KR101461142B1 - Gang form for wall of building and method for wall of building using the same - Google Patents

Gang form for wall of building and method for wall of building using the same Download PDF

Info

Publication number
KR101461142B1
KR101461142B1 KR20130154597A KR20130154597A KR101461142B1 KR 101461142 B1 KR101461142 B1 KR 101461142B1 KR 20130154597 A KR20130154597 A KR 20130154597A KR 20130154597 A KR20130154597 A KR 20130154597A KR 101461142 B1 KR101461142 B1 KR 101461142B1
Authority
KR
South Korea
Prior art keywords
gantry
building wall
rti
forming
depression
Prior art date
Application number
KR20130154597A
Other languages
Korean (ko)
Inventor
노승완
Original Assignee
삼성물산 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 삼성물산 주식회사 filed Critical 삼성물산 주식회사
Priority to KR20130154597A priority Critical patent/KR101461142B1/en
Application granted granted Critical
Publication of KR101461142B1 publication Critical patent/KR101461142B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/08Forms, which are completely dismantled after setting of the concrete and re-built for next pouring
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G2011/067Integrated forms comprising shuttering skin, bracing or strutting arrangements, workplatforms and railings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

Provided is a gang form for forming a building wall (10) having a protrusion (11) and a recessed portion (12), including an external gang form (100) enclosing the protrusion (11) and the recessed portion (12); and an internal gang form (200) inserted in the external gang form (100) and positioned in the recessed portion (12). The external gang form (100) is used to form the building wall (10) positioned at the protrusion (11), and the internal gang form (200) is used to form the building wall (10) positioned at the recessed portion (12).

Description

돌출부와 함몰부를 포함하는 건물 벽체 형성용 갱폼 및 이를 이용한 건물 벽체를 형성하는 방법{GANG FORM FOR WALL OF BUILDING AND METHOD FOR WALL OF BUILDING USING THE SAME}BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a gangue for forming a building wall including a protrusion and a depression and a method for forming a building wall using the gangue.

본 발명은 건설분야에 관한 것으로서, 보다 상세하게는 돌출부와 함몰부를 포함하는 건물의 외면을 형성하기 위해 사용되는 갱폼 및 이를 이용하여 건물의 외면을 형성하는 방법에 관한 것이다.
BACKGROUND OF THE INVENTION 1. Field of the Invention [0002] The present invention relates to a construction field, and more particularly, to a gantry used for forming an outer surface of a building including protrusions and depressions, and a method of forming an outer surface of the building using the gantry.

갱폼(gang form)이란, 주로 고층 아파트와 같이 평면상 상ㆍ하부가 동일한 단면 구조물에서, 외부 벽체 거푸집과 발판용 케이지를 일체로 하여 제작한 대형 거푸집을 말한다. A gang form is a large formwork which is made by integrating the exterior wall formwork and the footing cage in a cross-sectional structure with the same upper and lower planes, such as a high-rise apartment building.

여기서 케이지(cage)란 갱폼의 외부 벽체 거푸집 부분을 제외한 부분으로서, 거푸집의 설치 및 해체작업, 후속 미장 및 견출작업 등을 안전하게 수행할 수 있도록 설치한 작업발판, 안전난간을 말한다. Here, the cage is a part of the gantry excluding the formwork of the outer wall, which means a work footrest and a safety guardrail installed to safely perform the installation and dismantling of the formwork, the subsequent plastering, and the laying work.

케이지는 일반적으로 상부 케이지와 하부 케이지가 존재하며, 상부 케이지는 갱폼 케이지의 작업발판 중 거푸집의 설치 및 해체 작업용으로 사용되는 상부에 있는 작업발판을 말하며, 하부 케이지는 미장, 견출 작업용으로 사용되는 하부에 있는 작업발판을 말한다.
The upper cage generally refers to a work foot on the upper side which is used for installation and disassembly of the work scaffold of the gang-shaped cage, and the lower cage is a lower work scaffold which is used for plastering, Is the work footing in.

최근 건축물에 관한 입면 디자인 가이드라인에 따라 아파트 입면디자인의 차별화를 꾀하기 위해 돌출형 발코니의 설치가 요구되는 상황이다. Recently, it is required to install a protruding balcony in order to differentiate the facade design according to the elevation design guideline regarding the building.

돌출형 발코니는 상층과 하층간 돌출 위치가 일정하지 않고, 중첩되는 부분이 존재하여 이의 시공을 위해서는 종래의 단일 갱폼 시공방식으로 시공되기 어려운 문제점이 있었다.
The protruding balconies have a problem in that the protruding positions between the upper and lower floors are not constant and overlapping portions are present, so that it is difficult to apply the conventional single-glazing construction method.

이러한 돌출형 발코니의 시공을 위해 복수의 형태를 가진 갱폼 세트를 사용하거나, 프리캐스트 방식으로 발코니를 시공하거나 및 시스템 비계를 사용하는 시공방법 등이 고안되어 왔으나, 상술된 돌출형 발코니의 시공방법들은 모두 높은 공사비가 요구됨과 아울러 공기의 연장 요소로 작용되어 왔다. For the construction of such protruding balconies, there have been devised a gang-set having a plurality of forms, a construction method in which a balcony is installed in a precast manner, and a system scaffold is used. However, the above- All of which are required to have a high construction cost and have served as an extension of the air.

또한, 입면 변화층의 슬래브 지지 방법이 난해하고, 크랙이나 누수 등의 구조적 안전성을 담보하지 못하는 문제점이 존재하여 왔다.
Further, the method of supporting the slab of the elevation change layer is complicated, and structural safety such as cracks and leaks can not be secured.

본 발명은 상술된 종래의 돌출형 발코니와 같은 돌출부와 함몰부를 포함하는 건물 벽체 형성의 문제점을 해결하기 위해 안출된 것으로서, 본 발명의 목적은 외부 갱폼과 내부 갱폼으로 나누어지는 2단의 갱폼을 사용하여, 돌출 위치가 변화하는 다양한 건물 벽체의 형상에 대응되는 건물 벽체 형성용 갱폼 및 이를 이용한 건물 벽체를 형성하는 방법을 제공함에 있다.
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems of forming a building wall including protrusions and depressions such as the above-mentioned conventional protruding balcony, and the object of the present invention is to use a gantry of two stages divided into an outer gantry and an inner gantry The present invention also provides a method for forming a building wall body using the same and a gantry for forming a building wall body corresponding to a shape of various building wall bodies varying the protruding position.

