KR101497395B1 - Load test device - Google Patents

Load test device Download PDF

Info

Publication number
KR101497395B1
KR101497395B1 KR1020130081002A KR20130081002A KR101497395B1 KR 101497395 B1 KR101497395 B1 KR 101497395B1 KR 1020130081002 A KR1020130081002 A KR 1020130081002A KR 20130081002 A KR20130081002 A KR 20130081002A KR 101497395 B1 KR101497395 B1 KR 101497395B1
Authority
KR
South Korea
Prior art keywords
pressing
monorail
coupled
unit
load
Prior art date
Application number
KR1020130081002A
Other languages
Korean (ko)
Other versions
KR20150007075A (en
Inventor
유정모
박찬후
김학만
Original Assignee
삼성중공업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 삼성중공업 주식회사 filed Critical 삼성중공업 주식회사
Priority to KR1020130081002A priority Critical patent/KR101497395B1/en
Publication of KR20150007075A publication Critical patent/KR20150007075A/en
Application granted granted Critical
Publication of KR101497395B1 publication Critical patent/KR101497395B1/en

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N3/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N3/08Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/003Generation of the force
    • G01N2203/0032Generation of the force using mechanical means
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/02Details not specific for a particular testing method
    • G01N2203/026Specifications of the specimen
    • G01N2203/0262Shape of the specimen
    • G01N2203/0278Thin specimens
    • G01N2203/028One dimensional, e.g. filaments, wires, ropes or cables

Landscapes

  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

하중 테스트 장치가 개시된다. 본 발명에 따른 하중 테스트 장치는, 천정에 설치된 모노레일에 지지되며 모노레일을 가압하는 가압유닛과, 가압유닛에 결합되며 모노레일에 연결되어 가압유닛에 의해 모노레일에 인가되는 하중을 측정하는 하중 측정유닛을 포함한다. A load test apparatus is disclosed. The load test apparatus according to the present invention includes a pressurizing unit supported by a monorail installed on a ceiling and pressing the monorail, and a load measuring unit connected to the pressurizing unit and measuring a load applied to the monorail by the pressurizing unit do.

Description

하중 테스트 장치{Load test device}[0001] Load test device [0002]

본 발명은 하중 테스트 장치에 관한 것으로서, 보다 상세하게는, 장애물에 간섭받지 않으며 모노레일의 하중 테스트를 수행할 수 있는 하중 테스트 장치에 관한 것이다.BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a load test apparatus, and more particularly, to a load test apparatus capable of performing a load test of a monorail without interference with an obstacle.

일반적으로, 선박의 상부 데크(deck) 등에는 모노레일이 설치된다. 이러한 모노레일은 블록 등의 이송 및 탑재 등에 주로 사용된다.Generally, a monorail is installed on the upper deck of the ship. Such monorails are mainly used for transfer and mounting of blocks and the like.

이러한 모노레일에 대해서는, 선박의 건조 또는 선박의 운항 중 안정성 확보를 위해, 하중 테스트가 필수적으로 수행되어야 한다.For such monorails, load testing must be performed to ensure stability during ship construction or ship operation.

종래에는 크레인이나 체인블록을 이용하여 모노레일에 대한 하중 테스트를 수행하였다.Conventionally, a load test for a monorail was performed using a crane or a chain block.

도 1은 종래기술에 의해 하중 테스트 장치가 도시된 도면이다.1 is a view showing a load test apparatus according to the prior art.

종래기술에 따른 하중 테스트 장치는, 하부 테크(11)에 설치되는 테스트 러그(5)와, 상부 데크(10)에 설치된 모노레일(1)을 따라 이송하는 호이스트(2)와, 호이스트(2)에 연결되는 로드 셀(3)과, 로드 셀(3)과 테스트 러그(5)를 연결하는 체인 블록(4)을 포함한다.The load test apparatus according to the related art includes a test lug 5 installed on a lower tech 11, a hoist 2 for carrying along a monorail 1 installed on an upper deck 10, And a chain block 4 connecting the load cell 3 and the test lug 5. The load cell 3 is connected to the load cell 3,

이러한 구성을 갖는 종래기술에 따른 하중 테스트 방법을 설명하면, 먼저 하부 데크(11)에 테스트 러그(5)를 설치한 후, 상부 데크(10)에 설치된 모노레일(1)을 따라 이송하는 호이스트(2)에 로드 셀(3)을 연결한다.A test lug 5 is installed on the lower deck 11 and then a hoist 2 for transporting the test lug 5 along the monorail 1 installed on the upper deck 10 The load cell 3 is connected.

다음 체인블록(4)을 테스트 러그(5)와 로드 셀(3)에 연결한다. 이후 체인블록(4)을 수동으로 구동시켜 모노레일(1)에 하중을 인가한 후 로드 셀(3)의 하중 값을 읽어 들이는 것에 의해 모노레일에 대한 하중 테스트가 완료된다. Connect the next chain block (4) to the test lug (5) and load cell (3). Thereafter, the chain block 4 is manually driven to apply a load to the monorail 1, and load values of the load cell 3 are read to complete the load test on the monorail.

그런데 종래기술에 따른 하중 테스트 장치는, 모노레일(1)의 하부에 별도의 구조물이 존재하는 경우 구조물(미도시)이 배치된 경우에는 사용하기 어려운 문제점이 있다.However, the load test apparatus according to the related art has a problem that it is difficult to use the structure when a structure (not shown) is disposed when a separate structure exists under the monorail 1.

즉, 테스트 러그(5)가 설치되어야 할 위치에 구조물(미도시)이 존재함으로써, 하부 데크(11)에 테스트 러그(5)를 설치할 수 없어 하중 테스트 자체를 수행 할 수 없는 경우가 있으며, 구조물을 이동시킨 후 테스트 러그(5)를 설치해야 하는 경우 구조물의 이동이 용이하지 않은 문제점이 있다.That is, since there is a structure (not shown) at a position where the test lug 5 is to be installed, the test lug 5 can not be installed on the lower deck 11, so that the load test itself can not be performed. There is a problem that the structure is not easily moved when the test lug 5 is to be installed.

따라서, 모노레일(1)의 하부에 배치되는 구조물에 간섭받지 않으며 모노레일(1)의 하중 테스트를 실시할 수 있는 하중 테스트 장치의 개발이 필요한 실정이다.Therefore, it is necessary to develop a load test apparatus capable of performing a load test of the monorail 1 without being interfered with by a structure disposed under the monorail 1.

한국실용신안공개공보 제20-2013-0002440 ((주)대우조선해양), 2013.04.24.Korean Utility Model Laid Open Publication No. 20-2013-0002440 (DSME Co., Ltd.), 2013.04.24.

따라서 본 발명의 해결하고자 하는 과제는, 모노레일의 하부에 배치되는 구조물에 간섭되지 않고 모노레일의 하중 테스트를 실시할 수 있는 하중 테스트 장치를 제공하는 것이다.SUMMARY OF THE INVENTION Accordingly, it is an object of the present invention to provide a load test apparatus capable of performing a load test of a monorail without interfering with a structure disposed under the monorail.

본 발명의 일 측면에 따르면, 천정에 설치된 모노레일에 지지되며, 상기 모노레일을 가압하는 가압유닛; 및 상기 가압유닛에 결합되며, 상기 모노레일에 연결되어 상기 가압유닛에 의해 상기 모노레일에 인가되는 하중을 측정하는 하중 측정유닛을 포함하는 하중 테스트 장치가 제공될 수 있다.According to an aspect of the present invention, there is provided a method of manufacturing a monorail, comprising: a pressing unit supported on a monorail installed on a ceiling and pressing the monorail; And a load measuring device coupled to the pressurizing unit and connected to the monorail to measure a load applied to the monorail by the pressurizing unit.

상기 가압유닛은, 상기 하중 측정유닛이 결합되며, 상기 모노레일을 가압하는 가압부; 상기 가압부에 연결되며, 상기 가압부에 가압력을 제공하는 구동부; 및 상기 구동부에 연결되며, 상기 구동부를 지지하는 지지부를 포함할 수 있다.The pressurizing unit includes a pressurizing unit to which the load measuring unit is coupled and presses the monorail; A driving unit connected to the pressing unit and providing a pressing force to the pressing unit; And a support portion connected to the driving portion and supporting the driving portion.

상기 가압부는, 제1 위치에 상기 구동부가 결합되며, 상기 제1 위치에서 미리 결정된 간격만큼 이격된 제2 위치에 상기 하중 측정유닛이 결합되는 가압 몸체; 및 상기 가압 몸체에 결합되고, 상기 제1 위치와 상기 제2 위치 사이에 배치되며, 상기 천정에 연결되는 중심 블록을 포함할 수 있다.Wherein the pressing portion includes a pressing body to which the driving unit is coupled at a first position and to which the load measuring unit is coupled at a second position spaced apart from the first position by a predetermined interval; And a central block coupled to the pressurized body and disposed between the first and second positions and coupled to the ceiling.

상기 가압부는, 상기 모노레일에 인가되는 하중을 조절하는 하중 조절부를 더 포함할 수 있다.The pressing unit may further include a load adjusting unit for adjusting a load applied to the monorail.

상기 하중 조절부는, 상기 가압 몸체의 상단부에 마련되는 그루브의 측벽에 상호 이격되어 형성되는 복수의 관통공 및 상기 중심 블록에 형성되는 결합공에 삽입되는 결합핀을 포함할 수 있다.The load control unit may include a plurality of through holes spaced apart from each other on a side wall of a groove provided at an upper end of the pressing body, and a coupling pin inserted into a coupling hole formed in the central block.

상기 중심 블록은, 상기 천정에 연결되는 블록 몸체부; 및 상기 블록 몸체부의 하단부에 마련되어 상기 가압 몸체에 연결되며, 곡면 형상으로 마련되는 곡면부를 포함할 수 있다.The central block includes a block body connected to the ceiling; And a curved surface portion provided at a lower end of the block body portion and connected to the pressing body, the curved surface portion being provided in a curved shape.

상기 구동부는, 상기 지지부에 결합되며 가압 실린더 본체; 및 상기 가압 실린더 본체에 대해 상대이동 가능하며, 상기 가압부에 결합되는 가압 로드를 포함할 수 있다.The driving unit may include: a pressing cylinder body coupled to the supporting portion; And a pressing rod which is movable relative to the pressure cylinder body and is coupled to the pressing portion.

상기 가압 몸체에 결합되며, 가압 실린더 본체에 미리 결정된 거리만큼 이격되어 배치되어 상기 가압 로드가 휘어지는 것을 제한하는 가이드를 더 포함할 수 있다.And a guide coupled to the pressing body and spaced apart from the pressing cylinder body by a predetermined distance to restrict the pressing rod from being bent.

상기 천정 및 상기 지지부에 결합되며, 상기 지지부의 이동을 구속하는 케이블을 더 포함할 수 있다.And a cable coupled to the ceiling and the support and restricting movement of the support.

