KR101354282B1 - education instruments and method of construction quality management - Google Patents

education instruments and method of construction quality management Download PDF

Info

Publication number
KR101354282B1
KR101354282B1 KR1020120041740A KR20120041740A KR101354282B1 KR 101354282 B1 KR101354282 B1 KR 101354282B1 KR 1020120041740 A KR1020120041740 A KR 1020120041740A KR 20120041740 A KR20120041740 A KR 20120041740A KR 101354282 B1 KR101354282 B1 KR 101354282B1
Authority
KR
South Korea
Prior art keywords
construction
construction quality
quality management
plate
plan
Prior art date
Application number
KR1020120041740A
Other languages
Korean (ko)
Other versions
KR20130118665A (en
Inventor
노강하
Original Assignee
노강하
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 노강하 filed Critical 노강하
Priority to KR1020120041740A priority Critical patent/KR101354282B1/en
Publication of KR20130118665A publication Critical patent/KR20130118665A/en
Application granted granted Critical
Publication of KR101354282B1 publication Critical patent/KR101354282B1/en

Links

Images

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B25/00Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes
    • G09B25/04Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes of buildings
    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B19/00Teaching not covered by other main groups of this subclass
    • G09B19/0069Engineering, e.g. mechanical, electrical design
    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B19/00Teaching not covered by other main groups of this subclass
    • G09B19/10Modelling

Abstract

본 발명은 건설 품질 관리 교육 장치 및 이를 이용한 교육 방법에 관한 것으로, 건설현장의 너비와 높이를 결정하기 위한 플레이트, 체결수단에 의하여 상기 플레이트에 설치되어 결정된 건설현장의 너비와 높이를 확정하는 가이드프레임, 상기 플레이트 상에 체결되는 기둥용 프레임, 상기 기둥용 프레임에 브라켓으로 체결되는 보용 프레임, 기초공사, 구조물공사의 거푸집 및 콘크리트 타설, 전기와 기계설비 공사 및 마감공사 과정의 각종 구조물 및 설비의 표시를 위한 착탈가능한 표시수단 및, 건설 품질 관리 계획서를 포함하여 구성되는 것을 특징으로 하는 건설 품질 관리 교육 장치 및 이를 이용한 교육 방법에 관한 것이다.The present invention relates to a construction quality management education apparatus and a training method using the same, a plate for determining the width and height of a construction site, a guide frame for determining the width and height of the construction site determined by being installed on the plate by a fastening means , Pillar frames fastened on the plate, beam frames fastened with brackets to the pillar frames, foundation work, formwork and concrete casting of structure work, electrical and mechanical equipment construction and finishing of various structures and equipment Removable display means for, and a construction quality management education device comprising a construction quality management plan and a training method using the same.

Description

건설 품질 관리 교육 장치 및 이를 이용한 교육 방법{education instruments and method of construction quality management}Construction instruments and method of construction quality management

본 발명은 건설 품질 관리 교육을 원활하게 하기 위한 장치와 이를 이용한 교육 방법에 관한 것이다.The present invention relates to an apparatus for facilitating construction quality management education and a training method using the same.

일반적으로 건설회사의 인원은 대부분 프로젝트 업무를 수행하기 때문에 참여하는 멤버가 모두 다른 경험을 하여 참여하고 프로젝트가 끝나면 계약을 마무리하게 된다.In general, most construction companies work on projects, so all participating members have different experiences.

따라서 프로젝트를 잘 수행하기 위해서는, 설계도면이 작성된 이후 매 공사과정마다 품질관리를 수행하여 설계도면에 따라 공사가 이루어지고 있는지를 검사 및 검측하는 과정 즉 건설 품질 관리 과정을 거쳐야만 하고, 이러한 과정이 원활하게 진행되지 않으면 재작업을 하여야 하는 등 공사기간과 비용이 추가로 많이 드는 문제점이 있었다.Therefore, in order to carry out the project well, the quality control must be carried out every construction process after the design drawing is drawn up, and the inspection and detection of construction work according to the design drawing must be carried out, that is, the construction quality management process. If it did not proceed, there was a problem that the construction period and costs are additionally increased, such as rework.

상기에서 건설 품질 관리는 건설(건축/토목/엔지니어링)분야의 품질을 보증하기 위하여 국가기관, 감리기관 또는 고객이 설계된 시방서로부터 시공사가 지켜야 할 사항을 규정하고 지켜가는 과정을 모니터링 하는 제도로서, 설계도면 작성 후 건설품질관리계획서(QP)를 작성하고, 이에 따라 시공 과정에서 품질관리계획서에 따른 검사/검측과정을 수행하는 일련의 과정을 말한다.In the above, the construction quality management is a system that monitors the process of defining and observing the contractor's requirements from the specifications designed by the state agency, the supervisory institution or the customer in order to guarantee the quality in the construction (architectural / civil engineering / engineering) field. After drawing drawings, the construction quality management plan (QP) is prepared, and according to the construction process, it is a series of processes to perform the inspection / detection process according to the quality control plan.

이러한 건설 품질 관리는 일반적으로 관련학과를 졸업하거나 공공 및 사업 내 직업훈련원에서 직업훈련을 받거나, 건설현장이나 시험관련 기관에서 일을 배워야 하는데, 상기한 건설 품질 관리를 배우기 위한 적정한 교재가 없어서 교육에 곤란을 겪고 있는 실정이다.Such construction quality management generally requires graduates from related departments, vocational training at public and business vocational training centers, or learning to work at construction sites or test-related institutions, and there is no appropriate textbook for learning construction quality management. The situation is suffering.

