KR101187876B1 - 2-Arch Tunnel with Extension Tunnel and Method for Constructing The Same - Google Patents

2-Arch Tunnel with Extension Tunnel and Method for Constructing The Same Download PDF

Info

Publication number
KR101187876B1
KR101187876B1 KR1020090098882A KR20090098882A KR101187876B1 KR 101187876 B1 KR101187876 B1 KR 101187876B1 KR 1020090098882 A KR1020090098882 A KR 1020090098882A KR 20090098882 A KR20090098882 A KR 20090098882A KR 101187876 B1 KR101187876 B1 KR 101187876B1
Authority
KR
South Korea
Prior art keywords
tunnel
main
support wall
arch
extended
Prior art date
Application number
KR1020090098882A
Other languages
Korean (ko)
Other versions
KR20110041866A (en
Inventor
박재현
Original Assignee
(주)한국투아치
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)한국투아치 filed Critical (주)한국투아치
Priority to KR1020090098882A priority Critical patent/KR101187876B1/en
Publication of KR20110041866A publication Critical patent/KR20110041866A/en
Application granted granted Critical
Publication of KR101187876B1 publication Critical patent/KR101187876B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/14Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/01Methods or apparatus for enlarging or restoring the cross-section of tunnels, e.g. by restoring the floor to its original level
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/02Driving inclined tunnels or galleries

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

본선터널의 외측으로 확장된 확장터널부를 가지는 2아치터널 및 이의 시공방법이 개시된다. 본 발명에 따른 확장본선터널을 가지는 2아치터널은 중앙지지벽 및 상기 중앙지지벽의 상부에서 좌우 양측으로 구비되어 상기 중앙지지벽과 연속된 면을 형성하는 한 쌍의 2아치본선터널을 가지는 메인터널부 및 상기 2아치 본선터널의 외측에서 상기 2아치본선터널과 연속된 면을 형성하는 분리지지벽 및 상기 분리지지벽에서 외측으로 구비되어 상기 분리지지벽과 연속된 면을 형성하는 확장본선터널을 가지는 확장터널부를 포함하여 구성된다.

Figure R1020090098882

터널, 아치, 2아치터널, 시공, 지지벽, 글라스

Disclosed are a two-arch tunnel having an extended tunnel portion extended outward of the main ship tunnel and a construction method thereof. The two-arch tunnel having an extended main tunnel according to the present invention has a main support wall and a main two having a pair of two-arch main tunnels provided on both sides of the central support wall and forming a continuous surface with the central support wall. An extension main tunnel provided on the outside of the tunnel portion and the second arch main tunnel to form a continuous surface with the second arch main tunnel and an outer side of the separation support wall to form a continuous surface with the separation support wall; It is configured to include an extension tunnel having a.

Figure R1020090098882

Tunnel, arch, 2 arch tunnel, construction, support wall, glass

Description

확장터널부를 가지는 2아치터널 및 이의 시공방법{2-Arch Tunnel with Extension Tunnel and Method for Constructing The Same}2-Arch Tunnel with Extension Tunnel and Method for Constructing The Same}

본 발명은 2아치터널 및 이의 시공방법에 관한 것으로서, 보다 상세하게는 2아치본선터널 외측으로 확장되는 확장터널부를 가지는 2아치터널 및 이의 시공방법에 관한 것이다.The present invention relates to a two-arch tunnel and a construction method thereof, and more particularly, to a two-arch tunnel and a construction method thereof having an extended tunnel portion extending outside the two-arch main tunnel.

좁은 국토의 효율적인 활용과 사회 기반시설 확충을 위해 터널 건설 수요가 급속히 증가하고 있다. 이러한 터널의 건설은 산악지 절개나 도로의 곡선화를 방지하여 안전하고 환경 친화적인 도로건설을 위해서는 필수적인 요소이다.The demand for the construction of tunnels is increasing rapidly for the efficient use of narrow land and social infrastructure. The construction of these tunnels is essential for safe and environmentally friendly road construction by preventing mountain cuts and road curvature.

일반적으로 터널은 산허리를 관통하는 도로나 철로 등을 형성하기 위한 산악터널과, 도심지의 지중에 형성되는 시가지 터널 등으로 구분된다. 그리고 터널, 특히 산악 터널에 사용되는 터널은 그 형식에 따라 병렬 터널, 2아치 터널, 대단면 터널 등이 있다.In general, a tunnel is divided into a mountain tunnel for forming a road or a railroad that passes through a hillside, and a city tunnel formed in the underground of an urban area. Tunnels, especially those used in mountain tunnels, include parallel tunnels, two-arch tunnels, and large section tunnels, depending on their type.

2아치 터널이라 함은 중앙 지지벽을 기준으로 양측에 2개의 아치형 터널을 구비한 터널로써, 상기 2개의 아치형 본선터널로 차량이 운행 가능하도록 한 터널을 일컫는다. 따라서, 터널 간에 이격거리가 없어서 공간의 효율성에서 우수한 측 면이 있었다.The two-arch tunnel is a tunnel having two arched tunnels on both sides of the central support wall, and refers to a tunnel in which a vehicle can be operated by the two arched main tunnels. Therefore, there was no separation distance between tunnels, which resulted in an excellent aspect of space efficiency.

하지만, 차선수가 많은 도로와 연결되는 터널은 최소한 2개 이상의 터널을 나란하게 시공하는 경우가 자주 발생한다. 이러한 병렬 터널은 굴착 시 및 시공 후 안정성을 고려하여 터널간의 최소한의 이격거리를 두고 시공하여야 한다.However, tunnels that are connected to many roads often have at least two tunnels installed side by side. These parallel tunnels should be constructed with minimum separation distance between tunnels in consideration of stability during excavation and after construction.

왜냐하면, 터널입구는 풍화암에 가까운 암반으로 구성되어 있어 안정성이 떨어지기 때문이다. 참고로 한국도로공사 도로설계기준 터널편에서는 터널간의 최소한의 이격거리를 굴착 폭의 2~3배를 기준으로 정해놓고 있다.This is because the tunnel inlet is composed of rocks close to the weathered rock, which results in poor stability. For reference, at the Korea Highway Corporation Road Design Standard Tunnel, the minimum separation distance between tunnels is based on 2-3 times the excavation width.

이러한 상기의 병렬터널은 이격거리 설치에 대한 용지구입과 인접구조물(교량 및 교차로 등)의 설치 시 많은 문제점이 존재하였다.Such a parallel tunnel has a lot of problems when the paper purchase and installation of adjacent structures (bridges and intersections, etc.) for the separation distance installation.

더욱이, 최근에 부각되는 환경적인 측면으로 인하여 자전거의 사용을 장려하면서 자전거 전용도로가 확대되고 있다.Moreover, due to the recent environmental aspects, the road for bicycles is expanding while encouraging the use of bicycles.

하지만, 터널에는 자전거 전용도로를 별도로 구획하게 되는 경우에는 도로의 혼잡함이 증가하게 되는 문제점이 발생하였다.However, in the case of separately partitioning the bicycle-only road in the tunnel, there is a problem that the road congestion increases.

본 발명은 상기한 종래의 문제점을 해결하기 위한 것으로서, 본 발명의 목적은 2아치본선터널 외측으로 확장되는 확장본선터널이 더 구비됨으로 인하여 사람이 통행할 수 있는 인도 또는 자전거 전용도로의 역할을 수행할 수 있는 별도의 터널이 구비되는 확장터널부를 가지는 2아치터널을 제공하는 데에 있다.The present invention is to solve the above-mentioned problems, the object of the present invention serves as a sidewalk or bicycle path that can be passed by people because the expansion main tunnel is further extended to the outside of the two arch main tunnel It is to provide a two-arch tunnel having an expansion tunnel portion provided with a separate tunnel capable of.

본 발명의 다른 목적은 본 발명에 따른 확장터널부를 가지는 2아치터널을 시 공하는 방법을 제공하는 데에 있다.Another object of the present invention is to provide a method for constructing a two-arch tunnel having an extension tunnel according to the present invention.

상기와 같은 목적을 달성하기 위하여, 본 발명의 일 실시예에 따르면, 중앙지지벽 및 상기 중앙지지벽의 상부에서 좌우 양측으로 구비되어 상기 중앙지지벽과 연속된 면을 형성하는 한 쌍의 2아치본선터널을 가지는 메인터널부 및 상기 2아치 본선터널의 외측에서 상기 2아치본선터널과 연속된 면을 형성하는 분리지지벽 및 상기 분리지지벽에서 외측으로 구비되어 상기 분리지지벽과 연속된 면을 형성하는 확장본선터널을 가지는 확장터널부를 포함하여 구성되는 확장터널부를 가지는 2아치터널을 제공한다.In order to achieve the above object, according to an embodiment of the present invention, a pair of two arches provided on both the left and right sides of the central support wall and the upper portion of the central support wall to form a continuous surface with the central support wall A main tunnel portion having a main tunnel and a separating support wall which forms a continuous surface with the second arch main tunnel at an outer side of the 2-arch main tunnel, and an outer surface of the separating support wall that is provided outwardly. It provides a two-arch tunnel having an extension tunnel configured to include an extension tunnel having an extension main tunnel to form.

여기에서, 상기 확장터널부의 확장본선터널은 바닥부에서부터 천단부까지의 높이가 상기 메인터널부의 2아치본선터널 보다 낮게 형성될 수 있다.Herein, the extension main tunnel of the extension tunnel may have a height from the bottom to the top end lower than the two arch main tunnel of the main tunnel.

본 실시예에 따른 상기 확장터널부는 상기 메인터널부의 좌우 양측에 한 쌍으로 구비될 수 있다.The expansion tunnel part according to the present embodiment may be provided in pairs on both left and right sides of the main tunnel part.

본 실시예에 따른 상기 분리지지벽은 상기 2아치본선터널 및 확장본선터널의 진행 방향을 따라 복수 개의 조립체로 구비되며, 상기 복수 개의 조립체 사이에는 상기 2아치본선터널터널 및 확장본선터널이 상호 연통되도록 복수 개의 개구부가 구비될 수 있다.The separating support wall according to the present embodiment is provided with a plurality of assemblies along a traveling direction of the two-arch main tunnel and the extended main tunnel, and the two-arch main tunnel and the extended main tunnel communicate with each other. It may be provided with a plurality of openings.

여기에서, 상기 개구부에는 투명한 재질의 차단판이 구비될 수 있다.Here, the opening may be provided with a blocking plate of a transparent material.

또한, 상기 분리지지벽의 복수 개의 조립체 중 적어도 하나의 조립면에 상단에서부터 상기 개구부를 지나 바닥면까지 관통되는 배수홀을 더 포함하여 이루어 질 수 있다.In addition, at least one assembly surface of the plurality of assembly of the separation support wall may further comprise a drainage hole penetrating through the opening from the top to the bottom surface.

본 실시예에 따른 상기 분리지지벽은 상기 확장본선터널의 중앙에서 상기 중앙지지벽이 구비되는 방향으로 치우치게 비대칭으로 구비될 수 있다.The separating support wall according to the present embodiment may be asymmetrically biased in a direction in which the central support wall is provided at the center of the extended main tunnel.

본 발명의 일 실시예에 따른 확장터널부를 가지는 2아치터널의 시공방법은 중앙에 메인 파일럿터널 및 상기 메인 파일럿터널을 중심으로 하여 좌우 양측 중 적어도 어느 한 방향으로 소정거리 이격되는 확장 파일럿터널을 굴착하는 파일럿터널 굴착단계, 상기 메인 파일럿터널 및 상기 확장 파일럿터널 각각의 중앙에 중앙지지벽 및 분리지지벽을 설치하는 지지벽 설치단계, 상기 메인 파일럿터널에 설치된 중앙지지벽의 상부에서 좌우 양측으로 상기 중앙지지벽과 연속된 면을 형성하도록 한 쌍의 2아치본선터널을 굴착하는 단계 및 상기 확장 파일럿터널에 설치된 분리지지벽 외측으로 상기 분리지지벽과 연속된 면을 형성하도록 확장본선터널을 굴착하는 단계를 포함하여 구성될 수 있다.Construction method of a two-arch tunnel having an extension tunnel according to an embodiment of the present invention excavates an expansion pilot tunnel spaced a predetermined distance in at least one of the left and right sides around the main pilot tunnel and the main pilot tunnel in the center. A pilot tunnel excavation step, a support wall installation step of installing a central support wall and a separating support wall at the center of each of the main pilot tunnel and the extended pilot tunnel, the left and right sides of the central support wall installed in the main pilot tunnel; Digging a pair of two arch main tunnels to form a continuous surface with a central support wall; and digging an extended main tunnel to form a continuous surface with the separation support wall outside the separation support wall installed in the extension pilot tunnel. It may comprise a step.

여기에서, 확장본선터널을 굴착하는 단계에서는 상기 한 쌍의 2아치본선터널을 굴착하는 단계를 통해 형성된 2아치본선터널보다 낮게 굴착할 수 있다.Here, in the excavation of the extended main tunnel, the excavation can be carried out lower than the two arch main tunnel formed through the excavation of the pair of two arch main tunnels.

본 실시예에 따른 상기 파일럿터널 굴착단계에서는 상기 메인 파일럿터널을 중심으로 하여 좌우 양측으로 소정거리 이격되도록 확장 파일럿터널을 굴착하여 지지벽 설치단계에서 분리지지벽을 각각 설치하고, 확장본선터널을 굴착하는 단계에서 상기 한 쌍의 2아치본선터널의 좌우 양측에 한 쌍의 확장본선터널을 굴착할 수 있다.In the pilot tunnel excavation step according to the present embodiment, the expansion pilot tunnel is excavated to be spaced a predetermined distance to the left and right sides with respect to the main pilot tunnel to install a separate support wall in the support wall installation step, respectively, excavating the expansion main tunnel In a step may be excavated a pair of expansion main tunnel on the left and right sides of the pair of two arch main tunnel.

본 발명의 다른 실시예에 따른 확장터널부를 가지는 2아치터널 시공방법은 중앙에 메인 파일럿터널 및 상기 메인 파일럿터널을 중심으로 하여 좌우 양측 중 적어도 어느 한 방향으로 소정거리 이격되는 확장 파일럿터널을 굴착하는 파일럿터널 굴착단계, 상기 메인 파일럿터널의 중앙에 중앙지지벽을 설치하는 중앙지지벽 설치단계, 상기 확장 파일럿터널의 중앙에서 상기 중앙지지벽이 설치되는 방향으로 치우치게 비대칭 지지벽을 설치하는 비대칭 지지벽 설치단계 및 상기 메인 파일럿터널에 설치된 중앙지지벽의 상부에서 좌우 양측으로 상기 중앙지지벽과 연속된 면을 형성하도록 한 쌍의 2아치본선터널을 굴착하는 단계를 포함하여 구성될 수 있다.According to another embodiment of the present invention, a two-arch tunnel construction method having an extension tunnel unit includes excavating an extended pilot tunnel spaced a predetermined distance in at least one of left and right sides about a main pilot tunnel and the main pilot tunnel at the center thereof. A pilot support tunnel excavation step, a central support wall installation step for installing a central support wall in the center of the main pilot tunnel, an asymmetric support wall for installing an asymmetric support wall in a direction in which the central support wall is installed in the center of the extended pilot tunnel And a step of excavating a pair of two arch main tunnels to form a continuous surface with the central support wall at both the left and right sides of the top of the central support wall installed in the main pilot tunnel.

상기의 구성을 가지는 본 발명에 따른 확장터널부를 가지는 2아치터널 및 이의 시공방법은 다음과 같은 효과가 있다.The two-arch tunnel having an extension tunnel according to the present invention having the above configuration and a construction method thereof have the following effects.

첫째, 2아치본선터널 외측으로 별도의 확장본선터널이 구비됨으로 인하여 확장터널을 통해 사람이 통행할 수 있는 인도 또는 자전거 전용도로 사용될 수 있는 장점이 있다.First, since a separate expansion main tunnel is provided outside the 2 arch main tunnel, there is an advantage that it can be used as a road for exclusive use of a sidewalk or a bicycle that a person can pass through the expansion tunnel.

둘째, 2아치본선터널과 확장본선터널 사이에 구비되는 분리지지벽이 상호 연통되는 개구부가 형성되고, 상기 개구부에 투명한 재질의 차단판 또는 창틀이 구비되어 확장본선터널이 보다 넓게 보이는 효과가 있을 뿐만 아니라 2아치본선터널을 통과하는 차량에서 방출되는 배기가스가 상기 확장본선터널로 유입되는 것을 차단하여 쾌적한 환경을 유지시킬 수 있는 이점이 있다.Secondly, an opening is formed in which the separating support walls provided between the two-arch main tunnel and the extended main tunnel are in communication with each other, and the opening of the extended main tunnel is made wider by providing a blocking plate or a window frame made of a transparent material in the opening. In addition, the exhaust gas emitted from the vehicle passing through the 2-arch main tunnel is prevented from flowing into the extended main tunnel, thereby maintaining a pleasant environment.

셋째, 확장본선터널의 높이가 2아치본선터널보다 낮게 구비됨으로 인하여 2 아치본선터널의 중앙지지벽에 걸리는 이완하중이 최소화되는 효과가 있다.Third, since the height of the extended main tunnel is provided lower than that of the two arch main tunnel, the loosening load on the central support wall of the two arch main tunnel is minimized.

넷째, 분리지지벽의 복수 개의 조립체 중 적어도 하나의 조립면에 상단에서부터 상기 개구부를 지나 바닥면까지 관통되는 배수홀이 더 구비되어 배수가 원활하게 이루어질 수 있는 장점이 있다.Fourth, there is an advantage that the drainage hole is further provided in the at least one assembly surface of the plurality of assemblies of the separation support wall through the opening to the bottom surface through the opening can be smoothly drained.

다섯째, 분리지지벽을 비대칭지지벽으로 형성하는 경우에는 확장터널부를 시공하기 위해 굴착하는 확장 파일럿터널의 일부를 확장본선터널로 사용할 수 있어 공정이 단축되는 효과가 있다.Fifth, when the separation support wall is formed as an asymmetric support wall, a part of the expansion pilot tunnel that is excavated to construct the expansion tunnel portion can be used as the expansion main tunnel, thereby reducing the process.

이하 본 발명의 목적이 구체적으로 실현될 수 있는 본 발명의 바람직한 실시예를 첨부된 도면을 참조하여 설명한다. 본 실시예를 설명함에 있어서, 동일 구성에 대해서는 동일 명칭 및 동일 부호가 사용되며 이에 따른 부가적인 설명은 생략하기로 한다.DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, preferred embodiments of the present invention will be described with reference to the accompanying drawings. In describing the present embodiment, the same designations and the same reference numerals are used for the same components, and further description thereof will be omitted.

먼저, 도 1 내지 도 3을 참조하여 본 발명에 따른 확장터널부를 가지는 2아치터널의 구성을 설명하면 다음과 같다. 여기서 도 1은 본 발명의 일 실시예에 따른 확장터널부를 가지는 2아치터널의 단면도이고, 도 2는 도 1의 분리지지벽의 일부를 나타내는 상태도이며, 도 3은 도 2의 분리지지벽의 개구부를 나타내는 상태도이다.First, referring to Figures 1 to 3, the configuration of the two-arch tunnel having an extension tunnel according to the present invention will be described. 1 is a cross-sectional view of a two arch tunnel having an extension tunnel according to an embodiment of the present invention, Figure 2 is a state diagram showing a part of the separation support wall of Figure 1, Figure 3 is an opening of the separation support wall of Figure 2 It is a state diagram which shows.

도 1에 도시된 바와 같이, 본 발명의 일 실시예에 따른 확장터널부를 가지는 2아치터널은 크게, 중앙지지벽(120) 및 2아치본선터널(220, 240)을 가지는 메인터널부 및 분리지지벽(140, 160) 및 확장본선터널(320, 340)을 가지는 확장터널부를 포함하여 구성된다.As shown in FIG. 1, a two-arch tunnel having an expansion tunnel according to an embodiment of the present invention is largely divided into a main tunnel portion having a central support wall 120 and two arch main tunnels 220 and 240 and separated support. It includes an extension tunnel having a wall (140, 160) and the extension main tunnel (320, 340).

여기에서, 상기 중앙지지벽(120)은 메인 파일럿터널(20)의 길이 방향을 따라 구비되며, 상기 메인 파일럿터널(20)의 정 중앙에 위치하도록 설치되어 상기 2아치본선터널(220, 240)이 붕괴되는 것을 방지함과 동시에 상기 2아치본선터널(220, 240)의 중앙분리대 역할을 담당하게 된다.Here, the central support wall 120 is provided along the longitudinal direction of the main pilot tunnel 20, and is installed to be located at the center of the main pilot tunnel 20, so that the two arch main tunnels 220 and 240 are provided. It prevents the collapse and at the same time plays the role of a central separator of the two arch main tunnel (220, 240).

즉, 상기 중앙지지벽(120)은 상기 메인 파일럿터널(20)을 지지함에 있어, 상기 메인 파일럿터널(20)의 천단부방향으로부터 가해지는 응력 및 축력에 대응하여 지반의 붕락을 1차적으로 방지하는 역할을 하게 된다.That is, when supporting the main pilot tunnel 20, the central support wall 120 primarily prevents the collapse of the ground in response to the stress and axial force applied from the top end direction of the main pilot tunnel 20. It will play a role.

상기 중앙지지벽(120)과 상기 메인 파일럿터널(20)의 천단부(24) 사이에는 메인 크라운(22)이 설치된다.A main crown 22 is installed between the central support wall 120 and the top end portion 24 of the main pilot tunnel 20.

또한, 상기 중앙지지벽(120)은 상기 2아치본선터널(220, 240)과 연속된 면을 형성하고, 상기 2아치본선터널(220, 240)의 라이닝 콘크리트(226, 246)가 하부까지 연장되도록 형성된다.In addition, the central support wall 120 forms a continuous surface with the 2 arch main tunnels 220 and 240, and the lining concrete 226 and 246 of the 2 arch main tunnels 220 and 240 extends to the bottom. It is formed to be.

본 실시예에 따른 상기 2아치본선터널(220, 240)은 상기 메인 파일럿터널(20) 굴착 후에 상기 중앙지지벽(120)이 설치된 상태에서 상기 중앙지지벽(120)을 중심으로 좌우 양측으로 아치 형상으로 굴착된다.The two arch main tunnels 220 and 240 according to the present exemplary embodiment are arched to the left and right sides around the center support wall 120 in the state where the center support wall 120 is installed after the main pilot tunnel 20 is excavated. Excavated into shape.

상기 2아치본선터널(220, 240)의 바닥부(222, 242)는 포장콘크리트가 타설되어 차량의 이동을 원활하게 하고, 상기 2아치본선터널(220, 240)의 아치 형상의 내면에는 라이닝 콘크리트(226, 246)가 타설된다.The bottom portions 222 and 242 of the 2 arch main tunnels 220 and 240 are paved with concrete to facilitate the movement of the vehicle, and the lining concrete is formed on the inner surface of the arch of the 2 arch main tunnels 220 and 240. 226, 246 are poured.

본 실시예에 따른 상기 분리지지벽(140, 160)은 확장 파일럿터널(40, 60)의 길이 방향을 따라 구비되며, 상기 확장 파일럿터널(40, 60)의 정 중앙에 위치하도록 설치되어 상기 확장본선터널(320, 340)이 붕괴되는 것을 방지함과 동시에 상기 확장본선터널(320, 340)의 분리대 역할을 담당하게 된다.The separating support walls 140 and 160 according to the present exemplary embodiment are provided along the lengthwise direction of the extended pilot tunnels 40 and 60, and are installed to be located at the center of the extended pilot tunnels 40 and 60. While preventing the main ship tunnels 320 and 340 from collapsing, the main ship tunnels 320 and 340 serve as separators of the extended main ship tunnels 320 and 340.

즉, 상기 분리지지벽(140, 160) 은 상기 중앙지지벽(120)과 마찬가지로 상기 분리지지벽(140, 160)과 상기 확장 파일럿터널(40, 60)의 천단부(44, 64) 사이에는 확장 크라운(42, 62)이 설치되어 상기 확장 파일럿터널(40, 60)을 지지함에 있어, 상기 확장 파일럿터널(40, 60)의 천단부(44, 64)방향으로부터 가해지는 응력 및 축력에 대응하여 지반의 붕락을 1차적으로 방지하는 역할을 하게 된다.That is, the separation support walls 140 and 160 are disposed between the separation support walls 140 and 160 and the top ends 44 and 64 of the extended pilot tunnels 40 and 60 similarly to the central support wall 120. The expansion crowns 42 and 62 are installed to support the expansion pilot tunnels 40 and 60 to cope with stresses and axial forces applied from the top ends 44 and 64 of the expansion pilot tunnels 40 and 60, respectively. The primary role is to prevent the collapse of the ground.

상기 분리지지벽(140, 160) 은 도 2 및 도 3에 도시된 바와 같이, 상기 2아치본선터널(220, 240) 및 확장본선터널(320, 340)의 진행 방향을 따라 구비되고, 상기 2아치본선터널(220, 240) 및 확장본선터널(320, 340)이 상호 연통되도록 복수 개의 개구부(142)가 구비된다.As shown in FIGS. 2 and 3, the separating support walls 140 and 160 are provided along the traveling directions of the two arch main tunnels 220 and 240 and the extended main tunnels 320 and 340. A plurality of openings 142 are provided to allow the arch main tunnel 220 and 240 and the extended main tunnel 320 and 340 to communicate with each other.

여기에서, 상기 복수 개의 개구부(142)에는 투명한 재질의 차단판(144)이 구비된다. 본 실시예에서, 상기 차단판(144)은 투명한 유리재질로 이루어질 수 있다.Here, the plurality of openings 142 is provided with a blocking plate 144 of a transparent material. In this embodiment, the blocking plate 144 may be made of a transparent glass material.

한편, 상기 개구부(142)에 새시와 같은 창틀을 구비하여 상기 개구부(142)에 투명한 유리창을 설치할 수도 있다.On the other hand, by providing a window frame, such as a chassis in the opening 142 may be provided with a transparent glass window in the opening 142.

도 2 및 도 3에 도시된 바와 같이, 본 실시예에 따른 상기 분리지지벽(140)은 상기 2아치본선터널터널(220, 240) 및 확장본선터널(320, 340)의 진행 방향을 따라 복수 개의 조립체로 구비될 수 있다. 여기에서, 상기 개구부(142)는 상기 복 수 개의 조립체 사이에 구비된다.2 and 3, the separation support wall 140 according to the present embodiment has a plurality of secondary arch main tunnel tunnels 220 and 240 and expansion main tunnels 320 and 340 along the advancing direction. It can be provided with two assemblies. Here, the opening 142 is provided between the plurality of assemblies.

또한, 상기 분리지지벽(140)의 복수 개의 조립체 중 적어도 하나의 조립면에 상단에서부터 상기 개구부(142)를 지나 바닥면까지 관통되는 배수홀(146a, 146,b)이 구비된다. 여기에서 상기 배수홀(146a, 146b)은 상기 분리지지벽(140)의 상면을 통해 유입되는 수분이 상기 개구부(142)에 형성되는 상기 차단판(144)을 우회하여 바닥면 까지 안내하는 역할을 담당한다.In addition, at least one assembly surface of the plurality of assemblies of the separation support wall 140 is provided with drainage holes 146a, 146, b penetrating from the top to the bottom surface through the opening 142. Here, the drain holes 146a and 146b serve to guide the water flowing through the upper surface of the separation support wall 140 to the bottom surface by bypassing the blocking plate 144 formed in the opening 142. In charge.

본 실시예에서 상기 개구부(142) 상단의 형상은 원형을 이루고 있는 것을 일 예로 하고 있으나 이에 한정되지 않고, 상기 배수홀(146a, 146b)을 통해 수분이 상기 차단판(144)을 우회할 수 있도록 상부로 갈수록 단면적이 감소하는 모든 형상이 가능하다.In this embodiment, the shape of the upper end of the opening 142 is an example, but is not limited thereto, and the water may bypass the blocking plate 144 through the drain holes 146a and 146b. All shapes are possible with decreasing cross-sectional area towards the top.

또한, 도 2 및 도 3에 도시된 바와 같이, 본 실시예에서 상기 배수홀(146a,146b)은 상기 차단판(144)을 우회하여 바닥면까지 배출되도록 형성되어 있는 것을 예시하고 있으나 이에 한정되지 않고, 상기 개구부(142)가 바닥면 까지 형성되어 상기 차단판(144)이 바닥면에서부터 구비될 수도 있고, 상기 배수홀(146a, 146b)의 형태도 다양하게 이루어질 수 있다.In addition, as illustrated in FIGS. 2 and 3, the drain holes 146a and 146b are formed to bypass the blocking plate 144 to be discharged to the bottom surface in the present embodiment, but is not limited thereto. Instead, the opening 142 may be formed to the bottom surface such that the blocking plate 144 may be provided from the bottom surface, and the drain holes 146a and 146b may have various shapes.

상기 분리지지벽(140, 160)의 형상은 상기 중앙지지벽(120)과 대동소이하게 이루어져 상세한 설명은 생략하기로 한다.Shapes of the separation support walls 140 and 160 are substantially the same as the center support wall 120, and thus detailed description thereof will be omitted.

본 실시예에 따른 상기 확장본선터널(320, 340)은 상기 분리지지벽(140, 160)에서 외측으로 구비되어 상기 분리지지벽(140, 160)과 연속된 면을 형성하도록 아치 형상으로 굴착된다.The extended main tunnels 320 and 340 according to the present embodiment are provided outwardly from the separation support walls 140 and 160 and are excavated in an arch shape to form a continuous surface with the separation support walls 140 and 160. .

상기 확장본선터널(320, 340)은 도 1에 도시된 바와 같이, 상기 2아치본선터널(220, 240)의 좌우측 양측에 대칭을 이루도록 구비되어 상행과 하행을 이루는 것이 바람직하다.As shown in FIG. 1, the extended main tunnels 320 and 340 are provided to be symmetrical to both left and right sides of the two arch main tunnels 220 and 240 to form an up and down line.

본 실시예에 따른 상기 2아치본선터널(220, 240)은 일반적으로 차량이 주로 이용하는 4차선 터널로 사용되고, 상기 확장본선터널(320, 340)은 상기 2아치본선터널(220, 240)과 마찬가지로 차량이 이용할 수도 있으나 사람의 통행이 가능한 인도로 활용하거나 자전거 전용도로로 활용하는 더 효율적이다.The two arch main tunnels 220 and 240 according to the present embodiment are generally used as a four lane tunnel mainly used by vehicles, and the extended main tunnels 320 and 340 are similar to the two arch main tunnels 220 and 240. It can be used by vehicles, but it is more efficient to use as a road where people can pass or as a bicycle path.

이처럼, 사람의 통행이 가능한 인도로 활용하거나 자전거 전용도로로 주로 이용되는 상기 확장본선터널(320, 340)이 상기 2아치본선터널(220, 240)의 좌우측 양측에 대칭적으로 이루어지는 것에 한정되지 않고, 상기 2아치본선터널(220, 240)의 일측에 단독으로 구비된 확장본선터널(320, 340) 내부에서 차선을 구획하는 것도 가능하다.As described above, the extension main tunnels 320 and 340 which are used as a sidewalk or a bicycle lane are not symmetrically formed on both left and right sides of the two arch main tunnels 220 and 240. It is also possible to partition the lanes inside the extended main tunnels 320 and 340 provided on one side of the two arch main tunnels 220 and 240 alone.

상기 확장터널부를 가지는 2아치터널의 전체적인 형상이 아크 형상에 가깝게 되어 상기 2아치본선터널의 중앙지지벽에 걸리는 이완하중을 최소화하기 위하여, 상기 확장본선터널(320, 340)은 상기 확장본선터널(320, 340)의 바닥부(322, 342)에서부터 상기 확장본선터널(320, 340)의 천단부(324, 344)까지의 높이(L2)가 상기 2아치본선터널(220, 240)의 바닥부(222, 242)에서부터 상기 2아치본선터널(220, 240)의 천단부(224, 244)까지의 높이(L1) 보다 낮게 형성되는 것이 바람직하다.In order to minimize the loosening load applied to the central support wall of the 2-arch main tunnel, the overall main shape of the 2-arch tunnel having the extended tunnel part is closer to the arc shape. The height L2 from the bottom portions 322 and 342 of the 320 and 340 to the top ends 324 and 344 of the extended main tunnels 320 and 340 is the bottom portion of the two arch main tunnels 220 and 240. It is preferable to form lower than the height (L1) from (222, 242) to the top ends (224, 244) of the two arch main tunnel (220, 240).

다음으로 본 발명의 다른 실시예에 따른 확장터널부를 가지는 2아치터널에 대하여 도 4 및 도 5를 참조하여 설명하면 다음과 같다. 여기에서, 도 4는 본 발 명의 다른 실시예에 따른 확장터널부를 가지는 2아치터널의 단면도이고, 도 5는 도 4의 분리지지벽이 비대칭지지벽으로 이루어져 시공된 상태를 나타내는 상태도이다.Next, a two-arch tunnel having an extension tunnel according to another embodiment of the present invention will be described with reference to FIGS. 4 and 5. 4 is a cross-sectional view of a two arch tunnel having an expansion tunnel according to another embodiment of the present invention, and FIG. 5 is a state diagram showing a state in which the separated support wall of FIG. 4 is constructed of an asymmetric support wall.

본 실시예에 따른 확장터널부를 가지는 2아치터널은 상술한 실시예와 대동소이한 구조로 이루어져 있어 상술한 실시예와 동일한 부분에 대해서는 생략하고, 차이를 보이는 부분에 대해서 자세하게 설명하기로 한다.The two-arch tunnel having the expansion tunnel according to the present embodiment has a structure similar to that of the above-described embodiment, and therefore, the same parts as those of the above-described embodiment will be omitted and the parts showing the difference will be described in detail.

본 실시예에 따르면, 상기 확장본선터널(360, 380)은 상기 확장 파일럿터널(30, 50)을 이용하게 된다. 즉, 상기 확장 파일럿터널(30, 50)을 굴착한 후에 상기 확장 파일럿터널(30, 50)을 지지하는 상기 분리지지벽(130, 150)을 상기 확장 파일럿터널(30, 50)의 중앙에서부터 상기 중앙지지벽(120)방향으로 치우치도록 비대칭 지지벽(130, 150)으로 설치한다.According to the present embodiment, the extended main tunnels 360 and 380 use the extended pilot tunnels 30 and 50. That is, after digging the expansion pilot tunnels 30 and 50, the separation support walls 130 and 150 supporting the expansion pilot tunnels 30 and 50 are moved from the center of the expansion pilot tunnels 30 and 50. It is installed as an asymmetric support wall (130, 150) to be biased in the direction of the center support wall (120).

이에 따라, 상기 확장 파일럿터널(30, 50)은 상기 비대칭 지지벽(130, 150)으로 인하여 최후에 상기 2아치본선터널(220, 240)로 사용되는 파일럿터널부(30a)와 상기 확장본선터널(360, 380)로 사용되는 본선터널부(30b)로 구획된다.Accordingly, the extended pilot tunnels 30 and 50 are pilot tunnels 30a and the extended main tunnel, which are used as the second arch main tunnels 220 and 240 lastly due to the asymmetric support walls 130 and 150. It is divided into the main ship tunnel portion 30b used as (360, 380).

따라서, 상기 본선터널부(30b)가 상기 확장본선터널(360, 380)을 대신하게 됨으로 인하여 상기 확장 파일럿터널(30, 60)을 굴착할 때에 상술한 실시예와 같이, 상기 2아치본선터널(220, 240)의 바닥부(222, 242)에서부터 상기 2아치본선터널(220, 240)의 천단부(224, 244)까지의 높이(L1) 보다는 낮은 높이(L2)로 굴착함으로써, 상기 확장본선터널(360, 370)은 상기 확장본선터널(360, 380)의 바닥부(362, 382)에서부터 상기 확장본선터널(360, 360)의 천단부(364, 384)까지의 높이(L2)가 결정된다.Therefore, when the main pilot tunnel portion 30b replaces the extended main tunnels 360 and 380, when excavating the extended pilot tunnels 30 and 60, as in the above-described embodiment, the second arch main tunnel ( The expansion main line is excavated to a height L2 lower than the height L1 from the bottom portions 222 and 242 of the 220 and 240 to the top ends 224 and 244 of the two arch main tunnels 220 and 240. The tunnels 360 and 370 are determined by the height L2 from the bottom portions 362 and 382 of the extended main tunnels 360 and 380 to the top ends 364 and 384 of the extended main tunnels 360 and 360. do.

본 실시예에 따른 상기 비대칭 지지벽(130, 150)과 상기 확장 파일럿터널(30, 30)의 천단부(34, 54) 사이에는 확장크라운(32, 52)이 설치되며, 상기 비대칭 지지벽(130, 150)은 상기 확장본선터널(360, 380)의 바닥부(362, 382)에서 상기 확장 파일럿터널(30, 50)의 천단부(34, 54)와 연결되어 상기 확장 파일럿터널(30, 50) 및 확장본선터널(360, 380)을 지지하게 된다.Expansion crowns 32 and 52 are installed between the asymmetric support walls 130 and 150 and the top ends 34 and 54 of the extended pilot tunnels 30 and 30 according to the present embodiment. 130 and 150 are connected to top ends 34 and 54 of the extended pilot tunnels 30 and 50 at bottoms 362 and 382 of the extended main tunnels 360 and 380, respectively. 50) and the extension main tunnel 360, 380.

도 5에 도시된 바와 같이, 상기 확장 파일럿 터널(30)이 굴착됨과 동시에 상기 비대칭 지지벽(130)이 설치됨으로 인하여, 상기 확장 파일럿터널(30)을 길이 방향을 따라 계속해서 굴착해 나가는 동안에 상기 본선터널부(30b)을 통해 상기 확장 파일럿터널(30)의 굴착에 사용되는 장비를 원활하게 공급할 수 있는 효과가 있다. 즉, 상기 본선터널부(30b)가 장비이동통로로서의 역할을 담당하게 되는 것이다.As shown in FIG. 5, while the expansion pilot tunnel 30 is excavated and the asymmetric support wall 130 is installed, the expansion pilot tunnel 30 is continuously excavated along the longitudinal direction. There is an effect that can smoothly supply the equipment used for the excavation of the expansion pilot tunnel 30 through the main ship tunnel portion 30b. That is, the main tunnel portion 30b is to play a role as the equipment movement path.

끝으로, 도 6 및 도 7을 참조하여 본 발명의 여러 실시예들에 따른 각각의 시공방법에 대하여 설명하면 다음과 같다. 여기에서, 도 6은 본 발명의 일 실시예에 따른 확장터널부를 가지는 2아치터널의 시공방법을 나타내는 순서도이고, 도 7은 본 발명의 다른 실시예에 따른 확장터널부를 가지는 2아치터널의 시공방법을 나타내는 순서도이다.Finally, each construction method according to various embodiments of the present invention will be described with reference to FIGS. 6 and 7 as follows. 6 is a flow chart showing a construction method of a two-arch tunnel having an extension tunnel according to an embodiment of the present invention, Figure 7 is a construction method of a two-arch tunnel having an extension tunnel according to another embodiment of the present invention It is a flow chart showing.

본 발명의 일 실시예에 따른 확장터널부를 가지는 2아치터널의 시공방법은 파일럿터널 굴착단계(S1), 지지벽 설치단계(S3), 한 쌍의 2아치본선터널을 굴착하는 단계(S5) 및 확장본선터널을 굴착하는 단계(S8)를 포함하여 구성된다.Construction method of the two-arch tunnel having an extension tunnel according to an embodiment of the present invention is the pilot tunnel excavation step (S1), the support wall installation step (S3), excavating a pair of two arch main tunnel (S5) and It is configured to include a step (S8) for excavating the expansion main tunnel.

여기에서, 상기 파일럿터널 굴착단계(S1)에서 상기 메인 파일럿터널(20) 및 확장 파일럿터널(40, 60)을 굴착하는 과정은 다음과 같다.Here, the process of excavating the main pilot tunnel 20 and the extended pilot tunnel (40, 60) in the pilot tunnel excavation step (S1) is as follows.

먼저, 굴착대상이 되는 시공환경을 측량한 후, 3붐 점보드릴(3BOOM JUMBODRILL)이나 레그햄머와 같은 수개의 착암기를 장착한 착암장비를 사용하여 발파패턴에 의한 천공장, 간격의 적정여부를 확인하여 발파공을 천공하는 천공작업을 한다.First, survey the construction environment to be excavated, and then check whether the fabric factory and the interval are appropriate by the blasting pattern using rock drilling equipment equipped with several rock drills such as 3BOOM JUMBODRILL or leg hammer. To drill the blast hole.

다음으로는, 상기 발파공에 장약량의 적정여부를 확인하여 화약을 장약하고, 발파를 실시한다. 그리고 나서, 상기 발파 후에 환기를 실시하고, 상기 환기 과정에서 불발장약의 확인과 진동에 의한 2차 붕괴 여부를 확인하고, 안전을 위하여 페이로더, 차징카, 서비스카 등을 사용하여 낙반과 부석처리 및 발파로 인해 생성된 낙석처리를 실시한다.Next, check the appropriate amount of the charge in the blast hole to charge the gunpowder, and to carry out blasting. Then, after the blasting, ventilation is carried out, and during the ventilation process, confirmation of the unfixed medicine and the secondary collapse due to vibration, and for safety, the fall and pumice treatment using a payloader, charging car, service car, etc. And the rockfall treatment generated due to the blasting.

다음으로는, 휠로더(WHEEL LOADER)와 덤프트럭(DUMP TRUCK)과 같은 적재기계와 운반기계를 사용하여 버럭처리를 실시한다. 다음, 습식 숏크리트 타설용 로봇식 장비 또는 로봇형 쇼크리트 머신 및 믹서트럭(레미콘)을 사용하여 1차 쇼크리트 작업을 실시하고, 유압식 자주이동 작업차와 같은 장비를 사용하여 와이어메쉬 또는 락볼트와 같은 지보재를 설치한 후, 1차 쇼크리트 작업과 유사하게 2차 쇼크리트 작업을 실시한다.Next, the bagging process is carried out using a loading machine such as a wheel loader and a dump truck, and a conveying machine. Next, use the robotic equipment for wet shotcrete placement or the robotic shockcrete machine and mixer truck (reconcrete) to perform the primary shockcrete, and use equipment such as hydraulic self-propelled work vehicles and wire mesh or rock bolts. After the same support material is installed, the second shockcrete work is carried out similarly to the first shockcrete work.

이와 같은 단계를 반복하여 상기 메인 파일럿터널(20)의 시공이 진행되고, 상기 메인 파일럿터널(20)과 좌우 양측으로 소정거리 이격되는 거리에 위와 같은 단계를 반복하여 상기 확장 파일럿터널(40, 60)을 굴착한다.By repeating the above steps, the construction of the main pilot tunnel 20 proceeds, and the above steps are repeated at a distance spaced a predetermined distance from both the left and right sides of the main pilot tunnel 20 to extend the pilot tunnels 40 and 60. Excavate).

상기 메인 파일럿터널(20) 및 확장 파일럿터널(40, 60) 굴착 시 발파 충격에 의해 상기 메인 파일럿터널(20) 및 확장 파일럿터널(40, 60)에 구비될 상기 중앙지 지벽(120) 및 분리지지벽(140, 160)이 파손되거나 이탈되지 않는 거리까지 굴착 되었는지 확인하는 단계(S2)를 거쳐 발파 충격을 벗어나기에 충분한 거리가 확보되지 않은 경우에는 충분한 거리까지 상기 메인 파일럿터널(20) 및 확장 파일럿터널(40, 60)을 더 굴착하게 된다.When the main pilot tunnel 20 and the extended pilot tunnel (40, 60) is excavated by the blasting shock, the central ground wall 120 and the separated support to be provided in the main pilot tunnel 20 and the extended pilot tunnel (40, 60) After checking whether the walls 140 and 160 have been excavated to a distance that is not broken or dislodged, the main pilot tunnel 20 and the expansion pilot may be up to a sufficient distance if a sufficient distance to escape the blasting shock is not secured. Further tunnels 40 and 60 will be excavated.

이와 같이, 상기 중앙지지벽(120) 및 분리지지벽(140, 160)이 파손되거나 이탈되지 않는 안전이격거리까지 굴착 되었는지 확인하는 단계(S2)를 통해 지지벽 설치가 가능한 경우에 상기 메인 파일럿터널(20) 및 상기 확장 파일럿터널(40, 60) 각각의 중앙에 중앙지지벽(120) 및 분리지지벽(140, 160)을 설치하는 상기 지지벽 설치단계(S3)를 진행하고, 양생시킨다.As such, when the support wall is installed through the step S2 of checking whether the central support wall 120 and the separation support walls 140 and 160 are excavated to a safe separation distance that is not damaged or separated, the main pilot tunnel is possible. 20 and the support wall installation step (S3) of installing the central support wall 120 and the separation support walls 140 and 160 in the center of each of the extension pilot tunnels 40 and 60, and cures.

일반적으로, 상기 안전이격거리는 일반적으로 50M이상으로 산정되나, 반드시 이에 한정되는 것은 아니며, 시공현장의 환경과 안전관리기준의 범위 내에서 다양한 변형과 수정이 가능할 것이다.In general, the safety separation distance is generally calculated as 50M or more, but is not necessarily limited thereto, and various modifications and modifications may be made within the scope of the construction site environment and safety management standards.

다음으로, 상기 중앙지지벽(120) 및 분리지지벽(140, 160)이 본선터널 굴착 시 발파 등의 충격에 파손되지 않을 정도로 양생 되었는지를 파악하는 단계(S4)를 통해 양생이 이루어지지 않은 경우에는 시간을 좀더 두고 양생을 시키고, 양생이 완료된 후에는 상기 중앙지지벽(120)을 중심으로 하여 상기 중앙지지벽(120) 상부에서 좌우 양측으로 상기 중앙지지벽(120)과 연속된 면을 형성하도록 한 쌍의 2아치본선터널을 굴착하는 단계(S5)를 진행한다.Next, if the curing is not made through the step (S4) to determine whether the central support wall 120 and the separation support wall (140, 160) is cured enough to not be damaged by the impact, such as blasting when excavating the main tunnel After the curing is more time, and after curing is completed to form a continuous surface with the central support wall 120 from the upper side of the central support wall 120 to the left and right sides around the center support wall 120. In order to excavate a pair of two arch main tunnel (S5) to proceed.

상기 한 쌍의 2아치본선터널(220, 240)을 굴착하는 과정에서 상기 2아치본선터널(220, 240)의 아치면 전체에 걸쳐 라이닝 콘크리트를 타설하는 단계(S6) 및 상 기 2아치본선터널(220, 240)의 바닥부(222, 242)에 포장 콘크리트를 타설하는 단계(S7)를 통해 상기 2아치본선터널(220, 240)을 완성하게 된다.In the process of excavating the pair of two arch main tunnels 220 and 240, placing lining concrete over the entire arch surface of the two arch main tunnels 220 and 240 (S6) and the second arch main tunnel. The second arch main tunnels 220 and 240 are completed through the step S7 of placing the pavement concrete on the bottom portions 222 and 242 of the 220 and 240.

그 다음으로 상기 확장본선터널을 굴착하는 단계(S8)에서는 상기 분리지지벽(140, 160) 의 양생이 완료되면 상기 확장본선터널(320, 340)을 상기 분리지지벽(140, 160)을 중심으로 하여 상기 분리지지벽(140, 160) 상부에서 좌우 양측으로 상기 분리지지벽(140, 160)과 연속된 면을 형성하도록 확장본선터널(320, 340)을 굴착한다.Next, in the step of excavating the expansion main tunnel (S8) when the curing of the separation support wall (140, 160) is completed, the expansion main tunnel (320, 340) to the center of the separation support wall (140, 160) As a result, the expanded main tunnels 320 and 340 are excavated to form a continuous surface with the separation support walls 140 and 160 from both sides of the separation support walls 140 and 160.

이 때에, 상기 확장본선터널(320, 340)은 상기 2아치본선터널(220, 240)의 높이(L1)에 비하여 낮은 높이(L2)로 굴착하게 된다. 이에 따른 상세한 설명은 앞선 설명으로 대신하도록 한다.At this time, the expansion main tunnel 320, 340 is excavated to a lower height (L2) than the height (L1) of the two arch main tunnel (220, 240). Detailed description accordingly will be replaced by the above description.

이와 같이, 상기 확장본선터널(320, 340)이 굴착되면, 상기 확장본선터널(320, 340)의 아치면 전체에 걸쳐 라이닝 콘크리트를 타설하는 단계(S9) 및 상기 확장본선터널(320, 340)의 바닥부(322, 324)에 포장 콘크리트를 타설하는 단계(S10)를 통해 상기 확장본선터널(320, 340)을 완성하게 된다.As such, when the expansion main tunnels 320 and 340 are excavated, placing lining concrete over the entire arch surface of the expansion main tunnels 320 and 340 (S9) and the expansion main tunnels 320 and 340. The expansion main tunnel (320, 340) is completed through the step (S10) of placing the pavement concrete on the bottom portion (322, 324).

본 실시예에서 상기 확장본선터널(320, 340)은 상술한 바와 같이, 상기 2아치본선터널(220, 240)의 좌우 양측으로 대칭을 이루도록 형성된다.In the present embodiment, the extended main tunnels 320 and 340 are formed to be symmetrical to both left and right sides of the two arch main tunnels 220 and 240 as described above.

상술한 바와 같은 단계를 통해 최종적으로 본 발명의 일 실시예에 따른 확장터널부를 가지는 2아치터널이 완성된다.Through the steps as described above, a two-arch tunnel having an extended tunnel part according to an embodiment of the present invention is finally completed.

본 발명의 다른 실시예에 따른 확장터널부를 가지는 2아치터널의 시공방법은 상술한 실시예와 유사하게 이루어진다. 여기에서는 상술한 실시예와 차이점에 대 해서만 구체적으로 설명하기로 한다.The construction method of the two-arch tunnel having the expansion tunnel according to another embodiment of the present invention is made similarly to the above-described embodiment. Here, only the differences from the above-described embodiment will be described in detail.

본 실시예에 따른 확장터널부를 가지는 2아치터널의 시공방법은 크게, 파일럿터널 굴착단계(S11), 중앙지지벽 설치단계(S13), 비대칭 지지벽 설치단계(S14) 및 한 쌍의 2아치본선터널을 굴착하는 단계(S16)를 포함하여 이루어진다.The construction method of the two-arch tunnel having the expansion tunnel according to the present embodiment is large, pilot tunnel excavation step (S11), central support wall installation step (S13), asymmetric support wall installation step (S14) and a pair of two arch main ship And excavating the tunnel (S16).

여기에서, 상기 파일럿터널 굴착단계(S11)에서는 중앙에 메인 파일럿터널(20) 및 상기 메인 파일럿터널(20)을 중심으로 하여 좌우 양측 중 적어도 어느 한 방향으로 소정거리 이격되는 확장 파일럿터널(30, 50)을 굴착한다. 이에 따른 상세한 설명은 생략하기로 한다.Here, in the pilot tunnel excavation step (S11), the expansion pilot tunnel 30, which is spaced a predetermined distance in at least one of the left and right sides of the main pilot tunnel 20 and the main pilot tunnel 20 at the center thereof, Excavation 50). Detailed description thereof will be omitted.

여기에서, 상기 확장 파일럿터널(30, 50)의 높이(L2)는 2아치본선터널(220, 240)이 형성될 높이(L1)에 비하여 보다 낮게 형성시키는 것이 바람직하다.The height L2 of the extended pilot tunnels 30 and 50 may be lower than the height L1 of the two arch main tunnels 220 and 240.

상기 메인 파일럿터널(20) 및 확장 파일럿터널(30, 50) 굴착 시 발파 충격에 의해 상기 메인 파일럿터널(20) 및 확장 파일럿터널(30, 50)에 구비될 상기 중앙지지벽(120) 및 분리지지벽(130, 150)이 파손되거나 이탈되지 않는 거리까지 굴착 되었는지 확인하는 지지벽 설치 가능여부 판단 단계(S12)를 거쳐 발파 충격을 벗어나기에 충분한 거리가 확보된 경우에 상기 메인 파일럿터널(20)중앙에 중앙지지벽(120)을 설치하는 상기 중앙지지벽 설치단계(S13)를 진행하고, 양생시킨다.The central support wall 120 to be provided in the main pilot tunnel 20 and the extended pilot tunnel (30, 50) and separation by the blasting impact when the main pilot tunnel 20 and the extended pilot tunnel (30, 50) excavation The main pilot tunnel 20 when a sufficient distance to escape the blasting shock is secured through the step (S12) of determining whether or not the support wall 130, 150 has been excavated to a distance that is not broken or separated. The central support wall installation step (S13) for installing the central support wall 120 in the center and proceeds to cure.

그 다음으로, 상기 확장 파일럿터널(30, 50)의 중앙에서 상기 중앙지지벽(120)이 설치되는 방향으로 치우치게 비대칭 지지벽(130, 150)을 설치하는 비대칭 지지벽 설치단계(S14)를 진행하고, 양생시킨다.Next, the asymmetric support wall installation step (S14) of installing the asymmetric support walls 130 and 150 in a direction in which the center support wall 120 is installed in the center of the extended pilot tunnels 30 and 50 is performed. And cure.

여기에서, 상기 지지벽 설치 가능여부 판단 단계(S12)를 통해 상기 메인 파 일럿터널(20)을 설치하는 단계(S11)와 상기 중앙지지벽(120)을 설치하는 단계(S13)는 일정한 시간 차를 두고 동시에 진행되는 것이다.Here, the step (S11) of installing the main pilot tunnel 20 and the step (S13) of installing the central support wall 120 through the step (S12) of determining whether the support wall can be installed is a constant time difference. It will go on at the same time.

마찬가지로, 상기 확장 파일럿터널(30, 50)을 굴착하는 단계(S11) 및 상기 비대칭 지지벽을 설치하는 단계(S14) 역시 상기 지지벽 설치 가능여부 판단 단계(S12)를 통해 일정한 거리를 두고 동시에 진행된다.Similarly, the step of excavating the expansion pilot tunnel (30, 50) (S11) and the step of installing the asymmetric support wall (S14) also proceeds at the same time at a predetermined distance through the support wall installation determination step (S12) do.

여기에서, 상기 비대칭 지지벽을 설치하는 단계(S14)를 통해 상기 비대칭 지지벽(130, 150)이 설치됨으로 인하여 상기 확장 파일럿터널(30, 50)의 굴착에 사용되는 장비의 이동통로를 제공하여 시공기간을 단축할 수 있게 된다.Here, by providing the asymmetric support wall (S14) through the installation of the asymmetric support wall (130, 150) by providing a moving passage of the equipment used for the excavation of the expansion pilot tunnel (30, 50) Construction period can be shortened.

다음으로, 상기 중앙지지벽(120) 및 비대칭 지지벽(130, 150)이 본선터널 굴착 시 발파 등의 충격에 파손되지 않을 정도로 양생 되었는지를 파악하는 단계(S15)를 통해 양생이 완료된 후에는 상기 중앙지지벽(120)을 중심으로 하여 상기 중앙지지벽(120) 상부에서 좌우 양측으로 상기 중앙지지벽(120)과 연속된 면을 형성하도록 한 쌍의 2아치본선터널을 굴착하는 단계(S16)를 진행한다.Next, after the curing is completed through the step (S15) to determine whether the central support wall 120 and the asymmetric support walls (130, 150) are not cured by impacts such as blasting when the main tunnel is excavated (S15) Excavating a pair of two arch main tunnels to form a continuous surface with the central support wall 120 from both the left and right sides of the center support wall 120 with the center support wall 120 as the center (S16). Proceed.

상기 한 쌍의 2아치본선터널(220, 240)을 굴착하는 과정에서 상기 2아치본선터널(220, 240)의 아치면 전체에 걸쳐 라이닝 콘크리트를 타설하는 단계(S17) 및 상기 2아치본선터널(220, 240)의 바닥부(222, 242)에 포장 콘크리트를 타설하는 단계(S18)를 통해 상기 2아치본선터널(220, 240)을 완성하게 된다.In the process of excavating the pair of two arch main tunnels 220 and 240, placing lining concrete over the entire arch surface of the two arch main tunnels 220 and 240 (S17) and the second arch main tunnel ( The second arch main tunnels 220 and 240 are completed through the step S18 of placing the pavement concrete on the bottom portions 222 and 242 of the 220 and 240.

그 다음으로, 확장 파일럿터널(30, 50)의 본선터널부(30b)를 상기 확장본선터널(360, 380)로 대체하여, 상기 확장본선터널(360, 380)의 아치면 전체에 걸쳐 라이닝 콘크리트를 타설하는 단계(S19) 및 상기 확장본선터널(360, 380)의 바닥 부(362, 382)에 포장 콘크리트를 타설하는 단계(S20)를 통해 상기 확장본선터널(360, 380)을 완성하게 된다.Subsequently, the main tunnel section 30b of the extended pilot tunnels 30 and 50 is replaced with the extended main tunnels 360 and 380 so that the lining concrete is spread over the entire arch surface of the extended main tunnels 360 and 380. The expansion main tunnel (360, 380) is completed through the step (S19) and the step (S20) of paving concrete in the bottom portion (362, 382) of the expansion main tunnel (360, 380). .

본 실시예에서 상기 확장본선터널(360, 380)은 상술한 바와 같이, 상기 2아치본선터널(220, 240)의 좌우 양측으로 대칭을 이루도록 형성된다.In the present embodiment, the extended main tunnels 360 and 380 are formed to be symmetrical to both the left and right sides of the two arch main tunnels 220 and 240 as described above.

상술한 바와 같은 단계를 통해 최종적으로 본 발명의 일 실시예에 따른 확장터널부를 가지는 2아치터널이 완성된다.Through the steps as described above, a two-arch tunnel having an extended tunnel part according to an embodiment of the present invention is finally completed.

본 발명은 상술한 실시예에 한정되지 않으며, 첨부된 청구범위에서 알 수 있는 바와 같이 본 발명이 속한 분야의 통상의 지식을 가진 자는 본 발명의 정신을 벗어나지 않고 변형이 가능하고 이러한 변형은 본 발명의 범위에 속한다.The present invention is not limited to the above-described embodiments, and as can be seen in the appended claims, those skilled in the art can make modifications without departing from the spirit of the present invention, and such modifications are possible. Belongs to the scope of.

도 1은 본 발명의 일 실시예에 따른 확장터널부를 가지는 2아치터널의 단면도;1 is a cross-sectional view of a two arch tunnel having an extension tunnel according to an embodiment of the present invention;

도 2는 도 1의 분리지지벽의 일부를 나타내는 상태도;FIG. 2 is a state diagram showing a part of the separating support wall of FIG. 1; FIG.

도 3은 도 2의 분리지지벽의 개구부를 나타내는 상태도;3 is a state diagram showing an opening of the separating support wall of FIG. 2;

도 4는 본 발명의 다른 실시예에 따른 확장터널부를 가지는 2아치터널의 단면도;4 is a cross-sectional view of a two arch tunnel having an extension tunnel according to another embodiment of the present invention;

도 5는 도 4의 분리지지벽이 비대칭지지벽으로 이루어져 시공된 상태를 나타내는 상태도;5 is a state diagram showing a state in which the separated support wall of Figure 4 constructed of an asymmetric support wall;

도 6은 본 발명의 일 실시예에 따른 확장터널부를 가지는 2아치터널의 시공방법을 나타내는 순서도; 및6 is a flow chart showing a construction method of a two-arch tunnel having an extension tunnel according to an embodiment of the present invention; And

도 7은 본 발명의 다른 실시예에 따른 확장터널부를 가지는 2아치터널의 시공방법을 나타내는 순서도이다.7 is a flow chart showing a construction method of a two-arch tunnel having an extension tunnel according to another embodiment of the present invention.

< 도면의 주요부분에 대한 부호 설명 ><Explanation of Signs of Major Parts of Drawings>

10: 바닥부 12: 결합홈10: bottom 12: coupling groove

20: 메인 파일럿터널 22: 메인 크라운20: Main Pilot Tunnel 22: Main Crown

24: 메인 파일럿터널 천단부 30, 40, 50, 60: 확장 파일럿터널24: Top end of main pilot tunnel 30, 40, 50, 60: Extended pilot tunnel

30a: 파일럿터널부 30b: 본선터널부30a: Pilot Tunnel Section 30b: Main Tunnel Section

40, 60: 확장 파일럿터널 32, 42, 62: 확장 크라운40, 60: expansion pilot tunnel 32, 42, 62: expansion crown

34, 44, 64: 확장 파일럿터널 천단부 120: 중앙지지벽34, 44, 64: Extension pilot tunnel top end 120: center support wall

226, 246: 라이닝 콘크리트 126: 배수면226, 246: lining concrete 126: drainage surface

130, 150: 비대칭 지지벽 140, 160: 분리지지벽130, 150: asymmetric support wall 140, 160: separate support wall

142: 개구부 144: 차단판142: opening 144: blocking plate

146: 배수홀 220: 240: 2아치본선터널146: drainage hole 220: 240: 2 arch main tunnel

222, 242: 2아치본선터널 바닥부 224, 244: 2아치본선터널 천단부222, 242: 2 arch main tunnel bottom 224, 244: 2 arch main tunnel

320, 340, 360, 380: 확장본선터널320, 340, 360, 380: Extended Main Tunnel

322, 342, 362, 382: 확장본선터널 바닥부322, 342, 362, 382: bottom of the extended main tunnel

324, 344, 364, 384: 확장본선터널 천단부324, 344, 364, 384: Temple End of Extended Main Tunnel

Claims (11)

중앙지지벽 및 상기 중앙지지벽의 상부에서 좌우 양측으로 구비되어 상기 중앙지지벽과 연속된 면을 형성하는 한 쌍의 2아치본선터널을 가지는 메인터널부; 및A main tunnel portion having a center support wall and a pair of two-arch main tunnels provided on both sides of the center support wall and forming a continuous surface with the center support wall; And 상기 2아치본선터널의 외측에서 상기 2아치본선터널과 연속된 면을 형성하는 분리지지벽 및 상기 분리지지벽에서 외측으로 구비되어 상기 분리지지벽과 연속된 면을 형성하는 확장본선터널을 가지는 확장터널부;An extension having a separation support wall that forms a continuous surface with the 2 arch main tunnel at an outer side of the 2 arch main tunnel and an extended main tunnel that is provided outward from the separation support wall to form a surface continuous with the separation support wall; Tunnel portion; 를 포함하며,/ RTI &gt; 상기 분리지지벽은,The separating support wall, 상기 2아치본선터널터널 및 확장본선터널의 진행 방향을 따라 복수 개의 조립체로 구비되며, 상기 복수 개의 조립체 사이에는 상기 2아치본선터널 및 확장본선터널이 상호 연통되도록 개구부가 구비되고, 상기 개구부는 투명한 재질의 차단판이 배치되도록 틀이 형성되어 있는 확장터널부를 가지는 2아치터널.A plurality of assemblies are provided along a traveling direction of the two-arch main tunnel and the extended main tunnel, and an opening is provided between the plurality of assemblies to allow the two-arch main tunnel and the extended main tunnel to communicate with each other, and the opening is transparent. Two-arch tunnel with expansion tunnel part in which a frame is formed so that material blocking plate is placed. 청구항 1에 있어서,The method according to claim 1, 상기 확장터널부의 확장본선터널은,The expansion main tunnel of the expansion tunnel portion, 바닥부에서부터 천단부까지의 높이가 상기 메인터널부의 2아치본선터널 보다 낮게 형성되는 확장터널부를 가지는 2아치터널.A two-arch tunnel having an extended tunnel portion formed from the bottom to the top end is lower than the two-arch main tunnel of the main tunnel portion. 청구항 1에 있어서,The method according to claim 1, 상기 확장터널부는,The expansion tunnel unit, 상기 메인터널부의 좌우 양측에 한 쌍으로 구비되는 확장터널부를 가지는 2아치터널.A two-arch tunnel having an extended tunnel provided in a pair on the left and right sides of the main tunnel. 삭제delete 삭제delete 청구항 1에 있어서,The method according to claim 1, 상기 분리지지벽의 복수 개의 조립체 중 적어도 하나의 조립면에 상단에서부터 상기 개구부를 지나 바닥면까지 관통되는 배수홀을 더 포함하는 확장터널부를 가지는 2아치터널.And an expansion tunnel portion further including a drainage hole penetrating from an upper end to an bottom surface of the at least one assembly surface of the plurality of assemblies of the separation support wall. 청구항 1에 있어서,The method according to claim 1, 상기 분리지지벽은,The separating support wall, 상기 확장본선터널의 중앙에서 상기 중앙지지벽이 구비되는 방향으로 치우치게 비대칭으로 구비되는 확장터널부를 가지는 2아치터널.And a two-arch tunnel having an extended tunnel portion asymmetrically biased in a direction in which the central support wall is provided at the center of the expanded main tunnel. 중앙에 메인 파일럿터널 및 상기 메인 파일럿터널을 중심으로 하여 좌우 양측 중 적어도 어느 한 방향으로 소정거리 이격되는 확장 파일럿터널을 굴착하는 파일럿터널 굴착단계;A pilot tunnel excavating step of digging an extended pilot tunnel spaced at a predetermined distance in at least one direction from both left and right sides of the main pilot tunnel and the main pilot tunnel at the center; 상기 메인 파일럿터널 및 상기 확장 파일럿터널 각각의 중앙에 복수 개의 조립체로 이루어지며, 복수 개의 조립체 사이에 투명한 재질의 차단판이 배치되도록 틀이 형성되어 있는 개구부가 형성된 중앙지지벽 및 분리지지벽을 설치하는 지지벽 설치단계;A center support wall and a separation support wall, each having a plurality of assemblies formed at the center of each of the main pilot tunnel and the extended pilot tunnel, and having an opening having a frame formed therebetween so as to arrange a blocking plate of a transparent material between the plurality of assemblies. Supporting wall installation step; 상기 메인 파일럿터널에 설치된 중앙지지벽의 상부에서 좌우 양측으로 상기 중앙지지벽과 연속된 면을 형성하도록 한 쌍의 2아치본선터널을 굴착하는 단계; 및Excavating a pair of two arch main tunnels so as to form a continuous surface with the central support wall on both the left and right sides of the upper part of the central support wall installed in the main pilot tunnel; And 상기 확장 파일럿터널에 설치된 분리지지벽 외측으로 상기 분리지지벽과 연속된 면을 형성하도록 확장본선터널을 굴착하는 단계;Digging an expansion main tunnel to form a surface continuous with the separation support wall outside the separation support wall installed in the expansion pilot tunnel; 를 포함하여 구성되는 확장터널부를 가지는 2아치터널 시공방법.2 arch tunnel construction method having an extension tunnel configured to include a. 청구항 8에 있어서,The method of claim 8, 확장본선터널을 굴착하는 단계는,Excavating the extended main tunnel, 상기 한 쌍의 2아치본선터널을 굴착하는 단계를 통해 형성된 2아치본선터널보다 낮게 굴착하는 확장터널부를 가지는 2아치터널 시공방법.And a two-arch tunnel construction method having an extended tunnel portion for digging lower than the two-arch main tunnel formed by digging the pair of two-arch main tunnel. 청구항 8에 있어서,The method of claim 8, 상기 파일럿터널 굴착단계에서는,In the pilot tunnel excavation step, 상기 메인 파일럿터널을 중심으로 하여 좌우 양측으로 소정거리 이격되도록 확장 파일럿터널을 굴착하여 지지벽 설치단계에서 분리지지벽을 각각 설치하고, 확 장본선터널을 굴착하는 단계에서 상기 한 쌍의 2아치본선터널의 좌우 양측에 한 쌍의 확장본선터널을 굴착하는 확장터널부를 가지는 2아치터널 시공방법.Two pairs of two arch main ships are installed in the step of excavating an extended pilot tunnel so as to be separated by a predetermined distance from the left and right sides of the main pilot tunnel, and installing a separate support wall in the step of installing the support wall and digging an extended main tunnel. A two-arch tunnel construction method having an extended tunnel portion for excavating a pair of extended main tunnels on both left and right sides of a tunnel. 중앙에 메인 파일럿터널 및 상기 메인 파일럿터널을 중심으로 하여 좌우 양측 중 적어도 어느 한 방향으로 소정거리 이격되는 확장 파일럿터널을 굴착하는 파일럿터널 굴착단계;A pilot tunnel excavating step of digging an extended pilot tunnel spaced at a predetermined distance in at least one direction from both left and right sides of the main pilot tunnel and the main pilot tunnel at the center; 상기 메인 파일럿터널의 중앙에 중앙지지벽을 설치하는 중앙지지벽 설치단계;A central support wall installation step of installing a central support wall at the center of the main pilot tunnel; 상기 확장 파일럿터널의 중앙에서 상기 중앙지지벽이 설치되는 방향으로 치우치게 비대칭 지지벽을 설치하는 비대칭 지지벽 설치단계; 및An asymmetric support wall installation step of installing an asymmetric support wall in a direction in which the center support wall is installed in the center of the extended pilot tunnel; And 상기 메인 파일럿터널에 설치된 중앙지지벽의 상부에서 좌우 양측으로 상기 중앙지지벽과 연속된 면을 형성하도록 한 쌍의 2아치본선터널을 굴착하는 단계;Excavating a pair of two arch main tunnels so as to form a continuous surface with the central support wall on both the left and right sides of the upper part of the central support wall installed in the main pilot tunnel; 를 포함하며,/ RTI &gt; 상기 중앙지지벽 및 비대칭 지지벽은 복수 개의 조립체로 이루어지며, 복수 개의 조립체 사이에 투명한 재질의 차단판이 배치되도록 틀이 형성되어 있는 개구부가 형성되는 확장터널부를 가지는 2아치터널 시공방법.The center support wall and the asymmetric support wall is composed of a plurality of assemblies, a two-arch tunnel construction method having an expansion tunnel portion is formed with an opening is formed so that the frame is disposed between the plurality of assemblies a transparent blocking plate.
KR1020090098882A 2009-10-16 2009-10-16 2-Arch Tunnel with Extension Tunnel and Method for Constructing The Same KR101187876B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090098882A KR101187876B1 (en) 2009-10-16 2009-10-16 2-Arch Tunnel with Extension Tunnel and Method for Constructing The Same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090098882A KR101187876B1 (en) 2009-10-16 2009-10-16 2-Arch Tunnel with Extension Tunnel and Method for Constructing The Same

Publications (2)

Publication Number Publication Date
KR20110041866A KR20110041866A (en) 2011-04-22
KR101187876B1 true KR101187876B1 (en) 2012-10-04

Family

ID=44047645

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090098882A KR101187876B1 (en) 2009-10-16 2009-10-16 2-Arch Tunnel with Extension Tunnel and Method for Constructing The Same

Country Status (1)

Country Link
KR (1) KR101187876B1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101236173B1 (en) * 2011-05-30 2013-02-22 한국건설기술연구원 Expansion Method of Tunnel using Multi-connecting Rock Bolt
KR101413056B1 (en) * 2013-03-29 2014-07-02 (주)나우기술 Express subway lines in service line installation methods

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100438795B1 (en) 2003-07-31 2004-07-06 (주)현이앤씨 Design method about center wall of three arch tunnel the upside fixing type of lining excavation method
KR100844147B1 (en) 2007-03-07 2008-07-04 박재현 2 arch-tunnel with asymmetry support wall and construction method of the same

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100438795B1 (en) 2003-07-31 2004-07-06 (주)현이앤씨 Design method about center wall of three arch tunnel the upside fixing type of lining excavation method
KR100844147B1 (en) 2007-03-07 2008-07-04 박재현 2 arch-tunnel with asymmetry support wall and construction method of the same

Also Published As

Publication number Publication date
KR20110041866A (en) 2011-04-22

Similar Documents

Publication Publication Date Title
KR100752285B1 (en) Construction method for two arches tunnel
KR101344063B1 (en) The construction method of steel-concrete underpass
JP2020084474A (en) Widening construction method of existing tunnel
CN106437781A (en) Upper-soft lower-hard stratum tunnel supporting structure and construction method thereof
KR20180118009A (en) Duplex tunnel construction method
KR102136951B1 (en) Construction Method of Duplex Tunnel
JP3586864B2 (en) Underground structure construction method and elevated traffic path
KR101187876B1 (en) 2-Arch Tunnel with Extension Tunnel and Method for Constructing The Same
KR20170007975A (en) The Construction Method and Structure of linear curve-shaped non-excavation tunnel with using Forepoling Board and ground reinforcement
JP5843413B1 (en) Lowering method of existing tunnel
KR100844147B1 (en) 2 arch-tunnel with asymmetry support wall and construction method of the same
JP6944882B2 (en) How to build an invert in an existing tunnel
JP4144702B2 (en) How to build an enlarged tunnel
KR101187878B1 (en) 2 arch tunnel having central supporting wall provided with transparent windows and drain structures
KR101256576B1 (en) Variable and Reinforced Type Double Bore Tunnels with Extension Tunnel and Method for Constructing The Same
JP6144726B2 (en) Rehabilitation method for mountain road tunnels on expressway and suspension pier for rehabilitation method
KR100458922B1 (en) Method for Constructing a Lining Panel of a Tunnel, Lining Pannel System for a Tunnel and Omnidirectional Ventilation and Drain System for a Tunnel using the Same
KR101427812B1 (en) Open cut method for constructing an underground structure
KR101283663B1 (en) Method for digging two arch type tunnel
KR100882127B1 (en) Construction method for installation escalator of subway outside entrance
KR100689968B1 (en) 2-arch tunnel and method for constructing the same
KR101163607B1 (en) Variable and Reinforced Type Double Bore Tunnels and Method for Constructing The Same
KR20100128521A (en) Construction method of 2-arch tunnel
CN104264707B (en) Elevated road ramp approach section retaining structure
JP4583236B2 (en) Shield excavator

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20150907

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20160927

Year of fee payment: 5

LAPS Lapse due to unpaid annual fee