first gear 310 And is pulled or squeezed in a fluid-tight manner.

상기 지지부(200)의 양단부 사이에는, 배전선 수용 공간이 형성된다.A distribution line accommodating space is formed between both ends of the support portion 200.

상기 배전선 수용 공간에는, 배전선(10)의 이동을 안내하는 다수의 안내 롤러(410)와, 상기 배전선(10)을 탄성적으로 안내 하는 텐션 롤러(420)가 설치되는 것이 바람직하다.A plurality of guide rollers 410 for guiding the movement of the power distribution line 10 and a tension roller 420 for elastically guiding the power distribution line 10 are preferably provided in the power distribution line accommodation space.

상기 텐션 롤러(420)는 배전선(10)의 이동을 안내하는 롤러(421)와, 롤러(421)를 탄성 지지하는 스프링(422)과, 스프링(422)을 지지부에 고정하는 고정 프레임(423)으로 구성된다.The tension roller 420 includes a roller 421 for guiding the movement of the power distribution line 10, a spring 422 for elastically supporting the roller 421, a fixing frame 423 for fixing the spring 422 to the support, .

롤러(421)에는 배전선(10)의 이동을 안내하는 홈(미도시)이 형성되는 것이 좋다.The roller 421 may be provided with a groove (not shown) for guiding the movement of the power distribution line 10.

도면에 도시되지는 않았지만, 상기 지지부(200)는, 설치각도의 조절이 가능하도록 다관절로 형성되도록 단위 지지부로 형성될 수 있다.Although not shown in the drawings, the support portion 200 may be formed as a unit support portion so as to be formed into a multi-joint so as to adjust an installation angle.

여기서, 다수의 단위 지지부는 힌지 연결되고, 힌지는 모터와 같은 장치에 의해 회전각이 조절될 수 있다. 모터와 같은 장치는 제어기로부터 제어 신호를 받아 구동된다.Here, the plurality of unit supports are hinged and the angle of rotation can be controlled by a device such as a motor. A device such as a motor is driven by receiving a control signal from the controller.

상기와 같은 실시예에 의해, 본 발명은, 전주의 고소 위치에서 배전선의 두 군데를 기어 연결하고, 배전선을 장력을 실시간으로 측정하여 요구되는 장력을 유지할 수 있도록 하는 효과를 갖는다.According to the embodiment as described above, the present invention has the effect of gearing two distribution lines at the elevation position of the pole and measuring the tension of the distribution line in real time to maintain the required tension.

또한, 본 발명은, 배전선의 장력을 조절하는 경우 발생되는 잔류 배전선이 늘어지는 등의 문제로 인해 전선이 끊어지는 사고를 미연에 방지할 수 있는 효과를 갖는다.
Further, the present invention has an effect of preventing an accident that a wire is cut off due to a problem that a residual distribution line generated when controlling the tension of a distribution line is stretched.

한편, 도 4 및 도 5를 참조 하면, 지지부(200)의 양단부 사이에는, 배전선 수용 공간이 형성된다.4 and 5, a distribution line accommodating space is formed between both ends of the support portion 200. [

상기 배전선 수용 공간에는, 배전선(10)의 이동을 안내하는 다수의 안내 롤러(410)와, 상기 배전선(10)을 탄성적으로 안내 하는 텐션 롤러(420)가 설치된다.A plurality of guide rollers 410 for guiding the movement of the power distribution line 10 and a tension roller 420 for elastically guiding the power distribution line 10 are installed in the power distribution line accommodation space.

상기 텐션 롤러(420)에는, 상기 텐션 롤러(420)가 회전시 발생되는 회전수를 측정하고, 측정한 상기 회전수를 제어기(350)로 전송하는 엔코더(470)가 설치된다.The tension roller 420 is provided with an encoder 470 for measuring the number of revolutions generated when the tension roller 420 rotates and transmitting the measured number of revolutions to the controller 350.

