KR101474687B1 - Apparatus and method for measuring performance of load of scada system - Google Patents
Apparatus and method for measuring performance of load of scada system Download PDFInfo
- Publication number
- KR101474687B1 KR101474687B1 KR1020140028092A KR20140028092A KR101474687B1 KR 101474687 B1 KR101474687 B1 KR 101474687B1 KR 1020140028092 A KR1020140028092 A KR 1020140028092A KR 20140028092 A KR20140028092 A KR 20140028092A KR 101474687 B1 KR101474687 B1 KR 101474687B1
- Authority
- KR
- South Korea
- Prior art keywords
- load
- loads
- driving
- performance
- temperature
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims abstract description 31
- 238000004891 communication Methods 0.000 claims abstract description 49
- 238000012545 processing Methods 0.000 claims abstract description 16
- 238000012544 monitoring process Methods 0.000 claims description 31
- 238000001514 detection method Methods 0.000 claims description 5
- 238000005259 measurement Methods 0.000 claims description 3
- 238000005516 engineering process Methods 0.000 abstract description 8
- 239000000470 constituent Substances 0.000 description 8
- 230000008569 process Effects 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 230000008901 benefit Effects 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 238000013459 approach Methods 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 2
- 230000003247 decreasing effect Effects 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 238000003723 Smelting Methods 0.000 description 1
- 238000010248 power generation Methods 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 239000010865 sewage Substances 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- 239000002351 wastewater Substances 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/20—Pc systems
- G05B2219/24—Pc safety
- G05B2219/24215—Scada supervisory control and data acquisition
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Automation & Control Theory (AREA)
- General Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Quality & Reliability (AREA)
- Selective Calling Equipment (AREA)
Abstract
Description
개시된 기술은 원방감시제어 시스템의 부하의 성능을 측정하는 장치 및 방법에 관한 것이다.The disclosed technique relates to an apparatus and method for measuring the performance of a load of a remote monitoring control system.
원방감시제어 시스템인 스카다(SCADA, Supervisory Control And Data Acquisition) 시스템은 일반적으로 산업현장에 배치된 각종 설비들을 제어하는 시스템으로 이용된다. 즉, 제조, 생산, 발전, 가공 또는 제련과정과 같은 산업 공정이나 하수 처리, 폐수 수거, 송전 및 배전 등과 같은 기반 시설 공정의 작업을 감시하고 제어하는 역할을 수행한다.SCADA (Supervisory Control And Data Acquisition) system, which is a remote surveillance control system, is generally used as a system for controlling various facilities installed in an industrial field. It monitors and controls the operation of infrastructure processes such as industrial processes such as manufacturing, production, generation, processing or smelting processes, and sewage treatment, waste water collection, transmission and distribution.
이러한 원방감시제어 시스템은 일반적으로 원거리에 있는 복수의 현장설비들의 상태정보를 인접한 지역에 위치하는 원격소장치가 수집하여 통신망을 통해 중앙 관제 센터에 근무하는 관리자에게 전송하여 상기 관리자가 현장설비들을 통제하고 알맞게 운영할 수 있는 환경을 제공하게 된다. Such a remote monitoring and control system generally collects status information of a plurality of field facilities at a remote location by remote small facilities located in an adjacent area and transmits the collected information to an administrator working at a central control center through a communication network, And provide an environment in which it can operate properly.
앞서 언급한 바와 같이 이러한 원방감시제어 시스템은 원거리에 있는 각종 현장설비, 예컨대 부하들을 직접 방문하지 않고 원격으로 처리할 수 있을 뿐만 아니라 관리자가 항시 상주할 필요가 없기 때문에 이제는 거의 무인 자동화 시스템에 가깝도록 발전되어 있다.As mentioned above, this remote monitoring and control system not only remotely processes various on-site facilities such as loads, but also manages to be close to unmanned automation system Has been developed.
그러나, 현장에 설치되어 동작하는 각각의 부하들이 서로 동일하게 동작하는 것은 아니라서 각각의 부하들이 얼만큼의 성능을 발휘하는지를 확인하기 위해서 각각의 부하들을 일일이 확인하는 것은 상당히 까다롭다. However, it is difficult for each of the loads installed in the field to operate identically, so it is quite difficult to identify each load individually to see how much performance each load has.
물론 한두개의 부하가 제대로 된 성능을 내지 못하더라도 시스템 전체가 문제가 발생하는 것은 아니지만, 일정 개수 이상의 부하에 이러한 문제가 산발적으로 발생하게 되더라도 종래의 무인화 시스템만으로는 신속하고 유연하게 대처하기가 어렵다. 따라서, 시스템을 정상적으로 운영할 수 없게되고, 동시에 산업현장을 제대로 제어할 수 없어서 결과적으로 많은 손해를 발생시키게 된다. 일례로, 수처리 모터를 제어하는 원방감시제어 시스템에서 이용하는 모터가 테스트 환경에서는 별다른 문제가 없었으나, 현장에서는 앞서의 성능을 발휘하지 못하는 경우가 발생하는 경우가 종종 발생하기 때문에 이러한 상황을 바로바로 감지할 필요성이 있다.Of course, even if one or two loads do not perform properly, the whole system does not cause problems, but even if such a problem arises sporadically over a certain number of loads, it is difficult to cope quickly and flexibly with conventional unmanned systems alone. Therefore, the system can not be operated normally, and at the same time, the industrial site can not be controlled properly, resulting in a lot of damage. For example, a motor used in a remote monitoring and control system that controls a water treatment motor has no problem in a test environment, but sometimes it may happen that the above performance can not be achieved in the field. There is a need to do.
한편, 상기와 같이 언제 어떻게 발생할지 측정할 수 없는 상황에 따른 피해를 방지하기 위해서 중앙 관제 서버에 관리자를 항시 상주시키는 것은 별로 효율적이지 못하다. 실상 원방감시제어 시스템은 대부분 미리 시스템에 설정된 내용에 따라 자동으로 돌아가기 때문에 위급상황에 대비하기 위해서 항시 관리자를 배치하는 것은 곧 인력낭비가 되기 때문이다. 따라서, 개시된 기술에서는 원방감시제어 시스템의 부하가 실제로 어느 정도의 성능으로 동작하는지 측정하는 장치 및 방법을 개시하고자 한다.On the other hand, in order to prevent damage due to a situation in which it is impossible to measure how and when to occur as described above, it is not efficient to permanently place an administrator in the central control server. In fact, most remote monitoring and control systems automatically return according to the contents set in the system in advance, so it is a waste of manpower to deploy the manager at all times to prepare for the emergency situation. Therefore, the disclosed technology discloses an apparatus and method for measuring to what degree the load of the remote monitoring control system actually operates.
원방감시제어 시스템에 관한 종래기술로는 한국 공개특허 제1-2011-0136949호 (발명의 명칭 : 제어명령 인증이 가능한 원격감시제어 장치, 원격감시제어명령 인증 장치 및 제어명령 인증 방법)가 있다.Korean Patent Laid-Open Publication No. 1-2011-0136949 (entitled: remote monitoring and control device capable of authenticating control commands, remote monitoring and control command authentication device, and control command authentication method) is known as a conventional remote monitoring and control system.
개시된 기술은 원방감시제어 시스템의 각각의 부하의 동작 성능을 측정하여 상기 원방감시제어 시스템의 전체 효율성을 증대시키는 장치 및 방법을 제공하는데 있다.The disclosed technique is to provide an apparatus and method for measuring the operating performance of each load of a remote monitoring control system to increase the overall efficiency of the remote monitoring and control system.
상기의 기술적 과제를 이루기 위하여 개시된 기술의 제 1 측면은 현장에 설치되는 복수개의 부하들을 원격지에서 제어하는 원방감시제어(SCADA) 시스템에 있어서, 상기 복수개의 부하들 각각에 배치되어 상기 부하들의 구동온도, 구동전력 및 구동횟수를 감지하는 감지부, 상기 부하들의 구동온도, 구동전력 및 구동횟수를 유무선 통신으로 중앙 관제 서버에 전송하는 통신부, 상기 중앙 관제 서버에 배치되고, 상기 통신부로부터 상기 부하의 구동온도, 구동전력 및 구동횟수를 전송받아 상기 부하의 동작 성능을 측정하는 처리부 및 상기 측정된 동작 성능을 상기 통신부를 통해 전송받는 관리자 단말을 포함하는 원방감시제어 시스템의 부하의 동작 성능을 측정하는 장치을 제공하는데 있다.According to a first aspect of the present invention, there is provided a remote surveillance control (SCADA) system for remotely controlling a plurality of loads installed on a field, the system comprising: A communication unit for transmitting the driving temperature, the driving power and the driving frequency of the loads to the central control server through wired / wireless communication; and a control unit for controlling the driving of the load from the communication unit A processor for measuring the operation performance of the load by receiving the temperature, the drive power, and the drive frequency, and an administrator terminal for receiving the measured operation performance through the communication unit, .
상기의 기술적 과제를 이루기 위하여 개시된 기술의 제 2 측면은 현장에 설치되는 복수개의 부하들을 원격지에서 제어하는 원방감시제어(SCADA) 방법에 있어서, 상기 복수개의 부하들 각각에 배치되는 감지부가 상기 부하들의 구동온도, 구동전력 및 구동횟수를 감지하는 단계, 통신부가 상기 부하들의 구동온도, 구동전력 및 구동횟수를 유무선 통신으로 중앙 관제 서버에 전송하는 단계, 상기 중앙 관제 서버에 배치되는 처리부가 상기 통신부로부터 상기 부하의 구동온도, 구동전력 및 구동횟수를 전송받아 상기 부하의 동작 성능을 측정하는 단계 및 상기 측정된 동작 성능을 관리자 단말에 전송하는 단계를 포함하는 원방감시제어 시스템의 부하의 동작 성능을 측정하는 방법을 제공하는데 있다.According to a second aspect of the present invention, there is provided a remote surveillance control (SCADA) method for remotely controlling a plurality of loads installed on a site, wherein a sensing unit disposed in each of the plurality of loads The method comprising the steps of: sensing a driving temperature, a driving power, and a driving frequency; transmitting a driving temperature, a driving power, and a driving frequency of the loads to a central control server through wired / wireless communication; Measuring the operating performance of the load by receiving the driving temperature of the load, the driving power and the driving frequency, and transmitting the measured operating performance to the manager terminal, And to provide a method for performing the method.
개시된 기술의 실시 예들은 다음의 장점들을 포함하는 효과를 가질 수 있다. 다만, 개시된 기술의 실시 예들이 이를 전부 포함하여야 한다는 의미는 아니므로, 개시된 기술의 권리범위는 이에 의하여 제한되는 것으로 이해되어서는 아니 될 것이다. Embodiments of the disclosed technique may have effects that include the following advantages. It should be understood, however, that the scope of the disclosed technology is not to be construed as limited thereby, since the embodiments of the disclosed technology are not meant to include all such embodiments.
개시된 기술의 일 실시예에 따르면 원방감시제어 시스템의 부하의 동작 성능을 측정하는 장치 및 방법은 원방감시제어 시스템이 포함하는 복수개의 부하들의 동작 성능을 개별적으로 측정하여 원방감시제어 시스템 전체의 동작 효율성을 개선시키는 효과를 제공한다.According to an embodiment of the disclosed technology, an apparatus and method for measuring the operating performance of a load of a remote monitoring and control system can be realized by individually measuring the operation performance of a plurality of loads included in a remote monitoring control system, And the like.
또한, 부하의 성능이 일정 수준 이하로 떨어지게 되어 제기능을 수행하지 못하는 것을 즉각적으로 파악하고 부하를 교체하여 전체적인 시스템의 효율성을 증대시키는 효과를 제공한다.In addition, it provides an effect that the efficiency of the overall system can be increased by immediately recognizing that the performance of the load drops below a predetermined level and can not perform the function, and the load is replaced.
도 1은 개시된 기술의 일 실시예에 따른 원방감시제어 시스템의 부하의 동작 성능을 측정하는 장치에 대한 블록도이다.
도 2는 개시된 기술의 일 실시예에 원방감시제어 시스템의 부하의 동작 성능을 측정하는 방법에 대한 순서도이다.1 is a block diagram of an apparatus for measuring the operational performance of a load of a remote monitoring and control system according to an embodiment of the disclosed technique.