본 발명의 다른 목적은 한 세트의 갱폼만으로 다양한 위치의 돌출부와 함몰부를 포함하는 건물 벽체를 형성할 수 있도록 함으로써, 시공비 및 시공의 난이도를 낮추고 공기를 단축시킬 수 있는 건물 벽체 형성용 갱폼 및 이를 이용한 건물 벽체를 형성하는 방법을 제공함에 있다.
It is another object of the present invention to provide a gantry for forming a building wall capable of reducing the construction cost and difficulty of construction and shortening the air by forming a building wall body including protrusions and depressions at various positions with only one set of gauze, And a method for forming a building wall body.

본 발명의 또 다른 목적은 돌출부와 함몰부를 포함하는 건물 벽체를 형성함에 있어, 형성된 건물 벽체의 구조적 안정성을 담보할 수 있는 건물 벽체 형성용 갱폼 및 이를 이용한 건물 벽체를 형성하는 방법을 제공함에 있다.
It is another object of the present invention to provide a method of forming a building wall by using a gantry for forming a building wall which can guarantee the structural stability of a building wall formed in the building wall including the protrusion and the depression.

본 발명의 일 측면에 따르면, 건물 벽체(10) 형성용 갱폼에 있어서, 상기 건물 벽체(10)는 돌출부(11)와 함몰부(12)를 포함하고, 상기 돌출부(11)와 상기 함몰부(12)를 감싸는 외부 갱폼(100); 및 상기 외부 갱폼(100) 내측에 삽입되며, 상기 함몰부(12)에 위치하는 내부 갱폼(200);을 포함하되, 상기 외부 갱폼(100)은 상기 돌출부(11)에 위치한 상기 건물 벽체(10)을 형성하고, 상기 내부 갱폼(200)은 상기 함몰부(12)에 위치한 상기 건물 벽체(10)을 형성하는 것을 특징으로 하는 건물 벽체(10) 형성용 갱폼이 제공된다.
According to one aspect of the present invention, in the reforming for forming the building wall body 10, the building wall body 10 includes a protrusion 11 and a depression 12, and the protrusion 11 and the depression 12); < / RTI > And an inner gantry 200 inserted into the outer gantry 100 and positioned at the depression 12, wherein the outer gantry 100 is positioned within the building wall 10 And the inner gantry 200 forms the building wall 10 located at the depression 12. The gantry for forming the building wall 10 is provided.

여기서, 상기 외부 갱폼(100)은, 상기 돌출부(11)와 상기 함몰부(12)가 위치되는 내부공간(110)을 포함하며, 상기 내부공간(110)은 상부 및 하부가 개방된 것을 특징으로 하는 건물 벽체(10) 형성용 갱폼일 수 있다.
The outer gantry 100 includes an inner space 110 in which the protrusions 11 and the depressions 12 are located and the inner space 110 is open at the top and bottom Which is a gang form for forming the building wall body 10.

또한, 상기 내부 갱폼(200)은, 상기 건물 벽체(10)의 형성을 위한 거푸집(210); 및 상기 거푸집(210)이 장착된 케이지(220);를 포함하는 것을 특징으로 하는 건물 벽체(10) 형성용 갱폼일 수 있다.
Also, the inner gantry 200 includes a mold 210 for forming the building wall 10; And a cage 220 on which the mold 210 is mounted.

또한, 상기 내부 갱폼(200)은, 상기 돌출부(11)의 하부 슬래브의 형성을 위한 서포트부(230);를 더 포함하는 것을 특징으로 하는 건물 벽체(10) 형성용 갱폼일 수 있다.
The inner gantry 200 may further include a support 230 for forming the lower slab of the protrusion 11. The gant foam 200 may be a gantry for forming the building wall 10.

또한, 상기 서포트부(230)는, 상기 돌출부(11)의 하부 슬래브와 접촉된 슬래브판(231); 및 일단은 상기 슬래브판(231)을 지지함과 아울러, 타단은 상기 건물 벽체(10)에 형성된 창턱(13)에 의해 지지되는 상부 서포트(232);를 포함하는 것을 특징으로 하는 건물 벽체(10) 형성용 갱폼일 수 있다.
The support portion 230 may include a slab plate 231 contacting the lower slab of the protrusion 11; And an upper support (232) having one end supported by the slab plate (231) and the other end supported by a window sill (13) formed on the building wall (10) ). ≪ / RTI >

또한, 상기 서포트부(230)는, 상기 돌출부(11)의 하부 슬래브와 접촉된 슬래브판(231); 상기 슬래브판(231)과 접촉됨과 아울러, 상기 슬래브판(231)을 지지하는 상부 서포트(232); 상기 상부 서포트(232)와 접촉된 중간판(233); 및 일단은 상기 중간판(233)을 지지함과 아울러, 타단은 상기 건물 벽체(10)에 형성된 창턱(13)에 의해 지지되는 하부 서포트(234);를 포함하는 것을 특징으로 하는 건물 벽체(10) 형성용 갱폼일 수 있다.
The support portion 230 may include a slab plate 231 contacting the lower slab of the protrusion 11; An upper support 232 contacting the slab plate 231 and supporting the slab plate 231; An intermediate plate 233 in contact with the upper support 232; And a lower support (234) having one end supported by the intermediate plate (233) and the other end supported by a window sill (13) formed in the building wall (10) ). ≪ / RTI >

또한, 상기 건물 벽체(10)는, 상기 돌출부(11)와 상기 함몰부(12)의 위치가 변화하는 변화구간(14)을 포함하는 것을 특징으로 하는 건물 벽체(10) 형성용 갱폼일 수 있다.
The building wall 10 may be a gang form for forming the building wall 10 characterized in that the projecting portion 11 includes a change section 14 in which the position of the depression 12 changes .

본 발명의 다른 일 측면에 따르면, 돌출부(11)와 함몰부(12)를 포함하는 건물 벽체(10)을 형성하는 방법에 있어서, 상기 돌출부(11)와 상기 함몰부(12)를 감싸는 외부 갱폼(100)의 내측에, 상기 함몰부(12)에 위치되는 내부 갱폼(200)을 설치하는 제1 단계(S100); 및 상기 외부 갱폼(100)에 의해 상기 돌출부(11)에 위치한 상기 건물 벽체(10)을 형성시키고, 상기 내부 갱폼(200)에 의해 상기 함몰부(12)에 위치한 상기 건물 벽체(10)을 형성시키는 제2 단계(S200);를 포함하는 것을 특징으로 하는 건물 벽체(10)을 형성하는 방법이 제공된다.
According to another aspect of the present invention, there is provided a method of forming a building wall body 10 including a protrusion 11 and a depression 12, wherein the protrusion 11 and the outer damper 12, which surround the depression 12, A first step (S100) of installing an internal gauze (200) located in the depression (12) inside the body (100); And forming the building wall body 10 located at the protrusion 11 by the external gantry 100 and forming the building wall body 10 located at the depression 12 by the internal gantry 200, (S200) of making the building wall body (10).

