KR101425442B1 - Connecting Structure of Supporting Beams - Google Patents

Connecting Structure of Supporting Beams Download PDF

Info

Publication number
KR101425442B1
KR101425442B1 KR1020130071206A KR20130071206A KR101425442B1 KR 101425442 B1 KR101425442 B1 KR 101425442B1 KR 1020130071206 A KR1020130071206 A KR 1020130071206A KR 20130071206 A KR20130071206 A KR 20130071206A KR 101425442 B1 KR101425442 B1 KR 101425442B1
Authority
KR
South Korea
Prior art keywords
flange
plate
fixing
fastening
steel beam
Prior art date
Application number
KR1020130071206A
Other languages
Korean (ko)
Inventor
윤덕기
한동균
Original Assignee
(주)탑이엔에프
(주)포춘이엔씨
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)탑이엔에프, (주)포춘이엔씨 filed Critical (주)탑이엔에프
Priority to KR1020130071206A priority Critical patent/KR101425442B1/en
Application granted granted Critical
Publication of KR101425442B1 publication Critical patent/KR101425442B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • E02D17/083Shoring struts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2220/00Temporary installations or constructions
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Abstract

Provided is a new type connecting structure of a spread beam for connecting steel beams in a structure completely different from a structure of existing end plates and reinforcing ribs, for connecting the spread beam by a simple assembly only by drilling and bolt assembly without spot welding, for remarkably reducing a storage space as unnecessary connecting boards can be stacked and stored, and for transferring a large amount of connecting boards at a time as the volume is significantly decreased even if the connecting boards are transferred.

Description

버팀보의 연결 구조{Connecting Structure of Supporting Beams}Connecting Structure of Supporting Beams

본 발명은 토류벽과 같은 흙막이 구조물(이하, "토류벽"이라고 통칭한다)의 붕괴를 방지하기 위하여 설치하는 버팀보의 연결 구조에 관한 것이다.
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a strut connection structure for preventing collapse of a retaining structure such as a toe wall (hereinafter referred to as "toe wall ").

흙막이 가시설, 토류벽 등을 건설함에 있어서, 횡방향 토압을 지지하기 위하여 버팀보가 설치되는데, 버팀보로서 주로 빔을 이용하며 필요한 경우 다수 개의 빔을 연결하여 사용한다.In construction of the earth retaining walls, soil walls and the like, a strut is installed to support the transverse earth pressure. The strut is mainly used as a strut, and a plurality of beams are used when necessary.

도면에서, 도 1은 토류벽을 버팀보로 지지하고 있는 상태를 나타낸 개략적인 사시도이며, 도 2는 도 1의 원 A의 상세도로서, 종래 기술에 따른 버팀보의 연결구조를 상세히 도시한 개략도이다.FIG. 1 is a schematic perspective view showing a state in which a soil wall is supported by a strut, and FIG. 2 is a detailed view of a circle A in FIG. 1 and is a schematic diagram showing a connection structure of a strut in detail according to a conventional art.

굴착지의 붕괴를 막기 위해 도 1에 도시된 바와 같이, 굴착지에 수직빔(3)을 근입한다. 그리고 근입된 수직빔(3)과 수직빔(3)의 사이에 패널(5)을 적층하여 토류벽(1)을 시공한다. 이와 같은 토류벽(1)은 자체적으로 토압을 견디도록 설계되지만, 토압이 클 경우에는 토류벽(1)이 붕괴되지 않도록 지지하는 힘이 필요하다. 이와 같이 토류벽(1)을 지지하기 위해 마주하는 토류벽(1) 사이에 버팀보(10)를 설치하여 토류벽(1)을 보강한다.To prevent collapse of excavation paper, a vertical beam 3 is inserted into the excavation paper as shown in Fig. Then, the panel 5 is laminated between the inserted vertical beam 3 and the vertical beam 3 to construct the toothed wall 1. Such a wall 1 is designed to withstand the earth pressure itself, but when the earth pressure is large, a force is required to support the wall 1 so that it does not collapse. In order to support the toothed wall 1, the strut 10 is provided between the opposed toothed walls 1 to reinforce the toothed wall 1.

마주하는 토류벽(1) 사이를 지지하기 위해서는 버팀보(10)가 토류벽(1) 사이의 간격만큼의 길이를 가지고 있어야 하는데, 버팀보(10)의 길이가 상기 간격보다 짧을 경우에는 도 1에 보이듯이, 짧은 길이의 버팀보(10)를 연결하여 사용하게 된다.In order to support between the facing walls 1, the strut 10 must have a length corresponding to the distance between the walls 1. When the length of the strut 10 is shorter than the interval, as shown in FIG. 1, And a short strut 10 is connected to be used.

도 2는 도 1의 원 A의 상세도로서, 길이가 짧은 버팀보를 종래의 방법에 의하여 연결한 상태를 나타내고 있다.Fig. 2 is a detailed view of the circle A in Fig. 1, showing a state in which a strum boat having a short length is connected by a conventional method.

시공현장에서는 상기 토류벽(1) 사이의 간격만큼의 길이를 갖는 버팀보를 만들기 위해서, 짧은 길이의 버팀보(10)를 연결한다. 일반적으로 버팀보(10)로서 사용되는 빔은 상부 플랜지(11), 하부 플랜지(13) 및 웨브(12)에 더하여 단부판(end plate)(14) 및 상기 단부판(14)을 보강하기 위한 측면 보강리브(15)가 구비되어 있다. 상기 단부판(14)은 버팀보(10)의 단부에 필렛용접되어 설치된다.In the construction site, a short strut 10 is connected in order to form a strut having a length corresponding to the distance between the strut walls 1. In general, the beam used as the strut 10 includes an end plate 14 in addition to the upper flange 11, the lower flange 13 and the web 12 and a side surface 14 for reinforcing the end plate 14. [ A reinforcing rib 15 is provided. The end plate (14) is welded to the end of the strut (10) by fillet welding.

이와 같은 단부판(14)과 보강리브(15)는 주로 현장에서 용접 설치된다.The end plate 14 and the reinforcing rib 15 are welded in the field.

종래에는 버팀보(10)를 연결하기 위해서 버팀보(10) 단부에서, 상부플랜지(11)와 하부 플랜지(13)에 다수 개의 관통공을 뚫고, 연결하고자 하는 버팀보(10)를, 각각의 단부판(14)이 서로 맞닿도록 설치하게 된다. 상기 단부판(14)에도 관통공이 각각 형성된다. 상기 버팀보(10)의 상부 플랜지(11)와 하부 플랜지(13)에는 각각 강재판으로 이루어진 연결판(20)이 결합되는데, 상기 연결판(20)에는 각 버팀보(10)의 단부에 형성된 관통공과 대응하는 지점에 관통공이 천공된다.A plurality of through holes are formed in the upper flange 11 and the lower flange 13 at the ends of the strut 10 to connect the strut 10 and the strut 10 to be connected is connected to each end plate 14 are in contact with each other. A through hole is also formed in the end plate 14. A connecting plate 20 made of a steel plate is coupled to the upper flange 11 and the lower flange 13 of the strut 10. The connecting plate 20 has a through hole formed in an end of each strut 10, A through hole is drilled at the corresponding point.

이와 같이, 양측 버팀보(10)의 단부판(14)이 맞닿도록 설치된 상태에서, 양측 버팀보(10)의 상부 플랜지(11) 및 하부 플랜지(13)에 걸쳐서 상부 및 하부 연결판(20)을 위치하고, 볼트(22)를 연결판(20)과 버팀보(10)의 상부 플랜지(11) 및 하부 플랜지(13)의 각각에 형성된 관통공에 관통시킨 후에 반대편에서 너트(24)를 체결하여 연결판(20)으로 두 개의 버팀보(10)를 연결한다. 아울러, 서로 마주 접한 상기 단부판(14)에도 볼트(22)를 관통시켜 너트(24)로 체결함으로써 단부판(14)도 서로 결합하게 된다.The upper and lower connecting plates 20 are positioned over the upper flange 11 and the lower flange 13 of the both strut brackets 10 in a state where the end plates 14 of the both strut brackets 10 are in contact with each other The bolts 22 are passed through the connecting plate 20 and the through holes formed in the upper flange 11 and the lower flange 13 of the strut brace 10 and then the nut 24 is fastened to the connecting plate 20 20 to the two strand ropes 10. Also, the end plates 14, which are in contact with each other, are also fastened to the end plates 14 by fastening the bolts 22 with the nuts 24.

이와 같이 연결된 버팀보(10)는, 그 양단이 마주하는 토류벽(1)에 접하여 토류벽(1)을 보강하게 된다.The strut 10 connected in this way is in contact with the toothed wall 1 with its opposite ends facing each other to reinforce the toothed wall 1.

이와 같은 종래의 버팀보 연결 구조에서는, 가시설 현장의 주요 자재인 빔을 연결할 때 단부판(14)과 보강리브(15)를 현장에서 용접하여 붙여야 하기 때문에 용접이 균일하지 못하고 볼트 구멍 간격 맞춤이 어려워 품질이 저하되며, 현장 작업에 과다한 시간이 소요되어 공기가 지연되는 문제가 발생한다.In the conventional strut connection structure, since the end plate 14 and the reinforcing rib 15 must be welded together at the time of connecting the beams, which are the main materials of the temporary site, the welding is not uniform, And it takes a long time to work on the site, which causes air delays.

또한 용접 작업으로 인하여 숙력된 용접 기술자를 필요로 하며 별도의 용접장 부지와 장비를 필요로 하게 되어 공사비용이 더욱 증가된다.In addition, welding work requires an experienced welding technician and requires additional welding site and equipment, further increasing the construction cost.

또한 단부판과 보강리브가 용접된 강재 빔은 다른 용도로 활용되기 어려우며, 또한 다른 현장에서 버팀보로 사용하려고 하는 경우에도 그 길이가 맞지 않기 때문에 단부판과 보강리브가 설치된 부분을 절단 폐기한 후 다시 단부판과 보강리브를 용접설치하여야 하므로 매우 많은 폐자재가 발생한다.
Also, the steel beam welded with the end plate and the reinforcing rib is difficult to be used for other purposes, and even if it is intended to be used as a strut in other fields, the length is not matched. Therefore, the end plate and the portion provided with the reinforcing rib are cut off, And the reinforcing ribs are welded together, so a lot of waste material is generated.

대한민국 등록특허 제10-0699040호 "흙막이 벽체 지지용 버팀보의 연결구조"(2007.3.16 등록)Korean Registered Patent No. 10-0699040 entitled "Connection structure of strut braids for supporting earth retaining walls" (registered on March 16, 2007) 대한민국 등록특허 제10-0581611호 "삽입구조를 이용한 버팀보의 연결구조"(2006.5.12 등록)Korean Patent No. 10-0581611 entitled " Strut connection structure using insertion structure "(registered on May 12, 2006) 대한민국 등록특허 제10-0641662호 "버팀보의 연결구조"(2006.10.26 등록)Korean Registered Patent No. 10-0641662 "Strut connection structure" (registered on October 26, 2006) 대한민국 등록특허 제10-0986810호 "조립식 빔 연결장치 및 그것을 이용한 조립식 버팀보"(2010.10.4 등록)Korean Patent No. 10-0986810 "Prefabricated beam connecting apparatus and assembled strut board using it" (registered on October 4, 2010)

본 발명은 상기와 같은 종래 기술의 문제점을 해결하기 위하여 안출된 것으로, 단부판과 보강리브의 구조를 채택하지 않고 전혀 다른 구조로서 강재 빔을 연결하되, 현장 용접이 불필요하고 오직 천공과 볼트 조립에 의한 단순 조립에 의하여 버팀보를 연결하며, 사용하지 않는 연결대는 적층 보관이 가능하도록 하여 보관 공간을 획기적으로 감소시킬 수 있을 뿐만 아니라 사용하기 위하여 연결대를 이동하는 경우에도 그 부피가 획기적으로 감소되어 대량의 연결대를 한 번에 이동할 수 있는 새로운 형태의 버팀보 연결 구조를 제공하고자 한다.
The present invention has been conceived to solve the problems of the prior art as described above, and it is an object of the present invention to provide a steel structure which does not adopt the structure of the end plate and the reinforcing rib, And the unused connecting rod can be stored in a stacked state, so that the storage space can be drastically reduced. In addition, when the connecting rod is moved for use, the volume thereof is drastically reduced, We want to provide a new type of strut connection structure that can move the link at a time.

