KR101367434B1 - Connection clamp of an electric power distribution line pole - Google Patents

Connection clamp of an electric power distribution line pole Download PDF

Info

Publication number
KR101367434B1
KR101367434B1 KR1020130139374A KR20130139374A KR101367434B1 KR 101367434 B1 KR101367434 B1 KR 101367434B1 KR 1020130139374 A KR1020130139374 A KR 1020130139374A KR 20130139374 A KR20130139374 A KR 20130139374A KR 101367434 B1 KR101367434 B1 KR 101367434B1
Authority
KR
South Korea
Prior art keywords
distribution line
pair
clamp
support
tension
Prior art date
Application number
KR1020130139374A
Other languages
Korean (ko)
Inventor
성부호
Original Assignee
(주)성창종합기술단
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)성창종합기술단 filed Critical (주)성창종합기술단
Priority to KR1020130139374A priority Critical patent/KR101367434B1/en
Application granted granted Critical
Publication of KR101367434B1 publication Critical patent/KR101367434B1/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/02Devices for adjusting or maintaining mechanical tension, e.g. take-up device
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H59/00Adjusting or controlling tension in filamentary material, e.g. for preventing snarling; Applications of tension indicators
    • B65H59/38Adjusting or controlling tension in filamentary material, e.g. for preventing snarling; Applications of tension indicators by regulating speed of driving mechanism of unwinding, paying-out, forwarding, winding, or depositing devices, e.g. automatically in response to variations in tension
    • B65H59/382Adjusting or controlling tension in filamentary material, e.g. for preventing snarling; Applications of tension indicators by regulating speed of driving mechanism of unwinding, paying-out, forwarding, winding, or depositing devices, e.g. automatically in response to variations in tension using mechanical means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D1/00Rope, cable, or chain winding mechanisms; Capstans
    • B66D1/02Driving gear
    • B66D1/12Driving gear incorporating electric motors
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/05Suspension arrangements or devices for electric cables or lines
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/20Spatial arrangements or dispositions of lines or cables on poles, posts or towers

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Clamps And Clips (AREA)

Abstract

The present invention provides a dead-end clamp for an electric power distribution line, which includes: a support stand which is installed to protrude from a pole; a pair of clamp parts which protrude to both sides of the support stand and through which a distribution line passes; a tension control unit which pulls or loosens the distribution line to maintain the tension of the distribution line passing through the pair of clamp parts with preset tension; and an elastic support unit which is installed on the support stand and elastically supports the distribution line passing through the pair of clamp parts.

Description

배전선로용 인장 클램프{CONNECTION CLAMP OF AN ELECTRIC POWER DISTRIBUTION LINE POLE}Tension clamp for power distribution line {CONNECTION CLAMP OF AN ELECTRIC POWER DISTRIBUTION LINE POLE}

본 발명은 배전선로용 인장클램프에 관한 것으로서, 보다 상세하게는 전주에 설치되는 배전선로를 계절에 따라 실시간으로 장력이 일정하도록 조절하여 선로의 안정성을 유지할 수 있는 배전선로용 인장 클램프에 관한 것이다.
The present invention relates to a tension clamp for a distribution line, and more particularly, to a tension clamp for a distribution line that can maintain the stability of the line by adjusting the tension of the distribution line installed in Jeonju in real time according to the season.

일반적으로, 일반적으로 전력선은 발전소로부터 각 수용가에 이르기까지 지상 내지는 지하를 통해 다양한 형태로 설치되는데, 지상구간에서의 설치방법으로는 전주를 사용하는 방법이 주로 사용되고 있다.In general, power lines are installed in various forms through the ground or underground from the power plant to each customer, and the installation method using the pole is mainly used as the installation method in the ground section.

전주를 사용하여 전력선을 지지하는 방법에 의하면 일정구간마다 전주를 설치하고 전주에 의해 전력선을 지지함으로써 전력선의 설치상태를 안정적으로 유지하게 된다.According to the method of supporting electric power lines by using electric poles, electric poles are installed every certain section and the electric power lines are supported by electric poles to maintain the installation state of electric power lines stably.