여기서, 상기 제2 단계(S200) 이후에, 상기 외부 갱폼(100) 및 상기 내부 갱폼(200)을 상향 이동시키는 제3 단계(S300);를 더 포함하는 것을 특징으로 하는 건물 벽체(10)을 형성하는 방법일 수 있다.
The method further includes a third step (S300) of moving the external gantry 100 and the internal gantry 200 upward after the second step S200. Or the like.

또한, 상기 제3 단계(S300)는, 상기 외부 갱폼(100)을 상부로 슬라이딩하여 이동시키는 외부 갱폼(100) 이동 단계; 및 상기 내부 갱폼(200)을 상기 건물 벽체(10)에서 분리하여 상기 외부 갱폼(100) 내측으로 인입시키는 내부 갱폼(200) 이동 단계;를 포함하는 것을 특징으로 하는 건물 벽체(10)을 형성하는 방법일 수 있다.
In addition, the third step S300 may include moving the outer gantry 100 to slide the outer gantry 100 upward; And an inner gantry 200 moving the inner gantry 200 separated from the building wall 10 and drawing the inner gantry 200 into the outer gantry 100. [ Lt; / RTI >

또한, 상기 내부 갱폼(200)은 상기 건물 벽체(10)의 형성을 위한 거푸집(210); 상기 거푸집(210)이 장착된 케이지(220); 및 상기 돌출부(11)의 하부 슬래브의 형성을 위한 서포트부(230)를 포함하며, 상기 내부 갱폼(200) 이동 단계는, 상기 케이지(220)에 양중용 브라켓(241)을 설치하는 단계; 상기 양중용 브라켓(241)에 타워로프(242)를 체결하는 단계; 상기 케이지(220)에 형성된 안전고리(243)를 힌지 구동하여, 상기 건물 벽체(10)에 형성된 창턱(13)에 체결시키는 단계; 상기 서포트부(230)를 해체하는 단계; 상기 안전고리(323)를 해체하는 단계; 상기 내부 갱폼(200)을 상기 건물 벽체(10)에서 분리하는 단계; 상기 내부 갱폼(200)을 상향 이동시키는 단계; 및 상기 내부 갱폼(200)을 상기 외부 갱폼(100) 내측으로 인입시키는 단계;를 포함하는 것을 특징으로 하는 건물 벽체(10)을 형성하는 방법일 수 있다.
In addition, the inner gantry 200 includes a mold 210 for forming the building wall 10; A cage 220 on which the mold 210 is mounted; And a support part (230) for forming a lower slab of the protrusion (11), wherein the step of moving the inner gantry (200) comprises: installing a positive displacement bracket (241) on the cage (220); Tightening the tower rope (242) to the positive bracket (241); Driving the safety hook 243 formed on the cage 220 by hinge driving to secure it to the window sill 13 formed on the building wall 10; Disassembling the support unit 230; Disassembling the safety collar (323); Separating the inner gantry 200 from the building wall 10; Moving the inner gantry 200 upward; And inserting the inner gantry 200 into the outer gantry 100. The method of forming the building wall 10 according to an embodiment of the present invention will now be described in detail with reference to the drawings.

또한, 상기 돌출부(11)와 상기 함몰부(12)가 위치되는 상기 외부 갱폼(100)의 내부공간(110)은 상부 및 하부가 개방되며, 상기 내부 갱폼(200)을 상기 외부 갱폼(100) 내측으로 인입시키는 단계는, 상기 내부 갱폼(200)이 상기 외부 갱폼(100)의 상부 개방부로 인입되는 것을 특징으로 하는 건물 벽체(10)을 형성하는 방법일 수 있다.
The inner space 110 of the outer gantry 100 in which the protrusions 11 and the depressions 12 are located is open at the top and the bottom and the inner gantry 200 is connected to the outer gantry 100, The step of pulling inward can be a method of forming the building wall 10, characterized in that the inner gantry 200 is introduced into the upper opening of the outer gantry 100.

또한, 상기 건물 벽체(10)는, 상기 돌출부(11)와 상기 함몰부(12)의 위치가 변화하는 변화구간(14)을 포함하는 것을 특징으로 하는 건물 벽체(10)을 형성하는 방법일 수 있다.
The building wall 10 includes a protruding portion 11 and a change section 14 in which the position of the depressed portion 12 is changed. have.

본 발명에 따르면, 한 세트의 갱폼만으로도 돌출 위치가 변화하는 다양한 건물 벽체의 형상에 대응할 수 있는 효과가 있다.
According to the present invention, there is an effect that it is possible to cope with the shape of various building wall bodies where the protruding position changes by only one set of gauze.

본 발명에 따르면, 한 세트의 갱폼만으로 다양한 위치의 돌출부와 함몰부를 포함하는 건물 벽체를 형성할 수 있도록 함으로써, 시공비 및 시공의 난이도를 낮추고 공기를 단축시킬 수 있는 효과가 있다.
According to the present invention, it is possible to form a building wall body including protrusions and depressions at various positions with only one set of gauze, thereby reducing the construction cost and difficulty of construction and shortening the air.

본 발명에 따르면, 돌출부와 함몰부를 포함하는 건물 벽체를 형성함에 있어, 형성된 건물 벽체의 구조적 안정성을 담보할 수 있는 효과가 있다.
According to the present invention, in forming the building wall including the protrusion and the depression, the structural stability of the formed wall can be secured.

도 1은 본 발명의 일 실시예에 따른 돌출부와 함몰부를 포함하는 건물 벽체를 나타내는 도면.
도 2는 본 발명의 일 실시예에 따른 외부 갱폼 및 내부 갱폼을 나타내는 도면.
도 3은 본 발명의 일 실시예에 따른 외부 갱폼 및 내부 갱폼의 단면도.
도 4는 본 발명의 일 실시예에 따른 외부 갱폼 및 내부 갱폼의 측면도.
도 5 내지 도 13은 본 발명의 일 실시예에 따른 내부 갱폼 이동 단계를 나타내는 도면.
BRIEF DESCRIPTION OF THE DRAWINGS Fig. 1 is a view showing a building wall including projections and depressions according to an embodiment of the present invention; Fig.
Figure 2 illustrates an external gantry and an internal gantry in accordance with an embodiment of the present invention.
3 is a cross-sectional view of an outer gantry and an inner gantry in accordance with an embodiment of the present invention.
4 is a side view of an outer gantry and an inner gantry in accordance with an embodiment of the present invention.
FIGS. 5 to 13 illustrate an internal reforming step according to an embodiment of the present invention; FIG.