상기의 과제를 해결하기 위하여 본 발명은, 서로 마주보게 마련되는 제1-1플랜지 및 제1-2플랜지, 상기 제1-1플랜지 및 상기 제1-2플랜지를 연결하는 제1웨브를 포함하여 이루어지며, 상기 제1웨브에 복수의 제1체결공이 형성되며, 상기 제1-1플랜지에 복수의 제1-1체결공이 형성되며, 상기 제1-2플랜지에 복수의 제1-2체결공이 형성되는 제1강재 빔 ; 서로 마주보게 마련되는 제2-1플랜지 및 제2-2플랜지, 상기 제2-1플랜지 및 상기 제2-2플랜지를 연결하는 제2웨브를 포함하여 이루어지며, 상기 제1강재 빔과 일직선상으로 배치되며, 상기 제2웨브에 복수의 제2체결공이 형성되며, 상기 제2-1플랜지에 복수의 제2-1체결공이 형성되며, 상기 제2-2플랜지에 복수의 제2-2체결공이 형성되는 제2강재 빔 ; 상기 제1웨브의 일측면 및 상기 제2웨브의 일측면에 밀착되며 복수의 제3체결공이 형성되는 제3웨브 밀착판과, 상기 제3웨브 밀착판의 일단부에 회동가능하게 마련되어 상기 제1-1플랜지의 내측면 및 상기 제2-1플랜지의 내측면에 밀착되며 복수의 제3-1체결공이 형성되는 제3-1플랜지 밀착판과, 상기 제3웨브 밀착판의 타단부에 회동가능하게 마련되어 상기 제1-2플랜지의 내측면 및 상기 제2-2플랜지의 내측면에 밀착되며 복수의 제3-2체결공이 형성되는 제3-2플랜지 밀착판을 포함하여 이루어지는 제3연결대 ; 상기 제1웨브의 타측면 및 상기 제2웨브의 타측면에 밀착되며 복수의 제4체결공이 형성되는 제4웨브 밀착판과, 상기 제4웨브 밀착판의 일단부에 회동가능하게 마련되어 상기 제1-1플랜지의 내측면 및 상기 제2-1플랜지의 내측면에 밀착되며 복수의 제4-1체결공이 형성되는 제4-1플랜지 밀착판과, 상기 제4웨브 밀착판의 타단부에 회동가능하게 마련되어 상기 제1-2플랜지의 내측면 및 상기 제2-2플랜지의 내측면에 밀착되며 복수의 제4-2체결공이 형성되는 제4-2플랜지 밀착판을 포함하여 이루어지는 제4연결대 ; 상기 제3웨브 밀착판의 제3체결공과 제1강재 빔의 제1웨브의 제1체결공과 상기 제4웨브 밀착판의 제4체결공을 관통하면서 상기 제3웨브 밀착판과 제1강재 빔의 제1웨브와 상기 제4웨브 밀착판를 밀착 고정시키는 제3-1고정부재 ; 상기 제3웨브 밀착판의 제3체결공과 제2강재 빔의 제2웨브의 제2체결공과 상기 제4웨브 밀착판의 제4체결공을 관통하면서 상기 제3웨브 밀착판과 제2강재 빔의 제2웨브와 상기 제4웨브 밀착판를 밀착 고정시키는 제3-2고정부재 ; 상기 제3-1플랜지 밀착판의 제3-1체결공과 상기 제1강재 빔의 제1-1플랜지의 제1-1체결공을 관통하면서 상기 제3-1플랜지 밀착판과 상기 제1강재 빔의 제1-1플랜지을 밀착 고정시키는 제3-3고정부재 ; 상기 제3-1플랜지 밀착판의 제3-1체결공과 상기 제2강재 빔의 제2-1플랜지의 제2-1체결공을 관통하면서 상기 제3-1플랜지 밀착판과 상기 제2강재 빔의 제2-1플랜지을 밀착 고정시키는 제3-4고정부재 ; 상기 제3-2플랜지 밀착판의 제3-2체결공과 상기 제1강재 빔의 제1-2플랜지의 제1-2체결공을 관통하면서 상기 제3-2플랜지 밀착판과 상기 제1강재 빔의 제1-2플랜지을 밀착 고정시키는 제3-5고정부재 ; 상기 제3-2플랜지 밀착판의 제3-2체결공과 상기 제2강재 빔의 제2-2플랜지의 제2-2체결공을 관통하면서 상기 제3-2플랜지 밀착판과 상기 제2강재 빔의 제2-2플랜지을 밀착 고정시키는 제3-6고정부재 ; 상기 제1강재 빔의 제1-1플랜지의 제1-1체결공과 상기 제3-1플랜지 밀착판의 제3-1체결공과 상기 제3-2플랜지 밀착판의 제3-2체결공과 상기 제1강재 빔의 제1-2플랜지의 제1-2체결공을 관통하면서 마련되는 제3-7고정볼트부재 ; 상기 제3-7고정볼트부재에 마련되어 상기 제1강재 빔의 제1-1플랜지와 상기 제3-1플랜지 밀착판을 밀착 고정시키는 제3-7-1고정너트부재 ; 상기 제3-7고정볼트부재에 마련되어 상기 제1강재 빔의 제1-2플랜지와 상기 제3-2플랜지 밀착판을 밀착 고정시키는 제3-7-2고정너트부재 ; 상기 제2강재 빔의 제2-1플랜지의 제2-1체결공과 상기 제3-1플랜지 밀착판의 제3-1체결공과 상기 제3-2플랜지 밀착판의 제3-2체결공과 상기 제2강재 빔의 제2-2플랜지의 제2-2체결공을 관통하면서 마련되는 제3-8고정볼트부재 ; 상기 제3-8고정볼트부재에 마련되어 상기 제2강재 빔의 제2-1플랜지와 상기 제3-1플랜지 밀착판을 밀착 고정시키는 제3-8-1고정너트부재 ; 상기 제3-8고정볼트부재에 마련되어 상기 제2강재 빔의 제2-2플랜지와 상기 제3-2플랜지 밀착판을 밀착 고정시키는 제3-8-2고정너트부재 ; 상기 제4-1플랜지 밀착판의 제4-1체결공과 상기 제1강재 빔의 제1-1플랜지의 제1-1체결공을 관통하면서 상기 제4-1플랜지 밀착판과 상기 제1강재 빔의 제1-1플랜지을 밀착 고정시키는 제4-3고정부재 ; 상기 제4-1플랜지 밀착판의 제4-1체결공과 상기 제2강재 빔의 제2-1플랜지의 제2-1체결공을 관통하면서 상기 제4-1플랜지 밀착판과 상기 제2강재 빔의 제2-1플랜지을 밀착 고정시키는 제4-4고정부재 ; 상기 제4-2플랜지 밀착판의 제4-2체결공과 상기 제1강재 빔의 제1-2플랜지의 제1-2체결공을 관통하면서 상기 제4-2플랜지 밀착판과 상기 제1강재 빔의 제1-2플랜지을 밀착 고정시키는 제4-5고정부재 ; 상기 제4-2플랜지 밀착판의 제4-2체결공과 상기 제2강재 빔의 제2-2플랜지의 제2-2체결공을 관통하면서 상기 제4-2플랜지 밀착판과 상기 제2강재 빔의 제2-2플랜지을 밀착 고정시키는 제4-6고정부재 ; 상기 제1강재 빔의 제1-1플랜지의 제1-1체결공과 상기 제4-1플랜지 밀착판의 제4-1체결공과 상기 제4-2플랜지 밀착판의 제4-2체결공과 상기 제1강재 빔의 제1-2플랜지의 제1-2체결공을 관통하면서 마련되는 제4-7고정볼트부재 ; 상기 제4-7고정볼트부재에 마련되어 상기 제1강재 빔의 제1-1플랜지와 상기 제4-1플랜지 밀착판을 밀착 고정시키는 제4-7-1고정너트부재 ; 상기 제4-7고정볼트부재에 마련되어 상기 제1강재 빔의 제1-2플랜지와 상기 제4-2플랜지 밀착판을 밀착 고정시키는 제4-7-2고정너트부재 ; 상기 제2강재 빔의 제2-1플랜지의 제2-1체결공과 상기 제4-1플랜지 밀착판의 제4-1체결공과 상기 제4-2플랜지 밀착판의 제4-2체결공과 상기 제2강재 빔의 제2-2플랜지의 제2-2체결공을 관통하면서 마련되는 제4-8고정볼트부재 ; 상기 제4-8고정볼트부재에 마련되어 상기 제1강재 빔의 제1-1플랜지와 상기 제4-1플랜지 밀착판을 밀착 고정시키는 제4-8-1고정너트부재 ; 상기 제4-8고정볼트부재에 마련되어 상기 제1강재 빔의 제1-2플랜지와 상기 제4-2플랜지 밀착판을 밀착 고정시키는 제4-8-2고정너트부재 ; 를 포함하여 이루어지는 것을 특징으로 한다.In order to solve the above-described problems, the present invention is characterized by comprising a first 1-1 flange and a 1-2 flange facing each other, a first web connecting the first 1-1 flange and the 1-2 flange, A plurality of first fasteners are formed on the first web, a plurality of first fasteners are formed on the first flange, and a plurality of first fasteners are formed on the first flange, A first steel beam formed; And a second web connecting the second-1 flange and the second-2 flange, the second web having a first side and a second side opposite to each other, A plurality of second fasteners are formed on the second web, a plurality of second fasteners are formed on the second flange, and a plurality of second fasteners are fastened to the second flange, A second steel beam on which a ball is formed; A third web close plate which is in close contact with one side surface of the first web and one side surface of the second web and has a plurality of third fastening holes formed thereon, -1 flange fastening plate which is in close contact with the inner surface of the flange and the inner surface of the second-1 flange, and a plurality of third-1 fastening holes are formed; A third connecting block including a third-2 flange fastening plate which is in close contact with an inner surface of the 1-2 flange and an inner surface of the 2nd-2 flange and has a plurality of third-2 fastening holes formed therein; A fourth web close plate which is in close contact with the other side surface of the first web and the other side surface of the second web and has a plurality of fourth fastening holes formed thereon; -1 flange fastening plate which is in close contact with the inner surface of the flange and the inner surface of the second-1 flange, and a plurality of fourth-1 fastening holes are formed; And a fourth connecting rod including a fourth connecting flange attached to the inner surface of the first flange and the fourth flange close to the inner surface of the second flange; And the third fastening hole of the third web clamping plate and the first fastening hole of the first web of the first steel beam and the fourth fastening hole of the fourth web clamping plate while passing through the third web clamping plate and the first steel beam A 3-1 fixing member for tightly fixing the first web and the fourth web close plate; And the third fastening hole of the third web close plate and the second fastening hole of the second web of the second steel beam and the fourth fastening hole of the fourth web close plate while the third web close plate and the second steel beam A third-second fixing member for closely fixing the second web and the fourth web contact plate; Wherein the first to third fastening holes of the third-first flange fastening plate and the first-fastening holes of the first-steel flange of the first steel beam penetrate through the first- A third 3-3 fixing member for tightly fixing the 1-1 flange of the first fixing member; Wherein the third-1 flange-closure plate and the second steel-beam clamping plate penetrate through the second-1 fastening holes of the second-1 flange of the third steel- A third-fourth fixing member for tightly fixing the second-first flange of the second fixing member; The flange fastening plate of the third-second flange and the first-second fastening hole of the first-steel flange of the first steel beam while passing through the first-second fastening hole of the third- A third-fifth fixing member for tightly fixing the first-second flange of the second fixing member; The third-2 flange fastening plate and the second-2 flange of the second steel beam penetrate the second-2 fastening holes of the third-2 flange fastening plate and the second steel beam, A third 3-6 fixing member for tightly fixing the flange of the second 2-2 of the frame; The first 1-1 bolt of the first steel beam and the 3-1 bolt of the 3-1 bolt tightening plate and the 3-2 bolt of the 3-2 flange bolt tightening plate, A third-seventh fixing bolt member provided through the first-second fastening hole of the first-second flange of the one-piece steel beam; A 3-7-1 fixing nut provided on the 3-7 fixing bolt member for closely fixing the 1-1 flange of the first steel beam and the 3-1 flange closing plate; A 3-7-2 fixing nut provided on the 3-7 fixing bolt member for closely fixing the 1-2 flange of the first steel beam and the 3-2 flange close plate; The second-1 fastening holes of the second steel beam of the second steel beam, the 3-1 fastening holes of the 3-1 flange fastening plate, the 3-2 fastening holes of the 3-2 flange fastening plate, A 3-8 fixing bolt member provided through the 2-2 fastening holes of the flange of the 2-2 steel beam, A 3-8-1 fixing nut provided on the 3-8 fixing bolt member for closely fixing the 2-1 flange of the second steel beam and the 3-1 flange close plate; A 3-8-2 fixing nut provided on the 3-8 fixing bolt member for closely fixing the flange of the second steel beam to the flange close plate of the third steel flange; Wherein the first to fourth fasteners of the first to fourth flange fastening plates and the first-fastener holes of the first-steel flange of the first steel beam penetrate through the first- A fourth-third fixing member for tightly fixing the first 1-1 flange of the fourth fixing member; And the fourth-1 flange-closure plate and the second steel-beam clamping plate, while passing through the 4-1 fitting hole of the 4-1 flange-closure plate and the 2-1 fitting hole of the 2-1 flange of the second steel beam, A fourth-fourth fixing member for tightly fixing the second-first flange of the first-fourth fixing member; And the fourth-2 flange fastening plate and the first-second flange of the first steel beam penetrate through the first-second fastening holes of the fourth- A fourth-fifth fixing member for tightly fixing the first-second flange of the second fixing member; The fourth 4-2 flange fastening plate and the 2-2 fastening holes of the 2-2 flange of the second steel beam while passing through the 4-2 fastening holes of the 4-2 flange fastening plate and the 2- A fourth-sixth fixing member for tightly fixing the second-2 flange of the fourth member; The first 1-1 bolt of the first steel beam and the 4-1 fastening hole of the 4-1 flange fastening plate and the 4-2 fastening hole of the 4-2 flange fastening plate and the A fourth to seventh fixing bolt member provided through the first-second fastening hole of the first-second flange of the one-piece steel beam; A fourth-seventh fixing nut member provided on the fourth-seventh fixing bolt member for tightly fixing the first flange of the first steel beam and the fourth flange close-up plate; A 4-7-2 fixing nut provided on the 4-7 fixing bolt member for closely fixing the 1-2 flange of the first steel beam and the 4-2 flange close plate; The second-1 fastening holes of the second-steel flange of the second steel beam, the 4-1 fastening holes of the 4-1 flange fastening plate, the 4-2 fastening holes of the 4-2 flange fastening plate, A No. 4-8 fixing bolt member provided through the 2-2 fastening holes of the 2-2 flange of the 2-steel beam; A 4-8-1 fixing nut provided on the 4-8 fixing bolt member for closely fixing the 1-1 flange of the first steel beam and the 4-1 flange close plate; A 4-8-2 fixing nut provided on the 4-8 fixing bolt member for closely fixing the 1-2 flange of the first steel beam and the 4-2 flange close plate; And a control unit.

상기에 있어서, 제3-1플랜지 밀착판 및 상기 제3-2플랜지 밀착판이 상기 제3웨브 밀착판에 회동 가능하게 결합되기 위하여, 상기 제3웨브 밀착판의 양측 단부에 복수의 제3회전용 관이 서로 이격되어 마련되며, 상기 제3-1플랜지 밀착판의 일측 단부에 복수의 제3-1회전용 관이 서로 이격되어 마련되며, 상기 제3-2플랜지 밀착판의 일측 단부에 복수의 제3-2회전용 관이 서로 이격되어 마련되며, 상기 제3회전용 관 및 상기 제3-1회전용 관을 관통하는 형태로 제3-1회전축봉이 마련되며, 상기 제3회전용 관 및 상기 제3-2회전용 관을 관통하는 형태로 제3-2회전축봉이 마련되며 ; 제4-1플랜지 밀착판 및 상기 제4-2플랜지 밀착판이 상기 제4웨브 밀착판에 회동 가능하게 결합되기 위하여, 상기 제4웨브 밀착판의 양측 단부에 복수의 제4회전용 관이 서로 이격되어 마련되며, 상기 제4-1플랜지 밀착판의 일측 단부에 복수의 제4-1회전용 관이 서로 이격되어 마련되며, 상기 제4-2플랜지 밀착판의 일측 단부에 복수의 제4-2회전용 관이 서로 이격되어 마련되며, 상기 제4회전용 관 및 상기 제4-1회전용 관을 관통하는 형태로 제4-1회전축봉이 마련되며, 상기 제4회전용 관 및 상기 제4-2회전용 관을 관통하는 형태로 제4-2회전축봉이 마련되는 것 ; 이 바람직하다.In this case, in order to pivotally connect the third-1 flange-adhering plate and the third-2 flange-adhering plate to the third web-adhering plate, a plurality of third rotation- And a plurality of third-first revolving pipes are provided spaced apart from each other at one end of the third-first flange-adhering plate, and a plurality of third-first revolving tubes are provided at one end of the third- A third 3-1 rotation tube is provided so as to pass through the third rotation tube and the 3-1 rotation tube, A third-2 rotating shaft rod is provided so as to penetrate through the third -2 rotation tube; The fourth web flange adhered plate and the fourth 4-2 flange adhered plate are rotatably coupled to the fourth web adhered plate so that a plurality of fourth rotating pipes are spaced apart from each other at both side ends of the fourth web adhered plate A plurality of fourth-first revolving pipes are provided on one end of the fourth-first flange-adhering plate, and a plurality of fourth-two revolving pipes are provided on one end of the fourth- A fourth rotary shaft rod is provided so as to pass through the fourth rotary shaft and the fourth rotary shaft, and the fourth rotary shaft and the fourth rotary shaft are provided through the fourth rotary shaft and the fourth rotary shaft, A No. 4-2 rotary shaft rod is provided through the two-time dedicated pipe; .

상기에 있어서, 상기 제3-1플랜지 밀착판의 외측 단부에 제3-1보강부가 마련되며, 상기 제3-2플랜지 밀착판의 외측 단부에 제3-2보강부가 마련될 수 있다.In the above, the third-first reinforcing portion may be provided at the outer end of the third-first flange fastening plate, and the third-second reinforcing portion may be provided at the outer end of the third-second flange fastening plate.

상기에 있어서, 상기 제3-1보강부는 상기 제3-1플랜지 밀착판의 외측 단부가 절곡되어 형성된 것이며, 상기 제3-2보강부는 상기 제3-2플랜지 밀착판의 외측 단부가 절곡되어 형성되는 것일 수 있다.The third-first reinforcing portion is formed by bending the outer end of the third-first flange-adhering plate, and the third-second reinforcing portion is formed by bending the outer end of the third- .

상기에 있어서, 상기 제3-1보강부 및 상기 제3-2보강부는 환봉일 수 있다.
In the above, the 3-1 reinforcing portion and the 3-2 reinforcing portion may be round bars.

상기와 같이 본 발명은, 종래의 단부판과 보강리브의 구조를 탈피한 전혀 다른 구조로서 강재 빔을 연결하되, 현장 용접이 불필요하고 오직 천공과 볼트 조립에 의한 단순 조립에 의하여 버팀보를 연결하며, 사용하지 않는 연결대는 적층 보관이 가능하도록 하여 보관 공간을 획기적으로 감소시킬 수 있을 뿐만 아니라 사용하기 위하여 연결대를 이동하는 경우에도 그 부피가 획기적으로 감소되어 대량의 연결대를 한 번에 이동할 수 있는 새로운 형태의 버팀보 연결 구조를 제공하게 된다.
As described above, according to the present invention, a steel beam is connected by connecting a steel beam with a completely different structure from a structure of a conventional end plate and a reinforcing rib. However, since field welding is not necessary, In addition to not only reducing the storage space but also dramatically reducing the volume when moving a connecting rod for use, it is possible to store a large number of connecting rods at a time To provide a strut connection structure.

도 1은 종래의 기술에서 토류벽을 버팀보로 지지하고 있는 상태를 나타낸 개략적인 사시도,
도 2는 도 1의 원 A의 상세도로서 종래 기술에 따른 버팀보의 연결구조를 상세히 도시한 개략도,
도 3은 본 발명에 의한 제1실시예에 의한 버팀보의 연결 구조를 도시한 사시도,
도 4는 도 3의 정면도,
도 5는 도 4의 A-A 기준 단면도,
도 6은 도 3의 분리 사시도,
도 7은 도 3의 연결대를 펼친 상태의 사시도,
도 8은 도 7의 분리 사시도,
도 9는 본 발명에 의한 제2실시예인 연결대의 사시도,
도 10은 본 발명에 의한 제3실시예인 연결대의 사시도.
1 is a schematic perspective view showing a state in which a soil wall is supported by a strut in the prior art,
FIG. 2 is a detailed view of the circle A of FIG. 1,
FIG. 3 is a perspective view showing a connection structure of a strut according to the first embodiment of the present invention, FIG.
Fig. 4 is a front view of Fig. 3,
Figure 5 is a cross-sectional view taken along line AA of Figure 4,
FIG. 6 is an exploded perspective view of FIG. 3,
FIG. 7 is a perspective view of the connecting rod of FIG. 3 in an open state,
FIG. 8 is an exploded perspective view of FIG. 7,
9 is a perspective view of a connecting rod according to a second embodiment of the present invention,
10 is a perspective view of a connecting rod according to a third embodiment of the present invention.

아래에서는 첨부한 도면을 참조하여 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자가 용이하게 실시할 수 있도록 본 발명의 실시예를 상세히 설명한다. 그러나 본 발명은 여러 가지 상이한 형태로 구현될 수 있으며 여기에서 설명하는 실시예에 한정되지 않는다. 그리고 도면에서 본 발명을 명확하게 설명하기 위해서 설명과 관계없는 부분은 생략하였으며, 명세서 전체를 통하여 유사한 부분에 대해서는 유사한 도면 부호를 부여하였다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings, which will be readily apparent to those skilled in the art. The present invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. In order to clearly illustrate the present invention in the drawings, portions not related to the description are omitted, and like reference numerals are given to similar portions throughout the specification.

명세서 전체에서, 어떤 부분이 어떤 구성요소를 "포함"한다고 할 때, 이는 특별히 반대되는 기재가 없는 한 다른 구성요소를 제외하는 것이 아니라 다른 구성요소를 더 포함할 수 있는 것을 의미한다.Throughout the specification, when an element is referred to as "comprising ", it means that it can include other elements as well, without excluding other elements unless specifically stated otherwise.

먼저 본 발명에 의한 제1실시예를 설명한다.First, a first embodiment according to the present invention will be described.

도 3은 본 발명에 의한 제1실시예에 의한 버팀보의 연결 구조를 도시한 사시도이며, 도 4는 도 3의 정면도이며, 도 5는 도 4의 A-A 기준 단면도이며, 도 6은 도 3의 분리 사시도이며, 도 7은 도 3의 연결대를 펼친 상태의 사시도이며, 도 8은 도 7의 분리 사시도이다.FIG. 3 is a perspective view showing the connection structure of the strut according to the first embodiment of the present invention, FIG. 4 is a front view of FIG. 3, FIG. 5 is a cross- FIG. 7 is a perspective view of the connecting rod of FIG. 3 in an opened state, and FIG. 8 is an exploded perspective view of FIG.

본 실시예의 버팀보는 제1강재 빔(100)과 제2강재 빔(200)이 제3연결대(300)와 제4연결대(400)에 의하여 연결되는 구조이다.The strut of the present embodiment has a structure in which the first steel beam 100 and the second steel beam 200 are connected to each other by the third linkage 300 and the fourth linkage 400.

제1강재 빔(100)과 제2강재 빔(200)은 서로 일직선상으로 배치되며, 제1강재 빔(100)과 제2강재 빔(200)은 주로 H-빔이나 I-빔이 이용될 수 있다.The first steel beam 100 and the second steel beam 200 are arranged in a straight line with each other and the first steel beam 100 and the second steel beam 200 are mainly used for H- .

즉 제1강재 빔(100)은 서로 마주보게 마련되는 제1-1플랜지(110) 및 제1-2플랜지(120), 상기 제1-1플랜지(110) 및 상기 제1-2플랜지(120)를 연결하는 제1웨브(130)를 포함하여 이루어진다.That is, the first steel beam 100 includes a first 1-1 flange 110 and a first 1-2 flange 120, a first 1-1 flange 110, and a 1-2 second flange 120 (Not shown).

상기와 같은 제1강재 빔(100)의 단부에 볼트 체결을 위하여 복수의 체결공이 천공 형성된다. 즉, 제1웨브(130)에 복수의 제1체결공(131)이 형성되며, 제1-1플랜지(110)에 복수의 제1-1체결공(111)이 형성되며, 제1-2플랜지(120)에 복수의 제1-2체결공(121)이 형성된다.A plurality of fastening holes are formed in the end of the first steel beam 100 to fasten the bolts. That is, a plurality of first fastening holes 131 are formed in the first web 130, a plurality of first fastening holes 111 are formed in the first flange 110, A plurality of first-second fastening holes 121 are formed in the flange 120.

제2강재 빔(200) 또한 서로 마주보게 마련되는 제2-1플랜지(210) 및 제2-2플랜지(220), 상기 제2-1플랜지(210) 및 상기 제2-2플랜지(220)를 연결하는 제2웨브(230)를 포함하여 이루어진다.The second steel beam 200 also includes a second-first flange 210 and a second-second flange 220 facing each other, the second-first flange 210 and the second-second flange 220, And a second web 230 connecting the first and second webs.

상기와 같은 제2강재 빔(200)의 단부에 볼트 체결을 위하여 복수의 체결공이 천공 형성된다. 즉, 제2웨브(230)에 복수의 제2체결공(231)이 형성되며, 제2-1플랜지(210)에 복수의 제2-1체결공(211)이 형성되며, 제2-2플랜지(220)에 복수의 제2-2체결공(221)이 형성된다.A plurality of fastening holes are formed in the end portion of the second steel beam 200 to fasten the bolts. That is, a plurality of second fastening holes 231 are formed in the second web 230, a plurality of second fastening holes 211 are formed in the 2-1 flange 210, A plurality of second-2 fastening holes 221 are formed in the flange 220.

상기와 같은 형태의 제1강재 빔(100) 및 제2강재 빔(200)에 제3연결대(300) 및 제4연결대(400)가 장착된다.The third connecting rod 300 and the fourth connecting rod 400 are mounted on the first steel beam 100 and the second steel beam 200 of the above-described shape.

제3연결대(300)는 크게 제3웨브 밀착판(330)과, 제3-1플랜지 밀착판(310)과, 제3-2플랜지 밀착판(320)으로 이루어진다.The third connecting block 300 includes a third web close plate 330, a 3-1 flange close plate 310, and a 3-2 flange close plate 320.

제3-1플랜지 밀착판(310)과 제3-2플랜지 밀착판(320)은 제3웨브 밀착판(330)의 양측 단부에 회동 가능하게 마련된다.The third-first flange-close plate 310 and the third-second flange close-up plate 320 are rotatably provided at both ends of the third web close-up plate 330.

이와 같은 회동 가능한 결합 구조를 위하여 본 실시예는 다음과 같은 구조를 제안한다.For such a rotatable coupling structure, this embodiment proposes the following structure.

제3웨브 밀착판(330)의 양측 단부에 복수의 제3회전용 관(331)이 서로 이격되어 마련된다.A plurality of third rotating pipes 331 are provided on both side ends of the third web close plate 330 so as to be spaced apart from each other.

또한 제3-1플랜지 밀착판(310)의 일측 단부에 복수의 제3-1회전용 관(311)이 서로 이격되어 마련되며, 제3-2플랜지 밀착판(320)의 일측 단부에 복수의 제3-2회전용 관(321)이 서로 이격되어 마련된다.Also, a plurality of third-first revolving pipes 311 are provided on one end of the third-first flange-closing plate 310 and a plurality of third-first revolving pipes 311 are provided on one end of the third- And a third -2nd time dedicated pipe 321 are provided apart from each other.

아울러 제3회전용 관(331) 및 제3-1회전용 관(311)을 관통하는 형태로 제3-1회전축봉(312)이 마련되며, 또한 제3회전용 관(331) 및 제3-2회전용 관(321)을 관통하는 형태로 제3-2회전축봉(322)이 마련된다.The third rotating shaft 312 is provided so as to penetrate through the third rotating tube 311 and the third rotating tube 311 and the third rotating tube 313 and the third rotating tube 313, -2 rotation shaft bar 322 in such a manner as to penetrate through the -2 rotation return pipe 321.

따라서 제3-1플랜지 밀착판(310)은 제3-1회전축봉(312)을 회전축으로 하여 제3웨브 밀착판(330)에 대하여 회동 가능하며, 아울러 제3-2플랜지 밀착판(320)은 제3-2회전축봉(322)을 회전축으로 하여 제3웨브 밀착판(330)에 대하여 회동 가능하다.Therefore, the third-first flange-closing plate 310 is rotatable about the third-web-closing plate 330 with the third-first rotating shaft 312 as a rotation axis, Is rotatable with respect to the third web close-up plate (330) with the third-second rotating shaft bar (322) as a rotation axis.

이와 같이 회동 가능한 구조는 제3연결대(300)를 사용하지 않을 때, 즉 보관할 때 도 7과 같은 형태로 펼쳐서 보관하는 것을 가능하게 하며, 따라서 제3연결대(300)의 보관에 필요한 공간이 최소화될 수 있다.7, when the third connecting rod 300 is not used, that is, when the third connecting rod 300 is stored, it is possible to store the third connecting rod 300 in a form as shown in FIG. 7, .

한편 제3웨브 밀착판(330)에는 복수의 제3체결공(333)이 형성되며, 제3-1플랜지 밀착판(310)에는 복수의 제3-1체결공(313)이 형성되며, 제3-2플랜지 밀착판(320)에는 복수의 제3-2체결공(323)이 형성된다.On the other hand, a plurality of third fastening holes 333 are formed in the third web fastening plate 330, a plurality of third fastening holes 313 are formed in the third fastening flange 310, 3-2 A plurality of third-second fastening holes 323 are formed on the flange fastening plate 320.

이와 같은 제3연결대(300)는 제1강재 빔(100)의 단부와 제2강재 빔(200)의 단부 사이에 설치된다.The third connecting rod 300 is installed between the end of the first steel beam 100 and the end of the second steel beam 200.

즉 제3웨브 밀착판(330)은 제1강재 빔(100)의 제1웨브(130)의 일측면과 제2강재 빔(200)의 제2웨브(230)의 일측면에 밀착되도록 설치된다.The third web contact plate 330 is installed in close contact with one side of the first web 130 of the first steel beam 100 and one side of the second web 230 of the second steel beam 200 .

또한 제3-1플랜지 밀착판(310)은 제1강재 빔(100)의 제1-1플랜지(110)의 내측면과 제2강재 빔(200)의 제2-1플랜지(210)의 내측면에 밀착되도록 설치되며, 제3-2플랜지 밀착판(320)은 제1강재 빔(100)의 제1-2플랜지(120)의 내측면과 제2강재 빔(200)의 제2-2플랜지(220)의 내측면에 밀착되도록 설치된다.The 3-1 flange fastening plate 310 is formed on the inner surface of the 1-1 flange 110 of the first steel beam 100 and the inner surface of the 2-1 flange 210 of the second steel beam 200 The flange fastening plate 320 is provided so as to be in close contact with the side surface of the second steel beam 200 and the inner surface of the 1-2 flange 120 of the first steel beam 100, And is installed so as to be in close contact with the inner surface of the flange 220.

한편 제4연결대(400)는 제3연결대(300)의 반대측에 설치된다는 것만이 상이하며, 제4연결대(400)의 형태 및 구조는 제3연결대(300)의 구조와 동일하다.The fourth connecting block 400 is different from the third connecting block 300 in that the third connecting block 400 has the same configuration and structure as the third connecting block 300.

따라서 제4연결대(400)의 제4-1플랜지 밀착판, 제4-2플랜지 밀착판, 제4웨브 밀착판, 제4-1회전용 관, 제4-1회전축봉, 제4-1체결공, 제4-2회전용 관, 제4-2회전축봉, 제4-2체결공, 제4회전용 관, 제4체결공의 형태 및 구조는, 모두 제3-1플랜지 밀착판, 제3-2플랜지 밀착판, 제3웨브 밀착판, 제3-1회전용 관, 제3-1회전축봉, 제3-1체결공, 제3-2회전용 관, 제3-2회전축봉, 제3-2체결공, 제3회전용 관, 제3체결공의 형태 및 구조와 동일하므로 그 상세한 설명을 생략한다.Therefore, the fourth connecting plate 400, the fourth-1 flange-closing plate, the fourth-4 flange-closing plate, the fourth web-closing plate, the 4-1- The shape and structure of the ball, the No. 4-2 special pipe, the No. 4-2 rotation shaft, the No. 4-2 pipe, the No. 4 pipe, and the No. 4 pipe are all the same as those of No. 3-1 flange- 3-2 flange fastening plate, third web fastening plate, 3-1 first dedicated pipe, 3-1 first rotary shaft rod, 3-1 fastening hole, 3-2 second rotary tube, 3-2 rotary shaft rod, The third and the third fastening holes, the third exclusive pipe, and the third fastening hole, the detailed description thereof will be omitted.

상기와 같이 제3연결대(300)와 제4연결대(400)를 제1강재 빔(100)과 제2강재 빔(200) 사이에 삽입 설치한 후 고정부재들로 제3연결대(300), 제4연결대(400), 제1강재 빔(100), 제2강재 빔(200)을 고정하여 이들을 일체화시킨다.After the third connecting rod 300 and the fourth connecting rod 400 are inserted between the first steel beam 100 and the second steel beam 200 as described above, the third connecting rod 300, 4 connecting rod 400, the first steel beam 100, and the second steel beam 200 are fixed to integrate them.

이하에서 각 고정부재들은, 특별한 언급이 없다면, 볼트와 너트의 조합에 의하여 각 구성들을 고정시키는 부재들을 칭한다.Hereinafter, each of the fixing members refers to members that fix each component by a combination of bolts and nuts unless otherwise specified.

제3-1고정부재(301)는, 제3웨브 밀착판(330)의 제3체결공(333)과 제1강재 빔(100)의 제1웨브(130)의 제1체결공(131)과 제4웨브 밀착판의 제4체결공을 관통하면서 제3웨브 밀착판(330)과 제1강재 빔(100)의 제1웨브(130)와 제4웨브 밀착판를 밀착 고정시키게 된다.The third-first fixing member 301 is fixed to the third fixing hole 333 of the third web close-up plate 330 and the first fixing hole 131 of the first web 130 of the first steel beam 100, The third web close plate 330 and the first web 130 of the first steel beam 100 are closely fixed to the fourth web close plate while passing through the fourth tightening holes of the fourth web close plate.

제3-2고정부재(302)는, 제3웨브 밀착판(330)의 제3체결공(333)과 제2강재 빔(200)의 제2웨브(230)의 제2체결공(231)과 제4웨브 밀착판의 제4체결공을 관통하면서 제3웨브 밀착판(330)과 제2강재 빔(200)의 제2웨브(230)와 제4웨브 밀착판를 밀착 고정시키게 된다.The third-second fixing member 302 is connected to the third fixing holes 333 of the third web close-up plate 330 and the second fixing holes 231 of the second web 230 of the second steel beam 200, The third web close plate 330 and the second web 230 of the second steel beam 200 are closely contacted with the fourth web close plate while passing through the fourth tightening holes of the fourth web close plate.

제3-3고정부재(303)는, 제3-1플랜지 밀착판(310)의 제3-1체결공(313)과 제1강재 빔(100)의 제1-1플랜지(110)의 제1-1체결공(111)을 관통하면서 제3-1플랜지 밀착판(310)과 제1강재 빔(100)의 제1-1플랜지(110)을 밀착 고정시키게 된다.The third 3-3 fixing member 303 is engaged with the 3-1 fastening hole 313 of the 3-1 flange fastening plate 310 and the 3-1 fastening hole 313 of the 1-1 steel flange 110 of the first steel beam 100 The flange 110 of the first steel beam 100 is tightly fixed to the third -1 flange fastening plate 310 while passing through the 1-1 fastening holes 111.

제3-4고정부재(304)는, 제3-1플랜지 밀착판(310)의 제3-1체결공(313)과 제2강재 빔(200)의 제2-1플랜지(210)의 제2-1체결공(211)을 관통하면서 제3-1플랜지 밀착판(310)과 제2강재 빔(200)의 제2-1플랜지(210)을 밀착 고정시키게 된다.The third-fourth fixing member 304 is fixed to the third-first fastening hole 313 of the third-first flange fastening plate 310 and the second fastening hole 313 of the second- The flange tightening plate 310 and the 2-1 flange 210 of the second steel beam 200 are closely fixed to each other while passing through the 2-1 fastening holes 211.

제3-5고정부재(305)는, 제3-2플랜지 밀착판(320)의 제3-2체결공(323)과 제1강재 빔(100)의 제1-2플랜지(120)의 제1-2체결공(121)을 관통하면서 제3-2플랜지 밀착판(320)과 제1강재 빔(100)의 제1-2플랜지(120)을 밀착 고정시키게 된다.The third-fifth fixing member 305 is engaged with the third-second fastening hole 323 of the third-2 flange fastening plate 320 and the second fastening hole 323 of the first-second flange 120 of the first steel beam 100 1-2 flange 120 of the first steel beam 100 and the third -2 flange adhered plate 320 while closely passing through the 1-2 fastening holes 121. [

제3-6고정부재(306)는, 제3-2플랜지 밀착판(320)의 제3-2체결공(323)과 제2강재 빔(200)의 제2-2플랜지(220)의 제2-2체결공(221)을 관통하면서 제3-2플랜지 밀착판(320)과 제2강재 빔(200)의 제2-2플랜지(220)을 밀착 고정시키게 된다.The third 3-6 fixing member 306 is fixed to the 3-2 fastening hole 323 of the 3-2 flange fastening plate 320 and the 2-2 flange 220 of the second steel beam 200 2-2 fastening holes 221 and tightly contact the second flange 220 of the second steel beam 200 with the third flange fastening plate 320.

상기와 같은 제3-1~6고정부재(301, 302, 303, 304, 305, 306)에 의하여 제3연결대(300)가 제1강재 빔(100) 및 제2강재 빔(200)에 일체화된다.
The third link 300 is integrated with the first steel beam 100 and the second steel beam 200 by the third to sixth fixing members 301, 302, 303, 304, 305, do.

한편 제3-1플랜지 밀착판(310)과 제3-2플랜지 밀착판(320)은 제3웨브 밀착판(330)에 대하여 회전 가능하게 결합되어 있으므로 이를 보완하여 변형량을 최소화하기 위하여 제3-7~8고정볼트부재(307, 308) 등이 더 마련된다.On the other hand, the third-first flange-close plate 310 and the third-second flange close-up plate 320 are rotatably coupled to the third web close-up plate 330. Therefore, in order to minimize the amount of deformation, 7 to 8 fixing bolt members 307 and 308, and the like.

제3-7고정볼트부재(307)는 제1강재 빔(100)의 제1-1플랜지(110)의 제1-1체결공(111)과 제3-1플랜지 밀착판(310)의 제3-1체결공(313)과 제3-2플랜지 밀착판(320)의 제3-2체결공(323)과 제1강재 빔(110)의 제1-2플랜지(120)의 제1-2체결공(121)을 관통하면서 마련된다.The third to seventh fixing bolt members 307 are engaged with the first to third fastening holes 111 of the first flange 110 of the first steel beam 100 and the The first to third fastening holes 323 of the 3-1 fastening holes 313 and the 3-2 flange fastening plates 320 and the 1 st- 2 fastening hole 121, as shown in Fig.

이와 같은 제3-7고정볼트부재(307)에 제3-7-1~2고정너트부재(307a, 307b)가 마련된다.The third to seventh fixing bolt members 307 are provided with third to seventh and eighth fixing nut members 307a and 307b.

제3-7-1고정너트부재(307a)는 제3-7고정볼트부재(307)에 마련되어 제1강재 빔(100)의 제1-1플랜지(110)와 제3-1플랜지 밀착판(310)을 밀착 고정시키게 된다.The 3-7-1 fixing nut member 307a is provided on the 3-7 fixing bolt member 307 so that the first 1-1 flange 110 of the first steel beam 100 and the 3rd 1-1 flange closing plate 310 are tightly fixed.

또한 제3-7-2고정너트부재(307b)는 제3-7고정볼트부재(307)에 마련되어 제1강재 빔(100)의 제1-2플랜지(120)와 제3-2플랜지 밀착판(320)을 밀착 고정시키게 된다.The third 3-7-2 fixing nut member 307b is provided on the 3-7 fixing bolt member 307 so that the 1-2 flange 120 of the first steel beam 100 and the 3- (320).

한편 본 실시예에서 제3-7고정볼트부재(307)는 길이방향 전체에 걸쳐 나사산이 형성되어 있는 스터드 볼트를 사용하였으며, 아울러 스터드 볼트의 일측 단부에는 미리 하나의 너트가 용접에 의하여 고정되도록 하였다. 이와 같은 형태는 제3-7고정볼트부재(307)의 고정을 해제하는 경우에 매우 유용할 수 있다.In the present embodiment, the 3-7 fixing bolt member 307 is formed of a stud bolt having threads formed in the entire longitudinal direction thereof, and one nut is previously fixed to one end of the stud bolt by welding . Such a configuration can be very useful when releasing the fixing of the 3-7 fixing bolt member 307. [

그러나 본 실시예의 제3-7고정볼트부재(307)의 형태는 바람직한 하나의 예일 뿐이며, 제3-7고정볼트부재(307)의 형태는 매우 다양하게 변형될 수 있다. However, the shape of the 3-7 fixing bolt member 307 in this embodiment is only one preferred example, and the shape of the 3-7 fixing bolt member 307 can be very variously modified.

제3-8고정볼트부재(308)는 제2강재 빔(200)의 제2-1플랜지(210)의 제2-1체결공(211)과 제3-1플랜지 밀착판(310)의 제3-1체결공(313)과 제3-2플랜지 밀착판(320)의 제3-2체결공(323)과 제2강재 빔(210)의 제2-2플랜지(220)의 제2-2체결공(221)을 관통하면서 마련된다.The third 3-8 fixing bolt member 308 is engaged with the second 1-1 fastening hole 211 of the 2-1 flange 210 of the second steel beam 200 and the 3-2 of the flange 220 of the second steel beam 210 of the second steel beam 210 and the 3-2 fastening hole 323 of the 3-1 fastening hole 313 and the 3-2 flange fastening plate 320, 2 fastening holes 221,

이와 같은 제3-8고정볼트부재(308)에 제3-8-1~2고정너트부재(308a, 308b)가 마련된다.The third 3-8 fixing bolt member 308 is provided with the 3-8-1-2 fixing nut members 308a and 308b.

제3-8-1고정너트부재(308a)는 제3-8고정볼트부재(308)에 마련되어 제2강재 빔(200)의 제2-1플랜지(210)와 제3-1플랜지 밀착판(310)을 밀착 고정시키게 된다.The 3-8-1 fixing nut member 308a is provided on the 3-8 fixing bolt member 308 so that the 2-1 flange 210 of the second steel beam 200 and the 3-1 flange close- 310 are tightly fixed.

또한 제3-8-2고정너트부재(308b)는 제3-8고정볼트부재(308)에 마련되어 제2강재 빔(200)의 제2-2플랜지(220)와 제3-2플랜지 밀착판(320)을 밀착 고정시키게 된다.The 3-8-2 fixing nut member 308b is provided on the 3-8 fixing bolt member 308 so that the 2-2 flange 220 of the second steel beam 200 and the 3-2 flange close- (320).

상기와 같이 제3-7~8고정볼트부재(307, 308) 등에 의하여 제3연결대(300), 제1강재 빔(100), 제2강재 빔(200)이 완전히 고정된 상태로 일체화된다.
The third connecting rod 300, the first steel beam 100, and the second steel beam 200 are integrated in a completely fixed state by the third to seventh to eighth fixing bolt members 307 and 308 as described above.

한편 제4연결대(400)의 고정을 위하여, 앞서 설명한 제3-1고정부재(301), 제3-2고정부재(302)는 물론이며, 제4-3고정부재, 제4-4고정부재, 제4-5고정부재, 제4-6고정부재, 제4-7고정볼트부재, 제4-7-1고정너트부재, 제4-7-2고정너트부재, 제4-8고정볼트부재, 제4-8-1고정너트부재, 제4-8-2고정너트부재가 사용된다.On the other hand, in order to fix the fourth linkage 400, not only the above-mentioned 3-1 fixing member 301 and the 3-2 fixing member 302 but also the 4-3 fixing member, 4-5 fixing member, 4-6 fixing member, 4-7 fixing bolt member, 4-7-1 fixing nut member, 4-7-2 fixing nut member, 4-8 fixing bolt member, , No. 4-8-1 fixing nut member, and No. 4-8-2 fixing nut member are used.

제4-3고정부재, 제4-4고정부재, 제4-5고정부재, 제4-6고정부재, 제4-7고정볼트부재, 제4-7-1고정너트부재, 제4-7-2고정너트부재, 제4-8고정볼트부재, 제4-8-1고정너트부재, 제4-8-2고정너트부재는, 제3연결대(300) 대신에 제4연결대(400)를 고정하기 위한 부재라는 점을 제외하고는, 제3-3고정부재, 제3-4고정부재, 제3-5고정부재, 제3-6고정부재, 제3-7고정볼트부재, 제3-7-1고정너트부재, 제3-7-2고정너트부재, 제3-8고정볼트부재, 제3-8-1고정너트부재, 제3-8-2고정너트부재와 동일한 구성이다.
4-3 fixing member, 4-4 fixing member, 4-5 fixing member, 4-6 fixing member, 4-7 fixing bolt member, 4-7-1 fixing nut member, 4-7 The fourth to eighth fixing bolt members, the fourth to eighth fixing nut members, and the fourth to eighth fixing nut members are provided with a fourth connecting unit 400 instead of the third connecting unit 300 The third 3-5 fixing member, the 3-5 fixing member, the 3-6 fixing member, the 3-7 fixing bolt member, the third 3-5 fixing member, the 3- The third to eighth fixing nuts, the third to eighth fixing nuts, the third to eighth fixing nuts and the third to eighth fixing nuts.

상기와 같은 버팀보의 연결 구조는, 미리 공장에서 제3연결대(300) 및 제4연결대(400)를 제작한 후, 현장에서는 제1강재 빔(100) 및 제2강재 빔(200)에 체결공을 천공한 후 각 고정부재 등을 이용하여 볼트 고정함으로써 제1강재 빔(100)과 제2강재 빔(200)이 서로 연결된다.The connecting structure of the strut is such that the third connecting rod 300 and the fourth connecting rod 400 are manufactured in advance in the factory and then the first steel beam 100 and the second steel beam 200 are fastened And then the first steel beam 100 and the second steel beam 200 are connected to each other by bolting using respective fixing members or the like.

따라서 종래의 단부판과 보강리브의 설치를 위한 용접 작업이 전혀 불필요하게 되며, 오직 천공과 볼트 조립에 의한 단순 조립에 의하여 버팀보를 연결할 수 있다.Therefore, welding work for installation of the conventional end plate and the reinforcing rib is not necessary at all, and the strut can be connected only by simple assembly by boring and bolt assembly.

또한 제3연결대 등을 사용하지 않을 때에는 도 7과 같이 펼친 후 연결대를 적층하여 보관할 수 있으므로 연결대의 보관에 필요한 공간이 획기적으로 감소된다.When the third connecting rod or the like is not used, since the connecting rod can be stacked and stored after spreading as shown in FIG. 7, the space required for storing the connecting rod is drastically reduced.

또한 본 연결대를 현장에 설치하기 위하여 공장에서 현장까지 연결대를 이동하는 경우 혹은 현장이 종료된 후 본 연결대를 현장에서 공장으로 이동하는 경우에도 차량에 대량의 연결대를 적재할 수 있다.
It is also possible to load a large number of links in the vehicle when the link is moved from the factory to the site to install the link in the field, or when the link is moved from the site to the factory after the site is shut down.

도 9는 본 발명에 의한 제2실시예인 연결대의 사시도이며, 도 10은 본 발명에 의한 제3실시예인 연결대의 사시도이다.FIG. 9 is a perspective view of a connecting rod according to a second embodiment of the present invention, and FIG. 10 is a perspective view of a connecting rod according to a third embodiment of the present invention.

제3연결대(300) 및 제4연결대(400)는 동일한 구조이므로 상기 및 이하에서는 연결대(300)라 칭하기도 한다.The third linkage 300 and the fourth linkage 400 have the same structure, and thus may be referred to as a linkage 300 in the description below.

연결대(300)의 강성을 높이기 위하여 제3-1플랜지 밀착판(310)의 외측 단부에 제3-1보강부(314)가 마련되며, 제3-2플랜지 밀착판(320)의 외측 단부에 제3-2보강부(324)가 마련될 수 있다.The 3-1 reinforcing portion 314 is provided at the outer end of the 3-1 flange fastening plate 310 and the 3-1 reinforcing portion 314 is provided at the outer end of the 3-2 flange fastening plate 320 in order to increase the rigidity of the connecting rod 300 A third reinforcing portion 324 may be provided.

도 9에서 제3-1~2보강부(314, 324)는 환봉 형태의 봉으로서, 제3-1플랜지 밀착판(310) 및 제3-2플랜지 밀착판(320)에 용접되는 것이다.9, the reinforcing portions 314 and 324 are welded to the 3-1 flange fastening plate 310 and the 3-2 flange fastening plate 320 as bar-shaped rods.

도 10에서 제3-1~2플랜지 밀착판(310, 320)의 외측 단부가 절곡되어 제3-1~2보강부(314, 324)가 형성될 수 있음을 보여준다.
In FIG. 10, the outer ends of the flange fastening plates 310 and 320 are bent so that the reinforcing portions 314 and 324 can be formed.

전술한 본 발명의 설명은 예시를 위한 것이며, 본 발명이 속하는 기술분야의 통상의 지식을 가진 자는 본 발명의 기술적 사상이나 필수적인 특징을 변경하지 않고서 다른 구체적인 형태로 쉽게 변형이 가능하다는 것을 이해할 수 있을 것이다. 그러므로 이상에서 기술한 실시예들은 모든 면에서 예시적인 것일 뿐 한정적이 아닌 것으로 이해되어야만 한다. 예를 들어, 단일형으로 설명되어 있는 각 구성 요소는 분산되어 실시될 수도 있으며, 마찬가지로 분산된 것으로 설명되어 있는 구성 요소들도 결합된 형태로 실시될 수 있다.It will be understood by those skilled in the art that the foregoing description of the present invention is for illustrative purposes only and that those of ordinary skill in the art can readily understand that various changes and modifications may be made without departing from the spirit or essential characteristics of the present invention. will be. It is therefore to be understood that the embodiments described above are intended to be illustrative, but not limiting, in all respects. For example, each component described as a single entity may be distributed and implemented, and components described as being distributed may also be implemented in a combined form.

본 발명의 범위는 상기 상세한 설명보다는 후술하는 특허청구범위에 의하여 나타내어지며, 특허청구범위의 의미 및 범위 그리고 그 균등 개념으로부터 도출되는 모든 변경 또는 변형된 형태가 본 발명의 범위에 포함되는 것으로 해석되어야 한다.
The scope of the present invention is defined by the appended claims rather than the detailed description and all changes or modifications derived from the meaning and scope of the claims and their equivalents are to be construed as being included within the scope of the present invention do.

100 : 제1강재 빔
110 : 제1-1플랜지 111 : 제1-1체결공
120 : 제1-2플랜지 121 : 제1-2체결공
130 : 제1웨브 131 : 제1체결공
200 : 제2강재 빔
210 : 제2-1플랜지 211 : 제2-1체결공
220 : 제2-2플랜지 221 : 제2-2체결공
230 : 제2웨브 231 : 제2체결공
300 : 제3연결대
310 : 제3-1플랜지 밀착판 311 : 제3-1회전용 관
312 : 제3-1회전축봉 313 : 제3-1체결공
314 : 제3-1보강부
320 : 제3-2플랜지 밀착판 321 : 제3-2회전용 관
322 : 제3-2회전축봉 323 : 제3-2체결공
324 : 제3-2보강부
330 : 제3웨브 밀착판 331 : 제3회전용 관
333 : 제3체결공
301 : 제3-1고정부재 302 : 제3-2고정부재
303 : 제3-3고정부재 304 : 제3-4고정부재
305 : 제3-5고정부재 306 : 제3-6고정부재
307 : 제3-7고정볼트부재 307a : 제3-7-1고정너트부재
307b : 제3-7-2고정너트부재
308 : 제3-8고정볼트부재 308a : 제3-8-1고정너트부재
308b : 제3-8-2고정너트부재
400 : 제4연결대
100: First steel beam
110: 1-1 Flange 111: 1-1 Bolt hole
120: 1st to 2nd flange 121: 1st to 2nd fasteners
130: first web 131: first fastening hole
200: Second steel beam
210: 2-1 flange 211: 2-1 fastener
220: 2-2 flange 221: 2-2 fastener
230: second web 231: second fastening hole
300: The third connecting rod
310: 3-1 flange tightening plate 311: 3-1 turn tube
312: 3-1 rotation shaft rod 313: 3-1 fastening hole
314:
320: 3-2 flange tightening plate 321: 3-2 turn tube
322: 3-2 rotation shaft rod 323: 3-2 fastening hole
324:
330: third web close plate 331: third dedicated pipe
333: Third fastening hole
301: 3-1 fixing member 302: 3-2 fixing member
303: third 3-3 fixing member 304: third 3-4 fixing member
305: third to fifth fixing members 306: third to sixth fixing members
307: third 3-7 fixing bolt member 307a: third 3-7-1 fixing nut member
307b: 3-7-2 fixing nut member
308: 3-8 fixing bolt member 308a: 3-8-1 fixing nut member
308b: the 3-8-2 fixing nut member
400: fourth connecting rod

Claims (5)

서로 마주보게 마련되는 제1-1플랜지 및 제1-2플랜지, 상기 제1-1플랜지 및 상기 제1-2플랜지를 연결하는 제1웨브를 포함하여 이루어지며, 상기 제1웨브에 복수의 제1체결공이 형성되며, 상기 제1-1플랜지에 복수의 제1-1체결공이 형성되며, 상기 제1-2플랜지에 복수의 제1-2체결공이 형성되는 제1강재 빔 ;
서로 마주보게 마련되는 제2-1플랜지 및 제2-2플랜지, 상기 제2-1플랜지 및 상기 제2-2플랜지를 연결하는 제2웨브를 포함하여 이루어지며, 상기 제1강재 빔과 일직선상으로 배치되며, 상기 제2웨브에 복수의 제2체결공이 형성되며, 상기 제2-1플랜지에 복수의 제2-1체결공이 형성되며, 상기 제2-2플랜지에 복수의 제2-2체결공이 형성되는 제2강재 빔 ;
상기 제1웨브의 일측면 및 상기 제2웨브의 일측면에 밀착되며 복수의 제3체결공이 형성되는 제3웨브 밀착판과, 상기 제3웨브 밀착판의 일단부에 회동가능하게 마련되어 상기 제1-1플랜지의 내측면 및 상기 제2-1플랜지의 내측면에 밀착되며 복수의 제3-1체결공이 형성되는 제3-1플랜지 밀착판과, 상기 제3웨브 밀착판의 타단부에 회동가능하게 마련되어 상기 제1-2플랜지의 내측면 및 상기 제2-2플랜지의 내측면에 밀착되며 복수의 제3-2체결공이 형성되는 제3-2플랜지 밀착판을 포함하여 이루어지는 제3연결대 ;
상기 제1웨브의 타측면 및 상기 제2웨브의 타측면에 밀착되며 복수의 제4체결공이 형성되는 제4웨브 밀착판과, 상기 제4웨브 밀착판의 일단부에 회동가능하게 마련되어 상기 제1-1플랜지의 내측면 및 상기 제2-1플랜지의 내측면에 밀착되며 복수의 제4-1체결공이 형성되는 제4-1플랜지 밀착판과, 상기 제4웨브 밀착판의 타단부에 회동가능하게 마련되어 상기 제1-2플랜지의 내측면 및 상기 제2-2플랜지의 내측면에 밀착되며 복수의 제4-2체결공이 형성되는 제4-2플랜지 밀착판을 포함하여 이루어지는 제4연결대 ;
상기 제3웨브 밀착판의 제3체결공과 제1강재 빔의 제1웨브의 제1체결공과 상기 제4웨브 밀착판의 제4체결공을 관통하면서 상기 제3웨브 밀착판과 제1강재 빔의 제1웨브와 상기 제4웨브 밀착판를 밀착 고정시키는 제3-1고정부재 ;
상기 제3웨브 밀착판의 제3체결공과 제2강재 빔의 제2웨브의 제2체결공과 상기 제4웨브 밀착판의 제4체결공을 관통하면서 상기 제3웨브 밀착판과 제2강재 빔의 제2웨브와 상기 제4웨브 밀착판를 밀착 고정시키는 제3-2고정부재 ;
상기 제3-1플랜지 밀착판의 제3-1체결공과 상기 제1강재 빔의 제1-1플랜지의 제1-1체결공을 관통하면서 상기 제3-1플랜지 밀착판과 상기 제1강재 빔의 제1-1플랜지을 밀착 고정시키는 제3-3고정부재 ;
상기 제3-1플랜지 밀착판의 제3-1체결공과 상기 제2강재 빔의 제2-1플랜지의 제2-1체결공을 관통하면서 상기 제3-1플랜지 밀착판과 상기 제2강재 빔의 제2-1플랜지을 밀착 고정시키는 제3-4고정부재 ;
상기 제3-2플랜지 밀착판의 제3-2체결공과 상기 제1강재 빔의 제1-2플랜지의 제1-2체결공을 관통하면서 상기 제3-2플랜지 밀착판과 상기 제1강재 빔의 제1-2플랜지을 밀착 고정시키는 제3-5고정부재 ;
상기 제3-2플랜지 밀착판의 제3-2체결공과 상기 제2강재 빔의 제2-2플랜지의 제2-2체결공을 관통하면서 상기 제3-2플랜지 밀착판과 상기 제2강재 빔의 제2-2플랜지을 밀착 고정시키는 제3-6고정부재 ;
상기 제1강재 빔의 제1-1플랜지의 제1-1체결공과 상기 제3-1플랜지 밀착판의 제3-1체결공과 상기 제3-2플랜지 밀착판의 제3-2체결공과 상기 제1강재 빔의 제1-2플랜지의 제1-2체결공을 관통하면서 마련되는 제3-7고정볼트부재 ;
상기 제3-7고정볼트부재에 마련되어 상기 제1강재 빔의 제1-1플랜지와 상기 제3-1플랜지 밀착판을 밀착 고정시키는 제3-7-1고정너트부재 ;
상기 제3-7고정볼트부재에 마련되어 상기 제1강재 빔의 제1-2플랜지와 상기 제3-2플랜지 밀착판을 밀착 고정시키는 제3-7-2고정너트부재 ;
상기 제2강재 빔의 제2-1플랜지의 제2-1체결공과 상기 제3-1플랜지 밀착판의 제3-1체결공과 상기 제3-2플랜지 밀착판의 제3-2체결공과 상기 제2강재 빔의 제2-2플랜지의 제2-2체결공을 관통하면서 마련되는 제3-8고정볼트부재 ;
상기 제3-8고정볼트부재에 마련되어 상기 제2강재 빔의 제2-1플랜지와 상기 제3-1플랜지 밀착판을 밀착 고정시키는 제3-8-1고정너트부재 ;
상기 제3-8고정볼트부재에 마련되어 상기 제2강재 빔의 제2-2플랜지와 상기 제3-2플랜지 밀착판을 밀착 고정시키는 제3-8-2고정너트부재 ;
상기 제4-1플랜지 밀착판의 제4-1체결공과 상기 제1강재 빔의 제1-1플랜지의 제1-1체결공을 관통하면서 상기 제4-1플랜지 밀착판과 상기 제1강재 빔의 제1-1플랜지을 밀착 고정시키는 제4-3고정부재 ;
상기 제4-1플랜지 밀착판의 제4-1체결공과 상기 제2강재 빔의 제2-1플랜지의 제2-1체결공을 관통하면서 상기 제4-1플랜지 밀착판과 상기 제2강재 빔의 제2-1플랜지을 밀착 고정시키는 제4-4고정부재 ;
상기 제4-2플랜지 밀착판의 제4-2체결공과 상기 제1강재 빔의 제1-2플랜지의 제1-2체결공을 관통하면서 상기 제4-2플랜지 밀착판과 상기 제1강재 빔의 제1-2플랜지을 밀착 고정시키는 제4-5고정부재 ;
상기 제4-2플랜지 밀착판의 제4-2체결공과 상기 제2강재 빔의 제2-2플랜지의 제2-2체결공을 관통하면서 상기 제4-2플랜지 밀착판과 상기 제2강재 빔의 제2-2플랜지을 밀착 고정시키는 제4-6고정부재 ;
상기 제1강재 빔의 제1-1플랜지의 제1-1체결공과 상기 제4-1플랜지 밀착판의 제4-1체결공과 상기 제4-2플랜지 밀착판의 제4-2체결공과 상기 제1강재 빔의 제1-2플랜지의 제1-2체결공을 관통하면서 마련되는 제4-7고정볼트부재 ;
상기 제4-7고정볼트부재에 마련되어 상기 제1강재 빔의 제1-1플랜지와 상기 제4-1플랜지 밀착판을 밀착 고정시키는 제4-7-1고정너트부재 ;
상기 제4-7고정볼트부재에 마련되어 상기 제1강재 빔의 제1-2플랜지와 상기 제4-2플랜지 밀착판을 밀착 고정시키는 제4-7-2고정너트부재 ;
상기 제2강재 빔의 제2-1플랜지의 제2-1체결공과 상기 제4-1플랜지 밀착판의 제4-1체결공과 상기 제4-2플랜지 밀착판의 제4-2체결공과 상기 제2강재 빔의 제2-2플랜지의 제2-2체결공을 관통하면서 마련되는 제4-8고정볼트부재 ;
상기 제4-8고정볼트부재에 마련되어 상기 제1강재 빔의 제1-1플랜지와 상기 제4-1플랜지 밀착판을 밀착 고정시키는 제4-8-1고정너트부재 ;
상기 제4-8고정볼트부재에 마련되어 상기 제1강재 빔의 제1-2플랜지와 상기 제4-2플랜지 밀착판을 밀착 고정시키는 제4-8-2고정너트부재 ;
를 포함하여 이루어지는 것을 특징으로 하는 버팀보의 연결 구조.
And a first web connecting the first 1-1 flange and the 1-2 flange, the first 1-1 flange, and the 1-2 second flange facing each other, A first steel beam having a first fastening hole, a plurality of first fastening holes formed on the first fastening flange, and a plurality of first fastening holes formed on the first fastening hole;
And a second web connecting the second-1 flange and the second-2 flange, the second web having a first side and a second side opposite to each other, A plurality of second fasteners are formed on the second web, a plurality of second fasteners are formed on the second flange, and a plurality of second fasteners are fastened to the second flange, A second steel beam on which a ball is formed;
A third web close plate which is in close contact with one side surface of the first web and one side surface of the second web and has a plurality of third fastening holes formed thereon, -1 flange fastening plate which is in close contact with the inner surface of the flange and the inner surface of the second-1 flange, and a plurality of third-1 fastening holes are formed; A third connecting block including a third-2 flange fastening plate which is in close contact with an inner surface of the 1-2 flange and an inner surface of the 2nd-2 flange and has a plurality of third-2 fastening holes formed therein;
A fourth web close plate which is in close contact with the other side surface of the first web and the other side surface of the second web and has a plurality of fourth fastening holes formed thereon; -1 flange fastening plate which is in close contact with the inner surface of the flange and the inner surface of the second-1 flange, and a plurality of fourth-1 fastening holes are formed; And a fourth connecting rod including a fourth connecting flange attached to the inner surface of the first flange and the fourth flange close to the inner surface of the second flange;
And the third fastening hole of the third web clamping plate and the first fastening hole of the first web of the first steel beam and the fourth fastening hole of the fourth web clamping plate while passing through the third web clamping plate and the first steel beam A 3-1 fixing member for tightly fixing the first web and the fourth web close plate;
And the third fastening hole of the third web close plate and the second fastening hole of the second web of the second steel beam and the fourth fastening hole of the fourth web close plate while the third web close plate and the second steel beam A third-second fixing member for closely fixing the second web and the fourth web contact plate;
Wherein the first to third fastening holes of the third-first flange fastening plate and the first-fastening holes of the first-steel flange of the first steel beam penetrate through the first- A third 3-3 fixing member for tightly fixing the 1-1 flange of the first fixing member;
Wherein the third-1 flange-closure plate and the second steel-beam clamping plate penetrate through the second-1 fastening holes of the second-1 flange of the third steel- A third-fourth fixing member for tightly fixing the second-first flange of the second fixing member;
The flange fastening plate of the third-second flange and the first-second fastening hole of the first-steel flange of the first steel beam while passing through the first-second fastening hole of the third- A third-fifth fixing member for tightly fixing the first-second flange of the second fixing member;
The third-2 flange fastening plate and the second-2 flange of the second steel beam penetrate the second-2 fastening holes of the third-2 flange fastening plate and the second steel beam, A third 3-6 fixing member for tightly fixing the flange of the second 2-2 of the frame;
The first 1-1 bolt of the first steel beam and the 3-1 bolt of the 3-1 bolt tightening plate and the 3-2 bolt of the 3-2 flange bolt tightening plate, A third-seventh fixing bolt member provided through the first-second fastening hole of the first-second flange of the one-piece steel beam;
A 3-7-1 fixing nut provided on the 3-7 fixing bolt member for closely fixing the 1-1 flange of the first steel beam and the 3-1 flange closing plate;
A 3-7-2 fixing nut provided on the 3-7 fixing bolt member for closely fixing the 1-2 flange of the first steel beam and the 3-2 flange close plate;
The second-1 fastening holes of the second steel beam of the second steel beam, the 3-1 fastening holes of the 3-1 flange fastening plate, the 3-2 fastening holes of the 3-2 flange fastening plate, A 3-8 fixing bolt member provided through the 2-2 fastening holes of the flange of the 2-2 steel beam,
A 3-8-1 fixing nut provided on the 3-8 fixing bolt member for closely fixing the 2-1 flange of the second steel beam and the 3-1 flange close plate;
A 3-8-2 fixing nut provided on the 3-8 fixing bolt member for closely fixing the flange of the second steel beam to the flange close plate of the third steel flange;
Wherein the first to fourth fasteners of the first to fourth flange fastening plates and the first-fastener holes of the first-steel flange of the first steel beam penetrate through the first- A fourth-third fixing member for tightly fixing the first 1-1 flange of the fourth fixing member;
And the fourth-1 flange-closure plate and the second steel-beam clamping plate, while passing through the 4-1 fitting hole of the 4-1 flange-closure plate and the 2-1 fitting hole of the 2-1 flange of the second steel beam, A fourth-fourth fixing member for tightly fixing the second-first flange of the first-fourth fixing member;
And the fourth-2 flange fastening plate and the first-second flange of the first steel beam penetrate through the first-second fastening holes of the fourth- A fourth-fifth fixing member for tightly fixing the first-second flange of the second fixing member;
The fourth 4-2 flange fastening plate and the 2-2 fastening holes of the 2-2 flange of the second steel beam while passing through the 4-2 fastening holes of the 4-2 flange fastening plate and the 2- A fourth-sixth fixing member for tightly fixing the second-2 flange of the fourth member;
The first 1-1 bolt of the first steel beam and the 4-1 fastening hole of the 4-1 flange fastening plate and the 4-2 fastening hole of the 4-2 flange fastening plate and the A fourth to seventh fixing bolt member provided through the first-second fastening hole of the first-second flange of the one-piece steel beam;
A fourth-seventh fixing nut member provided on the fourth-seventh fixing bolt member for tightly fixing the first flange of the first steel beam and the fourth flange close-up plate;
A 4-7-2 fixing nut provided on the 4-7 fixing bolt member for closely fixing the 1-2 flange of the first steel beam and the 4-2 flange close plate;
The second-1 fastening holes of the second-steel flange of the second steel beam, the 4-1 fastening holes of the 4-1 flange fastening plate, the 4-2 fastening holes of the 4-2 flange fastening plate, A No. 4-8 fixing bolt member provided through the 2-2 fastening holes of the 2-2 flange of the 2-steel beam;
A 4-8-1 fixing nut provided on the 4-8 fixing bolt member for closely fixing the 1-1 flange of the first steel beam and the 4-1 flange close plate;
A 4-8-2 fixing nut provided on the 4-8 fixing bolt member for closely fixing the 1-2 flange of the first steel beam and the 4-2 flange close plate;
And a connecting structure of the strut braid.
제 1 항에 있어서,
제3-1플랜지 밀착판 및 상기 제3-2플랜지 밀착판이 상기 제3웨브 밀착판에 회동 가능하게 결합되기 위하여, 상기 제3웨브 밀착판의 양측 단부에 복수의 제3회전용 관이 서로 이격되어 마련되며, 상기 제3-1플랜지 밀착판의 일측 단부에 복수의 제3-1회전용 관이 서로 이격되어 마련되며, 상기 제3-2플랜지 밀착판의 일측 단부에 복수의 제3-2회전용 관이 서로 이격되어 마련되며, 상기 제3회전용 관 및 상기 제3-1회전용 관을 관통하는 형태로 제3-1회전축봉이 마련되며, 상기 제3회전용 관 및 상기 제3-2회전용 관을 관통하는 형태로 제3-2회전축봉이 마련되며 ;
제4-1플랜지 밀착판 및 상기 제4-2플랜지 밀착판이 상기 제4웨브 밀착판에 회동 가능하게 결합되기 위하여, 상기 제4웨브 밀착판의 양측 단부에 복수의 제4회전용 관이 서로 이격되어 마련되며, 상기 제4-1플랜지 밀착판의 일측 단부에 복수의 제4-1회전용 관이 서로 이격되어 마련되며, 상기 제4-2플랜지 밀착판의 일측 단부에 복수의 제4-2회전용 관이 서로 이격되어 마련되며, 상기 제4회전용 관 및 상기 제4-1회전용 관을 관통하는 형태로 제4-1회전축봉이 마련되며, 상기 제4회전용 관 및 상기 제4-2회전용 관을 관통하는 형태로 제4-2회전축봉이 마련되는 것 ;
을 특징으로 하는 버팀보의 연결 구조.
The method according to claim 1,
The third web flange adhering plate and the 3-2 flange adhering plate are rotatably coupled to the third web adhered plate so that a plurality of third rotating pipes are spaced apart from each other at both side ends of the third web adhered plate A plurality of third-first revolving pipes are provided at one end of the third-first flange-adhering plate, and a plurality of third-second revolving tubes are provided at one end of the third- A third rotary shaft rod is provided so as to pass through the third rotary shaft and the third rotary shaft, and the third rotary shaft and the third rotary shaft are provided through the third rotary shaft and the third rotary shaft, A 3-2 rotation shaft rod is provided through the 2-time exclusive pipe;
The fourth web flange adhered plate and the fourth 4-2 flange adhered plate are rotatably coupled to the fourth web adhered plate so that a plurality of fourth rotating pipes are spaced apart from each other at both side ends of the fourth web adhered plate A plurality of fourth-first revolving pipes are provided on one end of the fourth-first flange-adhering plate, and a plurality of fourth-two revolving pipes are provided on one end of the fourth- A fourth rotary shaft rod is provided so as to pass through the fourth rotary shaft and the fourth rotary shaft, and the fourth rotary shaft and the fourth rotary shaft are provided through the fourth rotary shaft and the fourth rotary shaft, A No. 4-2 rotary shaft rod is provided through the two-time dedicated pipe;
And a connecting structure of the strut.
제 1 항에 있어서,
상기 제3-1플랜지 밀착판의 외측 단부에 제3-1보강부가 마련되며, 상기 제3-2플랜지 밀착판의 외측 단부에 제3-2보강부가 마련되는 것을 특징으로 하는 버팀보의 연결 구조.
The method according to claim 1,
Wherein the third-first flange fastening plate has a third-first reinforcing portion at an outer end thereof, and the third-second flange fastening plate has a third-second reinforcing portion at an outer end thereof.
제 3 항에 있어서,
상기 제3-1보강부는 상기 제3-1플랜지 밀착판의 외측 단부가 절곡되어 형성된 것이며, 상기 제3-2보강부는 상기 제3-2플랜지 밀착판의 외측 단부가 절곡되어 형성되는 것을 특징으로 하는 버팀보의 연결 구조.
The method of claim 3,
Wherein the third-first reinforcing portion is formed by bending an outer end of the third-first flange-adhering plate, and the third-second reinforcing portion is formed by bending an outer end of the third- The connection structure of the strut.
제 3 항에 있어서,
상기 제3-1보강부 및 상기 제3-2보강부는 환봉인 것을 특징으로 하는 버팀보의 연결 구조.
The method of claim 3,
Wherein the third-first reinforcing portion and the third-second reinforcing portion are round rods.
KR1020130071206A 2013-06-20 2013-06-20 Connecting Structure of Supporting Beams KR101425442B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020130071206A KR101425442B1 (en) 2013-06-20 2013-06-20 Connecting Structure of Supporting Beams