상기 텐션 롤러(420)는 상기 배전선 수용 공간에 설치되는 제 1실린더(450)의 제 1실린더 축(451)에 회전 가능하게 설치된다.The tension roller 420 is rotatably installed on the first cylinder shaft 451 of the first cylinder 450 installed in the power line accommodating space.

상기 배전선 수용 공간에는, 보조 텐션 롤러(430)가 더 설치된다.An auxiliary tension roller (430) is further provided in the power distribution line accommodation space.

상기 보조 텐션 롤러(430)는 보조 롤러(431)와, 보조 롤러(431)를 탄성 지지하는 스프링(432)으로 구성된다.The auxiliary tension roller 430 includes an auxiliary roller 431 and a spring 432 for elastically supporting the auxiliary roller 431.

상기 보조 텐션 롤러(430)는 상기 배전선 수용 공간에 설치되는 제 2실린더(460)의 제 2실린더 축(461)에 회전 가능하게 설치된다.The auxiliary tension roller 430 is rotatably installed on the second cylinder axis 461 of the second cylinder 460 installed in the distribution line accommodating space.

여기서, 제 1,2실린더 축(451,461)은 승강 가능하게 설치된다.Here, the first and second cylinder shafts 451 and 461 are installed to be movable up and down.

상기 제어기(350)는, 도 5에 도시되는 바와 같이, 엔코더(470)로부터 측정되는 회전수가 기설정되는 기준 회전수에 이르지 못하면, 상기 보조 텐션 롤러(430)가 상기 배전선(10)을 탄성적으로 안내하도록 상기 제 2실린더 축(461)을 구동, 즉 하강시킨다.5, when the rotation speed measured from the encoder 470 does not reach the predetermined reference rotation speed, the controller 350 controls the auxiliary tension roller 430 to rotate the electric power distribution line 10 The second cylinder shaft 461 is driven or lowered to guide the second cylinder shaft 461 to the second cylinder shaft 461.

동시에, 제어기(350)는 상기 텐션 롤러(420)가 상기 배전선(10)으로부터 이격되도록 상기 제 1실린더 축(451)을 승강 구동시킨다.At the same time, the controller 350 drives the first cylinder shaft 451 to lift the tension roller 420 away from the power distribution line 10.

여기서, 상기 보조 텐션 롤러(430)에는 회전시 회전수를 측정하여 상기 제어기로 전송하는 보조 엔코더(480)가 설치된다.Here, the auxiliary tension roller 430 is provided with an auxiliary encoder 480 that measures the rotation speed during rotation and transmits the measured rotation speed to the controller.

상기 제어기(350)는, 상기 보조 엔코더(480)로부터 측정되는 회전수가 상기 기준 회전수에 이르지 못하면, 상기 제어기(350)와 전기적으로 연결되는 알람발생기(a;도시)를 통해 외부에 알람을 발생시킨다.When the number of rotations measured from the auxiliary encoder 480 does not reach the reference number of revolutions, the controller 350 generates an alarm through an alarm generator (a) (electrically connected to the controller 350) .

따라서, 본 발명에서는 텐션 롤러의 회전에 이상이 발생되는 경우, 정상적으로 텐션 및 배전선의 이동을 안내하지 못하기 때문에, 다른 텐션 롤러, 즉 보조 텐션 롤러를 사용하여 배전선의 장력을 일정하게 유지하여 배전선이 수용공간에 늘어짐으로 인해 이상이 발생되는 문제를 해결할 수 있다.Therefore, in the present invention, when an abnormality occurs in the rotation of the tension roller, it is impossible to normally guide the movement of the tension and the power distribution line. Therefore, by using another tension roller, that is, the auxiliary tension roller, It is possible to solve the problem that an abnormality occurs due to sagging in the accommodation space.

이상, 본 발명의 배전선로 인장 클램프에 관한 구체적인 실시예에 관하여 설명하였으나, 본 발명의 범위에서 벗어나지 않는 한도 내에서는 여러 가지 실시 변형이 가능함은 자명하다.Although the present invention has been described with respect to the specific embodiments of the tension clamp by the distribution line, it is apparent that various modifications can be made without departing from the scope of the present invention.

그러므로 본 발명의 범위에는 설명된 실시예에 국한되어 전해져서는 안 되며, 후술하는 특허청구범위뿐만 아니라 이 특허청구범위와 균등한 것들에 의해 정해져야 한다.Therefore, the scope of the present invention should not be limited to the above-described embodiments, but should be determined by the scope of the appended claims and equivalents thereof.

즉, 전술된 실시예는 모든 면에서 예시적인 것이며, 한정적인 것이 아닌 것으로 이해되어야 하며, 본 발명의 범위는 상세한 설명보다는 후술될 특허청구범위에 의하여 나타내어지며, 그 특허청구범위의 의미 및 범위 그리고 그 등가 개념으로부터 도출되는 모든 변경 또는 변형된 형태가 본 발명의 범위에 포함되는 것으로 해석되어야 한다.
It is to be understood that the foregoing embodiments are illustrative and not restrictive in all respects and that the scope of the present invention is indicated by the appended claims rather than the foregoing description, It is intended that all changes and modifications derived from the equivalent concept be included within the scope of the present invention.

10 : 배전선
20 : 길이 조절 부재
100 : 고정부
200 : 지지부
300 : 장력 조절부
10: Distribution line
20:
100:
200:
300:

Claims (4)

전주의 설정된 위치에 설치되는 고정부;
상기 고정부에 설치되며, 배전선이 관통되도록 배치되는 지지부;
상기 지지부에 설치되며, 상기 배전선의 장력이 설정된 장력을 유지하도록 조절하는 장력 조절부를 포함하고,
상기 배전선의 두 군데의 외면에는, 외면에 나사산이 형성되는 한 쌍의 길이 조절 부재가 설치되고,
상기 장력 조절부는,
상기 지지부의 양단부에 설치되는 한 쌍의 제 1기어와,
상기 제 1기어에 기어 물림되는 한 쌍의 제 2기어와,
상기 한 쌍의 제 2기어 각각을 회전시키는 한 쌍의 회전 모터와,
상기 배전선의 장력을 측정하는 센서와,
측정된 장력이 기설정된 기준 장력을 이루도록 상기 한 쌍의 회전 모터를 구동시키는 제어기를 구비하고,
상기 한 쌍의 제 1기어 각각에는 상기 한 쌍의 길이 조절 부재가 관통되어 상기 나사산과 나사 결합되는 중공이 형성되고,
상기 한 쌍의 제 1기어는 상기 지지부의 양단부에 형성되는 수용홈에 일부가 수용되어 회전되고,
상기 한 쌍의 회전 모터는 서로 역방향으로 회전 구동되고, 역방향으로 구동되는 상기 한 쌍의 회전 모터의 구동에 따라, 상기 한 쌍의 제 2기어는 서로 역방향으로 회전되고, 상기 한 쌍의 제 1기어는, 상기 한 쌍의 제 2기어의 회전에 연동되어 서로 역방향을 따라 회전되어, 상기 배전선은 회전되는 상기 제 1기어의 중공에 나사 결합된 상태로 당겨지거나 늘어지도록 유동되고,
상기 지지부의 양단부 사이에는, 배전선 수용 공간이 형성되고,
상기 배전선 수용 공간에는, 배전선의 이동을 안내하는 다수의 안내 롤러와, 상기 배전선을 탄성적으로 안내 하는 텐션 롤러가 설치되고,
상기 텐션 롤러에는, 상기 텐션 롤러가 회전시 발생되는 회전수를 측정하고, 측정한 상기 회전수를 상기 제어기로 전송하는 엔코더가 설치되고,
상기 텐션 롤러는 상기 배전선 수용 공간에 설치되는 제 1실린더의 제 1실린더 축에 회전 가능하게 설치되고,
상기 배전선 수용 공간에는, 보조 텐션 롤러가 더 설치되되,
상기 보조 텐션 롤러는 상기 배전선 수용 공간에 설치되는 제 2실린더의 제 2실린더 축에 회전 가능하게 설치되고,
상기 제어기는, 측정되는 회전수가 기설정되는 기준 회전수에 이르지 못하면, 상기 보조 텐션 롤러가 상기 배전선을 탄성적으로 안내하도록 상기 제 2실린더 축을 구동시키고,
상기 텐션 롤러가 상기 배전선으로부터 이격되도록 상기 제 1실린더 축을 구동시키는 것을 특징으로 하는 배전선로 인장 클램프.
A fixing part installed at a predetermined position of the electric pole;
A supporting part installed in the fixing part and arranged to penetrate the power distribution line;
And a tension adjusting unit installed on the support unit and adjusting a tension of the power distribution line to maintain a predetermined tension,
A pair of length adjusting members having threads formed on an outer surface thereof are provided on outer surfaces of two of the power distribution lines,
The tension adjusting unit may include:
A pair of first gears provided at both ends of the support portion,
A pair of second gears meshed with the first gear,
A pair of rotating motors for rotating the pair of second gears,
A sensor for measuring a tension of the power distribution line,
And a controller for driving the pair of rotary motors so that the measured tension is equal to a preset reference tension,
Wherein each of the pair of first gears is provided with a hollow through which the pair of length adjusting members penetrates and is screwed with the threads,