이때, 전주에 부착되어 동력선을 직접 고정하는 금구류가 전력선 인장 클램프이며, 그리고 상기의 인장 클램프는, 점차 폭이 좁아지는 케이스부와 일단에 구성된 커넥팅부를 가지는 본체와, 상기 케이스부에 설치되는 탄성수단인 스프링과, 상기 스프링에 의해 작동되도록 설치된 지지판과, 상기 지지판에 연동되어 상기 케이스부내에서 슬라이딩 가능토록 설치된 한쌍의 조임턱으로 구성하였다.At this time, the bracket attached to the pole and directly fixing the power line is a power line tension clamp, and the tension clamp is a main body having a case portion and a connecting portion formed at one end and the elastic portion provided in the case portion gradually narrowing in width; A spring as a means, a support plate installed to be operated by the spring, and a pair of tightening jaws interlocked with the support plate to be slidable in the case part.

여기서, 스프링의 이탈을 방지하기 위하여 상기 스프링의 내부에 고정핀이 끼워지고, 고정핀의 일부와 스프링은 케이스부 바닥에 형성된 스프링홈에 끼워지도록 하였다.Here, the fixing pin is inserted into the spring to prevent the spring from being separated, and a portion of the fixing pin and the spring are inserted into the spring groove formed at the bottom of the case part.

이와 같은 종래의 인장 클램프의 작동을 설명하면, 작업자가 손잡이를 통해 조임턱을 잡아당겨 후진시킴으로써 지지판이 스프링을 압축시키도록 한다. 이때 상기한 쌍의 조임턱은 케이스부 내에서 이동하면서 점차 서로 간의 간격이 멀어지게 되고, 상기 지지판은 한 쌍의 조임턱과 서로 맞물려 스프링의 팽창력을 받는 상태로 각 조임턱을 임시 고정하도록 하였다.Referring to the operation of the conventional tension clamp as described above, the operator pulls the tightening jaw through the handle to the back so that the support plate compresses the spring. At this time, the pair of tightening jaw is gradually moved away from each other while moving in the case portion, the support plate is engaged with the pair of tightening jaw to each other to temporarily fix each tightening jaw in the state of receiving the expansion force of the spring.

이 상태에서 전력선을 상기 양 조임턱 사이에 삽입하고, 조임턱과 지지판의 물림상태를 해제하면 스프링의 팽창력에 의해 상기 양 조임턱이 케이스부를 따라 이동하게 되며, 상기 케이스부가는 점차 폭이 좁아지는 형태이기 때문에 한 쌍의 조임턱이 점차 밀착되면서, 전력선을 압착 고정하도록 하였다.In this state, when the power line is inserted between the two tightening jaws, and releases the bite state of the tightening jaw and the support plate, the two tightening jaws are moved along the case part by the expansion force of the spring, and the case part is gradually narrowed in width. Because of the shape, the pair of tightening jaws are gradually in close contact, so that the power line is crimped and fixed.

상기와 같은 종래의 인장 클램프는 조임턱이 안치되어 전후방 이동하게 되는 케이스부가 일체형으로 되어 있어서, 조립 과정에 있어서 조임턱을 케이스부 내에 안치시키는 작업이 용이하지 않고 수작업에 의존할 수밖에 없는 구성이어서 제조 효율상 문제점이 지적되고 있다. 즉, 케이스부의 상면이 굴곡져 있으므로 조임턱을 케이스부내에 안치시킬 때 케이스부 상방에서 넣지를 못하고 케이스부의 후방쪽으로부터 전방으로 밀어넣듯이 삽입을 해야 하는 번거로움이 있었다.
본 발명과 관련된 선행문헌에는 대한민국 등록특허 제10-0904917호(2009년 06월 19일)가 있으며, 상기 선행문헌에는 전기안전사고 방지형 지중배전선로 접속구조물에 대한 기술이 개시된다.
The conventional tension clamp as described above is made of a case that is integrally integrated with the case portion is secured by the tightening jaw is moved to the front and rear, it is not easy to place the tightening jaw in the case during the assembly process, and the construction is forced to rely on manual work Efficiency problems are pointed out. That is, since the upper surface of the case portion is bent, when the tightening jaw is settled in the case portion, there is a hassle to insert it as if it is pushed forward from the rear side of the case portion without being inserted from above the case portion.
Prior art related to the present invention is Republic of Korea Patent No. 10-0904917 (June 19, 2009), the prior art discloses a technology for the connection structure of the underground safety line of the electrical safety accident prevention.

본 발명의 목적은, 배전선로용 인장클램프에 관한 것으로서, 보다 상세하게는 전주에 설치되는 배전선로를 계절에 따라 실시간으로 장력이 일정하도록 조절하여 선로의 안정성을 유지할 수 있는 배전선로용 인장 클램프를 제공함에 있다.
An object of the present invention relates to a tension clamp for a distribution line, and more particularly, a tensioning clamp for a distribution line that can maintain the stability of the line by adjusting the tension of the distribution line installed in Jeonju in real time according to the season. In providing.