상기 하중 측정유닛은 로드 셀(load cell)을 포함할 수 있다.The load measuring unit may include a load cell.

본 발명의 실시예들은, 모노레일을 가압하는 가압유닛이 모노레일에 지지됨으로써, 모노레일의 하부에 배치되는 구조물에 간섭되지 않고 모노레일의 하중 테스트를 실시할 수 있다. In the embodiments of the present invention, the pressurizing unit for pressurizing the monorail is supported on the monorail, so that the load test of the monorail can be performed without interfering with the structure disposed under the monorail.

도 1은 종래기술에 따른 하중 테스트 장치가 도시된 도면이다.
도 2는 본 발명에 따른 하중 테스트 장치가 모노레일에 지지된 상태가 도시된 도면이다.
도 3은 도 2의 하중 테스트 장치가 도시된 사시도이다.
도 4는 도 3의 하중 테스트 장치를 다른 방향에서 바라본 사시도이다.
도 5는 도 3의 정면도이다.
도 6은 도 3의 측면도이다.
도 7은 도 6에서 가이드가 절개된 상태가 도시된 도면이다.
도 8은 도 3의 분해사시도이다.
도 9는 도 2의 하중 테스트 장치에서 가이드가 미도시된 동작상태도이다.
1 is a view showing a load test apparatus according to the prior art.
2 is a view showing a state in which a load test apparatus according to the present invention is supported on a monorail.
3 is a perspective view showing the load test apparatus of FIG.
4 is a perspective view of the load test apparatus of FIG. 3 viewed from another direction.
5 is a front view of Fig.
Figure 6 is a side view of Figure 3;
Fig. 7 is a view showing a state in which the guide is cut in Fig. 6. Fig.
8 is an exploded perspective view of Fig.
FIG. 9 is an operational state diagram in which a guide is not shown in the load test apparatus of FIG. 2. FIG.

본 발명과 본 발명의 동작상의 이점 및 본 발명의 실시에 의하여 달성되는 목적을 충분히 이해하기 위해서는 본 발명의 바람직한 실시예를 예시하는 첨부 도면 및 첨부 도면에 기재된 내용을 참조하여야만 한다.In order to fully understand the present invention, operational advantages of the present invention, and objects achieved by the practice of the present invention, reference should be made to the accompanying drawings and the accompanying drawings which illustrate preferred embodiments of the present invention.

이하, 첨부된 도면을 참조하여 본 발명의 바람직한 실시예를 설명함으로써, 본 발명을 상세히 설명한다. 다만, 본 발명을 설명함에 있어서 이미 공지된 기능 혹은 구성에 대한 설명은, 본 발명의 요지를 명료하게 하기 위하여 생략하기로 한다.Hereinafter, the present invention will be described in detail with reference to the preferred embodiments of the present invention with reference to the accompanying drawings. In the following description, well-known functions or constructions are not described in order to avoid unnecessary obscuration of the present invention.

도 2는 본 발명에 따른 하중 테스트 장치가 모노레일에 지지된 상태가 도시된 도면이고, 도 3은 도 2의 하중 테스트 장치가 도시된 사시도이며, 도 4는 도 3의 하중 테스트 장치를 다른 방향에서 바라본 사시도이고, 도 5는 도 3의 정면도이며, 도 6은 도 3의 측면도이고, 도 7은 도 6에서 가이드가 절개된 상태가 도시된 도면이며, 도 8은 도 3의 분해사시도이고, 도 9는 도 2의 하중 테스트 장치에서 가이드가 미도시된 동작상태도이다.FIG. 3 is a perspective view showing the load test apparatus of FIG. 2, FIG. 4 is a view showing the load test apparatus of FIG. 3 in a different direction Fig. 6 is a side view of Fig. 3, Fig. 7 is a view showing a state where the guide is cut in Fig. 6, Fig. 8 is an exploded perspective view of Fig. 3, 9 is an operation state diagram in which a guide is not shown in the load test apparatus of FIG.

도 2 내지 9에 도시된 바와 같이, 본 실시예에 따른 하중 테스트 장치는, 천정(T)에 설치된 모노레일(M)에 지지되며, 모노레일(M)을 가압하는 가압유닛(110)과, 가압유닛(110)에 결합되며, 모노레일(M)에 연결되어 가압유닛(110)에 의해 모노레일(M)에 인가되는 하중을 측정하는 하중 측정유닛(120)을 포함한다.2 to 9, the load tester according to the present embodiment includes a pressing unit 110 supported by a monorail M installed on a ceiling T and pressing the monorail M, And a load measuring unit 120 coupled to the monorail M and measuring a load applied to the monorail M by the pressing unit 110. [

본 실시예에서 천정(T)은 선박의 상부 데크(deck)에 해당될 수 있는데, 이에 본 발명의 권리범위가 한정되는 것은 아니며, 모노레일(M)이 결합된 다양한 구조물이 본 실시예의 천정(T)에 해당된다.In the present embodiment, the ceiling T may correspond to the upper deck of the ship, and thus the scope of the present invention is not limited thereto, and various structures to which the monorail M is coupled are not limited to the ceiling T ).

이러한 천정(T)에는 소정의 간격으로 복수개의 천정 러그(R1)가 마련된다.The ceiling T is provided with a plurality of ceiling lugs R1 at predetermined intervals.

또한 본 실시예에서 모노레일(M)은, 천정(T)에 결합되는 천정 결합부(M1)와, 천정 결합부(M1)에서 연장되는 플랜지부(M2)를 포함한다.Also, in this embodiment, the monorail M includes a ceiling mating portion M 1 coupled to the ceiling T and a flange portion M 2 extending from the ceiling mating portion M 1.

가압유닛(110)은, 천정(T)에 설치된 모노레일(M)에 지지되며, 모노레일(M)을 가압한다. 본 실시예에서 가압유닛(110)은 모노레일(M)의 플랜지부(M2)에 지지된다.The pressurizing unit 110 is supported by a monorail M installed on the ceiling T and presses the monorail M. [ The pressing unit 110 is supported on the flange portion M2 of the monorail M in this embodiment.

이러한 가압유닛(110)은, 하중 측정유닛(120)이 결합되며 모노레일(M)을 가압하는 가압부(111)와, 가압부(111)에 연결되며 가압부(111)에 가압력을 제공하는 구동부(112)와, 구동부(112)에 연결되며 구동부(112)를 지지하는 지지부(113)를 포함한다.The pressurizing unit 110 includes a pressurizing unit 111 to which the load measuring unit 120 is coupled and presses the monorail M and a drive unit 112 that is connected to the pressurizing unit 111 and provides a pressing force to the pressurizing unit 111. [ And a supporting portion 113 connected to the driving portion 112 and supporting the driving portion 112.

본 실시예에서 구동부(112)는 한 쌍으로 마련되며, 모노레일(M)을 기준으로 상호 대칭되어 배치된다. 또한 가압부(111)도 구동부(112)와 마찬가지로 한 쌍으로 마련되며, 모노레일(M)을 기준으로 상호 대칭되어 배치된다.In this embodiment, the driving units 112 are provided as a pair and arranged symmetrically with respect to the monorail M as a reference. The pressurizing portions 111 are also provided as a pair in the same manner as the drive portion 112 and arranged symmetrically with respect to the monorail M as a reference.

가압부(111)는, 모노레일(M)에 지지되며, 모노레일(M)을 가압한다. 본 실시예에서 가압부(111)는 모노레일(M)의 플랜지부(M2)를 가압한다. 또한 가압부(111)에는, 플랜지부(M2)에 연결되며 가압에 의해 모노레일(M)에 인가되는 하중을 측정하는 하중 측정유닛(120)이 결합된다. The pressing portion 111 is supported by the monorail M and presses the monorail M. The pressing portion 111 presses the flange portion M2 of the monorail M in this embodiment. The pressurizing portion 111 is also connected to a load measuring unit 120 connected to the flange portion M2 and measuring a load applied to the monorail M by pressurization.

이러한 가압부(111)는, 제1 위치에 구동부(112)가 결합되며 제1 위치에서 미리 결정된 간격만큼 이격된 제2 위치에 하중 측정유닛(120)이 결합되는 가압 몸체(114)와, 가압 몸체(114)에 결합되고 제1 위치와 제2 위치 사이에 배치되며 천정(T)에 연결되는 중심 블록(115)을 포함한다.The pressing portion 111 includes a pressing body 114 to which the load measuring unit 120 is coupled at a second position where the driving portion 112 is coupled to the first position and spaced apart from the first position by a predetermined interval, And a central block 115 coupled to the body 114 and disposed between the first and second positions and connected to the ceiling T. [

가압 몸체(114)는 바(bar) 형상으로 마련된다. 이러한 가압 몸체(114)의 제1 위치에 구동부(112)가 결합되며, 제1 위치에서 미리 결정된 간격만큼 이격된 가압 몸체(114)의 제2 위치에 하중 측정유닛(120)이 결합된다. 본 실시예에서 구동부(112) 및 하중 측정유닛(120)은, 가압 몸체(114)의 하단부에 각각 결합된다.The pressing body 114 is provided in a bar shape. The driving unit 112 is coupled to the first position of the pressing body 114 and the load measuring unit 120 is coupled to the second position of the pressing body 114 spaced apart from the first position by a predetermined distance. In this embodiment, the driving unit 112 and the load measuring unit 120 are coupled to the lower end of the pressing body 114, respectively.

여기서 가압 몸체(114)의 제1 위치는, 모노레일(M)을 기준으로 하여 제2 위치보다 모노레일(M)에서 더 멀리 떨어진 위치이다.Here, the first position of the pressing body 114 is a position farther from the monorail M than the second position with respect to the monorail M.

또한 가압 몸체(114)의 상단부에는 중심 블록(115)이 끼워지는 그루브(G)가 마련된다. 이러한 그루브(G)의 양 측벽에는 상호 이격되어 형성되는 복수의 관통공(H1)이 형성된다.In addition, a groove (G) in which the center block (115) is fitted is provided at the upper end of the pressure body (114). A plurality of through holes H1 are formed on both side walls of the groove G so as to be spaced apart from each other.

한편, 중심 블록(115)은, 가압 몸체(114)에 결합되고, 제1 위치와 제2 위치 사이에 배치되며, 천정(T)에 연결된다. On the other hand, the central block 115 is coupled to the pressure body 114, is disposed between the first position and the second position, and is connected to the ceiling T. [

본 실시예에서 중심 블록(115)은, 천정(T)에 연결되는 블록 몸체부(115a)와, 블록 몸체부(115a)의 하단부에 마련되어 가압 몸체(114)에 연결되며 곡면 형상으로 마련되는 곡면부(115b)를 포함한다.The central block 115 includes a block body 115a connected to the ceiling T and a curved surface 115c provided at the lower end of the block body 115a and connected to the pressing body 114, And a portion 115b.

