KR101222863B1 - Modeling Method of Process For LNG Plant And System thereof - Google Patents

Modeling Method of Process For LNG Plant And System thereof Download PDF

Info

Publication number
KR101222863B1
KR101222863B1 KR1020110014041A KR20110014041A KR101222863B1 KR 101222863 B1 KR101222863 B1 KR 101222863B1 KR 1020110014041 A KR1020110014041 A KR 1020110014041A KR 20110014041 A KR20110014041 A KR 20110014041A KR 101222863 B1 KR101222863 B1 KR 101222863B1
Authority
KR
South Korea
Prior art keywords
lng plant
data
business
modeling
business process
Prior art date
Application number
KR1020110014041A
Other languages
Korean (ko)
Other versions
KR20120094650A (en
Inventor
황규환
한충희
이준복
원서경
Original Assignee
경희대학교 산학협력단
(주) 한길아이티
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 경희대학교 산학협력단, (주) 한길아이티 filed Critical 경희대학교 산학협력단
Priority to KR1020110014041A priority Critical patent/KR101222863B1/en
Publication of KR20120094650A publication Critical patent/KR20120094650A/en
Application granted granted Critical
Publication of KR101222863B1 publication Critical patent/KR101222863B1/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

본 발명은 LNG 플랜트 업무 프로세스 모델링에 관한 것으로, 이러한 본 발명은 LNG 플랜트 업무 프로세스 관련 데이터를 수집하는 단계, 상기 LNG 플랜트 업무 프로세스 관련 데이터에 대하여 일정 규칙에 따라 LNG 플랜트 업무 프로세스를 다수의 단계별로 정의하는 단계, 상기 정의된 LNG 플랜트 업무 프로세스를 구분 및 분류하고, 분류된 단계별 각 업무 활동 제어 항목들에 대하여 데이터의 입력, 제약 조건 및 조직의 배치, 그에 따른 출력의 흐름 연결을 모델링하는 모델링 단계를 포함하는 LNG 플랜트 업무 프로세스 모델링 방법의 구성을 개시한다.The present invention relates to the LNG plant business process modeling, the present invention is to collect the LNG plant business process-related data, the LNG plant business process related data to define the LNG plant business process in a plurality of stages according to a certain rule And a modeling step of classifying and classifying the defined LNG plant business process, and modeling the flow connection of data input, constraints and organization arrangement, and output according to each classified business activity control items. Disclosed is the configuration of a LNG plant business process modeling method that includes.

Description

LNG 플랜트 업무 프로세스 모델링 방법 및 시스템{Modeling Method of Process For LNG Plant And System thereof}Modeling method of process for LNG plant and system

본 발명은 LNG 플랜트 업무 프로세스에 관한 것으로, 특히 LNG 플랜트의 시공 전 단계들의 업무 프로세스를 효율적 관리가 가능한 모델로 모델링할 수 있는 LNG 플랜트 업무 프로세스 모델링 방법 및 시스템에 관한 것이다.The present invention relates to an LNG plant business process, and more particularly, to a LNG plant business process modeling method and system capable of modeling a business process of pre-construction stages of an LNG plant into a model that can be efficiently managed.

플랜트 산업은 엔지니어링(Engineering)과, 기계설비의 조달(Procurement), 시공(Construction)이 융합된 복합 산업(EPC)으로 산업효과가 높은 고부가가치 산업이며, 90년대 후반부터 건축 및 토목분야에서 업체 간의 가격경쟁이 심화되면서 해외공사 수주가 플랜트 중심으로 이동하여 우리나라의 수출동력으로 급부상하고 있다. 이에 따라 플랜트 건설의 프로젝트 수주에서부터 설계 시공은 물론 사전조사, 파이낸싱, 유지보수까지 전 분야에 대한 중요성이 확대되고 있는 실정이다. The plant industry is a high value-added industry with high industrial effects, combining engineering, procurement, and construction, and since the late 90s, As price competition intensifies, overseas construction orders are shifting to the center of the plant, which is rapidly emerging as Korea's export engine. As a result, the importance of everything from plant projects to design construction, as well as preliminary investigation, financing, and maintenance has increased.

한국도 플랜트 시장의 수출 증대가 매우 중요한 과제로 여겨지고 있으나, 현재까지는 석유가스와 석유화학부문에 너무 치우쳐 있고 업체들 간의 수주 불균형으로 인한 인력부족, 그리고 여러 기술적 또는 비용적인 문제를 안고 있다. 이러한 문제를 해결하기 위해서는 정확한 시장 환경 분석을 통한 경영전략의 수립이 요구되며, 국내 건설업체들이 향후 지속적인 수익을 확보하기 위해서는 최근의 시장동향을 고려할 때 시장발전이 제한적인 국내시장 대신 해외시장에 진출하기 위한 전략의 확보가 요구된다.In Korea, increasing exports of the plant market are considered to be very important tasks, but so far they are too biased for the petroleum gas and petrochemical sectors, lack of manpower due to unbalanced orders among companies, and various technical or cost problems. In order to solve these problems, it is necessary to establish a management strategy through accurate market environment analysis.In order to secure sustainable profits, domestic construction companies should enter overseas markets instead of the domestic market, which has limited market development in light of recent market trends. It is necessary to secure a strategy for doing so.

조사 결과 해외 플랜트 시장의 발전 가능성에 비해 국내 업체들이 플랜트 시장에 진출하기에 시공분야에서는 오랜 경험을 바탕으로 충분한 경험을 갖고 있으나 고부가가치 분야인 엔지니어링, 사업관리 분야 등에 대해서는 매우 취약한 것으로 조사되었으며, 이로 인해 해외 업체들과의 수주 경쟁에서 뒤처지는 것으로 나타났다. As a result of the survey, domestic companies have enough experience in the construction field to enter the plant market, compared to the possibility of development of the overseas plant market, but they are very vulnerable to high value-added engineering and business management. As a result, they are falling behind in competition for orders from overseas companies.

상술한 플랜트 건설 사업에 대하여 다시 정의하면, 플랜트 건설 사업은 시스템 또는 설비를 대상으로 기획과 타당성 조사, 기본 및 실시설계, 구매·조달, 시공 및 시운전, 운영 및 유지보수 등 전 단계에 걸친 업무를 일괄하여 수행하는 건설 분야이다. 이러한 플랜트 건설사업의 주요 특징은 복잡한 기술 집약형 물적 시스템, 기술 기준서의 산업, 산업설비기술의 역동성, 경험과 노하우의 중요성, 고도의 프로젝트 관리기술 요구 등으로 요약할 수 있다. 이러한 플랜트 건설 사업은 다양한 학문과 기술이 결합되어 복잡한 장치를 구성하며, 체계적인 기술기준과 절차서, 경험과 노하우의 축적, 관리기법 등에 의하여 성공 여부가 크게 좌우된다. 특히 현재 해외 LNG 플랜트 건설 시장의 규모가 꾸준히 확대될 것으로 분석되고 있는 상황에서 플랜트의 건설 사업을 수주하여 높은 부가가치를 창출하기 위해서는 지금까지의 시공 위주의 수주가 아닌 보다 체계적이며 효율적인 LNG 플랜트 사업 전 분야에 걸친 체계적인 지원이 필요한 실정이다.Re-defining the above-mentioned plant construction project, the plant construction project carries out all phases of work such as planning and feasibility study, basic and final design, procurement, procurement, construction and commissioning, operation and maintenance of systems or facilities. It is a field of construction to be carried out collectively. The main features of this plant construction project can be summarized by the complex technology-intensive physical system, the industry of technical standards, the dynamics of industrial equipment technology, the importance of experience and know-how, and the high level of project management skills. The plant construction project combines various disciplines and technologies to form complex devices, and success depends largely on systematic technical standards and procedures, accumulation of experience and know-how, and management techniques. In particular, as the size of the overseas LNG plant construction market is expected to expand steadily, in order to create high added value by winning the construction business of the plant, it is more systematic and efficient than all the construction orders. There is a need for systematic support.

따라서 본 발명의 목적은 LNG 플랜트 사업 전 분야에 걸쳐 체계적이며 효율적인 업무 진행 및 업무 프로세스의 이해와 전달을 보다 용이하게 할 수 있도록 LNG 플랜트 사업 관련 업무 프로세스의 적절한 모델링을 구축할 수 있는 LNG 플랜트 업무 프로세스 모델링 방법 및 시스템을 제공함에 있다.Therefore, an object of the present invention is to provide a systematic process for the efficient operation of the LNG plant business, and to facilitate the understanding and delivery of business processes. To provide a modeling method and system.

상기 목적을 달성하기 위하여, 본 발명의 LNG 플랜트 업무 프로세스 표준화 시스템은 LNG 플랜트 관련 데이터를 입력하는 입력부 및 외부로부터 수신하는 통신부 중 적어도 하나, 상기 LNG 플랜트 관련 데이터를 저장하는 저장부, 상기 저장부에 저장된 또는 외부로부터 수신하는 LNG 플랜트 업무 프로세스관련 데이터에 대하여 일정 규칙에 따라 LNG 플랜트 업무 프로세스를 다수의 단계별로 정의함과 아울러 구분 및 분류하고, 분류된 단계별 각 업무 활동 제어 항목들에 대하여 데이터의 입력, 제약 조건 및 조직의 배치, 그에 따른 출력의 흐름 연결을 모델링하는 제어부를 포함하는 것을 특징으로 한다.In order to achieve the above object, the LNG plant business process standardization system of the present invention is at least one of an input unit for inputting the LNG plant-related data and a communication unit for receiving from the outside, a storage unit for storing the LNG plant-related data, the storage unit Define and classify LNG plant business processes in multiple stages according to a certain rule for data related to LNG plant business process stored or received from outside, and input data for each business activity control items classified by stages. It includes a control unit for modeling the constraints and the arrangement of the organization, according to the flow connection of the output.

특히 상기 제어부는 상기 업무 활동 제어 항목에 대응하는 업무 활동 제어 모듈, 상기 업무 활동 제어 모듈에 의해 처리되는 기본 데이터를 입력하는 입력 제어 모듈, 상기 LNG 플랜트 업무 프로세스의 외부 제약 요인에 대한 제어 데이터 입력을 지원하는 데이터 제어 모듈, 상기 LNG 플랜트 업무 프로세스 진행을 위해 요구되는 조직 또는 조직 관련 정보나 규약을 포함하는 매커니즘 입력을 지원하는 매커니즘 제어 모듈을 포함할 수 있다.In particular, the control unit inputs control data for a work activity control module corresponding to the work activity control item, an input control module for inputting basic data processed by the work activity control module, and external constraints of the LNG plant work process. It may include a data control module for supporting, a mechanism control module for supporting a mechanism input including organization or organization-related information or protocol required for the LNG plant business process.

또한 상기 저장부는 상기 LNG 플랜트 업무 프로세스에 있어서 실제 작성되고 도출되는 산술 데이터 또는 상기 데이터에 대응하는 입찰 안내서, 실적 자료, 물량 산출서, 개산 견적서, 타사 입찰 자료, 사업 기준 예산 사업 수행 계획서 중 적어도 하나를 포함하는 상기 기본 데이터, 상기 LNG 플랜트 업무 진행 과정에서 직접 또는 간접적으로 상기 기본 데이터의 수치를 변경할 수 있거나 또는 상기 기본 데이터의 변동 가능성에 영향을 줄 수 있는 요소로서 사내 경영 전략, 법, 제도, 규정, 사업주 요구 조건, 입찰 참여 심의 회의, 국가 정책, 예비비 추정 자료, 리스크 관리 정책, 분야별 수행 지침, 계약서, 사규, 변경 계약서 중 적어도 하나를 포함하는 상기 제어 데이터, 상기 LNG 플랜트 업무 프로세스 지원을 위한 조직 관련 또는 조직의 행동 양식에 관한 데이터에 해당하는 프로젝트 TFT, 사내 KMB, 사내 ERP, 사업 수행 계획, Proposal 수행 계획 및 전략, 프로젝트팀, 사업주, 물품 공급 업체, 입찰 질의 분석, Clarification/Negotiation 조정, Vendor 정보 중 적어도 하나를 포함하는 상기 매커니즘을 저장할 수 있다.In addition, the storage unit at least one of arithmetic data actually generated and derived in the LNG plant business process or a bidding guide, performance data, quantity calculation, estimate estimate, third-party bidding data, business standard budget business execution plan corresponding to the data The basic data, including, can be changed directly or indirectly the numerical value of the basic data in the course of the operation of the LNG plant, or as an element that can affect the possibility of fluctuation of the basic data in-house management strategy, law, system, The control data including at least one of regulations, employer requirements, bid participation deliberations, national policies, reserve cost estimates, risk management policies, sectoral performance guidelines, contracts, regulations, change agreements, and support for the LNG plant business process. On organizational or organizational behavior The project TFT, in-house KMB, in-house ERP, project execution plan, proposal execution plan and strategy, project team, business owner, goods supplier, bidding quality analysis, Clarification / Negotiation adjustment, vendor information You can save the mechanism.

그리고 상기 시스템은 상기 기본 데이터 입력을 위한 사용자 인터페이스를 출력하는 표시부를 더 포함할 수 있다.The system may further include a display unit for outputting a user interface for inputting the basic data.

한편 상기 제어부는 상기 저장부에 저장된 다양한 LNG 플랜트 관련 정보 또는 통신부나 상기 입력부를 통하여 입력되는 다양한 LNG 플랜트 관련 정보에 대하여 공통 업무 프로세스의 도출과 정의 및 특정 업무 프로세스의 도출과 적용을 수행할 수 있으며, 이때 상기 제어부는 상기 정의된 단계별 LNG 플랜트 업무 프로세스들에 대하여 IDEFø 방법론을 기반으로 업무 활동 제어 항목들 간의 데이터 입력 배치 및 결과물 출력 배치를 모델링한다.On the other hand, the control unit may perform the derivation and definition of a common business process and the derivation and application of a specific business process to the various LNG plant-related information stored in the storage unit or various LNG plant-related information input through the communication unit or the input unit. In this case, the controller models the data input arrangement and the output output arrangement between the business activity control items based on the IDEF ø methodology for the step-by-step LNG plant business processes.

그리고 상기 제어부는 상기 LNG 플랜트 업무 프로세스에 대하여 기획, 설계, 구매조달, 시공 및 시운전 항목을 포함하는 대구분, 상기 대구분의 각 항목에 대한 세부 업무 구분, 상기 LNG 플랜트 업무 프로세스의 업무 수행 항목들을 그룹핑하여 구분한 업무 수행 구분, 상기 세부 업무 수행 항목들을 포함하는 4개의 단계로 구분하고, 각 단계별로 상위 카테고리의 코드 값이 하위 카테고리의 코드 값들과 연계되도록 모델링할 수 있으며, 상기 기획 단계에 대하여 프로젝트 조직, 프로포절 조직 구성, 지침작성 및 승인, 입찰 서류, 입찰, 사업 준비 업무로 분류되는 업무 활동 제어 모듈들을 기반으로 모델링을 수행하고, 상기 구매조달 단계에 대하여 Purchasing, Inspection, Expediting, Logistics 항목으로 분류되는 업무 활동 제어 모듈들을 기반으로 모델링을 수행한다.And the control unit for the LNG plant business process, including cod, including planning, design, procurement, construction and commissioning items, detailed work classification for each item of the cod, business performance items of the LNG plant business process The work can be divided into four groups, and the four steps including the detailed work performance items can be divided, and each step can be modeled so that the code values of the upper category are linked to the code values of the lower category. Modeling is based on business activity control modules classified into project organization, proposal organization composition, guideline creation and approval, bid documents, bidding, and business preparation work. Purchasing, Inspection, Expediting, and Logistics items for the procurement stage Modeling based on business activity control modules classified .

본 발명은 또한 LNG 플랜트 업무 프로세스 관련 데이터를 수집하는 단계, 상기 LNG 플랜트 업무 프로세스 관련 데이터에 대하여 일정 규칙에 따라 LNG 플랜트 업무 프로세스를 다수의 단계별로 정의하는 단계, 상기 정의된 LNG 플랜트 업무 프로세스를 구분 및 분류하고, 분류된 단계별 각 업무 활동 제어 항목들에 대하여 데이터의 입력, 제약 조건 및 조직의 배치, 그에 따른 출력의 흐름 연결을 모델링하는 모델링 단계를 포함하는 것을 LNG 플랜트 업무 프로세스 모델링 방법의 구성을 개시한다.The present invention also comprises the steps of collecting the LNG plant business process-related data, defining the LNG plant business process in a plurality of stages according to a schedule rule for the LNG plant business process-related data, distinguishing the LNG plant business process defined And a modeling step of classifying and modeling flow connection of data input, constraints and organizational arrangement, and output according to each classified activity activity control items according to the classified step. It starts.

여기서 상기 모델링 단계는 상기 업무 활동 제어 항목에 의해 처리되는 기본 데이터, 상기 LNG 플랜트 업무 프로세스의 외부 제약 요인에 대한 제어 데이터, 상기 LNG 플랜트 업무 프로세스 진행을 위해 요구되는 조직 또는 조직 관련 정보나 규약을 포함하는 매커니즘 데이터를 입력 위치에 배치하는 단계를 포함하고, 상기 기본 데이터는 상기 LNG 플랜트 업무 프로세스에 있어서 실제 작성되고 도출되는 산술 데이터 또는 상기 데이터에 대응하는 입찰 안내서, 실적 자료, 물량 산출서, 개산 견적서, 타사 입찰 자료, 사업 기준 예산 사업 수행 계획서 중 적어도 하나를 포함하며, 상기 제어 데이터는 상기 LNG 플랜트 업무 진행 과정에서 직접 또는 간접적으로 상기 기본 데이터의 수치를 변경할 수 있거나 또는 상기 기본 데이터의 변동 가능성에 영향을 줄 수 있는 요소로서 사내 경영 전략, 법, 제도, 규정, 사업주 요구 조건, 입찰 참여 심의 회의, 국가 정책, 예비비 추정 자료, 리스크 관리 정책, 분야별 수행 지침, 계약서, 사규, 변경 계약서 중 적어도 하나를 포함하고, 상기 매커니즘 데이터는 상기 LNG 플랜트 업무 프로세스 지원을 위한 조직 관련 또는 조직의 행동 양식에 관한 데이터에 해당하는 프로젝트 TFT, 사내 KMB, 사내 ERP, 사업 수행 계획, Proposal 수행 계획 및 전략, 프로젝트팀, 사업주, 물품 공급 업체, 입찰 질의 분석, Clarification/Negotiation 조정, Vendor 정보 중 적어도 하나를 포함할 수 있다.The modeling step may include basic data processed by the work activity control item, control data on external constraints of the LNG plant work process, and organization or organization-related information or protocol required for the LNG plant work process. And arranging mechanism data at an input position, wherein the basic data is arithmetic data actually generated and derived in the LNG plant business process, or a bidding guide corresponding to the data, performance data, a volume calculation statement, and an estimate of estimate. At least one of a third-party bidding data and a project-based budget project execution plan, wherein the control data can directly or indirectly change the numerical value of the basic data in the course of the LNG plant operation, or Could affect At least one of: internal management strategies, laws, institutions, regulations, employer requirements, bidding deliberation meetings, national policies, reserve estimates, risk management policies, sectoral performance guidelines, contracts, regulations, change agreements, The mechanism data includes project TFT, in-house KMB, in-house ERP, project execution plan, proposal execution plan and strategy, project team, employer, and commodity corresponding to data related to organizational or organizational behavior for supporting the LNG plant business process. It may include at least one of a supplier, a bid query analysis, a Clarification / Negotiation adjustment, and vendor information.

본 발명에 따르면, 본 발명의 LNG 플랜트 업무 프로세스 모델링 방법 및 시스템은 LNG 플랜트 사업과 관련되며 분류되고 정렬된 다양한 정보들에 있어서 업무 수행 항목들들 간의 연관성, 입출력, 제약조건, 담당 조직 등에 대한 정의와 이를 기반으로 한 모델링을 통하여 업무 흐름을 체계적이고 용이하게 이해하고 관리할 수 있도록 지원한다.According to the present invention, the LNG plant business process modeling method and system of the present invention is defined for the relationship between the business performance items, input and output, constraints, responsible organization, etc. in a variety of information that is related to the sorted and sorted LNG plant business Through this and the modeling based on this, it helps to understand and manage the work flow systematically and easily.

도 1은 본 발명의 실시 예에 따른 LNG 플랜트 업무 프로세스 모델링을 위한 시스템 구성의 외관을 개략적으로 나타낸 도면.
도 2는 본 발명의 실시 예에 따른 시스템의 구성을 보다 상세히 나타낸 도면.
도 3은 본 발명의 업무 프로세스 모델링의 개념을 설명하기 위한 도면.
도 4는 본 발명의 실시 예에 따른 LNG 플랜트 업무 프로세스 모델링 방법을 설명하기 위한 순서도.
도 5는 본 발명의 실시 예에 따른 LNG 플랜트 업무 프로세스의 기획 단계에 대한 모델링을 나타낸 도면.
도 6은 본 발명의 LNG 플랜트 업무 프로세스 기획 2단계 중 프로젝트 조직과 관련된 3단계 모델링을 나타낸 도면.
도 7은 본 발명의 실시 예에 따른 LNG 플랜트 업무 프로세스 중 Proposal 전략 회의와 관련된 기획 3단계 모델링을 설명하기 위한 도면.
도 8은 본 발명의 실시 예에 따른 LNG 플랜트 업무 프로세스 중 지침 작성 및 승인과 관련된 기획 3단계 모델링을 설명하기 위한 도면.
도 9는 본 발명의 실시 예에 따른 LNG 플랜트 업무 프로세스 중 입찰 서류 작성과 관련된 기획 3단계 모델링을 설명하기 위한 도면.
도 10은 본 발명의 실시 예에 따른 LNG 플랜트 업무 프로세스 중 입찰과 관련된 기획 3단계 모델링을 설명하기 위한 도면.
도 11은 본 발명의 실시 예에 따른 LNG 플랜트 업무 프로세스 중 사업 준비 업무 단계와 관련된 기획 3단계 모델링을 설명하기 위한 도면.
도 12는 본 발명의 실시 예에 따른 LNG 플랜트 업무 프로세스 중 구매조달 2단계에 대한 모델링을 설명하기 위한 도면.
도 13은 본 발명의 실시 예에 따른 LNG 플랜트 업무 프로세스 중 구매조달 3단계 Purchasing 단계에 대한 모델링을 설명하기 위한 도면.
도 14는 본 발명의 실시 예에 따른 LNG 플랜트 업무 프로세스 중 구매조달 3단계 Inspection 단계에 대한 모델링을 설명하기 위한 도면.
도 15는 본 발명의 실시 예에 따른 LNG 플랜트 업무 프로세스 중 구매조달 3단계 Expediting 단계에 대한 모델링을 설명하기 위한 도면.
도 16은 본 발명의 실시 예에 따른 LNG 플랜트 업무 프로세스 중 구매조달 2단계에 대한 모델링을 설명하기 위한 도면.
도 17은 본 발명의 실시 예에 따른 LNG 플랜트 업무 프로세스의 업무 활동 제어 블록들의 연결 관계를 나타낸 도면.
1 is a view schematically showing the appearance of the system configuration for the LNG plant business process modeling according to an embodiment of the present invention.
2 is a view showing in more detail the configuration of a system according to an embodiment of the present invention.
3 is a view for explaining the concept of business process modeling of the present invention.
4 is a flowchart illustrating a LNG plant business process modeling method according to an embodiment of the present invention.
5 is a view showing the modeling of the planning phase of the LNG plant business process according to an embodiment of the present invention.
6 is a view showing a three-step modeling associated with the project organization of the two-phase LNG plant business process planning of the present invention.
7 is a view for explaining the planning three-step modeling associated with the proposal strategic meeting of the LNG plant work process according to an embodiment of the present invention.
8 is a view for explaining the planning three-step modeling associated with the preparation and approval of instructions in the LNG plant business process according to an embodiment of the present invention.
9 is a view for explaining the planning three-stage modeling associated with the bid documents in the LNG plant business process according to an embodiment of the present invention.
10 is a view for explaining the planning three-step modeling associated with the bidding in the LNG plant business process according to an embodiment of the present invention.
11 is a view for explaining the planning three-step modeling associated with the business preparation work step of the LNG plant work process according to an embodiment of the present invention.
12 is a view for explaining the modeling for the second stage procurement of the LNG plant business process according to an embodiment of the present invention.
13 is a view for explaining the modeling for the Purchasing step of purchasing procurement step 3 of the LNG plant business process according to an embodiment of the present invention.
14 is a view for explaining the modeling for the purchase procurement three-stage inspection step of the LNG plant business process according to an embodiment of the present invention.
15 is a view for explaining the modeling for the purchase procurement step 3 Expediting step of the LNG plant business process according to an embodiment of the present invention.
16 is a view for explaining the modeling for the second stage procurement of the LNG plant business process according to an embodiment of the present invention.
17 is a view showing the connection of the work activity control blocks of the LNG plant work process according to an embodiment of the present invention.

이하, 본 발명에 따른 바람직한 실시 예를 첨부한 도면을 참조하여 상세히 설명한다. 하기의 설명에서는 본 발명의 실시 예에 따른 동작을 이해하는데 필요한 부분만이 설명되며, 그 이외 부분의 설명은 본 발명의 요지를 흩트리지 않도록 생략될 것이라는 것을 유의하여야 한다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. In the following description, only parts necessary for understanding the operation according to the embodiment of the present invention will be described, and the description of other parts will be omitted so as not to disturb the gist of the present invention.

이하에서 설명되는 본 명세서 및 청구범위에 사용된 용어나 단어는 통상적이거나 사전적인 의미로 한정해서 해석되어서는 아니 되며, 발명자는 그 자신의 발명을 가장 최선의 방법으로 설명하기 위해 용어의 개념으로 적절하게 정의할 수 있다는 원칙에 입각하여 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다. 따라서 본 명세서에 기재된 실시 예와 도면에 도시된 구성은 본 발명의 가장 바람직한 실시 예에 불과할 뿐이고, 본 발명의 기술적 사상을 모두 대변하는 것은 아니므로, 본 출원시점에 있어서 이들을 대체할 수 있는 다양한 균등물과 변형 예들이 있을 수 있음을 이해하여야 한다.The terms and words used in the present specification and claims should not be construed as limited to ordinary or dictionary meanings and the inventor is not limited to the meaning of the terms in order to describe his invention in the best way. It should be interpreted as meaning and concept consistent with the technical idea of the present invention. Therefore, the embodiments described in the present specification and the configuration shown in the drawings are only the most preferred embodiments of the present invention, and do not represent all of the technical idea of the present invention, and various equivalents may be substituted for them at the time of the present application. It should be understood that there may be water and variations.

이하, 본 발명에 따른 바람직한 실시 예를 첨부한 도면을 참조하여 상세히 설명한다. 하기의 설명에서는 본 발명의 실시 예에 따른 동작을 이해하는데 필요한 부분만이 설명되며, 그 이외 부분의 설명은 본 발명의 요지를 흩트리지 않도록 생략될 것이라는 것을 유의하여야 한다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. In the following description, only parts necessary for understanding the operation according to the embodiment of the present invention will be described, and the description of other parts will be omitted so as not to disturb the gist of the present invention.

이하에서 설명되는 본 명세서 및 청구범위에 사용된 용어나 단어는 통상적이거나 사전적인 의미로 한정해서 해석되어서는 아니 되며, 발명자는 그 자신의 발명을 가장 최선의 방법으로 설명하기 위해 용어의 개념으로 적절하게 정의할 수 있다는 원칙에 입각하여 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다. 따라서 본 명세서에 기재된 실시 예와 도면에 도시된 구성은 본 발명의 가장 바람직한 일실시 예에 불과할 뿐이고, 본 발명의 기술적 사상을 모두 대변하는 것은 아니므로, 본 출원시점에 있어서 이들을 대체할 수 있는 다양한 균등물과 변형 예들이 있을 수 있음을 이해하여야 한다.The terms and words used in the present specification and claims should not be construed as limited to ordinary or dictionary meanings and the inventor is not limited to the meaning of the terms in order to describe his invention in the best way. It should be interpreted as meaning and concept consistent with the technical idea of the present invention. Therefore, the embodiments described in the present specification and the configurations shown in the drawings are merely the most preferred embodiments of the present invention, and not all of the technical ideas of the present invention are described. Therefore, It is to be understood that equivalents and modifications are possible.

이하, 첨부 도면을 참조하여 본 발명의 실시 예를 보다 상세하게 설명하고자 한다.Hereinafter, with reference to the accompanying drawings will be described in detail an embodiment of the present invention.

도 1은 본 발명의 실시 예에 따른 LNG 플랜트 업무 프로세스 모델링을 위한 시스템 외관을 개략적으로 나타낸 것이며, 도 2는 상술한 시스템의 구성을 보다 상세히 나타낸 블록도이다. FIG. 1 schematically shows a system appearance for modeling an LNG plant business process according to an exemplary embodiment of the present invention, and FIG. 2 is a block diagram showing the configuration of the above-described system in more detail.

상기 도 1 및 도 2를 참조하면, 본 발명의 LNG 플랜트 업무 프로세스 모델링 위한 시스템(100)은 통신부(110), 입력부(120), 표시부(140), 저장부(150) 및 제어부(160)의 구성을 포함할 수 있다.1 and 2, the system 100 for modeling an LNG plant business process according to the present invention includes a communication unit 110, an input unit 120, a display unit 140, a storage unit 150, and a control unit 160. It can include a configuration.

이와 같은 구성을 가지는 본 발명의 시스템(100)은 입력부(120) 및 통신부(110)로부터 입력되는 또는 저장부(150)에 사전 저장된 표준화된 LNG 플랜트 업무 프로세스와 관련된 데이터들에 대하여 상호 연관성 및 업무 활동에 따라 도출되는 출력들의 흐름을 모델링하도록 지원한다. 특히 본 발명의 시스템(100)은 LNG 플랜트 업무 프로세스에 대하여 단계별로 구분된 각 항목들에 대한 모델링을 수행함으로써 전체 LNG 플랜트 업무 프로세스에 대한 체계화된 업무 흐름과 각 업무들의 상호 연관성을 쉽게 이해할 수 있도록 지원하며, 각 단계별 업무에 대한 이해를 높일 수 있다. 이하 본 발명의 LNG 플랜트 업무 프로세스 모델링을 위한 상기 시스템(100)의 각 구성의 기능과 역할에 대하여 보다 상세히 설명하기로 한다.The system 100 of the present invention having such a configuration has a correlation and work on data related to a standardized LNG plant work process inputted from the input unit 120 and the communication unit 110 or pre-stored in the storage unit 150. It helps to model the flow of outputs derived from an activity. In particular, the system 100 of the present invention performs modeling on each item that is divided in stages for the LNG plant business process so that the systematic work flow of the entire LNG plant business process and the correlation between the tasks can be easily understood. Support and improve understanding of each phase of work. Hereinafter, the function and role of each component of the system 100 for the LNG plant business process modeling of the present invention will be described in detail.

상기 통신부(110)는 외부로부터 LNG 플랜트 관련 데이터를 수신하거나, 저장부(150)에 저장된 데이터를 지정된 타 단말기에 전송할 수 있도록 통신 채널을 형성하는 구성이다. 이러한 통신부(110)는 상기 시스템(100)이 지원하는 방식에 따라 다양한 유무선 통신 모듈을 포함할 수 있다. 예를 들면 상기 통신부(110)는 상기 시스템(100)이 IP 기반의 유선 네트워크를 지원하는 경우 IP 네트워크에 유선으로 접속할 수 있는 다양한 통신 모뎀이 될 수 있다. 또한 상기 통신부(110)는 상기 시스템(100)이 IP 기반의 무선 네트워크를 지원하는 경우, IP 네트워크에 무선으로 접속할 수 있는 다양한 통신 모뎀이 될 수 있다. 그리고 상기 통신부(110)는 상기 시스템(100)이 이동성을 지원하는 경우 이동통신 모뎀을 포함할 수 있다. 이에 따라 본 발명의 통신부(110)는 특정 통신 모듈로서 한정되는 것이 아니라 본 발명의 LNG 플랜트 관련 정보의 송수신을 지원할 수 있는 특정 통신 채널을 통신 네트워크와 형성할 수 있는 다양한 통신 모듈로서 이해될 수 있을 것이다. 한편 본 발명의 통신부(110)는 네트워크를 통하여 업무 프로세스 모델링을 지원할 수 있도록 다른 시스템과의 연결을 지원할 수 있다. 특히 본 발명의 통신부(110)는 이하에서 설명하는 업무 프로세스 모델링 지원을 위한 기본 데이터, 제어 데이터 및 매커니즘 데이터 중 적어도 하나의 입력을 위하여 타 시스템 또는 네트워크 시스템과의 통신 채널을 형성하고 사용자 제어에 따라 해당 시스템으로부터 필요한 기본 데이터, 제어 데이터, 매커니즘 데이터를 수신하여 제어부(160)에 전달할 수 있다.The communication unit 110 is configured to form a communication channel so as to receive data related to the LNG plant from the outside or to transmit data stored in the storage unit 150 to another designated terminal. The communication unit 110 may include various wired / wireless communication modules according to a method supported by the system 100. For example, the communication unit 110 may be various communication modems that can be connected by wire to an IP network when the system 100 supports an IP-based wired network. In addition, when the system 100 supports an IP-based wireless network, the communication unit 110 may be various communication modems capable of wirelessly connecting to an IP network. In addition, the communication unit 110 may include a mobile communication modem when the system 100 supports mobility. Accordingly, the communication unit 110 of the present invention is not limited to a specific communication module but may be understood as various communication modules capable of forming a specific communication channel with a communication network that can support the transmission and reception of LNG plant related information of the present invention. will be. Meanwhile, the communication unit 110 of the present invention may support connection with another system so as to support business process modeling through a network. In particular, the communication unit 110 of the present invention forms a communication channel with another system or a network system for inputting at least one of basic data, control data, and mechanism data for supporting business process modeling described below, and according to user control. Basic data, control data, and mechanism data necessary for the system may be received and transmitted to the controller 160.

상기 입력부(120)는 숫자 또는 문자 정보를 입력받고 각종 기능들을 설정하기 위한 다수의 입력키 및 기능키들을 포함한다. 상기 기능키들은 특정 기능을 수행하도록 설정된 방향키, 사이드 키 및 단축키 등을 포함할 수 있다. 또한 상기 입력부(120)는 사용자 설정 및 시스템(100)의 기능 제어와 관련한 키 신호를 생성하고 생성된 신호를 상기 제어부(160)로 전달한다. 이러한 본 발명의 입력부(120)는 상기 시스템(100)의 부팅 과정에 필요한 입력 신호, LNG 플랜트 정보 입력을 위한 입력 신호, LNG 플랜트 정보 송수신을 위한 입력 신호 등을 사용자 요청에 따라 생성하고, 이를 제어부(160)에 전달할 수 있다. 상술한 입력부(120)는 다양한 형태로 구성될 수 있으며, 예를 들면 키보드, 마우스, 음성 인식기 등이 될 수 있다. 또한 상기 입력부(120)는 접속 인터페이스 형태로 구성될 수 도 있다. 예를 들면 상기 입력부(120)는 USB 접속 인터페이스, UART 접속 인터페이스 형태로 구성될 수 도 있다. 그러면 해당 시스템(100) 사용자는 상술한 접속 인터페이스를 특정 케이블 이용하여 다른 통신 단말기와 연결할 수 있으며, 이에 따라 상기 제어부(160)는 다른 통신 단말기에 저장된 LNG 플랜트 관련 정보 예를 들면 업무 프로세스 모델링 위한 정보를 상기 시스템(100)에 전송하도록 제어할 수 있다. 따라서 본 발명의 입력부(120)는 시스템(100) 운용자가 다양한 직접 입력 방식이나 특정 통신 방식 등을 기반으로 데이터를 시스템(100)에 입력할 수 있도록 지원하는 구성으로서 이해될 수 있을 것이다.The input unit 120 includes a plurality of input keys and function keys for receiving numeric or character information and setting various functions. The function keys may include a direction key, a side key, and an accelerator key set for performing a specific function. In addition, the input unit 120 generates a key signal related to user setting and function control of the system 100 and transmits the generated signal to the controller 160. The input unit 120 of the present invention generates an input signal for the booting process of the system 100, an input signal for inputting LNG plant information, an input signal for transmitting / receiving LNG plant information, etc. according to a user request, and the controller May be passed to 160. The input unit 120 may be configured in various forms and may be, for example, a keyboard, a mouse, or a voice recognizer. In addition, the input unit 120 may be configured in the form of a connection interface. For example, the input unit 120 may be configured in the form of a USB connection interface and a UART connection interface. Then, the user of the system 100 can connect the above-described connection interface with another communication terminal by using a specific cable. Accordingly, the control unit 160 stores LNG plant-related information stored in another communication terminal, for example, information for business process modeling. May be controlled to be transmitted to the system 100. Therefore, the input unit 120 of the present invention may be understood as a configuration that allows the system 100 operator to input data to the system 100 based on various direct input methods or specific communication methods.

상기 표시부(140)는 시스템(100)의 각종 메뉴를 비롯하여 사용자가 입력한 정보 또는 사용자에게 제공하는 정보를 표시한다. 즉, 표시부(140)는 시스템(100) 이용에 따른 다양한 화면 예를 들면, 대기화면, 메뉴 화면, 특정 응용 프로그램 재생 화면 등을 제공할 수 있다. 특히, 본 발명의 표시부(140)는 LNG 플랜트 관련 정보의 입출력과 관련된 화면을 제공할 수 있다. 즉 상기 표시부(140)는 LNG 플랜트 업무 프로세스 모델링 위한 관련 정보를 사용자가 입력하고자 하는 경우, 관련 정보를 입력할 수 있는 사용자 인터페이스를 제공할 수 있다. 또한 상기 표시부(140)는 LNG 플랜트와 관련된 모델링된 업무 프로세스를 사용자가 검색하고자 하는 경우, 해당 업무 프로세스 모델링 정보를 출력할 수 있는 사용자 인터페이스를 제공할 수 있다. 그리고 상기 표시부(140)는 상기 통신부(110)를 통하여 LNG 플랜트 관련 정보를 송신하는 상태를 나타낸 화면, LNG 플랜트 관련 정보를 수신하는 상태를 나타낸 화면 등을 출력할 수 도 있다. LNG 플랜트 사업자 또는 사업 예정자는 표시부(140)를 통하여 모델링된 LNG 플랜트 업무 프로세스를 확인하고, LNG 플랜트 사업에 필요한 전반적인 업무의 흐름과, 각 업무 수행 항목들 사이의 연관 관계 및 데이터의 흐름을 용이하게 파악하고 이해할 수 있다. 한편, 상기 표시부(140)는 액정 표시 장치(Liquid Crystal Display) 등으로 형성될 수 있으며, 상기 LCD가 터치스크린(Touch Screen) 형태로 형성되는 경우, 상기 표시부(140)는 입력수단에 포함될 수 있다. 이를 위해, 상기 표시부(140)는 표시 패널과 표시 패널 상에 배치되는 터치 패널을 마련할 수 있다. 그리고 시스템(100)은 표시부(140)의 터치스크린 지원에 따라 터치스크린 기반으로 수행할 수 있는 다양한 메뉴 화면을 제공할 수 있다.The display unit 140 displays information input by the user or information provided to the user, including various menus of the system 100. That is, the display unit 140 may provide various screens according to the use of the system 100, for example, a standby screen, a menu screen, and a screen for playing a specific application program. In particular, the display unit 140 of the present invention may provide a screen related to the input and output of the LNG plant-related information. That is, the display unit 140 may provide a user interface for inputting related information when a user wants to input related information for modeling an LNG plant business process. In addition, when the user wants to search for a modeled business process related to the LNG plant, the display unit 140 may provide a user interface for outputting corresponding business process modeling information. The display unit 140 may output a screen indicating a state of transmitting LNG plant related information, a screen indicating a state of receiving LNG plant related information, and the like through the communication unit 110. The LNG plant operator or the project planner can check the modeled LNG plant business process through the display unit 140, and facilitate the flow of overall work required for the LNG plant business, the relationship between each work performance item, and the flow of data. Can understand and understand Meanwhile, the display unit 140 may be formed of a liquid crystal display, or the like. When the LCD is formed in a touch screen form, the display unit 140 may be included in an input unit. . To this end, the display unit 140 may provide a display panel and a touch panel disposed on the display panel. The system 100 may provide various menu screens that can be performed based on the touch screen according to the touch screen support of the display unit 140.

상기 저장부(150)는 본 발명의 실시 예에 따른 기능 동작에 필요한 응용 프로그램을 비롯하여, 시스템(100)이 제공하는 다양한 응용 프로그램을 지원한다. 이러한 저장부(150)는 다양한 메모리 타입으로 구현될 수 있으며 사용 형태에 따라 RAM, ROM, Cache, 버퍼 메모리 등 다양한 방식으로 운영될 수 있다. 이러한 상기 저장부(150)는 크게 프로그램 영역과 데이터 영역을 포함할 수 있다.The storage unit 150 supports various application programs provided by the system 100, including an application program required to operate a function according to an embodiment of the present disclosure. The storage unit 150 may be implemented in various memory types and may be operated in various ways, such as RAM, ROM, Cache, and buffer memory, depending on the type of use. The storage unit 150 may include a program area and a data area.

상기 프로그램 영역은 시스템(100)의 부팅 및 상술한 각 구성의 운용을 위한 운영체제(OS, Operating System), 다양한 파일을 재생하기 위한 응용 프로그램 예를 들면, 상기 시스템(100)의 기능 지원 여부에 따른 통신기능 지원을 위한 응용 프로그램, 음원을 재생하기 위한 MP3 응용 프로그램, 사진 등을 재생하기 위한 이미지 출력 응용 프로그램, 동영상 재생 응용 프로그램 등을 저장할 수 있다. 특히, 본 발명의 프로그램 영역은 LNG 플랜트 업무 프로세스 모델링을 위한 다양한 프로그램 예를 들면 다양한 매커니즘(155)들을 저장할 수 있다. 또한 상기 LNG 플랜트 업무 프로세스 모델링을 위한 프로그램은 이하 도 3에서 설명하는 업무 프로세스 모델링을 위한 블록들을 제공하는 루틴들을 포함할 수 있다. The program area may include an operating system (OS) for booting the system 100 and operating the above-described components, an application program for reproducing various files, for example, depending on whether the system 100 supports the function. Application programs for supporting communication functions, MP3 applications for playing sound sources, image output applications for playing pictures, and video playback applications can be stored. In particular, the program area of the present invention can store various programs for modeling LNG plant business processes, for example various mechanisms 155. In addition, the program for modeling the LNG plant business process may include routines that provide blocks for business process modeling described in FIG. 3.

상기 데이터 영역은 시스템(100) 사용에 따라 발생하는 데이터가 저장되는 영역으로서, 다양한 컨텐츠들을 저장할 수 있다. 또한, 상기 데이터 영역은 상기 표시부(140)가 터치스크린으로 구현되는 경우, 터치스크린을 통하여 입력되는 사용자 입력을 저장할 수 있다. 특히 본 발명의 데이터 영역은 상기 통신부(110) 및 입력부(120)를 통하여 입력되는 상기 LNG 플랜트 관련 정보를 저장할 수 있다. 예를 들면 데이터 영역은 LNG 플랜트 업무 프로세스 모델링을 위한 데이터 예를 들면 기본 데이터(151), 제어 데이터(153) 등을 저장할 수 있다.The data area is an area in which data generated according to the use of the system 100 is stored, and may store various contents. In addition, when the display unit 140 is implemented as a touch screen, the data area may store a user input input through the touch screen. In particular, the data area of the present invention may store the LNG plant-related information input through the communication unit 110 and the input unit 120. For example, the data area may store data for modeling an LNG plant business process, for example, basic data 151 and control data 153.

상기 제어부(160)는 상기 시스템(100)의 각 구성에 전원 공급을 제어하여 초기화 과정을 수행하도록 지원하며, 초기화 과정이 완료되면 시스템(100)에 포함된 각 구성에 대하여 본 발명의 LNG 플랜트 업무 프로세스 모델링을 위한 정보 처리를 수행한다. 이를 위하여 상기 제어부(160)는 상기 저장부(150)에 저장된 기본 데이터(151) 및 제어 데이터(153)를 호출할 수 있으며 또한 업무 활동에 적용할 매커니즘(155)을 호출할 수 있다. 상기 제어부(160)는 저장부(150)로부터 호출된 각 항목들을 기반으로 도 3에 도시된 바와 같은 데이터 처리 규칙에 따라 데이터 처리를 수행하고 그에 따른 출력을 생성하도록 제어할 수 있다.The control unit 160 controls the power supply to each component of the system 100 to perform an initialization process, and when the initialization process is completed, the LNG plant task of the present invention for each component included in the system 100 Performs information processing for process modeling. To this end, the controller 160 may call the basic data 151 and the control data 153 stored in the storage 150, and may call a mechanism 155 to be applied to business activities. The controller 160 may control to perform data processing according to a data processing rule as shown in FIG. 3 based on each item called from the storage 150 and generate an output according thereto.

도 3은 본 발명의 실시 예에 따른 제어부(160)의 업무 프로세스 모델링을 위한 개념을 설명하기 위한 도면이다.3 is a view for explaining a concept for business process modeling of the controller 160 according to an embodiment of the present invention.

상기 도 3을 참조하면, 본 발명의 제어부(160)는 저장부(150)로부터 호출된 기본 데이터(151)의 입력을 제어하는 입력 제어 모듈(140), 저장부(150)로부터 호출된 제어 데이터(153)의 입력을 제어하는 데이터 제어 모듈(163), 저장부(150)의 매커니즘(155) 제어를 위한 매커니즘 제어 모듈(165)을 포함하며, 상기 입력 제어 모듈(161), 데이터 제어 모듈(163), 매커니즘 제어 모듈(165)에 의하여 전달되는 각 데이터들에 대한 업무 프로세스 처리를 수행하여 출력(Output)을 생성하는 업무 활동 제어 모듈(Activity)(167)을 포함할 수 있다.Referring to FIG. 3, the controller 160 of the present invention controls the input of the input control module 140 and the control data called from the storage 150 to control the input of the basic data 151 called from the storage 150. And a mechanism control module 165 for controlling the input of the module 153 and a mechanism 155 of the storage 150. The input control module 161 and the data control module 163, and a business activity control module (Activity) 167 that generates an output by performing a business process process on each of the data delivered by the mechanism control module 165.

여기서 기본 데이터(151)는 LNG 플랜트 업무 프로세스의 기본이 되는 데이터들로서 일정한 서식을 가지는 데이터가 될 수 있다. 예를 들면 기본 데이터(151)는 입찰 안내서, 실적 자료, 물량 산출서, 개산 견적서, 타사 입찰 자료, 사업 기준 예산 사업 수행 계획서 등이 될 수 있다. 이와 같이 기본 데이터(151)는 LNG 플랜트 업무 프로세스에 있어서 실제 작성되고 도출되는 산술 데이터 또는 그에 대응하는 데이터가 될 수 있다.Here, the basic data 151 may be data having a predetermined format as data that are the basis of the LNG plant business process. For example, the basic data 151 may be a bidding guide, performance data, quantity calculation, estimate estimate, third party bidding data, business standard budget business execution plan, and the like. As such, the basic data 151 may be arithmetic data or data corresponding thereto that are actually created and derived in the LNG plant business process.

상기 제어 데이터(153)는 LNG 플랜트 업무 프로세스에 있어서 외부 제약 요인이 되는 데이터들로서 다양한 형태의 제약 조건에 해당할 수 있다. 예를 들면 제어 데이터(153)는 사내 경영 전략, 법, 제도, 규정, 사업주 요구 조건, 입찰 참여 심의 회의, 국가 정책, 예비비 추정 자료, 리스크 관리 정책, 분야별 수행 지침, 계약서, 사규, 변경 계약서 등이 될 수 있다. 이와 같이 제어 데이터(153)는 LNG 플랜트 업무 진행 과정에서 직접 또는 간접적으로 상기 기본 데이터(151)의 수치를 변경할 수 있거나 또는 기본 데이터(151)의 변동 가능성에 영향을 줄 수 있는 요소들에 해당할 수 있다.The control data 153 is data that is an external constraint in the LNG plant business process and may correspond to various types of constraints. For example, the control data 153 may include internal management strategies, laws, institutions, regulations, employer requirements, bidding deliberation meetings, national policies, reserve estimates, risk management policies, sectoral performance guidelines, contracts, corporate rules, change agreements, etc. This can be As such, the control data 153 may correspond to factors that may change the value of the basic data 151 directly or indirectly in the course of LNG plant work, or may affect the possibility of variation of the basic data 151. Can be.

상기 매커니즘(155)은 본 발명의 LNG 플랜트 업무 프로세스 진행을 위해 요구되는 다양한 조직 또는 조직의 업무 수행 절차를 정의하는 정보를 제공하는 구성이 될 수 있다. 예를 들면 상기 매커니즘(155)은 프로젝트 TFT, 사내 KMB, 사내 ERP, 사업 수행 계획, Proposal 수행 계획 및 전략, 프로젝트팀, 사업주, 물품 공급 업체, 입찰 질의 분석, Clarification/Negotiation 조정, Vendor 정보 등의 항목을 포함한다. 이와 같이 본 발명의 매커니즘(155)은 LNG 플랜트 업무 프로세스 지원을 위한 조직 관련 또는 조직의 행동 양식에 관한 데이터를 제공하는 구성이 될 수 있다.The mechanism 155 may be configured to provide information that defines the work performance procedures of various organizations or organizations required for the LNG plant business process of the present invention. For example, the mechanism 155 may include a project TFT, an in-house KMB, an in-house ERP, a project execution plan, a proposal execution plan and strategy, a project team, a business owner, a product supplier, a bidding quality analysis, a Clarification / Negotiation adjustment, vendor information, and the like. Include the item. As such, the mechanism 155 of the present invention may be configured to provide data regarding organization-related or organizational behavior for supporting the LNG plant business process.

한편 본 발명의 제어부(160)는 상술한 바와 같은 기본 데이터(151)와 제어 데이터(153)에 대하여 매커니즘(155)의 요소를 적용하여 업무 활동에 관한 처리를 수행함에 따른 출력을 생성하게 된다. 실질적으로 업무 활동 제어 모듈(167)에서 생성된 출력은 다른 업무 프로세스의 기본 데이터(151) 또는 제어 데이터(153)로 재입력될 수 있다. 이에 따라 본 발명의 LNG 플랜트 업무 프로세스 모델링에 의해 모델링된 각 업무 프로세스들은 이전 업무 수행 항목 또는 다른 업무 수행 항목들과 상호 연계되거나 데이터 전달에 의한 연결 관계를 가질 수 있다. Meanwhile, the controller 160 of the present invention applies the elements of the mechanism 155 to the basic data 151 and the control data 153 as described above to generate an output according to the processing of the work activity. Substantially, the output generated by the business activity control module 167 may be re-entered into basic data 151 or control data 153 of another business process. Accordingly, each of the business processes modeled by the LNG plant business process modeling of the present invention may be interconnected with previous business performance items or other business performance items or have a connection relationship by data transfer.

