KR101234270B1 - 강관과 유공관을 이용한 비개착 굴착공법 - Google Patents
강관과 유공관을 이용한 비개착 굴착공법 Download PDFInfo
- Publication number
- KR101234270B1 KR101234270B1 KR1020090092281A KR20090092281A KR101234270B1 KR 101234270 B1 KR101234270 B1 KR 101234270B1 KR 1020090092281 A KR1020090092281 A KR 1020090092281A KR 20090092281 A KR20090092281 A KR 20090092281A KR 101234270 B1 KR101234270 B1 KR 101234270B1
- Authority
- KR
- South Korea
- Prior art keywords
- steel pipe
- temporary
- large steel
- pipe
- perforated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/001—Improving soil or rock, e.g. by freezing; Injections
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/105—Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/107—Reinforcing elements therefor; Holders for the reinforcing elements
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/005—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by forcing prefabricated elements through the ground, e.g. by pushing lining from an access pit
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/10—Making by using boring or cutting machines
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Structural Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Architecture (AREA)
- Environmental & Geological Engineering (AREA)
- Civil Engineering (AREA)
- Soil Sciences (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
Description
Claims (7)
- 삭제
- 굴착하고자 하는 구역의 폭방향 및 높이 방향으로 다수의 대형강관을 압입하는 대형강관 압입단계;상기 폭방향으로 압입된 대형강관의 내부에서 이웃하는 대형강관을 향해 대형강관의 압입방향을 따라 상향 경사지게 다수의 유공관을 압입한 후 유공관 내부에 그라우팅을 하여 유공관 주변으로 그라우트재가 침투하도록 함으로써 대형강관 사이에 가설루프가 형성되도록 하는 가설루프 형성단계;상기 가설루프의 하부를 소정의 깊이만큼 굴착하여 작업공간을 형성하는 작업공간 형성단계와, 상기 작업공간에서 대형강관의 마주하는 면의 일부분을 절단하고 대형강관에 일체가 되도록 소정의 간격으로 기둥을 수직하게 설치하는 기둥설치단계와, 상기 기둥의 상부에 브래킷을 설치하고 상기 브래킷을 연결하도록 앵글을 설치하는 지지부 설치단계와, 상기 지지부에 양단이 지지되도록 상기 가설루프의 하부에 아치형 구조물을 설치하는 아치형 구조물 형성단계로 이루어져 라이닝을 형성하고 이를 반복 하여 대형강관의 압입 깊이까지 전진하는 가설루프 형성단계;상기 높이방향으로 압입된 대형강관의 내부양측에서 이웃하는 대형강관을 향해 대형강관의 외측방향으로 경사지게 다수의 유공관을 소정의 간격으로 압입하고, 상기 유공관의 내부를 통해 그라우팅을 하여 유공관 주변으로 그라우트재가 침투하도록 함으로써 높이방향으로 대형강관 사이의 양측에 가설벽체가 형성되도록 하는 가설벽체 형성단계;상기 가설벽체 사이를 일정 깊이만큼 굴착한 후 가설벽체와 대형강관 사이를 보강하면서 라이닝을 형성하고, 이를 반복 시행하여 대형강관의 압입 깊이까지 전진하는 가설벽체 라이닝 형성단계;상기 가설루프 하부 및 가설벽체 사이의 굴착된 공간을 통해 폭방향 및 높이방향으로 압입된 대형강관을 거더로 연결하고 상기 거더에 연결되는 슬래브를 설치하여 지중에 대단면 구조물을 형성하는 단계;상기 대단면 구조물의 내부를 굴착하는 굴착단계를 포함하여 이루어진 것을 특징으로 하는 강관과 유공관을 이용한 비개착 굴착공법.
- 제 2 항에 있어서,상기 가설벽체 라이닝 형성단계는,상기 가설벽체 사이를 소정의 깊이만큼 굴착하여 작업공간을 형성하는 작업공간 형성단계;상기 작업공간에서 대형강관의 마주하는 면의 일부분을 절단하고 대형강관에 일체가 되도록 수평보강재를 설치하는 단계;상기 마주하도록 설치된 수평보강재를 수직보강재로 연결하는 수직보강재 설치단계;상기 수평보강재의 양단에 브래킷을 설치하고 상기 브래킷을 연결하도록 앵글을 설치하는 지지부 설치단계;상기 지지부의 양측에 지지되도록 가설벽체 사이에 마주하는 아치형 구조물을 형성하는 아치형 구조물 형성단계;를 포함하여 이루어진 것을 특징으로 하는 강관과 유공관을 이용한 비개착 굴착공법.
- 제 2 항 또는 제 3 항에 있어서,상기 아치형 구조물 형성단계는,상기 지지부에 양단이 지지되도록 아치형태로 철근을 조립하고, 쇼크리트를 타설하여 마감하는 것을 특징으로 하는 강관과 유공관을 이용한 비개착 굴착공법.
- 제 2 항 또는 제 3 항에 있어서,상기 아치형 구조물 형성단계는,상기 지지부에 양단이 지지되도록 아치형태의 프리캐스트 콘크리트판을 설치한 후 프리캐스트 콘크리트판과 가설루프 또는 가설벽체 사이를 그라우팅하여 형성하는 것을 특징으로 하는 강관과 유공관을 이용한 비개착 굴착공법.
- 제 2 항 또는 제 3 항에 있어서,상기 아치형 구조물 형성단계는,상기 지지부에 양단이 지지되도록 다수의 강관을 아치형태로 연결하고, 강관과 가설루프 또는 가설벽체 사이를 그라우팅하여 메우고 강관의 외면에 쇼크리트를 타설하여 마감하는 것을 특징으로 하는 강관과 유공관을 이용한 비개착 굴착공법.
- 제 2 항에 있어서,상기 가설루프 및 가설벽체를 형성하기 위해 설치되는 유공관은 가설루프와 가설벽체의 지지력을 향상시킬 수 있도록 상호 교차되도록 압입되는 것을 특징으로 하는 강관과 유공관을 이용한 비개착 굴착공법.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020090092281A KR101234270B1 (ko) | 2009-09-29 | 2009-09-29 | 강관과 유공관을 이용한 비개착 굴착공법 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020090092281A KR101234270B1 (ko) | 2009-09-29 | 2009-09-29 | 강관과 유공관을 이용한 비개착 굴착공법 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| KR20110034831A KR20110034831A (ko) | 2011-04-06 |
| KR101234270B1 true KR101234270B1 (ko) | 2013-02-19 |
Family
ID=44043267
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| KR1020090092281A Expired - Fee Related KR101234270B1 (ko) | 2009-09-29 | 2009-09-29 | 강관과 유공관을 이용한 비개착 굴착공법 |
Country Status (1)
| Country | Link |
|---|---|
| KR (1) | KR101234270B1 (ko) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105909259A (zh) * | 2016-06-12 | 2016-08-31 | 中铁十九局集团轨道交通工程有限公司 | 近距离下穿既有盾构隧道管幕施工沉降控制系统及方法 |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR102145162B1 (ko) * | 2020-05-06 | 2020-08-18 | 홍석훈 | 소구경 강관을 이용한 지하터널 형성용 구조물 설치 방법 |
| CN115262533B (zh) * | 2022-08-08 | 2023-06-27 | 上海建工集团股份有限公司 | 免接头地下连续墙及其施工方法 |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH04343995A (ja) * | 1991-05-20 | 1992-11-30 | S T K Kk | 併設トンネルの中間部覆工構造 |
| JP2000265797A (ja) * | 1999-03-15 | 2000-09-26 | Okumura Corp | トンネルの築造方法 |
| JP2008255606A (ja) | 2007-04-03 | 2008-10-23 | Metropolitan Expressway Co Ltd | 先行切梁工法及び先行切梁接合構造 |
-
2009
- 2009-09-29 KR KR1020090092281A patent/KR101234270B1/ko not_active Expired - Fee Related
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH04343995A (ja) * | 1991-05-20 | 1992-11-30 | S T K Kk | 併設トンネルの中間部覆工構造 |
| JP2000265797A (ja) * | 1999-03-15 | 2000-09-26 | Okumura Corp | トンネルの築造方法 |
| JP2008255606A (ja) | 2007-04-03 | 2008-10-23 | Metropolitan Expressway Co Ltd | 先行切梁工法及び先行切梁接合構造 |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105909259A (zh) * | 2016-06-12 | 2016-08-31 | 中铁十九局集团轨道交通工程有限公司 | 近距离下穿既有盾构隧道管幕施工沉降控制系统及方法 |
| CN105909259B (zh) * | 2016-06-12 | 2018-02-06 | 中铁十九局集团轨道交通工程有限公司 | 近距离下穿既有盾构隧道管幕施工沉降控制系统及方法 |
Also Published As
| Publication number | Publication date |
|---|---|
| KR20110034831A (ko) | 2011-04-06 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR100866162B1 (ko) | 의자형 자립식 흙막이벽의 시공방법 | |
| KR101121538B1 (ko) | 지하연속벽체를 이용한 터널 공법과 터널 구조체 | |
| CN205742213U (zh) | 基坑支护结构 | |
| KR101973565B1 (ko) | 종방향 플레이트가 부착된 phc 말뚝에 차수용 플레이트를 용접으로 접합하여 흙막이 벽체와 차수벽을 동시에 조성하는 흙막이 공법 | |
| CN110159294B (zh) | 一种高陡地形桥隧相接段接长明洞施工方法 | |
| JP4881555B2 (ja) | 地下構造物の構築方法 | |
| KR100914158B1 (ko) | 무지보형의 차수벽 흙막이공법 | |
| CN110017149A (zh) | 一种拱盖暗挖顺筑地下结构及施工方法 | |
| KR100656194B1 (ko) | 터널공법을 적용한 개착식 공법 | |
| KR101182704B1 (ko) | 피에이치씨파일로 구성된 흙막이벽을 이용한 건물 지하층 구조체의 시공방법 | |
| KR20140013497A (ko) | 절토지 네일링 보강사면 연결 탑다운 블록식 보강토옹벽 공법 | |
| KR20070076553A (ko) | 충전강관 루프와 콘크리트 벽체를 이용한 지하구조물축조방법 | |
| KR100794609B1 (ko) | 충전강관 루프와 콘크리트 벽체를 이용한 지하구조물축조방법 | |
| KR101843023B1 (ko) | 흙막이벽체파일과 건축물외부벽체 연결전단키 및 이를 이용한 지하구조물 시공방법 | |
| KR20080034424A (ko) | 압입강관 거더부 시공 및 그 구조를 이용한 지하구조물축조 방법 | |
| KR101234270B1 (ko) | 강관과 유공관을 이용한 비개착 굴착공법 | |
| KR102610909B1 (ko) | 침하방지를 위해 강관내부 앵커설치를 이용한 강관추진 공법 및 그 구조물 | |
| KR102021496B1 (ko) | 하향식 계단형 흙막이 시공방법 및 이를 통해 시공된 흙막이 구조체 | |
| KR100509707B1 (ko) | 골조관과 콘크리트리브를 이용한 비개착식 터널굴착방법및 상기 방법에 의하여 설치된 터널구조체 | |
| JP2010106482A (ja) | 山留擁壁及び山留擁壁形成方法 | |
| KR200362565Y1 (ko) | 프리캐스트 콘크리트 파일을 이용한 흙막이 구조체 | |
| KR100806867B1 (ko) | 강관루프 구조체 및 그 강관루프 구조체를 이용한터널구조체 시공방법 | |
| KR20070052109A (ko) | 슬림형 합성 바닥 구조를 이용한 슬라브와 외벽의 동시 타설 및 지하 역타설 동시구축방법 | |
| KR100673475B1 (ko) | 지하층 골조부의 골조용 피씨거더부재, 이를 이용한 지하층골조부의 조립구조 및 그 시공방법 | |
| KR101028695B1 (ko) | 지하 역타 공법에서 철골 또는 강관 기둥과 결합되는피씨보 연결구조 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A201 | Request for examination | ||
| PA0109 | Patent application |
St.27 status event code: A-0-1-A10-A12-nap-PA0109 |
|
| PA0201 | Request for examination |
St.27 status event code: A-1-2-D10-D11-exm-PA0201 |
|
| PG1501 | Laying open of application |
St.27 status event code: A-1-1-Q10-Q12-nap-PG1501 |
|
| D13-X000 | Search requested |
St.27 status event code: A-1-2-D10-D13-srh-X000 |
|
| D14-X000 | Search report completed |
St.27 status event code: A-1-2-D10-D14-srh-X000 |
|
| E902 | Notification of reason for refusal | ||
| PE0902 | Notice of grounds for rejection |
St.27 status event code: A-1-2-D10-D21-exm-PE0902 |
|
| T11-X000 | Administrative time limit extension requested |
St.27 status event code: U-3-3-T10-T11-oth-X000 |
|
| T11-X000 | Administrative time limit extension requested |
St.27 status event code: U-3-3-T10-T11-oth-X000 |
|
| E13-X000 | Pre-grant limitation requested |
St.27 status event code: A-2-3-E10-E13-lim-X000 |
|
| P11-X000 | Amendment of application requested |
St.27 status event code: A-2-2-P10-P11-nap-X000 |
|
| P13-X000 | Application amended |
St.27 status event code: A-2-2-P10-P13-nap-X000 |
|
| E701 | Decision to grant or registration of patent right | ||
| PE0701 | Decision of registration |
St.27 status event code: A-1-2-D10-D22-exm-PE0701 |
|
| GRNT | Written decision to grant | ||
| PR0701 | Registration of establishment |
St.27 status event code: A-2-4-F10-F11-exm-PR0701 |
|
| PR1002 | Payment of registration fee |
St.27 status event code: A-2-2-U10-U11-oth-PR1002 Fee payment year number: 1 |
|
| PG1601 | Publication of registration |
St.27 status event code: A-4-4-Q10-Q13-nap-PG1601 |
|
| LAPS | Lapse due to unpaid annual fee | ||
| PC1903 | Unpaid annual fee |
St.27 status event code: A-4-4-U10-U13-oth-PC1903 Not in force date: 20160213 Payment event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE |
|
| PC1903 | Unpaid annual fee |
St.27 status event code: N-4-6-H10-H13-oth-PC1903 Ip right cessation event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE Not in force date: 20160213 |
|
| P22-X000 | Classification modified |
St.27 status event code: A-4-4-P10-P22-nap-X000 |