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020130071206A KR101425442B1 (en) 2013-06-20 2013-06-20 Connecting Structure of Supporting Beams

Publications (1)

Publication Number Publication Date
KR101425442B1 true KR101425442B1 (en) 2014-08-14

Family

ID=51749214

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020130071206A KR101425442B1 (en) 2013-06-20 2013-06-20 Connecting Structure of Supporting Beams

Country Status (1)

Country Link
KR (1) KR101425442B1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101556763B1 (en) * 2014-11-11 2015-10-15 주식회사 거원에코텍 Construction method and support device for extracting pile
CN105064374A (en) * 2015-07-31 2015-11-18 河海大学 Large-span steel tube supporting beam with accurately-adjusted length
KR101661084B1 (en) * 2016-05-09 2016-09-28 주식회사 금원건설 Retaining wall installation method using prestressed beam and dual waling
KR102392355B1 (en) * 2021-08-10 2022-04-28 정원훈 Supportbeam connection structure
CN115142548A (en) * 2022-08-19 2022-10-04 中国新兴建筑工程有限责任公司山东分公司 Steel beam connecting structure mounting device and using method thereof
KR102456259B1 (en) * 2021-12-29 2022-10-19 (주)창조종합건축사사무소 Composite beam connection structure
KR102595545B1 (en) * 2022-12-09 2023-10-30 주식회사 엠쓰리시스템즈 Module length adjustment member

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS53110710U (en) * 1977-02-12 1978-09-04
JPH02128703U (en) * 1989-03-31 1990-10-24

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS53110710U (en) * 1977-02-12 1978-09-04
JPH02128703U (en) * 1989-03-31 1990-10-24

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101556763B1 (en) * 2014-11-11 2015-10-15 주식회사 거원에코텍 Construction method and support device for extracting pile
CN105064374A (en) * 2015-07-31 2015-11-18 河海大学 Large-span steel tube supporting beam with accurately-adjusted length
KR101661084B1 (en) * 2016-05-09 2016-09-28 주식회사 금원건설 Retaining wall installation method using prestressed beam and dual waling
KR102392355B1 (en) * 2021-08-10 2022-04-28 정원훈 Supportbeam connection structure
KR102456259B1 (en) * 2021-12-29 2022-10-19 (주)창조종합건축사사무소 Composite beam connection structure
CN115142548A (en) * 2022-08-19 2022-10-04 中国新兴建筑工程有限责任公司山东分公司 Steel beam connecting structure mounting device and using method thereof
KR102595545B1 (en) * 2022-12-09 2023-10-30 주식회사 엠쓰리시스템즈 Module length adjustment member

Similar Documents

Publication Publication Date Title
KR101425442B1 (en) Connecting Structure of Supporting Beams
HUE030423T2 (en) Steel plate structure and steel plate concrete wall
KR101302458B1 (en) Cast-in anchor channel with sub-anchor
CH713032B1 (en) An assembly comprising a heat transfer conduit embedded in a prefabricated tubular pile and a method for installing the assembly
KR101414242B1 (en) Reinforcement apparatus for H-beam column and reinforcement method using that
KR20150093175A (en) A cabled pipe rack
KR101677210B1 (en) Channel of assembly type casted in concrete structure
US8276345B2 (en) Jamb stud connector and method of use thereof
CN102011432B (en) Novel polygonal combined steel pipe
JP5282483B2 (en) Piping unit and its connection structure
KR101275932B1 (en) Method for installing ALC panel to concrete slab
JP6596034B2 (en) Joint member and frame structure
US8661764B2 (en) Method of forming multilayered netlock girder system
KR101690995B1 (en) Truss member and structure with an infilled tube
JP2009249995A (en) Replacement method for main column material of steel pipe tower and connection fixture structure used for the same
US8763317B2 (en) Concrete roof panel
JP6435576B2 (en) Construction method for substructure including crossbar
JP3724371B2 (en) Roof structure of structure, manufacturing method of roof structure unit and roof construction method
KR200403692Y1 (en) Two-Way Nailing Fixing Device For Reinforcing Rod Of The Surface reinforcement
KR20090005399U (en) Sk panel
CN220117444U (en) Steel structure connecting piece
KR20080020915A (en) Bolted moment resist connection of steel column and steel beams for easy site job
KR20130119716A (en) Installation structure of screening panel for construction site
CN217782089U (en) Novel portable groove supporting device
CN211369159U (en) Assembled shear force wall of area restraint edge node module

Legal Events

Date Code Title Description
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee