KR101346671B1 - The pin connection structure using the spacer in the junction of pc beam and vertical member - Google Patents

The pin connection structure using the spacer in the junction of pc beam and vertical member Download PDF

Info

Publication number
KR101346671B1
KR101346671B1 KR1020120138735A KR20120138735A KR101346671B1 KR 101346671 B1 KR101346671 B1 KR 101346671B1 KR 1020120138735 A KR1020120138735 A KR 1020120138735A KR 20120138735 A KR20120138735 A KR 20120138735A KR 101346671 B1 KR101346671 B1 KR 101346671B1
Authority
KR
South Korea
Prior art keywords
spacer
concrete
pillar
plate
pin joint
Prior art date
Application number
KR1020120138735A
Other languages
Korean (ko)
Inventor
홍원기
김선국
박선치
손기영
Original Assignee
(주)케이에이치하우징솔루션스
경희대학교 산학협력단
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)케이에이치하우징솔루션스, 경희대학교 산학협력단 filed Critical (주)케이에이치하우징솔루션스
Priority to KR1020120138735A priority Critical patent/KR101346671B1/en
Application granted granted Critical
Publication of KR101346671B1 publication Critical patent/KR101346671B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/185Connections not covered by E04B1/21 and E04B1/2403, e.g. connections between structural parts of different material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/30Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts being composed of two or more materials; Composite steel and concrete constructions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/388Separate connecting elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/17Floor structures partly formed in situ
    • E04B5/23Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2415Brackets, gussets, joining plates

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The present invention relates to a pin joint structure between a PC beam and a vertical member using a spacer to improve constructability and economic efficiency as a steel frame usage decreases by using a PC beam and a PC column instead of using a rigid joint method for filling a joint between a beam and a vertical member with concrete in a building in which a core wall bears the entire horizontal load; and as a PC beam and a vertical member (PC column and core wall) are joined to each other by a pin at a distance using a spacer without being filled with concrete.

Description

간격재를 이용한 PC보와 수직부재의 접합부 핀접합 구조{The pin connection structure using the spacer in the junction of PC beam and Vertical member}The pin connection structure using the spacer in the junction of PC beam and Vertical member}

본 발명은 코어벽체가 수평하중을 전부 부담하는 건물에서 보와 수직부재의 접합부에 불필요하게 충진되어 강접합(rigid joint)되던 공법에서 벗어나, PC보 및 PC기둥을 사용하여 철골의 사용량을 줄이고 PC보와 수직부재(PC기둥, 코어벽체)의 접합부가 간격재를 사용하여 충진되지 않고 이격되어 소위 핀접합(pin connection)으로 거동하므로 시공성과 경제성이 향상된 간격재를 이용한 PC보와 수직부재의 접합부 핀접합 구조에 관한 것이다.
In the present invention, the core wall is completely filled with the horizontal load, and is unnecessarily filled in the joints of the beams and the vertical members so that the rigid joints are removed. Joint between beam and vertical member (PC column, core wall) is spaced without filling with spacer and behaves as a pin connection, so the connection between PC beam and vertical member using spacer with improved construction and economy It relates to a pin junction structure.

도 1은 코어벽체가 적용되는 일반적인 건물의 시공과정 및 본 발명이 적용된 건물의 시공과정을 도시한 것이다.1 illustrates a construction process of a general building to which a core wall is applied, and a construction process of a building to which the present invention is applied.

도 1에 도시된 바와 같이, 코어벽체가 적용되는 건물은 중앙의 코어벽체(CW)가 선시공되고 뒤를 이어서 기둥 및 보를 시공하고 슬래브는 기둥과 보의 접합부를 슬래브콘크리트(300)로 충진하며 함께 시공된다.As shown in Figure 1, the core wall is applied to the building is the core core wall (CW) is pre-constructed, followed by the pillar and beam construction, the slab is filled with the slab concrete 300 to join the column and beam construction together do.

상기 코어벽체가 적용되는 건물은 코어벽체(CW)가 수직하중을 부담하는 동시에 수평하중을 전부 부담한다. 따라서 상기 기둥 및 보는 수평하중을 부담할 필요가 없다. In the building to which the core wall is applied, the core wall CW bears vertical loads and all horizontal loads. Thus, there is no need to bear the horizontal load of the column and beam.

그리고 상기 코어벽체가 적용되는 건물은 주로 기둥과 보가 철골로 시공되게 되는 데, 현재 상기 철골의 경우 원자재 가격의 상승으로 철근 콘크리트 건물보다 공사비가 상승 하는 문제점이 있다.In addition, the building to which the core wall is applied is mainly constructed of columns and beams in steel frame, and in the case of the steel frame, there is a problem in that construction cost is higher than that of reinforced concrete buildings due to an increase in raw material prices.

따라서, PC보 및 PC기둥을 사용하여 철골의 사용량을 줄이고 PC보와 수직부재(PC기둥, 코어벽체)의 접합부는 간격재로 인하여 콘크리트가 충진되지 않아 핀접합(pin connection)으로 거동하므로 부재의 크기를 줄이고 시공성과 경제성이 향상된 PC보와 수직부재의 접합부 무충진 구조에 관한 연구가 시급한 실정이다.
Therefore, the use of PC beams and PC pillars reduces the amount of steel, and the connection between the PC beams and the vertical members (PC pillars, core walls) is not filled with concrete due to the spacers and therefore acts as a pin connection. There is an urgent need to study the joint-free structure of PC beams and vertical members with reduced size and improved construction and economy.

본 발명은 상기한 바와 같은 종래의 제반 문제점을 해소하기 위해서 제시되는 것이다. 그 목적은 다음과 같다.SUMMARY OF THE INVENTION The present invention has been made in order to solve the above-mentioned problems of the related art. The purpose is as follows.

첫째, 양단부에만 철골브래킷이 구성된 PC보 및 PC기둥을 사용하여 철골의 사용량과 양중무게를 줄여 경제성 및 시공성이 향상된 간격재를 이용한 PC보와 수직부재의 접합부 핀접합 구조를 제공하고자 한다. First, the use of PC beams and PC columns composed of steel brackets at both ends reduces the amount of use and weight of steel, thereby providing a pin joint structure of the joints of the PC beams and vertical members using spacers with improved economic efficiency and constructability.

둘째, 간격재를 사용하여 PC보와 수직부재(PC기둥, 코어벽체)의 접합부가 불필요하게 충진되지 않고 이격되어 핀접합(pin connection)으로 거동하므로 시공성과 경제성이 향상된 간격재를 이용한 PC보와 수직부재의 접합부 핀접합 구조를 제공하고자 한다.
Secondly, the space between the PC beam and the vertical member (PC column, core wall) is separated by the spacer and behaves as a pin connection without space. It is intended to provide a joint pin joint structure of a vertical member.

상기한 기술적 과제를 해결하기 위해 본 발명은 수직하중과 수평하중을 부담하는 코어벽체(CW)가 시공되는 건물에서,In order to solve the above technical problem, the present invention provides a building in which a core wall (CW) is constructed that bears a vertical load and a horizontal load.

수직으로 설치되는 PC기둥(100); 스터드볼트(SB)를 사용하여 상기 PC기둥(100)의 외면에 일체로써 설치되는 플레이트(520) 및 상기 플레이트(520)에 설치된 브래킷(580)을 포함하여 구성되는 엠베드플레이트(500); 수평으로 설치되는 양단부의 보단부철골(220)과 상기 보단부철골(220) 상부 및 하부에 각각 설치되는 상부주근(240) 및 하부주근 그리고 상기 보단부철골(220)의 끝단을 노출시키고 상기 하부주근을 포함하여 타설양생되는 보하부콘크리트(260)를 포함하여 구성되어 상기 브래킷(580)에 보단부철골(220)이 결합되는 PC보(200); 및, 상기 PC보(200) 위에 타설되는 슬래브콘크리트(300);를 포함하여 구성되되,PC pillar 100 is installed vertically; An m bed plate 500 including a plate 520 integrally installed on an outer surface of the PC pillar 100 and a bracket 580 installed on the plate 520 using a stud bolt SB; The upper end 240 and the lower main root and the lower end of the upper end 240 and the lower end of the upper end of the lower end steel frame 220 are respectively installed horizontally and the lower end of the lower end steel frame 220 PC beam 200 is configured to include the lower portion of the lower body concrete 260, including the main root, the lower end steel frame 220 is coupled to the bracket 580; And, Slab concrete 300 is poured onto the PC beam 200; configured to include,

상기 코어벽체(CW)가 건물에 작용하는 모든 수평하중을 부담하고 상기 PC기둥(100)은 수직하중만 부담하며,The core wall (CW) bears all the horizontal loads acting on the building and the PC pillar 100 bears only the vertical loads,

상기 보하부콘크리트(260)의 단부와 PC기둥(100) 사이에는 간격재(600)가 설치되어, 상기 슬래브콘크리트(300) 타설시 상기 보하부콘크리트(260)와 PC기둥(100) 사이에는 상기 간격재(600) 두께 만큼 상기 슬래브콘크리트(300)가 타설되지 않고 유격을 가지므로, The spacer 600 is installed between the end of the lower concrete 260 and the PC pillar 100, and the lower concrete between the lower concrete 260 and the PC pillar 100 when the slab concrete 300 is placed. Since the slab concrete 300 has a play without pouring as much as the thickness of the spacer 600,

상기 PC기둥(100)과 상기 PC보(200)의 결합부위는 상기 간격재(600)에 의해 상기 슬래브콘크리트(300)가 충진되지 않아 핀접합(pin joint)되는 특징으로 하는 간격재를 이용한 PC보와 수직부재의 접합부 핀접합 구조를 제공한다.
Combined portion of the PC pillar 100 and the PC beam 200 is not filled with the slab concrete 300 by the spacer 600, the PC using a spacer characterized in that the pin joint (pin joint) It provides a joint pin joint structure of the beam and the vertical member.

본 발명에 따르면 다음과 같은 효과가 기대된다.According to the present invention, the following effects are expected.

첫째, 양단부에만 철골브래킷이 구성된 PC보 및 PC기둥을 사용하여 철골의 사용량과 양중무게를 줄여 경제성 및 시공성이 향상된 간격재를 이용한 PC보와 수직부재의 접합부 핀접합 구조를 제공한다. First, by using the PC beam and PC pillar composed of steel brackets only at both ends, to reduce the amount of use and weight of the steel frame to provide a pin joint structure of the junction portion of the PC beam and the vertical member using spacers with improved economic efficiency and workability.

둘째, 간격재를 사용하여 PC보와 수직부재(PC기둥, 코어벽체)의 접합부가 불필요하게 충진되지 않고 이격되어 핀접합(pin connection)으로 거동하므로 시공성과 경제성이 향상된 간격재를 이용한 PC보와 수직부재의 접합부 핀접합 구조를 제공한다.
Secondly, the space between the PC beam and the vertical member (PC column, core wall) is separated by the spacer and behaves as a pin connection without space. It provides a junction pin joint structure of the vertical member.

도 1은 코어벽체가 적용되는 일반적인 건물의 시공과정 및 본 발명이 적용된 건물의 시공과정을 도시한 것이다.
도 2는 본 발명이 적용되는 부위를 표시한 것이다.
도 3은 본 발명의 간격재를 이용한 PC보와 수직부재의 접합부 핀접합 구조의 실시예에서 사용되는 엠베드플레이트를 도시한 것이다.
도 4 내지 6은 본 발명의 간격재를 이용한 PC보와 수직부재의 접합부 핀접합 구조의 실시예의 시공과정을 도시한 것이다.
도 7은 본 발명의 간격재를 이용한 PC보와 수직부재의 접합부 핀접합 구조의 다른 실시예에서 사용되는 기둥연결구를 포함한 PC기둥을 도시한 것이다.
도 8 내지 10은 본 발명의 간격재를 이용한 PC보와 수직부재의 접합부 핀접합 구조의 다른 실시예를 도 7의 기둥연결구를 이용하여 시공하는 과정을 도시한 것이다.
도 11 및 12는 본 발명에 사용되는 다른 기둥연결구를 포함한 PC기둥의 조립과정을 도시한 것이다.
도 13 및 14는 본 발명에 사용되는 또 다른 기둥연결구를 포함한 PC기둥의 조립과정을 도시한 것이다.
도 15 및 16은 PC기둥 대신에 코어벽체에 본 발명을 적용하는 과정을 도시한 것이다.
도 17 내지 20은 본 발명의 또 다른 실시예이다.
1 illustrates a construction process of a general building to which a core wall is applied, and a construction process of a building to which the present invention is applied.
Figure 2 shows the site to which the present invention is applied.
Figure 3 shows the m bed plate used in the embodiment of the junction portion pin joint structure of the PCB and the vertical member using the spacer of the present invention.
4 to 6 show the construction process of the embodiment of the junction pin joint structure of the PCB and the vertical member using the spacer of the present invention.
Figure 7 illustrates a PC pillar including a pillar connector used in another embodiment of the junction pin joint structure of the PCB and the vertical member using the spacer of the present invention.
8 to 10 illustrate a process of constructing another embodiment of the junction pin bonding structure of the PCB and the vertical member using the spacer of the present invention using the pillar connector of FIG. 7.
11 and 12 illustrate the assembly process of the PC column including the other column connector used in the present invention.
Figures 13 and 14 illustrate the assembly process of the PC column including another column connector used in the present invention.
15 and 16 illustrate a process of applying the present invention to a core wall instead of a PC column.
17 to 20 are yet another embodiment of the present invention.

도 2는 본 발명이 적용되는 부위를 표시한 것이다. Figure 2 shows the site to which the present invention is applied.

구체적으로 빨간점선의 A부분은 수직부재로써 PC기둥(100)이 사용되는 실시예가 설치될 부분이고, 파란점선의 B부분은 수직부재로써 코어벽체(CW)가 사용되는 실시예가 설치될 부분이다.
Specifically, the A portion of the red dotted line is the portion where the embodiment in which the PC pillar 100 is used as the vertical member is installed, and the B portion of the blue dotted line is the portion in which the embodiment in which the core wall CW is used as the vertical member.

이하 첨부한 도면과 함께 상기와 같은 본 발명의 개념이 바람직하게 구현된 실시예를 통하여 본 발명을 더욱 상세하게 설명한다.
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 3은 본 발명의 간격재를 이용한 PC보와 수직부재의 접합부 핀접합 구조의 실시예에서 사용되는 엠베드플레이트를 도시한 것이고, 도 4 내지 6은 본 발명의 간격재를 이용한 PC보와 수직부재의 접합부 핀접합 구조의 실시예의 시공과정을 도시한 것이다.
Figure 3 shows the m bed plate used in the embodiment of the pin joint structure of the junction portion of the PC and the vertical member using the spacer of the present invention, Figures 4 to 6 are perpendicular to the PC beam using the spacer of the present invention. The construction process of the embodiment of the junction pin junction structure of the member is shown.

도 3 내지 6에 도시된 본 발명의 간격재를 이용한 PC보와 수직부재의 접합부 핀접합 구조의 실시예는 수직하중과 수평하중을 부담하는 코어벽체(CW)가 시공되는 건물에서,3 to 6 is an embodiment of the pin joint structure of the junction portion of the PC beam and the vertical member using the spacer of the present invention in a building in which a core wall (CW) that bears vertical load and horizontal load is constructed.

수직으로 설치되는 PC기둥(100); 스터드볼트(SB)를 사용하여 상기 PC기둥(100)의 외면에 일체로써 설치되는 플레이트(520) 및 상기 플레이트(520)에 설치된 브래킷(580)을 포함하여 구성되는 엠베드플레이트(500); 수평으로 설치되는 양단부의 보단부철골(220)과 상기 보단부철골(220) 상부 및 하부에 각각 설치되는 상부주근(240) 및 하부주근 그리고 상기 보단부철골(220)의 끝단을 노출시키고 상기 하부주근을 포함하여 타설양생되는 보하부콘크리트(260)를 포함하여 구성되어 상기 브래킷(580)에 보단부철골(220)이 결합되는 PC보(200); 및, 상기 PC보(200) 위에 타설되는 슬래브콘크리트(300);를 포함하여 구성되되,PC pillar 100 is installed vertically; An m bed plate 500 including a plate 520 integrally installed on an outer surface of the PC pillar 100 and a bracket 580 installed on the plate 520 using a stud bolt SB; The upper end 240 and the lower main root and the lower end of the upper end 240 and the lower end of the upper end of the lower end steel frame 220 are respectively installed horizontally and the lower end of the lower end steel frame 220 PC beam 200 is configured to include the lower portion of the lower body concrete 260, including the main root, the lower end steel frame 220 is coupled to the bracket 580; And, Slab concrete 300 is poured onto the PC beam 200; configured to include,

상기 코어벽체(CW)가 건물에 작용하는 모든 수평하중을 부담하고 상기 PC기둥(100)은 수직하중만 부담하며,The core wall (CW) bears all the horizontal loads acting on the building and the PC pillar 100 bears only the vertical loads,

상기 보하부콘크리트(260)의 단부와 PC기둥(100) 사이에는 간격재(600)가 설치되어, 상기 슬래브콘크리트(300) 타설시 상기 보하부콘크리트(260)와 PC기둥(100) 사이에는 상기 간격재(600) 두께 만큼 상기 슬래브콘크리트(300)가 타설되지 않고 유격을 가지므로, The spacer 600 is installed between the end of the lower concrete 260 and the PC pillar 100, and the lower concrete between the lower concrete 260 and the PC pillar 100 when the slab concrete 300 is placed. Since the slab concrete 300 has a play without pouring as much as the thickness of the spacer 600,

상기 PC기둥(100)과 상기 PC보(200)의 결합부위는 상기 간격재(600)에 의해 상기 슬래브콘크리트(300)가 충진되지 않아 핀접합(pin joint)되는 특징으로 한다.The coupling portion of the PC pillar 100 and the PC beam 200 is characterized in that the slab concrete 300 is not filled by the spacer 600 is pin-joined (pin joint).

본 발명 중 상기 PC보(200)는 도 4에 도시된 바와 같이, 수평으로 설치되는 양단부의 보단부철골(220)과 상기 보단부철골(220) 상부 및 하부에 각각 설치되는 상부주근(240) 및 하부주근 그리고 상기 보단부철골(220)의 끝단을 노출시키고 상기 하부주근을 포함하여 타설양생되는 보하부콘크리트(260)를 포함하여 구성된다. 경우에 따라 상기 보단부철골(220) 상부에는 상기 슬래브콘크리트(300)와의 결합력을 높이기 위해 스터드볼트가 설치될 수 있다.
The PC beam 200 of the present invention, as shown in Figure 4, the upper end 240 is installed on the upper and lower ends of the lower end steel frame 220 and the lower end steel frame 220 is installed horizontally, respectively And a lower portion of the lower portion and the lower portion of the lower portion of the steel frame 220 is exposed and the lower portion of the lower portion of the concrete, including the lower portion of the lower portion. In some cases, a stud bolt may be installed on the upper end steel frame 220 in order to increase the coupling force with the slab concrete 300.

상기 간격재(600)로 시공현장에서 쉽게 구할 수 있는 스티로폼이나 나무조각 등을 사용할 수 있으나, 슬래브콘크리트(300) 타설시 위치가 변동되지 않고 슬래브콘크리트(300) 경화시까지 임시적으로 간격을 유지할 수 있는 재질이면 무엇이든 사용가능하며, 상기 간격 형성 후 반드시 제거할 필요는 없다.
Styrofoam or wood chips can be easily used as the spacing member 600, but the slab concrete 300 can be temporarily held until the slab concrete 300 is hardened without changing its position when placed. Any material can be used, and it is not necessary to remove it after forming the gap.

도 7은 본 발명의 간격재를 이용한 PC보와 수직부재의 접합부 핀접합 구조의 다른 실시예에서 사용되는 기둥연결구를 포함한 PC기둥을 도시한 것이고, 도 8 내지 10은 본 발명의 간격재를 이용한 PC보와 수직부재의 접합부 핀접합 구조의 다른 실시예를 도 7의 기둥연결구를 이용하여 시공하는 과정을 도시한 것이다.Figure 7 illustrates a PC pillar including a column connector used in another embodiment of the junction portion pin joint structure of the PC beam and the vertical member using the spacer of the present invention, Figures 8 to 10 using the spacer of the present invention Another embodiment of the junction pin bonding structure of the PC beam and the vertical member is shown the process of construction using the column connector of FIG.

도 7 내지 10에 도시된 본 발명의 간격재를 이용한 PC보와 수직부재의 접합부 핀접합 구조의 다른 실시예는 수직하중과 수평하중을 부담하는 코어벽체(CW)가 시공되는 건물에서,Another embodiment of the junction pin bonding structure of the PC beam and the vertical member using the spacer of the present invention shown in Figures 7 to 10 is in a building in which the core wall (CW) to bear the vertical load and the horizontal load is constructed,

기둥브래킷(480)을 포함한 다수개의 기둥연결구(400)를 사용하여 수직으로 길이가 연장된 PC기둥(100); 수평으로 설치되는 양단부의 보단부철골(220)과 상기 보단부철골(220) 상부 및 하부에 각각 설치되는 상부주근(240) 및 하부주근 그리고 상기 보단부철골(220)의 끝단을 노출시키고 상기 하부주근을 포함하여 타설양생되는 보하부콘크리트(260)를 포함하여 구성되어 상기 기둥브래킷(480)에 보단부철골(220)이 결합되는 PC보(200); 및, 상기 PC보(200) 위에 타설되는 슬래브콘크리트(300);를 포함하여 구성되되,PC pillar 100 vertically extended using a plurality of pillar connector 400 including the pillar bracket 480; The upper end 240 and the lower main root and the lower end of the upper end 240 and the lower end of the upper end of the lower end steel frame 220 are respectively installed horizontally and the lower end of the lower end steel frame 220 PC beam 200 is configured to include the bottom portion concrete 260 is pour cured including the main root and the bottom end steel frame 220 is coupled to the pillar bracket 480; And, Slab concrete 300 is poured onto the PC beam 200; configured to include,

상기 코어벽체(CW)가 건물에 작용하는 모든 수평하중을 부담하고 상기 PC기둥(100)은 수직하중만 부담하며,The core wall (CW) bears all the horizontal loads acting on the building and the PC pillar 100 bears only the vertical loads,

상기 기둥연결구(400)는 도 7에 도시된 바와 같이 동일한 형상으로 상하 평행하게 설치되는 상부플레이트(420)와 하부플레이트(440) 그리고 상기 상부플레이트(420)와 하부플레이트(440) 사이에 설치되는 플레이트연결철골(460) 및 상기 플레이트연결철골(460)에 설치되는 상기 기둥브래킷(480)을 포함하여 구성되고,The pillar connector 400 is installed between the upper plate 420 and the lower plate 440 and the upper plate 420 and the lower plate 440 which are installed in parallel in the same shape as shown in FIG. It comprises a plate connecting steel 460 and the pillar bracket 480 is installed on the plate connecting steel 460,

상기 상부플레이트(420)와 하부플레이트(440) 사이에는 상기 슬래브콘크리트(300)가 충진되지만, 상기 보하부콘크리트(260)의 단부와 PC기둥(100) 사이에는 간격재(600)가 설치되어 상기 슬래브콘크리트(300) 타설시 상기 보하부콘크리트(260)와 PC기둥(100) 사이에는 상기 간격재(600) 두께 만큼 상기 슬래브콘크리트(300)가 타설되지 않고 유격을 가지므로, The slab concrete 300 is filled between the upper plate 420 and the lower plate 440, but the spacer 600 is installed between the end portion of the lower concrete 260 and the PC pillar 100. When the slab concrete 300 is poured, since the slab concrete 300 is not poured between the bottom portion concrete 260 and the PC pillar 100 by the thickness of the spacer 600,

상기 PC기둥(100)과 상기 PC보(200)의 결합부위는 상기 간격재(600)에 의해 상기 슬래브콘크리트(300)가 충진되지 않아 핀접합(pin joint)되는 특징으로 한다.The coupling portion of the PC pillar 100 and the PC beam 200 is characterized in that the slab concrete 300 is not filled by the spacer 600 is pin-joined (pin joint).

경우에 따라 상기 상부플레이트(420) 상부 및 상기 하부플레이트(440) 하부에는 기둥콘크리트와의 결합력을 높이기 위해 스터드볼트가 설치될 수 있다. In some cases, a stud bolt may be installed at an upper portion of the upper plate 420 and a lower portion of the lower plate 440 to increase coupling force with the pillar concrete.

상기 기둥브래킷(480)으로 2개의 L형 앵글을 사용할 때는 상기 보단부철골(220)의 두께에 대응하는 간격의 틈을 두고 상기 2개의 L형 앵글을 서로 마주보게 설치하여 상기 틈으로 상기 보단부철골(220)의 웨브가 삽입되고, When using two L-shaped angles as the pillar bracket 480, the two ends of the L-shaped angles are installed to face each other with a gap having a gap corresponding to the thickness of the lower end steel frame 220, and the lower end is formed by the gap. The web of steel frame 220 is inserted,

상기 기둥브래킷(480)의 길이를 연장하고자 할 때는 상기 2개의 L형 앵글 사이에 별도의 연장철골이나 연장플레이트를 결합하여 길이를 연장하고, 상기 연장철골 또는 연장플레이트의 단부와 상기 보단부철골(220) 웨브의 단부를 맞닿게 하여 양쪽에서 결합플레이트를 체결한다.
In order to extend the length of the pillar bracket 480, the length of the extension steel plate or the extension plate is combined with a separate extension steel plate or extension plate between the two L-shaped angles, and the proximal end steel frame ( 220) Fasten the coupling plate on both sides by abutting the ends of the web.

도 11 및 12는 본 발명에 사용되는 다른 기둥연결구를 포함한 PC기둥의 조립과정을 도시한 것이고, 도 13 및 14는 본 발명에 사용되는 또 다른 기둥연결구를 포함한 PC기둥의 조립과정을 도시한 것으로, 도 11 내지 14의 기둥연결구(400`) 부위는 소위 말하는 CFT(concrete filled tube)를 구성한 것이다.11 and 12 show the assembly process of the PC column including the other column connector used in the present invention, Figures 13 and 14 illustrate the assembly process of the PC column including another column connector used in the present invention 11 to 14, the pillar connector 400` portion constitutes a so-called concrete filled tube (CFT).

도 11 및 12에 도시된 본 발명은 상술한 상기 기둥연결구(400) 대신에 CFT기둥연결구(400`)가 구성된 것으로,11 and 12 of the present invention is that the CFT column connector 400` is configured in place of the above-described column connector 400,

상기 CFT기둥연결구(400`)는 상하 평행하게 설치되는 상부플레이트(420`)와 하부플레이트(440`); 상기 상부플레이트(420`)와 하부플레이트(440`) 사이에 설치되는 다수개의 기둥철근(490); 상기 상부플레이트(420`)와 하부플레이트(440`)을 각각 상단과 하단으로 놓고 감싸서 결합하는 튜브철판(470); 상기 튜브철판(470) 외면에 부착된 기둥브래킷(480`); 및, 상기 튜브철판(470) 내부에 충진되는 충진콘크리트(450);를 포함하여 구성된다.The CFT pillar connector 400 ′ includes an upper plate 420 ′ and a lower plate 440 ′ installed in parallel with each other; A plurality of column reinforcing bars 490 installed between the upper plate 420 'and the lower plate 440'; A tube iron plate 470 which wraps the upper plate 420` and the lower plate 440` to the upper and lower ends, respectively; A pillar bracket 480 'attached to an outer surface of the tube iron plate 470; And a filling concrete 450 filled in the tube iron plate 470.

이때 상기 보하부콘크리트(260)의 단부와 상기 튜브철판(470) 사이에는 간격재(600)가 설치되어, 상기 슬래브콘크리트(300) 타설시 상기 보하부콘크리트(260)와 PC기둥(100) 사이에는 상기 간격재(600) 두께 만큼 상기 슬래브콘크리트(300)가 타설되지 않고 유격을 가지므로, At this time, the spacer 600 is installed between the end portion of the lower concrete 260 and the tube iron plate 470, and the lower concrete 260 and the PC pillar 100 when the slab concrete 300 is placed. Since the slab concrete 300 is not poured as much as the thickness of the spacer 600, it has a play,

상기 PC기둥(100)과 상기 PC보(200)의 결합부위는 상기 간격재(600)에 의해 상기 슬래브콘크리트(300)가 충진되지 않아 핀접합(pin joint)되는 특징으로 한다.
The coupling portion of the PC pillar 100 and the PC beam 200 is characterized in that the slab concrete 300 is not filled by the spacer 600 is pin-joined (pin joint).

상기 상부플레이트(420`)와 하부플레이트(440`)의 형상은 도 13 및 14에 도시된 원형이나 도 11 및 12에 도시된 사각형 등 각형으로 현장사정과 설계상 필요에 따라 구성할 수 있다.
The upper plate 420 ′ and the lower plate 440 ′ may be configured in a circular shape as shown in FIGS. 13 and 14 or a square shape as shown in FIGS. 11 and 12, according to field conditions and design needs.

도 15 및 16은 PC기둥 대신에 코어벽체에 본 발명을 적용하는 과정을 도시한 것이다.15 and 16 illustrate a process of applying the present invention to a core wall instead of a PC column.

도 15 및 16에 도시된 예는 상기 PC기둥(100) 대신에 코어벽체(CW)가 구성되고,15 and 16 is a core wall (CW) is configured in place of the PC pillar 100,

스터드볼트(SB)를 사용하여 상기코어벽체(CW)의 외면에 일체로써 설치되는 플레이트(520) 및 상기 플레이트(520)에 설치된 브래킷(580)을 포함하여 구성되는 엠베드플레이트(500); 수평으로 설치되는 양단부의 보단부철골(220)과 상기 보단부철골(220) 상부 및 하부에 각각 설치되는 상부주근(240) 및 하부주근 그리고 상기 보단부철골(220)의 끝단을 노출시키고 상기 하부주근을 포함하여 타설양생되는 보하부콘크리트(260)를 포함하여 구성되어 상기 브래킷(580)에 보단부철골(220)이 결합되는 PC보(200); 및, 상기 PC보(200) 위에 타설되는 슬래브콘크리트(300);를 포함하여 구성되되,An m bed plate 500 including a plate 520 integrally installed on an outer surface of the core wall CW using a stud bolt SB and a bracket 580 installed on the plate 520; The upper end 240 and the lower main root and the lower end of the upper end 240 and the lower end of the upper end of the lower end steel frame 220 are respectively installed horizontally and the lower end of the lower end steel frame 220 PC beam 200 is configured to include the lower portion of the lower body concrete 260, including the main root, the lower end steel frame 220 is coupled to the bracket 580; And, Slab concrete 300 is poured onto the PC beam 200; configured to include,

상기 보하부콘크리트(260)의 단부와 코어벽체(CW) 사이에는 간격재(600)가 설치되어, 상기 슬래브콘크리트(300) 타설시 상기 보하부콘크리트(260)와 코어벽체(CW) 사이에는 상기 간격재(600) 두께 만큼 상기 슬래브콘크리트(300)가 타설되지 않고 유격을 가지므로, The spacer 600 is installed between the end of the lower concrete 260 and the core wall CW, and the lower concrete 260 and the core wall CW are disposed between the lower concrete 260 and the core wall CW. Since the slab concrete 300 has a play without pouring as much as the thickness of the spacer 600,

상기 PC기둥(100)과 상기 코어벽체(CW)의 결합부위는 상기 간격재(600)에 의해 충진되지 않아 핀접합(pin joint)되는 특징으로 한다.
The coupling portion of the PC pillar 100 and the core wall CW is not filled by the spacer 600, and thus is pin-joined.

본 발명은 수평하중을 전부 코어벽체(CW)가 받으므로 수평하중이 아닌 수직하중에만 저항하는 PC보의 기능에 착안하여 수직부재와 PC보의 접합부를 핀접합(pin joint)으로 설계하기 위한 것으로, 자재의 낭비 없이 경제적으로 설계가 가능하고 RC구조나 철골구조와 같은 시공속도를 가지면서 철골구조에 비하여 철골 사용량이 대폭 줄어 경제적이다.The present invention is to design the joint between the vertical member and the PC beam by the pin joint, focusing on the function of the PC beam that resists only the vertical load, not the horizontal load because the core wall (CW) receives all the horizontal load In addition, it is possible to design economically without waste of materials, and it is economical because steel usage is drastically reduced compared to steel structure with construction speed such as RC structure or steel structure.

그리고 PC보의 상부철근 및 하부철근이 기둥내부로 연결되지 않아 시공이 간단하여 공기가 절감되며, 접합부에 간격재을 이용하여 슬래브콘크리트(300)가 타설되지 않도록 보양하고 거푸집 대용으로 데크플레이트를 설치하여 슬래브콘크리트(300)를 타설할 수 있다.
And because the upper and lower reinforcement of the PC beam is not connected to the inside of the column, the construction is simple, and the air is saved.The slab concrete 300 is provided by the spacer at the joint to prevent it from being poured, The slab concrete 300 can be poured.

특히, 상기 슬래브콘크리트(300) 타설 전 상기 간격재(600)를 삽입한 후 PC보(200)와 PC기둥(100) 또는 코어벽체(CW)의 접합부의 하부에 접합부거푸집을 슬래브거푸집과 함께 설치하거나 상기 접합부거푸집 설치 후 상기 접합부거푸집에 상기 간격재(600)를 거치하고 상기 슬래브콘크리트(300) 타설하면, 상기 접합부 및 슬래브를 함께 시공할 수 있다.
Particularly, after the slab concrete 300 is placed before the spacing member 600 is inserted, the joint formwork is installed together with the slab formwork at the lower portion of the junction between the PC beam 200 and the PC pillar 100 or the core wall (CW). Alternatively, after the junction die is installed, when the spacer 600 is mounted on the junction die and the slab concrete 300 is poured, the joint and the slab may be constructed together.

도 17 내지 20은 본 발명의 또 다른 실시예이다.
17 to 20 are yet another embodiment of the present invention.

구체적으로 도 17의 실시예는 도 4 내지 6의 실시예에서,Specifically, in the embodiment of FIG. 17, in the embodiment of FIGS. 4 to 6,

상기 간격재(600)의 두께는 상기 보하부콘크리트(260)와 PC기둥(100) 사이 간격폭으로 하여 상기 간격재(600)는 상기 슬래브콘크리트(300) 타설시 임시거푸집으로 사용된 후 제거되고,The thickness of the spacer 600 is the gap width between the bottom concrete 260 and the PC pillar 100, the spacer 600 is removed after being used as a temporary formwork when placing the slab concrete 300 ,

상기 보하부콘크리트(260)와 PC기둥(100) 사이에는 임시거푸집으로 사용된 상기 간격재(600) 두께 만큼 상기 슬래브콘크리트(300)가 타설되지 않고 유격을 가지므로, 상기 PC기둥(100)과 상기 PC보(200)의 결합부위는 상기 슬래브콘크리트(300)가 충진되지 않는 무충진부(BB)를 형성하여 핀접합(pin joint)되는 특징으로 한다.
Between the bottom concrete 260 and the PC pillar 100, since the slab concrete 300 has a play without pouring as much as the thickness of the spacer 600 used as a temporary formwork, the PC pillar 100 and Coupling portions of the PC beam 200 is characterized in that the pin joint is formed by forming a non-filling portion (BB) is not filled with the slab concrete (300).

구체적으로 도 18의 실시예는 도 7 내지 10의 실시예에서,Specifically, the embodiment of Figure 18 is in the embodiment of Figures 7 to 10,

상기 간격재(600)의 두께는 상기 보하부콘크리트(260)와 PC기둥(100) 사이 간격폭으로 하여 상기 간격재(600)는 상기 슬래브콘크리트(300) 타설시 임시거푸집으로 사용된 후 제거되고,The thickness of the spacer 600 is the gap width between the bottom concrete 260 and the PC pillar 100, the spacer 600 is removed after being used as a temporary formwork when placing the slab concrete 300 ,

상기 보하부콘크리트(260)와 PC기둥(100) 사이에는 임시거푸집으로 사용된 상기 간격재(600) 두께 만큼 상기 슬래브콘크리트(300)가 타설되지 않고 유격을 가지므로, 상기 PC기둥(100)과 상기 PC보(200)의 결합부위는 상기 슬래브콘크리트(300)가 충진되지 않는 무충진부(BB)를 형성하여 핀접합(pin joint)되는 특징으로 한다.
Between the bottom concrete 260 and the PC pillar 100, since the slab concrete 300 has a play without pouring as much as the thickness of the spacer 600 used as a temporary formwork, the PC pillar 100 and Coupling portions of the PC beam 200 is characterized in that the pin joint is formed by forming a non-filling portion (BB) is not filled with the slab concrete (300).

구체적으로 도 19의 실시예는 도 11 내지 14의 실시예에서,Specifically, in the embodiment of Figures 11 to 14,

상기 간격재(600)의 두께는 상기 보하부콘크리트(260)와 튜브철판(470) 사이 간격폭으로 하여 상기 간격재(600)는 상기 슬래브콘크리트(300) 타설시 임시거푸집으로 사용된 후 제거되고,The thickness of the spacer 600 is the gap width between the bottom concrete 260 and the tube iron plate 470 so that the spacer 600 is removed after being used as a temporary formwork when placing the slab concrete 300 ,

상기 보하부콘크리트(260)와 튜브철판(470) 사이에는 임시거푸집으로 사용된 상기 간격재(600) 두께 만큼 상기 슬래브콘크리트(300)가 타설되지 않고 유격을 가지므로, 상기 PC기둥(100)과 상기 PC보(200)의 결합부위는 상기 슬래브콘크리트(300)가 충진되지 않는 무충진부(BB)를 형성하여 핀접합(pin joint)되는 특징으로 한다.
Between the bottom concrete 260 and the tube iron plate 470, since the slab concrete 300 has a play without pouring as much as the thickness of the spacer 600 used as a temporary formwork, the PC pillar 100 and Coupling portions of the PC beam 200 is characterized in that the pin joint is formed by forming a non-filling portion (BB) is not filled with the slab concrete (300).

구체적으로 도 20의 실시예는 도 15 내지 16의 실시예에서,Specifically, in the embodiment of FIG. 20, in the embodiment of FIGS. 15 to 16,

상기 간격재(600)의 두께는 상기 보하부콘크리트(260)와 코어벽체(CW) 사이 간격폭으로 하여 상기 간격재(600)는 상기 슬래브콘크리트(300) 타설시 임시거푸집으로 사용된 후 제거되고,The thickness of the spacer 600 is the gap width between the bottom concrete 260 and the core wall (CW), the spacer 600 is removed after being used as a temporary formwork when pouring the slab concrete 300 ,

상기 보하부콘크리트(260)와 코어벽체(CW) 사이에는 임시거푸집으로 사용된 상기 간격재(600) 두께 만큼 상기 슬래브콘크리트(300)가 타설되지 않고 유격을 가지므로, 상기 코어벽체(CW)과 상기 PC보(200)의 결합부위는 상기 슬래브콘크리트(300)가 충진되지 않는 무충진부(BB)를 형성하여 핀접합(pin joint)되는 특징으로 한다.
Since the slab concrete 300 has a play between the bottom portion concrete 260 and the core wall (CW) as the thickness of the spacer 600 used as a temporary formwork, the slab concrete 300 is not placed, and the core wall (CW) and Coupling portions of the PC beam 200 is characterized in that the pin joint is formed by forming a non-filling portion (BB) is not filled with the slab concrete (300).

본 발명은 상기에서 언급한 바와 같이 바람직한 실시예와 관련하여 설명되었으나, 본 발명의 요지를 벗어남이 없는 범위 내에서 다양한 수정 및 변형이 가능하며, 다양한 분야에서 사용 가능하다. While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it is to be understood that the invention is not limited to the disclosed embodiments, but, on the contrary, is intended to cover various modifications and equivalent arrangements included within the spirit and scope of the invention.

따라서 본 발명의 청구범위는 이건 발명의 진정한 범위 내에 속하는 수정 및 변형을 포함한다.
It is therefore intended that the appended claims cover such modifications and variations as fall within the true scope of the invention.

BB: 무충진부
CW: 코어벽체
SB: 스터드볼트
100: PC기둥
200: PC보
220: 보단부철골
240: 상부주근
260: 보하부콘크리트
300: 슬래브콘크리트
400: 기둥연결구
400`: CFT기둥연결구
420, 420`: 상부플레이트
440, 440`: 하부플레이트
450: 충진콘크리트
460: 플레이트연결철골
470: 튜브철판
480, 480`: 기둥브래킷
500: 엠베트플레이트
520: 플레이트
580: 브래킷
600: 간격재
BB: no filling
CW: core wall
SB: Stud Bolt
100: PC pillar
200: PC Report
220: Bodanbu Steel
240: upper root
260: Boha Concrete
300: slab concrete
400: column connector
400`: CFT pillar connector
420, 420`: upper plate
440, 440`: lower plate
450: Filled concrete
460: plate connection steel
470: tube iron plate
480, 480`: Pillar bracket
500: embedded plate
520: plate
580: bracket
600: spacer

Claims (9)

수직하중과 수평하중을 부담하는 코어벽체(CW)가 시공되는 건물에서,
수직으로 설치되는 PC기둥(100);
스터드볼트(SB)를 사용하여 상기 PC기둥(100)의 외면에 일체로써 설치되는 플레이트(520) 및 상기 플레이트(520)에 설치된 브래킷(580)을 포함하여 구성되는 엠베드플레이트(500);
수평으로 설치되는 양단부의 보단부철골(220)과 상기 보단부철골(220) 상부 및 하부에 각각 설치되는 상부주근(240) 및 하부주근 그리고 상기 보단부철골(220)의 끝단을 노출시키고 상기 하부주근을 포함하여 타설양생되는 보하부콘크리트(260)를 포함하여 구성되어 상기 브래킷(580)에 보단부철골(220)이 결합되는 PC보(200); 및,
상기 PC보(200) 위에 타설되는 슬래브콘크리트(300);
를 포함하여 구성되되,
상기 코어벽체(CW)가 건물에 작용하는 모든 수평하중을 부담하고 상기 PC기둥(100)은 수직하중만 부담하며,
상기 보하부콘크리트(260)의 단부와 PC기둥(100) 사이에는 간격재(600)가 설치되어, 상기 슬래브콘크리트(300) 타설시 상기 보하부콘크리트(260)와 PC기둥(100) 사이에는 상기 간격재(600) 두께 만큼 상기 슬래브콘크리트(300)가 타설되지 않고 유격을 가지므로,
상기 PC기둥(100)과 상기 PC보(200)의 결합부위는 상기 간격재(600)에 의해 상기 슬래브콘크리트(300)가 충진되지 않아 핀접합(pin joint)되는 특징으로 하는 간격재를 이용한 PC보와 수직부재의 접합부 핀접합 구조.
In buildings where core walls (CW) are constructed that bear vertical and horizontal loads,
PC pillar 100 is installed vertically;
An m bed plate 500 including a plate 520 integrally installed on an outer surface of the PC pillar 100 and a bracket 580 installed on the plate 520 using a stud bolt SB;
The upper end 240 and the lower main root and the lower end of the upper end 240 and the lower end of the upper end of the lower end steel frame 220 are respectively installed horizontally and the lower end of the lower end steel frame 220 PC beam 200 is configured to include the lower portion of the lower body concrete 260, including the main root, the lower end steel frame 220 is coupled to the bracket 580; And
Slab concrete 300 is poured onto the PC beam 200;
, ≪ / RTI >
The core wall (CW) bears all the horizontal loads acting on the building and the PC pillar 100 bears only the vertical loads,
The spacer 600 is installed between the end of the lower concrete 260 and the PC pillar 100, and the lower concrete between the lower concrete 260 and the PC pillar 100 when the slab concrete 300 is placed. Since the slab concrete 300 has a play without pouring as much as the thickness of the spacer 600,
Combined portion of the PC pillar 100 and the PC beam 200 is not filled with the slab concrete 300 by the spacer 600, the PC using a spacer characterized in that the pin joint (pin joint) Pin joint structure of beam and vertical member.
수직하중과 수평하중을 부담하는 코어벽체(CW)가 시공되는 건물에서,
기둥브래킷(480)을 포함한 다수개의 기둥연결구(400)를 사용하여 수직으로 길이가 연장된 PC기둥(100);
수평으로 설치되는 양단부의 보단부철골(220)과 상기 보단부철골(220) 상부 및 하부에 각각 설치되는 상부주근(240) 및 하부주근 그리고 상기 보단부철골(220)의 끝단을 노출시키고 상기 하부주근을 포함하여 타설양생되는 보하부콘크리트(260)를 포함하여 구성되어 상기 기둥브래킷(480)에 보단부철골(220)이 결합되는 PC보(200); 및,
상기 PC보(200) 위에 타설되는 슬래브콘크리트(300);
를 포함하여 구성되되,
상기 코어벽체(CW)가 건물에 작용하는 모든 수평하중을 부담하고 상기 PC기둥(100)은 수직하중만 부담하며,
상기 기둥연결구(400)는 동일한 형상으로 상하 평행하게 설치되는 상부플레이트(420)와 하부플레이트(440) 그리고 상기 상부플레이트(420)와 하부플레이트(440) 사이에 설치되는 플레이트연결철골(460) 및 상기 플레이트연결철골(460)에 설치되는 상기 기둥브래킷(480)을 포함하여 구성되고,
상기 상부플레이트(420)와 하부플레이트(440) 사이에는 상기 슬래브콘크리트(300)가 충진되지만 상기 보하부콘크리트(260)의 단부와 PC기둥(100) 사이에는 간격재(600)가 설치되어, 상기 슬래브콘크리트(300) 타설시 상기 보하부콘크리트(260)와 PC기둥(100) 사이에는 상기 간격재(600) 두께 만큼 상기 슬래브콘크리트(300)가 타설되지 않고 유격을 가지므로,
상기 PC기둥(100)과 상기 PC보(200)의 결합부위는 상기 간격재(600)에 의해 상기 슬래브콘크리트(300)가 충진되지 않아 핀접합(pin joint)되는 특징으로 하는 간격재를 이용한 PC보와 수직부재의 접합부 핀접합 구조.
In buildings where core walls (CW) are constructed that bear vertical and horizontal loads,
PC pillar 100 vertically extended using a plurality of pillar connector 400 including the pillar bracket 480;
The upper end 240 and the lower main root and the lower end of the upper end 240 and the lower end of the upper end of the lower end steel frame 220 are respectively installed horizontally and the lower end of the lower end steel frame 220 PC beam 200 is configured to include the bottom portion concrete 260 is pour cured including the main root and the bottom end steel frame 220 is coupled to the pillar bracket 480; And
Slab concrete 300 is poured onto the PC beam 200;
, ≪ / RTI >
The core wall (CW) bears all the horizontal loads acting on the building and the PC pillar 100 bears only the vertical loads,
The pillar connector 400 is the upper plate 420 and the lower plate 440 and the plate connection steel 460 is installed between the upper plate 420 and the lower plate 440 in parallel with the same shape and It is configured to include the pillar bracket 480 is installed on the plate connecting steel 460,
The slab concrete 300 is filled between the upper plate 420 and the lower plate 440, but the spacer 600 is installed between the end of the lower concrete 260 and the PC pillar 100, When the slab concrete 300 is poured, since the slab concrete 300 is not poured between the bottom portion concrete 260 and the PC pillar 100 by the thickness of the spacer 600,
Combined portion of the PC pillar 100 and the PC beam 200 is not filled with the slab concrete 300 by the spacer 600, the PC using a spacer characterized in that the pin joint (pin joint) Pin joint structure of beam and vertical member.
제2항에서,
상하 평행하게 설치되는 상부플레이트(420`)와 하부플레이트(440`);
상기 상부플레이트(420`)와 하부플레이트(440`) 사이에 설치되는 다수개의 기둥철근(490);
상기 상부플레이트(420`)와 하부플레이트(440`)을 각각 상단과 하단으로 놓고 감싸서 결합하는 튜브철판(470);
상기 튜브철판(470) 외면에 부착된 기둥브래킷(480`); 및,
상기 튜브철판(470) 내부에 충진되는 충진콘크리트(450);
를 포함하여 구성되는 CFT기둥연결구(400`)가 상기 기둥연결구(400) 대신에 구성되어,
상기 보하부콘크리트(260)의 단부와 상기 튜브철판(470) 사이에는 간격재(600)가 설치되어, 상기 슬래브콘크리트(300) 타설시 상기 보하부콘크리트(260)와 PC기둥(100) 사이에는 상기 간격재(600) 두께 만큼 상기 슬래브콘크리트(300)가 타설되지 않고 유격을 가지므로,
상기 PC기둥(100)과 상기 PC보(200)의 결합부위는 상기 간격재(600)에 의해 상기 슬래브콘크리트(300)가 충진되지 않아 핀접합(pin joint)되는 특징으로 하는 간격재를 이용한 PC보와 수직부재의 접합부 핀접합 구조.
3. The method of claim 2,
An upper plate 420 ′ and a lower plate 440 ′ installed up and down in parallel;
A plurality of column reinforcing bars 490 installed between the upper plate 420 'and the lower plate 440';
A tube iron plate 470 which wraps the upper plate 420` and the lower plate 440` to the upper and lower ends, respectively;
A pillar bracket 480 'attached to an outer surface of the tube iron plate 470; And
Filled concrete 450 is filled in the tube iron plate 470;
CFT pillar connector 400` configured to include is configured in place of the pillar connector 400,
The spacer 600 is installed between the end portion of the lower concrete 260 and the tube iron plate 470, and is disposed between the lower concrete 260 and the PC pillar 100 when the slab concrete 300 is placed. Since the slab concrete 300 has a play without pouring as much as the thickness of the spacer 600,
Combined portion of the PC pillar 100 and the PC beam 200 is not filled with the slab concrete 300 by the spacer 600, the PC using a spacer characterized in that the pin joint (pin joint) Pin joint structure of beam and vertical member.
제3항에서,
상기 상부플레이트(420`)와 하부플레이트(440`)의 형상은 원형 또는 각형인 것을 특징으로 하는 간격재를 이용한 PC보와 수직부재의 접합부 핀접합 구조.
4. The method of claim 3,
The upper plate 420 ′ and the lower plate 440 ′ have a circular or rectangular shape, and a junction pin bonding structure of a PCB and a vertical member using spacers.
제1항에서,
상기 PC기둥(100) 대신에 코어벽체(CW)가 구성되고,
스터드볼트(SB)를 사용하여 상기코어벽체(CW)의 외면에 일체로써 설치되는 플레이트(520) 및 상기 플레이트(520)에 설치된 브래킷(580)을 포함하여 구성되는 엠베드플레이트(500);
수평으로 설치되는 양단부의 보단부철골(220)과 상기 보단부철골(220) 상부 및 하부에 각각 설치되는 상부주근(240) 및 하부주근 그리고 상기 보단부철골(220)의 끝단을 노출시키고 상기 하부주근을 포함하여 타설양생되는 보하부콘크리트(260)를 포함하여 구성되어 상기 브래킷(580)에 보단부철골(220)이 결합되는 PC보(200); 및,
상기 PC보(200) 위에 타설되는 슬래브콘크리트(300);
를 포함하여 구성되되,
상기 보하부콘크리트(260)의 단부와 코어벽체(CW) 사이에는 간격재(600)가 설치되어, 상기 슬래브콘크리트(300) 타설시 상기 보하부콘크리트(260)와 코어벽체(CW) 사이에는 상기 간격재(600) 두께 만큼 상기 슬래브콘크리트(300)가 타설되지 않고 유격을 가지므로,
상기 PC기둥(100)과 상기 코어벽체(CW)의 결합부위는 상기 간격재(600)에 의해 충진되지 않아 핀접합(pin joint)되는 특징으로 하는 간격재를 이용한 PC보와 수직부재의 접합부 핀접합 구조.
In claim 1,
Instead of the PC pillar 100, the core wall (CW) is configured,
An m bed plate 500 including a plate 520 integrally installed on an outer surface of the core wall CW using a stud bolt SB and a bracket 580 installed on the plate 520;
The upper end 240 and the lower main root and the lower end of the upper end 240 and the lower end of the upper end of the lower end steel frame 220 are respectively installed horizontally and the lower end of the lower end steel frame 220 PC beam 200 is configured to include the lower portion of the lower body concrete 260, including the main root, the lower end steel frame 220 is coupled to the bracket 580; And
Slab concrete 300 is poured onto the PC beam 200;
, ≪ / RTI >
The spacer 600 is installed between the end of the lower concrete 260 and the core wall CW, and the lower concrete 260 and the core wall CW are disposed between the lower concrete 260 and the core wall CW. Since the slab concrete 300 has a play without pouring as much as the thickness of the spacer 600,
Coupling portion of the PC pillar 100 and the core wall (CW) is not filled by the spacer 600 is pin-joined (pin joint) of the PCB and the vertical member joint pin using the spacer Junction structure.
제1항에서,
상기 간격재(600)의 두께는 상기 보하부콘크리트(260)와 PC기둥(100) 사이 간격폭으로 하여 상기 간격재(600)는 상기 슬래브콘크리트(300) 타설시 임시거푸집으로 사용된 후 제거되고,
상기 보하부콘크리트(260)와 PC기둥(100) 사이에는 임시거푸집으로 사용된 상기 간격재(600) 두께 만큼 상기 슬래브콘크리트(300)가 타설되지 않고 유격을 가지므로, 상기 PC기둥(100)과 상기 PC보(200)의 결합부위는 상기 슬래브콘크리트(300)가 충진되지 않아 핀접합(pin joint)되는 특징으로 하는 간격재를 이용한 PC보와 수직부재의 접합부 핀접합 구조.
In claim 1,
The thickness of the spacer 600 is the gap width between the bottom concrete 260 and the PC pillar 100, the spacer 600 is removed after being used as a temporary formwork when placing the slab concrete 300 ,
Between the bottom concrete 260 and the PC pillar 100, since the slab concrete 300 has a play without pouring as much as the thickness of the spacer 600 used as a temporary formwork, the PC pillar 100 and The joining portion of the PC beam 200 is a pin joint structure of the PC beam and the vertical member using the spacer member, characterized in that the slab concrete 300 is not filled with the pin joint (pin joint).
제2항에서,
상기 간격재(600)의 두께는 상기 보하부콘크리트(260)와 PC기둥(100) 사이 간격폭으로 하여 상기 간격재(600)는 상기 슬래브콘크리트(300) 타설시 임시거푸집으로 사용된 후 제거되고,
상기 보하부콘크리트(260)와 PC기둥(100) 사이에는 임시거푸집으로 사용된 상기 간격재(600) 두께 만큼 상기 슬래브콘크리트(300)가 타설되지 않고 유격을 가지므로, 상기 PC기둥(100)과 상기 PC보(200)의 결합부위는 상기 슬래브콘크리트(300)가 충진되지 않아 핀접합(pin joint)되는 특징으로 하는 간격재를 이용한 PC보와 수직부재의 접합부 핀접합 구조.
3. The method of claim 2,
The thickness of the spacer 600 is the gap width between the bottom concrete 260 and the PC pillar 100, the spacer 600 is removed after being used as a temporary formwork when placing the slab concrete 300 ,
Between the bottom concrete 260 and the PC pillar 100, since the slab concrete 300 has a play without pouring as much as the thickness of the spacer 600 used as a temporary formwork, the PC pillar 100 and The joining portion of the PC beam 200 is a pin joint structure of the PC beam and the vertical member using the spacer member, characterized in that the slab concrete 300 is not filled with the pin joint (pin joint).
제3항 또는 제4항에서,
상기 간격재(600)의 두께는 상기 보하부콘크리트(260)와 튜브철판(470) 사이 간격폭으로 하여 상기 간격재(600)는 상기 슬래브콘크리트(300) 타설시 임시거푸집으로 사용된 후 제거되고,
상기 보하부콘크리트(260)와 튜브철판(470) 사이에는 임시거푸집으로 사용된 상기 간격재(600) 두께 만큼 상기 슬래브콘크리트(300)가 타설되지 않고 유격을 가지므로, 상기 PC기둥(100)과 상기 PC보(200)의 결합부위는 상기 슬래브콘크리트(300)가 충진되지 않아 핀접합(pin joint)되는 특징으로 하는 간격재를 이용한 PC보와 수직부재의 접합부 핀접합 구조.
4. The method according to claim 3 or 4,
The thickness of the spacer 600 is the gap width between the bottom concrete 260 and the tube iron plate 470 so that the spacer 600 is removed after being used as a temporary formwork when placing the slab concrete 300 ,
Between the bottom concrete 260 and the tube iron plate 470, since the slab concrete 300 has a play without pouring as much as the thickness of the spacer 600 used as a temporary formwork, the PC pillar 100 and The joining portion of the PC beam 200 is a pin joint structure of the PC beam and the vertical member using the spacer member, characterized in that the slab concrete 300 is not filled with the pin joint (pin joint).
제5항에서,
상기 간격재(600)의 두께는 상기 보하부콘크리트(260)와 코어벽체(CW) 사이 간격폭으로 하여 상기 간격재(600)는 상기 슬래브콘크리트(300) 타설시 임시거푸집으로 사용된 후 제거되고,
상기 보하부콘크리트(260)와 코어벽체(CW) 사이에는 임시거푸집으로 사용된 상기 간격재(600) 두께 만큼 상기 슬래브콘크리트(300)가 타설되지 않고 유격을 가지므로, 상기 코어벽체(CW)과 상기 PC보(200)의 결합부위는 상기 슬래브콘크리트(300)가 충진되지 않아 핀접합(pin joint)되는 특징으로 하는 간격재를 이용한 PC보와 수직부재의 접합부 핀접합 구조.
The method of claim 5,
The thickness of the spacer 600 is the gap width between the bottom concrete 260 and the core wall (CW), the spacer 600 is removed after being used as a temporary formwork when pouring the slab concrete 300 ,
Since the slab concrete 300 has a play between the bottom portion concrete 260 and the core wall (CW) as the thickness of the spacer 600 used as a temporary formwork, the slab concrete 300 is not placed, and the core wall (CW) and The joining portion of the PC beam 200 is a pin joint structure of the PC beam and the vertical member using the spacer member, characterized in that the slab concrete 300 is not filled with the pin joint (pin joint).
KR1020120138735A 2012-12-03 2012-12-03 The pin connection structure using the spacer in the junction of pc beam and vertical member KR101346671B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120138735A KR101346671B1 (en) 2012-12-03 2012-12-03 The pin connection structure using the spacer in the junction of pc beam and vertical member

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120138735A KR101346671B1 (en) 2012-12-03 2012-12-03 The pin connection structure using the spacer in the junction of pc beam and vertical member

Publications (1)

Publication Number Publication Date
KR101346671B1 true KR101346671B1 (en) 2014-02-14

Family

ID=50269323

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120138735A KR101346671B1 (en) 2012-12-03 2012-12-03 The pin connection structure using the spacer in the junction of pc beam and vertical member

Country Status (1)

Country Link
KR (1) KR101346671B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101591224B1 (en) 2015-01-05 2016-02-02 (주)세종알앤디 Construction Method Using Precast Concrete Member With Assembly Plate And Fixing Channel
KR101864198B1 (en) * 2015-10-07 2018-07-16 경희대학교 산학협력단 the SRC connection structure between precast concrete column and precast concrete beam, the plate connection structure between precast concrete upper column and precast concrete lower column

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0528806U (en) * 1991-09-19 1993-04-16 株式会社長谷工コーポレーシヨン Fireproof coating structure for steel members
JPH09177316A (en) * 1995-12-25 1997-07-08 Kajima Corp Form doubling as spacer of pc post joining part
KR20100043731A (en) * 2008-10-21 2010-04-29 한양대학교 산학협력단 Precast concrete column using steel material and precast reinforced concrete construction using the same
KR100987762B1 (en) 2010-04-12 2010-10-13 (주) 다우와키움건설 Joint structure of vertical member and andhorizontal member

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0528806U (en) * 1991-09-19 1993-04-16 株式会社長谷工コーポレーシヨン Fireproof coating structure for steel members
JPH09177316A (en) * 1995-12-25 1997-07-08 Kajima Corp Form doubling as spacer of pc post joining part
KR20100043731A (en) * 2008-10-21 2010-04-29 한양대학교 산학협력단 Precast concrete column using steel material and precast reinforced concrete construction using the same
KR100987762B1 (en) 2010-04-12 2010-10-13 (주) 다우와키움건설 Joint structure of vertical member and andhorizontal member

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101591224B1 (en) 2015-01-05 2016-02-02 (주)세종알앤디 Construction Method Using Precast Concrete Member With Assembly Plate And Fixing Channel
KR101864198B1 (en) * 2015-10-07 2018-07-16 경희대학교 산학협력단 the SRC connection structure between precast concrete column and precast concrete beam, the plate connection structure between precast concrete upper column and precast concrete lower column

Similar Documents

Publication Publication Date Title
KR101379305B1 (en) Wall structure manufacturing method using precast front wall panel and precast back wall panel
KR101457077B1 (en) Reformed concrete filled tube column structure
KR101301076B1 (en) Wall structure construction method using precast front wall panel and precast back wall panel
JP5406563B2 (en) Composite beam, building, and composite beam construction method
KR20090089270A (en) Drop panel structure of lattice-form and construction method thereof
RU2548627C2 (en) Steel frame structure with usage of u-shaped composite beam
KR101372643B1 (en) Formless composite beam and manufacturing method thereof
KR20110032687A (en) Construction method for joining steel or reinforced steel concrete column and beam with reinforcing end part
KR101962853B1 (en) Joint for Precast Beam and Columns
KR101334071B1 (en) The needless filling structure in the junction of pc beam and vertical member
JP2010242390A (en) Joining method and structure of column-beam joint part having steel brace
KR101346671B1 (en) The pin connection structure using the spacer in the junction of pc beam and vertical member
JP2011144513A (en) Joint of precast floor slab in bridge
KR200469319Y1 (en) Construction structure for joining steel or reinforced steel concrete column and beam with reinforcing end part
KR20170013009A (en) Method for constructing junction between the double wall Precast Concretes and the junction structure thereof, the construction method for underground parking using he double wall Precast Concrete, and construction method for the rainwater storage using he double wall Precast Concrete
JP5869717B1 (en) Existing concrete structure reinforcement structure
KR101880813B1 (en) A sandwitch pc pannel structure and construction method of structure using thereof
KR20130042526A (en) Attachment plates adjoining ends of concrete beam with walls of abutments, and method of building concrete structure using the same
KR101415695B1 (en) Structure for clean room using composite beam
KR20090007085A (en) Form with reinforced bar, manufacturing method thereof and construction method using the same
JP2011089390A (en) Rigid connection structure of corner section
KR101324884B1 (en) Hybrid building construction method combining dry type and wet type
JP5207078B2 (en) Construction method for seismic control columns
WO2015051551A1 (en) Building and construction method thereof
JP5872332B2 (en) Seismic reinforcement method for buildings

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee