KR101332521B1 - Module-type girder having kerb assembly and method for constructing module-type girder - Google Patents

Module-type girder having kerb assembly and method for constructing module-type girder Download PDF

Info

Publication number
KR101332521B1
KR101332521B1 KR1020120013006A KR20120013006A KR101332521B1 KR 101332521 B1 KR101332521 B1 KR 101332521B1 KR 1020120013006 A KR1020120013006 A KR 1020120013006A KR 20120013006 A KR20120013006 A KR 20120013006A KR 101332521 B1 KR101332521 B1 KR 101332521B1
Authority
KR
South Korea
Prior art keywords
curb
girder
assembly
steel pipe
modular
Prior art date
Application number
KR1020120013006A
Other languages
Korean (ko)
Other versions
KR20130091598A (en
Inventor
박선규
조두용
정호성
최진웅
Original Assignee
성균관대학교산학협력단
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 성균관대학교산학협력단 filed Critical 성균관대학교산학협력단
Priority to KR1020120013006A priority Critical patent/KR101332521B1/en
Publication of KR20130091598A publication Critical patent/KR20130091598A/en
Application granted granted Critical
Publication of KR101332521B1 publication Critical patent/KR101332521B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/10Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

본 발명은 연석 조립체를 구비하는 모듈형 거더에 관한 것이며, 본 발명의 연석 조립체를 구비하는 모듈형 거더는 프리캐스트 콘크리트로 제작되며, 상호 결합되는 복수개의 거더; 상기 거더 상에 상호 이격되게 설치되는 복수개의 강관; 프리캐스트 콘크리트로 제작되며, 상기 강관이 삽입되도록 삽입공이 형성되어 상기 거더 상에 설치되는 복수개의 연석 조립체;를 포함하며, 상기 연석 조립체는 상기 강관을 중심으로 상호 마주보며 결합하여 삽입공을 형성하는 한 쌍의 연석몸체로 구성되는 것을 특징으로 한다.
따라서, 본 발명에 의하면, 조립형 연석 조립체를 이용하여 용이하게 시공할 수 있는 조립체를 구비하는 모듈형 거더가 제공된다.
The present invention relates to a modular girder having a curb assembly, the modular girder having a curb assembly of the present invention is made of precast concrete, a plurality of girders coupled to each other; A plurality of steel pipes spaced apart from each other on the girder; It is made of precast concrete, and the insertion hole is formed so that the steel pipe is inserted into a plurality of curbstone assembly is installed on the girder; The curbstone assembly is coupled to face each other with respect to the steel pipe to form an insertion hole It is characterized by consisting of a pair of curb body.
Therefore, according to this invention, the modular girder provided with the assembly which can be easily constructed using an assembled curbstone assembly is provided.

Description

연석 조립체를 구비하는 모듈형 거더 및 모듈형 거더 시공방법{MODULE-TYPE GIRDER HAVING KERB ASSEMBLY AND METHOD FOR CONSTRUCTING MODULE-TYPE GIRDER}Modular girder and modular girder construction method with curb assembly {MODULE-TYPE GIRDER HAVING KERB ASSEMBLY AND METHOD FOR CONSTRUCTING MODULE-TYPE GIRDER}

본 발명은 연석 조립체를 구비하는 모듈형 거더 및 모듈형 거더 시공방법에 관한 것으로서, 보다 상세하게는 모듈형 거더를 이용하여 구조물을 용이하게 시공할 수 있는 연석 조립체를 구비하는 모듈형 거더 및 모듈형 거더 시공방법에 관한 것이다.The present invention relates to a modular girder and a modular girder construction method having a curb assembly, and more particularly, a modular girder and a modular girder having a curb assembly which can be easily constructed using a modular girder. It is about a girder construction method.

일반적으로 교량의 최외곽에는 연석이 설치되어 보행자를 보호하고, 주행중인 차량이 교량으로부터 이탈되는 것을 방지하고 있다.In general, curbstones are installed on the outermost side of the bridge to protect pedestrians and to prevent driving vehicles from escaping from the bridge.

종래에는 미리 시공된 상태의 거더의 상부에 설치된 연석 형상에 대응되는 거푸집을 제작하고, 제작된 거푸집에 콘크리트를 타설하는 방법을 이용하여 연석을 설치하는 것이 일반적이다. 그러나, 이러한 종래의 시공방법의 경우에 양생기간으로 인하여 공사기간 지연되고, 품질관리가 까다로운 문제가 있었다.Conventionally, it is common to prepare a formwork corresponding to the curb shape installed on the upper part of the girder in a pre-constructed state, and install the curb by using a method of pouring concrete into the manufactured formwork. However, in the case of such a conventional construction method, the construction period is delayed due to the curing period, and quality control is difficult.

또한, 차량 충돌 후에 파손된 연석을 교체하기 위해서는 파손된 부분과 연결되어 있는 콘크리트 연석을 모두 제거한 후에 콘크리트를 다시 타설하여야 하므로, 유지 및 보수가 용이하지 않다는 문제가 있었다.In addition, in order to replace the damaged curb after the vehicle crash, after removing all the concrete curb connected to the damaged portion, the concrete must be poured again, there was a problem that maintenance and repair is not easy.

따라서, 본 발명의 목적은 이와 같은 종래의 문제점을 해결하기 위한 것으로서, 조립형 연석 조립체를 이용하여 용이하게 시공할 수 있는 조립체를 구비하는 모듈형 거더를 제공함에 있다.Accordingly, an object of the present invention is to solve such a conventional problem, to provide a modular girder having an assembly that can be easily constructed using the prefabricated curb assembly.

또한, 모듈형 거더를 이용하여 공사기간 및 공사비용을 절감할 수 있는 모듈형 거더 시공방법을 제공함에 있다.In addition, the present invention provides a modular girder construction method that can reduce the construction period and construction cost by using a modular girder.

상기 목적은, 본 발명에 따라, 프리캐스트 콘크리트로 제작되며, 상호 결합되는 복수개의 거더; 상기 거더 상에 상호 이격되게 설치되는 복수개의 강관; 프리캐스트 콘크리트로 제작되며, 상기 강관이 삽입되도록 삽입공이 형성되어 상기 거더 상에 설치되는 복수개의 연석 조립체;를 포함하며, 상기 연석 조립체는 상기 강관을 중심으로 상호 마주보며 결합하여 삽입공을 형성하는 한 쌍의 연석몸체로 구성되는 것을 특징으로 하는 연석 조립체를 구비하는 모듈형 거더에 의해 달성된다.The object, according to the present invention, is made of precast concrete, a plurality of girders coupled to each other; A plurality of steel pipes spaced apart from each other on the girder; It is made of precast concrete, and the insertion hole is formed so that the steel pipe is inserted into a plurality of curbstone assembly is installed on the girder; The curbstone assembly is coupled to face each other with respect to the steel pipe to form an insertion hole A modular girder having a curb assembly comprising a pair of curb bodies.

삭제delete

또한, 결합강도가 향상되도록 상기 한 쌍의 연석몸체와 상기 강관을 관통하여 체결되는 체결부재를 더 포함할 수 있다.In addition, the coupling member may further include a fastening member fastened through the pair of curb bodies and the steel pipe so as to increase the bonding strength.

또한, 상기 강관은 적어도 일부가 상기 연석 조립체의 상측으로 돌출되에 노출되고, 노출된 상기 강관에 장착되어 상측으로 돌출되는 지주부재; 이웃하는 상기 지주부재 간을 상호 연결하는 방호 울타리;를 더 포함할 수 있다.
또한, 상기 목적은, 본 발명에 따라, 프리캐스트 콘크리트를 이용하여 거더를 제작하는 거더 제작단계; 프리캐스트 콘크리트를 이용하여 연석 조립체를 제작하는 연석 조립체 제작단계; 상기 거더 상에 복수개의 강관을 삽입하여 설치하는 강관설치단계; 상기 제작된 연석 조립체를 상기 강관 상에 장착하는 연석장착단계; 복수개의 거더를 상호 연결하는 거더 연결단계;를 포함하고, 상기 연석 조립체는 서로 결합하여 삽입공을 형성하는 한 쌍의 연석몸체로 구성되며, 상기 연석장착단계는 상기 강관이 상기 삽입공 상에 위치시킨 상태에서 상기 한 쌍의 연석몸체를 결합시키는 연석몸체 결합단계; 체결부재를 상기 한 쌍의 연석몸체와 상기 강관을 관통시켜 체결하는 체결부재 체결단계;를 포함하는 것을 특징으로 하는 모듈형 거더 시공방법에 의해 달성된다.
In addition, the steel pipe is at least a portion is exposed to the projecting to the upper side of the curb assembly, the holding member is mounted to the exposed steel pipe protruding upward; It may further include a; protective fence for interconnecting the adjacent strut member.
In addition, the above object, according to the present invention, girder manufacturing step of manufacturing the girder using precast concrete; Curb assembly manufacturing step of manufacturing a curb assembly using precast concrete; Steel pipe installation step of installing by inserting a plurality of steel pipe on the girder; Curb mounting step of mounting the manufactured curb assembly on the steel pipe; And a girder connecting step of interconnecting a plurality of girders, wherein the curb assembly is composed of a pair of curb bodies which are coupled to each other to form insertion holes, and the curb mounting step includes the steel pipe being positioned on the insertion hole. Curb body coupling step of coupling the pair of curb body in the state; A fastening member fastening step of fastening the fastening member through the pair of curb bodies and the steel pipe is achieved by a modular girder construction method comprising a.

삭제delete

삭제delete

또한, 상기 연석몸체 결합단계에서는 상기 강관이 적어도 일부가 상기 연석 조립체의 상부에 노출되도록 하고, 상기 연석장착단계 이후에 상기 연석 조립체로부터 외부로 노출된 복수개의 강관 각각에 지주부재를 설치하는 지주부재 설치단계; 이웃하여 배치되는 상기 지주부재를 상호 연결하는 방호부재를 설치하는 방호부재 설치단계;를 더 포함할 수 있다.In addition, in the curb body coupling step, the steel member is at least a portion of the holding member to be exposed to the upper portion of the curb assembly, and the holding member is installed in each of the plurality of steel pipes exposed to the outside from the curb assembly after the curb mounting step Installation step; It may further include a protective member installation step of installing a protective member for interconnecting the strut members disposed adjacent to each other.

본 발명에 따르면, 프리캐스트 콘크리트를 이용하여 모듈형으로 거더를 미리 제작하여 연결함으로써, 시공 현장에서 거푸집 제작, 콘크리트 타설 등의 공정을 거쳐야 하는 종래의 시공방법에 비하여 간단하게 시공할 수 있으므로, 공사기간이 줄어들고 공사비용을 절감할 수 있는 연석 조립체를 구비하는 모듈형 거더 및 모듈형 거더 시공방법이 제공된다.According to the present invention, by using the precast concrete to make the girder in a modular form in advance, the construction can be easily compared to the conventional construction method that must go through the process of forming the formwork, concrete, etc. in the construction site, construction Modular girders and modular girder construction methods are provided with curb assemblies that can reduce time and reduce construction costs.

또한, 모듈형 거더의 길이, 형상 및 중량을 원하는 형태로 설계하여 제작할 수 있으므로 운반이 용이하고, 긴급 설계 변경 시에도 원하는 구간에 설치되는 모듈형 거더의 형태만 재설계하여 해결할 수 있으므로 설계변경이 매우 용이하다.In addition, the length, shape and weight of the modular girder can be designed and manufactured in a desired form, so it is easy to carry, and even in case of an emergency design change, only the shape of the modular girder installed in the desired section can be redesigned and solved so that the design change is easy. Very easy.

또한, 강관 상에 분리형 연석몸체를 강관을 둘러싸는 형태로 조립하여 연석 조립체를 제작함으로써, 강관의 직경에 상관없이 연석 조립체를 장착할 수 있으므로, 연석 조립체에 삽입공을 정밀 가공하는데 소요되는 비용 및 시간을 절감할 수 있다.In addition, by preparing a curbstone assembly by assembling a separate curb body in the form surrounding the steel pipe on the steel pipe, the curbstone assembly can be mounted regardless of the diameter of the steel pipe, the cost required to precisely process the insertion hole in the curbstone assembly Save time.

또한, 연석 조립체의 파손 시에는 파손된 연석 조립체만 분리하는 방법을 통하여 교환 및 보수가 용이하다.In addition, when the curbstone assembly is broken, it is easy to exchange and repair through a method of separating only the damaged curbstone assembly.

도 1은 본 발명의 일실시예에 따른 연석 조립체를 구비하는 모듈형 거더 다수개가 상호 연결되어 형성되는 구조물의 개략적인 사시도이고,
도 2는 도 1의 연석 조립체를 구비하는 모듈형 거더의 분해 사시도이고,
도 3은 본 발명의 일실시예에 따른 모듈형 거더 시공방법의 공정 흐름도이고,
도 4는 도 3의 모듈형 거더 시공방법의 거더 제작단계 공정을 개략적으로 도시한 것이고,
도 5는 도 3의 모듈형 거더 시공방법의 연석 조립체 제작단계 공정을 개략적으로 도시한 것이고,
도 6은 도 3의 모듈형 거더 시공방법의 강관설치단계 공정을 개략적으로 도시한 것이고,
도 7은 도 3의 모듈형 거더 시공방법의 연석몸체 결합단계 공정을 개략적으로 도시한 것이고,
도 8은 도 3의 모듈형 거더 시공방법의 체결부재 체결단계 공정을 개략적으로 도시한 것이고,
도 9는 도 3의 모듈형 거더 시공방법의 지주부재 설치단계 공정을 개략적으로 도시한 것이고,
도 10은 도 3의 모듈형 거더 시공방법의 방호부재 설치단계 공정을 개략적으로 도시한 것이고,
도 11은 도 3의 모듈형 거더 시공방법의 거더 연결단계 공정을 개략적으로 도시한 것이다.
1 is a schematic perspective view of a structure in which a plurality of modular girders having a curb assembly according to an embodiment of the present invention are interconnected and formed;
FIG. 2 is an exploded perspective view of the modular girder with the curb assembly of FIG. 1,
3 is a process flowchart of a modular girder construction method according to an embodiment of the present invention,
Figure 4 schematically shows the girder manufacturing step process of the modular girder construction method of FIG.
Figure 5 schematically shows the curbstone assembly manufacturing process of the modular girder construction method of FIG.
Figure 6 schematically shows the steel pipe installation step process of the modular girder construction method of Figure 3,
Figure 7 schematically shows the curb body coupling step process of the modular girder construction method of Figure 3,
FIG. 8 schematically illustrates a fastening member fastening step process of the modular girder construction method of FIG. 3;
FIG. 9 schematically illustrates a step of installing a support member of the modular girder construction method of FIG. 3;
FIG. 10 schematically illustrates a process of installing a protection member of the modular girder construction method of FIG. 3;
FIG. 11 schematically illustrates the girder connection step process of the modular girder construction method of FIG. 3.

이하, 첨부한 도면을 참조하여 본 발명의 일실시예에 따른 연석 조립체를 구비하는 모듈형 거더에 대하여 상세하게 설명한다.Hereinafter, with reference to the accompanying drawings will be described in detail a modular girder having a curb assembly according to an embodiment of the present invention.

도 1은 본 발명의 일실시예에 따른 연석 조립체를 구비하는 모듈형 거더 다수개가 상호 연결되어 형성되는 구조물의 개략적인 사시도이고, 도 2는 도 1의 연석 조립체를 구비하는 모듈형 거더의 분해 사시도이다.1 is a schematic perspective view of a structure in which a plurality of modular girders having a curb assembly are formed interconnected according to an embodiment of the present invention, and FIG. 2 is an exploded perspective view of a modular girder having a curb assembly of FIG. to be.

도 1 및 도 2를 참조하면, 본 발명의 일실시예에 따른 연석 조립체를 구비하는 모듈형 거더(100)는 상호 조립되어 교량 등의 구조물(10)을 구성하도록 모듈형 거더에 관한 것으로서, 거더(110)와 강관(120)과 연석 조립체(130)와 체결부재(140)와 지주부재(150)와 방호부재(160)를 포함한다.1 and 2, the modular girder 100 having a curb assembly according to an embodiment of the present invention relates to a modular girder to be assembled together to form a structure 10, such as a bridge, girder 110, the steel pipe 120, the curb assembly 130, the fastening member 140, the strut member 150, and the protective member 160 are included.

상기 거더(110)는 일반적인 교량 시공에 사용되는 거더의 횡단면과 동일한 단면을 갖는 것으로서, 운반 및 제작이 용이하도록 모듈형으로 제작된다. 특히, 본 실시예에서 거더(110)는 프리캐스트 콘크리트(Precast Concrete)로 미리 제작된다.The girder 110 has the same cross section as the cross section of the girder used in general bridge construction, and is manufactured in a modular form to facilitate transportation and fabrication. In particular, in the present embodiment, the girder 110 is made in advance of precast concrete.

한편, 거더(110)의 상면 단부 영역에는 후술하는 강관(120)이 장착될 수 있도록 길이 방향을 따라 복수개의 결합공(111)이 상호 이격되게 형성된다.On the other hand, the upper end portion of the girder 110 is formed with a plurality of coupling holes 111 are spaced apart from each other along the longitudinal direction so that the steel pipe 120 to be described later is mounted.

상기 강관(120)은 상기 거더(110) 상에 장착되어 후술하는 연석 조립체(130)를 고정하여 지지하는 부재로서, 복수개가 상술한 거더(110)의 결합공(111) 상에 각각 장착된다. 한편, 강관(120)의 길이는 일단이 결합공(111) 내에 장착된 후에 연석 조립체(130)가 결합된 상태에서 연석 조립체의 상단으로 타단부의 일부가 노출될 수 있는 정도로 구비된다. 강관(120)의 소재는 연석조립체(130)를 견고히 지지할 수 있는 것이라면 제한되는 것은 아니다.The steel pipe 120 is mounted on the girder 110 and is a member for fixing and supporting the curb assembly 130 to be described later, a plurality of each is mounted on the coupling hole 111 of the girder 110 described above. On the other hand, the length of the steel pipe 120 is provided so that a portion of the other end can be exposed to the top of the curb assembly in the state in which the curb assembly 130 is coupled after one end is mounted in the coupling hole 111. The material of the steel pipe 120 is not limited as long as it can firmly support the curbstone assembly 130.

상기 연석 조립체(130)는 보행자의 안전을 확보하고 진행 차량의 구조물 이탈을 방지하기 위하여 외곽 경계에 설치되는 것으로서, 한 쌍의 연석몸체(131)로 구성된다.The curb assembly 130 is installed on the outer boundary in order to ensure the safety of the pedestrian and to prevent the departure of the structure of the progressing vehicle, it is composed of a pair of curb body 131.

상기 연석몸체(131)는 거더(110)와 동일한 소재인 프리캐스트 콘크리트로 제작되는 것으로서, 한 쌍이 상호 결합함으로써 연석 조립체(130)를 형성한다.The curb body 131 is made of precast concrete, which is the same material as the girder 110, and forms a curb assembly 130 by combining a pair.

연석몸체(131)의 결합면(132) 상에는 반원형의 횡단면을 가지고 함몰되는 함몰부(133)가 연석몸체(131)의 상하로 길게 형성되며, 한 쌍의 연석몸체(131)의 결합시 각 연석몸체(131)에 형성되는 함몰부(133)가 서로 대향됨으로써 원형 단면의 삽입공(134)을 형성한다.On the coupling surface 132 of the curb body 131, the depression 133, which is recessed with a semicircular cross section, is formed long up and down of the curb body 131, and each curb when the pair of curb body 131 is coupled The depressions 133 formed in the body 131 face each other to form insertion holes 134 having a circular cross section.

한편, 함몰부(133)에 강관(120)이 접촉된 상태에서 한 쌍의 연석몸체(131)는 서로 대향하며 결합됨으로써, 연석 조립체(130)의 삽입공(134) 내에 최종적으로 강관(120)이 삽입되는 구조를 갖는다.On the other hand, in the state in which the steel pipe 120 is in contact with the recess 133, the pair of curb bodies 131 are opposed to each other, and thus, the steel pipe 120 is finally inserted into the insertion hole 134 of the curb assembly 130. It has a structure to be inserted.

상기 체결부재(140)는 연석 조립체(130) 및 이에 삽입된 강관(120)이 견고하게 서로 체결되도록 연석 조립체(130)와 강관(120)을 두께방향으로 따라 관통하여 체결되는 부재이다. 본 실시예에서 체결부재(140)로는 볼트가 이용되나 이에 제한되는 것은 아니다.The fastening member 140 is a member that penetrates the curb assembly 130 and the steel pipe 120 in the thickness direction so that the curb assembly 130 and the steel pipe 120 inserted thereto are firmly fastened to each other. In this embodiment, the fastening member 140 is used but the bolt is not limited thereto.

상기 지주부재(150)는 후술하는 방호부재(160)를 지지하기 위하여 강관(120)에 장착되는 것으로서, 설치된 복수개 강관(120) 각각의 상단으로부터 연장되어 상측으로 돌출되게 장착된다.The support member 150 is mounted on the steel pipe 120 to support the protection member 160, which will be described later. The support member 150 extends from an upper end of each of the plurality of installed steel pipes 120 and protrudes upward.

상기 방호부재(160)는 연석 조립체(130)의 상방의 영역을 보호하기 위한 부재로서, 거더(110) 상에 설치되는 각 강관(120)을 차례대로 연결하며 거더(110)의 길이방향을 따라 길게 장착된다.The protection member 160 is a member for protecting an upper area of the curb assembly 130, and connects each steel pipe 120 installed on the girder 110 in sequence and along the longitudinal direction of the girder 110. It is mounted long.

따라서, 상술한 구조로 구성되는 연석 조립체(130)를 구비하는 조립식 모듈형 거더(110)를 복수개 제작하여 상호 연결함으로써 최종 구조물(10)을 용이하게 시공할 수 있다.
Accordingly, the final structure 10 may be easily constructed by making a plurality of modular modular girders 110 having the curb assembly 130 having the above-described structure and interconnecting them.

지금부터는 본 발명의 일실시예에 따른 모듈형 거더 시공방법(S100)에 대하여 설명한다.Hereinafter, a modular girder construction method (S100) according to an embodiment of the present invention will be described.

도 3은 본 발명의 일실시예에 따른 모듈형 거더 시공방법의 공정 흐름도이다.3 is a process flowchart of the modular girder construction method according to an embodiment of the present invention.

도 3을 참조하면, 본 발명의 일실시예에 따른 모듈형 거더 시공방법(S100)은 모듈형의 거더(100)를 제작하고 조립하여 최종 구조물(10)을 시공하는 방법에 관한 것으로서, 거더 제작단계(S110)와 연석 조립체 제작단계(S120)와 강관설치단계(S130)와 연석장착단계(S140)와 지주부재 설치단계(S150)와 방호부재 설치단계(S160)와 거더 연결단계(S170)를 포함한다.Referring to Figure 3, the modular girder construction method according to an embodiment of the present invention (S100) relates to a method for constructing the final structure 10 by manufacturing and assembling the modular girder 100, girder fabrication Step (S110) and curbstone assembly manufacturing step (S120) and steel pipe installation step (S130) and curbstone mounting step (S140) and holding member installation step (S150) and protective member installation step (S160) and girder connection step (S170) Include.

도 4는 도 3의 모듈형 거더 시공방법의 거더 제작단계 공정을 개략적으로 도시한 것이다.Figure 4 schematically shows the girder manufacturing step process of the modular girder construction method of FIG.

도 4에 도시된 바와 같이, 상기 거더 제작단계(S110)는 모듈형의 거더(100)를 제작하여 준비하는 단계이다. 본 단계에서 거더(100)는 제작 후에 운반이 용이하고 우수한 내구력의 프리캐스트 콘크리트(Precast Concrete)로 제작된다. As shown in Figure 4, the girder manufacturing step (S110) is a step to prepare and prepare a modular girder 100. In this step, the girder 100 is made of precast concrete of easy carrying and excellent durability after production.

한편, 거더(100)는 모듈형으로서 복수개가 상호 연결, 조립됨으로써 최종 구조물(10)을 구성하는 것이며, 운반이 용이하도록 제작되는 장소와 시공되는 장소가 떨어져 있는 거리를 고려하여, 적절히 분할된 길이로 제작될 수 있다. 또한, 곡률을 가지는 경로에 시공되는 거더(100)의 경우에는 곡률반경 등 고려하여 제작되는 것이 바람직하다.On the other hand, the girder 100 is modular and constitutes the final structure 10 by interconnecting and assembling a plurality, and the length is appropriately divided in consideration of the distance between the place to be manufactured and the place to be constructed for easy transportation. It can be produced as. In addition, in the case of the girder 100 which is constructed in a path having a curvature, it is preferable to be manufactured in consideration of the radius of curvature.

거더(100) 상면의 단부 측에는 내부로 함몰되는 형태의 복수개의 결합공(111)을 거더(100)의 길이방향을 따라 상호 이격되게 형성한다. 각 결합공(111)의 함몰깊이, 결합공(111)의 개수는 설치되는 강관(120)의 길이, 각 거더(100) 상에 설치되는 연석 조립체(130)의 형태 및 개수 등을 종합적으로 고려하여 설계하는 것이 바람직하다.End portions of the upper surface of the girder 100 are formed to be spaced apart from each other along the longitudinal direction of the girder 100 a plurality of coupling holes 111 in the form recessed inward. Depth of each coupling hole 111, the number of coupling holes 111 in consideration of the length of the steel pipe 120 is installed, the shape and number of curb assembly 130 is installed on each girder 100, etc. It is preferable to design by.

도 5는 도 3의 모듈형 거더 시공방법의 연석 조립체 제작단계 공정을 개략적으로 도시한 것이다.FIG. 5 schematically illustrates a curbstone assembly manufacturing process of the modular girder construction method of FIG. 3.

도 5에 도시된 바와 같이, 상기 연석 조립체 제작단계(S120)는 거더(110) 상에 설치되는 연석 조립체(130)를 구성하는 연석몸체(131)를 제작하는 단계이다. 즉, 한 쌍의 연석몸체(131)가 상호 결합하여 연석 조립체(130)를 구성하며 본 단계에서는 조립식 구조(130)를 구성하는 연석몸체(131)를 제작한다.As shown in FIG. 5, the curbstone assembly manufacturing step S120 is a step of manufacturing the curb body 131 constituting the curbstone assembly 130 installed on the girder 110. That is, a pair of curb bodies 131 are coupled to each other to form a curb assembly 130, and in this step to produce a curb body 131 constituting the prefabricated structure (130).

본 단계에서 상기 연석몸체(131)는 상술한 거더(110)와 마찬가지로 경량으로서 운반이 용이하고 내구성이 우수한 프리캐스트 콘크리트로 제작된다. 각 연석몸체(131)의 측면, 즉, 연석몸체(131) 간 대향하며 결합되는 결합면(132) 상에는 반원 형태의 단면을 가지고 함몰되는 함몰부(133)가 형성된다. 따라서, 연석몸체(131) 간 결합시에 결합면(132)에 형성되는 함몰부(133)가 대향됨으로써 삽입공(134)이 형성된다.In this step, the curb body 131 is made of precast concrete, which is light and easy to carry and has excellent durability similar to the girder 110 described above. On the side surface of each curb body 131, that is, the engaging surface 132 facing and coupled between the curb bodies 131, a recess 133 is formed to have a semicircular cross section. Thus, the insertion hole 134 is formed by opposing the recessed portion 133 formed on the coupling surface 132 at the time of coupling between the curb bodies 131.

한편, 연석몸체(131) 상에 형성되는 함몰부(133)의 갯수는 각 연석 조립체(130)와 결합되는 강관(120)의 개수에 대응되게 형성한다. 본 실시예에서는 각 연석 조립체(130)에 두 개의 강관(120)이 삽입되어 함몰부(133) 역시 두 개를 형성하는 것으로 하여 설명하나, 이에 제한되는 것은 아니다.On the other hand, the number of depressions 133 formed on the curb body 131 is formed to correspond to the number of steel pipes 120 coupled to each curb assembly (130). In this embodiment, two steel pipes 120 are inserted into each curb assembly 130 to be described as forming two recesses 133, but the present invention is not limited thereto.

도 6은 도 3의 모듈형 거더 시공방법의 강관설치단계 공정을 개략적으로 도시한 것이다.Figure 6 schematically shows the steel pipe installation step process of the modular girder construction method of FIG.

도 6에 도시된 바와 같이, 상기 강관설치단계(S130)는 제작된 거더(110)의 결합공(111) 내에 강관(120)을 삽입하여 설치함으로써 거더(110)의 상측으로 강관(120)이 돌출되도록 하는 단계이다.As shown in Figure 6, the steel pipe installation step (S130) is a steel pipe 120 to the upper side of the girder 110 by installing by inserting the steel pipe 120 in the coupling hole 111 of the manufactured girder 110. This step is to protrude.

상기 연석장착단계(S140)는 복수개의 강관(120)에 연석 조립체(130)를 장착T시키는 단계로서, 연석몸체 결합단계(S141)와 체결부재 체결단계(S142)를 포함한다.The curbstone mounting step (S140) is a step of mounting the curb assembly 130 to the plurality of steel pipes 120, and includes a curb body coupling step (S141) and a fastening member fastening step (S142).

도 7은 도 3의 모듈형 거더 시공방법의 연석몸체 결합단계 공정을 개략적으로 도시한 것이다.Figure 7 schematically shows the curb body coupling step process of the modular girder construction method of FIG.

도 7에 도시된 바와 같이, 상기 연석몸체 결합단계(S141)는 한 쌍의 연석몸체(131)를 상호 결합하여 연석 조립체(130)를 조립하는 단계이다.As shown in Figure 7, the curb body coupling step (S141) is a step of assembling the curb assembly 130 by mutually coupling a pair of curb body 131.

먼저, 각 연석몸체(131)의 함몰부(133)를 강관(120)의 외주면에 접촉시킨 상태에서 한 쌍의 연석몸체(131)를 서로 대향 배치하여 결합시킨다. 따라서, 대향하는 한 쌍의 함몰부(133)는 삽입공(134)을 형성하고, 삽입공(134) 내에는 강관(120)이 삽입된 상태로 연석몸체(131)가 조립된다.First, a pair of curb bodies 131 are disposed to face each other in a state where the recesses 133 of each curb body 131 are in contact with the outer circumferential surface of the steel pipe 120. Accordingly, the pair of recesses 133 facing each other form an insertion hole 134, and the curb body 131 is assembled with the steel pipe 120 inserted into the insertion hole 134.

도 8은 도 3의 모듈형 거더 시공방법의 체결부재 체결단계 공정을 개략적으로 도시한 것이다.FIG. 8 schematically illustrates a fastening member fastening step process of the modular girder construction method of FIG. 3.

도 8에 도시된 바와 같이, 상기 체결부재 체결단계(S142)는 소정의 체결부재(140)를 이용하여 연석몸체 결합단계(S141)에서 조립된 연석몸체(131)와 강관(120)을 견고히 체결하는 단계이다. 본 실시예에서 체결부재(140)로는 볼트가 이용되며, 체결부재(140)를 연석몸체(131)와 강관(120)을 관통하도록 체결하여 결합시킨다.As shown in Figure 8, the fastening member fastening step (S142) is firmly fastened to the curb body 131 and the steel pipe 120 assembled in the curb body coupling step (S141) using a predetermined fastening member 140. It's a step. In this embodiment, the fastening member 140 uses a bolt, and fastens the fastening member 140 to pass through the curb body 131 and the steel pipe 120 to be coupled.

따라서, 본 단계에서는 한 쌍의 연석몸체(131)가 강관(120)의 양측으로부터 강관(120)을 수용하며 상호 조립됨으로써, 연석몸체(131)에 형성되는 함몰부(133)의 내경의 크기가 강관(120)의 외경에 정확하게 대응되지 않는 경우에도 강관(120)과 연석 조립체(130) 간의 견고한 조립이 가능하다.Therefore, in this step, the pair of curb bodies 131 receive the steel pipes 120 from both sides of the steel pipe 120 and are assembled to each other, so that the size of the inner diameter of the recess 133 formed in the curb body 131 is increased. Even if it does not correspond precisely to the outer diameter of the steel pipe 120, a solid assembly between the steel pipe 120 and the curb assembly 130 is possible.

한편, 본 실시예에서 각 거더(110) 상에 장착되는 복수개의 연석 조립체(130)의 구조는 이웃하는 연석 조립체(130)가 상호 이격되는 형태로 배치되나, 이에 제한되지 않고, 이웃하는 연석 조립체(130)가 모두 연결되는 구조로 배열될 수도 있으며, 연결되는 거더(110)의 총 길이, 개수, 시공장소 및 사용용도, 강관(120)의 개수, 시공비용 등을 종합적으로 고려하여 다른 배열구조가 채택될 수도 있다.On the other hand, in the present embodiment, the structure of the plurality of curb assembly 130 mounted on each girder 110 is arranged in a form in which the neighboring curb assembly 130 is spaced apart from each other, but is not limited thereto, the neighboring curb assembly All of the 130 may be arranged in a structure that is connected, the total length, the number of the girder 110 to be connected, the use of the factory and use, the number of steel pipes 120, the construction cost in consideration of the other arrangement structure May be adopted.

도 9는 도 3의 모듈형 거더 시공방법의 지주부재 설치단계 공정을 개략적으로 도시한 것이다.FIG. 9 schematically illustrates a step of installing a support member of the modular girder construction method of FIG. 3.

도 9에 도시된 바와 같이, 상기 지주부재 설치단계(S150)는 연석 조립체(130)의 상측으로 돌출되는 강관(120) 각각에 지주부재(150)를 설치하는 단계이다. 따라서, 본 단계에 의하면, 상호 이격되는 복수개의 강관(120) 각각에 지주부재(150)가 설치되므로, 강관(120)과 마찬가지로 지주부재(150) 역시 복수개가 상호 이격되는 형태로 배치된다.As shown in Figure 9, the holding member installation step (S150) is a step of installing the holding member 150 in each of the steel pipe 120 protruding to the upper side of the curb assembly 130. Therefore, according to this step, since the holding member 150 is installed in each of the plurality of steel pipes 120 that are spaced apart from each other, like the steel pipe 120, the holding members 150 are also arranged in a plurality of spaced apart form.

도 10은 도 3의 모듈형 거더 시공방법의 방호부재 설치단계 공정을 개략적으로 도시한 것이다.FIG. 10 schematically illustrates a process of installing a protective member of the modular girder construction method of FIG. 3.

도 10에 도시된 바와 같이, 상기 방호부재 설치단계(S160)는 상호 이격되는 지주부재(150)에 방호부재(160)를 설치하는 단계이다.As shown in Figure 10, the protective member installation step (S160) is a step of installing the protective member 160 in the strut member 150 spaced apart from each other.

본 실시예에서 설치되는 방호부재(160)는 거더(110)의 길이방향을 따라서 길게 형성되며, 이격되게 배치되는 지주부재(150)를 모두 연결하며 설치된다. 또한, 방호부재(160)는 지주부재(150)의 높이별로 복수개가 상호 이격되게 장착된다. 따라서, 본 단계에 의하면, 방호부재(150)와 지주부재(160)는 서로 직각을 형성하는 구조로 설계된다.Protective member 160 is installed in this embodiment is formed long along the longitudinal direction of the girder 110, is installed to connect all the strut members 150 are spaced apart. In addition, the plurality of protection member 160 is mounted to be spaced apart from each other by the height of the holding member 150. Therefore, according to this step, the protection member 150 and the holding member 160 is designed to have a structure forming a right angle with each other.

도 11은 도 3의 모듈형 거더 시공방법의 거더 연결단계 공정을 개략적으로 도시한 것이다.FIG. 11 schematically illustrates the girder connection step process of the modular girder construction method of FIG. 3.

도 11에 도시된 바와 같이, 상기 거더 연결단계(S170)는 상술한 단계의 공정에 의하여 완성되는 모듈형 거더(100) 복수개를 상호 연결하여 최종 구조물(10)을 완성하는 단계이다.As illustrated in FIG. 11, the girder connection step S170 is a step of completing the final structure 10 by interconnecting a plurality of modular girders 100 completed by the above-described steps.

즉, 본 단계에서는 프리캐스트 콘크리트로 미리 제작되는 모듈형의 거더(100)를 시공장소에서 서로 연결함으로 원하는 형태의 구조물(10)이 최종 완성된다.
That is, in this step, the structure 10 of the desired shape is finally completed by connecting the modular girders 100 made of precast concrete to each other at the city factory.

따라서, 본 실시예에 의하면, 프리캐스트 콘크리트를 이용하여 모듈형으로 거더(100)를 미리 제작하여 연결함으로써, 시공 현장에서 거푸집 제작, 콘크리트 타설 등의 공정을 거쳐야 하는 종래의 시공방법에 비하여 간단하게 시공할 수 있으므로, 공사기간이 줄어들고 공사비용을 절감할 수 있다.Therefore, according to the present embodiment, by preparing and connecting the girder 100 in a modular form using precast concrete in advance, it is simpler than the conventional construction method that requires a process such as formwork, concrete pouring, etc. at the construction site. As construction can be done, construction period can be shortened and construction cost can be reduced.

또한, 모듈형 거더(100)의 길이, 형상 및 중량을 원하는 형태로 설계하여 제작할 수 있으므로 운반이 용이하고, 긴급 설계 변경 시에도 원하는 구간에 설치되는 모듈형 거더의 형태만 재설계하여 해결할 수 있으므로 설계변경이 매우 용이하다.In addition, since the length, shape and weight of the modular girder 100 can be designed and manufactured in a desired form, it is easy to carry and can be solved by redesigning only the shape of the modular girder installed in a desired section even when an urgent design is changed. Design change is very easy.

또한, 강관(120) 상에 분리형 연석몸체(131)를 강관(120)을 둘러싸는 형태로 조립하여 연석 조립체(130)를 장착함으로써, 연석 조립체(130)에 삽입공을 정밀하게 가공할 필요없이 강관(120)의 직경에 상관없이 연석 조립체를 장착할 수 있으므로 가공비용 및 시간을 절감할 수 있다.
In addition, by assembling the detachable curb body 131 in the form surrounding the steel pipe 120 on the steel pipe 120 to mount the curb assembly 130, there is no need to precisely process the insertion hole in the curb assembly 130 Regardless of the diameter of the steel pipe 120 can be mounted curb assembly can reduce the processing cost and time.

본 발명의 권리범위는 상술한 실시예에 한정되는 것이 아니라 첨부된 특허청구범위 내에서 다양한 형태의 실시예로 구현될 수 있다. 특허청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술 분야에서 통상의 지식을 가진 자라면 누구든지 변형 가능한 다양한 범위까지 본 발명의 청구범위 기재의 범위 내에 있는 것으로 본다.The scope of the present invention is not limited to the above-described embodiments, but may be embodied in various forms of embodiments within the scope of the appended claims. Without departing from the gist of the invention claimed in the claims, it is intended that any person skilled in the art to which the present invention pertains falls within the scope of the claims described in the present invention to various extents which can be modified.

100 : 본 발명의 일실시예에 따른 연석 조립체를 구비하는 모듈형 거더
110 : 거더 120 : 강관
130 : 연석 조립체 131 : 연석몸체
140 : 체결부재 150 : 지주부재
160 : 방호부재
100: modular girder having a curb assembly according to an embodiment of the present invention
110: girder 120: steel pipe
130: curb assembly 131: curb body
140: fastening member 150: holding member
160: protective member

Claims (7)

프리캐스트 콘크리트로 제작되며, 상호 결합되는 복수개의 거더;
상기 거더 상에 상호 이격되게 설치되는 복수개의 강관;
프리캐스트 콘크리트로 제작되며, 상기 강관이 삽입되도록 삽입공이 형성되어 상기 거더 상에 설치되는 복수개의 연석 조립체;를 포함하며,
상기 연석 조립체는 상기 강관을 중심으로 상호 마주보며 결합하여 삽입공을 형성하는 한 쌍의 연석몸체로 구성되는 것을 특징으로 하는 연석 조립체를 구비하는 모듈형 거더.
A plurality of girders made of precast concrete and bonded to each other;
A plurality of steel pipes spaced apart from each other on the girder;
It is made of precast concrete, a plurality of curbstone assembly is formed on the girder and the insertion hole is formed so that the steel pipe is inserted;
The curb assembly is a modular girder having a curb assembly, characterized in that composed of a pair of curb body to form an insertion hole by facing each other centered around the steel pipe.
제1항에 있어서,
결합강도가 향상되도록 상기 한 쌍의 연석몸체와 상기 강관을 관통하여 체결되는 체결부재를 더 포함하는 것을 특징으로 하는 연석 조립체를 구비하는 모듈형 거더.
The method of claim 1,
Modular girder having a curb assembly, characterized in that it further comprises a fastening member fastened through the pair of curb body and the steel pipe so as to increase the bonding strength.
제1항 또는 제2항에 있어서,
상기 강관은 적어도 일부가 상기 연석 조립체의 상측으로 돌출되에 노출되고,
노출된 상기 강관에 장착되어 상측으로 돌출되는 지주부재; 이웃하는 상기 지주부재 간을 상호 연결하는 방호 울타리;를 더 포함하는 것을 특징으로 하는 연석 조립체를 구비하는 모듈형 거더.
3. The method according to claim 1 or 2,
The steel pipe is exposed to at least a portion protruding above the curb assembly,
A holding member mounted on the exposed steel pipe and protruding upward; Modular girder having a curb assembly, characterized in that it further comprises; a protective fence for interconnecting the adjacent strut members.
프리캐스트 콘크리트를 이용하여 거더를 제작하는 거더 제작단계;
프리캐스트 콘크리트를 이용하여 연석 조립체를 제작하는 연석 조립체 제작단계;
상기 거더 상에 복수개의 강관을 삽입하여 설치하는 강관설치단계;
상기 제작된 연석 조립체를 상기 강관 상에 장착하는 연석장착단계;
복수개의 거더를 상호 연결하는 거더 연결단계;를 포함하고,
상기 연석 조립체는 서로 결합하여 삽입공을 형성하는 한 쌍의 연석몸체로 구성되며, 상기 연석장착단계는 상기 강관이 상기 삽입공 상에 위치시킨 상태에서 상기 한 쌍의 연석몸체를 결합시키는 연석몸체 결합단계; 체결부재를 상기 한 쌍의 연석몸체와 상기 강관을 관통시켜 체결하는 체결부재 체결단계;를 포함하는 것을 특징으로 하는 모듈형 거더 시공방법.
Girder manufacturing step of manufacturing the girder using the precast concrete;
Curb assembly manufacturing step of manufacturing a curb assembly using precast concrete;
Steel pipe installation step of installing by inserting a plurality of steel pipe on the girder;
Curb mounting step of mounting the manufactured curb assembly on the steel pipe;
Includes a girder connection step of interconnecting a plurality of girders,
The curb assembly is composed of a pair of curb bodies that are coupled to each other to form an insertion hole, the curb mounting step is the curb body coupling to couple the pair of curb body in the state that the steel pipe is placed on the insertion hole step; And a fastening member fastening step of fastening the fastening member by passing through the pair of curb bodies and the steel pipe.
제4항에 있어서,
상기 연석몸체 결합단계에서는 상기 강관이 적어도 일부가 상기 연석 조립체의 상부에 노출되도록 하고,
상기 연석장착단계 이후에 상기 연석 조립체로부터 외부로 노출된 복수개의 강관 각각에 지주부재를 설치하는 지주부재 설치단계; 이웃하여 배치되는 상기 지주부재를 상호 연결하는 방호부재를 설치하는 방호부재 설치단계;를 더 포함하는 것을 특징으로 하는 모듈형 거더 시공방법.
5. The method of claim 4,
In the curb body coupling step so that at least a portion of the steel pipe is exposed to the top of the curb assembly,
A holding member installation step of installing a holding member on each of the plurality of steel pipes exposed from the curb assembly to the outside after the curb mounting step; Modular girder construction method further comprising; a protective member installation step of installing a protective member for interconnecting the strut member disposed adjacent to.
삭제delete 삭제delete
KR1020120013006A 2012-02-08 2012-02-08 Module-type girder having kerb assembly and method for constructing module-type girder KR101332521B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120013006A KR101332521B1 (en) 2012-02-08 2012-02-08 Module-type girder having kerb assembly and method for constructing module-type girder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120013006A KR101332521B1 (en) 2012-02-08 2012-02-08 Module-type girder having kerb assembly and method for constructing module-type girder

Publications (2)

Publication Number Publication Date
KR20130091598A KR20130091598A (en) 2013-08-19
KR101332521B1 true KR101332521B1 (en) 2013-11-22

Family

ID=49216737

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120013006A KR101332521B1 (en) 2012-02-08 2012-02-08 Module-type girder having kerb assembly and method for constructing module-type girder

Country Status (1)

Country Link
KR (1) KR101332521B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107604788A (en) * 2017-10-12 2018-01-19 潍坊市市政工程股份有限公司 Cement concrete L-type kerbstone preparation method and its method for paving

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010009514A (en) * 1999-07-10 2001-02-05 권재원 A built-up protection wall of the bridge

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010009514A (en) * 1999-07-10 2001-02-05 권재원 A built-up protection wall of the bridge

Also Published As

Publication number Publication date
KR20130091598A (en) 2013-08-19

Similar Documents

Publication Publication Date Title
KR101314081B1 (en) Retaining wall and upeer structure connection method for rahmen structure
KR101645462B1 (en) Precast crossing beam manufacturing method for bridge and precast crossing beam construction method for bridge
KR101588593B1 (en) Temporary bridge construction method
KR101762148B1 (en) Bridge using precast psc deck type girder and construction method therefor
KR102011412B1 (en) Joint for Precast Beam and Columns
KR20130095093A (en) Bridge expansion joint and repairing method for using the same
JP2016153598A (en) Precast concrete column and connection method thereof
KR101638093B1 (en) Rahmen using hinge type pc wall and method for constructing the same
KR20140026886A (en) Structure equipped with box girder
JP5386379B2 (en) Precast slab joints in bridges
KR101332521B1 (en) Module-type girder having kerb assembly and method for constructing module-type girder
JP2010216187A (en) Composite floor slab
JP4461914B2 (en) Temporary deadline structure and temporary deadline method
KR101395129B1 (en) Precast panel and slab construction method using the same
JP2017115347A (en) Reinforced-concrete wall handrail and manufacturing method thereof
KR20170013009A (en) Method for constructing junction between the double wall Precast Concretes and the junction structure thereof, the construction method for underground parking using he double wall Precast Concrete, and construction method for the rainwater storage using he double wall Precast Concrete
KR102035821B1 (en) Guard rail for preventing jaywalking and construction method for the same
KR101001063B1 (en) The gurder to use steel pipe for bridge
KR100990967B1 (en) Assembled bridge and method for constucting an assembled bridge
JP2011157733A (en) Method of constructing composite steel floor slab bridge, steel floor slab with rib, and composite steel floor slab bridge
KR101043710B1 (en) Through bridge construction method by side beam and slab by box structure without lateral prestressing
KR101929885B1 (en) Steel girder and manufacturing method thereof
KR200425920Y1 (en) Assembly Type Complex Temporary Bridge Deck
JP2005042391A (en) Steel expansion joint and construction method of steel expansion joint
JP5448560B2 (en) Dowel bar, dowel bar unit, and dowel bar burial method

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20160928

Year of fee payment: 4

LAPS Lapse due to unpaid annual fee