블록 몸체부(115a)는 천정(T)에 연결된다. 이러한 블록 몸체부(115a)에는 앞서 설명한 관통공(H1)에 연통되는 결합공(H2)이 형성된다.The block body portion 115a is connected to the ceiling T. In the block body portion 115a, a coupling hole H2 communicating with the through hole H1 described above is formed.

곡면부(115b)는, 블록 몸체부(115a)의 하단부에 마련되어 가압 몸체(114)에 연결된다. The curved surface portion 115b is provided at the lower end of the block body portion 115a and is connected to the pressing body 114. [

이러한 구조를 갖는 중심 블록(115)은 지렛대의 중심점 역할을 수행한다. 즉 중심 블록(115)이 천정(T)에 연결된 상태에서 가압 몸체(114)를 구동부(112)가 밀어주면, 지렛대 원리에 의해 가압 몸체(114)가 모노레일(M)의 플랜지부(M2)를 가압한다.The central block 115 having such a structure serves as a center point of the leverage. When the driving body 112 pushes the pressing body 114 with the center block 115 connected to the ceiling T, the pressing body 114 presses the flange portion M2 of the monorail M Pressure.

이때, 가압 몸체(114)에 연결되는 곡면부(115b)가 곡면 형상으로 마련됨으로써, 중심 블록(115)과 가압 몸체(114)의 접촉 면적을 최소로 줄일 수 있어 지렛대 효과를 극대화할 수 있다.At this time, since the curved surface portion 115b connected to the pressing body 114 is formed in a curved shape, the contact area between the central block 115 and the pressing body 114 can be minimized, thereby maximizing the leverage effect.

또한 가압부(111)는, 모노레일(M)에 인가되는 하중을 조절하는 하중 조절부(116)를 더 포함한다. 이러한 하중 조절부(116)는, 가압 몸체(114)의 관통공(H1) 및 중심 블록(115)의 결합공(H2)에 삽입되는 결합핀(117)을 포함한다.The pressurizing portion 111 further includes a load control portion 116 for regulating a load applied to the monorail M. [ The load adjusting portion 116 includes a through hole H1 of the pressing body 114 and an engaging pin 117 inserted into the engaging hole H2 of the center block 115. [

이러한 하중 조절부(116)는, 가압 몸체(114)에 결합되는 중심 블록(115)의 위치를 가변시킴으로써, 가압 몸체(114)가 모노레일(M)의 플랜지부(M2)에 인가하는 하중을 가변시킬 수 있다.The load adjusting portion 116 adjusts the load applied to the flange portion M2 of the monorail M by the pressing body 114 by varying the position of the center block 115 coupled to the pressing body 114, .

한편 구동부(112)는, 가압부(111)에 연결되며, 가압부(111)에 가압력을 제공한다. 이러한 구동부(112)는, 지지부(113)에 결합되는 가압 실린더 본체(112a)와, 가압 실린더 본체(112a)에 대해 상대이동 가능하며 가압부(111)에 결합되는 가압 로드(112b)를 포함한다. 본 실시예에서 가압 로드(112b)는 가압 몸체(114)의 하단부에 결합된다.On the other hand, the driving unit 112 is connected to the pressing unit 111 and provides a pressing force to the pressing unit 111. The driving portion 112 includes a pressing cylinder body 112a coupled to the supporting portion 113 and a pressing rod 112b that is movable relative to the pressing cylinder body 112a and is coupled to the pressing portion 111 . In this embodiment, the pressing rod 112b is coupled to the lower end of the pressing body 114. [

한편 지지부(113)는, 구동부(112)에 연결되며, 구동부(112)를 지지한다. 본 실시예에서 가압 실린더 본체(112a)가 지지부(113)에 연결되어 지지부(113)에 지지된다. 또한 이러한 지지부(113)는 측벽에 마련되는 지지부 러그(R2)를 포함한다.The supporting part 113 is connected to the driving part 112 and supports the driving part 112. In this embodiment, the pressurizing cylinder body 112a is connected to the support portion 113 and is supported by the support portion 113. [ The supporting portion 113 includes a supporting lug R2 provided on the side wall.

한편 하중 측정유닛(120)은, 가압유닛(110)에 결합되며, 모노레일(M)에 연결되어 가압유닛(110)에 의해 모노레일(M)에 인가되는 하중을 측정한다. 이러한 하중 측정유닛(120)은 로드 셀(load cell, 미도시)을 포함한다.The load measuring unit 120 is coupled to the pressurizing unit 110 and connected to the monorail M to measure the load applied to the monorail M by the pressurizing unit 110. [ The load measurement unit 120 includes a load cell (not shown).

이와 같이 본 실시예에 따른 하중 측정유닛(120)은, 가압 몸체(114)의 하단부에 결합되며 모노레일(M)의 플랜지부(M2)에 연결됨으로써, 가압 몸체(114)가 모노레일(M)의 플랜지부(M2)를 가압 시 모노레일(M)에 인가되는 하중을 측정한다. The load measuring unit 120 according to the present embodiment is connected to the flange portion M2 of the monorail M and is coupled to the lower end portion of the pressing body 114 so that the pressing body 114 contacts the flange portion M2 of the monorail M, The load applied to the monorail M when the flange portion M2 is pressed is measured.