본 발명에 따른 돌출부와 함몰부를 포함하는 건물 벽체 형성용 갱폼 및 이를 이용한 건물 벽체를 형성하는 방법의 실시예를 첨부도면을 참조하여 상세히 설명하기로 하며, 첨부 도면을 참조하여 설명함에 있어, 동일하거나 대응하는 구성 요소는 동일한 도면 번호를 부여하고 이에 대한 중복되는 설명은 생략하기로 한다.
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will now be described more fully hereinafter with reference to the accompanying drawings, in which exemplary embodiments of the invention are shown. The corresponding components are denoted by the same reference numerals, and redundant description thereof will be omitted.

또한, 이하 사용되는 제1, 제2 등과 같은 용어는 동일 또는 상응하는 구성 요소들을 구별하기 위한 식별 기호에 불과하며, 동일 또는 상응하는 구성 요소들이 제1, 제2 등의 용어에 의하여 한정되는 것은 아니다.
It is also to be understood that the terms first, second, etc. used hereinafter are merely reference numerals for distinguishing between identical or corresponding components, and the same or corresponding components are defined by terms such as first, second, no.

또한, 결합이라 함은, 각 구성 요소 간의 접촉 관계에 있어, 각 구성 요소 간에 물리적으로 직접 접촉되는 경우만을 뜻하는 것이 아니라, 다른 구성이 각 구성 요소 사이에 개재되어, 그 다른 구성에 구성 요소가 각각 접촉되어 있는 경우까지 포괄하는 개념으로 사용하도록 한다.
In addition, the term " coupled " is used not only in the case of direct physical contact between the respective constituent elements in the contact relation between the constituent elements, but also means that other constituent elements are interposed between the constituent elements, Use them as a concept to cover each contact.

본 발명에 따른 건물 벽체(10) 형성용 갱폼은 돌출부(11)와 함몰부(12)를 포함하는 건물 벽체(10)의 형성을 위해 사용된다. The gangue for forming the building wall body 10 according to the present invention is used for forming the building wall body 10 including the projecting portion 11 and the depression 12.

특히, 종래의 갱폼에 의해서는 건물의 각 층마다 돌출부(11)와 함몰부(12)의 위치가 변화하는 경우 2 이상의 세트의 갱폼을 사용하여 건물 벽체(10)를 시공하여 왔으나, 본 발명에 따른 갱폼을 사용하면 한 세트의 갱폼만으도 돌출부(11) 및 함몰부(12)의 위치가 다양한 건물 벽체(10)를 시공하는 것이 가능하다. Particularly, when the position of the protruding portion 11 and the depressed portion 12 changes in each layer of the building by the conventional gantry, the building wall body 10 is constructed by using two or more sets of gantry. However, It is possible to construct the building wall body 10 in which the positions of the protrusions 11 and the depressions 12 are varied even with only one set of gauze.

여기서 돌출부(11)란 건물 벽체(10)에서 건물의 외측을 향하여 돌출된 부분을 의미하며, 함몰부(12)란 돌출부(11)에 비하여 건물의 내측을 향하여 함몰된 부분을 의미한다(도 1). Here, the protruding portion 11 means a portion protruding toward the outside of the building in the building wall body 10, and the depressed portion 12 means a portion depressed toward the inside of the building as compared with the protruding portion 11 ).

함몰부(12)는 건물 벽체(10)에서 건물의 내측을 향하여 함몰된 구조를 취할 수 있고, 건물 벽체(10)와 같은 수준의 위치에 있을 수도 있다.
The depressed portion 12 may have a depressed structure toward the inside of the building 10 from the building wall 10 and may be located at the same level as the building wall 10.

본 발명의 일 실시예에 다른 건물 벽체(10) 형성용 갱폼은 돌출부(11)와 함몰부(12)를 감싸는 외부 갱폼(100) 및 외부 갱폼(100) 내측에 삽입되며, 함몰부(12)에 위치하는 내부 갱폼(200)을 포함한다(도 2). The gangue for forming the building wall body 10 according to an embodiment of the present invention is inserted inside the outer gangue 100 and the outer gantry 100 surrounding the gang portion 12 and the depression 12, (Fig. 2).

여기서 외부 갱폼(100)은 돌출부(11)에 위치한 건물 벽체(10)을 형성하고, 내부 갱폼(200)은 함몰부(12)에 위치한 건물 벽체(10)을 형성하는 것을 발명의 특징으로 한다. Wherein the outer gantry 100 forms a building wall 10 located at the protrusion 11 and the inner gantry 200 forms a building wall 10 located at the depression 12. [

즉, 종래의 시공방법에 사용되던 갱폼은 고정된 형태를 취하고 있었기 때문에 건물 벽체(10)의 돌출부(11)와 함몰부(12)의 위치가 변화하는 경우, 갱폼의 교체가 요구되어 시공의 난이도가 높고, 시공비가 상승되며, 공기가 길어지는 문제점이 있어왔다. That is, when the position of the protruding portion 11 and the depressed portion 12 of the building wall body 10 changes, it is required to replace the ganged foam, which is used in the conventional construction method, The construction cost is increased, and the air is lengthened.

그러나, 본 발명에 따른 갱폼은 돌출부(11)에 위치한 건물 벽체(10)를 형성하는 외부 갱폼(100)과 함몰부(12)에 의치한 건물 벽체(10)를 형성하는 내부 갱폼(200)으로 구조가 분리되어 있기 때문에, 돌출부(11)와 함몰부(12)의 위치가 변화하더라도, 변화된 함몰부(12)의 위치로 내부 갱폼(200)을 이동시키는 것만으로, 돌출부(11) 및 함몰부(12)의 위치가 변화된 건물 벽체(10)를 형성시키는 것이 가능한 효과를 갖는다.
However, the gang foam according to the present invention has an outer gang 100 forming the building wall 10 located in the protrusion 11 and an inner gang 200 forming the building wall 10 dented in the depression 12 Even if the positions of the projecting portions 11 and the depressed portions 12 are changed, the projected portions 11 and depressed portions 12 can be easily moved only by changing the position of the depressed portions 12, It is possible to form the building wall 10 in which the position of the building wall 12 is changed.

또한, 본 발명에 따른 갱폼은 한 세트의 갱폼만으로 다양한 돌출부(11) 및 함몰부(12)를 가진 건물의 외벽(10)을 형성하는 것이 가능하므로, 시공의 난이도를 낮추고, 공시기간을 단축시켜 공사비용을 절감할 수 있다는 효과를 갖는다.
In addition, since the gauze according to the present invention can form the outer wall 10 of the building having the various protrusions 11 and the depressions 12 by only one set of gauze, it is possible to reduce the difficulty of construction and shorten the disclosure period And the construction cost can be reduced.

또한, 본 발명에 따른 갱폼은 돌출부(11)와 함몰부(12)의 위치가 변화하는 변화구간(14)의 슬래브 시공을 정교하게 수행할 수 있으므로 건물의 구조적 안정성 및 마감품질의 향상에 기여할 수 있는 효과를 갖는다.
In addition, the gang foam according to the present invention can finely perform the slab construction of the change section 14 in which the positions of the protrusions 11 and the depressions 12 are changed, thereby contributing to improvement of the structural stability and finishing quality of the building .

또한, 본 발명에 따른 갱폼은 건물 벽체(10)에 돌출부(11) 및 함몰부(12)가 일체로 타설될 수 있도록 하므로 수려한 건물 외관 형성에 기여할 수 있다는 효과를 갖는다.
In addition, the gang foam according to the present invention has the effect that the protruding portion 11 and the depressed portion 12 can be integrally installed in the building wall body 10, thereby contributing to the formation of a beautiful building appearance.

돌출부(11)에 위치한 건물 벽체(10)를 형성하는 외부 갱폼(100)은 돌출부(11)와 함몰부(12)가 위치되는 내부공간(110)을 포함하며, 내부공간(110)은 상부 및 하부가 개방되는 것이 바람직하다(도 3). The outer gantry 100 forming the building wall 10 located at the protrusion 11 includes an inner space 110 in which the protrusion 11 and the depression 12 are located, It is preferable that the lower portion is opened (Fig. 3).

상층의 건물 벽체(10)와 하층의 건물 벽체(10)의 돌출부(11)와 함몰부(12)의 위치가 상이한 경우, 외부 갱폼(100)을 상층 건물 벽체(10)가 형성될 위치로 이동시키고, 내부 갱폼(200)을 외부 갱폼(100) 내부공간(110)의 함몰부(12)의 위치로 이동시키는 작업이 요구된다. The outer gantry 100 is moved to the position where the upper building wall 10 is to be formed when the position of the depression 12 is different from the position of the depression 11 of the upper building wall 10 and the lower wall 10 of the building wall It is required to move the inner gantry 200 to the position of the depression 12 of the inner space 110 of the outer gantry 100.

이 경우, 내부공간(110)의 상부 및 하부가 개방된 구조를 취하면, 개방된 상부 및 하부로 내부 갱폼(200)을 내부공간(110)으로 인입시키는 것이 용이하다는 효과를 갖는다.
In this case, when the upper and lower portions of the inner space 110 are opened, it is easy to draw the inner gantry 200 into the inner space 110 with the opened upper and lower portions.

함몰부(12)에 위치한 건물 벽체(10)를 형성하는 내부 갱폼(200)은 건물 벽체(10)의 형성을 위한 거푸집(210) 및 거푸집(210)이 장착된 케이지(220)를 포함한다(도 2, 4).The inner gantry 200 forming the building wall 10 located at the depression 12 includes a form 210 for the formation of the building wall 10 and a cage 220 to which the form 210 is attached 2 and 4).

또한, 내부 갱폼(200)은 돌출부(11)의 하부 슬래브의 형성을 위한 서포트부(230);를 더 포함할 수 있다.
Further, the inner gantry 200 may further include a support portion 230 for forming the lower slab of the protrusion 11.

돌출부(11)와 함몰부(12)의 위치가 변화되는 변화구간(14)에서는 함몰부(12)의 상측에 돌출부(11)의 하부 슬래브가 형성된다. The lower slab of the projection 11 is formed on the upper side of the depression 12 in the change section 14 where the positions of the projections 11 and the depressions 12 are changed.

이 경우 함몰부(12)에 위치한 건물 벽체(10)를 형성하는 내부 갱폼(200)을 이용하여 돌출부(11)의 하부 슬래브를 형성하는 것이 가능하다.
In this case, it is possible to form the lower slab of the projecting portion 11 by using the inner gantry 200 which forms the building wall 10 located at the depression 12.

돌출부(11)의 하부 슬래브의 형성을 위해, 서포트부(230)는 돌출부(11)의 하부 슬래브와 접촉된 슬래브판(231), 슬래브판(231)과 접촉됨과 아울러 슬래브판(231)을 지지하는 상부 서포트(232), 상부 서포트(232)와 접촉된 중간판(233) 및 일단은 상기 중간판(233)을 지지함과 아울러, 타단은 상기 건물 벽체(10)에 형성된 창턱(파라펫)(13)에 의해 지지되는 하부 서포트(234)를 포함할 수 있다(도 4). The support part 230 is in contact with the slab plate 231 and the slab plate 231 which are brought into contact with the lower slab of the projecting part 11 and the slab plate 231 is supported An intermediate plate 233 which is in contact with the upper support 232 and one end supports the intermediate plate 233 and the other end supports a parapet formed on the building wall 10, And a lower support 234 that is supported by a support member 13 (Fig. 4).

즉, 창턱(13)에 의해 지지되는 지지력이 하부 서포트(234), 중간판(233) 및 상부 서포트(232)를 통해 슬래브판(231)으로 전달되며, 전달된 지지력에 의해 지지되는 슬래브판(231)은 돌출부(11)의 하부 슬래브 형성을 위한 거푸집으로서의 역할을 수행한다. That is, the supporting force supported by the window sill 13 is transmitted to the slab plate 231 through the lower support 234, the intermediate plate 233 and the upper support 232, and the slab plate 231 supported by the transmitted supporting force 231 serve as dies for the formation of the lower slab of the protrusion 11.

본 발명의 다른 일 실시예에 의하면, 상부 서포트(232)를 직접 창턱(13)에 지지시킴으로서, 슬래브판(231)을 지지하는 것도 가능하다.
According to another embodiment of the present invention, it is also possible to support the slab plate 231 by supporting the upper support 232 directly on the window sill 13.

이하 본 발명의 일 실시예에 따른 건물 벽체(10)를 형성하는 방법에 관하여 설명한다. Hereinafter, a method of forming the building wall 10 according to an embodiment of the present invention will be described.

본 발명의 일 실시예에 따른 건물 벽체(10)를 형성하는 방법은, 돌출부(11)와 함몰부(12)를 감싸는 외부 갱폼(100)의 내측에, 함몰부(12)에 위치되는 내부 갱폼(200)을 설치하는 제1 단계(S100), 외부 갱폼(100)에 의해 돌출부(11)에 위치한 건물 벽체(10)을 형성시키고, 내부 갱폼(200)에 의해 함몰부(12)에 위치한 건물 벽체(10)을 형성시키는 제2 단계(S200), 외부 갱폼(100) 및 상기 내부 갱폼(200)을 상향 이동시키는 제3 단계(S300)를 포함한다. A method of forming a building wall 10 according to an embodiment of the present invention includes the steps of forming an inner gum 100 located in a depression 12 on an inner side of an outer gum 100 that encloses a protrusion 11 and a depression 12, The building wall body 10 located at the protruding portion 11 is formed by the outer gantry 100 and the building wall body 10 located at the depression 12 is formed by the inner gantry 200. In the first step S100, A second step S200 of forming the wall 10, a third step S300 of moving the outer gantry 100 and the inner gantry 200 upward.

제3 단계(S300) 이후에는 제1 단계(S100) 및 제2 단계(S200)가 반복 수행됨으로써, 건물 벽체(10)가 상향으로 점차 형성된다.
After the third step S300, the first step S100 and the second step S200 are repeatedly performed so that the building wall body 10 is gradually formed upward.

제3 단계(S300)는 외부 갱폼(100)을 상부로 슬라이딩하여 이동시키는 외부 갱폼(100) 이동 단계 및 내부 갱폼(200)을 건물 벽체(10)에서 분리하여 외부 갱폼(100) 내측으로 인입시키는 내부 갱폼(200) 이동 단계를 포함할 수 있다.
The third step S300 is a step of moving the outer gantry 100 to slide the outer gantry 100 upward and moving the inner gantry 200 into the outer gantry 100 by separating the inner gantry 200 from the building wall 10 And an inner gaming 200 movement step.

당해층의 건물 외벽(10) 형성이 종료된 이후에는 갱폼이 상층으로 이동하여 상층의 건물 외면(10)을 형성하게 된다. After the formation of the outer wall 10 of the layer is completed, the gang foam moves to the upper layer to form the outer surface 10 of the upper layer.

본 발명의 일 실시예에 따른 갱폼이 상층으로 이동되는 과정을 설명하면 이하와 같다. The process of moving the gang foam to the upper layer according to an embodiment of the present invention will be described below.

일단 외부 갱폼(100)이 상층으로 이동된다. 외부 갱폼(100)의 내부공간(110)은 상부 및 하부가 개방된 형태를 취하므로, 외부 갱폼(100)이 상층으로 이동되더라도 내부 갱폼(200)은 당해층에 머물르게 된다(도 5). The outer gauze 100 is once moved to the upper layer. The inner space 110 of the outer gantry 100 has an open top and bottom so that the inner gantry 200 remains in the layer even though the outer gantry 100 is moved to the upper layer.

당해층에 위치된 내부 갱폼(200)이 상층으로 이동되는 단계는, 케이지(220)에 양중용 브라켓(241)을 설치하는 단계(도 6), 양중용 브라켓(241)에 타워로프(242)를 체결하는 단계(도 7), 케이지(220)에 형성된 안전고리(243)를 힌지 구동하여 건물 벽체(10)에 형성된 창턱(13)에 체결시키는 단계(도 8), 상부 서포트(232) 및 하부 서포트(234)를 해체하는 단계(도 9, 도 10), 안전고리(323)를 해체하는 단계(도 11), 내부 갱폼(200)을 건물 벽체(10)에서 분리하는 단계(도 12), 내부 갱폼(200)을 상향 이동시켜, 내부 갱폼(200)을 외부 갱폼(100) 내측으로 인입시키는 단계(도 13)를 포함할 수 있다(도 5). The step of moving the inner gantry 200 positioned in the layer to the upper layer comprises the steps of installing the positive bracket 241 on the cage 220 and attaching the tower rope 242 to the positive bracket 241, (FIG. 7); a step of hinging the safety hook 243 formed on the cage 220 to fasten it to the window sill 13 formed on the building wall 10 (FIG. 8); the upper support 232 and (Fig. 12), disassembling the lower support 234 (Figs. 9 and 10), dismantling the safety collar 323 (Fig. 11), separating the inner gantry 200 from the building wall 10 (Fig. 5), and moving the inner gantry 200 upward to pull the inner gantry 200 inside the outer gantry 100 (Fig. 5).

여기서, 내부 갱폼(200)은 외부 갱폼(100)의 상부 개방부로 인입되는 것이 바람직하다.
Here, the inner gantry 200 is preferably introduced into the upper opening of the outer gantry 100.

이상은 본 발명에 의해 구현될 수 있는 바람직한 실시예의 일부에 관하여 설명한 것에 불과하므로, 주지된 바와 같이 본 발명의 범위는 위의 실시예에 한정되어 해석되어서는 안 될 것이며, 위에서 설명된 본 발명의 기술적 사상과 그 근본을 함께 하는 기술적 사상은 모두 본 발명의 범위에 포함된다고 할 것이다.
It will be apparent to those skilled in the art that various modifications and variations can be made in the present invention without departing from the spirit or scope of the invention as defined in the appended claims. It is to be understood that both the technical idea and the technical spirit of the invention are included in the scope of the present invention.

10 : 건물 벽체
11 : 돌출부
12 : 함몰부
100 : 외부 갱폼
200 : 내부 갱폼
10: Building wall
11:
12:
100: external gang
200: Internal modding

Claims (13)

건물 벽체(10) 형성용 갱폼에 있어서,
상기 건물 벽체(10)는 돌출부(11)와 함몰부(12)를 포함하고,
상기 돌출부(11)와 상기 함몰부(12)를 감싸는 외부 갱폼(100); 및
상기 외부 갱폼(100) 내측에 삽입되며, 상기 함몰부(12)에 위치하는 내부 갱폼(200);을 포함하되,
상기 외부 갱폼(100)은 상기 돌출부(11)에 위치한 상기 건물 벽체(10)을 형성하고, 상기 내부 갱폼(200)은 상기 함몰부(12)에 위치한 상기 건물 벽체(10)을 형성하는 것을 특징으로 하는 건물 벽체(10) 형성용 갱폼.
In the reforming for forming the building wall body 10,
The building wall (10) includes a projection (11) and a depression (12)
An outer gantry 100 surrounding the protrusions 11 and the depressions 12; And
And an inner gantry 200 inserted into the outer gantry 100 and positioned at the depression 12,
The outer gantry 100 forms the building wall 10 located at the protrusion 11 and the inner gantry 200 forms the building wall 10 located at the depression 12. [ (10).
제1항에 있어서,
상기 외부 갱폼(100)은,
상기 돌출부(11)와 상기 함몰부(12)가 위치되는 내부공간(110)을 포함하며, 상기 내부공간(110)은 상부 및 하부가 개방된 것을 특징으로 하는 건물 벽체(10) 형성용 갱폼.
The method according to claim 1,
The external gauze 100 may be a single-
Wherein the upper space and the lower space are opened so that the upper space and the lower space of the inner space are opened when the protrusion part and the depression part are located.
제2항에 있어서,
상기 내부 갱폼(200)은,
상기 건물 벽체(10)의 형성을 위한 거푸집(210); 및
상기 거푸집(210)이 장착된 케이지(220);를
포함하는 것을 특징으로 하는 건물 벽체(10) 형성용 갱폼.
3. The method of claim 2,
The inner gantry (200)
A mold (210) for forming the building wall (10); And
A cage 220 on which the mold 210 is mounted;
(10). ≪ RTI ID = 0.0 > 11. < / RTI >
제3항에 있어서,
상기 내부 갱폼(200)은,
상기 돌출부(11)의 하부 슬래브의 형성을 위한 서포트부(230);를
더 포함하는 것을 특징으로 하는 건물 벽체(10) 형성용 갱폼.
The method of claim 3,
The inner gantry (200)
A support part 230 for forming a lower slab of the projecting part 11;
(10). ≪ RTI ID = 0.0 > 11. < / RTI >
제4항에 있어서,
상기 서포트부(230)는,
상기 돌출부(11)의 하부 슬래브와 접촉된 슬래브판(231); 및
일단은 상기 슬래브판(231)을 지지함과 아울러, 타단은 상기 건물 벽체(10)에 형성된 창턱(13)에 의해 지지되는 상부 서포트(232);를
포함하는 것을 특징으로 하는 건물 벽체(10) 형성용 갱폼.
5. The method of claim 4,
The support unit 230,
A slab plate 231 in contact with the lower slab of the protrusion 11; And
An upper support 232 having one end supported by the slab plate 231 and the other end supported by a window sill 13 formed on the building wall 10;
(10). ≪ RTI ID = 0.0 > 11. < / RTI >
제4항에 있어서,
상기 서포트부(230)는,
상기 돌출부(11)의 하부 슬래브와 접촉된 슬래브판(231);
상기 슬래브판(231)과 접촉됨과 아울러, 상기 슬래브판(231)을 지지하는 상부 서포트(232);
상기 상부 서포트(232)와 접촉된 중간판(233); 및
일단은 상기 중간판(233)을 지지함과 아울러, 타단은 상기 건물 벽체(10)에 형성된 창턱(13)에 의해 지지되는 하부 서포트(234);를
포함하는 것을 특징으로 하는 건물 벽체(10) 형성용 갱폼.
5. The method of claim 4,
The support unit 230,
A slab plate 231 in contact with the lower slab of the protrusion 11;
An upper support 232 contacting the slab plate 231 and supporting the slab plate 231;
An intermediate plate 233 in contact with the upper support 232; And
A lower support 234 having one end supported by the intermediate plate 233 and the other end supported by a window sill 13 formed in the building wall body 10;
(10). ≪ RTI ID = 0.0 > 11. < / RTI >
제5항 또는 제6항에 있어서,
상기 건물 벽체(10)는,
상기 돌출부(11)와 상기 함몰부(12)의 위치가 변화하는 변화구간(14)을 포함하는 것을 특징으로 하는 건물 벽체(10) 형성용 갱폼.
The method according to claim 5 or 6,
The building wall (10)
And a change section (14) in which the positions of the protrusions (11) and the depressions (12) are changed.
돌출부(11)와 함몰부(12)를 포함하는 건물 벽체(10)을 형성하는 방법에 있어서,
상기 돌출부(11)와 상기 함몰부(12)를 감싸는 외부 갱폼(100)의 내측에, 상기 함몰부(12)에 위치되는 내부 갱폼(200)을 설치하는 제1 단계(S100); 및
상기 외부 갱폼(100)에 의해 상기 돌출부(11)에 위치한 상기 건물 벽체(10)을 형성시키고, 상기 내부 갱폼(200)에 의해 상기 함몰부(12)에 위치한 상기 건물 벽체(10)을 형성시키는 제2 단계(S200);를
포함하는 것을 특징으로 하는 건물 벽체(10)을 형성하는 방법.
A method of forming a building wall (10) comprising a projection (11) and a depression (12)
A first step S100 of providing an inner gum 200 positioned at the depression 12 inside the outer gum 100 surrounding the protrusions 11 and the depressions 12; And
The building wall body 10 located at the protrusion 11 is formed by the outer gantry 100 and the building wall body 10 located at the depression 12 is formed by the inner gantry 200 In the second step S200,
(10). ≪ RTI ID = 0.0 > 11. < / RTI >
제8항에 있어서,
상기 제2 단계(S200) 이후에,
상기 외부 갱폼(100) 및 상기 내부 갱폼(200)을 상향 이동시키는 제3 단계(S300);를 더 포함하는 것을 특징으로 하는 건물 벽체(10)을 형성하는 방법.
9. The method of claim 8,
After the second step S200,
And a third step (S300) of moving the outer gantry 100 and the inner gantry 200 upwardly.
제9항에 있어서,
상기 제3 단계(S300)는,
상기 외부 갱폼(100)을 상부로 슬라이딩하여 이동시키는 외부 갱폼(100) 이동 단계; 및
상기 내부 갱폼(200)을 상기 건물 벽체(10)에서 분리하여 상기 외부 갱폼(100) 내측으로 인입시키는 내부 갱폼(200) 이동 단계;를
포함하는 것을 특징으로 하는 건물 벽체(10)을 형성하는 방법.
10. The method of claim 9,
In the third step S300,
Moving the outer gantry 100 to slide the outer gantry 100 upward; And
Moving the inner gantry 200 to separate the inner gantry 200 from the building wall 10 and drawing the inner gantry 200 into the outer gantry 100;
(10). ≪ RTI ID = 0.0 > 11. < / RTI >
제10항에 있어서,
상기 내부 갱폼(200)은
상기 건물 벽체(10)의 형성을 위한 거푸집(210);
상기 거푸집(210)이 장착된 케이지(220); 및
상기 돌출부(11)의 하부 슬래브의 형성을 위한 서포트부(230)를 포함하며,
상기 내부 갱폼(200) 이동 단계는,
상기 케이지(220)에 양중용 브라켓(241)을 설치하는 단계;
상기 양중용 브라켓(241)에 타워로프(242)를 체결하는 단계;
상기 케이지(220)에 형성된 안전고리(243)를 힌지 구동하여, 상기 건물 벽체(10)에 형성된 창턱(13)에 체결시키는 단계;
상기 서포트부(230)를 해체하는 단계;
상기 안전고리(243)를 해체하는 단계;
상기 내부 갱폼(200)을 상기 건물 벽체(10)에서 분리하는 단계;
상기 내부 갱폼(200)을 상향 이동시키는 단계; 및
상기 내부 갱폼(200)을 상기 외부 갱폼(100) 내측으로 인입시키는 단계;를
포함하는 것을 특징으로 하는 건물 벽체(10)을 형성하는 방법.
11. The method of claim 10,
The inner gantry 200
A mold (210) for forming the building wall (10);
A cage 220 on which the mold 210 is mounted; And
And a support part (230) for forming a lower slab of the projecting part (11)
In the step of moving the internal gantry 200,
Installing a positive bracket (241) on the cage (220);
Tightening the tower rope (242) to the positive bracket (241);
Driving the safety hook 243 formed on the cage 220 by hinge driving to secure it to the window sill 13 formed on the building wall 10;
Disassembling the support unit 230;
Disassembling the safety ring (243);
Separating the inner gantry 200 from the building wall 10;
Moving the inner gantry 200 upward; And
Drawing the inner gantry 200 into the outer gantry 100;
(10). ≪ RTI ID = 0.0 > 11. < / RTI >
제11항에 있어서,
상기 돌출부(11)와 상기 함몰부(12)가 위치되는 상기 외부 갱폼(100)의 내부공간(110)은 상부 및 하부가 개방되며,
상기 내부 갱폼(200)을 상기 외부 갱폼(100) 내측으로 인입시키는 단계는,
상기 내부 갱폼(200)이 상기 외부 갱폼(100)의 상부 개방부로 인입되는 것을 특징으로 하는 건물 벽체(10)을 형성하는 방법.
12. The method of claim 11,
The inner space 110 of the outer gantry 100 in which the protrusions 11 and the depressions 12 are located is open at the top and bottom,
The step of drawing the inner gantry 200 into the outer gantry 100 may include:
Characterized in that the inner gantry (200) is introduced into the upper opening of the outer gantry (100).
제10항에 있어서,
상기 건물 벽체(10)는,
상기 돌출부(11)와 상기 함몰부(12)의 위치가 변화하는 변화구간(14)을 포함하는 것을 특징으로 하는 건물 벽체(10)을 형성하는 방법.
11. The method of claim 10,
The building wall (10)
And a change section (14) in which the positions of the protrusions (11) and the depressions (12) are changed.
KR20130154597A 2013-12-12 2013-12-12 Gang form for wall of building and method for wall of building using the same KR101461142B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR20130154597A KR101461142B1 (en) 2013-12-12 2013-12-12 Gang form for wall of building and method for wall of building using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR20130154597A KR101461142B1 (en) 2013-12-12 2013-12-12 Gang form for wall of building and method for wall of building using the same

Publications (1)

Publication Number Publication Date
KR101461142B1 true KR101461142B1 (en) 2014-11-20

Family

ID=52290542

Family Applications (1)

Application Number Title Priority Date Filing Date
KR20130154597A KR101461142B1 (en) 2013-12-12 2013-12-12 Gang form for wall of building and method for wall of building using the same

Country Status (1)

Country Link
KR (1) KR101461142B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101499390B1 (en) * 2014-04-11 2015-03-05 현대산업개발 주식회사 Method of constructing protruding balcony of building

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09324535A (en) * 1996-06-04 1997-12-16 Kurimoto Kensetsu Kogyo Kk Simple-form combining scaffolding device
KR20110110927A (en) * 2010-04-02 2011-10-10 주식회사 엘에스폼웍 Structure for formation edge girder gang form of new building
KR101162748B1 (en) 2009-12-30 2012-07-05 주식회사 엘에스폼웍 A variable mould
US20130020732A1 (en) 2010-04-14 2013-01-24 Vsl International Ag Adjustable Formwork Climber

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09324535A (en) * 1996-06-04 1997-12-16 Kurimoto Kensetsu Kogyo Kk Simple-form combining scaffolding device
KR101162748B1 (en) 2009-12-30 2012-07-05 주식회사 엘에스폼웍 A variable mould
KR20110110927A (en) * 2010-04-02 2011-10-10 주식회사 엘에스폼웍 Structure for formation edge girder gang form of new building
US20130020732A1 (en) 2010-04-14 2013-01-24 Vsl International Ag Adjustable Formwork Climber

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101499390B1 (en) * 2014-04-11 2015-03-05 현대산업개발 주식회사 Method of constructing protruding balcony of building

Similar Documents

Publication Publication Date Title
WO2009017354A3 (en) Multi-horizontal structure member forming method
NZ602866A (en) False formwork for moulding concrete panels
KR101461142B1 (en) Gang form for wall of building and method for wall of building using the same
KR101309564B1 (en) Evacuation ladders of installation structure
KR200459142Y1 (en) The pipe sleeve had the high and low-control function
CN103938755B (en) The isolation structure of hanging conversion beam and construction method thereof under a kind of hoistway
KR101213276B1 (en) System form combined with exterior insulation installation, and construction method thereof
CN107724643A (en) One kind installs elevator hoistways structure and installation method additional
JP2023165995A5 (en) Renovated sash, sash and sash renovation method
KR20080092161A (en) A sleeve for drain pipe
KR20180057380A (en) Supporting and connecting apparatus for foamwork
JP4672444B2 (en) Waterproof pan for renovation
CN207526051U (en) A kind of hoistway structure for installing elevator additional
CN210563404U (en) Totally-enclosed stair template for cast-in-place stair construction
KR20180125648A (en) The supporter for concrete forms of slab
CN103883108A (en) Simple installation construction method used for residence kitchen or toilet exhaust passage and convenient to implement
MXPA04007379A (en) An erection unit for a building floor slab and the erection method thereof.
KR20190086606A (en) Connecting support for form strut for constructing slab
CN105756323A (en) Civil building kitchen and toilet-based construction method for sunk suspended form mold
KR101832180B1 (en) Once step the let down slab panel
KR102452215B1 (en) Method of constructing an unit bathroom using the level adjustment apparatus
KR100482272B1 (en) A supprot pipe for construction
JP2012172370A (en) Fire resistant structure for pit block and construction method of pit block
CN208363614U (en) The casing of reserving hole in a kind of fabricated construction
CN102433937A (en) Precast beam slab connecting structure

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20171106

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20191028

Year of fee payment: 6