본 발명의 목적은 건설 품질 관리 교육을 원활하게 수행할 수 있도록 교육 장치를 제공하고, 이를 이용하여 건설 품질 관리 교육을 효과적으로 수행할 수 있도록 하는 방법을 제공하는 데 있다.It is an object of the present invention to provide a training apparatus for smoothly performing construction quality management education, and to provide a method for effectively performing construction quality management education using the same.

상기한 목적을 달성하기 위한 본 발명의 특징은, 건설현장의 너비와 높이를 결정하기 위한 플레이트, 체결수단에 의하여 상기 플레이트에 설치되어 결정된 건설 현장의 너비와 높이를 확정하는 가이드프레임, 상기 플레이트 상에 체결되는 기둥용 프레임, 상기 기둥용 프레임에 브라켓으로 체결되는 보용 프레임, 기초공사, 구조물공사의 거푸집 및 콘크리트 타설, 전기와 기계설비 공사 및 마감공사 과정의 각종 구조물 및 설비의 표시를 위한 착탈 가능한 표시수단 및, 건설 품질 관리 계획서를 포함하여 구성되는 것을 특징으로 하는 건설 품질 관리 교육 장치에 있다.A feature of the present invention for achieving the above object is a plate for determining the width and height of the construction site, the guide frame for determining the width and height of the construction site determined to be installed on the plate by the fastening means, on the plate Pole frame fastened to the frame, beam frame fastened to the frame for the pillar, foundation work, formwork of concrete construction and concrete pouring, detachable for the display of various structures and equipment in the electrical and mechanical equipment construction and finishing process And a display means and a construction quality control plan.

상기에서 표시수단은 전면에 기초공사, 구조물공사의 거푸집 및 콘크리트 타설, 전기와 기계설비 공사 및 마감공사 과정의 각종 구조물 및 설비의 이미지가 도시되어 있고, 후면에 이형지 혹은 매직 테이프가 구비된 부착수단이 형성된 스티커이거나, 해당 구조물 및 설비와 대응되는 임의의 부품 혹은 모형으로 부착수단에 의하여 착탈되는 것 중에서 택일하거나 병용한다.In the above, the display means is an image of various structures and facilities of the foundation construction, formwork of concrete construction and concrete pouring, electrical and mechanical equipment construction and finishing process on the front, and the attachment means provided with a release paper or magic tape on the back The formed sticker, or any of the parts or models corresponding to the corresponding structure and equipment, or alternatively used or detached by the attachment means.

이때, 부착수단은 나사못, 테이프, 접착제, 점착제, 매직 테이프 중에서 택일 된다.
At this time, the attachment means is selected from a screw, a tape, an adhesive, an adhesive, a magic tape.

한편, 본 발명의 다른 특징은, 설계 도면에 따라 건설현장의 너비와 높이를 결정하기 위한 플레이트(10) 상에 건설현장의 너비와 높이를 확정하는 가이드프레임(20)을 체결수단(22)으로 설치하고, 설계 도면에 따라 기 작성된 건설 품질 관리 계획서의 검사/검측항목별 검사 결과값을 상기 건설품질 관리 계획서에 표시하는 모형 현장 개설 단계; 모형 현장이 개설된 후 터파기, 파일박기, 기초철근, 기초 콘크리트를 포함하는 기초공사용 표시수단을 상기 플레이트 상에 설치하고, 설계 도면에 따라 기 작성된 건설 품질 관리 계획서의 검사/검측항목별 검사결과값을 상기 건설품질 관리 계획서에 표시하는 기초공사단계; 기둥용 프레임을 플레이트 상에 체결수단으로 체결하고, 보용 프레임을 상기한 기둥용 프레임에 브라켓으로 설치하며, 거푸집 및 콘크리트 타설 과정 표시수단을 플레이트 상에 부착하고, 설계 도면에 따라 기 작성된 건설 품질 관리 계획서의 검사/검측항목별 검사결과값을 상기 건설품질 관리 계획서에 표시하는 구조물공사 단계; 전기와 기계 설비 공사 과정의 구조물 및 설비 표시수단들을 상기 플레이트 또는 플레이트와 기둥용 프레임, 보용 프레임 상의 해당위치에 부착하고, 설계 도면에 따라 기 작성된 건설 품질 관리 계획서의 검사/검측항목별 검사결과값을 상기 건설품질 관리 계획서에 표시하는 전기와 기계 설비 공사 단계; 마감공사 과정의 구조물 및 설비 표시수단들을 상기 플레이트 상에 부착하고, 설계 도면에 따라 기 작성된 건설 품질 관리 계획서의 검사/검측항목별 검사결과값을 상기 건설품질 관리 계획서에 표시하는 마감 공사 단계; 를 포함하는 것을 특징으로 하는 건설 품질 관리 교육 방법에 있다.On the other hand, another feature of the present invention, the fastening means 22 to the guide frame 20 to determine the width and height of the construction site on the plate 10 for determining the width and height of the construction site according to the design drawing A model site establishment step of installing and displaying an inspection result for each inspection / detection item of a construction quality management plan previously prepared according to a design drawing on the construction quality management plan; After the construction of the model site, the foundation engineering marking means including trench, pile pile, foundation reinforcement and foundation concrete was installed on the plate, and the inspection result by inspection / inspection item of the construction quality management plan prepared according to the design drawing. A basic construction step of displaying a value on the construction quality management plan; The pillar frame is fastened on the plate by fastening means, the beam frame is installed on the pillar frame as a bracket, the formwork and concrete placing process indicator is attached on the plate, and the construction quality management pre-made according to the design drawing. A structure construction step of displaying inspection result values for inspection / detection items of a plan in the construction quality management plan; The structure and equipment marking means of the electrical and mechanical equipment construction process are attached at the corresponding positions on the plate or plate and pillar frame and beam frame, and the inspection result by inspection / detection item of the construction quality control plan prepared according to the design drawing. Electrical and mechanical equipment construction step of displaying in the construction quality management plan; A finishing work step of attaching the structure and equipment display means of the finishing work on the plate and displaying the inspection result for each inspection / detection item of the construction quality control plan previously prepared according to the design drawing on the construction quality control plan; In the construction quality management education method comprising a.

상기에서 건설 품질 관리 계획서의 해당 항목 체크는, 피교육자가 출력된 인쇄물 상에 표시하는 것과, 입력수단과 표시수단과 메모리 수단 및 이들의 동작을 제어하는 제어부를 구비한 통상의 컴퓨터, 모바일 단말기를 포함한 학습용 단말기를 이용하여, 건설 품질 관리 계획서에 따른 검사/검측과정을 작성하고, 작성된 건설 품질 관리 계획서에 따른 검사/검측과정을 해당 체크 항목을 입력수단을 통해서 입력하는 것 중에서 택일할 수 있다.The check of the corresponding item of the construction quality management plan includes the normal computer and the mobile terminal, which are displayed on the printed material by the trainee, the input means, the display means, the memory means, and a control unit for controlling the operation thereof. By using the learning terminal, the inspection / detection process according to the construction quality management plan may be prepared, and the inspection / detection process according to the created construction quality management plan may be selected from inputting a check item through an input means.

그리고 상기 건설 품질 관리 계획서에 따른 검사/검측과정을 학습용 단말기를 이용하여 해당 체크 항목의 데이터가 입력되는 경우에는, 프로그램에 의하여 해당 단계별로 필수 입력 체크 항목의 데이터 입력이 완료되어야 다음 단계의 데이터를 입력할 수 있도록 입력메뉴의 활성화를 제어부에서 제어할 수도 있다.And if the data of the check item is input to the inspection / detection process according to the construction quality management plan using the learning terminal, the data of the next step must be completed after the data input of the required input check item is completed by the corresponding step by the program. The control of the activation of the input menu may be controlled to input.

상기한 바와 같은 구성을 갖는 본 발명에 의하면 건설 품질 관리 교육을 위한 통합된 장치를 제공하고, 효율적으로 교육시킴으로써, 건설 품질 관리의 효율을 향상시킬 수 있게 되는 것이다.According to the present invention having the configuration as described above it is possible to improve the efficiency of construction quality management by providing an integrated device for construction quality management education, and training efficiently.

도 1은 본 발명에 따른 현장개설용 자재를 나타내는 도면
도 2는 본 발명에 따른 철골구조 공사용 자재를 나타내는 도면
도 3은 본 발명에 따른 기초공사의 구조물용 표시수단을 나타내는 도면
도 4는 본 발명에 따른 구조물 콘크리트 공사용 구조물 및 자재용 표시수단을 나타내는 도면
도 5는 전기/기계설비공사용 자재용 표시수단을 나타내는 도면
도 6은 문 표시용 표시수단을 나타내는 도면
도 7은 건설 품질 관리 계획서를 나타내는 도면
도 8은 표시수단의 단면구조를 나타내는 도면
도 9a 및 도 9b는 본 발명의 기초공사의 현장개설 과정을 나타내는 도면
도 10은 본 발명의 기초공사 과정을 나타내는 도면
도 11은 본 발명의 구조물공사 과정을 나타내는 도면
도 12는 본 발명의 전기/기계설비공사 과정을 나타내는 도면
도 13은 본 발명의 마감공사 과정을 나타내는 도면
1 is a view showing a field opening material according to the present invention
2 is a view showing a steel frame construction material according to the present invention
3 is a view showing the display means for the structure of the foundation according to the invention
Figure 4 is a view showing a structure for concrete construction and material display means according to the invention
5 is a view showing the display means for the electrical / mechanical equipment construction materials
6 shows display means for displaying a door;
7 is a view showing a construction quality control plan
8 shows a cross-sectional structure of display means;
9a and 9b is a view showing the process of opening the foundation of the present invention
10 is a view showing the basic construction process of the present invention
11 is a view showing a structure construction process of the present invention
12 is a view showing the electrical / mechanical equipment construction process of the present invention
13 is a view showing the finishing process of the present invention

이하 본 발명의 실시 예를 첨부한 도면을 참조하여 설명한다.
Hereinafter, embodiments of the present invention will be described with reference to the accompanying drawings.

본 발명에 따른 건설 품질 관리 교육 장치는, 도 1에 나타내는 바와 같이 건설 현장의 너비와 높이를 결정하기 위한 플레이트(10), 체결수단(22)에 의하여 상기 플레이트(10)에 설치되어 결정된 건설현장의 너비와 높이를 확정하는 가이드프레임(20), 도 2에 나타내는 바와 같이 상기 플레이트(10) 상에 체결되는 기둥용 프레임(30), 상기 기둥용 프레임(30)에 브라켓(40)으로 체결되는 보용 프레임(50), 도 3에 나타내는 바와 같이 기초공사의 각종 구조물 표시를 위한 착탈가능한 표시수단, 도 4에 나타내는 바와 같이 구조물공사의 거푸집 및 철근배근, 콘크리트 타설을 포함한 각종 구조물 표시를 위한 착탈 가능한 표시수단, 도 5a 및 도 5b에 나타내는 바와 같이 전기와 기계설비 공사 과정의 구조물 및 설비의 표시를 위한 착탈 가능한 표시수단, 도 6에 나타내는 바와 같이 마감공사 과정의 각종 구조물 및 설비의 표시를 위한 착탈가능한 표시수단 및, 도 7에 나타내는 건설 품질 관리 계획서에 따른 검사/검측과정(60)을 포함하여 구성된다.Construction quality management training apparatus according to the present invention, as shown in Figure 1, the construction site installed and determined on the plate 10 by the plate 10, fastening means 22 for determining the width and height of the construction site Guide frame 20 to determine the width and height of the pillar frame 30 is fastened on the plate 10, as shown in Figure 2, the pillar frame 30 is fastened with a bracket 40 Removable display means for the display of the various structures of the basic construction, as shown in Fig. 3, the removable frame 50, the removable for the display of various structures, including formwork and reinforcement, concrete pouring Display means, as shown in Figs. 5A and 5B, detachable display means for displaying structures and equipment in the process of electric and mechanical equipment construction, as shown in Fig. 6 It is configured to include a detachable display means for displaying the various structures and equipment of the finishing work process, and the inspection / detection process 60 according to the construction quality management plan shown in FIG.

상기에서 표시수단은 도 8에 나타내는 바와 같이 전면에 기초공사, 구조물공사의 거푸집 및 콘크리트 타설, 전기와 기계설비 공사 및 마감공사 과정의 각종 구조물 및 설비의 이미지(S1)가 도시되어 있고, 후면에 이형지(S2)가 부착된 점착층(S3)으로 구성된 부착수단 혹은 부착수단으로 매직 테이프가 구비된 스티커이거나, 해당 구조물 및 설비와 대응되는 임의의 부품 혹은 모형으로 부착수단에 의하여 착탈되는 것 중에서 택일하거나 병용할 수 있다.In the above display means, as shown in FIG. 8, an image (S1) of various structures and facilities of a foundation work, formwork of concrete work and concrete pouring, electricity and mechanical work, and finishing work is shown on the front surface, The attachment means or attachment means consisting of the adhesive layer (S3) to which the release paper (S2) is attached, or a sticker provided with a magic tape, or any component or model corresponding to the structure and equipment may be detached by an attachment means. Or can be used in combination.

그리고 부착수단은 나사못, 테이프, 접착제, 점착제, 매직 테이프 중에서 택일된다.
The attachment means is selected from among screws, tapes, adhesives, adhesives, magic tapes.

상기한 교육 장치를 이용한 교육 방법을 하기에서 살펴본다.
An education method using the above-described education apparatus will be described below.

I단계: 현장개설 및 기초공사Phase I: Site Opening and Foundation Construction

1. 팀조직1. Team organization

실습조를 편성하고, 현장건설조직도를 작성하며, 담당별 업무분장을 한다.
Organize a training group, draw up a site construction organization chart, and assign work duties for each department in charge.

2. 현장개설2. Site establishment

해당 업무별 준비사항을 체크하고, 현장을 개설하는데 현장 개설 과정을 하기에서 살펴본다.Check the preparation for each task, and look at the process of opening the site.

1) 현장도면을 가지고 현장모형을 제작한다.1) Make a site model with site drawings.

이때, 필요한 도구는 건설현장의 너비와 높이를 결정하기 위한 플레이트, 설정된 건설현장의 너비와 높이를 확정하기 위한 가이드프레임 및 가이드프레임을 체결하기 위한 체결수단(나사)으로 구성되는데, 그 예로는 도 9에 나타내는 바와 같이 플레이트(10)인 합판 2개, 가이드프레임(20) 4개, 체결수단(30)을 이용하여 현장 모형을 제작한다.
At this time, the necessary tool is composed of a plate for determining the width and height of the construction site, a guide frame for determining the width and height of the set construction site and a fastening means (screw) for fastening the guide frame, for example, As shown in Fig. 9, a field model is produced using two plywood plates, four guide frames 20 and fastening means 30.

2) 제작된 현장모형 앞면에 토공사를 하는데, 이를 위하여 토공사를 표시하는 토공사 표시수단(101)을 현장 모형 앞면에 부착수단을 이용하여 부착하는데, 상기 토공사 표시수단은 현장모형의 플레이트 사이즈에 맞는 시트지(본 발명의 실시예에서는 녹색시트지)(12)를 사용하여 시트지 이면의 점착제를 부착수단으로 하여 부착한다. 이외에도 부착수단으로는 셀로판 테이프, 풀, 매직 테이프 등 공지의 것을 사용할 수 있다.
2) The earthwork is carried out on the front of the manufactured site model. For this purpose, the earthwork display means 101 for displaying the earthwork is attached to the front surface of the site model by means of attachment means. (In the embodiment of the present invention, green sheet paper) 12 is used to attach the pressure-sensitive adhesive on the back of the sheet paper as an attachment means. In addition, as an attachment means, a well-known thing, such as a cellophane tape, a pull, a magic tape, can be used.

3) 이러한 토공사를 마무리한 후 측량을 실시하여 현장 모형이 정해진 사이즈대로 개설되었는지 확인한다. 이를 위하여 현장 모형에는 측정 기준점을 설정한다.
3) After finishing the earthworks, surveying is carried out to confirm that the site model is opened to the specified size. To do this, a measurement reference point is set in the field model.