몸체로 형성되는 부재가 타 부재들을 내장하고 있고 볼트 부재로 조여지는 것이어서 일부 부재가 원래 위치로부 터 일탈 되거나 분리되어 지상으로 떨어지지 않으며, 볼트 부재와 탄성체 부재에 의해 부재 내부의 톱니 부위가 배전선의 피복을 뚫고 들어가면서 배전선과 견고하게 결합하게 되고, 빗물이나 눈 녹은 물이 배전선으로 쉽게 침투할 수 없는 배전 선로 인장 클램프에 관한 것이다.
The member formed by the body contains other members and is tightened by the bolt member so that some members do not deviate from the original position or separate and fall to the ground, and the teeth inside the member are formed by the bolt member and the elastic member. It relates to a distribution line tension clamp that tightly couples to a distribution line as it penetrates the sheath, and that rainwater or snow melt cannot easily penetrate the distribution line.

바람직한 양태에 있어서, 본 발명은 전주로부터 돌출되도록 설치되는 지지대부와; 상기 지지대부의 양측으로 돌출되며, 배전선이 관통되는 한 쌍의 클램프부와; 상기 한 쌍의 클램프부를 관통하는 배전선의 장력이 설정된 장력을 유지하도록 상기 배전선를 당기거나 푸는 장력 조절부와; 상기 지지대부에 설치되며, 상기 한 쌍의 클램프부를 관통하는 배전선을 탄성적으로 지지하는 탄성 지지부를 포함하는 배전선로용 인장클램프를 제공한다.In a preferred aspect, the present invention and the support is installed to protrude from the pole; A pair of clamp portions protruding to both sides of the support portion and through which distribution lines pass; A tension adjusting unit for pulling or releasing the distribution line so that the tension of the distribution line passing through the pair of clamp portions maintains the set tension; It is provided on the support and provides a tension clamp for a distribution line including an elastic support for elastically supporting the distribution line passing through the pair of clamps.

상기 한 쌍의 클램프부 각각은, 상기 지지대부의 일측으로부터 연장되는 연장 몸체와, 상기 연장 몸체의 단부에 설치되며, 상기 배전선이 관통하고, 관통하는 상기 배전선이 상기 지지대부 측으로 이어지도록 안내하는 안내홀을 갖는 클램프 몸체와, 상기 클램프 몸체에 설치되며, 상기 안내홀을 관통하는 배전선을 구름 지지하는 안내 롤러를 구비하는 것이 바람직하다.Each of the pair of clamp portions may include an extension body extending from one side of the support portion and an end portion of the extension body to guide the distribution line through and the distribution line passing through to the support portion side. It is preferable to have a clamp body having a hole, and a guide roller which is provided in the clamp body and supports the distribution line passing through the guide hole.

상기 장력 조절부는, 상기 클램프 몸체의 내부에 서로 기어 물림되도록 설치되는 한 쌍의 이동 기어와, 상기 한 쌍의 이동 기어를 회전 구동시키는 모터와, 상기 클램프 몸체에 설치되며, 상기 클램프 몸체를 곤통하이 이전에 위치되는 배전선과의 거리를 측정하는 거리 측정기와, 상기 측정한 거리가 기설정된 기준 거리를 이루도록 상기 모터를 구동시키는 제어기를 구비하는 것이 바람직하다.The tension adjusting unit includes a pair of moving gears installed to be engaged with each other in the clamp body, a motor for rotationally driving the pair of moving gears, and installed on the clamp body, and the clamp body is in a high position. It is preferable to have a distance meter for measuring the distance to the distribution line is located previously, and a controller for driving the motor so that the measured distance is a predetermined reference distance.

상기 한 쌍의 이동 기어의 사이에는 배전선이 기어 물림되어 관통하고, 상기 모터의 구동에 의해 구동되는 상기 한 쌍의 이동 기어의 회전 구동에 따라 상기 배전선은 좌우 방향을 따라 강제 이동되고, 상기 배전선의 외면에는 상기 한 쌍의 이동 기어와 기어 물림되도록 기어치가 형성되는 것이 바람직하다.A distribution line is geared through the pair of moving gears, and the distribution line is forcedly moved along the left and right directions according to the rotational driving of the pair of moving gears driven by the motor. It is preferable that the gear teeth are formed on the outer surface such that the pair of moving gears and the gear bites.