The pair of first gears are rotatably received in a receiving groove formed at both ends of the supporting portion,
Wherein the pair of rotary motors are rotated in opposite directions to each other and the pair of second gears are rotated in opposite directions in accordance with the driving of the pair of rotary motors driven in the reverse direction, Is rotated in a direction opposite to each other in conjunction with the rotation of the pair of second gears so that the power distribution line is pulled or drawn so as to be threadedly engaged with the hollow of the first gear to be rotated,
A distribution line accommodating space is formed between both ends of the support portion,
The distribution line accommodating space is provided with a plurality of guide rollers for guiding the movement of the distribution line and a tension roller for elastically guiding the distribution line,
Wherein the tension roller is provided with an encoder for measuring the number of revolutions generated when the tension roller rotates and for transmitting the measured number of revolutions to the controller,
Wherein the tension roller is rotatably installed on a first cylinder axis of a first cylinder installed in the power distribution line accommodation space,
In the power distribution line accommodating space, an auxiliary tension roller is further provided,
Wherein the auxiliary tension roller is rotatably installed on a second cylinder axis of a second cylinder installed in the power distribution line accommodation space,
Wherein the controller drives the second cylinder axis so that the auxiliary tension roller elastically guides the power distribution line when the measured rotation speed does not reach the predetermined reference rotation speed,
And the tension roller drives the first cylinder shaft so as to be spaced apart from the power distribution line.
삭제delete 제 1항에 있어서,
상기 보조 텐션 롤러에는 회전시 회전수를 측정하여 상기 제어기로 전송하는 보조 엔코더가 설치되고,
상기 제어기는, 상기 보조 엔코더로부터 측정되는 회전수가 상기 기준 회전수에 이르지 못하면,
상기 제어기와 전기적으로 연결되는 알람발생기를 통해 외부에 알람을 발생시키는 것을 특징으로 하는 배전선로 인장 클램프.
The method according to claim 1,
The auxiliary tension roller is provided with an auxiliary encoder for measuring the rotation speed during rotation and transmitting the rotation speed to the controller,
Wherein when the number of revolutions measured from the auxiliary encoder does not reach the reference number of revolutions,
And an alarm is externally generated through an alarm generator electrically connected to the controller.
제 1항에 있어서,
상기 지지부는,
설치각도의 조절이 가능하도록 다관절로 형성되는 것을 특징으로 하는 배전선로 인장 클램프.
The method according to claim 1,
The support portion
Wherein the tensioning clamp is formed of a multi-joint so as to adjust an installation angle.
KR20140176937A 2014-12-10 2014-12-10 Connection clamp of an electric power distribution line KR101504120B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR20140176937A KR101504120B1 (en) 2014-12-10 2014-12-10 Connection clamp of an electric power distribution line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR20140176937A KR101504120B1 (en) 2014-12-10 2014-12-10 Connection clamp of an electric power distribution line

Publications (1)

Publication Number Publication Date
KR101504120B1 true KR101504120B1 (en) 2015-03-19

Family

ID=53028020

Family Applications (1)

Application Number Title Priority Date Filing Date
KR20140176937A KR101504120B1 (en) 2014-12-10 2014-12-10 Connection clamp of an electric power distribution line

Country Status (1)

Country Link
KR (1) KR101504120B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101794303B1 (en) 2016-10-17 2017-11-07 주식회사 타우이엔지 Insulator Fixing Type Frame for Adjusting Tension of Distribution Line
KR102516788B1 (en) * 2023-01-25 2023-03-31 진대승 Distribution line fault section monitoring system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08169638A (en) * 1994-12-16 1996-07-02 Toa Hatsudouki Kk Method for keeping constant tension of winder for transmission line erection
KR100904917B1 (en) 2009-03-30 2009-06-29 (주)협동전기감리단 Frame for underground distribution line fixation
KR101158560B1 (en) 2012-05-16 2012-06-21 (주)일광종합기술단 Apparatus of tension relief using power electric transmision
KR101367434B1 (en) * 2013-11-15 2014-02-26 (주)성창종합기술단 Connection clamp of an electric power distribution line pole

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08169638A (en) * 1994-12-16 1996-07-02 Toa Hatsudouki Kk Method for keeping constant tension of winder for transmission line erection
KR100904917B1 (en) 2009-03-30 2009-06-29 (주)협동전기감리단 Frame for underground distribution line fixation
KR101158560B1 (en) 2012-05-16 2012-06-21 (주)일광종합기술단 Apparatus of tension relief using power electric transmision
KR101367434B1 (en) * 2013-11-15 2014-02-26 (주)성창종합기술단 Connection clamp of an electric power distribution line pole

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101794303B1 (en) 2016-10-17 2017-11-07 주식회사 타우이엔지 Insulator Fixing Type Frame for Adjusting Tension of Distribution Line
KR102516788B1 (en) * 2023-01-25 2023-03-31 진대승 Distribution line fault section monitoring system

Similar Documents

Publication Publication Date Title
KR101592964B1 (en) Method for hot line work of power distribution equipment
KR101027732B1 (en) Cable pulling equipment of drum cable
KR101504120B1 (en) Connection clamp of an electric power distribution line
KR101976553B1 (en) taping device for wire harness
JP6478319B2 (en) Electric wire drawing device
CN105181497A (en) Steel wire rope fatigue test device
KR101367434B1 (en) Connection clamp of an electric power distribution line pole
CN113620088B (en) Wrap up in line machine
US4663928A (en) Machine for winding on a cable, with a very short pitch, at least one metal sheathing wire
KR102194101B1 (en) cable feeder apparatus for installing electric cable
KR102396099B1 (en) Transmission device for power cable
CN209601812U (en) A kind of caterpillar-tractor of rapid material-feeding and positioning
KR102493927B1 (en) Fixing Equipment for Overhead Power Distribution Line
KR101314637B1 (en) Portable winch for electric wire tension method
KR101756055B1 (en) Multi-purpose cable tension maintenance and installation device
WO2009105017A1 (en) Hose feed machine
CN211556686U (en) Cable laying and tensioning device for electric power engineering
KR20120055839A (en) Cable tray installation type cable pulling machine
JP6903438B2 (en) Conductor bar peeling tools and methods
CN107516562B (en) Device for automatically winding adhesive tape and winding wire harness
KR20190143586A (en) Pulley changing apparatus for conveyor
KR102125972B1 (en) cable winding drum stand
KR101980145B1 (en) Carbon fiber supplying device
CN218286685U (en) Winding equipment for fishing rod production
CN218642346U (en) Adjustable rope guide

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
E701 Decision to grant or registration of patent right
FPAY Annual fee payment

Payment date: 20171222

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20190227

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20200108

Year of fee payment: 6