KR101235866B1 - Pipe and inspection road supporter - Google Patents

Pipe and inspection road supporter Download PDF

Info

Publication number
KR101235866B1
KR101235866B1 KR1020120090805A KR20120090805A KR101235866B1 KR 101235866 B1 KR101235866 B1 KR 101235866B1 KR 1020120090805 A KR1020120090805 A KR 1020120090805A KR 20120090805 A KR20120090805 A KR 20120090805A KR 101235866 B1 KR101235866 B1 KR 101235866B1
Authority
KR
South Korea
Prior art keywords
support unit
scaffold
pipeline
support
inspection
Prior art date
Application number
KR1020120090805A
Other languages
Korean (ko)
Inventor
김기종
Original Assignee
주식회사 에스더블유지
(주)건교산업
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 에스더블유지, (주)건교산업 filed Critical 주식회사 에스더블유지
Priority to KR1020120090805A priority Critical patent/KR101235866B1/en
Application granted granted Critical
Publication of KR101235866B1 publication Critical patent/KR101235866B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/10Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
    • E01D19/103Parapets, railings ; Guard barriers or road-bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D18/00Bridges specially adapted for particular applications or functions not provided for elsewhere, e.g. aqueducts, bridges for supporting pipe-lines

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

PURPOSE: A support for a pipe line and an inspection path are provided to minimize cracks in a bridge by minimizing the number of components for installing a pipe line and a scaffold, and secure an inspection space and improve visibility by integrally connecting the pipe line with the scaffold. CONSTITUTION: A support for a pipe line(20) and an inspection path includes a pipe line supporting unit(30) and a scaffold supporting unit(40). A settling portion(36), on which the pipe line is settled, is formed at the upper portion of the pipe line supporting unit. The settling portion is concave to surround the outer circumference surface of the pipe line. One side wall of the pipe line supporting unit is fixed to a fixing object with a fixing means(60). One side of the scaffold supporting unit is coupled to the part of the other side wall of the pipe line supporting unit with a coupling member(62) so that the scaffold supporting unit is perpendicularly installed on the pipe line supporting unit in the opposite direction to the fixing object. A scaffold is laid on the upper surface of the scaffold supporting unit.

Description

관로 및 점검로 지지대{pipe and inspection road supporter}Pipe and inspection road supporter

본 발명은 관로 및 점검로 지지대에 관한 것으로, 더욱 상세하게는 관로와 점검로를 효과적으로 설치하도록 한 관로 및 점검로 지지대에 관한 것이다.
The present invention relates to a pipeline and inspection support, and more particularly, to a pipeline and inspection support to effectively install the pipeline and the inspection.

일반적으로 교량의 박스보 내부에는 교량 내부면의 균열 등을 점검하기 위해 점검자가 보행하는 점검 시설물 및 교량의 상판에서 흐르는 오수를 배수하는 관로가 설치된다. 이러한 점검 시설물과 관로는 독립적으로 교량의 박스보 내부면에 앵커 볼트 따위의 결합수단으로 고정된다.In general, in the box beam of the bridge, the inspection facility walked by the inspector and the pipeline for draining the sewage flowing from the top plate of the bridge are installed to check the cracks on the inner surface of the bridge. These inspection facilities and pipelines are independently fixed to the inner surface of the bridge box by coupling means such as anchor bolts.

이와 같이, 관로와 점검 시설물이 교량의 박스보에 앵커 볼트 따위로 각각 장착되면서 교량의 박스보 내부면에 필요 이상으로 앵커 볼트 설치 홈이 형성되었다. 이러한 설치 홈은 교량의 박스보 내부면의 균열을 유발하는 원인이 되었고, 외관상 미려하지 않은 문제점이 있었다.In this way, the anchor bolt installation grooves were formed in the inner box bore of the bridge more than necessary, as the pipe and the inspection facility were respectively mounted on the box bore of the bridge. Such installation grooves cause cracks in the inner surface of the bridge box, and there is a problem that is not beautiful in appearance.

또한, 관로와 점검 시설물이 각각 설치되면서 서로 간섭됨에 따라 점검 시설물에 의해 관로 부분이 가려져 교량을 정확히 점검할 수 없었다. In addition, as the pipelines and the inspection facilities were installed, the interference portions were obstructed, so that the portion of the pipeline was obscured by the inspection facilities, and the bridge could not be accurately inspected.

또한, 교량에 관로와 점검 시설물이 각각 설치되므로 이러한 시설물이 보수 보강에 장애요소가 되었다.In addition, pipelines and inspection facilities were installed on the bridges, which made these facilities an obstacle to reinforcement.

종래기술로서 등록특허공보 제0182383호(하단면 주행식 교량 하부면 작업대차의 내측작업대), 제0472096호(교량의 박스보 내부 이동식 점검시설), 등록실용신안 제0167497호(교량 점검로)가 개시되어 있다.
As a prior art, Korean Patent No.0182383 (inner working platform of lower section running bridge lower surface work cart), 0472096 (mobile inspection facility inside box beam of bridge) and registered utility model No. 0167497 (bridge inspection road) Is disclosed.

본 발명은 상기의 문제점을 해결하기 위하여 창안된 것으로, 본 발명의 목적은 관로 및 점검로를 지지하는 관로지지유닛과 발판지지유닛을 서로 결합시킨 상태로 교량에 설치하도록 함으로써 기존에 따로따로 설치함에 따라 필요 이상으로 형성된 설치 홈의 갯수를 줄일 수 있게 되고, 그로 인해 발생될 수 있는 균열을 방지할 수 있어 교량의 손상을 최소화할 수 있으며, 한 번의 설치로 관로와 점검로를 설치할 수 있어 작업시간 단축 등 작업효율을 높일 수 있는 관로 및 점검로 지지대를 제공하는 데 있다.
The present invention was devised to solve the above problems, and an object of the present invention is to separately install by installing a pipe support unit and a scaffold support unit supporting the pipe and the inspection path to the bridge in a state in which they are connected to each other. Therefore, it is possible to reduce the number of installation grooves formed more than necessary, and to prevent cracks that can occur, thereby minimizing damage to the bridge, and to install pipelines and inspection roads in one installation. It is to provide the support by pipeline and inspection that can increase work efficiency such as shortening.

상기의 목적을 달성하기 위한 본 발명의 관로 및 점검로 지지대는 교량을 포함한 고정대상물에 설치되어 교량 점검자가 보행할 수 있는 발판과 유체가 흐르는 관로를 지지하기 위한 관로 및 점검로 지지대에 있어서, 상기 관로가 안착되어 그 관로의 외주면이 감싸여지도록 상부에 함몰되어 안착부가 형성되고, 일측벽이 상기 고정대상물에 고정수단으로 고정되는 관로지지유닛; 상기 관로지지유닛의 타측벽 일부분에 일측이 결합부재로 결합되어 상기 고정대상물과 대향되는 방향으로 수직하게 설치되고, 상면에 상기 발판이 놓여지는 발판지지유닛;으로 이루어진 것을 특징으로 한다.In the pipeline and inspection passage support of the present invention for achieving the above object is installed in a fixed object including a bridge, the pipeline and inspection passage support for supporting the scaffold and fluid flowing passage that the bridge inspector can walk, A pipeline support unit recessed at an upper portion of the pipeline to be seated so as to surround the outer circumferential surface of the pipeline, and a seating unit formed thereon, and one side wall of the pipeline supporting unit fixed to the fixed object by fixing means; One side is coupled to the portion of the other side wall of the pipe support unit by a coupling member and installed vertically in a direction opposite to the fixed object, the scaffold support unit is placed on the top surface;

상기 관로지지유닛은 사다리꼴 모양으로, 상기 고정대상물에 고정되는 일측벽은 경사면으로 형성되고, 상기 발판지지유닛이 결합되는 타측벽은 수직면으로 형성되며, 상부에 상기 안착부가 형성된다.The pipe support unit has a trapezoidal shape, one side wall fixed to the fixed object is formed in an inclined surface, the other side wall to which the scaffold support unit is coupled is formed in a vertical surface, the seating portion is formed on the top.

상기 관로지지유닛은 내부에 중공부가 형성된 틀체로 형성되고, 상기 중공부의 가장자리는 보강띠가 마련된다.The pipe support unit is formed of a frame body having a hollow portion therein, and an edge of the hollow portion is provided with a reinforcing band.

상기 발판지지유닛의 타측에서 상측방향으로 수직하게 설치되고 일정 간격으로 안전바이 끼워지는 난간대를 더 포함한다.It further includes a handrail that is installed vertically in the upper direction from the other side of the scaffold support unit and is fitted by safety at regular intervals.

상기 난간대와 접하는 상기 발판지지유닛의 타측에는 상방으로 걸림턱이 형성되고, 상기 난간대에는 상기 걸림턱에 걸려 체결된 채 상기 발판지지유닛에 연결부재로 연결되어 고정되도록 체결턱이 형성된다.
A locking jaw is formed on the other side of the scaffold support unit which is in contact with the handrail, and a locking jaw is formed to be connected to the scaffold support unit by a connecting member and fixed while being caught by the locking jaw.

상기의 구조로 이루어진 본 발명의 관로 및 점검로 지지대에 따르면, 교량에 관로와 발판을 설치하기 위한 구성요소의 최소화로 교량의 균열발생을 최소화할 수 있고, 관로와 발판의 하나의 함께 연결되어져 설치됨에 따라 점검공간을 확보할 수 있음은 물론 그로 인해 시인성이 향상되는 효과가 있다.According to the pipeline and the inspection furnace support of the present invention made of the above structure, it is possible to minimize the occurrence of cracks in the bridge by minimizing the components for installing the pipeline and scaffold in the bridge, it is installed connected to one of the pipeline and the scaffold As a result, it is possible to secure the inspection space, thereby improving visibility.

또한, 관로 및 점검로 지지대 하부에 별도의 관로 또는 점검로가 설치되지 않으므로 발판의 하부를 점검함에 있어 시야가 확보되어 점검이 용이한 효과가 있다.
In addition, a separate pipeline or inspection path is not installed in the lower part of the support for the pipeline and the inspection road, so that the visual field is secured in the inspection of the lower part of the scaffold, thereby making it easy to check.

도 1은 본 발명의 일 실시예에 따른 관로 및 점검로 지지대를 보인 사시도,
도 2는 본 발명의 일 실시예에 따른 관로 및 점검로 지지대의 분리 사시도,
도 3은 본 발명의 일 실시예에 따른 발판지지유닛과 난간대의 결합상태를 ㄷ도시한 정면도,
도 4는 본 발명의 일 실시예에 따른 관로 및 점검로 지지대의 장착 상태도.
1 is a perspective view showing the support by the pipeline and the inspection according to an embodiment of the present invention,
Figure 2 is an exploded perspective view of the support of the pipeline and the inspection in accordance with an embodiment of the present invention,
Figure 3 is a front view showing a coupling state of the scaffolding support unit and the handrail according to an embodiment of the present invention,
Figure 4 is a mounting state of the support and the pipeline and the inspection in accordance with an embodiment of the present invention.

이하, 첨부된 도면을 참조하여 본 발명의 바람직한 실시예에 따른 관로 및 점검로 지지대를 상세히 설명한다.Hereinafter, with reference to the accompanying drawings will be described in detail the support and the pipeline in accordance with a preferred embodiment of the present invention.

첨부의 도 1 내지 도 4에 도시된 바와 같이, 본 발명에 따른 관로 및 점검로 지지대는 고정대상물(10)에 고정수단(60)으로 고정되는 것으로, 고정대상물(10)은 교량의 박스보나 교량 외면, 교량의 상판 외면, 상판을 지지하는 교각 등 본 발명의 지지대가 고정되는 대상물이다.As shown in the accompanying Figures 1 to 4, the support and the passageway according to the present invention is fixed to the fixed object 10 by the fixing means 60, the fixed object 10 is a box beam or bridge of the bridge It is an object to which the support of this invention is fixed, such as an outer surface, the outer surface of the upper plate of a bridge, and the bridge which supports an upper plate.

상기 관로(20)는 교량의 박스보의 길이방향을 따라 설치되어 있고, 교량에서 흐르는 오수가 유입되어 흐르게 된다. 오수의 원활한 흐름을 위해 상기 관로(20)는 그 직경이 변경될 수 있다. The pipeline 20 is installed along the longitudinal direction of the box beam of the bridge, and the sewage flowing from the bridge flows in. In order to facilitate the flow of sewage, the pipe 20 may be changed in diameter.

상기 점검로 즉, 발판(20)은 소정의 폭과 길이를 갖는 것으로, 교량의 박스보의 길이방향을 따라 설치되어 교량의 점검자가 보행하게 되며, 기존에 이미 공지되어 적용되고 있는 발판을 사용하면 된다.In other words, the inspection path, that is, the scaffold 20 has a predetermined width and length, is installed along the longitudinal direction of the box beam of the bridge so that the inspector of the bridge walks, and using the scaffold already known and applied do.

본 발명은 관로를 지지하는 관로지지유닛(30)과 발판을 지지하는 발판지지유닛(40)을 서로 결합시켜 놓음으로써 고정대상물에 한 번의 설치를 통해 관로와 발판을 모두 설치할 수 있게 된다.According to the present invention, both the pipeline and the scaffold can be installed through a single installation on the fixed object by coupling the pipeline support unit 30 supporting the pipeline and the scaffold support unit 40 supporting the scaffold.

상기 관로지지유닛(30)과 발판지지유닛(40)은 금속재질로 형성될 수 있고, 그외 관로와 발판을 지지할 수 있을 정도의 재질과 강도이면 모두 가능하다.The pipeline support unit 30 and the scaffold support unit 40 may be formed of a metal material, and may be any materials and strengths sufficient to support the pipeline and the scaffold.

상기 관로지지유닛(30)는 상부에 유체가 흐르는 관로(20)가 안착될 수 있는 안착부(36)가 형성되고, 이 안착부(36)는 상측이 개방된 반원 형태로 형성되어 하측방향으로 함몰되어 있다. 물론 상기 안착부(36)는 반원형태일 뿐 관로를 지지할 수 있는 길이를 갖는 호 형으로 형성될 수도 있다.The pipeline support unit 30 has a seating portion 36 on which a fluid flow passage 20 can be seated, and the seating portion 36 is formed in a semicircle with an open upper side in a downward direction. It is recessed. Of course, the seating portion 36 may be formed in an arc shape having a length capable of supporting a pipe only in a semicircular shape.

상기 안착부(36)에는 관로의 안착시 완충을 위해 완충부재가 구비될 수 있고, 상기 안착부(36)에 보다 작은 직경의 관로(20)를 안착 고정시키는 경우에는 유동을 방지하기 위해 상기 안착부(36)에는 간격조절부재가 구비될 수 있다.The seating portion 36 may be provided with a cushioning member for cushioning when the pipe is seated, and in the case of fixing the pipe 20 having a smaller diameter to the seating portion 36 to prevent the flow. The part 36 may be provided with a gap adjusting member.

이때, 상기 관로지지유닛(30)의 일측벽이 고정대상물(10)에 고정되는데, 고정대상물(10)이 대부분 경사져 있음에 따라 상기 관로지지유닛(30)의 일측벽은 결합면(32)으로 형성된다. 물론, 고정대상물의 경사각도에 따라 그 경사각은 바뀔 수 있으며, 고정대상물이 수직으로 형성된 경우에는 상기 관로지지유닛(30)의 일측벽도 수직으로 형성될 수 있다.At this time, one side wall of the pipe support unit 30 is fixed to the fixed object 10. As the fixed object 10 is mostly inclined, one side wall of the pipe support unit 30 is coupled to the coupling surface 32. Is formed. Of course, the inclination angle may be changed according to the inclination angle of the fixed object, and when the fixed object is vertically formed, one side wall of the pipe support unit 30 may also be vertically formed.

상기 관로지지유닛(30)의 타측벽에는 발판지지유닛(40)이 관로지지유닛에 대해 수직방향으로 설치되어져 발판(15)이 올려진 경우에 지면과 수평이 되도록 마련되어야 하므로, 상기 관로지지유닛(30)의 타측벽은 수직면(34)으로 형성된다.Since the scaffold support unit 40 is installed in the vertical direction with respect to the conduit support unit on the other side wall of the conduit support unit 30, the scaffold support unit should be provided to be horizontal to the ground when the scaffold 15 is raised. The other side wall 30 is formed with the vertical surface 34.

즉, 상기 관로지지유닛(30)은 도 4에 도시된 바와 같이, 전체적인 형상이 사다리꼴 모양으로 형성되는 것이고, 이때, 상기 관로지지유닛(30)는 내부에 중공부(38)가 형성되어 사디리꼴 틀체로 형성된다.That is, the pipe support unit 30 is as shown in Figure 4, the overall shape is formed in a trapezoidal shape, in this case, the pipe support unit 30 is a hollow portion 38 is formed therein, sadie-like It is formed into a frame.

상기 관로지지유닛(30)을 틀체로 형성하는 이유는, 내부면을 중공부로 형성하여 관로지지유닛의 무게를 줄임은 물론 그에 따라 비용낭비를 줄이도록 한 것이고, 이때, 상기 중공부(38)의 가장자리는 보강을 위해 보강띠(39)가 마련되는 것이 바람직하다.The reason for forming the pipe support unit 30 as a frame is to reduce the weight of the pipe support unit by reducing the weight of the pipe support unit by forming an inner surface of the hollow part, and in this case, the hollow part 38 The edge is preferably provided with a reinforcing band 39 for reinforcement.

한편, 상기 결합면(32)과 수직면(34) 및 안착부(36)는 접촉면적을 넓힘은 물론 강도증가를 위해 일정 폭을 갖도록 형성된다. 상기 결합면(32)에는 고정수단의 고정을 위해 구멍이 형성되어 있다.On the other hand, the coupling surface 32 and the vertical surface 34 and the seating portion 36 is formed to have a predetermined width for increasing the contact area as well as strength. The coupling surface 32 is formed with a hole for fixing the fixing means.

상기 고정수단은 통상의 앵커볼트를 사용할 수 있다.The fixing means may use a conventional anchor bolt.

상기 발판지지유닛(40)은 관로지지유닛(30)의 타측벽에 결합부재(62)를 매개로 결합되는 것으로, 발판지지유닛(40)의 상면은 발판(15)의 설치를 위해 수평상태로 형성된다.The scaffold support unit 40 is to be coupled to the other side wall of the pipe support unit 30 via the coupling member 62, the upper surface of the scaffold support unit 40 in a horizontal state for the installation of the scaffold 15 Is formed.

상기 발판지지유닛(40)은 관로지지유닛(30)의 타측벽 상부나 하부 또는 중앙부에 결합될 수 있는 것으로, 그 결합위치는 선택가능하나, 가능하면 관로(20)가 발판(15)보다 상측에 위치하도록 관로지지유닛(30)의 타측벽 하부에 설치되게 한다.The scaffold support unit 40 is to be coupled to the upper or lower or central portion of the other side wall of the pipe support unit 30, the coupling position is selectable, if possible, the pipe 20 is higher than the scaffold 15 It is to be installed in the lower side of the other side wall of the pipe support unit 30 to be located in.

상기 결합부재(62)는 고정볼트와 너트로 구성될 수 있다.The coupling member 62 may be composed of a fixing bolt and a nut.

이때, 상기 관로지지유닛(30)에 결합되는 발판지지유닛(40)의 일측은 휨 등이 일어나지 않고 결합된 상태를 유지하도록 발판(15)이 설치된 방향으로 돌출되어 보강프레임(44)이 일체로 형성될 수 있다.At this time, one side of the scaffold support unit 40 coupled to the pipe support unit 30 protrudes in the direction in which the scaffold 15 is installed to maintain the combined state without bending or the like, and the reinforcing frame 44 is integrally formed. Can be formed.

그리고, 상기 발판지지유닛(40)의 타측에는 상측방향으로 수직하게 난간대(50)가 설치되는데, 이 난간대(50)에는 작업자의 안전사고를 방지하도록 일정 간격으로 안전바(55)이 끼워져 있다.The other side of the scaffold support unit 40 is provided with a handrail 50 vertically upwardly. The handrail 50 is fitted with safety bars 55 at regular intervals to prevent a safety accident of an operator.

상기 난간대(50)의 견고한 결합을 위해 상기 난간대(50)와 접하는 상기 발판지지유닛(40)의 타측에는 상방으로 걸림턱(42)이 형성되어 있고, 상기 난간대(50)에는 상기 걸림턱(42)에 걸려 체결된 채 상기 발판지지유닛(40)에 연결부재(64)로 연결되어 고정되도록 체결홈(52)이 형성되어 있다.The locking jaw 42 is formed on the other side of the scaffold support unit 40 in contact with the handrail 50 for a firm coupling of the handrail 50, and the locking jaw 42 is attached to the handrail 50. The fastening groove 52 is formed to be connected to and fixed to the scaffold support unit 40 by the connecting member 64 while being fastened to the hook.

따라서, 상기 걸림턱(42)이 체결홈(52)에 끼워지면서 난간대(50)가 발판지지유닛(40)에 체결되고, 이 상태로 연결부재(64)에 의해 고정되는 것이다.Therefore, while the locking jaw 42 is fitted into the fastening groove 52, the handrail 50 is fastened to the scaffold support unit 40, and is fixed by the connecting member 64 in this state.

상기 연결부재(64)는 결합부재와 마찬가지로 고정볼트와 너트로 구성될 수 있다.The connecting member 64 may be composed of a fixing bolt and a nut like the coupling member.

상기와 같이 구성된 본 발명의 관로 및 점검로 지지대는 교량의 길이 방향 또는 폭 방향을 따라 설치되는데, 발판지지유닛이 관로지지유닛에 결합된 채 관로지지유닛이 교량의 고정대상물(10)에 앵커볼트 등의 고정수단으로 고정되어져 설치된다.The pipeline and the inspection support of the present invention configured as described above are installed along the longitudinal direction or the width direction of the bridge, while the scaffold support unit is coupled to the pipeline support unit, the pipeline support unit is anchored to the fixed object 10 of the bridge. It is fixed and installed by the fixing means of the back.

본 발명의 관로 및 점검로 지지대가 일정 간격으로 두고 설치가 완료되면, 관로지지유닛(30)의 안착부(36)에 관로(20)를 안착시키고, 발판지지유닛(40)의 상면에는 발판(15)을 올려놓아 볼트, 리벳, 용접 등의 방식으로 고정하면 된다.When the installation is completed at a predetermined interval by the pipeline and the inspection of the present invention, the pipeline 20 is seated on the seating portion 36 of the pipeline support unit 30, and the scaffolding on the upper surface of the scaffold support unit 40 ( 15) Put it up and fix it by bolts, rivets, welding, etc.

한편, 발판지지유닛에 결합되는 난간대 및 안전바는 발판지지유닛의 설치 전에 결합하여 설치하거나 발판지지유닛의 설치 후 결합할 수 있는 것으로, 관로지지유닛과 발판지지유닛 및 난간대의 결합순서와 관로 및 발판의 설치순서는 변경될 수 있다.On the other hand, the handrail and the safety bar coupled to the scaffold support unit can be combined or installed before the installation of the scaffold support unit or can be combined after the installation of the scaffold support unit. The installation order of the scaffold can be changed.

본 발명의 관로 및 점검로 지지대는 하나의 결합체로 이루어져 교량에 설치되는 구성요소를 최소화함으로써 교량의 고정대상물 예로서 박스보의 균열 발생을 최소화할 수 있게 되며, 점검공간 확보로 시인성이 향상되어 진다.
The pipeline and the inspection furnace support of the present invention consists of a single assembly to minimize the components installed on the bridge to minimize the occurrence of cracks in the box beam as an example of the fixed object of the bridge, and visibility is improved by securing the inspection space .

10: 고정대상물 15: 발판
20: 관로 30: 관로지지유닛
32: 결합면 34: 수직면
36: 안착부 38: 중공부
39: 보강띠 40: 발판지지유닛
42: 걸림턱 44: 보강프레임
50: 난간대 52: 체결턱
55: 안전바 60: 고정수단
62: 결합부재 64: 연결부재
10: fixed object 15: scaffold
20: pipeline 30: pipeline support unit
32: mating surface 34: vertical surface
36: seating part 38: hollow part
39: reinforcing belt 40: scaffold support unit
42: engaging jaw 44: reinforcement frame
50: handrail 52: fastening jaw
55: safety bar 60: fixing means
62: coupling member 64: connecting member

Claims (5)

교량을 포함한 고정대상물(10)에 설치되어 교량 점검자가 보행할 수 있는 발판(15)과 유체가 흐르는 관로(20)를 지지하기 위한 관로 및 점검로 지지대에 있어서,
상기 관로(20)가 안착되어 그 관로의 외주면이 감싸여지도록 상부에 함몰되어 안착부(36)가 형성되고, 일측벽이 상기 고정대상물(10)에 고정수단(60)으로 고정되는 관로지지유닛(30);
상기 관로지지유닛(30)의 타측벽 일부분에 일측이 결합부재(62)로 결합되어 상기 고정대상물(10)과 대향되는 방향으로 수직하게 설치되고, 상면에 상기 발판(15)이 놓여지는 발판지지유닛(40);
으로 이루어진 것을 특징으로 하는 관로 및 점검로 지지대.
In the pipeline and inspection path support for supporting the scaffold 15 and the fluid flow passage 20 through which the bridge inspector can walk and installed on the fixed object 10 including the bridge,
The pipeline 20 is recessed in the upper portion so that the outer peripheral surface of the pipeline is wrapped to form a seating portion 36, and one side wall is a pipe support unit fixed to the fixed object 10 by the fixing means 60. 30;
One side is coupled to the coupling member 62 to the other side wall portion of the pipe support unit 30 is installed vertically in a direction opposite to the fixed object 10, the scaffold support on which the footrest 15 is placed Unit 40;
Support passage and inspection, characterized in that consisting of.
제1항에 있어서,
상기 관로지지유닛(30)은 사다리꼴 모양으로, 상기 고정대상물(10)에 고정되는 일측벽은 고정대상물(10)의 경사각도와 동일한 각도로 결합면(32)이 형성되고, 상기 발판지지유닛(40)이 결합되는 타측벽은 수직면(34)으로 형성되며, 상부에 상기 안착부(36)가 형성되는 것을 특징으로 하는 관로 및 점검로 지지대.
The method of claim 1,
The pipe support unit 30 has a trapezoidal shape, and one side wall fixed to the fixed object 10 has a coupling surface 32 formed at an angle equal to the inclination angle of the fixed object 10, and the scaffold support unit 40 is formed. The other side wall) is coupled to the vertical surface (34) is formed, the support and the pipeline and the check, characterized in that the seating portion 36 is formed on the top.
제2항에 있어서,
상기 관로지지유닛(30)은 내부에 중공부(38)가 형성된 틀체로 형성되고, 상기 중공부(38)의 가장자리는 보강띠(39)가 마련된 것을 특징으로 하는 관로 및 점검로 지지대.
The method of claim 2,
The pipeline support unit 30 is formed of a frame body with a hollow portion 38 formed therein, and an edge of the hollow portion 38 is a reinforcing band 39, characterized in that the support and the support passage.
제1항에 있어서,
상기 발판지지유닛(40)의 타측에서 상측방향으로 수직하게 설치되고 일정 간격으로 안전바(55)이 끼워지는 난간대(50)를 더 포함하는 것을 특징으로 하는 관로 및 점검로 지지대.
The method of claim 1,
The rail support unit is characterized in that it further comprises a handrail 50 which is installed vertically from the other side of the scaffold support unit 40 and the safety bar 55 is fitted at a predetermined interval.
제4항에 있어서,
상기 난간대(50)와 접하는 상기 발판지지유닛(40)의 타측에는 상방으로 걸림턱(42)이 형성되고,
상기 난간대(50)에는 상기 걸림턱(42)에 걸려 체결된 채 상기 발판지지유닛(40)에 연결부재(64)로 연결되어 고정되도록 체결턱(52)이 형성되는 것을 특징으로 하는 관로 및 점검로 지지대.
5. The method of claim 4,
The other side of the scaffold support unit 40 in contact with the handrail 50 is formed with a locking jaw 42 upwards,
Pipe rail and inspection, characterized in that the fastening jaw 52 is formed on the handrail 50 is connected to the footrest support unit 40 and fixed to the foothold support unit 40 while being fastened to the locking jaw (42) With supporters.
KR1020120090805A 2012-08-20 2012-08-20 Pipe and inspection road supporter KR101235866B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120090805A KR101235866B1 (en) 2012-08-20 2012-08-20 Pipe and inspection road supporter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120090805A KR101235866B1 (en) 2012-08-20 2012-08-20 Pipe and inspection road supporter

Publications (1)

Publication Number Publication Date
KR101235866B1 true KR101235866B1 (en) 2013-02-25

Family

ID=47899958

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120090805A KR101235866B1 (en) 2012-08-20 2012-08-20 Pipe and inspection road supporter

Country Status (1)

Country Link
KR (1) KR101235866B1 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100049343A (en) * 2008-11-03 2010-05-12 신세계산업(주) Bridge inspection passage
KR101036999B1 (en) 2010-12-31 2011-05-25 (주)아리산업 Construction method for bridge footway

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100049343A (en) * 2008-11-03 2010-05-12 신세계산업(주) Bridge inspection passage
KR101036999B1 (en) 2010-12-31 2011-05-25 (주)아리산업 Construction method for bridge footway

Similar Documents

Publication Publication Date Title
KR100998631B1 (en) Sidewalk for bridge
KR101678849B1 (en) Cable Bridge and Constructing Method thereof
KR101271450B1 (en) Safety fence for easy control angle
JP4574705B2 (en) Suspended scaffolding
CN103243649B (en) The system and method for a kind of cable saddle Fast Installation, location
CN208884362U (en) A kind of Construction of continuous beam bracket
JP2016089445A (en) Device for supporting safety net and scaffolding
CN104847102A (en) Wall attaching method and device of attached self-lifting scaffold on retraction section of building outer wall
KR101235866B1 (en) Pipe and inspection road supporter
CN103628692B (en) A kind of floor beam mounting bracket and use it to install the method for floor beam
JP2017040113A (en) Overhanging passage of steel structure
JP5773469B1 (en) Suspended scaffolding
KR100381724B1 (en) Inspection plate for a pier
KR101567301B1 (en) Footstool Installation Structure
KR101309119B1 (en) Pipe install device for bridges and it's pipe construction methods
KR20080004624U (en) Stainless steel coupling device
JP5807883B1 (en) Suspended scaffolding
CN204715720U (en) The attachment supporting arrangement of the attachment type raise scaffold outside the building section of receipts within the walls
CN104818859B (en) The installation method of orbit traffic overhead station operation platform
KR101428748B1 (en) A Sidewalk Enlargement Installation
KR101181702B1 (en) Pipe and inspection road supporter
KR20130116451A (en) Structure with supporter and safe rail for mold
KR200397402Y1 (en) A pillar For Bridge Inspection
JP3180873U (en) Repair scaffold
KR20190041976A (en) Coupling device for scaffolding pipes

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E701 Decision to grant or registration of patent right
N231 Notification of change of applicant
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20151125

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20161209

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20190131

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20191128

Year of fee payment: 8