상기 탄성 지지부는, 상기 지지대부의 상부에 위치되어 상기 지지대부의 상부를 지나는 배전선을 롤링 지지하는 선로 안내 롤러와, 상기 지지대부의 상단에 설치되며, 상기 선로 안내 롤러의 회전축을 탄성 지지하는 탄성체를 구비하는 것이 바람직하다.The elastic support portion, a line guide roller for rolling support of the distribution line passing through the upper portion of the support and positioned in the upper portion of the support, and an elastic body installed on the upper end of the support, elastic support for the rotation axis of the line guide roller It is preferable to have a.

또한, 상기 배전선로용 인장클램프는, 회전 조절부를 더 구비한다.In addition, the tension clamp for the distribution line further includes a rotation control unit.

상기 회전 조절부는, 상기 지지대부에 설치되며, 상기 연장 몸체를 회전시키는 회전 모터를 구비하되, 상기 제어기는 기설정된 회전각을 유지하도록 상기 회전 모터를 구동시켜, 상기 클램프 부를 회전시키는 것이 바람직하다.
The rotation control unit is installed on the support, and provided with a rotary motor for rotating the extension body, the controller is preferable to drive the rotary motor to maintain a predetermined rotation angle to rotate the clamp unit.

본 발명은, 배전선로용 인장클램프에 관한 것으로서, 보다 상세하게는 전주에 설치되는 배전선로를 계절에 따라 실시간으로 장력이 일정하도록 조절하여 선로의 안정성을 유지할 수 있는 효과를 갖는다.The present invention relates to a tension clamp for a distribution line, and more particularly, it is possible to maintain the stability of the line by adjusting the tension of the distribution line installed in Jeonju in real time according to the season.

또한, 본 발명은 일부 부재가 원래 위치로부터 일탈 되거나 분리되어 지상으로 떨어지지 않으며, 배전선과 기어 연결됨으로써 배전선과 견고하게 결합하게 되고, 배전선의 장력 조절시 처지거나 늘어짐을 방지할 수 있는 효과를 갖는다.
In addition, the present invention does not deviate or separated from the original position of some members to the ground, it is connected to the distribution line and the gear is firmly coupled to the distribution line, and has the effect of preventing sagging or sagging during the tension adjustment of the distribution line.

도 1은 본 발명의 배선용 주름관과 배전박스 연결조립체를 보여주는 도면이다.
도 2는 도 1의 클램프부와 장력 조절부를 보여주는 도면이다.
도 3은 본 발명의 배선용 주름관과 배전박스 연결조립체의 다른 예를 보여주는 도면이다.
1 is a view showing a corrugated pipe and a distribution box connection assembly of the present invention.
2 is a view showing the clamp portion and the tension adjusting portion of FIG.
3 is a view showing another example of the corrugated pipe and distribution box connection assembly of the present invention.

이하, 첨부한 도면을 참고로 하여 배선용 주름관과 배전박스 연결조립체를 설명한다.Hereinafter, a corrugated pipe for wiring and a connection box connection assembly will be described with reference to the accompanying drawings.

도 1은 본 발명의 배선용 주름관과 배전박스 연결조립체를 보여주는 도면이고, 도 2는 도 1의 클램프부와 장력 조절부를 보여주는 도면이다.1 is a view showing a corrugated pipe and a distribution box connection assembly of the present invention, Figure 2 is a view showing the clamp portion and the tension adjusting portion of FIG.

도 1 및 도 2를 참조 하면, 본 발명은 전주(10)로부터 돌출되도록 설치되는 지지대부(100)와; 상기 지지대부(100)의 양측으로 돌출되며, 배전선이 관통되는 한 쌍의 클램프부(200)와; 상기 한 쌍의 클램프부(200)를 관통하는 배전선(1)의 장력이 설정된 장력을 유지하도록 상기 배전선(1)를 당기거나 푸는 장력 조절부(300)와; 상기 지지대부(100)에 설치되며, 상기 한 쌍의 클램프부(200)를 관통하는 배전선(1)을 탄성적으로 지지하는 탄성 지지부(400)를 포함하는 배전선로용 인장클램프를 제공한다.1 and 2, the present invention and the support portion 100 is installed to protrude from the pole 10; A pair of clamp parts 200 protruding to both sides of the support part 100 and through which distribution lines pass; A tension adjusting unit (300) for pulling or releasing the distribution line (1) so that the tension of the distribution line (1) passing through the pair of clamp portions (200) maintains the set tension; It is provided on the support portion 100, and provides a tension clamp for a distribution line including an elastic support portion 400 for elastically supporting the distribution line (1) passing through the pair of clamp portion (200).