한편 본 실시예에 따른 하중 테스트 장치는, 가압 몸체(114)에 결합되며, 가압 실린더 본체(112a)에 미리 결정된 거리만큼 이격되어 배치되어 가압 로드(112b)가 휘어지는 것을 제한하는 가이드(130)를 더 포함한다.The load test apparatus according to the present embodiment includes a guide 130 which is coupled to the pressurizing body 114 and is spaced apart from the pressurizing cylinder body 112a by a predetermined distance to restrict the pressurizing rod 112b from being bent .

이러한 가이드(130)는, 구동부(112)의 가압 몸체(114)의 가압 시 가압 로드(112b)가 미세하게 휘어지는 경우 가압 실린더 본체(112a)에 접촉됨으로써, 가압 로드(112b)가 허용치를 넘어서까지 휘어지는 것을 제한할 수 있다.The guide 130 is in contact with the pressurizing cylinder main body 112a when the pressing rod 112b is slightly bent when the pressing body 114 of the driving portion 112 is pressed, It is possible to restrict the warping.

한편 본 실시예에 따른 하중 테스트 장치는, 천정(T) 및 지지부(113)에 결합되며, 지지부(113)의 이동을 구속하는 케이블(140)을 더 포함한다.The load test apparatus according to the present embodiment further includes a cable 140 coupled to the ceiling T and the support portion 113 and restricting the movement of the support portion 113. [

이러한 케이블(140)은, 일측이 천정 러그(R1)에 결합되고 타측이 지지부 러그(R2)에 결합됨으로써, 실린더 로드의 작동 시 반력에 의해 지지부(113)가 이동되는 것을 제한한다. One end of the cable 140 is coupled to the ceiling lug R1 and the other end is coupled to the support lug R2, thereby restricting the support 113 from being moved by the reaction force when the cylinder rod is operated.

이하에서 본 실시예에 따른 하중 테스트 장치의 동작을 설명한다. 도 9에서 설명의 편의를 위해 가이드(130)는 미도시된다.Hereinafter, the operation of the load test apparatus according to the present embodiment will be described. The guide 130 is not shown for convenience of explanation in FIG.

먼저 하중 테스트가 필요한 모노레일(M)에 하중 테스트 장치를 위치시킨다. 이때 모노레일(M)을 가압하는 가압유닛(110)은 모노레일(M)에 지지됨으로써, 모노레일(M)의 하부에 별도의 구조물(Y)이 존재하더라도 이에 간섭받지 않는다.First, place the load test device on the monorail (M) where load testing is required. The pressure unit 110 for pressing the monorail M is supported by the monorail M so that even if a separate structure Y exists under the monorail M, the pressure unit 110 is not interfered with.

이러한 하중 테스트 장치가 모노레일(M)에 지지될 때, 가압 몸체(114)가 모노레일(M)의 플랜지부(M2)에 지지되며, 중심 블록(115)은 천정(T)에 연결되며, 가압 몸체(114)의 하단부에 결합된 하중 측정유닛(120)은 모노레일(M)의 플랜지부(M2)에 접촉된다.When the load test apparatus is supported on the monorail M, the pressurizing body 114 is supported on the flange portion M2 of the monorail M, the center block 115 is connected to the ceiling T, The load measuring unit 120 coupled to the lower end of the arm 114 contacts the flange portion M2 of the monorail M. [

이후 케이블(140)을 지지부 러그(R2) 및 천정 러그(R1)에 결합하여 지지부(113)의 이동을 구속한다.The cable 140 is then coupled to the support lug R2 and the top lug R1 to restrain movement of the support portion 113. [

다음 가압 실린더 본체(112a)의 작동에 의해, 가압 로드(112b)가 가압 몸체(114)를 천정(T) 방향으로 가압한다. The pressing rod 112b presses the pressing body 114 in the direction of the ceiling T by the operation of the next pressurizing cylinder main body 112a.

이때 중심 블록(115)은 천정(T)에 연결된 상태이므로 중심 블록(115)이 지렛대의 중심점과 같은 역할을 수행함으로써, 가압 몸체(114)는 모노레일(M)의 플렌지부를 아래쪽으로 가압하여 모노레일(M)에 하중을 인가한다.At this time, since the center block 115 is connected to the ceiling T, the center block 115 functions as a center point of the lever so that the pressurizing body 114 presses the flange portion of the monorail M downward, M).

이러한 가압 몸체(114)에 의한 하중은 모노레일(M)의 플렌지부에 접촉된 하중 측정유닛(120)에 의해 인식된다.The load by the pressure body 114 is recognized by the load measuring unit 120 that is in contact with the flange portion of the monorail M. [

이후 모노레일(M)에 인가되는 하중을 증가시켜 실험할 필요가 있는 경우 중심 블록(115)을 모노레일(M)에 근접하는 위치에 배치시킨 후 앞서 설명한 과정을 수행한다.Then, when it is necessary to increase the load applied to the monorail M, the central block 115 is disposed at a position close to the monorail M, and then the above-described process is performed.

이와 같이 본 실시예에 따른 하중 테스트 장치는, 모노레일(M)을 가압하는 가압유닛(110)이 모노레일(M)에 지지됨으로써, 모노레일(M)의 하부에 배치되는 구조물에 간섭되지 않고 모노레일(M)의 하중 테스트를 실시할 수 있다. The load test apparatus according to the present embodiment is configured such that the pressure unit 110 for pressing the monorail M is supported on the monorail M so that the monorail M is not interfered with the structure disposed under the monorail M, ) Can be carried out.

또한 실시예에 따른 하중 테스트 장치는, 모노레일(M)의 플랜지부(M2)에 지지됨으로써, 천정(T)과 모노레일(M)을 사이의 간격이 작은 경우에도 사용될 수 있는 이점이 있다.The load tester according to the embodiment is also advantageously used when the interval between the ceiling T and the monorail M is small because the load tester according to the embodiment is supported by the flange portion M2 of the monorail M.

이상 도면을 참조하여 본 실시예에 대해 상세히 설명하였지만 본 실시예의 권리범위가 전술한 도면 및 설명에 국한되지는 않는다.Although the present invention has been described in detail with reference to the above drawings, the scope of the scope of the present invention is not limited to the above-described drawings and description.

이와 같이 본 발명은 기재된 실시예에 한정되는 것이 아니고, 본 발명의 사상 및 범위를 벗어나지 않고 다양하게 수정 및 변형할 수 있음은 이 기술의 분야에서 통상의 지식을 가진 자에게 자명하다. 따라서 그러한 수정예 또는 변형예들은 본 발명의 특허청구범위에 속한다 하여야 할 것이다.It will be apparent to those skilled in the art that various modifications and variations can be made in the present invention without departing from the spirit or scope of the invention. Accordingly, such modifications or variations are intended to fall within the scope of the appended claims.

110: 가압유닛 111: 가압부
112: 구동부 112a: 가압 실린더 본체
112b: 가압 로드 113: 지지부
114: 가압 몸체 115: 중심 블록
115a: 블록 몸체부 115b: 곡면부
116: 하중 조절부 117: 결합핀
120: 하중 측정유닛 130: 가이드
140: 케이블 T: 천정
M: 모노레일 M1: 천정 결합부
M2: 플랜지부 H1: 관통공
H2: 결합공 R1: 천정 러그
R2: 지지부 러그 G: 그루브
Y: 구조물
110: pressure unit 111: pressure unit
112: driving part 112a: pressing cylinder body
112b: pressing rod 113:
114: pressure body 115: center block
115a: Block body part 115b: Curved part
116: load adjusting portion 117: engaging pin
120: load measuring unit 130: guide
140: Cable T: Ceiling
M: Monorail M1: Ceiling coupling part
M2: flange portion H1: through hole
H2: Bonding hole R1: Ceiling lug
R2: Supporting lug G: Groove
Y: Structure

Claims (10)

천정에 설치된 모노레일에 지지되며, 상기 모노레일을 가압하는 가압유닛; 및
상기 가압유닛에 결합되며, 상기 모노레일에 연결되어 상기 가압유닛에 의해 상기 모노레일에 인가되는 하중을 측정하는 하중 측정유닛을 포함하며,
상기 가압유닛은,
상기 하중 측정유닛이 결합되며, 상기 모노레일의 플랜지부를 하측으로 가압하는 가압부;
상기 가압부에 연결되며, 상기 가압부에 가압력을 제공하는 구동부; 및
상기 구동부에 연결되어 상기 구동부를 지지하되, 상기 천정에 연결되어 고정되는 지지부를 포함하는 하중 테스트 장치.
A pressing unit supported by a monorail installed on a ceiling and pressing the monorail; And
And a load measuring unit coupled to the pressurizing unit and connected to the monorail to measure a load applied to the monorail by the pressurizing unit,
The pressure unit includes:
A pressing unit coupled to the load measuring unit and pressing the flange portion of the monorail downward;
A driving unit connected to the pressing unit and providing a pressing force to the pressing unit; And
And a support portion connected to the driving portion to support the driving portion and connected to the ceiling.
삭제delete 제1항에 있어서,
상기 가압부는,
제1 위치에 상기 구동부가 결합되며, 상기 제1 위치에서 미리 결정된 간격만큼 이격된 제2 위치에 상기 하중 측정유닛이 결합되는 가압 몸체; 및
상기 가압 몸체에 결합되고, 상기 제1 위치와 상기 제2 위치 사이에 배치되며, 상기 천정에 연결되는 중심 블록을 포함하는 하중 테스트 장치.
The method according to claim 1,
The pressing portion
A pressing body to which the driving unit is coupled at a first position and to which the load measuring unit is coupled at a second position spaced apart from the first position by a predetermined interval; And
And a center block coupled to the pressure body and disposed between the first and second positions and connected to the ceiling.
제3항에 있어서,
상기 가압부는,
상기 모노레일에 인가되는 하중을 조절하는 하중 조절부를 더 포함하는 하중 테스트 장치.
The method of claim 3,
The pressing portion
And a load controller for controlling a load applied to the monorail.
제4항에 있어서,
상기 하중 조절부는,
상기 가압 몸체의 상단부에 마련되는 그루브의 측벽에 상호 이격되어 형성되는 복수의 관통공 및 상기 중심 블록에 형성되는 결합공에 삽입되는 결합핀을 포함하는 하중 테스트 장치.
5. The method of claim 4,
The load control unit includes:
A plurality of through holes spaced apart from each other on a side wall of a groove provided at an upper end of the pressing body, and an engaging pin inserted into a coupling hole formed in the central block.
제3항에 있어서,
상기 중심 블록은,
상기 천정에 연결되는 블록 몸체부; 및
상기 블록 몸체부의 하단부에 마련되어 상기 가압 몸체에 연결되며, 곡면 형상으로 마련되는 곡면부를 포함하는 하중 테스트 장치.
The method of claim 3,
The center block may include:
A block body connected to the ceiling; And
And a curved surface portion provided at a lower end portion of the block body portion and connected to the pressing body, the curved surface portion being provided in a curved shape.
제1항에 있어서,
상기 구동부는,
상기 지지부에 결합되며 가압 실린더 본체; 및
상기 가압 실린더 본체에 대해 상대이동 가능하며, 상기 가압부에 결합되는 가압 로드를 포함하는 하중 테스트 장치.
The method according to claim 1,
The driving unit includes:
A pressing cylinder body coupled to the support portion; And
And a pressing rod that is movable relative to the pressure cylinder body and is coupled to the pressing portion.
제7항에 있어서,
상기 가압 몸체에 결합되며, 가압 실린더 본체에 미리 결정된 거리만큼 이격되어 배치되어 상기 가압 로드가 휘어지는 것을 제한하는 가이드를 더 포함하는 하중 테스트 장치.
8. The method of claim 7,
And a guide coupled to the pressing body and disposed to be spaced apart from the pressing cylinder body by a predetermined distance to restrict the pressing rod from being bent.
제1항에 있어서,
상기 천정 및 상기 지지부에 결합되며, 상기 지지부의 이동을 구속하는 케이블을 더 포함하는 하중 테스트 장치.
The method according to claim 1,
And a cable coupled to the ceiling and the support, the cable restricting movement of the support.
제1항에 있어서,
상기 하중 측정유닛은 로드 셀(load cell)을 포함하는 하중 테스트 장치.
The method according to claim 1,
Wherein the load measuring unit comprises a load cell.
KR1020130081002A 2013-07-10 2013-07-10 Load test device KR101497395B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020130081002A KR101497395B1 (en) 2013-07-10 2013-07-10 Load test device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020130081002A KR101497395B1 (en) 2013-07-10 2013-07-10 Load test device

Publications (2)

Publication Number Publication Date
KR20150007075A KR20150007075A (en) 2015-01-20
KR101497395B1 true KR101497395B1 (en) 2015-03-02

Family

ID=52570157

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020130081002A KR101497395B1 (en) 2013-07-10 2013-07-10 Load test device

Country Status (1)

Country Link
KR (1) KR101497395B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200485095Y1 (en) 2016-08-16 2017-11-27 삼성중공업 주식회사 Load test devices
KR20190073164A (en) * 2017-12-18 2019-06-26 대우조선해양 주식회사 Monorail load test equipment including truss structures

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110296832B (en) * 2019-07-15 2020-04-28 中国矿业大学 Drive test system and method of monorail crane

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100902174B1 (en) * 2008-02-11 2009-06-10 한국철도공사 Apparatus for measuring drawing resistance of shoulder of rail tie
KR100976765B1 (en) * 2010-05-27 2010-08-18 주식회사 알앤비 High precise apparatus for applying constant load of hybrid type using lever and air cylinder
KR20110003158U (en) * 2009-09-22 2011-03-30 대우조선해양 주식회사 Monorail load test apparatus
KR20130004015U (en) * 2011-12-23 2013-07-03 현대중공업 주식회사 Load testing device for monorail

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100902174B1 (en) * 2008-02-11 2009-06-10 한국철도공사 Apparatus for measuring drawing resistance of shoulder of rail tie
KR20110003158U (en) * 2009-09-22 2011-03-30 대우조선해양 주식회사 Monorail load test apparatus
KR100976765B1 (en) * 2010-05-27 2010-08-18 주식회사 알앤비 High precise apparatus for applying constant load of hybrid type using lever and air cylinder
KR20130004015U (en) * 2011-12-23 2013-07-03 현대중공업 주식회사 Load testing device for monorail

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200485095Y1 (en) 2016-08-16 2017-11-27 삼성중공업 주식회사 Load test devices
KR20190073164A (en) * 2017-12-18 2019-06-26 대우조선해양 주식회사 Monorail load test equipment including truss structures
KR102420900B1 (en) 2017-12-18 2022-07-15 대우조선해양 주식회사 Monorail load test equipment including truss structures

Also Published As

Publication number Publication date
KR20150007075A (en) 2015-01-20

Similar Documents

Publication Publication Date Title
KR101497395B1 (en) Load test device
ATE482168T1 (en) DEVICE FOR LIFTING PIPES
CN103562463B (en) For the measuring system of stake
KR101302346B1 (en) Device for testing of endurance of landing gear
AU2013360454A8 (en) Hybrid gimbal support structure
US9212890B2 (en) Measuring device
NO20064938L (en) Support device for a material handling and lifting device
RU2005140099A (en) TEST LEVER
KR20160000858U (en) Tension Load Test Device for Lug
CN202522410U (en) Automobile gearshift manipulation device
KR102404212B1 (en) Apparatus for bending cable
CN203929510U (en) Timber testing equipment
CN103885370A (en) Production-line monitoring system and production-line monitoring method
CN203587452U (en) Tensile testing device for junction box
KR101886257B1 (en) A Surface Profile Measuring Method Using Apparatus For Surface Profile Measuring By Strain Gauge
CN203894128U (en) Novel antenna drawing testing device
CN108215312A (en) Press device
CN210375929U (en) Concrete creep multifunctional test system
KR101434575B1 (en) Apparatus for testing load of monorail
KR101104268B1 (en) Method and apparatus for testing of lug load using hydraulic and pneumatic
CN208635948U (en) For the retentivity test machine of Nippon Standard three-phase socket
KR20120037272A (en) Lifting and land transport apparatus for ship
KR101357492B1 (en) 3 dimensional structure test device
KR102025843B1 (en) Portable device for installing wireless power charging cable
KR101660253B1 (en) batten system

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20190201

Year of fee payment: 5