2 is a flow diagram of a method for measuring operational performance of a load of a remote monitoring and control system in an embodiment of the disclosed technique.
본 발명은 다양한 변경을 가할 수 있고 여러 가지 실시예를 가질 수 있는 바, 특정 실시예들을 도면에 예시하고 상세한 설명에 상세하게 설명하고자 한다. 그러나, 이는 본 발명을 특정한 실시 형태에 대해 한정하려는 것이 아니며, 본 발명의 사상 및 기술 범위에 포함되는 모든 변경, 균등물 내지 대체물을 포함하는 것으로 이해되어야 한다.While the invention is susceptible to various modifications and alternative forms, specific embodiments thereof are shown by way of example in the drawings and will herein be described in detail. It should be understood, however, that the invention is not intended to be limited to the particular embodiments, but includes all modifications, equivalents, and alternatives falling within the spirit and scope of the invention.
제 1, 제 2, A, B 등의 용어는 다양한 구성요소들을 설명하는데 사용될 수 있지만, 해당 구성요소들은 상기 용어들에 의해 한정되지는 않으며, 단지 하나의 구성요소를 다른 구성요소로부터 구별하는 목적으로만 사용된다. 예를 들어, 본 발명의 권리 범위를 벗어나지 않으면서 제 1 구성요소는 제 2 구성요소로 명명될 수 있고, 유사하게 제 2 구성요소도 제 1 구성요소로 명명될 수 있다. 및/또는 이라는 용어는 복수의 관련된 기재된 항목들의 조합 또는 복수의 관련된 기재된 항목들 중의 어느 항목을 포함한다.The terms first, second, A, B, etc., may be used to describe various components, but the components are not limited by the terms, but may be used to distinguish one component from another . For example, without departing from the scope of the present invention, the first component may be referred to as a second component, and similarly, the second component may also be referred to as a first component. And / or < / RTI > includes any combination of a plurality of related listed items or any of a plurality of related listed items.
본 명세서에서 사용되는 용어에서 단수의 표현은 문맥상 명백하게 다르게 해석되지 않는 한 복수의 표현을 포함하는 것으로 이해되어야 한다. 그리고 "포함한다" 등의 용어는 설시된 특징, 개수, 단계, 동작, 구성요소, 부분품 또는 이들을 조합한 것이 존재함을 의미하는 것이지, 하나 또는 그 이상의 다른 특징들이나 개수, 단계 동작 구성요소, 부분품 또는 이들을 조합한 것들의 존재 또는 부가 가능성을 배제하지 않는 것으로 이해되어야 한다.It is to be understood that the singular < RTI ID = 0.0 > terms < / RTI > used herein should be interpreted to include a plurality of representations unless the context clearly dictates otherwise. And "comprises ", when used in this specification, specify the presence of stated features, numbers, steps, operations, elements, parts, or combinations thereof, Or combinations thereof, as a matter of course.
도면에 대한 상세한 설명을 하기에 앞서, 본 명세서에서의 구성부들에 대한 구분은 각 구성부가 담당하는 주기능 별로 구분한 것에 불과함을 명확히 하고자 한다. 즉, 이하에서 설명할 2개 이상의 구성부가 하나의 구성부로 합쳐지거나 또는 하나의 구성부가 보다 세분화된 기능별로 2개 이상으로 분화되어 구비될 수도 있다. 그리고 이하에서 설명할 구성부 각각은 자신이 담당하는 주기능 이외에도 다른 구성부가 담당하는 기능 중 일부 또는 전부의 기능을 추가적으로 수행할 수도 있으며, 구성부 각각이 담당하는 주기능 중 일부 기능이 다른 구성부에 의해 전담되어 수행될 수도 있음은 물론이다. 따라서, 본 명세서를 통해 설명되는 각 구성부들의 존재 여부는 기능적으로 해석되어야 할 것이다.Before describing the drawings in detail, it is to be clarified that the division of constituent parts in this specification is merely a division by main functions of each constituent part. That is, two or more constituent parts to be described below may be combined into one constituent part, or one constituent part may be divided into two or more functions according to functions that are more subdivided. In addition, each of the constituent units described below may additionally perform some or all of the functions of other constituent units in addition to the main functions of the constituent units themselves, and that some of the main functions, And may be carried out in a dedicated manner. Accordingly, the presence or absence of each component described in this specification should be interpreted as a function.
도 1은 개시된 기술의 일 실시예에 따른 원방감시제어 시스템의 부하의 동작 성능을 측정하는 장치에 대한 블록도이다. 도 1을 참조하면 원방감시제어 시스템의 부하의 동작 성능을 측정하는 장치는 현장에 설치되는 복수개의 부하들을 원격지에서 제어하는 원방감시제어(SCADA) 시스템에 있어서, 상기 복수개의 부하들 각각에 배치되어 상기 부하들의 구동온도, 구동전력 및 구동횟수를 감지하는 감지부(110), 상기 부하들의 구동온도, 구동전력 및 구동횟수를 유무선 통신으로 중앙 관제 서버에 전송하는 통신부(120), 상기 중앙 관제 서버에 배치되고, 상기 통신부로부터 상기 부하들의 구동온도, 구동전력 및 구동횟수를 전송받아 상기 부하들의 동작 성능을 측정하는 처리부(130) 및 상기 측정된 동작 성능을 상기 통신부를 통해 전송받는 관리자 단말(140)을 포함한다.1 is a block diagram of an apparatus for measuring the operational performance of a load of a remote monitoring and control system according to an embodiment of the disclosed technique. Referring to FIG. 1, an apparatus for measuring the operation performance of a load of a remote monitoring and control system includes a remote monitoring control (SCADA) system for remotely controlling a plurality of loads installed on the ground, A communication unit 120 for transmitting the driving temperature, the driving power, and the driving frequency of the loads to the central control server through wired / wireless communication; A processing unit 130 for receiving the driving temperature, the driving power and the driving frequency of the loads from the communication unit and measuring the operation performance of the loads, and a
감지부(110)는 복수개의 부하들에 각각 배치된다. 그리고 상기 부하의 상태를 감지한다. 여기에서 부하는, 원방제어감시(SCADA) 시스템이 포함하는 현장에 설치된 장비들을 의미한다. 예컨대, 수처리 모터, 발전 모터 또는 소정의 공정을 처리하는 장치일 수 있다. 원방제어감시 시스템은 이러한 부하들이 동작하는 것을 감시하여 전체적인 시스템이 원활하게 돌아갈 수 있게끔 제어하는 시스템이다.The sensing unit 110 is disposed in each of the plurality of loads. And detects the state of the load. Here, the load refers to the equipment installed on the site, which includes the SCADA system. For example, it may be a water treatment motor, a power generation motor, or a device that processes a predetermined process. The control system monitors the operation of these loads and controls the entire system to run smoothly.
한편, 개시된 기술에서는 이러한 원방제어감시 시스템에 있어서, 부하가 동작을 정지하기 전에 교체하거나 수리를 하기 위해서 상기 부하의 동작 성능을 측정하고자 한다. 통상적으로, 원방제어감시 시스템이 포함하는 부하는 복수개이다. 따라서, 한두개의 부하가 고장나거나 노후되어 작동이 멈추었거나, 제기능에 미치지 못하는 수준으로 동작한다고 하더라도 시스템 전체가 가동이 중지되는 것은 아니다. On the other hand, in the disclosed technique, the operation performance of the load is measured in order to replace or repair the load before stopping the operation in the one-shot control system. Typically, the load control system includes a plurality of loads. Accordingly, even if one or two loads are broken or aged, the operation is stopped or the operation is not performed to the extent that the function is not performed, the entire system is not shut down.
그러나, 이는 전체 시스템의 효율성을 고려하였을 때, 분명한 손해이며, 이러한 일이 동시다발적으로 또는 불규칙적으로 발생하면 크고 작은 손해가 누적될 수 있다. 따라서, 개시된 기술에서는 각각의 부하에 감지부(110)를 배치하여 상기 부하의 구동온도, 구동전력 및 구동횟수를 감지한다.However, this is a definite loss when considering the efficiency of the overall system, and large or small damages can accumulate if this happens simultaneously or irregularly. Accordingly, in the disclosed technology, the sensing unit 110 is disposed in each load to sense the driving temperature, the driving power, and the driving frequency of the load.
한편, 감지부(110)는 앞서 언급한 바와 같이 부하의 구동온도, 구동전력 및 구동횟수를 감지한다. 원방제어감시 시스템이 포함하는 부하는 전원에서 공급되는 전력을 통해 구동되고, 중앙 관제 서버에서 상기 부하의 동작이 제대로 이루어지는지를 관리하고 있다. 감지부(110)는 이와 별개로 상기 부하가 몇도에서 동작하고 있는지, 얼마의 구동전력으로 동작하고 있는지, 그리고 얼마나 많은 횟수를 동작하였는지를 감지한다. 개시된 기술에서는 이와 같이 각 부하의 구동온도, 구동전력 및 구동횟수를 각 부하의 동작 상태를 나타내는 정보로 판단한다.Meanwhile, the sensing unit 110 senses the driving temperature, the driving power, and the driving frequency of the load as described above. The load included in the one-time control system is driven by the power supplied from the power source, and the central control server manages whether the load operates properly. The sensing unit 110 separately senses how many degrees the load is operating, how much driving power it is operating, and how many times it operates. In the disclosed technique, the drive temperature, the drive power, and the drive frequency of each load are determined as information indicating the operation state of each load.
한편, 상기와 같이 부하의 구동온도, 구동전력 및 구동횟수를 감지하기 위해서 감지부(110)는 온도센서, 전류센서, 전압센서 및 동작감지센서 중 적어도 하나를 포함한다. 상기 온도센서를 이용하면 부하가 동작하는 상태의 온도를 측정하는 것이 가능하다. 그리고 전류센서 및 전압센서를 이용하면 부하의 구동전력이 얼마인지 측정하는 것이 가능하다. 그리고 동작감지센서를 이용하면 부하가 몇 번의 동작을 수행하였는지도 측정할 수 있다. 따라서, 감지부(110)는 이러한 센서들을 이용하여 부하가 어떠한 상태에서 얼만큼의 전력으로 몇회 작동하였는지 감지하는 것이 가능하다.Meanwhile, the sensing unit 110 includes at least one of a temperature sensor, a current sensor, a voltage sensor, and a motion sensor to sense the driving temperature, the driving power, and the driving frequency of the load. By using the temperature sensor, it is possible to measure the temperature in a state where the load is operating. It is also possible to measure the driving power of the load by using the current sensor and the voltage sensor. Using the motion detection sensor, it is possible to measure how many times the load has been performed. Accordingly, the sensing unit 110 can detect how many times the power is used under which state the load is operated by using these sensors.
통신부(120)는 상기 감지부(110)에서 감지하는 상기 부하의 구동온도, 구동전력 및 구동횟수를 유무선 통신으로 중앙 관제 서버에 전송한다. 여기에서 유무선 통신이라고 함은 소정의 인터넷용 통신 회선을 이용하거나 3G, 4G 또는 와이파이와 같은 무선망을 이용하는 것을 의미한다. 통신부(120)는 부하가 배치되는 현장의 환경이나 부하의 작업 특성을 고려하여 소정의 유무선 통신을 수행할 수 있다.The communication unit 120 transmits the driving temperature, the driving power, and the driving frequency of the load sensed by the sensing unit 110 to the central control server through wired / wireless communication. Here, the term "wired / wireless communication" means that a predetermined Internet communication line is used or a wireless network such as 3G, 4G or Wi-Fi is used. The communication unit 120 can perform predetermined wired / wireless communication in consideration of the environment of the site where the load is placed and the work characteristics of the load.
처리부(130)는 상기 원방감시제어 시스템의 중앙 관제 서버에 배치되다. 그리고, 상기 통신부(120)로부터 부하의 구동온도, 구동전력 및 구동횟수를 전송받아 상기 부하의 동작 성능을 측정한다. 처리부(130)는 부하의 동작 성능을 측정하기 위해서 소정의 알고리즘을 탑재한다. 그리고 상기 알고리즘을 이용하여 부하의 구동전력, 구동온도 및 구동횟수를 입력값으로 설정하고, 상기 부하의 동작 성능을 계산한다.The processing unit 130 is disposed at the central control server of the remote monitoring and control system. Then, the operating performance of the load is measured by receiving the driving temperature, the driving power, and the driving frequency of the load from the communication unit 120. The processing unit 130 loads a predetermined algorithm to measure the operation performance of the load. Then, the driving power, the driving temperature, and the driving frequency of the load are set as input values using the above algorithm, and the operation performance of the load is calculated.
일 실시예로, 변수가 적용하지 않은 상태에서 부하의 예상 성능이 100%라고 한다면, 상기 부하가 구동되는 온도가 평소보다 높거나 낮은 상태에서는 80%의 성능으로 동작할 수 있다. 또는, 평소에는 90%~100% 사이의 동작 성능으로 구동되던 부하가 어느날 폭염으로 인해 50%~60%의 성능을 보일 수도 있다. 또는 부하는 기계장치의 일종이라 통상적인 작동횟수의 임계값이 존재하는데 여기에 가까워지거나 이를 넘어서게 된다면 부하가 제 성능을 발휘하지 못할 수도 있다. 따라서, 처리부(130)에서는 이와 같이 부하의 동작 성능에 영향을 미치는 변수들로 각 부하의 구동전력, 구동온도 및 구동횟수를 상기 감지부(110)로부터 전송받아 계산한다.In one embodiment, if the expected performance of the load is 100% without the variable applied, it can operate at 80% performance when the temperature at which the load is driven is higher or lower than usual. Or, a load that is normally driven with an operating performance between 90% and 100% may experience a 50% to 60% performance due to the heat one day. Or the load is a kind of mechanical device, so that the load may not be able to perform if the threshold of the number of operating times exists and approaches or exceeds this threshold. Accordingly, in the processing unit 130, the driving power, the driving temperature, and the driving frequency of each load are received from the sensing unit 110 by using variables that affect the operation performance of the load.
한편, 상기 처리부(130)는 상기 부하의 예상 성능을 포함하는 소정의 입력값을 미리 입력받는 것이 가능하다. 통상적으로 현장에서 동작하는 부하의 경우 설치된 시간이 경과함에 따라 동작 퍼포먼스가 점점 줄어들게 되는데 어느 순간을 기점으로 성능이 입력값 미만으로 떨어지게 되면 이 때를 교체주기로 잡을 수 있다.Meanwhile, the processing unit 130 may receive a predetermined input value including the expected performance of the load in advance. Generally, in the case of a load operating in the field, the operation performance is gradually reduced as the installed time elapses. If the performance falls below the input value from a certain moment, this time can be regarded as a replacement cycle.
한편, 처리부(130)는 상기와 같이 부하의 예상 성능을 입력받은 이후에 계산된 부하의 동작 성능을 비교할 수 있다. 예컨대, 입력받은 예상 성능이 10이라면, 부하의 구동전력, 구동온도 및 구동횟수를 토대로 부하의 동작 성능을 계산하여 실제 부하의 동작 성능이 10인지 그 미만인지를 계산할 수 있다.On the other hand, the processor 130 may compare the calculated performance of the load after receiving the expected performance of the load as described above. For example, if the expected performance inputted is 10, the operation performance of the load can be calculated based on the driving power of the load, the driving temperature, and the number of times of driving, and the operation performance of the actual load can be calculated to be 10 or less.
관리자 단말(140)은 상기 처리부(130)에서 측정된 동작 성능을 통신부(120)를 통해 전송받는다. 원방감시제어 시스템의 특성상 관리자가 항시 대기하지 않아도 자동으로 시스템이 운영되기 때문에 시스템의 관리자가 부하의 상태를 일일이 확인하여 교체할 수 없으므로, 관리자가 소지하는 관리자 단말(140)에 메시지를 전송하는 것으로 이러한 문제점을 해결하는 것이 가능하다. 앞서 설명한 바와 같이 통신부(120)는 유무선 통신망을 이용하고 있으므로, 관리자 단말(140)은 이를 통해 처리부(130)에서 측정된 부하의 동작 성능을 전송받는 것이 가능하다. 따라서, 부하를 교체해야하는지 또는 유지해야하는지를 손쉽게 판단할 수 있는 장점이 있다. The
한편, 관리자 단말(140)은 부하의 동작 성능을 일정한 주기에 따라 전송받을 수 있다. 예컨대, 부하의 동작 성능이 1년이 남았다면, 한달에 한번씩 부하의 교체를 요구하는 메시지를 처리부(130)로부터 전송받을 수 있다. 또는 부하의 동작 성능을 알리는 간격을 점차 줄여가면서 전송받을 수도 있다. 즉, 부하의 동작 성능이 1년이 남았다면, 6개월, 3개월, 1개월 및 보름과 같이 점차적으로 간격을 좁혀서 부하의 교체를 유도할 수 있다.Meanwhile, the
한편, 상기 관리자 단말(140)은 상기 원방감시제어 시스템이 포함하는 복수개의 부하들에 대한 제어 신호를 상기 중앙 관제 서버에 전송하는 것이 가능하다. 관리자 단말(140)은 상기 제어 신호를 입력하는 소정의 입력수단을 포함한다. 예컨대, 관리자 단말(140)은 PC, 노트북 또는 스마트폰일 수 있다. 즉, 중앙 관제 서버에서 직접 제어 신호를 입력하는 대신에, 원격지에서 관리자 단말(140)를 이용하여 상기 제어 신호를 입력하고, 이를 통신부(120)를 통해 전송하는 것이 가능하다. 따라서, 부하의 동작 상태를 감시함과 동시에 부하의 동작을 제어하는 것이 가능하다.Meanwhile, the
도 2는 개시된 기술의 일 실시예에 원방감시제어 시스템의 부하의 동작 성능을 측정하는 방법에 대한 순서도이다. 도 2를 참조하면 원방감시제어 시스템의 부하의 동작 성능을 측정하는 방법은 현장에 설치되는 복수개의 부하들을 원격지에서 제어하는 원방감시제어(SCADA) 방법에 있어서, 상기 복수개의 부하들 각각에 배치되는 감지부가 상기 부하들의 구동전력, 구동온도 및 구동횟수를 감지하는 단계(210), 통신부가 상기 부하들의 구동전력, 구동온도 및 구동횟수를 유무선 통신으로 중앙 관제 서버에 전송하는 단계(220), 상기 중앙 관제 서버에 배치되는 처리부가 상기 통신부로부터 상기 부하들의 상태를 전송받아 상기 부하의 동작 성능을 측정하는 단계(230) 및 상기 측정된 동작 성능을 관리자 단말에 전송하는 단계(240)를 포함한다.2 is a flow diagram of a method for measuring operational performance of a load of a remote monitoring and control system in an embodiment of the disclosed technique. Referring to FIG. 2, a method for measuring an operation performance of a load of a remote monitoring and control system includes a remote monitoring control (SCADA) method for remotely controlling a plurality of loads installed on a site, A
210 단계에서는 감지부가 부하들의 구동전력, 구동온도 및 구동횟수를 감지한다. 감지부는 원방제어감시 시스템이 포함하는 복수개의 부하들 각각에 배치된다. 감지부는 상기 부하의 상태로 부하의 구동온도, 구동전력 및 구동횟수를 감지한다. 원방제어감시 시스템이 포함하는 부하는 전원에서 공급되는 전력을 통해 구동되고, 중앙 관제 서버에서 상기 부하의 동작이 제대로 이루어지는지를 관리하고 있다. 감지부는 이와 별개로 상기 부하가 몇도에서 동작하고 있는지, 얼마의 구동전력으로 동작하고 있는지, 그리고 얼마나 많은 횟수를 동작하였는지를 감지한다.In
한편, 210 단계에서 상기와 같이 부하의 구동전력, 구동온도 및 구동횟수를 감지하기 위해서, 감지부는 온도센서, 전류센서, 전압센서 및 동작감지센서 중 적어도 하나를 포함한다. 상기 온도센서를 이용하면 부하가 동작하는 상태의 온도를 측정하는 것이 가능하다. 그리고 전류센서 및 전압센서를 이용하면 부하의 구동전력이 얼마인지 측정하는 것이 가능하다. 그리고 동작감지센서를 이용하면 부하가 몇 번의 동작을 수행하였는지도 측정할 수 있다. 따라서, 감지부는 이러한 센서들을 이용하여 부하가 어떠한 상태에서 얼만큼의 전력으로 몇회 작동하였는지 감지하는 것이 가능하다.In
220 단계에서는 통신부가 상기 부하들의 구동전력, 구동온도 및 구동횟수를 유무선 통신으로 중앙 관제 서버에 전송한다. 통신부는 유무선 통신을 이용한다. 여기에서 유무선 통신이라고 함은 소정의 인터넷용 통신 회선을 이용하거나 3G, 4G 또는 와이파이와 같은 무선망을 이용하는 것을 의미한다. 통신부는 부하가 배치되는 현장의 환경이나 부하의 작업 특성을 고려하여 소정의 유무선 통신을 수행할 수 있다.In
230 단계에서는 상기 중앙 관제 서버에 배치되는 처리부가 상기 통신부로부터 상기 부하들의 구동전력, 구동온도 및 구동횟수를 전송받아 상기 부하의 동작 성능을 측정한다. 처리부는 상기 원방감시제어 시스템의 중앙 관제 서버에 배치되다. 그리고, 상기 통신부로부터 부하의 상태를 전송받아 상기 부하의 동작 성능을 측정한다. 처리부는 부하의 동작 성능을 측정하기 위해서 소정의 알고리즘을 탑재한다. 그리고 상기 알고리즘을 이용하여 부하의 구동전력, 구동온도 및 구동횟수를 입력값으로 설정하고, 상기 부하의 동작 성능을 계산한다.In
일 실시예로, 변수가 적용하지 않은 상태에서 부하의 동작 성능이 100이라고 한다면, 상기 부하가 구동되는 온도가 평소보다 높거나 낮은 상태에서는 100에 다소 못미치는 85의 성능을 가질 수 있다. 또한, 평소에는 80~90의 성능으로 구동되던 부하가 어느날 80의 성능에 훨씬 못미치는 성능을 보일 수도 있다. 마찬가지로 부하가 동작할 수 있는 최대 횟수에 가까워지게 되면 구동 성능이 점점 떨어질 수도 있다. 따라서, 230 단계에서는 이와 같이 부하의 동작 성능에 영향을 미치는 변수들을 상기 처리부를 이용하여 계산한다.In one embodiment, if the operating performance of the load is 100 while the variable is not applied, the load may have a performance of 85, which is slightly lower than 100 when the temperature at which the load is driven is higher or lower than usual. Also, a load that is normally driven at 80 to 90 percent performance may show performance well below 80 at some time. Likewise, as the load approaches the maximum number of times it can operate, the driving performance may decrease. Accordingly, in
한편, 230 단계에서 처리부는 상기 부하의 예상 성능을 나타내는 입력값을 미리 입력받는 것이 가능하다. 통상적으로 현장에서 동작하는 부하의 경우 설치된 시간이 경과함에 따라 동작 퍼포먼스가 점점 줄어들게 되는데 어느 순간을 기점으로 효율성이 평균 이하로 떨어지게 되면 이 때를 교체주기로 설정할 수 있다. On the other hand, in
또한, 처리부는 상기와 같이 부하의 예상 성능을 미리 입력받은 이후에 계산된 부하의 동작 성능을 비교할 수 있다. 예컨대, 입력받은 예상 성능이 10이라면, 부하의 구동전력, 구동온도 및 구동횟수를 토대로 부하의 동작 성능을 계산하여 실제 부하의 동작 성능이 10인지 그 이하인지를 계산할 수 있다.Further, the processor may compare the calculated performance of the load after receiving the expected performance of the load in advance as described above. For example, if the expected performance inputted is 10, the operation performance of the load can be calculated based on the driving power of the load, the driving temperature, and the number of times of driving, and the operation performance of the actual load can be calculated to be 10 or less.
240 단계에서는 상기 측정된 부하의 동작 성능을 관리자 단말에 전송한다. 관리자 단말은 상기 처리부에서 측정된 동작 성능을 통신부를 통해 전송받는다. 원방감시제어 시스템의 특성상 관리자가 항시 대기하지 않아도 자동으로 시스템이 운영되기 때문에 시스템의 관리자가 부하의 상태를 일일이 확인하여 교체할 수 없으므로, 관리자가 소지하는 관리자 단말에 메시지를 전송하는 것으로 이러한 문제점을 해결하는 것이 가능하다. In
앞서 설명한 바와 같이 통신부는 유무선 통신망을 이용하고 있으므로, 관리자 단말은 이를 통해 앞서 230 단계에서 측정된 부하의 동작 성능을 전송받는 것이 가능하다. 따라서, 부하를 교체해야하는지 또는 유지해야하는지를 손쉽게 판단할 수 있는 장점이 있다. As described above, since the communication unit uses the wired / wireless communication network, the manager terminal can receive the performance of the load measured in
한편, 관리자 단말은 부하의 동작 성능을 일정한 주기에 따라 전송받을 수 있다. 예컨대, 부하의 동작 성능이 5년이 남았다면, 1년에 한번씩 부하의 교체를 요구하는 메시지를 처리부로부터 전송받을 수 있다. 또는 부하의 동작 성능을 알리는 간격을 점차 줄여가면서 전송받을 수도 있다. 즉, 부하의 동작 성능이 1년이 남았다면, 6개월, 3개월, 1개월 및 보름과 같이 점차적으로 간격을 좁혀서 부하의 교체를 유도할 수 있다.Meanwhile, the administrator terminal can receive the operation performance of the load according to a certain period. For example, if the load performance remains for five years, a message requesting replacement of the load can be received from the processing unit once a year. Or may be transmitted while gradually decreasing the interval for notifying the performance of the load. That is, if the operation performance of the load is one year, the load can be changed by gradually narrowing the intervals such as 6 months, 3 months, 1 month, and full-time.
한편, 240 단계에서 관리자 단말은 상기 원방감시제어 시스템이 포함하는 복수개의 부하들에 대한 제어 신호를 상기 중앙 관제 서버에 전송하는 것이 가능하다. 관리자 단말은 상기 제어 신호를 입력하는 소정의 입력수단을 포함한다. 예컨대, 관리자 단말은 PC, 노트북 또는 스마트폰일 수 있다. 즉, 중앙 관제 서버에서 직접 제어 신호를 입력하는 대신에, 원격지에서 관리자 단말을 이용하여 상기 제어 신호를 입력하고, 이를 통신부를 통해 전송하는 것이 가능하다. 따라서, 원방감시제어 시스템의 부하의 동작 성능을 측정하여 원방감시제어 시스템이 의도하지않게 정지되는 상황을 방지하고 부하를 효율적으로 제어하는 효과를 제공한다.On the other hand, in
개시된 기술의 일 실시예에 따른 원방감시제어 시스템의 부하의 동작 성능을 측정하는 장치 및 방법은 이해를 돕기 위하여 도면에 도시된 실시 예를 참고로 설명되었으나, 이는 예시적인 것에 불과하며, 당해 분야에서 통상적 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 타 실시 예가 가능하다는 점을 이해할 것이다. 따라서, 개시된 기술의 진정한 기술적 보호범위는 첨부된 특허청구범위에 의해 정해져야 할 것이다.Although the apparatus and method for measuring the operating performance of the load of the remote monitoring control system according to an embodiment of the disclosed technology have been described with reference to the embodiments shown in the drawings for purposes of understanding, It will be understood by those skilled in the art that various changes and modifications may be made without departing from the scope of the present invention. Accordingly, the true scope of protection of the disclosed technology should be determined by the appended claims.
110 : 감지부 120 : 통신부
130 : 처리부 140 : 관리자 단말
210 : 부하 상태 감지 220 : 감지 정보 전송
230 : 부하 동작 성능 측정 240 : 관리자 단말에 전송110: sensing unit 120: communication unit
130: processing section 140:
210: Load status detection 220: Sense information transmission
230: Measurement of load operation performance 240: Transfer to the administrator terminal
Claims (10)
상기 복수개의 부하들 각각에 배치되어 상기 부하들의 구동온도, 구동전력 및 구동횟수를 감지하는 감지부;
상기 부하들의 구동온도, 구동전력 및 구동횟수를 유무선 통신으로 중앙 관제 서버에 전송하는 통신부;
상기 중앙 관제 서버에 배치되고, 상기 통신부로부터 상기 부하들의 구동온도, 구동전력 및 구동횟수를 전송받아 상기 부하의 동작 성능을 측정하는 처리부; 및
상기 측정된 동작 성능을 상기 통신부를 통해 전송받는 관리자 단말;을 포함하되,
상기 감지부는 온도센서, 전류센서, 전압센서 및 동작감지센서를 포함하고,
상기 처리부는 소정의 측정 알고리즘을 탑재하여 미리 입력받은 상기 부하의 예상 성능과 상기 동작 성능을 비교하고,
상기 관리자 단말은 상기 복수개의 부하들에 대한 제어 신호를 상기 중앙 관제 서버에 전송하여 상기 부하의 구동온도, 구동전력 및 구동횟수를 제어하고, 상기 동작 성능에 대한 알림을 점차 간격을 줄여가며 전송받아 상기 부하들에 대한 교체를 유도하는 원방감시제어 시스템의 부하의 동작 성능을 측정하는 장치.1. A remote control system (SCADA) system for remotely controlling a plurality of loads installed on a site,
A sensing unit disposed in each of the plurality of loads to sense a driving temperature, a driving power, and a driving frequency of the loads;
A communication unit for transmitting the driving temperature, the driving power, and the driving frequency of the loads to the central control server through wired / wireless communication;
A processing unit which is disposed in the central control server and receives the driving temperature, the driving power and the driving frequency of the loads from the communication unit and measures the operation performance of the load; And
And an administrator terminal that receives the measured operation performance through the communication unit,
Wherein the sensing unit includes a temperature sensor, a current sensor, a voltage sensor, and a motion detection sensor,
Wherein the processor compares the expected performance of the load, which has been previously input with a predetermined measurement algorithm, and the operation performance,
The manager terminal transmits a control signal for the plurality of loads to the central control server to control the driving temperature, the driving power, and the driving frequency of the load, and transmits the notification of the operating performance to the central control server And measures the operating performance of the load of the remote monitoring control system that induces replacement of the loads.
상기 복수개의 부하들 각각에 배치되는 감지부가 상기 부하들의 구동온도, 구동전력 및 구동횟수를 감지하는 단계;
통신부가 상기 부하들의 구동온도, 구동전력 및 구동횟수를 유무선 통신으로 중앙 관제 서버에 전송하는 단계;
상기 중앙 관제 서버에 배치되는 처리부가 상기 통신부로부터 상기 부하들의 구동온도, 구동전력 및 구동횟수를 전송받아 상기 부하의 동작 성능을 측정하는 단계; 및
상기 측정된 동작 성능을 관리자 단말에 전송하는 단계;를 포함하되,
상기 감지부는 온도센서, 전류센서, 전압센서 및 동작감지센서를 포함하고,
상기 처리부는 소정의 측정 알고리즘을 탑재하여 미리 입력받은 상기 부하의 예상 성능과 상기 동작 성능을 비교하고,
상기 관리자 단말은 상기 복수개의 부하들에 대한 제어 신호를 상기 중앙 관제 서버에 전송하여 상기 부하의 구동온도, 구동전력 및 구동횟수를 제어하고, 상기 동작 성능에 대한 알림을 점차 간격을 줄여가며 전송받아 상기 부하들에 대한 교체를 유도하는 원방감시제어 시스템의 부하의 동작 성능을 측정하는 방법.A remote surveillance control (SCADA) method for remotely controlling a plurality of loads installed on a site,
Sensing a driving temperature, a driving power, and a driving frequency of the loads, the sensing unit being disposed in each of the plurality of loads;
Transmitting a driving temperature, a driving power, and a driving frequency of the loads to the central control server through wired / wireless communication;
A processing unit disposed in the central control server receives the driving temperature, the driving power, and the driving frequency of the loads from the communication unit to measure the operation performance of the load; And
And transmitting the measured performance to the administrator terminal,
Wherein the sensing unit includes a temperature sensor, a current sensor, a voltage sensor, and a motion detection sensor,
Wherein the processor compares the expected performance of the load, which has been previously input with a predetermined measurement algorithm, and the operation performance,
The manager terminal transmits a control signal for the plurality of loads to the central control server to control the driving temperature, the driving power, and the driving frequency of the load, and transmits the notification of the operating performance to the central control server Wherein the at least one of the plurality of loads includes a plurality of loads.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020140028092A KR101474687B1 (en) | 2014-03-11 | 2014-03-11 | Apparatus and method for measuring performance of load of scada system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020140028092A KR101474687B1 (en) | 2014-03-11 | 2014-03-11 | Apparatus and method for measuring performance of load of scada system |
Publications (1)
Publication Number | Publication Date |
---|---|
KR101474687B1 true KR101474687B1 (en) | 2014-12-17 |
Family
ID=52679421
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020140028092A KR101474687B1 (en) | 2014-03-11 | 2014-03-11 | Apparatus and method for measuring performance of load of scada system |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101474687B1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101885865B1 (en) | 2017-12-20 | 2018-08-21 | 금양산업개발 (주) | Monitoring and controlling system of remote facility |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100858369B1 (en) | 2008-04-23 | 2008-09-17 | 주식회사 대은계전 | Remote control system of the underground water well observation |
KR101093504B1 (en) | 2011-08-26 | 2011-12-13 | (주)서전기전 | Remote area monitoring control system using mobile communication technology and control method thereof |
KR101266143B1 (en) * | 2012-07-27 | 2013-05-21 | 주식회사 대은계전 | Supervisory control and data acquisition system and method |
-
2014
- 2014-03-11 KR KR1020140028092A patent/KR101474687B1/en active IP Right Grant
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100858369B1 (en) | 2008-04-23 | 2008-09-17 | 주식회사 대은계전 | Remote control system of the underground water well observation |
KR101093504B1 (en) | 2011-08-26 | 2011-12-13 | (주)서전기전 | Remote area monitoring control system using mobile communication technology and control method thereof |
KR101266143B1 (en) * | 2012-07-27 | 2013-05-21 | 주식회사 대은계전 | Supervisory control and data acquisition system and method |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101885865B1 (en) | 2017-12-20 | 2018-08-21 | 금양산업개발 (주) | Monitoring and controlling system of remote facility |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101812777B1 (en) | System for monitoring district heating customer facility based on internet of things and improving efficiency | |
US9436199B2 (en) | Controlling the setback and setback recovery of a power-consuming device | |
KR101314089B1 (en) | Unmanned control system for equpiment and the control method | |
US10794150B2 (en) | Predicting and optimizing drilling equipment operating life using condition based maintenance | |
CN104092310A (en) | Intelligent power distribution monitoring and energy management systematic background | |
KR101526149B1 (en) | Remote cascade control system based standard protocol for boiler and heater and the method thereof | |
JP5459657B2 (en) | Plant monitoring and control system and water treatment facility trouble recognition program | |
JP2018185634A (en) | Management monitoring system | |
CN204496241U (en) | Based on the PLC long distance control system in high in the clouds | |
KR101860015B1 (en) | IoT device manager for providing before service based on error prediction | |
CN103940257B (en) | Air-cooling island temperature control system | |
CN204485168U (en) | A kind of fire-fighting automatic inspection device | |
US20200348363A1 (en) | System and methods for fault detection | |
KR101576433B1 (en) | Method and apparatus for detecting an abnormally operating device comparing to other devices | |
KR101474687B1 (en) | Apparatus and method for measuring performance of load of scada system | |
JP6841589B2 (en) | Abnormality sign monitoring system | |
CN203837517U (en) | Temperature control system of air cooling island | |
US11366460B2 (en) | System for monitoring electrical devices and a method thereof | |
KR20190046149A (en) | Status monitoring and management system of automation and measurement facilities using smartphone | |
CN203190575U (en) | Automatic control device of air conditioner | |
KR20170112467A (en) | Machine care system based iot sensor and operating method thereof | |
CN107831432A (en) | A kind of monitoring system of shunting switch | |
KR20130078369A (en) | Digital protective relay and method for collecting data thereof | |
KR101277531B1 (en) | Smart mcu relay for monitoring and controlling power consumption of duplex communication crane system and control service system and method thereof | |
US10109025B2 (en) | Method for controlling a technical apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AMND | Amendment | ||
E601 | Decision to refuse application | ||
X091 | Application refused [patent] | ||
AMND | Amendment | ||
X701 | Decision to grant (after re-examination) | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20171102 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20190107 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20191212 Year of fee payment: 6 |