상기 한 쌍의 클램프부(200) 각각은, 상기 지지대부(100)의 일측으로부터 연장되는 연장 몸체(210)와, 상기 연장 몸체(210)의 단부에 설치되며, 상기 배전선(1)이 관통하고, 관통하는 상기 배전선(1)이 상기 지지대부(100) 측으로 이어지도록 안내하는 안내홀(221)을 갖는 클램프 몸체(220)와, 상기 클램프 몸체(220)에 설치되며, 상기 안내홀(221)을 관통하는 배전선(1)을 구름 지지하는 안내 롤러(230)를 구비하는 것이 바람직하다.Each of the pair of clamp parts 200 is provided at an extension body 210 extending from one side of the support part 100 and an end of the extension body 210, and the distribution line 1 penetrates. The clamp body 220 has a guide hole 221 for guiding the distribution line 1 penetrating to the support part 100 side, and is installed in the clamp body 220 and the guide hole 221. It is preferable to provide the guide roller 230 for rolling support the power distribution line 1 penetrating.

상기 장력 조절부(300)는, 상기 클램프 몸체(220)의 내부에 서로 기어 물림되도록 설치되는 한 쌍의 이동 기어(310)와, 상기 한 쌍의 이동 기어(310)를 회전 구동시키는 모터(320)와, 상기 클램프 몸체(220)에 설치되며, 상기 클램프 몸체(220)를 관통하기 이전에 위치되는 배전선(1)과의 거리를 측정하는 거리 측정기(330)와, 상기 측정한 거리가 기설정된 기준 거리를 이루도록 상기 모터(320)를 구동시키는 제어기(340)를 구비하는 것이 바람직하다.The tension adjusting unit 300 includes a pair of moving gears 310 installed in the clamp body 220 so as to be meshed with each other, and a motor 320 for rotationally driving the pair of moving gears 310. And a distance meter 330 installed on the clamp body 220 to measure a distance from the power distribution line 1 positioned before passing through the clamp body 220, and the measured distance is preset. It is preferable to have a controller 340 for driving the motor 320 to achieve a reference distance.

상기 한 쌍의 이동 기어(310)의 사이에는 배전선(1)이 기어 물림되어 관통하고, 상기 모터(320)의 구동에 의해 구동되는 상기 한 쌍의 이동 기어(310)의 회전 구동에 따라 상기 배전선(1)은 좌우 방향을 따라 강제 이동되고, 상기 배전선(1)의 외면에는 상기 한 쌍의 이동 기어(310)와 기어 물림되도록 기어치가 형성되는 것이 바람직하다.The distribution line 1 is geared and penetrated between the pair of moving gears 310, and the distribution line is driven by rotation of the pair of moving gears 310 driven by the driving of the motor 320. (1) is forcibly moved along the left and right directions, the gear teeth are preferably formed on the outer surface of the distribution line (1) so as to mesh with the pair of moving gear (310).

상기 탄성 지지부(400)는, 상기 지지대부(100)의 상부에 위치되어 상기 지지대부(100)의 상부를 지나는 배전선(1)을 롤링 지지하는 선로 안내 롤러(410)와, 상기 지지대부(100)의 상단에 설치되며, 상기 선로 안내 롤러(410)의 회전축을 탄성 지지하는 탄성체(420)를 구비한다.The elastic support part 400 is located in the upper part of the support part 100, the track guide roller 410 for supporting the rolling line 1 passing through the upper part of the support part 100 and the support part 100 It is installed on the top of the), and has an elastic body 420 to elastically support the rotation axis of the line guide roller 410.

또한, 도 2를 참조 하면, 클램프 몸체(220)의 일단에는 거리 측정기(330)가 설치되도록 돌출 연장되는 돌출바(331)가 설치된다.In addition, referring to FIG. 2, one end of the clamp body 220 is provided with a protruding bar 331 protruding and extending so that the distance measurer 330 is installed.

상기 돌출바(331)는 실린더(332)와 연결되어, 상기 실린더(332)에 의해 좌우로 신축될 수 있다.The protrusion bar 331 may be connected to the cylinder 332 and may be stretched from side to side by the cylinder 332.

상기 실린더(332)는 제어기(340)의 제어 신호에 의해 돌출바(331)를 축으로 하여 신축시킨다.The cylinder 332 expands and contracts with the protrusion bar 331 as an axis by a control signal of the controller 340.

따라서, 본 발명에서는 거리 측정기(330)의 위치를 가변시켜, 장력 조절을 위한 거리 측정 위치를 가변시키고, 이에 따라 한 곳의 측정위치에만 국한하여 발생되는 측정오차를 방지할 수 있다.Therefore, in the present invention, by varying the position of the distance measuring device 330, the distance measuring position for adjusting the tension can be varied, thereby preventing the measurement error generated only in one measuring position.

도 3은 본 발명의 배선용 주름관과 배전박스 연결조립체의 다른 예를 보여주는 도면이다.3 is a view showing another example of the corrugated pipe and distribution box connection assembly of the present invention.

도 3을 참조 하면, 상기 배전선로용 인장클램프는, 회전 조절부(500)를 더 구비한다.Referring to FIG. 3, the distribution clamp tension clamp further includes a rotation controller 500.

상기 회전 조절부(500)는, 상기 지지대부(100)에 설치되며, 상기 연장 몸체(210)를 회전시키는 회전 모터이다.The rotation control unit 500 is installed in the support unit 100, and is a rotary motor for rotating the extension body 210.

상기 제어기(340)는 기설정된 회전각을 유지하도록 상기 회전 조절부(500)를 구동시켜, 상기 클램프 부(200)를 회전시킬 수 있다.The controller 340 may drive the rotation adjusting unit 500 to maintain a predetermined rotation angle, thereby rotating the clamp unit 200.

이에 따라, 계절 기후에 따라 배전선로(1)의 위치가 가변되지 않고, 클램프 부(100)의 설정 위치를 항상 일정하게 유지하여 배전선로(1)를 당기거나 푸는 작동을 하는 경우 안정적인 작동을 하도록 할 수 있다.Accordingly, the position of the distribution line 1 does not vary according to the seasonal climate, and the setting position of the clamp unit 100 is always kept constant so that the stable operation is performed when the distribution line 1 is pulled or unrolled. can do.

상기와 같은 구성 및 작용에 따라, 본 발명은, 배전선로용 인장클램프에 관한 것으로서, 보다 상세하게는 전주에 설치되는 배전선로를 계절에 따라 실시간으로 장력이 일정하도록 조절하여 선로의 안정성을 유지할 수 있는 효과를 갖는다.According to the configuration and action as described above, the present invention relates to a tension clamp for the distribution line, more specifically, it is possible to maintain the stability of the line by adjusting the tension of the distribution line installed in Jeonju in real time according to the season. Has the effect.

또한, 본 발명은 일부 부재가 원래 위치로부터 일탈 되거나 분리되어 지상으로 떨어지지 않으며, 배전선과 기어 연결됨으로써 배전선과 견고하게 결합하게 되고, 배전선의 장력 조절시 처지거나 늘어짐을 방지할 수 있는 효과를 갖는다.In addition, the present invention does not deviate or separated from the original position of some members to the ground, it is connected to the distribution line and the gear is firmly coupled to the distribution line, and has the effect of preventing sagging or sagging during the tension adjustment of the distribution line.

이상에서는 본 발명의 실시예를 중심으로 설명하였으나, 이는 예시적인 것에 불과하며, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 기술자라면 이로부터 다양한 변형 및 균등한 타 실시 예가 가능하다는 점을 이해할 것이다. 따라서, 본 발명의 진정한 기술적 보호범위는 이하에 기재되는 특허청구범위에 의해서 판단되어야 할 것이다.
While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it is to be understood that the invention is not limited to the disclosed embodiments, but, on the contrary, is intended to cover various modifications and equivalent arrangements included within the spirit and scope of the appended claims. . Accordingly, the true scope of the present invention should be determined by the following claims.

1 : 배전 선로
100 : 지지대부
200 : 클램프부
300 : 장력 조절부
400 : 탄성 지지부
500 : 회전 조절부
1: distribution line
100: support base
200: clamp part
300: tension control unit
400: elastic support
500: rotation control unit

Claims (4)

전주로부터 돌출되도록 설치되는 지지대부;
상기 지지대부의 양측으로 돌출되며, 배전선이 관통되는 한 쌍의 클램프부;
상기 한 쌍의 클램프부를 관통하는 배전선의 장력이 설정된 장력을 유지하도록 상기 배전선를 당기거나 푸는 장력 조절부;
상기 지지대부에 설치되며, 상기 한 쌍의 클램프부를 관통하는 배전선을 탄성적으로 지지하는 탄성 지지부를 포함하고,
상기 한 쌍의 클램프부 각각은,
상기 지지대부의 일측으로부터 연장되는 연장 몸체와,
상기 연장 몸체의 단부에 설치되며, 상기 배전선이 관통하고, 관통하는 상기 배전선이 상기 지지대부 측으로 이어지도록 안내하는 안내홀을 갖는 클램프 몸체와,
상기 클램프 몸체에 설치되며, 상기 안내홀을 관통하는 배전선을 구름 지지하는 안내 롤러를 구비하고,
상기 장력 조절부는, 상기 클램프 몸체의 내부에 서로 기어 물림되도록 설치되는 한 쌍의 이동 기어와, 상기 한 쌍의 이동 기어를 회전 구동시키는 모터와, 상기 클램프 몸체에 설치되며, 상기 클램프 몸체를 관통하기 이전에 위치되는 배전선과의 거리를 측정하는 거리 측정기와, 측정한 상기 거리가 기설정된 기준 거리를 이루도록 상기 모터를 구동시키는 제어기를 구비하고,
상기 한 쌍의 이동 기어의 사이에는 배전선이 기어 물림되어 관통하고,
상기 모터의 구동에 의해 구동되는 상기 한 쌍의 이동 기어의 회전 구동에 따라 상기 배전선은 좌우 방향을 따라 강제 이동되고,
상기 배전선의 외면에는 상기 한 쌍의 이동 기어와 기어 물림되도록 기어치가 형성되고,
상기 탄성 지지부는,
상기 지지대부의 상부에 위치되어 상기 지지대부의 상부를 지나는 배전선을 롤링 지지하는 선로 안내 롤러와,
상기 지지대부의 상단에 설치되며, 상기 선로 안내 롤러의 회전축을 탄성 지지하는 탄성체를 구비하고,
상기 배전선로용 인장클램프는, 회전 조절부를 더 구비하되,
상기 회전 조절부는,
상기 지지대부에 설치되며, 상기 연장 몸체를 회전시키는 회전 모터를 구비하되,
상기 제어기는 기설정된 회전각을 유지하도록 상기 회전 모터를 구동시켜, 상기 클램프 부를 회전시키는 것을 특징으로 하는 배전선로용 인장클램프.

A support part installed to protrude from the electric pole;
A pair of clamp portions protruding to both sides of the support portion, through which distribution lines pass;
A tension adjusting unit for pulling or releasing the distribution line so that the tension of the distribution line passing through the pair of clamp portions maintains the set tension;
It is installed on the support, and includes an elastic support for elastically supporting the distribution line passing through the pair of clamps,
Each of the pair of clamp portions,
An extension body extending from one side of the support;
A clamp body installed at an end of the extension body, the clamp body having a guide hole through which the distribution line penetrates and guides the distribution line penetrating to the support part side;
It is installed in the clamp body, and provided with a guide roller for rolling support the distribution line passing through the guide hole,
The tension adjusting unit includes a pair of moving gears installed to be engaged with each other in the clamp body, a motor for rotationally driving the pair of moving gears, installed in the clamp body, and penetrating the clamp body. And a distance measuring device for measuring a distance to a previously located distribution line, and a controller for driving the motor such that the measured distance is a preset reference distance.
Between the pair of moving gears, a distribution line is geared through and penetrates,
According to the rotational drive of the pair of moving gears driven by the driving of the motor, the distribution line is forcibly moved along the left and right directions,
Gears are formed on the outer surface of the distribution line so as to be bitten with the pair of moving gears,
The elastic support portion
A track guide roller positioned at an upper part of the support part and supporting a distribution line passing through the upper part of the support part;
Is installed on the upper end of the support portion, and provided with an elastic body for elastically supporting the rotation axis of the line guide roller,
The tension clamp for the distribution line is further provided with a rotation control unit,
The rotation control unit,
Is installed on the support portion, provided with a rotary motor for rotating the extension body,
And the controller drives the rotary motor to maintain a predetermined rotation angle, thereby rotating the clamp unit.

삭제delete 삭제delete 삭제delete
KR1020130139374A 2013-11-15 2013-11-15 Connection clamp of an electric power distribution line pole KR101367434B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020130139374A KR101367434B1 (en) 2013-11-15 2013-11-15 Connection clamp of an electric power distribution line pole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020130139374A KR101367434B1 (en) 2013-11-15 2013-11-15 Connection clamp of an electric power distribution line pole

Publications (1)

Publication Number Publication Date
KR101367434B1 true KR101367434B1 (en) 2014-02-26

Family

ID=50271980

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020130139374A KR101367434B1 (en) 2013-11-15 2013-11-15 Connection clamp of an electric power distribution line pole

Country Status (1)

Country Link
KR (1) KR101367434B1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101504120B1 (en) * 2014-12-10 2015-03-19 이호성 Connection clamp of an electric power distribution line
KR101556932B1 (en) 2014-12-29 2015-10-05 (주)해우엔지니어링건축사사무소 Distributing board for power distribution connection os an underground power line
KR20160116375A (en) 2015-03-30 2016-10-10 경남정보대학교 산학협력단 Manufacturing method of tension clamp for aluminum wiring
KR101702082B1 (en) * 2016-09-02 2017-02-07 주식회사 에스지이엔지 Apparatus for Reducing Impact of Jumper Wires of Aerial Transmission Line Tower
KR101824187B1 (en) 2017-01-26 2018-01-31 (주)오성이엠 Distribution line connector with preventing slack function

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100881354B1 (en) * 2008-11-01 2009-02-02 주식회사 한국종합기술 An apparatus of tension relief using power electric transmission
KR100904917B1 (en) * 2009-03-30 2009-06-29 (주)협동전기감리단 Frame for underground distribution line fixation
JP2010220453A (en) * 2009-03-19 2010-09-30 Tokyo Electric Power Co Inc:The Back tension device for laying suspension cable (messenger) and method for laying suspension cable (messenger) using the back tension device
KR101126669B1 (en) 2011-10-05 2012-03-29 이재걸 Electric wire guide roller

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100881354B1 (en) * 2008-11-01 2009-02-02 주식회사 한국종합기술 An apparatus of tension relief using power electric transmission
JP2010220453A (en) * 2009-03-19 2010-09-30 Tokyo Electric Power Co Inc:The Back tension device for laying suspension cable (messenger) and method for laying suspension cable (messenger) using the back tension device
KR100904917B1 (en) * 2009-03-30 2009-06-29 (주)협동전기감리단 Frame for underground distribution line fixation
KR101126669B1 (en) 2011-10-05 2012-03-29 이재걸 Electric wire guide roller

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101504120B1 (en) * 2014-12-10 2015-03-19 이호성 Connection clamp of an electric power distribution line
KR101556932B1 (en) 2014-12-29 2015-10-05 (주)해우엔지니어링건축사사무소 Distributing board for power distribution connection os an underground power line
KR20160116375A (en) 2015-03-30 2016-10-10 경남정보대학교 산학협력단 Manufacturing method of tension clamp for aluminum wiring
KR101702082B1 (en) * 2016-09-02 2017-02-07 주식회사 에스지이엔지 Apparatus for Reducing Impact of Jumper Wires of Aerial Transmission Line Tower
KR101824187B1 (en) 2017-01-26 2018-01-31 (주)오성이엠 Distribution line connector with preventing slack function

Similar Documents

Publication Publication Date Title
KR101367434B1 (en) Connection clamp of an electric power distribution line pole
JP5436572B2 (en) Power tool for stainless steel metal locking ties
GB2541144A (en) Securing device
JP5606187B2 (en) Stringer
KR100987424B1 (en) Electric power line of supporting pole for preventing of an electric shock
KR101794296B1 (en) Connecting clamp for replacing power line of power distribution line
CA2956679C (en) Method and components for fence/post installation
CN110416915B (en) Device for adjusting tension of electric wire and cable
JP6523090B2 (en) Fall prevention handrail strength testing device
KR100659179B1 (en) Fixing device of electric power distribution line with adjustment function of the upper and lower position
KR101771688B1 (en) Transmission and distribution equipment for cable laying and fixing power
KR101504120B1 (en) Connection clamp of an electric power distribution line
KR101355102B1 (en) Insulator of electric power line for preventing electric shock
CN109696734B (en) Optical cable warning tape laying equipment with rolling adjusting function based on vehicle body
KR101503779B1 (en) Insulator of electric power line for preventing electric shock
RU2327325C1 (en) Feathering winch
US6409154B1 (en) Fish tape feed mechanism
KR101604835B1 (en) a device for prevention of aerial distribution line
CN113835180B (en) Tensile machine for adjusting tensioning of sensing optical cable
US8782870B2 (en) Insulator drilling jig
JPS6031576Y2 (en) Curtain rail wire tension adjustment mechanism
CN211743945U (en) Rat-proof cable bridge
CN215494285U (en) Tensile machine for adjusting tensioning of sensing optical cable
JP2007263247A (en) Pulling device for existing pipe lining pipe member
JP3214240U (en) Wire guide

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20170210

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20180212

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20190211

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20200210

Year of fee payment: 7