KR101306253B1 - Foundation member and construction method for marine bridge using the same - Google Patents

Foundation member and construction method for marine bridge using the same Download PDF

Info

Publication number
KR101306253B1
KR101306253B1 KR1020110070881A KR20110070881A KR101306253B1 KR 101306253 B1 KR101306253 B1 KR 101306253B1 KR 1020110070881 A KR1020110070881 A KR 1020110070881A KR 20110070881 A KR20110070881 A KR 20110070881A KR 101306253 B1 KR101306253 B1 KR 101306253B1
Authority
KR
South Korea
Prior art keywords
pile
insertion groove
base member
precast
bridge
Prior art date
Application number
KR1020110070881A
Other languages
Korean (ko)
Other versions
KR20130010220A (en
Inventor
박경래
이충희
이태영
안일찬
Original Assignee
삼성물산 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 삼성물산 주식회사 filed Critical 삼성물산 주식회사
Priority to KR1020110070881A priority Critical patent/KR101306253B1/en
Publication of KR20130010220A publication Critical patent/KR20130010220A/en
Application granted granted Critical
Publication of KR101306253B1 publication Critical patent/KR101306253B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/52Submerged foundations, i.e. submerged in open water
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/14Geometrical or physical properties resilient or elastic
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/15Geometrical or physical properties including at least a hinge

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Bridges Or Land Bridges (AREA)
  • Foundations (AREA)

Abstract

본 발명은 프리캐스트 방식에 의해 제조된 본체(110); 해저지반에 매설된 복수의 파일(200)의 상단이 삽입되기 위한 파일 삽입홈(121)이 형성되도록, 본체(110)의 저면에 형성된 복수의 파일 삽입홈 형성부(120);를 포함하는 해상교량용 프리캐스트 기초부재(100)를 제시함으로써, 시공이 간편하면서도, 우수한 구조적 안정성을 얻도록 한다.The present invention is a main body 110 manufactured by a precast method; A plurality of pile insertion groove forming portion 120 formed on the bottom surface of the main body 110 so that the pile insertion groove 121 for inserting the upper end of the plurality of piles 200 embedded in the seabed ground; By presenting the bridge precast base member 100, the construction is simple, but to obtain excellent structural stability.

Description

프리캐스트 기초부재 및 이를 이용한 해상교량의 시공방법{FOUNDATION MEMBER AND CONSTRUCTION METHOD FOR MARINE BRIDGE USING THE SAME}Precast foundation member and construction method of marine bridge using the same {FOUNDATION MEMBER AND CONSTRUCTION METHOD FOR MARINE BRIDGE USING THE SAME}

본 발명은 건설 분야에 관한 것으로서, 상세하게는 해상교량의 시공방법에 관한 것이다.TECHNICAL FIELD The present invention relates to the field of construction, and in particular, to a construction method of an offshore bridge.

해상교량은 일반교량과 달리, 현장에 대한 접근성이 대단히 취약하다는 점, 자중 및 사용하중에 의한 상하방향 하중 이외에도 파압에 의한 측방향 하중이 크게 작용한다는 점 등의 특수성이 있다.Unlike general bridges, marine bridges have special characteristics such as weak accessibility to the site, and lateral loads due to wave pressure in addition to vertical loads due to self and service loads.

따라서 일반교량과 같이 교각의 하단이 파일과 직접 연결되는 구조를 취하지 않고, 다수의 파일(11)의 상단에 일단 파일캡 구조물(10)을 설치하고, 이 위에 교각(12)을 설치하여, 하나의 교각(12)이 다수의 파일(11)에 의해 지지되는 구조를 취하는 것이 일반적이다.Therefore, like the general bridge, the lower end of the pier does not take the structure directly connected to the pile, and once the pile cap structure 10 is installed on the top of the plurality of piles 11, and the pier 12 is installed on this, one It is common for the piers 12 to have a structure supported by a plurality of piles 11.

그런데, 해중에서 이러한 구조를 시공하는 것은 쉬운 일이 아니므로, 간편한 시공에 의해 안정적인 교각의 기초구조를 이루기 위한 공법의 개발이 시급한 실정이었다.However, since it is not easy to construct such a structure in the sea, it is urgent to develop a construction method for achieving a stable structure of the foundation by simple construction.

본 발명은 상기와 같은 문제점을 해결하기 위하여 도출된 것으로서, 시공이 간편하면서도, 우수한 구조적 안정성을 얻도록 하는 프리캐스트 기초부재 및 이를 이용한 해상교량의 시공방법을 제시하는 것을 그 목적으로 한다.The present invention was derived to solve the above problems, and its object is to present a precast base member and a method of constructing a marine bridge using the same, which is easy to construct and obtains excellent structural stability.

상기 과제의 해결을 위하여, 본 발명은 프리캐스트 방식에 의해 제조된 본체(110); 해저지반에 매설된 복수의 파일(200)의 상단이 삽입되기 위한 파일 삽입홈(121)이 형성되도록, 상기 본체(110)의 저면에 형성된 복수의 파일 삽입홈 형성부(120);를 포함하는 해상교량용 프리캐스트 기초부재(100)를 제시한다.In order to solve the above problems, the present invention is a main body 110 manufactured by a precast method; Includes; a plurality of file insertion groove forming portion 120 formed on the bottom surface of the main body 110 to form a file insertion groove 121 for inserting the top of the plurality of files 200 embedded in the seabed ground; A precast foundation member 100 for marine bridges is presented.

상기 파일 삽입홈 형성부(120)는 상기 파일(200)의 상단 측면을 감싸도록, 상기 본체(110)의 저면에서 하측으로 돌출형성된 통형 구조이고, 상기 파일 삽입홈(121)은 상기 통형 구조의 내부 영역에 의해 형성된 것이 바람직하다.The pile insertion groove forming unit 120 is a cylindrical structure protruding downward from the bottom of the main body 110 so as to surround the upper side of the pile 200, the pile insertion groove 121 of the cylindrical structure It is preferably formed by the interior region.

상기 파일(200)이 상기 파일 삽입홈 형성부(120)에 삽입된 상태에서, 그라우트(G)를 주입하여 충전하도록, 상기 본체(110)에는 상하방향으로 그라우트 주입공(111)이 관통형성된 것이 바람직하다.In the state in which the pile 200 is inserted into the pile insertion groove forming unit 120, the grout injection hole 111 is formed through the main body 110 in a vertical direction so as to inject and fill the grout G. desirable.

상기 파일 삽입홈(121)의 내측 상면에는 상기 파일(200)의 상면과의 레벨링을 위한 레벨링 부재(130)가 설치된 것이 바람직하다.It is preferable that a leveling member 130 is provided on the inner upper surface of the pile insertion groove 121 for leveling with the upper surface of the pile 200.

상기 레벨링 부재(130)는 상기 파일 삽입홈(121)의 내측 상면에 결합한 본체 결합부(131); 상기 파일(200)의 상면에 거치되는 파일 거치부(132); 상기 본체 결합부(131)와 상기 파일 거치부(132)의 상호 힌지거동을 위한 힌지 결합부(133);를 포함하는 것이 바람직하다.The leveling member 130 includes a main body coupling portion 131 coupled to the inner upper surface of the pile insertion groove 121; A pile holder 132 mounted on an upper surface of the pile 200; It is preferable to include; a hinge coupling portion 133 for mutual hinge behavior of the main body coupling portion 131 and the pile mounting portion 132.

상기 본체(110)의 상면에는 교각(300)의 하단이 결합하기 위한 교각 결합부(112)가 형성된 것이 바람직하다.It is preferable that the pier coupling portion 112 is formed on the upper surface of the main body 110 to couple the lower end of the pier 300.

본 발명은 상기 프리캐스트 기초부재(100)를 이용한 해상교량의 시공방법으로서, 해저지반에 복수의 파일(200)을 근입하는 파일 근입단계; 상기 파일(200)의 상단이 상기 파일 삽입홈(121)에 삽입되도록 하여, 상기 프리캐스트 기초부재(100)를 상기 복수의 파일(200)의 상부에 설치하는 기초부재 설치단계; 상기 파일(200)의 상단과 상기 파일 삽입홈(121)의 사이 영역에 그라우트(G)를 충전하는 그라우팅 단계;를 포함하는 것을 특징으로 하는 해상교량의 시공방법을 함께 제시한다.The present invention provides a method of constructing an offshore bridge using the precast base member 100, the file inlet step of injecting a plurality of piles 200 into the seabed; A base member installation step of installing the precast base member 100 on an upper portion of the plurality of piles 200 by inserting an upper end of the pile 200 into the pile insertion groove 121; The grouting step of filling the grout (G) in the area between the top of the pile 200 and the pile insertion groove 121 is presented together with the construction method of the offshore bridge, characterized in that it comprises a.

상기 파일 근입단계와 상기 기초부재 설치단계의 사이에는, 상기 파일 삽입홈(121)의 내측 상면과 상기 파일(200)의 상면과의 레벨링을 위한 레벨링 부재(130)를 설치하는 레벨링 단계;를 더 포함하는 것이 바람직하다.A leveling step of installing a leveling member 130 for the leveling of the upper surface of the pile 200 and the inner upper surface of the pile insertion groove 121 between the pile entering step and the foundation member installation step; It is preferable to include.

상기 기초부재 설치단계와 상기 그라우팅 단계의 사이에는, 폐쇄부재(122)에 의해, 상기 파일 삽입홈(121)과 상기 파일(200) 사이의 하측 트임부를 폐쇄하는 폐쇄단계;를 더 포함하는 것이 바람직하다.Between the base member installation step and the grouting step, the closing step of closing the lower trim between the pile insertion groove 121 and the pile 200 by a closing member 122; Do.

본 발명은 상기 프리캐스트 기초부재(100)를 이용한 해상교량의 시공방법으로서, 해저지반에 복수의 파일(200)을 근입하는 파일 근입단계; 상기 파일(200)의 상단이 상기 파일 삽입홈(121)에 삽입되도록 하여, 상기 프리캐스트 기초부재(100)를 상기 복수의 파일(200)의 상부에 설치하는 기초부재 설치단계; 상기 그라우트 주입공(111)을 통해, 상기 파일(200)의 상단과 상기 파일 삽입홈(121)의 사이 영역에 그라우트(G)를 충전하는 그라우팅 단계;를 포함하는 것을 특징으로 하는 해상교량의 시공방법을 함께 제시한다.The present invention provides a method of constructing an offshore bridge using the precast base member 100, the file inlet step of injecting a plurality of piles 200 into the seabed; A base member installation step of installing the precast base member 100 on an upper portion of the plurality of piles 200 by inserting an upper end of the pile 200 into the pile insertion groove 121; The grouting step of filling the grout (G) in the area between the upper end of the pile 200 and the pile insertion groove 121 through the grout injection hole 111; construction of the offshore bridge comprising a Present the method together.

본 발명은 상기 프리캐스트 기초부재(100)를 이용한 해상교량의 시공방법으로서, 해저지반에 복수의 파일(200)을 근입하는 파일 근입단계; 상기 파일(200)의 상단을 상기 파일 삽입홈(121)에 삽입하되, 상기 레벨링 부재(130)가 상기 파일(200)의 상면에 접촉하도록 하여 레벨링을 함과 아울러, 상기 프리캐스트 기초부재(100)를 상기 복수의 파일(200)의 상부에 설치하는 기초부재 설치단계; 상기 파일(200)의 상단과 상기 파일 삽입홈(121)의 사이 영역에 그라우트(G)를 충전하는 그라우팅 단계;를 포함하는 것을 특징으로 하는 해상교량의 시공방법을 함께 제시한다.The present invention provides a method of constructing an offshore bridge using the precast base member 100, the file inlet step of injecting a plurality of piles 200 into the seabed; The upper end of the pile 200 is inserted into the pile insertion groove 121, and the leveling member 130 contacts the upper surface of the pile 200 for leveling and the precast base member 100. Base member installation step of installing a) on the upper portion of the plurality of piles (200); The grouting step of filling the grout (G) in the area between the top of the pile 200 and the pile insertion groove 121 is presented together with the construction method of the offshore bridge, characterized in that it comprises a.

본 발명은 시공이 간편하면서도, 우수한 구조적 안정성을 얻도록 하는 프리캐스트 기초부재 및 이를 이용한 해상교량의 시공방법을 제시한다.The present invention proposes a precast base member and a method of constructing a marine bridge using the same, which are simple to be constructed, and to obtain excellent structural stability.

도 1은 종래의 해상교량의 기초구조물의 단면도.
도 2 이하는 본 발명의 실시예를 도시한 것으로서,
도 2는 프리캐스트 기초부재의 사시도.
도 3 내지 6은 해상교량의 시공방법의 제1 실시예의 공정도.
도 7은 해상교량의 시공방법의 제2 실시예의 공정도.
도 8은 해상교량의 시공방법의 제3 실시예의 공정도.
도 9,10은 해상교량의 시공방법의 제4 실시예의 공정도.
1 is a cross-sectional view of a base structure of a conventional marine bridge.
2 shows an embodiment of the present invention,
2 is a perspective view of a precast base member.
3 to 6 are process drawings of the first embodiment of the method for constructing a marine bridge.
7 is a process chart of Embodiment 2 of the construction method of an offshore bridge.
8 is a process chart of Embodiment 3 of the construction method of an offshore bridge.
9 and 10 are process charts of Embodiment 4 of the method for constructing an offshore bridge;

이하, 첨부도면을 참조하여 본 발명의 실시예에 관하여 상세히 설명한다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 2 이하에 도시된 바와 같이, 본 발명에 의한 해상교량용 프리캐스트 기초부재(100)는 기본적으로, 프리캐스트 방식에 의해 제조된 본체(110); 해저지반에 매설된 복수의 파일(200)의 상단이 삽입되기 위한 파일 삽입홈(121)이 형성되도록, 본체(110)의 저면에 형성된 복수의 파일 삽입홈 형성부(120);를 포함하여 구성된다.As shown in Figure 2 below, the precast foundation member 100 for offshore bridges according to the present invention basically comprises a main body 110 manufactured by a precast method; And a plurality of file insertion groove forming parts 120 formed on the bottom surface of the main body 110 so that the file insertion grooves 121 for inserting the upper ends of the plurality of files 200 embedded in the seabed are formed. do.

이러한 프리캐스트 기초부재(100)를 이용한 해상교량의 시공방법은 다음과 같은 공정에 의해 이루어진다.The construction method of the marine bridge using the precast foundation member 100 is made by the following process.

해저지반에 복수의 파일(200)을 근입한다(도 3).A plurality of piles 200 are inserted in the seabed (FIG. 3).

프리캐스트 기초부재(100)는 지상에서 프리캐스트 방식에 의해 제조하고, 해상 크레인 등에 의해 인양하여 시공위치로 운반한다.The precast base member 100 is manufactured by the precast method on the ground, lifted by an offshore crane, etc., and transported to a construction position.

파일(200)의 두부가 일정한 높이를 갖도록 정리하고, 파일(200)의 상단이 파일 삽입홈(121)에 삽입되도록 하여, 프리캐스트 기초부재(100)를 복수의 파일(200)의 상부에 설치한다(도 4).The head of the pile 200 is arranged to have a constant height, and the upper end of the pile 200 is inserted into the pile insertion groove 121 so that the precast base member 100 is installed on the upper portion of the pile 200. (FIG. 4).

파일(200)의 상단과 파일 삽입홈(121)의 사이 영역에 그라우트(G)를 충전하여 고정한다.The grout G is charged and fixed to an area between the upper end of the pile 200 and the pile insertion groove 121.

즉, 파일(200)을 먼저 해저지반에 근입해 두고, 프리캐스트 방식에 의해 제조된 기초부재(100 : 파일캡)를 그 파일(200) 위에 설치하되, 파일(200)의 상단이 기초부재(100)의 삽입홈(121)에 삽입되는 방식에 의해 기초부재(100)가 거치되도록 한 것이다.That is, the pile 200 is first placed in the seabed, and the base member 100 (pile cap) manufactured by the precast method is installed on the pile 200, but the upper end of the pile 200 is the base member ( The base member 100 is mounted by the method of being inserted into the insertion groove 121 of the 100.

이러한 구조를 취하는 경우, 파일(200)의 상단 외주와 기초부재(100)의 삽입홈(121) 내주 사이의 주면 마찰력에 의해, 상부 하중이 파일(200)에 전달되므로, 별도의 철근연결 등의 공정이 없더라도, 충분히 안정적인 구조를 이룰 수 있다.In this case, the upper load is transmitted to the pile 200 by the main surface friction force between the upper outer circumference of the pile 200 and the inner circumference of the insertion groove 121 of the base member 100, so that a separate reinforcing bar connection or the like is performed. Even without the process, a sufficiently stable structure can be achieved.

따라서 해상작업을 최소화하여 시공이 간편하면서도, 우수한 구조적 안정성을 얻도록 한다는 효과가 있다.Therefore, the construction work is easy to minimize the sea work, there is an effect to obtain excellent structural stability.

파일 삽입홈 형성부(120)는 구체적으로, 파일(200)의 상단 측면을 감싸도록, 본체(110)의 저면에서 하측으로 돌출형성된 통형 구조이고, 파일 삽입홈(121)은 그 통형 구조의 내부 영역에 의해 형성되도록 하는 것이 바람직하다.The pile insertion groove forming unit 120 is specifically, a tubular structure protruding downward from the bottom of the main body 110 so as to surround the upper side of the pile 200, and the pile insertion groove 121 is inside the cylindrical structure. It is preferred to be formed by regions.

이러한 통형 구조의 파일 삽입홈 형성부(120)는 그 삽입홈(121)에 삽입된 파일(200)의 상단 외주와의 결합길이를 충분히 길게 조정할 수 있으므로, 해상교량의 구조적 안정성을 위한 주면 마찰력을 충분히 확보할 수 있도록 한다.The pile insertion groove forming unit 120 of the tubular structure can adjust the length of engagement with the upper outer circumference of the pile 200 inserted into the insertion groove 121 sufficiently long, so that the main surface friction force for structural stability of the offshore bridge Make sure you have enough.

파일(200)의 상면과 파일 삽입홈(121)의 내측 상면이 평면상에서 만나는 경우에는 문제가 없으나, 그렇지 못한 경우에는 별도의 레벨링 부재(130)를 파일(200)의 상면과 파일 삽입홈(121)의 내측 상면 사이에 설치하여, 상부구조의 하중이 안정적으로 하부구조로 전달되도록 하기 위한 레벨링 작업이 필요하다.There is no problem when the upper surface of the pile 200 and the inner upper surface of the pile insertion groove 121 meet on a plane. Installed between the inner upper surface of the), it is necessary to level the work to ensure that the load of the superstructure is transmitted to the lower structure stably.

이러한 레벨링 부재(130)는 탄성 재질에 의해 일체로 형성된 구조를 적용할 수도 있으나, 파일 삽입홈(121)의 내측 상면에 스터드 등에 의해 결합한 본체 결합부(131); 파일(200)의 상면에 거치되는 파일 거치부(132); 본체 결합부(131)와 상기 파일 거치부(132)의 힌지거동을 위한 힌지 결합부(133);를 포함하는 구조를 취함으로써, 상부구조의 하중이 안정적으로 파일(200)의 상면에 전달되도록 하는 것이 바람직하다(도 7,8).The leveling member 130 may be applied to the structure formed integrally by the elastic material, the body coupling portion 131 coupled to the inner upper surface of the pile insertion groove 121 by a stud or the like; A pile holder 132 mounted on an upper surface of the pile 200; By taking a structure including a body coupling portion 131 and the hinge coupling portion 133 for the hinge behavior of the pile mounting portion 132, so that the load of the superstructure is stably transmitted to the upper surface of the pile 200 It is preferable to (FIG. 7,8).

파일(200)이 파일 삽입홈 형성부(120)에 삽입된 상태에서, 그 사이의 영역은 그라우트(G)를 주입하여 충전하여야 하는데, 파일 삽입홈(121)과 파일(200) 사이의 하측이 트인 상태에서 그라우트(G) 주입작업을 수행하면, 그 하측 트임부를 통해 그라우트(G)가 바닷물 속으로 퍼져 버릴 것인바, 위 하측 트임부를 별도의 폐쇄부재(122)에 의해 폐쇄한 후, 상기 그라우트 작업을 수행하는 것이 바람직하다(도 9).In the state in which the pile 200 is inserted into the pile insertion groove forming unit 120, the area therebetween should be filled by injecting grout G, and the lower side between the pile insertion groove 121 and the pile 200 is filled. When the grout (G) injection operation is performed in the open state, the grout (G) will spread into the sea water through the lower trim, and the upper lower trim is closed by a separate closing member 122, and then the grout It is desirable to carry out the work (FIG. 9).

여기서 폐쇄부재(122)는, 수면 위에서 압축공기를 불어넣어 팽창시키는 튜브 구조 등을 사용하면 된다.In this case, the closure member 122 may be a tube structure or the like that blows compressed air on the water surface and expands it.

그라우팅 작업을 위하여 본체(110)에 상하방향으로 그라우트 주입공(111)이 관통형성되는 경우, 기초부재의 상부(수면 위)에서 그 그라우트 주입공(111)을 통해 그라우트(G) 충전작업을 할 수 있으므로, 시공의 편의성 및 구조적 안정성 측면에서 바람직하다(도 9).When the grout injection hole 111 penetrates the main body 110 in the vertical direction for the grouting operation, the grout filling operation may be performed through the grout injection hole 111 at the upper portion (on the water surface) of the base member. Therefore, it is preferable in terms of construction convenience and structural stability (Fig. 9).

구체적으로, 그라우트 주입공(111)은 기초부재(100)의 상면에서 하부 삽입홈(121)의 내부 영역 사이를 관통하도록 형성되는데, 그라우트 주입공(111)의 하측 트임부는 파일(200)과 파일 삽입홈 형성부(120)의 사이 영역을 향하도록 형성되는 것이 바람직하며, 3개 정도의 복수가 형성되는 것이 작업의 편의성 및 밀실한 그라우팅을 위하여 더욱 바람직하다(도 9,10).Specifically, the grout injection hole 111 is formed so as to penetrate between the inner region of the lower insertion groove 121 on the upper surface of the base member 100, the lower cut portion of the grout injection hole 111 is pile 200 and pile It is preferable to be formed to face the area between the insertion groove forming portion 120, it is more preferable that three or more are formed for the convenience of work and tight grouting (Fig. 9, 10).

이러한 그라우트 주입공(111)에 그라우트 주입관(111a)을 설치하되, 그라우트 주입관(111a)의 하측 트임부가 파일 삽입홈 형성부(120)의 하단에 인접하여 위치하도록 함으로써, 주입된 그라우트(G)가 하측에서 상측으로 차오르도록 하는 것이 더욱 바람직하다(도 9).The grout injection pipe 111a is installed in the grout injection hole 111, but the lower groove of the grout injection pipe 111a is positioned adjacent to the lower end of the pile insertion groove forming unit 120, thereby injecting grout (G). ) Is more preferably raised from the lower side to the upper side (FIG. 9).

기초부재 본체(110)의 상면에 교각(300)의 하단이 결합하기 위한 돌출구조, 철근노출구조 등에 의한 교각 결합부(112)가 형성되는 경우, 역시 프리캐스트 방식에 의해 제조된 교각(300)을 위 교각 결합부(112)에 쉽게 결합하여 고정할 수 있다는 장점이 추가된다.When the pier coupling portion 112 is formed on the upper surface of the base member main body 110 by the protrusion structure, the rebar exposure structure, etc. for coupling the lower end of the pier 300, the pier 300 also manufactured by the precast method. The advantage is that it can be easily coupled to the pier coupling portion 112 to be fixed.

이상은 본 발명에 의해 구현될 수 있는 바람직한 실시예의 일부에 관하여 설명한 것에 불과하므로, 주지된 바와 같이 본 발명의 범위는 위의 실시예에 한정되어 해석되어서는 안 될 것이며, 위에서 설명된 본 발명의 기술적 사상과 그 근본을 함께 하는 기술적 사상은 모두 본 발명의 범위에 포함된다고 할 것이다.It will be apparent to those skilled in the art that various modifications and variations can be made in the present invention without departing from the spirit or scope of the invention as defined in the appended claims. It is to be understood that both the technical idea and the technical spirit of the invention are included in the scope of the present invention.

100 : 프리캐스트 기초부재 110 : 본체
111 : 그라우트 주입공 112 : 교각 결합부
120 : 파일 삽입홈 형성부 121 : 파일 삽입홈
130 : 레벨링 부재 131 : 본체 결합부
132 : 파일 거치부 133 : 힌지 결합부
200 : 파일 G : 그라우트
100: precast base member 110: main body
111: grout injection hole 112: pier coupling portion
120: file insertion groove forming unit 121: file insertion groove
130 leveling member 131 body coupling portion
132: file holder 133: hinge coupling unit
200: File G: Grout

Claims (11)

삭제delete 삭제delete 프리캐스트 방식에 의해 제조된 본체(110);
해저지반에 매설된 복수의 파일(200)의 상단이 삽입되기 위한 파일 삽입홈(121)이 형성되도록, 상기 본체(110)의 저면에 형성된 복수의 파일 삽입홈 형성부(120);를 포함하며,
상기 파일 삽입홈 형성부(120)는
상기 파일(200)의 상단 측면을 감싸도록, 상기 본체(110)의 저면에서 하측으로 돌출형성된 통형 구조이고,
상기 파일 삽입홈(121)은 상기 통형 구조의 내부 영역에 의해 형성되며,
상기 파일(200)이 상기 파일 삽입홈 형성부(120)에 삽입된 상태에서, 그라우트(G)를 주입하여 충전하도록, 상기 본체(110)에는 상하방향으로 그라우트 주입공(111)이 관통형성된 것을 특징으로 하는 해상교량용 프리캐스트 기초부재(100).
A main body 110 manufactured by a precast method;
And a plurality of file insertion groove forming parts 120 formed on the bottom surface of the main body 110 so that the file insertion grooves 121 for inserting the upper ends of the plurality of files 200 embedded in the seabed are formed. ,
The pile insertion groove forming unit 120 is
To surround the upper side of the pile 200, the tubular structure protruding downward from the bottom of the main body 110,
The pile insertion groove 121 is formed by an inner region of the tubular structure,
In the state in which the pile 200 is inserted into the pile insertion groove forming unit 120, the grout injection hole 111 is formed through the main body 110 in the vertical direction so as to inject and fill the grout G. The precast foundation member 100 for offshore bridges.
제3항에 있어서,
상기 파일 삽입홈(121)의 내측 상면에는 상기 파일(200)의 상면과의 레벨링을 위한 레벨링 부재(130)가 설치된 것을 특징으로 하는 해상교량용 프리캐스트 기초부재(100).
The method of claim 3,
A precast foundation member (100) for marine bridges, characterized in that a leveling member (130) for leveling with the upper surface of the pile (200) is installed on the inner upper surface of the pile insertion groove (121).
제4항에 있어서,
상기 레벨링 부재(130)는
상기 파일 삽입홈(121)의 내측 상면에 결합한 본체 결합부(131);
상기 파일(200)의 상면에 거치되는 파일 거치부(132);
상기 본체 결합부(131)와 상기 파일 거치부(132)의 상호 힌지거동을 위한 힌지 결합부(133);를
포함하는 것을 특징으로 하는 해상교량용 프리캐스트 기초부재(100).
5. The method of claim 4,
The leveling member 130
A main body engaging portion 131 coupled to an inner upper surface of the pile insertion groove 121;
A pile holder 132 mounted on an upper surface of the pile 200;
Hinge coupling portion 133 for the mutual hinge behavior of the main body coupling portion 131 and the pile holder 132;
Precast foundation member for offshore bridge, characterized in that it comprises a.
제3항에 있어서,
상기 본체(110)의 상면에는 교각(300)의 하단이 결합하기 위한 교각 결합부(112)가 형성된 것을 특징으로 하는 해상교량용 프리캐스트 기초부재(100).
The method of claim 3,
The precast foundation member 100 for the marine bridge, characterized in that the pier coupling portion 112 is formed on the upper surface of the main body 110 to couple the lower end of the pier 300.
제3항 내지 제6항 중 어느 한 항의 프리캐스트 기초부재(100)를 이용한 해상교량의 시공방법으로서,
해저지반에 복수의 파일(200)을 근입하는 파일 근입단계;
상기 파일(200)의 상단이 상기 파일 삽입홈(121)에 삽입되도록 하여, 상기 프리캐스트 기초부재(100)를 상기 복수의 파일(200)의 상부에 설치하는 기초부재 설치단계;
상기 파일(200)의 상단과 상기 파일 삽입홈(121)의 사이 영역에 그라우트(G)를 충전하는 그라우팅 단계;를
포함하는 것을 특징으로 하는 해상교량의 시공방법.
As a method of constructing a marine bridge using the precast base member 100 of any one of claims 3 to 6,
A file access step of accessing a plurality of files 200 to the seabed;
A base member installation step of installing the precast base member 100 on an upper portion of the plurality of piles 200 by inserting an upper end of the pile 200 into the pile insertion groove 121;
Grouting step of filling the grout (G) in the area between the top of the pile 200 and the pile insertion groove 121;
Construction method of the offshore bridge comprising a.
제7항에 있어서,
상기 파일 근입단계와 상기 기초부재 설치단계의 사이에는,
상기 파일 삽입홈(121)의 내측 상면과 상기 파일(200)의 상면과의 레벨링을 위한 레벨링 부재(130)를 설치하는 레벨링 단계;를
더 포함하는 것을 특징으로 하는 해상교량의 시공방법.
The method of claim 7, wherein
Between the pile entering step and the base member installation step,
A leveling step of installing a leveling member 130 for leveling an inner upper surface of the pile insertion groove 121 and an upper surface of the pile 200;
Construction method of the marine bridge, characterized in that it further comprises.
제7항에 있어서,
상기 기초부재 설치단계와 상기 그라우팅 단계의 사이에는,
폐쇄부재(122)에 의해, 상기 파일 삽입홈(121)과 상기 파일(200) 사이의 하측 트임부를 폐쇄하는 폐쇄단계;를
더 포함하는 것을 특징으로 하는 해상교량의 시공방법.
The method of claim 7, wherein
Between the base member installation step and the grouting step,
A closing step of closing the lower trim between the pile insertion groove 121 and the pile 200 by the closing member 122;
Construction method of the marine bridge, characterized in that it further comprises.
제3항의 프리캐스트 기초부재(100)를 이용한 해상교량의 시공방법으로서,
해저지반에 복수의 파일(200)을 근입하는 파일 근입단계;
상기 파일(200)의 상단이 상기 파일 삽입홈(121)에 삽입되도록 하여, 상기 프리캐스트 기초부재(100)를 상기 복수의 파일(200)의 상부에 설치하는 기초부재 설치단계;
상기 그라우트 주입공(111)을 통해, 상기 파일(200)의 상단과 상기 파일 삽입홈(121)의 사이 영역에 그라우트(G)를 충전하는 그라우팅 단계;를
포함하는 것을 특징으로 하는 해상교량의 시공방법.
As a method of constructing a marine bridge using the precast base member 100 of claim 3,
A file access step of accessing a plurality of files 200 to the seabed;
A base member installation step of installing the precast base member 100 on an upper portion of the plurality of piles 200 by inserting an upper end of the pile 200 into the pile insertion groove 121;
Grouting step of filling the grout (G) in the region between the top of the pile 200 and the pile insertion groove 121 through the grout injection hole 111;
Construction method of the offshore bridge comprising a.
제4항의 프리캐스트 기초부재(100)를 이용한 해상교량의 시공방법으로서,
해저지반에 복수의 파일(200)을 근입하는 파일 근입단계;
상기 파일(200)의 상단을 상기 파일 삽입홈(121)에 삽입하되, 상기 레벨링 부재(130)가 상기 파일(200)의 상면에 접촉하도록 하여 레벨링을 함과 아울러, 상기 프리캐스트 기초부재(100)를 상기 복수의 파일(200)의 상부에 설치하는 기초부재 설치단계;
상기 파일(200)의 상단과 상기 파일 삽입홈(121)의 사이 영역에 그라우트(G)를 충전하는 그라우팅 단계;를
포함하는 것을 특징으로 하는 해상교량의 시공방법.
As a construction method of the marine bridge using the precast base member 100 of claim 4,
A file access step of accessing a plurality of files 200 to the seabed;
The upper end of the pile 200 is inserted into the pile insertion groove 121, and the leveling member 130 contacts the upper surface of the pile 200 for leveling and the precast base member 100. Base member installation step of installing a) on the upper portion of the plurality of piles (200);
Grouting step of filling the grout (G) in the area between the top of the pile 200 and the pile insertion groove 121;
Construction method of the offshore bridge comprising a.
KR1020110070881A 2011-07-18 2011-07-18 Foundation member and construction method for marine bridge using the same KR101306253B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110070881A KR101306253B1 (en) 2011-07-18 2011-07-18 Foundation member and construction method for marine bridge using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110070881A KR101306253B1 (en) 2011-07-18 2011-07-18 Foundation member and construction method for marine bridge using the same

Publications (2)

Publication Number Publication Date
KR20130010220A KR20130010220A (en) 2013-01-28
KR101306253B1 true KR101306253B1 (en) 2013-09-09

Family

ID=47839506

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110070881A KR101306253B1 (en) 2011-07-18 2011-07-18 Foundation member and construction method for marine bridge using the same

Country Status (1)

Country Link
KR (1) KR101306253B1 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101383208B1 (en) * 2013-07-29 2014-04-09 휴먼이엔씨주식회사 Bridge for pedestrian and bicycle and this construction method
JP6624797B2 (en) * 2015-03-27 2019-12-25 大成建設株式会社 Construction method of pile foundation structure and pile foundation structure
US11891802B2 (en) 2019-05-09 2024-02-06 Junction7 Limited Modular slab, slab system, piles and methods of use thereof
CN113981809A (en) * 2020-06-28 2022-01-28 周兆弟 Tramcar roadbed structure and construction method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006336414A (en) * 2005-06-06 2006-12-14 Sekisui House Ltd Pile head cap, pile head structure of steel pipe pile, structure of building and pile head treating method of steel pipe pile
KR100778252B1 (en) * 2006-05-16 2007-11-22 (주)스틸엔콘크리트 Fabrication-type slab bridge constructed by supporting H-girder to connection member inserted on matrix pile column and construction method thereof
KR101034185B1 (en) * 2010-12-15 2011-05-12 콘비젼스 주식회사 Bridge for bike-lane and construction method thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006336414A (en) * 2005-06-06 2006-12-14 Sekisui House Ltd Pile head cap, pile head structure of steel pipe pile, structure of building and pile head treating method of steel pipe pile
KR100778252B1 (en) * 2006-05-16 2007-11-22 (주)스틸엔콘크리트 Fabrication-type slab bridge constructed by supporting H-girder to connection member inserted on matrix pile column and construction method thereof
KR101034185B1 (en) * 2010-12-15 2011-05-12 콘비젼스 주식회사 Bridge for bike-lane and construction method thereof

Also Published As

Publication number Publication date
KR20130010220A (en) 2013-01-28

Similar Documents

Publication Publication Date Title
KR101413593B1 (en) Composite pile with end bearing capacity, friction capacity and construction method therefor
KR101306253B1 (en) Foundation member and construction method for marine bridge using the same
KR101206344B1 (en) Precast panel for retaining wall and construction method therewith
KR20110103000A (en) Precast bridge joint structure with composite hollow concrete filled tube and a construction method for the same
KR20060128804A (en) The pc structure pier and manufacturing method thereof
KR100923587B1 (en) Micro pile construction method using anchorage appratus of micro pile
JP5976373B2 (en) Pile foundation reinforcement structure and reinforcement method
KR101463427B1 (en) Composite type steel temporary construction and construction method thereof
KR101341176B1 (en) Offshore pile-type support structure and construction method thereof
KR20090069480A (en) Prestressed quay wall and construction method thereof
KR101262865B1 (en) Construction method for cofferdam
KR101855458B1 (en) Composite pile
KR100707938B1 (en) Foundation structure of micro pile
KR101163363B1 (en) Simple supported multiple reinforcement of steel pipe pile
KR20090118722A (en) Precast foundation and pile connection structure between precast foundation and pile
JP2002364006A (en) Construction method for underwater foundation
KR101095581B1 (en) Pile structure
JP5504951B2 (en) Seismic reinforcement method for structures and seismic reinforcement structure for structures
JP5176788B2 (en) Construction method of underground structure
JP2015166538A (en) Form installation method, form and underwater structure
KR20180131042A (en) Pile and method for constucting same
KR20130123050A (en) Installation method of slab foundation for offshore wind power generator using position senser
KR20060095924A (en) Upstream faced type fill dam with anchor
JP4475116B2 (en) Vertical shaft structure and its construction method
KR20140036766A (en) Railway roadbed having seismic structure

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20160830

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20170901

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20180904

Year of fee payment: 6