3. 기초공사3. Foundation construction

상기한 바와 같이 정확한 사이즈로 현장이 개설되면 도 10에 나타내는 바와 같이 기초공사를 하게 되는데, 이러한 기초공사는 터파기를 한 후 파일 박기를 하고 이후에 기초철근과 기초 콘크리트를 하여 되메우기를 하는 것으로, 상기 기초터파기, 파일박기, 기초철근, 기초콘크리트는 각각을 표시하는 표시수단(도 3 참조)을 부착수단으로서 부착하고, 되메우기는 생략하는데 상기한 부착수단은 전면에 기초터파기, 파일박기, 기초철근, 기초콘크리트를 표시하는 이미지가 표시되고 이를 시트지상에 풀을 포함한 부착수단으로 부착한 것이다.When the site is opened in the correct size as described above, as shown in FIG. 10, the foundation work is carried out, and such foundation work is carried out after digging and pile pile and then backfilled with the foundation reinforcement and the concrete. The foundation trench, pile drilling, foundation reinforcement, and foundation concrete attach display means (refer to FIG. 3) indicating each, as an attachment means, and the backfill is omitted, and the attachment means includes the foundation trench, pile insertion, foundation The image showing the reinforcement, the foundation concrete is displayed and attached to the sheet by the attachment means including the glue.

도 3에서 미설명부호 141은 기초 터파기용 표시수단이고, 142는 파일박기용 표시수단, 143은 기초철근용 표시수단, 144는 기초콘크리트용 표시수단, 145는 기초 거푸집용 표시수단이다.
In FIG. 3, reference numeral 141 denotes display means for basic burrow, 142 denotes display means for pile insertion, 143 denotes display means for basic reinforcing bars, 144 denotes display means for basic concrete, and 145 denotes display means for basic formwork.

4. 품질관리계획서의 계획/실행/체크4. Planning / Execution / Check of Quality Management Plan

상기한 바와 같이 기초공사 수행하는 과정에서 작성된 품질관리계획서에 따른 검사/검측과정을 각 공사 과정마다 품질관리를 체크하게 된다.
As described above, the quality control is checked for each construction process during the inspection / detection process according to the quality control plan created during the foundation construction.

IIII 단계; 구조물공사(철골 및 콘크리트 공사) step; Structure construction (steel and concrete construction)

1. 철골공사1. Steel Structure Construction

철골공사는 통상, 철골구조물발주, 철골조립(기둥), 철골조립(바닥), 철골검측의 순으로 이루어지며, 이러한 철골공사 진행을 모형화하기 위하여 구조물의 철골모양에 따른 기둥용 프레임과 보용 프레임을 다수개 준비하여, 해당 기둥용 프레임(30)을 구조물의 철골모양에 맞도록 도면을 참조하여 플레이트(10) 상에 체결수단으로 배치하고, 상기 기둥용 프레임(30)에 보용 프레임(50)을 브라켓(40)으로 연결하는데, 상기 철골을 위한 기둥 및 보용 프레임은 플레이트에 제 1브라켓(42)을 이용하여 소정간격 상부로 이격시켜 고정한다.
Steel frame construction usually consists of order of steel structure, steel frame assembly (column), steel frame assembly (bottom), and steel frame inspection.In order to model the progress of steel frame construction, the pillar frame and the supporting frame according to the steel frame shape of the structure By preparing a plurality, the pillar frame 30 is arranged as a fastening means on the plate 10 with reference to the drawings so as to fit the steel frame of the structure, and the beam frame 50 to the pillar frame 30 Connected to the bracket 40, the pillar and the support frame for the steel frame is fixed to the plate by using a first bracket 42 spaced apart by a predetermined interval.

2. 콘크리트공사2. Concrete construction

콘크리트 공사는 철근구매, 거푸집제작, 철근배근, 콘크리트 타설의 순으로 이루어지는데, 이를 위하여 도 11에 나타내는 바와 같이 철근배근 표시용 표시수단(102)인 금속와이어와, 철근 연결부를 표시하기 위한 연결표시수단(103), 거푸집제작 및 콘크리트 타설을 표시하기 위한 각각의 접착가능한 표시수단(104)(105)을 구비한다. 상기에서 거푸집제작 및 콘크리트 타설용 표시수단은 넓이가 다른 접착테이프를 각각 사용하고, 연결표시수단은 나사못을 사용한다.Concrete construction consists of reinforcing bar purchase, formwork, reinforcement, and concrete placement. For this purpose, as shown in FIG. 11, the metal wire, which is the display unit 102 for displaying the reinforcing bar, and a connection display for displaying the reinforcing bar connection part. Means 103, each of the adhesive means 104, 105 for marking formwork and concrete pouring. In the above, the display means for manufacturing formwork and concrete pouring use adhesive tapes having different widths, and the connecting display means uses screws.

이와 같이 재료가 준비되면 우선 거푸집용 표시수단을 해당 위치에 부착한 후 철근배근 표시용 표시수단인 금속와이어를 거푸집용 표시수단 상에 배치시키면서 철근 연결부에 연결표시수단인 나사못을 체결하고, 거푸집용 표시수단 상에 콘크리트 타설용 표시수단을 부착하고, 이러한 과정을 수행함에 있어서 품질관리계획서에 따른 검사/검측과정을 체크한다.
In this way, when the material is prepared, first attach the formwork display means to the corresponding position, and then fasten the screw, which is the connecting display means to the reinforcing connector, by placing the metal wire, which is the display means for the reinforcement display, on the formwork display means. Attach the marking means for placing concrete on the marking means and check the inspection / detection process according to the quality control plan in performing this process.

IIIIII . 전기/기계 설비 공사. Electrical / mechanical equipment construction

1. 전기설비공사1. Electric installation

전기 설비 공사는 도 12에 나타내는 바와 같이 상기한 보용 프레임(50)의 하부에 전력트레이 표시용 표시수단(107)인 30mm몰딩재를 플레이트(10)에 접착하되, 전력트레이 표시용 표시수단인 30mm몰딩재를 절단하여 인출위치가 유지되도록 하며, 전력선 표시용 표시수단(108)인 전선을 상기 전력트레이 표시용 표시수단인 30mm몰딩재 상에 배선하고 고정하며, 상기 전력선 표시용 표시수단인 전선의 일측단은 건설물의 내부와 대응되는 위치에 노출시키고 전선의 타단은 변압기용 표시수단(109)에 연결되도록 위치시킨다.As shown in FIG. 12, the electric installation is bonded to the plate 10 with a 30 mm molding material, which is the display means 107 for displaying the power tray, on the lower portion of the walkway frame 50, and 30 mm, which is the display means for displaying the power tray. Cutting the molding material so that the drawing position is maintained, and wires and fixes the electric wire which is the display means for power line display 108 on the 30 mm molding material which is the display means for displaying the power tray, and One end is exposed to a position corresponding to the interior of the construction and the other end of the wire is positioned to be connected to the display means 109 for the transformer.

그리고 상기한 기둥 및 보용 프레임의 상부에 조명을 위한 전력선 표시수단(미도시)인 전선을 배치한다.
In addition, a wire that is a power line display means (not shown) for lighting is disposed on the pillar and the support frame.

2. 기계설비공사2. Mechanical Equipment Construction

콘크리트 타설용 표시수단의 윗부분에 기계설비 표시용 표시수단(111)인 20mm몰딩재를 이용하여 플레이트에 접착하는데 기계설비 표시용 표시수단인 20mm몰딩재는 절단하고 인출위치가 유지되도록 하며, 상기 기계설비 표시용 표시수단인 20mm몰딩재 위에 공조배관 표시용 표시수단(112)인 호스를 설치 고정하는데, 이 과정에서 공조배관 표시용 표시수단(112)인 호스를 연결관용 표시수단(113)으로 연결하고, 공조배관 표시용 표시수단인 호스의 일측 종단은 공조기용 표시수단(114)과 연결되도록 배치한다.
The 20 mm molding material, which is a display means for displaying mechanical equipment, is cut and maintained in a withdrawal position to be adhered to a plate using a 20 mm molding material, which is a display means 111 for displaying mechanical equipment, on the upper portion of the display means for placing concrete. On the 20mm molding material which is a display means for display, the hose which is the display means 112 for the air conditioning pipe display is installed and fixed. In this process, the hose which is the display means 112 for the air conditioning pipe display is connected to the display means 113 for the connection pipe. One end of the hose, which is a display means for displaying the air conditioning pipe, is arranged to be connected to the display means 114 for the air conditioner.

이러한 모든 과정은 품질관리계획서에 따른 검사/검측과정을 따라 계획/실행/체크된다.
All these processes are planned / implemented / checked according to the inspection / detection process according to the quality control plan.

IVIV ; 마감공사 및 제품인도; Finishing work and product delivery

1. 마감공사1. Finishing work

도 13에 나타내는 바와 같이 마감을 위하여 플레이트 상에 문위치를 결정하여 문용 표시수단(121)을 플레이트에 나사로 고정하고, 각종 기계 및 전기 기구용 표시수단(131)(132)(133)(134)을 설치하고, 조명용 전력선의 표시수단인 전선의 종단에 조명용 표시수단인 꼬마 전구를 설치한다.
As shown in Fig. 13, the door position is determined on the plate for finishing, and the door display means 121 is fixed to the plate by screws, and the display means 131, 132, 133, 134 for various mechanical and electrical appliances. And installs a small light bulb, which is a display means for lighting, at the end of the wire that is a display means of the lighting power line.

2. 외장공사2. Exterior construction

외장 공사는 생략한다.
Exterior construction is omitted.

3. 인도준비3. Preparation for delivery

이러한 과정을 품질관리계획서에 따라 검사/검측과정을 계획/실행/체크 한다.
This process is planned / implemented / checked according to the quality control plan.

한편, 상기한 건설 품질 관리 교육 방법의 건설 품질 관리 계획서의 해당 항목 체크는 피교육자가 출력된 인쇄물 상에 표시할 수도 있고, 입력수단과 표시수단 과 메모리 수단 및 이들의 동작을 제어하는 제어부를 구비한 통상의 컴퓨터, 모바일 단말기를 포함한 학습용 단말기를 이용하여, 건설 품질 관리 계획서를 작성하고, 작성된 건설 품질 관리 계획서의 해당 체크 항목을 입력수단을 통해서 입력할 수도 있으며, 프로그램에 따라 해당 단계별로 반드시 입력되어야 할 체크 항목의 데이터 입력이 완료되어야 다음 단계의 데이터를 입력할 수 있도록 입력메뉴의 활성화를 제어부에서 제어할 수도 있다.Meanwhile, the corresponding item check of the construction quality management plan of the construction quality management education method may be displayed on the printed output by the trainee, and may include an input means, a display means, a memory means, and a control unit for controlling the operation thereof. Using a learning terminal including a normal computer and a mobile terminal, a construction quality control plan may be prepared, and a corresponding check item of the completed construction quality control plan may be input through an input means, and must be entered at each step according to the program. The controller may control the activation of the input menu to input data of a next step only after data input of a check item to be completed is completed.

10: 플레이트 20: 가이드프레임
30: 기둥용 프레임 40: 브라켓
50: 보용 프레임 60: 건설 품질 관리 계획서
10: plate 20: guide frame
30: frame for pillar 40: bracket
50: beam frame 60: construction quality control plan

Claims (6)

건설현장의 너비와 높이를 결정하기 위한 플레이트(10),
체결수단(22)에 의하여 상기 플레이트(10)에 설치되어 결정된 건설현장의 너비와 높이를 확정하는 가이드프레임(20),
상기 플레이트(10) 상에 체결되는 기둥용 프레임(30),
상기 기둥용 프레임(30)에 브라켓(40)으로 체결되는 보용 프레임(50),
기초공사, 구조물공사의 거푸집 및 콘크리트 타설, 전기와 기계설비 공사 및 마감공사 과정의 구조물 및 설비의 표시를 위한 착탈가능한 표시수단 및,
건설 품질 관리 계획서(60)를 포함하여 구성되는 것을 특징으로 하는 건설 품질 관리 교육 장치.
Plate 10 for determining the width and height of the construction site,
Guide frame 20 to determine the width and height of the construction site determined by the fastening means 22 installed on the plate 10,
Frame 30 for fastening on the plate 10,
Bow frame 50 is fastened to the bracket frame 30 to the pillar frame 30,
Detachable marking means for marking structures and facilities in foundation work, formwork for concrete works, concrete pouring, electrical and mechanical equipment construction and finishing,
Construction quality management training device comprising a construction quality management plan (60).
제 1항에 있어서, 상기 표시수단은 전면에 기초공사, 구조물공사의 거푸집 및 콘크리트 타설, 전기와 기계설비 공사 및 마감공사 과정의 구조물 및 설비의 이미지가 도시되어 있고, 후면에 이형지 혹은 매직 테이프가 구비된 부착수단이 형성된 스티커이거나, 해당 구조물 및 설비와 대응되는 임의의 부품 혹은 모형으로 부착수단에 의하여 착탈되는 것 중에서 택일하거나 병용하는 것을 특징으로 하는 건설 품질 관리 교육 장치.According to claim 1, The display means is shown in the front of the foundation work, the formwork of the construction work and concrete casting, the image of the structure and equipment of the electrical and mechanical equipment construction and finishing process, and the release paper or magic tape on the back Construction quality management education device, characterized in that the sticker provided with the attachment means is provided, or any of the parts or models corresponding to the structure and equipment to be attached or detached by the attachment means. 제 1항에 있어서, 상기 부착수단은 나사못, 테이프, 접착제, 점착제, 매직 테이프 중에서 택일되는 것을 특징으로 하는 건설 품질 관리 교육 장치.The construction quality control training apparatus according to claim 1, wherein the attachment means is selected from a screw, a tape, an adhesive, an adhesive, a magic tape. 설계 도면에 따라 건설현장의 너비와 높이를 결정하기 위한 플레이트(10) 상에 건설현장의 너비와 높이를 확정하는 가이드프레임(20)을 체결수단(22)으로 설치하고, 설계 도면에 따라 기 작성된 건설 품질 관리 계획서의 검사/검측항목별 검사 결과값을 상기 건설품질 관리 계획서에 표시하는 모형 현장 개설 단계;
모형 현장이 개설된 후 터파기, 파일박기, 기초철근, 기초 콘크리트를 포함하는 기초공사용 표시수단을 상기 플레이트 상에 설치하고, 설계 도면에 따라 기 작성된 건설 품질 관리 계획서의 검사/검측항목별 검사결과값을 상기 건설품질 관리 계획서에 표시하는 기초공사단계;
기둥용 프레임을 플레이트 상에 체결수단으로 체결하고, 보용 프레임을 상기한 기둥용 프레임에 브라켓으로 설치하며, 거푸집 및 콘크리트 타설 과정 표시수단을 플레이트 상에 부착하고, 설계 도면에 따라 기 작성된 건설 품질 관리 계획서의 검사/검측항목별 검사결과값을 상기 건설품질 관리 계획서에 표시하는 구조물공사 단계;
전기와 기계 설비 공사 과정의 구조물 및 설비 표시수단들을 상기 플레이트 또는 플레이트와 기둥용 프레임, 보용 프레임 상의 해당위치에 부착하고, 설계 도면에 따라 기 작성된 건설 품질 관리 계획서의 검사/검측항목별 검사결과값을 상기 건설품질 관리 계획서에 표시하는 전기와 기계 설비 공사 단계;
마감공사 과정의 구조물 및 설비 표시수단들을 상기 플레이트 상에 부착하고, 설계 도면에 따라 기 작성된 건설 품질 관리 계획서의 검사/검측항목별 검사결과값을 상기 건설품질 관리 계획서에 표시하는 마감 공사 단계; 를 포함하는 것을 특징으로 하는 건설 품질 관리 교육 방법.
On the plate 10 for determining the width and height of the construction site according to the design drawing, a guide frame 20 for determining the width and height of the construction site is installed as the fastening means 22, and prepared according to the design drawing. A model site establishment step of displaying inspection result values for inspection / detection items of a construction quality management plan in the construction quality management plan;
After the construction of the model site, the foundation engineering marking means including trench, pile pile, foundation reinforcement and foundation concrete was installed on the plate, and the inspection result by inspection / inspection item of the construction quality management plan prepared according to the design drawing. A basic construction step of displaying a value on the construction quality management plan;
The pillar frame is fastened on the plate by fastening means, the beam frame is installed on the pillar frame as a bracket, the formwork and concrete placing process indicator is attached on the plate, and the construction quality management pre-made according to the design drawing. A structure construction step of displaying inspection result values for inspection / detection items of a plan in the construction quality management plan;
The structure and equipment marking means of the electrical and mechanical equipment construction process are attached at the corresponding positions on the plate or plate and pillar frame and beam frame, and the inspection result by inspection / detection item of the construction quality control plan prepared according to the design drawing. Electrical and mechanical equipment construction step of displaying in the construction quality management plan;
A finishing work step of attaching the structure and equipment display means of the finishing work on the plate and displaying the inspection result for each inspection / detection item of the construction quality control plan previously prepared according to the design drawing on the construction quality control plan; Construction quality management training method comprising a.
제 4항에 있어서, 상기 건설 품질 관리 계획서의 비교결과 표시는,
입력수단과 표시수단과 메모리 수단 및 이들의 동작을 제어하는 제어부를 구비한 통상의 컴퓨터, 모바일 단말기를 포함한 학습용 단말기를 이용하여 수행되고, 입력수단으로 입력된 비교결과가 표시수단에 표시된 건설 품질 관리 계획서의 해당 체크 항목에 표시되는 것을 특징으로 하는 건설 품질 관리 교육 방법.
The comparison result display of the construction quality control plan according to claim 4,
Construction quality management performed by using a learning terminal including a computer, a mobile terminal, and a general computer having an input means, a display means, a memory means, and a control unit controlling the operation thereof, and the comparison result inputted by the input means is displayed on the display means. Construction quality management training method characterized in that displayed in the corresponding check item of the plan.
제 5항에 있어서, 상기 건설 품질 관리 계획서를 학습용 단말기를 이용하여 해당 체크 항목의 데이터가 입력되는 경우에는, 프로그램에 의하여 해당 단계별로 필수 입력 체크 항목의 데이터 입력이 완료되어야 다음 단계의 데이터를 입력할 수 있도록 입력메뉴의 활성화를 제어부에서 제어하는 것을 특징으로 하는 건설 품질 관리 교육 방법.According to claim 5, When the data of the check item is input by using the learning terminal for the construction quality management plan, the data input of the required input check item is completed in the corresponding step by the program to enter the data of the next step A control method for construction quality control, characterized in that the control of the activation of the input menu to enable.
KR1020120041740A 2012-04-20 2012-04-20 education instruments and method of construction quality management KR101354282B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120041740A KR101354282B1 (en) 2012-04-20 2012-04-20 education instruments and method of construction quality management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120041740A KR101354282B1 (en) 2012-04-20 2012-04-20 education instruments and method of construction quality management

Publications (2)

Publication Number Publication Date
KR20130118665A KR20130118665A (en) 2013-10-30
KR101354282B1 true KR101354282B1 (en) 2014-01-23

Family

ID=49636907

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120041740A KR101354282B1 (en) 2012-04-20 2012-04-20 education instruments and method of construction quality management

Country Status (1)

Country Link
KR (1) KR101354282B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102565424B1 (en) * 2022-12-29 2023-08-08 현대건설(주) Safety training system and method for augmented reality-based construction equipment

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000003894A (en) * 1998-06-29 2000-01-25 전주범 Panel position controller
KR100873650B1 (en) 2008-06-04 2008-12-11 최창기 Automatic newspaper dispenser
KR100970271B1 (en) 2009-11-25 2010-07-16 광주광역시 남구 Vertical bulletin board for placard

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000003894A (en) * 1998-06-29 2000-01-25 전주범 Panel position controller
KR100873650B1 (en) 2008-06-04 2008-12-11 최창기 Automatic newspaper dispenser
KR100970271B1 (en) 2009-11-25 2010-07-16 광주광역시 남구 Vertical bulletin board for placard

Also Published As

Publication number Publication date
KR20130118665A (en) 2013-10-30

Similar Documents

Publication Publication Date Title
Zhang et al. BIM-based fall hazard identification and prevention in construction safety planning
JP5681581B2 (en) Concrete floor slab finish height management method
KR101354282B1 (en) education instruments and method of construction quality management
JP2018526656A (en) Mounting system and method for mapping building components
JP6420734B2 (en) Road auxiliary equipment construction method and moving direction instruction program
US20170284112A1 (en) Method for Constructing Structure Framework with Graduated Tracks and Studs
JP2002266498A (en) Construction planning device of power plant
US10214924B1 (en) Method of using a panel framing device to build panels for use in house construction
KR102297794B1 (en) Construction status management device
JP3231853U (en) Building material allocation tool
JP2006208981A (en) Display implement
Tezel et al. Visual controls at the workface of road construction and maintenance: Preliminary report
JP2006016753A (en) Method and device for indicating construction position of constructed object
JP2012242981A (en) Plant construction process generation support system, plant construction process generation support method, and program
CN206709835U (en) A kind of construction engineering cost field surveys device
EP3547173A1 (en) Construction management system and method
JP5272500B2 (en) Device for determining the possibility of damage to the fixing bracket, device for creating a mounting plan for the fixing bracket, a method for determining the possibility of damage to the fixing bracket, and a method for preparing the mounting plan for the fixing bracket
EP4145089A1 (en) Tilt analysis method, tilt analysis program, and tilt analysis device
EP2600333A3 (en) Construction site information device
JP7289175B1 (en) architectural system
CN110777634B (en) Construction method for pre-embedded section of arch rib of steel pipe arch bridge
Tezel et al. Visual controls at the workface of road construction and maintenance
Dhalaik et al. Estimation and Design of Formwork and Scaffold for G plus 4 Building
CN207620401U (en) A kind of steel construction buried plate installation instrument
JP3449709B1 (en) Display method and program of steel support erection inspection result

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20171102

Year of fee payment: 5

LAPS Lapse due to unpaid annual fee