상술한 LNG 플랜트 업무 프로세스 모델링을 위해서는 LNG 플랜트 업무 프로세스와 관련된 다양한 업무 수행 항목들을 일정한 규칙에 따라 그룹핑을 수행함과 아울러, 그룹핑된 업무 수행 항목들을 상위 세부 업무 구분으로 재분류하고, 다시 재분류된 세부 업무 구분들을 대구분으로 분류 및 정렬할 필요가 있다. 이러한 LNG 플랜트 업무 프로세스 모델링을 위하여 본 발명의 제어부(160)는 LNG 플랜트 업무 프로세스를 단계별 특히 4단계로 구분하고, 구분된 각 단계별로 업무 수행 항목들의 상하위 항목 분류와 정의 및 정렬을 수행한다.For the LNG plant business process modeling described above, the various business performance items related to the LNG plant business process are grouped according to a predetermined rule, and the grouped business performance items are reclassified into higher detailed business divisions and reclassified again. Task divisions need to be categorized and sorted into large sections. In order to model the LNG plant work process, the controller 160 of the present invention divides the LNG plant work process into four stages, in particular, four stages, and classifies, defines, and sorts the top and bottom items of the work performance items in each of the divided stages.

이를 보다 상세히 설명하면, 본 발명의 LNG 플랜트 업무 프로세스 모델링을 위한 LNG 플랜트 업무 프로세스 정의는 먼저 대구분으로 LNG 플랜트 업무 프로세스를 기획, 설계, 구매조달, 시공 및 시운전 항목으로 정의할 수 있다. 그리고 상기 기획 단계에 대한 제2 단계 세부 업무 구분은 ITB 접수, 프로젝트 조직, 프로포잘 전략, 지침작성 및 승인, 입찰 서류, 입찰, 프로젝트 전략, 사업 준비 업무, 수행 항목들로 정의될 수 있으며, 기획 제3 단계의 업무 수행 구분으로 프로젝트 조직 구성, 프로젝트 전략 회의, ITB 검토, 입찰 설계안 작성, 입찰 실행 예산 수립, Technical 입찰서 작성, 총괄 입찰서 작성, 입찰 질의서 작성, 입찰 Clarification/Negotiation 회의, 입찰 자료 정리/보관, 사업수행체계 및 조직 구성, 기획단계 사업관리방안 수립, 단계별 업무수행계획 수립, 사업기준예산 수립 항목들을 포함하도록 정의될 수 있다. In more detail, the LNG plant business process definition for the LNG plant business process modeling of the present invention may be first defined as a plan, design, procurement, construction and commissioning of the LNG plant business process. In addition, the second stage detailed work division for the planning stage may be defined as ITB reception, project organization, proportional strategy, guideline preparation and approval, bid documents, bidding, project strategy, business preparation work, and performance items. Project organization, project strategy meeting, ITB review, bid design drafting, bid execution budgeting, technical bidding, general bidding, bid questionnaire, bid clarification / negotiation meeting, bid materials / It can be defined to include the items of archiving, project execution system and organization, establishment of planning project management plan, establishment of work execution plan by stage, and establishment of project standard budget.

상기 구매조달 단계에 대한 제2 단계 세부 업무 구분은 Purchasing, Inspection, Expediting, Logistics 항목들을 포함할 수 있으며, 상기 구매조달 제3 단계의 업무 수행 구분은 Procurement Plan, 구매조달단계 사업관리방안 수립, Quotation, Evaluation & Negotiation, Purchasing Order, Inspection 수행, Expediting 수행, Transportation 수행, Field Material Control 항목들을 포함하도록 정의될 수 있다.The second stage detailed business division for the procurement stage may include purchasing, inspection, expediting, and logistics items, and the third stage of procurement stage includes procurement plan, establishment of procurement stage business management plan, and Quotation. , Evaluation & Negotiation, Purchasing Order, Inspection, Expediting, Transportation, and Field Material Control.

상기 제어부(160)는 상술한 바와 같이 정의된 LNG 플랜트 업무 프로세스에 대하여 단계별로 정의된 각 항목들의 연결 관계를 정의하고, 각 항목들의 입력 및 조직과 제약 조건의 배치 및 그에 따른 출력을 배치함으로써 단계별 업무 프로세스 모델링을 지원할 수 있다. The controller 160 defines the connection relationship of each item defined step by step with respect to the LNG plant business process defined as described above, and by placing the input and organization of each item and the arrangement of constraints and the output accordingly Support business process modeling.

상술한 바와 같이 본 발명의 실시 예에 따른 시스템(100)은 LNG 플랜트 업무 프로세스와 관련하여, 일정 규칙에 따라 정의된 LNG 플랜트 업무 프로세스의 단계별 각 항목들에 대하여 데이터의 입력, 제약 조건 및 조직의 배치, 그에 따른 출력의 흐름 연결을 통하여 각 항목들의 연결 관계와 데이터의 흐름 및 업무의 진행과 성격 등을 손쉽게 파악할 수 있도록 지원할 수 있다.As described above, according to the embodiment of the present invention, the system 100 may include data input, constraints, and organization of each step of the LNG plant business process defined according to a schedule rule in relation to the LNG plant business process. By arranging and connecting the output flows accordingly, it is possible to easily understand the connection relationship of each item, the flow of data, and the progress and nature of work.

이상에서는 본 발명의 실시 예에 따른 LNG 플랜트 업무 프로세스 모델링을 위한 시스템의 구성과 각 구성들의 역할에 대하여 설명하였다. 이하에서는 본 발명의 실시 예에 따른 LNG 플랜트 업무 프로세스 모델링 방법에 대하여 도면을 참조하여 보다 상세히 설명하기로 한다. In the above, the configuration of the system and the role of each configuration for the LNG plant business process modeling according to an embodiment of the present invention has been described. Hereinafter, a LNG plant business process modeling method according to an embodiment of the present invention will be described in detail with reference to the accompanying drawings.

도 4는 본 발명의 실시 예에 따른 LNG 플랜트 업무 프로세스 모델링 방법을 설명하기로 위한 순서도이다.Figure 4 is a flow chart for explaining the LNG plant business process modeling method according to an embodiment of the present invention.

상기 도 4를 참조하면, 본 발명의 LNG 플랜트 업무 프로세스 모델링 방법은 먼저, 시스템(100)에 전원이 공급되면 시스템(100)의 제어부(160)가 공급된 전원을 이용하여 시스템(100)의 각 구성의 초기화를 제어하고, 초기화가 완료되면 본 발명의 실시 예에 따른 LNG 플랜트 업무 프로세스 모델링을 위한 각 구성들의 기능을 제어하기 위한 신호 흐름을 제어할 수 있다. 특히 상기 제어부(160)는 초기화 과정이 완료된 이후 기 설정된 스케줄 정보에 따라 S101 단계에서와 같이 대기 화면을 표시부(140)에 출력하도록 제어할 수 있다. 이 과정에서 실질적으로 상기 제어부(160)는 설정된 스케줄 정보에 따라 대기 화면을 출력하는 것으로서, 사전 설정이 업무 프로세스 모델링 기능을 수행하도록 설정된 경우 대기 화면의 출력 과정이 생략되고 업무 프로세스 모델링을 위한 기능 수행 화면 출력을 제어할 수 도 있다.Referring to FIG. 4, in the LNG plant work process modeling method of the present invention, first, when power is supplied to the system 100, each of the systems 100 is controlled using the power supplied from the control unit 160 of the system 100. Controlling the initialization of the configuration, and when the initialization is complete, it is possible to control the signal flow for controlling the functions of the components for the LNG plant business process modeling according to an embodiment of the present invention. In particular, after the initialization process is completed, the controller 160 may control to output the standby screen to the display unit 140 as in step S101 according to preset schedule information. In this process, the control unit 160 substantially outputs the standby screen according to the set schedule information. When the preset is set to perform the business process modeling function, the output process of the standby screen is omitted and the function for the business process modeling is performed. You can also control the screen output.

한편 제어부(160)는 입력부(120)로부터 특정 입력 신호가 발생하면 S103 단계로 분기하여 생성된 특정 입력 신호가 업무 프로세스 모델링 기능을 활성화하기 위한 입력 신호인지 여부를 확인할 수 있다. 이 단계에서 상기 제어부(160)는 생성된 입력 신호가 업무 프로세스 모델링 기능 지원을 위한 입력 신호가 아닌 경우 S105 단계로 분기하여 시스템(100)의 해당 사용자 기능 예를 들면 파일 검색 기능, 파일 재생 기능, 네트워크 접속 기능 등을 수행하도록 지원할 수 있다.Meanwhile, when a specific input signal is generated from the input unit 120, the controller 160 may determine whether the specific input signal generated by branching to step S103 is an input signal for activating the business process modeling function. In this step, if the generated input signal is not an input signal for supporting a business process modeling function, the control unit 160 branches to step S105 to correspond to a corresponding user function of the system 100, for example, a file search function, a file playback function, It can support to perform network access function.

S103 단계에서 생성된 입력 신호가 업무 프로세스 모델링 기능 활성화를 위한 신호인 경우, 제어부(160)는 S107 단계로 분기하여 LNG 플랜트의 단계별 업무 프로세스 정의를 수행할 수 있다. 이 과정을 수행하기 위하여 제어부(160)는 저장부(150)에 저장된 다양한 LNG 플랜트 관련 정보 또는 통신부(110)나 입력부(120)를 통하여 입력되는 다양한 LNG 플랜트 관련 정보에 대하여 공통 업무 프로세스의 도출 과정 및 특정 업무 프로세스의 적용 과정을 수행할 수 있다. 그리고 제어부(160)는 정의된 업무 프로세스에 관하여 LNG 플랜트 사업 분야의 전문가가 제공하는 정보를 기반으로 일정한 규칙에 따라 업무 프로세스 정의를 보정하도록 지원할 수 있다. 특히 본 발명의 제어부(160)는 LNG 플랜트 업무 프로세스에 대하여 일정 단계 예를 들면 대구분, 세부 업무 구분, 업무 수행 구분, 세부 업무 수행 항목들의 단계로 구분하고, 각 단계별 업무 수행의 특징에 따른 정의를 수행할 수 있다. 예시적으로 상기 제어부(160)는 LNG 플랜트 업무 프로세스에 대하여 대구분으로서 기획, 설계, 구매조달, 시공 및 시운전 항목으로 분류 정의할 수 있으며, 각 구분별 세부 업무 구분과 업무 수행 항목들의 그룹핑을 정의할 수 있다. 상기 S107 단계에서의 업무 프로세스의 정의는 실질적으로 각 구분별로 개별적으로 이루어질 수 있다. 즉 상기 제어부(160)는 업무 프로세스 정의 과정에서 대구분에 속하는 기획 대구분에 대한 세부 업무 구분과 업무 수행 항목들의 분류 및 그룹핑만을 독립적으로 수행하도록 제어할 수 있으며, 또한 업무 프로세스 정의 과정에서 구매조달 대구분에 대한 세부 업무 구분과 업무 수행 항목들의 분류 및 그룹핑만을 독립적으로 수행하도록 제어할 수 있다. When the input signal generated in step S103 is a signal for activating the business process modeling function, the controller 160 branches to step S107 to perform step-by-step business process definition of the LNG plant. In order to perform this process, the control unit 160 derives a common work process for various LNG plant related information stored in the storage 150 or various LNG plant related information input through the communication unit 110 or the input unit 120. And the application of a specific business process. In addition, the controller 160 may support to correct the work process definition according to a predetermined rule based on information provided by an expert in the LNG plant business field regarding the defined work process. Particularly, the control unit 160 of the present invention divides the LNG plant business process into a predetermined step, for example, a coarse division, a detailed business division, a business performance division, and a detailed business execution phase, and defines the characteristics of the performance of each phase. Can be performed. For example, the control unit 160 may be classified into planning, design, procurement, construction, and commissioning items as large categories for the LNG plant work process, and define a detailed work division and grouping of work performance items for each division. can do. The definition of the business process in step S107 may be made substantially individually for each division. That is, the control unit 160 may control to independently perform detailed task division and grouping and grouping of work performance items for the planned large division belonging to the large division in the business process definition process, and also purchase procurement in the business process definition process. It can be controlled to independently perform detailed task division and classification and grouping of task performance items for large division.

S107 단계에서 업무 프로세스의 정의가 완료되면, 제어부(160)는 S109 단계로 분기하여 기본 데이터(151) 입력을 지원할 수 있다. 이를 위하여 제어부(160)는 표시부(140)를 통하여 기본 데이터(151)를 입력할 수 있는 사용자 인터페이스를 제공할 수 있다. 특히 상기 제어부(160)는 기본 데이터(151)가 입찰 안내서, 실적 자료, 물량 산출서 등과 같은 산술 데이터인 경우, 해당 산술 데이터의 입력을 위한 입력 양식을 표시부(140)에 출력하도록 제어할 수 있다. 그러면 LNG 플랜트 업무 프로세스 모델링을 위한 시스템(100) 사용자는 표시부(140)에 출력되는 입력 양식 등에 산술 데이터를 입력하는 방식을 기반으로 기본 데이터(151) 입력을 수행할 수 있다. 또한 상기 시스템(100)이 데이터 호환을 지원하는 경우 상기 시스템(100) 사용자는 입력 양식을 기반으로 산술 데이터의 입력을 수행하지 않고 기본 데이터(151)의 직접 입력을 위한 통신부(110)의 통신 채널 형성을 수행할 수 있다. 이를 위하여 시스템(100) 사용자는 시스템(100)에 직접적으로 입력할 수 있는 형태의 기본 데이터(151)를 수집할 수 있다.When the definition of the business process is completed in step S107, the control unit 160 branches to step S109 to support the input of the basic data 151. To this end, the controller 160 may provide a user interface for inputting the basic data 151 through the display unit 140. In particular, when the basic data 151 is arithmetic data such as a bid guide, performance data, and a quantity statement, the controller 160 may control the display unit 140 to output an input form for inputting the arithmetic data. . Then, the user of the system 100 for modeling the LNG plant business process may perform basic data 151 input based on a method of inputting arithmetic data into an input form output to the display unit 140. In addition, when the system 100 supports data compatibility, the user of the system 100 does not perform input of arithmetic data based on an input form, but a communication channel of the communication unit 110 for direct input of basic data 151. Formation can be performed. To this end, the user of the system 100 may collect basic data 151 in a form that can be directly input to the system 100.

다음으로 상기 제어부(160)는 S111 단계에서 제어 데이터(153) 및 매커니즘(155)의 적용을 수행하도록 지원할 수 있다. 이를 위하여 상기 제어부(160)는 저장부(150)에 사전 저장된 제어 데이터(153) 및 매커니즘(155) 호출을 수행하고, 호출된 제어 데이터(153) 및 매커니즘(155)을 입력된 기본 데이터(151)에 적용하도록 제어할 수 있다. 이때 제어부(160)는 기본 데이터(151), 제어 데이터(153) 및 매커니즘(155)의 적용을 위하여 업무 활동 제어 모듈(167)을 호출할 수 있다. 여기서 제어 데이터(153) 또한 저장부(150)에 사전 저장되어 있지 않을 수 있으며, 이에 따라 제어부(160)는 제어 데이터(153)를 위한 사용자 인터페이스를 기본 데이터(151)을 위한 방식에서와 같이 지원할 수 있다. 이때 제어부(160)는 제어 데이터(153) 입력을 위하여 LNG 플랜트 업무 프로세스 정의 과정에서 정의된 각 제어 조건들에 대한 항목들을 리스트 형태로 제공할 수 있으며, 사용자는 특정 항목을 선택한 후 해당 제어 데이터(153)를 입력하기 위한 업무를 수행할 수 있다. 또는 사용자가 특정 제어 데이터(153)를 입력하는 경우 제어부(160)는 입력된 제어 데이터(153)의 특성을 판단하고, 판단된 제어 데이터(153)의 특성을 적용하여 해당 제어 데이터(153)의 입력 위치 및 모델링에서의 위치 결정을 수행할 수 있다. 한편 매커니즘(155)과 관련된 조직 정보의 경우 제어부(160)는 저장부(150)에 사전 저장된 정보를 이용하거나, 사내 조직 정보를 제공하는 프로그램 접근을 수행하고 정보의 요청 및 수신을 통하여 수집할 수 있다. 또한 제어부(160)는 매커니즘(155)과 관련된 정보 즉 사규, 법규 또한 해당 정보를 제공하는 사내 네트워크에 접근하여 자동 수집하도록 제어할 수 있다. 이를 위하여 LNG 플랜트 업무 진행 과정에서 실질적으로 각 과정에서 도출된 분석 결과들 및 각 과정에서 이용된 데이터들은 사내 일정 서버에 사전 정의된 형태로 분류 및 저장되는 것이 바람직하다.Next, the control unit 160 may support to apply the control data 153 and the mechanism 155 in step S111. To this end, the controller 160 calls the control data 153 and the mechanism 155 prestored in the storage 150, and inputs the called control data 153 and the mechanism 155 into the input basic data 151. ) Can be controlled. In this case, the controller 160 may call the work activity control module 167 to apply the basic data 151, the control data 153, and the mechanism 155. In this case, the control data 153 may not be pre-stored in the storage 150, and accordingly, the controller 160 may support a user interface for the control data 153 as in the method for the basic data 151. Can be. In this case, the control unit 160 may provide items for each control condition defined in the LNG plant business process definition process in the form of a list for input of the control data 153. The user selects a specific item and then selects the corresponding control data ( 153 may perform a task for inputting. Alternatively, when the user inputs specific control data 153, the controller 160 determines the characteristics of the input control data 153 and applies the characteristics of the determined control data 153 to apply the control data 153. Positioning in input position and modeling can be performed. Meanwhile, in the case of organization information related to the mechanism 155, the controller 160 may use information stored in advance in the storage unit 150, perform a program access to provide organization information, and collect the information through request and reception. have. In addition, the control unit 160 may control to automatically collect information related to the mechanism 155, that is, private regulations, laws and regulations, by accessing the internal network providing the corresponding information. For this purpose, it is preferable that the analysis results and data used in each process substantially in the course of LNG plant work are classified and stored in a predetermined form in the internal schedule server.

다음으로 기본 데이터(151), 제어 데이터(153) 및 매커니즘(155)이 제공되면 제어부(160)는 S113 단계에서 호출된 업무 활동 제어 모듈(167)을 이용하여 제공된 데이터들의 업무 수행 결과를 출력할 수 있다. 이 과정에서 제어부(160)는 기본 데이터(151)에 대한 출력 결과물 도출을 위하여 제어 데이터(153) 및 매커니즘(155)의 한계와 일정 규칙을 활용하게 된다. 본 발명의 업무 활동 제어에 따른 출력 도출 특히 기획과 구매조달 분야에서의 출력 도출과 각 데이터들의 연결 관계에 대해서는 후술하는 도면과 표를 참조하여 보다 상세히 설명하기로 한다.Next, when the basic data 151, the control data 153, and the mechanism 155 are provided, the controller 160 outputs a work performance result of the provided data using the work activity control module 167 called in step S113. Can be. In this process, the controller 160 utilizes the limitations and schedule rules of the control data 153 and the mechanism 155 to derive an output result for the basic data 151. Output derivation according to the business activity control of the present invention, in particular in the planning and procurement field output derivation and the connection relationship of each data will be described in more detail with reference to the drawings and tables to be described later.

이후 상기 제어부(160)는 S115 단계에서 업무 프로세스 모델링 기능 종료를 위한 입력 신호 발생 여부를 확인하고, 해당 입력 신호 발생이 없는 경우 S107 단계로 분기하여 다른 업무 프로세스 정의를 수행하도록 지원할 수 있다. 상기 S107 단계에서 LNG 플랜트 업무 프로세스에 대한 전체 정의가 수행되지 않고 대구분의 각 단계 중 특정 단계 예를 들면 기획 단계만 정의된 경우 제어부(160)는 S103 단계로 복귀하여 다른 단계에 대한 정의 및 모델링을 수행하도록 지원할 수 있다. 한편 S107 단계에서 대구분에 포함된 각 단계들 전체에 대한 정의 및 모델링이 완료된 경우 제어부(160)는 S101 단계 이전으로 리턴하고, 다른 플랜트 업무 프로세스의 모델링 지원을 위한 기능 수행 대기를 지원할 수 있을 것이다.Thereafter, the controller 160 checks whether an input signal for terminating the work process modeling function is generated in step S115, and if there is no input signal generation, branches to step S107 to support another business process definition. If the entire definition of the LNG plant business process is not performed in step S107 and only a specific step, for example, a planning step is defined among each step of the large division, the control unit 160 returns to step S103 to define and model other steps. It can help to do this. On the other hand, if the definition and modeling of all the steps included in the large division in step S107 is completed, the control unit 160 may return to before the step S101, and may support to perform a function for supporting modeling of other plant business processes. .

이하 본 발명의 실시 예에 따른 LNG 플랜트 업무 프로세스의 기획 및 구매조달과 관련된 모델링 형태에 대하여 IDEFø 방법론을 기반으로 적용한 도면과 표를 참조하여 보다 상세히 설명하기로 한다. 도 5 내지 도 16은 본 발명의 실시 예에 따른 LNG 플랜트 업무 프로세스 중 기획 단계의 모델링 및 구매조달 단계의 모델링을 설명하기 위한 도면이다.Hereinafter, a modeling form related to planning and procurement of an LNG plant business process according to an exemplary embodiment of the present invention will be described in detail with reference to the drawings and tables applied based on the IDEFø methodology. 5 to 16 are diagrams for explaining the modeling of the planning phase and purchasing procurement phase of the LNG plant business process according to an embodiment of the present invention.

먼저, 도 5는 본 발명의 LNG 플랜트 업무 프로세스의 기획 2 단계 모델링을 나타낸 도면이며, 표 1은 기획 2 단계 모델링을 위한 기본 데이터, 제어 데이터, 매커니즘, 업무 활동 제어 모듈과 출력 값을 나타낸 것이다.First, Figure 5 is a diagram showing the planning two-stage modeling of the LNG plant business process of the present invention, Table 1 shows the basic data, control data, mechanism, business activity control module and output value for the planning two-stage modeling.

codecode ActivityActivity InputInput OutputOutput ControlControl MechanismsMechanisms A11A11 프로젝트 조직Project organization 입찰안내서(ITB)
실적자료
Bidding Guide (ITB)
Performance data
프로젝트팀
프로젝트팀전략
Project team
Project Team Strategy
사내경영전략
법, 제도, 규정
사업주요구조건
입찰참여심의회의
In-house Management Strategy
Law, system and regulation
Business requirements
Bid Participation Council
프로젝트TFT
사내KMB
사내ERP
Project TFT
In-house KMB
In-house ERP
A12A12 Proposal 조직 구성Proposal Organization 입찰안내서(ITB)
실적자료
Bidding Guide (ITB)
Performance data
프로젝트전략Project strategy 사내경영전략
법, 제도, 규정
사업주요구조건
프로포잘전략사전실무회의
In-house Management Strategy
Law, system and regulation
Business requirements
Proposal Strategic Dictionary Working Group
Risk분석과 대책
설계/구매/공사/사업수행계획
Proposal 수행계획 및 전략
Risk Analysis and Measures
Design / Purchase / Construction / Project Execution Plan
Proposal execution plan and strategy
A13A13 지침작성 및 승인Guidelines and Approval 입찰안내서(ITB)
물량산출서
실적자료
개산견적서
Bidding Guide (ITB)
A statement of quantity
Performance data
Estimate
ITB상세검토
시공계획서
개산견적서
상세견적서
ITB Detailed Review
Construction plan
Estimate
Detailed Quotation
법, 제도, 규정
사업주요구조건
사내경영전략
국가정책
Law, system and regulation
Business requirements
In-house Management Strategy
National policy
프로젝트팀
턴키계약자
사업주
물품공급업체
Project team
Turnkey contractor
Business owner
Commodity Supplier
A14A14 입찰 서류Bid documents 상세견적서
물량산출서
실적자료
타사입찰자료
Detailed Quotation
A statement of quantity
Performance data
Third Party Bidding Material
설계도면
설계계획절차서
구매계획절차서
사업관리계획절차서
시공계획절차서
blueprint
Design Planning Procedure
Purchase Planning Procedure
Project Management Planning Procedure
Construction Planning Procedure
법, 제도, 규정
사업주요구조건
사내경영전략
국가정책
예산작성, 조정
CostLevel조정
예비비추정자료
리스크관리정책
Law, system and regulation
Business requirements
In-house Management Strategy
National policy
Budgeting, Adjustment
CostLevel Adjustment
Preliminary Non-Estimate Data
Risk Management Policy
구매계획및절차서
사업관리계획및절차서
시공계획및절차서
Contingency 분석 및 조정
Purchase Plan and Procedure
Project management plan and procedure
Construction plan and procedure
Contingency Analysis and Adjustment
A15A15 입찰bidding 입찰질의자료
Clarification/Negotiation자료
Bid inquiry data
Clarification / Negotiation
입찰질의서
Clarification/Negotiation산출
Bid
Calculation of Clarification / Negotiation
사업주요구조건
사내경영전략
Business requirements
In-house Management Strategy
입찰질의분석
Clarification/Negotiation조정
Bid Query Analysis
Clarification / Negotiation Adjustment
A16A16 사업준비 업무Business preparation 사업수행기본방침
실적자료
입찰가산정자료
사업기준예산
사업수행계획서 초안
ProjectSchedule
사업수행업무목록
Basic business policy
Performance data
Bid Calculation Data
Project Standard Budget
Draft Project Implementation Plan
ProjectSchedule
Project Performance List
마일스톤스케줄
조직도
업무분장계획
사업관리계획서
분야별수행계획서
사업관리기본지침
Milestone Schedule
Organization chart
Work division plan
Project Management Plan
Performance Plan by Sector
Basic Guidelines for Business Management
법, 제도, 규정
사업주요구조건
사내경영전략
국가정책
조직도및업무분장계획
턴키계약서
분야별수행지침
Law, system and regulation
Business requirements
In-house Management Strategy
National policy
Organization chart and division of work plan
Turnkey contract
Performance Guidelines by Sector
Vendor정보
프로젝트TFT
사내KMB
사내ERP
턴키계약자
Vendor Information
Project TFT
In-house KMB
In-house ERP
Turnkey contractor

상기 표 1은 본 발명의 시스템(100)에 의하여 미리 수집된 LNG 플랜트 업무 프로세스와 관련된 다양한 정보들에 대한 공통 업무 프로세스의 도출과 특정 업무 프로세스의 도출을 통하여 기획 2단계에 대하여 정의한 정보를 본 발명의 모델링 요소에 맞도록 배치한 것이다. 이를 위하여 본 발명의 시스템(100)은 모델링을 위한 데이터 배치를 위하여 LNG 플랜트 업무 프로세스들에서의 각 명칭들의 사전 정의, 정의된 명칭들 간의 업무 수행 관계, 업무 수행 결과의 연관 관계를 파악하고, 해당 정보들의 공통 특징의 도출과 특정 업무의 적용을 수행함으로써 달성할 수 있다.Table 1 shows the information defined for the second stage of planning through the derivation of a common work process and a specific work process for a variety of information related to the LNG plant business process collected by the system 100 of the present invention It is positioned to fit the modeling elements of. To this end, the system 100 of the present invention grasps the pre-definition of each name in the LNG plant business processes, the business performance relationship between the defined names, and the correlation between the business performance results for data arrangement for modeling. This can be achieved by deriving common features of information and applying specific tasks.

상기 도 5 및 표 1을 참조하면, LNG 플랜트 업무 프로세스 기획 2 단계는 프로젝트 조직, 프로포절 조직 구성, 지침작성 및 승인, 입찰 서류, 입찰, 사업 준비 업무로 분류되는 업무 활동 제어 모듈을 포함할 수 있다. 표 1에서 코드 값은 제어부(160)에서 LNG 플랜트 업무 프로세스의 모델링을 위한 각 업무 활동 제어 항목들을 구분하도록 지원하기 위한 것이다.Referring to FIG. 5 and Table 1, the LNG plant business process planning stage 2 may include a business activity control module classified into project organization, proposal organization, guideline preparation and approval, bid documents, bidding, and business preparation work. . Code values in Table 1 are to assist the control unit 160 to distinguish each of the business activity control items for the modeling of the LNG plant business process.

도 6은 본 발명의 실시 예에 따른 LNG 플랜트 업무 프로세스 중 프로젝트 조직과 관련된 기획 3 단계의 모델링 형태를 나타낸 도면이며, 표 2는 상기 기획 3 단계의 프로젝트 조직과 관련된 기본 데이터, 제어 데이터, 매커니즘, 업무 활동 제어와 출력 값을 나타낸 도면이다.6 is a view showing the modeling form of the three planning stages associated with the project organization of the LNG plant business process according to an embodiment of the present invention, Table 2 is a basic data, control data, mechanisms, A diagram showing work activity control and output values.

CodeCode ActivityActivity InputInput OutputOutput ControlControl MechanismsMechanisms A111A111 Project 조직 구성Project Organization Configuration 입찰안내서(ITB)
실적자료
Bidding Guide (ITB)
Performance data
프로젝트팀
프로젝트전략
Project team
Project strategy
사내경영전략
법, 제도, 규정
사업주요구조건
입찰참여심의회의
In-house Management Strategy
Law, system and regulation
Business requirements
Bid Participation Council
프로젝트TFT
사내KMB
사내ERP
Project TFT
In-house KMB
In-house ERP

상기 도 6 및 표 2를 참조하면, 본 발명의 기획 3단계 모델링은 기획 2단계에서의 프로젝트 조직 구성에 대한 3단계 모델링을 나타낸 것이다. 이를 위하여 프로젝트 조직 구성의 기획 3단계 모델링은 코드 값이 "A111"로 정의함으로써, 기획 2단계 "A11"의 하위 카테고리에 속하도록 정의된다. 기획 3단계 프로젝트 조직 구성의 모델링은 표 2 및 도 6에 나타낸 바와 같이 업무 활동 제어 블록으로서 "프로젝트 조직 구성"이 배치되며, 입력(Input), 제어(Control) 및 매커니즘(Mechanisms)의 각 요소가 업무 활동 제어 블록에 제공되고 그에 따른 출력으로서 프로젝트팀 및 프로젝트 전략이 생성될 수 있다.6 and Table 2, the planning three-stage modeling of the present invention shows the three-stage modeling of the project organization configuration in the second stage of the planning. For this purpose, the planning phase 3 modeling of the project organizational configuration is defined to belong to the subcategory of planning phase 2 "A11" by defining the code value as "A111". The modeling of the planning phase 3 project organizational structure is shown in Table 2 and FIG. 6, where the "project organizational structure" is placed as a work activity control block, and each element of input, control, and mechanisms Project teams and project strategies can be generated as provided to the business activity control block and output accordingly.

도 7은 본 발명의 실시 예에 따른 LNG 플랜트 업무 프로세스 중 Proposal 전략 회의와 관련된 기획 3 단계의 모델링 형태를 나타낸 도면이며, 표 3은 상기 기획 3 단계의 Proposal 전략 회의와 관련된 기본 데이터, 제어 데이터, 매커니즘, 업무 활동 제어와, 출력 값을 나타낸 도면이다.7 is a view showing the modeling form of the three planning phases associated with the proposal strategic meeting of the LNG plant business process according to an embodiment of the present invention, Table 3 is the basic data, control data, The diagram shows the mechanism, work activity control, and output values.

CodeCode ActivityActivity InputInput OutputOutput ControlControl MechanismsMechanisms A121A121 Proposal 전략회의Proposal Strategy Meeting 입찰안내서(ITB)
실적자료
Bidding Guide (ITB)
Performance data
프로젝트전략Project strategy 사내경영전략
법, 제도, 규정
사업주요구조건
프로포잘전략사전실무회의
In-house Management Strategy
Law, system and regulation
Business requirements
Proposal Strategic Dictionary Working Group
Risk분석과 대책
설계/구매/공사/사업수행계획
Proposal 수행계획 및 전략
Risk Analysis and Measures
Design / Purchase / Construction / Project Execution Plan
Proposal execution plan and strategy

상기 도 7 및 표 3을 참조하면, 본 발명의 Proposal 전략 회의 모델링은 코드 값이 A121을 가지는 Proposal 전략 회의 업무 활동 제어 블록에 입력으로 입찰 안내서 및 실적 자료가 제공되며, 제어요소로 사내 경영전략, 법, 제도, 규정, 사업주요구조건, 프로포잘전략사전실무회의가 제공된다. 그리고 매커니즘 요소로 Risk 분석과 대책, 설계/구매/공사/사업수행계획, Proposal 수행계획 및 전략이 업무 활동 제어 블록에 제공된다. 그러면 Proposal 전략 회의 업무 활동 제어 블록은 프로젝트 전략을 출력으로 생성할 수 있다. 여기서 코드 값 A121은 기획 단계 중 Proposal 전략 단계인 A12의 3단계 모델링임을 지시하는 값이 될 수 있다.Referring to FIG. 7 and Table 3, in the proposal strategy meeting model of the present invention, a bid guide and performance data are provided as inputs to a proposal strategy meeting activity control block having a code value of A121, and as a control element, an internal management strategy, Laws, institutions, regulations, employer requirements, and the Proportional Strategic Dictionary Working Group are provided. As a mechanism, risk analysis and countermeasures, design / purchase / construction / project execution plan, proposal execution plan and strategy are provided in the business activity control block. The proposal strategy meeting activity control block can then generate the project strategy as output. In this case, the code value A121 may be a value indicating that the modeling is a three-stage modeling of the proposal strategy step A12.

도 8은 본 발명의 실시 예에 따른 LNG 플랜트 업무 프로세스 중 지침 작성 및 승인 단계와 관련된 기획 3 단계의 모델링 형태를 나타낸 도면이며, 표 4는 상기 지침 작성 및 승인 단계에서 각 기획 3 단계의 구성들과 관련된 기본 데이터, 제어 데이터, 매커니즘, 업무 활동 제어 모듈과 출력 값을 나타낸 도면이다.8 is a view showing the modeling form of the three planning stages associated with the instructions creation and approval step of the LNG plant business process according to an embodiment of the present invention, Table 4 is the configuration of each of the three planning stages in the preparation and approval stage Basic data, control data, mechanism, work activity control module and output values related to the figure.

CodeCode ActivityActivity InputInput OutputOutput ControlControl MechanismsMechanisms A131A131 ITB검토ITB Review 입찰안내서(ITB)Bidding Guide (ITB) ITB 상세검토ITB Detailed Review 법, 제도, 규정
사업주요구조건
사내경영전략
국가정책
Law, system and regulation
Business requirements
In-house Management Strategy
National policy
프로젝트팀
턴키계약자
사업주
Project team
Turnkey contractor
Business owner
A132A132 입찰 설계안 작성Create a bid design 입찰안내서
물량산출서
실적자료
Bidding Guide
A statement of quantity
Performance data
입찰보증금
시공계획서
개산견적서
상세견적서
Bid Deposit
Construction plan
Estimate
Detailed Quotation
법, 제도, 규정
사업주요구조건
사내경영전략
국가정책
설계작성,조정,품의
Law, system and regulation
Business requirements
In-house Management Strategy
National policy
Design creation, adjustment, product
프로젝트팀
턴키계약자
사업주
물품공급업체(Vendor)
Project team
Turnkey contractor
Business owner
Vendor
A133A133 입찰실행 예산 수립Establish bidding budget 개산견적서
시공계획서
입찰보증금
물량산출서
Estimate
Construction plan
Bid Deposit
A statement of quantity
상세견적서Detailed Quotation 법, 제도, 규정
사업주요구조건
사내경영전략
국가정책
Law, system and regulation
Business requirements
In-house Management Strategy
National policy
턴키계약자
사업주
물품공급업체(Vendor)
Turnkey contractor
Business owner
Vendor

상기 도 8 및 표 4를 참조하면, 본 발명의 지침 작성 및 승인 단계는 3개의 코드 값 즉 A131, A132, A133으로 각각 할당된 ITB 검토, 입찰 설계안 작성, 입찰 실행 예산 수립의 업무 활동 제어 블록을 가진다. 그리고 표 4에 나타낸 바와 같이 각 업무 활동 제어 블록에는 기본 데이터(Input), 제어 데이터(Control), 매커니즘 데이터(Mechanisms)가 입력 요소로 마련되며, 그에 따른 결과물로 출력(Output)이 배치될 수 있다. 상기 3개의 코드 값은 각각 기획 2단계 중 지침 작성 및 승인 단계의 하부 카테고리임을 지시하는 값으로 정의된다. 시스템 사용자는 모델링된 코드 값들의 배치 확인을 통하여 상위 카테고리들의 업무에 대하여 손쉽게 이해할 수 있으며, 특정 상위 카테고리에 배치된 하위 카테고리 검색 또한 용이하게 수행할 수 있다.Referring to FIG. 8 and Table 4, the guideline preparation and approval step of the present invention is a business activity control block of ITB review assigned to three code values, namely A131, A132, and A133, bidding design drafting, and bid execution budgeting. Have As shown in Table 4, basic data (Input), control data (Control), and mechanism data (Mechanisms) are provided as input elements in each work activity control block, and output may be arranged as a result. . Each of the three code values is defined as a value indicating that they are subcategories of the guideline preparation and approval stage of the second stage of planning. The system user can easily understand the tasks of the upper categories by checking the arrangement of the modeled code values, and can also easily search the lower categories arranged in a specific upper category.

도 9는 본 발명의 실시 예에 따른 LNG 플랜트 업무 프로세스 중 입찰서류 작성 단계와 관련된 기획 3 단계의 모델링 형태를 나타낸 도면이며, 표 5는 상기 기획 3 단계의 입찰서류 작성 단계와 관련된 기본 데이터, 제어 데이터, 매커니즘, 업무 활동 제어 모듈과 출력 값을 나타낸 도면이다.9 is a view showing the modeling form of the three planning phases associated with the bidding document creation step of the LNG plant business process according to an embodiment of the present invention, Table 5 is the basic data and control related to the bidding document creation step of the planning phase 3 A diagram showing data, mechanisms, business activity control modules and output values.

CodeCode ActivityActivity InputInput OutputOutput ControlControl MechanismsMechanisms A141A141 Technical 입찰서 작성Technical Bidding 상세견적서
물량산출서
실적자료
Detailed Quotation
A statement of quantity
Performance data
설계도면
설계계획절차서
구매계획절차서
사업관리계획절차서
시공계획절차서
blueprint
Design Planning Procedure
Purchase Planning Procedure
Project Management Planning Procedure
Construction Planning Procedure
법, 제도, 규정
사업주요구조건
사내경영전략
국가정책
예산작성, 조정
Law, system and regulation
Business requirements
In-house Management Strategy
National policy
Budgeting, Adjustment
구매계획 및 절차서
사업관리계획및절차서
시공계획및절차서
Purchase Plan and Procedure
Project management plan and procedure
Construction plan and procedure
A142A142 총괄입찰서 작성General bidding 상세견적서
타사입찰자료
실적자료
Detailed Quotation
Third Party Bidding Material
Performance data
물량산출확인서Quantity calculation confirmation 사업주요구조건
사내경영전략
CostLevel 조정
예산작성, 조정
예비비추정자료
리스크관리정책
Business requirements
In-house Management Strategy
CostLevel Adjustment
Budgeting, Adjustment
Preliminary Non-Estimate Data
Risk Management Policy
contingency 분석 및 조정contingency analysis and adjustment

상기 도 9 및 표 5를 참조하면, 본 발명의 입찰 서류 작성 단계는 코드 값 A141, A142로 구분되는 두 개의 업무 활동 제어 블록을 포함할 수 있다. 즉 입찰 서류 작성 단계는 Technical 입찰서 작성 및 총괄 입찰서 작성 단계를 포함할 수 있다. 각 업무 활동 제어 블록에는 상세 견적서, 물량 산출서 및 실적 자료가 기본 데이터로 제공되며, 다양한 규정과 조건, 전략, 정책 등이 제어 데이터로 제공된다.Referring to FIG. 9 and Table 5, the bid document preparation step of the present invention may include two work activity control blocks divided by code values A141 and A142. That is, the bid document preparation step may include a technical bid book preparation step and a general bidding step creation step. Each business activity control block is provided with detailed quotations, quantity statements and performance data as basic data, and various regulations, conditions, strategies, and policies are provided as control data.

도 10은 본 발명의 실시 예에 따른 LNG 플랜트 업무 프로세스 중 입찰 단계와 관련된 기획 3 단계의 모델링 형태를 나타낸 도면이며, 표 6은 상기 기획 3 단계의 입찰과 관련된 기본 데이터, 제어 데이터, 매커니즘, 업무 활동 제어 모듈과 출력 값을 나타낸 도면이다.10 is a view showing the modeling form of the three planning phases associated with the bidding phase of the LNG plant business process according to an embodiment of the present invention, Table 6 shows the basic data, control data, mechanisms, work related to the bidding of the planning stage 3 A diagram showing the activity control module and output values.

CodeCode ActivityActivity InputInput OutputOutput ControlControl MechanismsMechanisms A151A151 입찰 질의서 작성Fill out a bid questionnaire 입찰 질의 자료Bid Query Data 입찰 질의서Bid questionnaire 사내 경영 전략In-house management strategy 입찰 질의 분석Bid Query Analysis A152A152 입찰
Clarification/Nego회의
bidding
Clarification / Nego Meeting
Clarification/Negotiation 자료Clarification / Negotiation Resources Clarification/Negotiation 산출Clarification / Negotiation Output 사업주요구조건
사내경영전략
Business requirements
In-house Management Strategy
Clarification/Negotiation 조정Clarification / Negotiation Adjustment

상기 도 10 및 표 6을 참조하면, 본 발명의 입찰 단계 모델링은 두 개의 코드 값인 A151, A152로 구분된 입찰 질의서 작성, 입찰 Clarification/Nego회의를 포함하는 업무 활동 제어 블록을 포함한다. 입찰 질의서 작성 모델링의 경우 입찰 질의 자료, 사내 경영 전략, 입찰 질의 분석을 입력으로 배치하며, 출력으로 입찰 질의서가 배치될 수 있다. 입찰 Clarification/Nego회의 모델링의 경우 Clarification/Negotiation 자료, 사업주요구조건과 사내경영전략, Clarification/Negotiation 조정이 입력으로 배치되며, Clarification/Negotiation 산출이 출력으로 배치된다.Referring to FIG. 10 and Table 6, the bidding step modeling of the present invention includes a work activity control block including a bid questionnaire divided into two code values A151 and A152 and a bidding Clarification / Nego meeting. In the bidding modeling modeling, bidding query data, in-house management strategy, and bidding query analysis are arranged as inputs, and a bidding questionnaire may be arranged as an output. In the case of modeling bidding Clarification / Nego, Clarification / Negotiation data, business requirements and in-house management strategy, and Clarification / Negotiation adjustment are placed as inputs, and Clarification / Negotiation calculations are placed as outputs.

도 11은 본 발명의 실시 예에 따른 LNG 플랜트 업무 프로세스 중 사업 준비 업무 단계와 관련된 기획 3 단계의 모델링 형태를 나타낸 도면이며, 표 7은 상기 기획 3 단계의 사업 준비 업무 단계와 관련된 기본 데이터, 제어 데이터, 매커니즘, 업무 활동 제어 모듈과 출력 값을 나타낸 도면이다.11 is a view showing the modeling form of the three planning stages associated with the business preparation work step of the LNG plant work process according to an embodiment of the present invention, Table 7 is the basic data, control related to the business preparation work step of the planning step 3 A diagram showing data, mechanisms, business activity control modules and output values.

CodeCode ActivityActivity InputInput OutputOutput ControlControl MechanismsMechanisms A161A161 사업수행체계 및 조직 구성Project execution system and organization 사업수행기본방침
실적자료
ProjectSchedule
사업수행업무목록
Basic business policy
Performance data
ProjectSchedule
Project Performance List
마일스톤스케줄
업무분장계획
조직도
Milestone Schedule
Work division plan
Organization chart
턴키계약서
사내경영전략
사업주요구조건
국가정책
Turnkey contract
In-house Management Strategy
Business requirements
National policy
턴키계약자
프로젝트TFT
사내KMB
사내ERP
Turnkey contractor
Project TFT
In-house KMB
In-house ERP
A162A162 기획단계 사업관리방안수립Establishment of project management plan at planning stage 기획단계
실적자료
Planning stage
Performance data
사업관리계획서
사업관리기본지침
사업관리방안
Project Management Plan
Basic Guidelines for Business Management
Project Management Plan
조직도 및 업무분장계획
턴키계약서
사업관리지침
Organization chart and division of work plan
Turnkey contract
Project Management Guidelines
턴키계약자(사업관리담당)Turnkey Contractor (Project Management)
A163A163 단계별업무수행계획 수립Establishment of work plan for each stage 설계단계실적자료
구매조달단계실적자료
시공단계실적자료
시운전단계실적자료
Design Stage Performance Data
Procurement Stage Performance Data
Construction Stage Performance Data
Trial run performance data
설계단계수행계획서
구매조달단계수행계획서
시공단계수행계획서
시운전단계수행계획서
Design Stage Implementation Plan
Procurement Stage Performance Plan
Construction Stage Performance Plan
Commissioning Stage Performance Plan
조직도 및 업무분장계획
턴키계약서
분야별수행지침
법, 제도, 규정
Organization chart and division of work plan
Turnkey contract
Performance Guidelines by Sector
Law, system and regulation
Vendor 정보Vendor Information
A164A164 사업기준예산수립Project Standard Budget 실적자료
입찰가산정자료
Performance data
Bid Calculation Data
사업기준예산
사업수행계획서초안
Project Standard Budget
Draft Project Implementation Plan
조직도 및 업무분장계획
턴키계약서
사내예산편성지침
Organization chart and division of work plan
Turnkey contract
Internal Budget Guidelines
턴키계약자(사업비담당)
Vendor 정보
Turnkey Contractor (Project Cost Manager)
Vendor Information

상기 도 11 및 표 7을 참조하면, 본 발명의 사업 준비 업무는 4개의 업무 활동 제어 블록을 가지며 각 업무 활동 제어 블록은 코드 값이 A161, A162, A163, A164으로 할당되고, 사업수행체계 및 조직 구성, 기획 단계 사업 관리 방안 수립, 단계별 업무 수행 계획 수립, 사업기준 예산 수립 항목을 포함할 수 있다. 이와 같은 4개의 각 업무 활동 제어 블록은 기본 데이터, 제어 데이터 및 매커니즘 데이터가 입력으로 배치되며, 결과물로서 출력이 도시된 바와 같이 배치될 수 있다.Referring to FIG. 11 and Table 7, the business preparation task of the present invention has four business activity control blocks, and each business activity control block is assigned a code value of A161, A162, A163, A164, and a business execution system and organization. It may include the composition, planning phase project management plan, phased work plan, and project-based budget. In each of these four business activity control blocks, the basic data, the control data and the mechanism data are arranged as inputs, and as output, the outputs can be arranged as shown.

도 12는 본 발명의 실시 예에 따른 LNG 플랜트 업무 프로세스 중 구매조달 단계와 관련된 기획 2 단계의 모델링 형태를 나타낸 도면이며, 표 8은 상기 기획 2 단계와 관련된 기본 데이터, 제어 데이터, 매커니즘, 업무 활동 제어 모듈과 출력 값을 나타낸 도면이다.12 is a view showing the modeling form of the second stage of planning related to the procurement phase of the LNG plant business process according to an embodiment of the present invention, Table 8 is the basic data, control data, mechanism, work activities related to the second stage of planning A diagram showing the control module and output values.

CodeCode ActivityActivity InputInput OutputOutput ControlControl MechanismsMechanisms A31A31 PurchasingPurchasing Purchasing
Manual
유사사업실적자료
EquipmentList 및 MaterialList
Purchasing
Manual
Similar business performance data
EquipmentList and MaterialList
Purchase Order
Acceptance
Form
Delivery
Schedule
ProjectPurchasingProcedure
Purchase order
Acceptance
Form
Delivery
Schedule
ProjectPurchasingProcedure
계약서
사업수행계획서
사규&법규
General
Purchasing
Condition
contract
Project execution plan
Privacy & Law
General
Purchasing
Condition
구매조직(Contractor)
Owner
Vendor
Contractor
Owner
Vendor
A32A32 InspectionInspection Start-Manufacturing
Inspection-Manual
자재정보DB
Inspection-Checklist
V/P(도면)
Progressive-Manufacturing
Start-Manufacturing
Inspection-Manual
Material Information DB
Inspection-Checklist
V / P (drawing)
Progressive-Manufacturing
Pre-Inspection
Meeting Schedule
Assignand
Priorize
Inspection-Resources
Inspection Plan
Project
Inspection-Procedure
검사결과보고서
품질보증서
Pre-Inspection
Meeting Schedule
Assignand
Priorize
Inspection-Resources
Inspection Plan
Project
Inspection-Procedure
Inspection result report
product warranty
Specifications
Strategy
사업수행계획서
Inspection Plan
Assingand
Priorize
Inspection-Resources
사규&법규
Project
Inspection-Procedure
Specifications
Strategy
Project execution plan
Inspection Plan
Assingand
Priorize
Inspection-Resources
Privacy & Law
Project
Inspection-Procedure
Supplier
구매조직(Contractor)
Vendor
Owner
Supplier
Contractor
Vendor
Owner
A33A33 ExpeditingExpediting Expediting-Manual
납품계획서
Expediting-Manual
Delivery plan
Project
Expediting Procedure
V/P(도면)
업무수행보고서
Project
Expediting Procedure
V / P (drawing)
Performance report
사규&법규
Project
Purchasing Procedure
사업수행계획서
Privacy & Law
Project
Purchasing Procedure
Project execution plan
Owner
구매조직(Contractor)
Vendor
Owner
Contractor
Vendor
A34A34 LogisticsLogistics 화물인도지시서
Logistics-manual
EquipmentList 및 MaterialList
Packing List
Cargo Delivery Instructions
Logistics-manual
EquipmentList and MaterialList
Packing List
기자재조달 현황표
Project Logistics Procedure
Equipment Procurement Status
Project Logistics Procedure
사규&법규
Project Logistics Procedure
Purchase Order Acceptance Form
변경계약서
Delivery Schedule
Privacy & Law
Project Logistics Procedure
Purchase Order Acceptance Form
Change agreement
Delivery Schedule
Vendor
구매조직(Contractor)
Supplier
Vendor
Contractor
Supplier

상기 도 12 및 표 8을 참조하면, 본 발명의 구매조달 모델링은 4개의 업무 활동 제어 블록을 포함하며, 코드 값이 A31, A32, A33, A34로 할당된 Purchasing, Inspection, Expediting, Logistics 항목들을 포함한다. 상술한 각 업무 활동 제어 모듈은 2단계 기본 데이터, 제어 데이터 및 매커니즘 데이터가 입력으로 배치되며, 결과물로서 출력(Output)이 배치될 수 있다. 상기 각 4개의 업무 활동 제어 블록은 다시 적어도 하나의 3단계 업무 활동 제어 블록들을 포함할 수 있다. 이러한 3단계 업무 활동 제어 블록들과 모델링을 위한 데이터 배치에 대하여 도면 및 표를 참조하여 보다 상세히 설명하기로 한다.Referring to FIG. 12 and Table 8, the procurement modeling of the present invention includes four business activity control blocks, and includes Purchasing, Inspection, Expediting, and Logistics items assigned code values of A31, A32, A33, and A34. do. In each of the above-described business activity control modules, two-stage basic data, control data, and mechanism data may be arranged as inputs, and outputs may be arranged as outputs. Each of the four business activity control blocks may again include at least one three-level business activity control blocks. These three-stage business activity control blocks and data arrangement for modeling will be described in more detail with reference to the drawings and tables.

도 13은 본 발명의 실시 예에 따른 LNG 플랜트 업무 프로세스의 구매조달 3단계 중 Purchasing 단계의 모델링 형태를 나타낸 도면이며, 표 9는 상기 구매조달 3 단계의 Purchasing 단계와 관련된 기본 데이터, 제어 데이터, 매커니즘, 업무 활동 제어 모듈과 출력 값을 나타낸 도면이다.13 is a view showing the modeling form of the Purchasing step of the three purchasing procurement phase of the LNG plant business process according to an embodiment of the present invention, Table 9 is the basic data, control data, mechanism related to the Purchasing step of the procurement three stages This diagram shows the work activity control module and the output values.

CodeCode ActivityActivity InputInput OutputOutput ControlControl MechanismsMechanisms A311A311 Procurement PlanProcurement Plan 유사사업실적자료
EquipmentList 및 MaterialList
Procurement
Considerations
Purchasing Manual
Similar business performance data
EquipmentList and MaterialList
Procurement
Considerations
Purchasing Manual
Delivery Schedule Project
Purchasing Procedure
Procurement Schedule
Project Vend or List
Delivery Schedule Project
Purchasing Procedure
Procurement Schedule
Project Vend or List
Procurement
Strategy
사규&법규
계약서
사업수행계획서
Procurement
Strategy
Privacy & Law
contract
Project execution plan
구매조직(Contractor)
Vendor
Contractor
Vendor
A312A312 구매조달단계
사업관리방안수립
Procurement stage
Establishment of project management plan
사업수행업무록록
마일스톤스케줄
분야별수행계획서
Business record
Milestone Schedule
Performance Plan by Sector
구매조달단계
사업관리 지침
Procurement stage
Project Management Guidelines
사업수행계획서Project execution plan 구매조직(Contractor)
Vendor
Contractor
Vendor
A313A313 QuotationQuotation ProjectVendor List
Budgets
Technical And Commercial Documents
Material Requisition
Project Vendor List
Budgets
Technical And Commercial Documents
Material requisition
제작일정관리표
Preselection of Vendor`s List
Production Schedule
Preselection of Vendor`s List
Procurement
Schedule
Project
Purchasing Procedure
사규&법규
계약서
사업수행계획서
Procurement
Schedule
Project
Purchasing Procedure
Privacy & Law
contract
Project execution plan
구매조직(Contractor)
Vendor
Contractor
Vendor
A314A314 Evaluation & NegotiationEvaluation & Negotiation Preselection of Vendor`s List
Negotiating Checklist
Preselection of Vendor`s List
Negotiating Checklist
구매계약서Purchase Agreement 제작일정관리표
Purchasing Procedure
사규&법규
Agenda
기술규격서
Production Schedule
Purchasing Procedure
Private & Legal
Agenda
Technical specification
구매조직(Contractor)
Vendor
Owner
Contractor
Vendor
Owner
A315A315 Purchasing order**Purchasing order ** Purchase
Requisition
Purchase
Requisition
Purchase Order Acceptance FormPurchase Order Acceptance Form 구매계약서
Procurement Schedule
Project Purchasing Procedure
사규&법규
계약서
계약용 구매규격서
Purchase Agreement
Procurement Schedule
Project Purchasing Procedure
Privacy & Law
contract
Contract Purchase Specification
구매조직(Contractor)
Vendor
Contractor
Vendor

상기 도 13 및 표 9를 참조하면, 본 발명의 Purchasing 단계는 3단계로서 5개의 업무 활동 제어 블록을 포함한다. 상기 Purchasing 단계의 업무 활동 제어 블록은 해당 업무 활동 제어 블록들이 Purchasing 단계의 하우 카테고리임을 지시하기 위한 코드 값들인 A311, A312, A313, A314, A315으로 지정된다. 이러한 업무 활동 제어 블록들은 Procurement Plan, 구매조달 단계 사업 관리 방안 수립, Quotation, Evaluation & Negotiation, Purchasing order 항목들을 포함할 수 있다. 각 업무 활동 제어 블록들은 상술한 표 9에서와 같이 기본 데이터(Input), 제어 데이터(Control), 매커니즘(Mechanisms)을 입력에 배치하고 결과물로서 출력(Output)을 배치하여 해당 단계에 대한 모델링을 수행할 수 있다.Referring to FIG. 13 and Table 9, the Purchasing step of the present invention includes five business activity control blocks as three steps. The work activity control block in the purchasing step is designated with code values A311, A312, A313, A314, and A315 for indicating that the work activity control blocks are a how-to category in the purchasing step. These business activity control blocks may include Procurement Plan, Procurement Stage Business Management Plan, Quotation, Evaluation & Negotiation, and Purchasing Order. Each business activity control block performs the modeling of the corresponding step by placing the basic data (Input), control data (Control), mechanisms (Mechanisms) to the input and the output (output) as a result as shown in Table 9 above can do.

도 14는 본 발명의 실시 예에 따른 LNG 플랜트 업무 프로세스의 구매조달 3단계 중 Inspection 단계의 모델링 형태를 나타낸 도면이며, 표 10은 상기 구매조달 3 단계의 Inspection 단계와 관련된 기본 데이터, 제어 데이터, 매커니즘, 업무 활동 제어 모듈과 출력 값을 나타낸 도면이다.14 is a view showing the modeling form of the inspection step of the purchase procurement step 3 of the LNG plant business process according to an embodiment of the present invention, Table 10 is the basic data, control data, mechanisms related to the inspection step of the procurement step 3 This diagram shows the work activity control module and the output values.

CodeCode ActivityActivity InputInput OutputOutput ControlControl MechanismsMechanisms A321A321 Inspection PlanInspection Plan Get Input From All Parties
Purchase Order Form
Inspection Manual
Get Input From All Parties
Purchase Order Form
Inspection Manual
Pre-Inspection Meeting Schedule
Project Inspection Plan
Resources
Inspection Procedure
Pre-Inspection Meeting Schedule
Project Inspection Plan
Resources
Inspection Procedure
Specifications
Strategy
사업수행계획서
사규&법규
Project
Inspection
Procedure
Specifications
Strategy
Project execution plan
Private & Legal
Project
Inspection
Procedure
Supplier
구매조직(Contractor)
Owner
Supplier
Contractor
Owner
A322A322 Raw-Material InspectionRaw-Material Inspection Inspection Manual
TBE
자재정보 DB
Inspection Check list
Inspection Manual
TBE
Material Information DB
Inspection Check list
검사결과보고서
Start Manufacturing
Project
Inspection Procedure
Inspection result report
Start manufacturing
Project
Inspection Procedure
Inspection Plan
사규&법규
Project
Inspection
Procedure
Inspection Plan
Private & Legal
Project
Inspection
Procedure
Supplier
구매조직(Contractor)
Vendor
Supplier
Contractor
Vendor
A323A323 Progressive InspectionProgressive Inspection Start Manufacturing
Inspection Manual
자재정보 DB
Inspection Check List
V/P(도면)
Start manufacturing
Inspection Manual
Material Information DB
Inspection Check List
V / P (drawing)
검사결과보고서
Progressive Manufacturing
Project
Inspection Procedure
Inspection result report
Progressive Manufacturing
Project
Inspection Procedure
Inspection Plan
사규&법규
Project
Inspection
Procedure
Inspection Plan
Privacy & Law
Project
Inspection
Procedure
Supplier
구매조직(Contractor)
Vendor
Supplier
Contractor
Vendor
A324A324 Final InspectionFinal inspection Progressive Manufacturing
Inspection Manual
Inspection Check list
V/P(도면)
Progressive Manufacturing
Inspection Manual
Inspection Check list
V / P (drawing)
검사결과보고서
품질보증서
Project
Inspection Procedure
Inspection result report
product warranty
Project
Inspection Procedure
Inspection Plan
사규&법규
Project
Inspection
Procedure
Inspection Plan
Private & Legal
Project
Inspection
Procedure
Supplier
구매조직(Contractor)
Vendor
Owner
Supplier
Contractor
Vendor
Owner

상기 도 14 및 표 10을 참조하면, 본 발명의 Inspection 단계의 모델링은 코드 값이 A321, A322, A323, A324를 가지는 4개의 업무 활동 제어 블록인 Inspection Plan, Raw-Material Inspection, Progressive Inspection, Final Inspection을 포함한다. 각 코드 값들은 상위 카테고리인 A32 카테고리의 하위 카테고리임을 나타내며, 이에 따라 LNG 플랜트 사업자 또는 사업 진행자는 상술한 코드 값 확인을 통하여 현재 모델링된 업무 활동 제어 블록의 위치와 상호 연결 관계를 손쉽게 파악하고 이해할 수 있다.Referring to FIG. 14 and Table 10, in the modeling of the inspection step of the present invention, four business activity control blocks having code values of A321, A322, A323, and A324 are Inspection Plan, Raw-Material Inspection, Progressive Inspection, and Final Inspection. It includes. Each code value represents a sub-category of the A32 category, which is the upper category. Therefore, the LNG plant operator or the project operator can easily identify and understand the location and interconnection relationship of the currently modeled business activity control block by checking the code value described above. have.

도 15는 본 발명의 실시 예에 따른 LNG 플랜트 업무 프로세스의 구매조달 3단계 중 Expediting 단계의 모델링 형태를 나타낸 도면이며, 표 11은 상기 구매조달 3 단계의 Expediting 단계와 관련된 기본 데이터, 제어 데이터, 매커니즘, 업무 활동 제어 모듈과 출력 값을 나타낸 도면이다.15 is a view showing the modeling form of the Expediting step of the three purchasing procurement step of the LNG plant business process according to an embodiment of the present invention, Table 11 is the basic data, control data, mechanism related to the Expediting step of the purchase procurement step 3 This diagram shows the work activity control module and the output values.

CodeCode ActivityActivity InputInput OutputOutput ControlControl MechanismsMechanisms A331A331 Kick-off meeting with VendorKick-off meeting with Vendor Expediting ManualExpediting Manual Project
Expediting
Procedure
Project
Expediting
Procedure
사규&법규
Project Purchasing Procedure
사업수행계획서
Private & Legal
Project Purchasing Procedure
Project execution plan
Owner
구매조직(contractor)
Vendor
Owner
Contractor
Vendor
A332A332 Vendor PrintVendor print Expediting ManualExpediting Manual V/P(도면)V / P (drawing) Project Expediting Procedure
사업수행계획서
Project Expediting Procedure
Project execution plan
구매조직(contractor)
Vendor
Contractor
Vendor
A333A333 Manufacturing scheduleManufacturing schedule Expediting Manual
납품계획서
Expediting Manual
Delivery plan
업무수행 보고서Performance report Project Expediting Procedure
사업수행계획서
Project Expediting Procedure
Project execution plan
구매조직(contractor)Contractor

상기 도 15 및 표 11을 참조하면, 본 발명의 Expediting 모델링은 Kick-off meeting with Vendor, Vendor Print, Manufacturing schedule로 구분되는 업무 활동 제어 블록들을 포함하며, 각 업무 활동 제어 블록들은 표 11에서 나타낸 바와 같은 기본 데이터, 제어 데이터 및 매커니즘 데이터가 입력에 배치되며, 결과물로서 출력이 배치되도록 모델링될 수 있다.Referring to FIG. 15 and Table 11, Expediting modeling of the present invention includes business activity control blocks classified into Kick-off meeting with Vendor, Vendor Print, and Manufacturing schedule, each of which is shown in Table 11 The same basic data, control data and mechanism data can be placed at the input and can be modeled to place the output as a result.

도 16은 본 발명의 실시 예에 따른 LNG 플랜트 업무 프로세스의 구매조달 3단계 중 Logistics 단계의 모델링 형태를 나타낸 도면이며, 표 12는 상기 구매조달 3 단계의 Logistics 단계와 관련된 기본 데이터, 제어 데이터, 매커니즘, 업무 활동 제어 모듈과 출력 값을 나타낸 도면이다.16 is a view showing the modeling form of the Logistics step of the three purchasing procurement phase of the LNG plant business process according to an embodiment of the present invention, Table 12 is the basic data, control data, mechanism related to the Logistics stage of the three procurement procurement This diagram shows the work activity control module and the output values.

CodeCode ActivityActivity InputInput OutputOutput ControlControl MechanismsMechanisms A341A341 Transportation 수행Transportation Logistics Manual
Packing List
Logistics Manual
Packing List
화물인도지시서
Project Logistics Procedure
Cargo Delivery Instructions
Project Logistics Procedure
사규&법규
Project Logistics Procedure
Privacy & Law
Project Logistics Procedure
VendorVendor
A342A342 Field material controlField material control 화물인도지시서
Logistics Manual
Equipment List 및 Material List
Cargo Delivery Instructions
Logistics Manual
Equipment List and Material List
기자재조달현황표
Project Logistics Procedure
Equipment Procurement Status
Project Logistics Procedure
사규&법규
Project Logistics Procedure
Purchase Order Acceptance Form
변경 계약서
Privacy & Law
Project Logistics Procedure
Purchase Order Acceptance Form
A change agreement
구매조직(Contractor)
Supplier
Contractor
Supplier

상기 도 16 및 표 12를 참조하면, 본 발명의 Logistics 단계의 모델링은 두 개의 코드 값인 A341, A342로 구분된 Transportation 수행, Field material control 업무 활동 제어 블록을 포함할 수 있다.Referring to FIG. 16 and Table 12, the modeling of the logistics stage of the present invention may include a traffic performance, field material control work activity control block divided into two code values A341 and A342.

상술한 바와 같이 본 발명의 실시 예에 따른 LNG 플랜트 업무 프로세스 모델링은 전체 LNG 플랜트 업무 프로세스를 4개의 단계로 분류 정의하고, 도 17에 나타낸 바와 같이 각 단계들에 대하여 상하위 카테고리 연결성을 가지도록 업무 활동 제어 블록을 기준으로 입력 데이터와 출력 데이터를 배치할 수 있다. 이에 따라 본 발명은 LNG 플랜트 업무 프로세스 전체 업무 활동의 흐름과, 업무 활동 간의 연결 관계, 데이터의 전달과 흐름 등을 손쉽게 파악하고 이해할 수 있도록 지원한다.As described above, the LNG plant business process modeling according to the embodiment of the present invention classifies and defines the entire LNG plant business process into four stages, and as shown in FIG. 17, the business activities to have upper and lower category connectivity for each stage. Input data and output data can be arranged based on the control block. Accordingly, the present invention supports to easily understand and understand the flow of business activities of the entire LNG plant business process, the connection relationship between the business activities, the transfer and flow of data, and the like.

이러한 본 발명은 IDEFø방법론을 통해 업무 프로세스 모델링을 수행함으로써 효율적인 업무 프로세스 관리가 가능하도록 지원한다. 따라서 본 발명에 의하여 수행된 모델링 데이터들을 기반으로 플랜트 프로젝트 전체에 해당하는 생애주기 전 단계의 업무 프로세스 분석과 IDEFø방법론을 통한 업무 프로세스 모델링을 이용하여 효율적 지식관리 체계를 구축할 수 있다.This invention supports efficient business process management by performing business process modeling through the IDEF ø methodology. Therefore, based on the modeling data performed by the present invention, it is possible to build an efficient knowledge management system using the business process analysis of the life cycle stage corresponding to the whole plant project and the business process modeling through the IDEFø methodology.

여기서 본 명세서와 도면에 개시된 본 발명의 실시 예들은 이해를 돕기 위해 특정 예를 제시한 것에 지나지 않으며, 본 발명의 범위를 한정하고자 하는 것은 아니다. 여기에 개시된 실시 예들 이외에도 본 발명의 기술적 사상에 바탕을 둔 다른 변형예들이 실시 가능하다는 것은, 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에게 자명한 것이다.Herein, the embodiments of the present invention disclosed in the specification and the drawings are merely presented as specific examples for clarity and are not intended to limit the scope of the present invention. In addition to the embodiments disclosed herein, it is apparent to those skilled in the art that other modifications based on the technical idea of the present invention may be implemented.

100 : 시스템 110 : 통신부
120 : 입력부 140 : 표시부
150 : 저장부 151 : 기본 데이터
153 : 제어 데이터 153 : 매커니즘
160 : 제어부 161 : 입력 제어 모듈
163 : 데이터 제어 모듈 165 : 매커니즘 제어 모듈
167 : 업무 활동 제어 모듈
100: system 110: communication unit
120: input unit 140:
150: storage unit 151: basic data
153: control data 153: mechanism
160: control unit 161: input control module
163: data control module 165: mechanism control module
167: business activity control module

Claims (12)

LNG 플랜트 관련 데이터를 입력하는 입력부 및 외부로부터 수신하는 통신부 중 적어도 하나;
상기 LNG 플랜트 관련 데이터를 저장하는 저장부;
상기 저장부에 저장된 또는 외부로부터 수신하는 LNG 플랜트 업무 프로세스관련 데이터에 대하여 일정 규칙에 따라 LNG 플랜트 업무 프로세스를 다수의 단계별로 정의함과 아울러 구분 및 분류하고, 분류된 단계별 각 업무 활동 제어 항목들에 대하여 데이터의 입력, 제약 조건 및 조직의 배치, 그에 따른 출력의 흐름 연결을 모델링하는 제어부;
를 포함하고,
상기 제어부는
상기 LNG 플랜트 업무 프로세스에 대하여 기획, 설계, 구매조달, 시공 및 시운전 항목을 포함하는 대구분, 상기 대구분의 각 항목에 대한 세부 업무 구분, 상기 LNG 플랜트 업무 프로세스의 업무 수행 항목들을 그룹핑하여 구분한 업무 수행 구분, 상기 세부 업무 수행 항목들을 포함하는 4개의 단계로 구분하고, 각 단계별로 상위 카테고리의 코드 값이 하위 카테고리의 코드 값들과 연계되도록 모델링하는 것을 특징으로 하는 LNG 플랜트 업무 프로세스 모델링을 지원하는 시스템.
At least one of an input unit for inputting LNG plant related data and a communication unit for receiving from the outside;
A storage unit storing the LNG plant related data;
Define and classify the LNG plant business process in a plurality of stages according to a predetermined rule for data related to the LNG plant business process stored in or received from the storage unit, and classify and classify the LNG plant business process in each of the classified business activity control items. A controller for modeling the input of data, constraints and organizational arrangements, and thus the flow connection of outputs;
Including,
The control unit
The LNG plant business process is divided into cods including planning, design, procurement, construction, and commissioning, detailed work for each item of the cods, and grouping work performed items of the LNG plant business process. Division of business performance, divided into four steps including the detailed work performance items, each step to support the LNG plant business process modeling, characterized in that the model code model of the upper category associated with the code values of the lower category system.
제1항에 있어서
상기 제어부는
상기 업무 활동 제어 항목에 대응하는 업무 활동 제어 모듈;
상기 업무 활동 제어 모듈에 의해 처리되는 기본 데이터를 입력하는 입력 제어 모듈;
상기 LNG 플랜트 업무 프로세스의 외부 제약 요인에 대한 제어 데이터 입력을 지원하는 데이터 제어 모듈;
상기 LNG 플랜트 업무 프로세스 진행을 위해 요구되는 조직 또는 조직 관련 정보나 규약을 포함하는 매커니즘 입력을 지원하는 매커니즘 제어 모듈;
을 포함하는 것을 특징으로 하는 LNG 플랜트 업무 프로세스 모델링을 지원하는 시스템.
The method of claim 1, wherein
The control unit
A work activity control module corresponding to the work activity control item;
An input control module for inputting basic data processed by the work activity control module;
A data control module for supporting control data input for external constraints of the LNG plant work process;
A mechanism control module supporting a mechanism input including an organization or organization-related information or protocol required for the LNG plant business process to proceed;
System for supporting the LNG plant business process modeling comprising a.
제2항에 있어서
상기 저장부는
상기 LNG 플랜트 업무 프로세스에 있어서 실제 작성되고 도출되는 산술 데이터 또는 상기 데이터에 대응하는 입찰 안내서, 실적 자료, 물량 산출서, 개산 견적서, 타사 입찰 자료, 사업 기준 예산 사업 수행 계획서 중 적어도 하나를 포함하는 상기 기본 데이터;
상기 LNG 플랜트 업무 진행 과정에서 직접 또는 간접적으로 상기 기본 데이터의 수치를 변경할 수 있거나 또는 상기 기본 데이터의 변동 가능성에 영향을 줄 수 있는 요소로서 사내 경영 전략, 법, 제도, 규정, 사업주 요구 조건, 입찰 참여 심의 회의, 국가 정책, 예비비 추정 자료, 리스크 관리 정책, 분야별 수행 지침, 계약서, 사규, 변경 계약서 중 적어도 하나를 포함하는 상기 제어 데이터;
상기 LNG 플랜트 업무 프로세스 지원을 위한 조직 관련 또는 조직의 행동 양식에 관한 데이터에 해당하는 프로젝트 TFT, 사내 KMB, 사내 ERP, 사업 수행 계획, Proposal 수행 계획 및 전략, 프로젝트팀, 사업주, 물품 공급 업체, 입찰 질의 분석, Clarification/Negotiation 조정, Vendor 정보 중 적어도 하나를 포함하는 상기 매커니즘;
을 저장하는 것을 특징으로 하는 LNG 플랜트 업무 프로세스 모델링을 지원하는 시스템.
The method according to claim 2, wherein
The storage unit
The arithmetic data actually generated and derived in the LNG plant business process, or the bidding guide corresponding to the data, performance data, a quantity calculation statement, an estimate of estimate, a third party bidding data, a business standard budget business execution plan including at least one Basic data;
In-house management strategies, laws, systems, regulations, employer requirements, bids as factors that can change the value of the basic data directly or indirectly in the course of the LNG plant operation or affect the possibility of fluctuation of the basic data. The control data including at least one of a deliberation meeting, a national policy, a reserve cost estimation data, a risk management policy, a sectoral performance guideline, a contract, a regulation, and a change contract;
Project TFT, In-house KMB, In-house ERP, Project Execution Plan, Proposal Execution Plan and Strategy, Project Team, Business Owner, Commodity Supplier, Bidding, which correspond to data related to organization or behavioral patterns for supporting the LNG plant business process The mechanism including at least one of query analysis, Clarification / Negotiation coordination, and vendor information;
System for supporting the LNG plant business process modeling, characterized in that for storing.
제3항에 있어서
상기 기본 데이터 입력을 위한 사용자 인터페이스를 출력하는 표시부;
를 더 포함하는 것을 특징으로 하는 LNG 플랜트 업무 프로세스 모델링을 지원하는 시스템.
The method of claim 3, wherein
A display unit for outputting a user interface for inputting the basic data;
The system for supporting the LNG plant business process modeling further comprising a.
제1항에 있어서
상기 제어부는
상기 저장부에 저장된 다양한 LNG 플랜트 관련 정보 또는 통신부나 상기 입력부를 통하여 입력되는 다양한 LNG 플랜트 관련 정보에 대하여 공통 업무 프로세스의 도출과 정의 및 특정 업무 프로세스의 도출과 적용을 수행하는 것을 특징으로 하는 LNG 플랜트 업무 프로세스 모델링을 지원하는 시스템.
The method of claim 1, wherein
The control unit
LNG plant characterized in that the derivation and definition of common business processes and the derivation and application of specific business processes to various LNG plant-related information stored in the storage unit or various LNG plant-related information input through the communication unit or the input unit. A system that supports business process modeling.
제5항에 있어서
상기 제어부는
상기 정의된 단계별 LNG 플랜트 업무 프로세스들에 대하여 IDEFø 방법론을 기반으로 업무 활동 제어 항목들 간의 데이터 입력 배치 및 결과물 출력 배치를 모델링하는 것을 특징으로 하는 LNG 플랜트 업무 프로세스 모델링을 지원하는 시스템.
The method of claim 5, wherein
The control unit
A system for supporting LNG plant business process modeling, characterized in that for the step-by-step LNG plant business processes defined above, modeling data input arrangements and output output arrangements between business activity control items based on the IDEFø methodology.
삭제delete 제1항에 있어서
상기 제어부는
상기 기획 단계에 대하여 프로젝트 조직, 프로포절 조직 구성, 지침작성 및 승인, 입찰 서류, 입찰, 사업 준비 업무로 분류되는 업무 활동 제어 모듈들을 기반으로 모델링을 수행하는 것을 특징으로 하는 LNG 플랜트 업무 프로세스 모델링을 지원하는 시스템.
The method of claim 1, wherein
The control unit
Support the LNG plant business process modeling, characterized in that the modeling is carried out based on the business activity control modules classified into project organization, proposal organization composition, guideline creation and approval, bid documents, bidding, business preparation work for the planning stage. System.
제1항에 있어서
상기 제어부는
상기 구매조달 단계에 대하여 Purchasing, Inspection, Expediting, Logistics 항목으로 분류되는 업무 활동 제어 모듈들을 기반으로 모델링을 수행하는 것을 특징으로 하는 LNG 플랜트 업무 프로세스 모델링을 지원하는 시스템.
The method of claim 1, wherein
The control unit
The system for supporting the LNG plant business process modeling, characterized in that the modeling based on the business activity control modules classified into Purchasing, Inspection, Expediting, Logistics items for the procurement step.
LNG 플랜트 업무 프로세스 관련 데이터를 수집하는 단계;
상기 LNG 플랜트 업무 프로세스 관련 데이터에 대하여 일정 규칙에 따라 LNG 플랜트 업무 프로세스를 다수의 단계별로 정의하는 단계;
상기 정의된 LNG 플랜트 업무 프로세스를 구분 및 분류하고, 분류된 단계별 각 업무 활동 제어 항목들에 대하여 데이터의 입력, 제약 조건 및 조직의 배치, 그에 따른 출력의 흐름 연결을 모델링하는 모델링 단계;
를 포함하고,
상기 정의하는 단계는,
상기 LNG 플랜트 업무 프로세스에 대하여 기획, 설계, 구매조달, 시공 및 시운전 항목을 포함하는 대구분, 상기 대구분의 각 항목에 대한 세부 업무 구분, 상기 LNG 플랜트 업무 프로세스의 업무 수행 항목들을 그룹핑하여 구분한 업무 수행 구분, 상기 세부 업무 수행 항목들을 포함하는 4개의 단계로 구분하고,
상기 모델링 단계는,
각 단계별로 상위 카테고리의 코드 값이 하위 카테고리의 코드 값들과 연계되도록 모델링하는 것을 특징으로 하는 LNG 플랜트 업무 프로세스 모델링 방법.
Collecting data related to the LNG plant business process;
Defining an LNG plant work process in a plurality of stages according to a schedule rule with respect to the LNG plant work process related data;
A modeling step of classifying and classifying the defined LNG plant business process and modeling flow connection of data input, constraint and organization arrangement, and output according to each classified business activity control items;
Including,
The defining step is,
The LNG plant business process is divided into cods including planning, design, procurement, construction, and commissioning, detailed work for each item of the cods, and grouping the work performance items of the LNG plant business process. Divided into four stages including the business performance category and the detailed business performance items,
The modeling step,
LNG plant business process modeling method characterized in that for each step to model the code value of the upper category associated with the code values of the lower category.
제10항에 있어서
상기 모델링 단계는
상기 업무 활동 제어 항목에 의해 처리되는 기본 데이터, 상기 LNG 플랜트 업무 프로세스의 외부 제약 요인에 대한 제어 데이터, 상기 LNG 플랜트 업무 프로세스 진행을 위해 요구되는 조직 또는 조직 관련 정보나 규약을 포함하는 매커니즘 데이터를 입력 위치에 배치하는 단계;를 포함하고,
상기 기본 데이터는 상기 LNG 플랜트 업무 프로세스에 있어서 실제 작성되고 도출되는 산술 데이터 또는 상기 데이터에 대응하는 입찰 안내서, 실적 자료, 물량 산출서, 개산 견적서, 타사 입찰 자료, 사업 기준 예산 사업 수행 계획서 중 적어도 하나를 포함하며,
상기 제어 데이터는 상기 LNG 플랜트 업무 진행 과정에서 직접 또는 간접적으로 상기 기본 데이터의 수치를 변경할 수 있거나 또는 상기 기본 데이터의 변동 가능성에 영향을 줄 수 있는 요소로서 사내 경영 전략, 법, 제도, 규정, 사업주 요구 조건, 입찰 참여 심의 회의, 국가 정책, 예비비 추정 자료, 리스크 관리 정책, 분야별 수행 지침, 계약서, 사규, 변경 계약서 중 적어도 하나를 포함하고,
상기 매커니즘 데이터는 상기 LNG 플랜트 업무 프로세스 지원을 위한 조직 관련 또는 조직의 행동 양식에 관한 데이터에 해당하는 프로젝트 TFT, 사내 KMB, 사내 ERP, 사업 수행 계획, Proposal 수행 계획 및 전략, 프로젝트팀, 사업주, 물품 공급 업체, 입찰 질의 분석, Clarification/Negotiation 조정, Vendor 정보 중 적어도 하나를 포함하는 것을 특징으로 하는 LNG 플랜트 업무 프로세스 모델링 방법.
The method of claim 10
The modeling step
Input mechanism data including basic data processed by the work activity control item, control data on external constraints of the LNG plant work process, and organization or organization-related information or protocol required for the LNG plant work process Positioning at a location;
The basic data is at least one of arithmetic data actually generated and derived in the LNG plant business process, or a bidding guide, performance data, quantity calculation, estimate estimate, third party bidding data, and business standard budget business execution plan corresponding to the data. Including;
The control data may change the value of the basic data directly or indirectly in the course of the LNG plant operation, or may influence the possibility of change of the basic data. At least one of requirements, bid participation deliberation meetings, national policies, reserve estimates, risk management policies, sectoral performance guidelines, contracts, regulations, change agreements,
The mechanism data includes project TFT, in-house KMB, in-house ERP, project execution plan, proposal execution plan and strategy, project team, employer, and commodity corresponding to data related to organizational or organizational behavior for supporting the LNG plant business process. An LNG plant business process modeling method comprising at least one of a supplier, a bidding query analysis, a Clarification / Negotiation adjustment, and vendor information.
제11항에 있어서
상기 모델링 단계는
상기 기획 단계에 대하여 프로젝트 조직, 프로포절 조직 구성, 지침작성 및 승인, 입찰 서류, 입찰, 사업 준비 업무로 분류되는 업무 활동 제어 모듈들을 기반으로 모델링을 수행하는 단계;
상기 구매조달 단계에 대하여 Purchasing, Inspection, Expediting, Logistics 항목으로 분류되는 업무 활동 제어 모듈들을 기반으로 모델링을 수행하는 단계;
중 어느 하나의 단계를 포함하는 것을 특징으로 하는 LNG 플랜트 업무 프로세스 모델링 방법.
The method of claim 11, wherein
The modeling step
Performing modeling on the planning stage based on business activity control modules classified into project organization, proposal organization, guideline preparation and approval, bid documents, bidding, and business preparation work;
Performing modeling on the procurement step based on business activity control modules classified into purchasing, inspection, expediting, and logistics items;
LNG plant business process modeling method comprising the step of any one of.
KR1020110014041A 2011-02-17 2011-02-17 Modeling Method of Process For LNG Plant And System thereof KR101222863B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110014041A KR101222863B1 (en) 2011-02-17 2011-02-17 Modeling Method of Process For LNG Plant And System thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110014041A KR101222863B1 (en) 2011-02-17 2011-02-17 Modeling Method of Process For LNG Plant And System thereof

Publications (2)

Publication Number Publication Date
KR20120094650A KR20120094650A (en) 2012-08-27
KR101222863B1 true KR101222863B1 (en) 2013-01-25

Family

ID=46885458

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110014041A KR101222863B1 (en) 2011-02-17 2011-02-17 Modeling Method of Process For LNG Plant And System thereof

Country Status (1)

Country Link
KR (1) KR101222863B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101934338B1 (en) * 2017-08-25 2019-03-18 오스템임플란트 주식회사 Business Management System, Method And Recording Medium

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
해외 LNG플랜트의 시공 전단계 업무프로세스 분석(한국건설관리학회 학술발표대회논문집, 윤나리외 4명, 2009년11월 발행) *
해외 LNG플랜트의 시공 전단계 업무프로세스 분석(한국건설관리학회 학술발표대회논문집, 윤나리외 4명, 2009년11월 발행)*

Also Published As

Publication number Publication date
KR20120094650A (en) 2012-08-27

Similar Documents

Publication Publication Date Title
KR100846275B1 (en) Web-based collaboration method and realtime collaboration system for re-organization, re-modeling, innovation of industry and embodiment the virtual manufacturing
US20100169229A1 (en) Business Processing System Using Remote PC Control System of Both Direction
WO2006041865A2 (en) Method for reengineering of business processes
Wu et al. An advanced CMII-based engineering change management framework: the integration of PLM and ERP perspectives
CN101256647A (en) Item management system being suitable for garden engineering
KR20130047776A (en) Stand alone domain each construction web site with auto maker and using it for the group system
Kang et al. Information-integration maturity model for the capital projects industry
Durugbo Managing industrial service co-design: identifying challenges from technology firms
JP4826211B2 (en) Business negotiation / order system, business negotiation / ordering method, and business negotiation / order processing program
KR101069202B1 (en) Optimal Information Processing Method of LNG Plant And Apparatus supporting the same
Hernández et al. A DSS-based framework for enhancing collaborative web-based operations management in manufacturing SME supply chains
Medina-Serrano et al. Collaborative and sustainable supply chain practices: a case study
Kouvelis et al. The structure of global supply chains: The design and location of sourcing, production, and distribution facility networks for global markets
Vafaeinezhad et al. Robust optimization of a mathematical model to design a dynamic cell formation problem considering labor utilization
KR100441660B1 (en) Knowledge service system through ordered workflow, service method thereof, service method for developing products through network and system thereof
KR101222863B1 (en) Modeling Method of Process For LNG Plant And System thereof
KR20170014338A (en) Erp system having a structure of modularized frame
Omayer et al. The interaction of BIM And FM through sport projects life cycle (case study: Sailia training site in Qatar)
US20230316197A1 (en) Collaborative, multi-user platform for data integration and digital content sharing
KR101276594B1 (en) Standardization Method of Process For LNG Plant And System thereof
KR20150128243A (en) Method for Providing Customized ERP
KR101052585B1 (en) LAN plant support system and user interface supporting it
Ziegler et al. TRUMPF uses a mixed integer model as decision support for strategic production network design
Dekkers et al. Practices for strategic capacity management in Malaysian manufacturing firms
Lasni et al. Implementing construction planning and control software: A specialized contractor perspective

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20160113

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20170106

Year of fee payment: 5

LAPS Lapse due to unpaid annual fee