KR101155405B1 - Construction equipment of the mat with an aggregate of a concrete block, or construction equipment of the mat with an aggregate of a natural stone - Google Patents

Construction equipment of the mat with an aggregate of a concrete block, or construction equipment of the mat with an aggregate of a natural stone Download PDF

Info

Publication number
KR101155405B1
KR101155405B1 KR1020050019754A KR20050019754A KR101155405B1 KR 101155405 B1 KR101155405 B1 KR 101155405B1 KR 1020050019754 A KR1020050019754 A KR 1020050019754A KR 20050019754 A KR20050019754 A KR 20050019754A KR 101155405 B1 KR101155405 B1 KR 101155405B1
Authority
KR
South Korea
Prior art keywords
mat
gripping member
sides
construction
pair
Prior art date
Application number
KR1020050019754A
Other languages
Korean (ko)
Other versions
KR20060043791A (en
Inventor
야와라 구마가이
Original Assignee
야와라 구마가이
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 야와라 구마가이 filed Critical 야와라 구마가이
Publication of KR20060043791A publication Critical patent/KR20060043791A/en
Application granted granted Critical
Publication of KR101155405B1 publication Critical patent/KR101155405B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B09DISPOSAL OF SOLID WASTE; RECLAMATION OF CONTAMINATED SOIL
    • B09BDISPOSAL OF SOLID WASTE NOT OTHERWISE PROVIDED FOR
    • B09B3/00Destroying solid waste or transforming solid waste into something useful or harmless
    • B09B3/40Destroying solid waste or transforming solid waste into something useful or harmless involving thermal treatment, e.g. evaporation
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F26DRYING
    • F26BDRYING SOLID MATERIALS OR OBJECTS BY REMOVING LIQUID THEREFROM
    • F26B3/00Drying solid materials or objects by processes involving the application of heat
    • F26B3/02Drying solid materials or objects by processes involving the application of heat by convection, i.e. heat being conveyed from a heat source to the materials or objects to be dried by a gas or vapour, e.g. air
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F26DRYING
    • F26BDRYING SOLID MATERIALS OR OBJECTS BY REMOVING LIQUID THEREFROM
    • F26B3/00Drying solid materials or objects by processes involving the application of heat
    • F26B3/28Drying solid materials or objects by processes involving the application of heat by radiation, e.g. from the sun
    • F26B3/30Drying solid materials or objects by processes involving the application of heat by radiation, e.g. from the sun from infrared-emitting elements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F26DRYING
    • F26BDRYING SOLID MATERIALS OR OBJECTS BY REMOVING LIQUID THEREFROM
    • F26B2200/00Drying processes and machines for solid materials characterised by the specific requirements of the drying good
    • F26B2200/04Garbage
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/20Waste processing or separation

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Microbiology (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Revetment (AREA)

Abstract

간단한 방법으로 블록 집합체 부착 매트를 확실하게 협지할 수 있고, 장치의 취급도 간편하며, 유지보수가 간단한 블록 집합체 부착 매트의 시공 장치를 제공한다.It is possible to securely sandwich the block assembly attaching mat in a simple manner, to provide a device for constructing the block assembly attaching mat, which is easy to handle and easy to maintain.

콘크리트 블록 또는 자연석의 집합체 부착 매트의 단부를 하부 파지 부재와 상부 파지 부재로 협지하여 들어 올리는 시공 장치에 있어서, 상기 하부 파지 부재는, 길이 방향으로 연장되는 정점을 중앙으로 하여 전후 2변의 경사면으로 이루어지고, 상기 전후 2변의 경사면에는 익스팬디드 메탈이 고착되어 있고, 상기 상부 파지부재는 상기 하부 파지 부재의 상기 2변의 경사면을 덮도록 우산 모양이며, 상기 체결 기구에는, 상기 상부 파지 부재의 좌우에 복수의 누름 조정 부재를 구비하는 한 쌍의 누름 부재가 설치되어 있고, 상기 한 쌍의 누름 부재와 상기 프레임 본체의 상부 프레임 사이에는 각각 2변의 링크가 설치되어 있어, 각각의 연결 부재를 l개의 핸들을 회전시켜 좌우 이동시킴으로써, 한 쌍의 누름 부재를 상하 이동시켜 상기 상부 파지 부재와 상기 하부 파지 부재 사이의 상기 매트를 파지 또는 개방한다.In the construction apparatus which clamps the edge part of an aggregate attachment mat of a concrete block or natural stone by the lower gripping member and the upper gripping member, The said lower gripping member consists of inclined surfaces of front and back two sides with the vertex extended in the longitudinal direction as the center. Expanded metal is fixed to the inclined surfaces of the front and rear two sides, and the upper gripping member has an umbrella shape so as to cover the inclined surfaces of the two sides of the lower gripping member. A pair of pressing members provided with a plurality of pressing adjustment members are provided, and two sides of links are provided between the pair of pressing members and the upper frame of the frame body, respectively, to handle each connecting member by l handles. Rotate the left and right to move the pair of pressing members up and down to move the upper holding member The grip or open the mat between the lower gripping member.

프레임 본체, 하부 파지 부재, 상부 파지 부재, 매트, 시공 장치, 경사면, 익스팬 디드 메탈, 체결 기구, 누름 조정 부재, 누름 부재, 링크, 연결 부재, 핸들.  Frame body, lower gripping member, upper gripping member, mat, construction device, inclined surface, expanded metal, fastening mechanism, pressing adjustment member, pressing member, link, connecting member, handle.

Description

콘크리트 블록 및 자연석 집합체 부착 매트의 시공 장치{CONSTRUCTION EQUIPMENT OF THE MAT WITH AN AGGREGATE OF A CONCRETE BLOCK, OR CONSTRUCTION EQUIPMENT OF THE MAT WITH AN AGGREGATE OF A NATURAL STONE}Construction equipment for concrete blocks and mats with natural stone aggregates {CONSTRUCTION EQUIPMENT OF THE MAT WITH AN AGGREGATE OF A CONCRETE BLOCK, OR CONSTRUCTION EQUIPMENT OF THE MAT WITH AN AGGREGATE OF A NATURAL STONE}

도 1의 (a)는 종래의 콘크리트 블록 조합체 부착 매트의 시공 장치의 측면도이고, 도 1의 (b)는 상기 매트 체결 기구(b)의 단면 확대도이다.Fig.1 (a) is a side view of the construction apparatus of the conventional concrete block combination attachment mat, and Fig.1 (b) is an enlarged cross section of the said mat fastening mechanism (b).

도 2는 본 발명의 실시예의 시공 장치에 사용하는 콘크리트 블록 집합체 부착 매트의 평면도이다.2 is a plan view of a concrete block assembly attaching mat used in the construction apparatus of the embodiment of the present invention.

도 3은 도 2의 콘크리트 블록 집합체 부착 매트에 이용하는 캐스트 스톤 블록의 평면도이다.FIG. 3 is a plan view of a cast stone block used for the mat for attaching the concrete block aggregate of FIG. 2. FIG.

도 4는 도 2의 콘크리트 블록 집합체 부착 매트에 있어서, 2매의 매트의 접합 상태를 도시하는 설명도이다.It is explanatory drawing which shows the bonding state of two mats in the mat with a concrete block assembly of FIG.

도 5는 도 2의 콘크리트 블록 집합체 부착 매트를 시공 장치에 의해 호안 공사에 시공한 상태를 도시하는 사시도이다.It is a perspective view which shows the state which constructed the concrete block assembly attachment mat of FIG.

도 6은 본 발명의 실시예의 시공 장치를 포크리프트에 장착하여, 콘크리트, 블록 집합체 부착 매트를 시공하는 상태를 도시하는 사시도이다FIG. 6 is a perspective view showing a state in which a construction device of an embodiment of the present invention is mounted on a forklift to construct concrete and a block assembly attaching mat; FIG.

도 7은 본 발명의 실시예의 시공 장치를 측면으로부터 본 평면도이다.It is the top view which looked at the construction apparatus of the Example of this invention from the side.

도 8은 본 발명의 실시예의 시공 장치의 한쪽을 연결 기둥에 장착한 정면도 이다. It is a front view which attached one side of the construction apparatus of the Example of this invention to a connection pillar.

도 9는 도 7의 하부 파지 부재(4)와 상부 파지 부재(5)의 확대 단면도이다.FIG. 9 is an enlarged cross-sectional view of the lower gripping member 4 and the upper gripping member 5 of FIG. 7.

도 10은 도 7에서 상부 파지 부재(5)와 체결 기구(6)를 제거한 상태에서, 시공 장치를 합체시키는 연결기구의 분해 설명도이다.FIG. 10 is an exploded explanatory view of a coupling mechanism incorporating a construction device in a state where the upper gripping member 5 and the coupling mechanism 6 are removed in FIG. 7.

* 도면의 주요부호에 대한 설명 *Explanation of the main symbols in the drawings

X: 매트의 캐스트 스톤 블록이 존재하지 않는 부분X: Part where the cast stone block of the mat does not exist

1: 캐스트 스톤 블록 집합체 부착 매트1: cast stone block aggregate attachment mat

4: 하부 파지부 5: 상부 파지 부재4: lower gripping portion 5: upper gripping member

6: 체결 기구 7: 연결 기둥 접속 부재6: fastening mechanism 7: connecting column connecting member

11: 캐스트 스톤 블록 12: 경사면 11: cast stone block 12: slope

13A, 13B, 13C, 13D: 캐스트 스톤 2, 2A, 2B: 시공 장치13A, 13B, 13C, 13D: Cast Stone 2, 2A, 2B: Construction Device

31: 저부 32: 상부 프레임31: bottom 32: upper frame

33a, 33b: 측부 프레임 34: 핸들 지지부재33a, 33b: side frame 34: handle support member

51a, 51b: 경사면, 52: 이등변 삼각형,51a, 51b: slope, 52: isosceles triangle,

61a, 61b: 누름 부재, 62a: 상부 링크, 61a, 61b: pressing member, 62a: upper link,

62b: 하부 링크, 8la, 81b: 레일62b: lower link, 8la, 81b: rail

본 발명은, 호안(護岸) 공사 등의 개보수 시공에 사용하는 콘크리트 블록 및 자연석 집합체 부착 매트의 시공 장치에 관한 것이다.TECHNICAL FIELD This invention relates to the construction apparatus of the concrete block and mat with natural stone aggregate used for retrofitting construction, such as a shelter construction.

종래로부터, 호안 공사 등의 개보수 시공에 사용하는 콘크리트 블록으로서, 예를 들면, 일본 특허공개공보 평3-3766호에 개시되어 있는 바와 같이, 다수의 콘크리트 블록을 직포(織布) 매트 상에 집합하여 고정시키고, 이 블록 집합체 부착 매트마다 일괄하여 호안 공사 등에 시공하는 방법이 공지되어 있다.Conventionally, as a concrete block used for renovation construction of a lanyard construction etc., for example, as disclosed in Unexamined-Japanese-Patent No. 3-3766, many concrete blocks are aggregated on a woven fabric mat. It is known to fix and fix them to the mat for each block assembly, and to apply them to shore protection construction and the like.

또한, 본 출원인은, 캐스트 스톤(cast stone) 콘크리트의 호안 공사에서의 시공을 간단하게 하기 위하여, 천연석 모양의 캐스트 스톤 콘크리트 블록을 소형으로 하고, 또한, 시공면에 있어서의 캐스트 스톤의 배치 상황이 불규칙하게 보이고, 조인트 선도 직선적이 아니며 불규칙한 선을 이루어 시공면에 흐르는 빗물 등에 의해 조인트 부분의 토사가 유실되지 않도록 구성되어, 풀이나 관목이 자랄 수 있어 자연 파괴가 최소한으로 그치도록 한 콘크리트 블록 집합체 부착 매트를 제안하고 있다(일본 특허출원 제2003-50371호 ).In addition, the present applicant is to reduce the size of the natural stone cast stone concrete block in order to simplify the construction in the revetment construction of cast stone concrete, and the arrangement of the cast stone on the construction surface Concrete block assembly that looks irregular, the joint lines are not linear but irregular lines are constructed so that the soil of the joint part is not lost due to rainwater flowing on the construction surface, so that grass or shrub can grow and natural destruction is minimized. Mat is proposed (Japanese Patent Application No. 2003-50371).

이 콘크리트 블록 집합체 부착 매트는, 미리, 6mxl.6m의 섬유 매트에 다수의 캐스트 스톤 콘크리트 블록을 집합 상태로 배치하고 그 배치로부터 이탈하지 않게 고정한 블록 집합체 부착 매트이지만, 이 블록 집합체 부착 매트의 호안 공사나 하천에서의 시공 시에 전용 시공 장치가 필요하다.This concrete block aggregate attachment mat is a block aggregate attachment mat which arranged many cast stone concrete blocks in the assembled state to a fiber mat of 6mxl.6m beforehand and fixed so that it does not deviate from the placement, but the raft construction of this block aggregate attachment mat B. Special construction equipment is required for construction in rivers.

종래의 전용 시공 장치는, 도 1에 도시한 바와 같이, 통상적으로 1톤 이상인 매트의 양단을 전용 파지 공구(a)로 협지하여, 양단의 전용 파지 공구(a)를 크레인이나 포크리프트로 들어 올려 운반하거나 시공하고 있다.In the conventional dedicated construction apparatus, as shown in Fig. 1, both ends of the mat, which are usually 1 ton or more, are sandwiched with a dedicated gripping tool a, and the dedicated gripping tools a at both ends are lifted by a crane or a forklift. Carrying or constructing.

그런데, 전술한 매트의 시공에 있어서는, 전술한 바와 같이 한 쌍의 파지 장 치(a)를 구비하는 전용 시공 장치를 사용하지만, 종래의 전용 시공 장치에는, 다음과 같은 문제점이 있다.By the way, in the construction of the mat described above, a dedicated construction apparatus having a pair of gripping apparatus a is used as described above, but a conventional dedicated construction apparatus has the following problems.

즉, 한 쌍의 매트 파지 장치(a)의 한쪽을 도 1에 도시하였는데, 파지하는 매트의 길이는 6m이고 폭은 1.6m인 폭이 넓은 섬유의 천이며, 매트 고정 기구(b)는, 매트의 폭 이상의 길이를 가진 하부 파지 부재(c)와 상부 파지 부재(d)에 의해, 매트(1)의 한쪽 단부의 캐스트 스톤이 없는 부분(X)을 상하 방향으로부터 협지하여 파지하고, 마찬가지로, 매트(1)의 다른 쪽 단부(X)를 파지하여, 한 쌍의 매트 고정 기구(b)를 가지는 시공 장치를 크레인 등으로 들어 올려 운반 및 시공한다. 이 매트 고정 기구(b)의 하부 파지 부재(c)는, 통상적으로, 길이 방향으로 한 쌍의 철봉(e)과 경질 고무(f)가 설치되어 있고, 상부 파지 부재(d)의 철제의 평면(g)과 함께 매트(1)를 협지할 뿐만 아니라, 매트(l)의 미끄러짐을 저지하기 위하여, 철봉(h)을 말아 넣어, 상부 파지 부재(d)로 다시 협지하고 있다. 따라서, 매트(1)를 협지하는 작업이 귀찮고, 경질 고무(h)가 마모하기 때문에 교체하지 않으면 안되어, 번거로웠다.That is, one of a pair of mat holding devices a is shown in FIG. 1, the length of the holding mat is 6 m and the width is 1.6 m, and the mat fixing mechanism b is a mat. The lower gripping member (c) and the upper gripping member (d) having a length equal to or more than the width of the mat grip the portion (X) without cast stone at one end of the mat (1) from the up and down direction and grip the same. The other end X of (1) is gripped, and the construction apparatus which has a pair of mat fixing mechanism b is lifted up by a crane etc., and it carries and constructs it. The lower gripping member c of the mat fixing mechanism b is usually provided with a pair of iron bars e and hard rubbers f in the longitudinal direction, and is made of the iron plane of the upper gripping member d. In addition to clamping the mat 1 together with (g), in order to prevent slippage of the mat 1, the iron bar h is rolled up and clamped again by the upper gripping member d. Therefore, the operation | work which clamps the mat 1 is troublesome, and since the hard rubber h wears out, it must be replaced and it was cumbersome.

또한, 고정기구(b)의 상부 파지 부재(d)는, 양단에 상하 이동하도록 양단의 2개의 핸들(i, j)을 설치한 나사봉(k. l)에 장착되고, 매트(1)의 협지 작업 시에는, 상부 파지 부재(d)가 항상 수평 상태로 하강하도록, 작업원 2인에 의해, 양단의 핸들(i, j)을 동시에 회전시켜 매트 단부(X)를 협지하지 않으면 안 되었다.In addition, the upper gripping member d of the fixing mechanism b is attached to a screw rod k. L provided with two handles i and j at both ends so as to move up and down at both ends thereof. At the time of clamping operation, the two end members must simultaneously rotate the handles i and j so that the mat end part X may be clamped so that the upper gripping member d may always fall in a horizontal state.

본 발명은, 상기의 문제점을 감안하여 이루어진 것이며, 그 목적은, 콘크리 트 블록 집합체 부착 매트의 시공 장치에 있어서, 작업원 1인으로도, 간단하게 블록 집합체 부착 매트를 확실하게 협지할 수 있어, 장치의 취급도 간편하고, 보수가 간단한 블록 집합체 부착 매트의 시공 장치를 제공하는 것이다.This invention is made | formed in view of said problem, The objective is the construction apparatus of the concrete block assembly attachment mat, WHEREIN: Even one worker can reliably hold a block assembly attachment mat, It is an object of the present invention to provide a construction apparatus for a block assembly attaching mat that is easy to handle and easy to repair.

상기 과제를 해결하기 위하여, 청구항 1의 발명은, 프레임 본체와 상기 프레임 본체 내에 설치된 하부 파지 부재와 상부 파지 부재로 구성되어, 콘크리트 블록 또는 자연석의 집합체 부착 매트의 단부를 상기 하부 파지 부재와 상기 상부 파지 부재로 협지하여 들어 올리는 시공 장치에 있어서, 상기 하부 파지 부재는, 상기 시공 장치의 상기 프레임 본체의 저부에 고정되어 있으며, 매트의 폭에 대응하는 길이를 가지고, 길이 방향으로 연장되는 정점을 중앙으로 하여 전후 2변의 경사면으로 이루어지고, 상기 전후 2변의 경사면에는 익스팬디드 메탈이 고착되어 있고, 상기 상부 파지부재는, 상기 하부 파지 부재의 상기 2변의 경사면을 덮도록 전후 2변의 경사면으로 이루어져 상기 매트의 단부를 협지하는 우산 모양이며, 상기 상부 파지 부재의 상부에는 상하로 이동하는 체결 기구가 연결되어 있고, 상기 체결 기구에는, 상기 상부 파지 부재의 좌우에 복수의 누름 조정 부재를 구비하는 한 쌍의 누름 부재가 설치되어 있고, 상기 한 쌍의 누름 부재와 상기 프레임 본체의 상부 프레임 사이에는 각각 2변의 링크를 설치하고, 상기 2변의 링크는 연결 부재로 연결되어, 각각의 연결 부재를 l개의 핸들을 회전시켜 좌우 이동시킴으로써, 한 쌍의 누름 부재를 상하 이동시켜 상기 상부 파지 부재와 상기 하부 파지 부재 사이의 매트를 파지 또는 개방하는 것을 특징으로 하는 콘크리트 블록 또는 자연석의 집합체 부착 매트의 시공 장치이다.In order to solve the said subject, invention of Claim 1 is comprised by the frame main body and the lower holding member and upper holding member provided in the said frame main body, The edge part of the aggregate holding mat of a concrete block or a natural stone is attached to the said lower holding member and said upper part In the construction apparatus clamped and lifted by the holding member, the lower holding member is fixed to the bottom of the frame body of the construction apparatus, has a length corresponding to the width of the mat, and centers a vertex extending in the longitudinal direction. And an expanded metal is fixed to the inclined surfaces of the front and rear two sides, and the upper gripping member is formed of the inclined surfaces of the two front and rear sides so as to cover the inclined surfaces of the two sides of the lower gripping member. Umbrella shape to sandwich the end of the mat, the upper portion of the upper holding member A fastening mechanism for moving up and down is connected, and the fastening mechanism is provided with a pair of pressing members including a plurality of pressing adjustment members on the left and right sides of the upper gripping member, and the pair of pressing members and the frame. Two side links are respectively provided between the upper frames of the main body, and the two side links are connected to the connecting members, and the pair of pressing members are moved up and down by moving the connecting members to the left and right by rotating the l handles. A construction device for a concrete block or mat for attaching aggregates of natural stones, characterized in that the mat between the upper gripping member and the lower gripping member is held or opened.

청구항 2의 발명은, 제1항에 있어서, 상기 프레임 본체의 상부 프레임의 상부에는, 연결 기둥 접속 부재가 설치되어 있고, 상기 매트의 양단에 대응하도록 한 쌍의 상기 시공 장치를 파지하는 연결 기둥이 배치되며, 상기 연결 기둥의 양쪽에 레일이 설치되어 있고, 상기 연결 기둥의 상면에 복수의 결합홈을 가지는 핀 고정 부재가 설치되어 있고, 상기 연결 기둥 접속 부재에는, 상기 레일 상에서 이동 가능한 한 쌍의 롤러가 설치되어 있고, 상기 결합홈에 결합하는 착탈 가능한 회전축이 설치되어 있으며, 상기 연결 기둥의 저면에 대하여 상기 시공 장치의 상기 프레임 본체의 측부 프레임과 상기 연결 기둥이 직각의 위치로 고정되도록 한 착탈 가능한 고정축이 설치되어 있어, 상기 고정축을 제거했을 때에는 상기 프레임 본체가 회전 가능하게 되고, 상기 회전축을 제거했을 때에는, 상기 프레임 본체가 상기 롤러에 의해 상기 연결 기둥의 상기 레일 상에서 이동 가능한 것을 특징으로 하는 콘크리트 블록 또는 자연석의 집합체 부착 매트의 시공 장치이다.The invention according to claim 2, wherein in the upper part of the upper frame of the frame body, a connecting column connecting member is provided, and a connecting column for holding the pair of construction devices so as to correspond to both ends of the mat. It is arrange | positioned, The rail is provided in the both sides of the said connection column, The pin fixing member which has a some coupling groove is provided in the upper surface of the said connection column, The said connection column connection member is a pair which can move on the said rail A roller is provided, and a detachable rotating shaft which is coupled to the coupling groove is installed, and the side frame of the frame body of the construction device and the connecting column are fixed to a right angle position with respect to the bottom surface of the connecting column. The fixed shaft is provided, and when the fixed shaft is removed, the frame body is rotatable. When the rotation axis is removed, the frame main body is movable on the rail of the connecting column by the roller.

청구항 3의 발명은, 제2항에 있어서, 상기 연결 기둥의 대략 중앙부에는 포크리프트의 포크 결합부와 크레인 현수부가 설치되어 있는 것을 특징으로 하는 콘크리트 블록 또는 자연석의 집합체 부착 매트의 시공 장치이다.The invention according to claim 3 is a construction device for a concrete block or mat with an aggregate of natural stone according to claim 2, wherein a fork coupling portion and a crane suspension portion of the forklift are provided at substantially the center portion of the connecting column.

이상과 같이, 본 발명에 의하면, 1개의 핸들을 회전시켜 하부 파지 부재의 복수의 누름 부재를 동시에 조작할 수 있기 때문에, 1명의 작업원으로 매트 단부의 전폭에 걸쳐 균일하게 체결하여 파지할 수 있고, 하부 파지 부재의 양쪽 경사면에는 익스팬디드 메탈을 설치하였기 때문에, 중량이 있는 매트라도 미끄러져 떨어지지 않고, 종래의 경질 고무와 같이 마모가 격렬하지 않기 때문에 보수가 용이하며, 특히 청구항 2의 발명에 의하면, 시공 장치가 연결 기둥에 결합되는 부분에 롤러를 설치하였기 때문에, 시공 장치의 위치 결정이 간단하며, 고정축을 결합시키면 시공도구를 수직으로 세운 상태로 고정시킬 수 있어 취급도 간편하게 된다.As described above, according to the present invention, since a plurality of pressing members of the lower gripping member can be operated simultaneously by rotating one handle, one worker can be uniformly fastened and gripped over the entire width of the mat end. Since expanded metal is provided on both inclined surfaces of the lower gripping member, even a heavy mat does not slip, and wear is not as violent as in conventional hard rubber, and maintenance is easy. According to the present invention, since the roller is provided at the portion where the construction device is coupled to the connecting column, the positioning of the construction device is simple, and when the fixed shaft is engaged, the construction tool can be fixed in a vertically upright state, and the handling is easy.

여기에서, 본 발명의 콘크리트 블록 또는 자연석의 집합체 부착 매트의 시공 장치에 있어서, 콘크리트의 캐스트 스톤 블록 집합체 부착 매트의 시공 장치의 바람직한 실시예를 도면에 따라 설명한다.Here, the preferred embodiment of the construction apparatus of the cast stone block aggregate attachment mat of concrete in the construction apparatus of the aggregate block mat of the concrete block or natural stone of this invention is demonstrated according to drawing.

본 실시예에 사용한 캐스트 스톤 블록 집합체 부착 매트는, 도 2에 도시한 바와 같이, 길이가 6m이고 폭은 1.6m로서 폭이 넓고, 세멘트 등의 알칼리의 화학반응에 강한 폴리프로필렌 섬유를 배치하며, 하면은 강도가 있는 폴리에스테르 섬유를 배치한 복합 소재의 부직포(不織布)로 되어 있고, 또한 하면에는 폴리에스테르의 필라멘트를 보강을 위해 혼입한 것이다. 캐스트 스톤 블록 집합체 부착 매트는, 이 매트(l)에 다수의 캐스트 스톤 블록(11)을 전면에 깔아 고정한 것이며, 도 3에 도시한 바와 같이, 4개의 종류의 캐스트 스톤 블록(llA, llB, 11C, 1lD)을 조합한 것이다. 1개의 캐스트 스톤의 기판의 평면은, 종횡의 치수가 대략 같은 대략 정방형을 하고 있고, 정방형의 4개의 코너 중 적어도 하나는 45o의 경사면(l2A, l2B, 12C, 12D)을 가지고 있다. 도 2에 도시한 바와 같이, 이들 블록 기판을 조합시키면 매트의 거의 전면을 덮으며, 그 접합한 접합선(14)은 직선이 아니고, 2개의 평행한 선을 교대로 45˚의 사선을 따라 이동시킨 것으로서, 종횡의 접합선이 사다 리꼴을 간격을 두고 배열한 형상으로 되는 평면 형상을 하고 있다.As shown in Fig. 2, the cast stone block aggregate attaching mat used in the present embodiment has a length of 6 m and a width of 1.6 m, which is wide and arranges polypropylene fibers resistant to alkali chemical reactions such as cement, The lower surface is made of a nonwoven fabric of a composite material in which polyester fibers having strength are arranged, and the filament of polyester is incorporated in the lower surface for reinforcement. The cast stone block aggregate attaching mat is formed by fixing a large number of cast stone blocks 11 on the mat 1 to the front, and as shown in FIG. 3, four types of cast stone blocks llA, llB, and 11C. , 1lD). The plane of the board | substrate of one cast stone has a substantially square with the substantially same horizontal dimension, and at least one of four square corners has 45 o inclined surfaces l2A, l2B, 12C, and 12D. As shown in Fig. 2, when these block substrates are combined, they almost cover the entire surface of the mat, and the bonded bond line 14 is not a straight line, and two parallel lines are alternately moved along a 45-degree diagonal line. As a result, the vertical and horizontal joining lines have a planar shape in which a trapezoid is arranged at intervals.

이 블록 기판에 적절하게 자연석을 모방한 캐스트 스톤(13A, 13B, 13C, 13D)을 배치하여 캐스트 스톤 블록으로 만들지만, 이 캐스트 스톤 블록(11)을 매트(1)의 전면에 깔아 고정시키고, 도 4에 도시한 바와 같이, 매트(1)에서의 캐스트 스톤 블록 집합체의 접합선(14)은, 사다리꼴(l4A, l4B)을 간격을 두고 배열한 형상이며, 다음의 매트(1)에서의 캐스트 스톤 콘크리트 블록의 접합선(15)도 사다리꼴(15A, l5B)을 간격을 두고 배열한 형상으로서, 그 형상을 1개의 블록 기판 만큼 어긋나게 두면, 도 5에 도시한 바와 같이, 호안(Y) 등의 현장에서 캐스트 스톤 블록 집합체의 매트(1D)를 깔고, 그 매트(1D)의 폭 방향의 캐스트 스톤 블록이 없는 부분에, 다음의 매트(1C)의 캐스트 스톤 블록이 약간 나온 부분을 접합하고, 순차적으로, 1D, lC, lB, lA의 순으로 배열하여 시공한다. 이 시공 때의 접합 부분은, 매트와 매트가 다소 어긋남이 있어도, 자연스럽게 맞는 접합 위치에 정확하게 유도되어, 접합선은 서로 맞아 눈에 띄지 않게 된다.The cast stone blocks 13A, 13B, 13C, and 13D are appropriately placed on the block substrate to form cast stone blocks, but the cast stone blocks 11 are laid on the front of the mat 1 to be fixed. As shown in FIG. 4, the joining line 14 of the cast stone block aggregate in the mat 1 is a shape arrange | positioned at intervals with trapezoids l4A and l4B, The cast stone in the following mat 1 The joint line 15 of the concrete block is also a shape arranged at intervals of the trapezoids 15A and l5B. When the shape is shifted by one block substrate, as shown in FIG. Laying the mat 1D of the cast stone block assembly, joining the part of the cast stone block of the next mat 1C slightly to the part without the cast stone block in the width direction of the mat 1D, and sequentially Install in order of 1D, lC, lB, lA. The joint part at the time of construction is guide | induced correctly to the joint position which fits naturally, even if a mat and a mat | matte shift | deviate a little, and a joining line mutually becomes inconspicuous.

이와 같은, 캐스트 스톤 블록 집합체 부착 매트의 양단부는, 50cm의 범위(50cm×160cm)에 캐스트 스톤 블록(11)집합체가 존재하지 않는 매트만 있는 부분(X)이 설치되어 있어, 도 6에 도시한 바와 같이, 이 양 단부 X를 본 실시예의 시공 장치(2A, 2B)로 파지하여 운반하거나 현장에서 포크리프트 또는 크레인(Z) 등으로 호안(Y) 등에 시공한다.Both ends of the mat with the cast stone block aggregate are provided with a portion X having only a mat in which the cast stone block 11 aggregate does not exist in a range of 50 cm (50 cm x 160 cm). As described above, the two end portions X are gripped and transported by the construction apparatuses 2A and 2B of the present embodiment, or are installed on the raft Y or the like by a forklift or a crane Z at the site.

여기에서, 도 7 내지 도 l0에 따라, 시공 장치(2, 2A, 2B)를 설명한다.Here, according to FIG. 7 thru | or 0, the construction apparatus 2, 2A, 2B is demonstrated.

도 7은, 도 6의 한 쌍의 시공 장치(2A, 2B) 내, 한쪽의 시공 장치(2)(2A)를 핸들이 있는 외측으로부터 본 평면도로서, 프레임 본체(3)과 프레임 본체(3) 내에 설치된 하부 파지부재(4)와 상부 파지 부재(5)로 이루어지고, 캐스트 스톤 블록(1l) 집합체 부착 매트(1)의 단부(X)를 하부 파지 부재(4)와 상부 파지 부재(5)로 협지하여, 이 시공 장치(2)를 전술한 도 6의 포크리프트(Z)로 들어 올린다.FIG. 7 is a plan view of one construction device 2 (2A) in the pair of construction devices 2A and 2B of FIG. 6 viewed from the outside with a handle, and includes the frame main body 3 and the frame main body 3. The lower gripping member 4 and the upper gripping member 5 provided therein, and the lower end holding member 4 and the upper gripping member 5 have an end X of the cast stone block 1 l assembly attaching mat 1. The construction device 2 is lifted by the forklift Z of FIG. 6 described above.

도 7에 있어서, 하부 파지 부재(4)는, 시공 장치(2)의 프레임 본체(3)의 저부 프레임을 겸하여 저부(31)에 고정되고, 매트(1)의 폭(1.6m) 이상의 길이를 가지고 있고, 도 9의 측단면 확대도에 도시한 바와 같이, 하부가 사각형(4l)이고, 상부가 지붕형의 단면이 이등변 삼각형(42)를 하고 있으며, 중앙의 정점(43)은 길이 방향(폭 방향)으로 연장되어, 이등변 삼각형(42)의 2변의 경사면(42a, 42b)에는 익스팬디드 메탈(expanede metal)(44)이 용접으로 고착되어 있고, 이 경사면(42a, 42b)의 전후 방향에는, 도 7에 도시한 바와 같이, 캐스트 스톤 블록 부착 매트(1)가 전진 또는 후퇴한다.In FIG. 7, the lower gripping member 4 serves as the bottom frame of the frame main body 3 of the construction apparatus 2 and is fixed to the bottom portion 31, and has a length of 1.6 m or more than the width of the mat 1. As shown in the enlarged side cross-sectional view of FIG. 9, the lower portion is a rectangle 4l, and the upper portion is an isosceles triangle 42 in a roof-shaped cross section, and the center vertex 43 is in the longitudinal direction (width). Direction), an expanded metal 44 is fixed to the inclined surfaces 42a and 42b of the two sides of the isosceles triangle 42 by welding, and in the front and rear directions of the inclined surfaces 42a and 42b. As shown in Fig. 7, the cast stone block attaching mat 1 moves forward or backward.

하부 파지 부재(4)에 대향하여 상부 파지 부재(5)가 상하 이동 가능하게 설치되지만, 상부 파지 부재(5)는, 하부 파지 부재(4)의 2변의 경사면(42a, 42b)을 덮도록, 전후 방향의 2변의 경사면(51a, 5lb)으로 이루어지고, 이 이등변 삼각형(52)의 2변(51a, 51b)으로 이루어지는 우산 모양에 의해 매트 단부(X)를 위로부터 협지하도록 구성되어 있다.While the upper gripping member 5 is provided to be movable up and down to face the lower gripping member 4, the upper gripping member 5 covers the inclined surfaces 42a and 42b of the two sides of the lower gripping member 4, It is comprised so that the mat edge part X may be pinched from the top by the umbrella shape which consists of inclined surfaces 51a and 5lb of two sides of the front-back direction, and consists of two sides 51a and 51b of this isosceles triangle.

이 상부 파지 부재(5)의 상부에는 상하로 이동하는 체결 기구(6)가 연결되어 있다.A fastening mechanism 6 that moves up and down is connected to the upper portion of the upper gripping member 5.

이 체결 기구(6)는, 상부 파지 부재(5)의 좌우에 한 쌍의 누름 부재(61a, 61b)가 설치되고, 이 누름 부재(61a, 61b)는 상부 파지 부재(5)에의 가압력을 어느 부분에도 거의 균일하게 하기 위해서 복수의 누름 조정 부재(61al, 61a2, 61bl, 61b2)를 가지고, 도 9에 도시한 바와 같이, 각각의 누름 조정 부재(61al, 6la2, 61bl, 61b2)에는, 조정 나사(611)와 고정 너트(612)에 의하여, 상부 파지 부재(5)와 각각의 누름 부재(61a, 61b)의 간격을 조정하고 있다.The fastening mechanism 6 is provided with a pair of pressing members 61a and 61b on the left and right sides of the upper gripping member 5, and the pressing members 61a and 61b provide a pressing force to the upper gripping member 5. In order to make it almost even to a part, it has several press adjustment member 61al, 61a2, 61bl, 61b2, and as shown in FIG. 9, each press adjustment member 61al, 6la2, 61bl, 61b2 has an adjustment screw. By the 611 and the fixing nut 612, the space | interval of the upper holding member 5 and each press member 61a, 61b is adjusted.

한편, 프레임 본체(3)의 저부(31)와 상부 프레임(32)은 양쪽의 측부 프레임(33a, 33b)에 의해 연결되어 고정되어 있지만, 상기 한 쌍의 누름 부재(61a, 61b)와 프레임 본체(3)의 상부 프레임(32) 사이에는 각각 2변의 상부 링크(62a), 하부 링크(62b)가 설치되고, 상부 링크(62a)는 상부 프레임(32)의 소정 위치의 베어링 부재(62l)와 링크 연결 부재(63)에 각각 회전 가능하게 지지되고, 하부 링크(62b)는 누름 부재(61a)(6lb)의 중앙부의 베어링 부재(61a3, 61b3)와 링크 연결 부재(63)에 각각 회전 가능하게 지지되어 있다. 따라서, 링크 연결 부재(63)(63a, 63b)의 좌우 이동이 누름 부재(61a, 61b)의 상하 이동으로 변환된다.On the other hand, although the bottom part 31 and the upper frame 32 of the frame main body 3 are connected and fixed by both side frames 33a and 33b, the pair of pressing members 61a and 61b and the frame main body are fixed. An upper link 62a and a lower link 62b of two sides are respectively provided between the upper frame 32 of (3), and the upper link 62a is a bearing member 62l at a predetermined position of the upper frame 32, and the upper link 62a. The lower link 62b is rotatably supported by the link connecting member 63, respectively, and the lower link 62b is rotatably attached to the bearing members 61a3 and 61b3 and the link connecting member 63 at the center of the pressing members 61a and 6lb, respectively. Supported. Therefore, the left and right movements of the link connecting members 63 (63a, 63b) are converted to the vertical movements of the pressing members 61a, 61b.

프레임 본체(3)의 상부 프레임(32)의 중앙부의 아래 쪽에는 핸들 지지 부재(34)가 설치되고, 원형 핸들(64)의 핸들축(64l)이 회전 가능하게 축지지되고, 핸들(64)은 매트(1)가 파지되는 쪽의 반대쪽에서 바깥쪽에 장착되는데, 작업원이 조작하기 쉬운 위치에 장착된다. 프레임 본체(3) 내의 핸들축(641)에는, 한 쌍의 회전 암(642a, 642b)이 설치되고, 회전암(642a, 642b)의 선단부(643)와 상기 링크 연결 부재(63)의 중앙부(631)는 연결봉(65a, 65b)에 의해 연결되어, 연결봉(65a, 65b)과 선단부(643) 및 연결봉(65a, 65b)과 중앙부(631)는 회전 가능하게 연결되고, 연결 봉(65a, 65b)의 중앙에는 길이를 조정하는 조정 부재(651)(턴벅클)이 설치되어 있다.The handle support member 34 is provided below the center part of the upper frame 32 of the frame main body 3, the handle shaft 64l of the circular handle 64 is rotatably supported, and the handle 64 The silver is mounted on the outside from the opposite side to which the mat 1 is gripped, and is mounted at a position that is easy for a worker to operate. A pair of rotary arms 642a and 642b are provided on the handle shaft 641 in the frame main body 3, and the front end portions 643 of the rotary arms 642a and 642b and the central portion of the link connecting member 63 are provided. 631 is connected by connecting rods 65a and 65b, so that connecting rods 65a and 65b and tip portions 643 and connecting rods 65a and 65b and central portion 631 are rotatably connected and connecting rods 65a and 65b. ), An adjustment member 651 (turnbuckle) for adjusting the length is provided.

체결 기구(6)는, 이상과 같은 기구이기 때문에, 도 7에 있어서, 프레임 본체(3)의 측부 중앙의 하나의 핸들(64)을 l/4 회전시켜, 각각의 연결 부재(63a, 63b)를 좌우 이동시킴으로써, 한 쌍의 누름 부재(61a, 61b)를 상하 이동시켜 상부 파지 부재와 하부 파지 부재 사이의 매트를 파지 또는 개방할 수 있다.Since the fastening mechanism 6 is a mechanism as described above, in FIG. 7, the one handle 64 at the center of the side of the frame main body 3 is rotated 1/4 of the respective connecting members 63a and 63b. By moving left and right, the pair of pressing members 61a and 61b can be moved up and down to grasp or open the mat between the upper holding member and the lower holding member.

다음에, 도 6에 도시한 바와 같이, 전술한 2개의 시공 장치로 매트(l)의 양 단부(X)를 협지하지만, 2개의 시공 장치를 합체시키는 연결 기구를 설명한다.Next, as shown in FIG. 6, although the both ends X of the mat 1 are clamped with the two construction apparatuses mentioned above, the coupling mechanism which unites two construction apparatuses is demonstrated.

시공 장치(2)(2A, 2B)의 프레임 본체(3)의 상부 프레임(32)의 상부에는 연결 기둥 접속 부재(7)가 설치되어 있다. 이 연결 기둥 접속 부재(7)는, 매트(1)의 양 단부(X)에 대응하기 위해 한 쌍의 시공 장치(2A, 2B)를 연결 기둥(8)에 장착하는 것이며, 길이도 매트(1)의 길이 6m에 대응하고 있다.The connection column connection member 7 is provided in the upper part of the upper frame 32 of the frame main body 3 of the construction apparatus 2 (2A, 2B). In order to correspond to the both ends X of the mat 1, this connecting pillar connection member 7 mounts a pair of construction apparatus 2A, 2B to the connecting pillar 8, and also length mat 1 ) Corresponds to the length of 6m.

이 연결 기둥(8)에서, 상부 파지 부재(5)와 체결 기구(6)를 제외한 도 8에 도시한 바와 같이, 연결 기둥(8)의 양쪽은 빔을 겸한 레일(8la, (81b)이 설치되고, 연결 기둥(8)의 상면에는 복수의 결합 홈(83)을 가지는 핀 고정 부재(82a, 82b)가 형성되어 있다.In this connecting column 8, as shown in FIG. 8 except for the upper gripping member 5 and the fastening mechanism 6, rails 8la and 81b serving as beams are provided on both sides of the connecting column 8. The pin fixing members 82a and 82b having a plurality of engaging grooves 83 are formed on the upper surface of the connecting pillar 8.

다른 한편, 시공 장치(2)의 연결 기둥 접속 부재(7)에는, 레일(81) 상에서 이동 가능한 한 쌍의 롤러(7la, 71b)가 설치되고, 매트(1)의 길이 등에 맞는 결합홈(83)에 끼워맞추어지는 착탈 가능한 회전축(72)을 설치하고, 이 회전축(72)을 세팅할 때에는, 시공 장치(2)를 롤러(71a, 7lb)에 의해 연결 기둥(8)의 레일상(81)에 서 이동시켜, 원하는 결합홈(83)에 끼워맞추어지는 위치에서 회전축(72)을 연결 기둥 접속 부재(7)의 결합 구멍(73a, 73b)과 결합홈(83)에 삽입한다. 따라서, 이 연결 기둥(8)의 위치에서 시공 장치(2)는 좌우로 요동 가능하게 지지된다(도 8의 점선 R).On the other hand, the pair of rollers 7la and 71b which are movable on the rail 81 is provided in the connection column connection member 7 of the construction apparatus 2, and the coupling groove 83 suitable for the length of the mat 1, etc. When attaching and detaching the rotating shaft 72 fitted to the (), and setting this rotating shaft 72, the construction device (2) by the roller (71a, 7lb) on the rail 81 of the connecting column (8) The rotary shaft 72 is inserted into the coupling holes 73a and 73b and the coupling groove 83 of the connection column connecting member 7 at a position to be fitted into the desired coupling groove 83. Therefore, at the position of this connecting column 8, the construction apparatus 2 is supported so that it can rock left and right (dotted line R of FIG. 8).

또한, 연결 기둥 접속 부재(7)에는, 연결 기둥(8)의 저면에 대해 시공 장치(2)의 프레임 본체(3)의 측부 프레임(33)과 연결 기둥(8)이 직각의 위치로 고정되도록 한 착탈 가능한 결합 구멍(74a, 74b)과 고정축(75)을 설치하여, 시공 작업을 중단한 때에는, 연결 기둥 접속 부재(7)와 2개의 시공 장치(2A, 2B)를 안정된 형상으로 평지에 둘 수 있도록 하고 있다. 즉, 고정축(75)을 제거했을 때에는 프레임 본체(3)가 회전 가능하게 되어 매트(l)를 무리없이 매달 수 있고, 또한, 회전축(72)을 제거한 때에는, 시공 장치(2A, 2B)가 롤러(71a, 71b)에 의해 연결 기둥(8)의 레일(81) 상에서 간단히 이동 가능하게 되어, 연결 기둥(8)에서의 소정 위치의 설치나 연결 기둥(8)으로부터의 제거가 간단해진다.Moreover, the side frame 33 and the connection column 8 of the frame main body 3 of the construction apparatus 2 are fixed to the connection column connection member 7 at the right angle position with respect to the bottom face of the connection column 8. When the detachable coupling holes 74a and 74b and the fixed shaft 75 are provided and the construction work is interrupted, the connecting column connecting member 7 and the two construction devices 2A and 2B are placed on a flat surface in a stable shape. I can do it. That is, when the fixed shaft 75 is removed, the frame main body 3 is rotatable, and the mat 1 can be suspended without difficulty, and when the rotating shaft 72 is removed, the installation apparatuses 2A and 2B The rollers 71a and 71b make it easy to move on the rail 81 of the connection column 8, and the installation of the predetermined position in the connection column 8 and the removal from the connection column 8 are simplified.

또한, 연결 기둥(8)의 거의 중앙부에는 복수의 크레인 현수부(84)와 포크리프트의 포크 결합부(85)가 설치되어 있어, 크레인과 포크리프트의 포오크에서의 시공 장치의 취급을 용이하게 하고 있고, 특히, 연결 기둥(8)의 아래 쪽에 설치한 포크 결합부(85)는, 연결 기둥(8)의 바로 아래와 상단 포크 결합부(85a)와, 프레임 본체(3)의 측부 프레임(33)과 거의 같은 높이의 지지체(851)로 지지되는 하단 포크 결합부(85b)로 이루어져, 포오크리프트에서의 높이 이동이 충분하지 않은 경우에는 하단 후오크 결합부(85b)를 이용하여 높이를 보강하고, 또한, 시공 작업을 중단할 때에는, 하단 포크 결합부(85b)가 2개의 시공 장치(2A, 2B)로 보다 안정된 형상으로 평지에 둘 수 있도록 하고 있다.In addition, a plurality of crane suspensions 84 and forklift portions 85 of the forklift are provided near the center of the connecting column 8 to facilitate the handling of the construction device in the forks of the crane and forklift. In particular, the fork coupling portion 85 provided below the coupling pillar 8 includes the upper and lower fork coupling portions 85a directly below the coupling pillar 8 and the side frame 33 of the frame body 3. It consists of a lower fork coupling portion (85b) that is supported by a support (851) having a height substantially equal to, if the height movement in the forklift is not sufficient, the height is reinforced using the lower hook coupling portion (85b), In addition, when stopping construction work, the lower fork coupling part 85b is made to be able to put on flat on a more stable shape with two construction apparatus 2A, 2B.

그리고, 본 발명의 특징을 손상시키지 않는 한, 전술한 실시예에 한정하지 않는 것은 물론이다.It goes without saying that the present invention is not limited to the above-described embodiments as long as the features of the present invention are not impaired.

이상과 같이, 본 발명에 의하면, 1개의 핸들을 회전시켜 하부 파지 부재의 복수의 누름 부재를 동시에 조작할 수 있기 때문에, 1명의 작업원으로 매트 단부의 전폭에 걸쳐 균일하게 체결하여 파지할 수 있고, 하부 파지 부재의 양쪽 경사면에는 익스팬디드 메탈을 설치하였기 때문에, 중량이 있는 매트라도 미끄러져 떨어지지 않고, 종래의 경질 고무와 같이 마모가 격렬하지 않기 때문에 보수가 용이하며, 특히 청구항 2의 발명에 의하면, 시공 장치가 연결 기둥에 결합되는 부분에 롤러를 설치하였기 때문에, 시공 장치의 위치 결정이 간단하며, 고정축을 결합시키면 시공도구를 수직으로 세운 상태로 고정시킬 수 있어 취급도 간편하게 된다.As described above, according to the present invention, since a plurality of pressing members of the lower gripping member can be operated simultaneously by rotating one handle, one worker can be uniformly fastened and gripped over the entire width of the mat end. Since expanded metal is provided on both inclined surfaces of the lower gripping member, even a heavy mat does not slip, and wear is not as violent as in conventional hard rubber, and maintenance is easy. According to the present invention, since the roller is provided at the portion where the construction device is coupled to the connecting column, the positioning of the construction device is simple, and when the fixed shaft is engaged, the construction tool can be fixed in a vertically upright state, and the handling is easy.

Claims (3)

프레임 본체와 상기 프레임 본체 내에 설치된 하부 파지 부재와 상부 파지 부재로 구성되어, 콘크리트 블록 또는 자연석의 집합체 부착 매트의 단부를 상기 하부 파지 부재와 상기 상부 파지 부재로 협지하여 들어 올리는 시공 장치에 있어서,In the construction device which consists of a frame main body and the lower holding member and upper holding member provided in the said frame main body and clamps the edge part of the aggregate block mat of a concrete block or natural stone by the said lower holding member and the said upper holding member, 상기 하부 파지 부재는, 상기 시공 장치의 상기 프레임 본체의 저부에 고정되어 있으며, 매트의 폭에 대응하는 길이를 가지고, 길이 방향으로 연장되는 정점을 중앙으로 하여 전후 2변의 경사면으로 이루어지고, 상기 전후 2변의 경사면에는 익스팬디드 메탈이 고착되어 있고,The lower gripping member is fixed to the bottom of the frame main body of the construction apparatus, has a length corresponding to the width of the mat, and is formed of two inclined surfaces of front and rear sides with a vertex extending in the longitudinal direction as a center. Expanded metal is fixed to the slopes on both sides, 상기 상부 파지부재는, 상기 하부 파지 부재의 상기 2변의 경사면을 덮도록 전후 2변의 경사면으로 이루어져 상기 매트의 단부를 협지하는 우산 모양이며, 상기 상부 파지 부재의 상부에는 상하로 이동하는 체결 기구가 연결되어 있고,The upper gripping member is formed of an inclined surface of the front and rear two sides so as to cover the inclined surfaces of the two sides of the lower gripping member is an umbrella shape to sandwich the end of the mat, the fastening mechanism for moving up and down is connected to the upper portion of the upper gripping member It is, 상기 체결 기구에는, 상기 상부 파지 부재의 좌우에 복수의 누름 조정 부재를 구비하는 한 쌍의 누름 부재가 설치되어 있고, 상기 한 쌍의 누름 부재와 상기 프레임 본체의 상부 프레임 사이에는 각각 2변의 링크가 설치되어 있고, 상기 2변의 링크는 연결 부재로 연결되어 있어, 각각의 연결 부재를 l개의 핸들을 회전시켜 좌우 이동시킴으로써, 한 쌍의 누름 부재를 상하 이동시켜 상기 상부 파지 부재와 상기 하부 파지 부재 사이의 상기 매트를 파지 또는 개방하는 것을 특징으로 하는 콘크리트 블록 또는 자연석의 집합체 부착 매트의 시공 장치.The fastening mechanism is provided with a pair of pressing members including a plurality of pressing adjustment members on the left and right sides of the upper gripping member, and two sides of a link are provided between the pair of pressing members and the upper frame of the frame body. The two sides of the link are connected to each other by a connecting member, and the pair of pressing members are moved up and down by rotating each of the connecting members by rotating the L handles to move between the upper and lower holding members. Apparatus for constructing a mat with an aggregate of concrete blocks or natural stones, characterized in that the mat is held or opened. 제1항에 있어서,The method of claim 1, 상기 프레임 본체의 상부 프레임의 상부에는, 연결 기둥 접속 부재가 설치되어 있고, 상기 매트의 양단에 대응하도록 한 쌍의 상기 시공 장치를 파지하는 연결 기둥이 배치되며,In the upper part of the upper frame of the said frame main body, the connection column connection member is provided, and the connection column which hold | grips a pair of the said construction apparatus so that the both ends of the mat may be arrange | positioned, 상기 연결 기둥의 양쪽에 레일이 설치되어 있고, 상기 연결 기둥의 상면에 복수의 결합홈을 가지는 핀 고정 부재가 설치되어 있고,Rails are provided on both sides of the connection column, and pin fixing members having a plurality of coupling grooves are provided on an upper surface of the connection column. 상기 연결 기둥 접속 부재에는, 상기 레일 상에서 이동 가능한 한 쌍의 롤러가 설치되어 있고, 상기 결합홈에 결합하는 착탈 가능한 회전축이 설치되어 있으며, 상기 연결 기둥의 저면에 대하여 상기 시공 장치의 상기 프레임 본체의 측부 프레임과 상기 연결 기둥이 직각의 위치로 고정되도록 한 착탈 가능한 고정축이 설치되어 있어, 상기 고정축을 제거했을 때에는 상기 프레임 본체가 회전 가능하게 되고, 상기 회전축을 제거했을 때에는, 상기 프레임 본체가 상기 롤러에 의해 상기 연결 기둥의 상기 레일 상에서 이동 가능한 것을 특징으로 하는 콘크리트 블록 또는 자연석의 집합체 부착 매트의 시공 장치.The connecting column connecting member is provided with a pair of rollers movable on the rail, and a detachable rotating shaft coupled to the coupling groove is provided, and the bottom of the connecting column is connected to the frame body of the construction apparatus. A detachable fixed shaft is provided in which the side frame and the connecting column are fixed at a right angle position. When the fixed shaft is removed, the frame main body is rotatable. When the rotating shaft is removed, the frame main body is A construction device for a concrete block or mat for attaching aggregates of natural stones, characterized by being movable on the rail of the connecting column by a roller. 제2항에 있어서,3. The method of claim 2, 상기 연결 기둥의 중앙부에는 포크리프트의 포크 결합부와 크레인 현수부가 설치되어 있는 것을 특징으로 하는 콘크리트 블록 또는 자연석의 집합체 부착 매트의 시공 장치.The construction unit of the concrete block or mat of the aggregate of natural stone, characterized in that the forklift portion of the forklift and the crane suspension portion is installed in the central portion of the connecting column.
KR1020050019754A 2004-10-15 2005-03-09 Construction equipment of the mat with an aggregate of a concrete block, or construction equipment of the mat with an aggregate of a natural stone KR101155405B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2004301906A JP4318621B2 (en) 2004-10-15 2004-10-15 Construction equipment for mats with blocks and natural stone aggregates.
JPJP-P-2004-00301906 2004-10-15

Publications (2)

Publication Number Publication Date
KR20060043791A KR20060043791A (en) 2006-05-15
KR101155405B1 true KR101155405B1 (en) 2012-06-20

Family

ID=36380905

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050019754A KR101155405B1 (en) 2004-10-15 2005-03-09 Construction equipment of the mat with an aggregate of a concrete block, or construction equipment of the mat with an aggregate of a natural stone

Country Status (2)

Country Link
JP (1) JP4318621B2 (en)
KR (1) KR101155405B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102036804B1 (en) 2019-08-30 2019-10-25 주식회사지오환경 Natural stone fixing structure

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4584281B2 (en) * 2007-04-20 2010-11-17 和 熊谷 Mat with concrete block and method for producing the same
US11383300B2 (en) 2017-10-30 2022-07-12 Sumitomo Electric Industries, Ltd. Sintered material and cutting tool including the same
CN114010026A (en) * 2021-11-16 2022-02-08 新晃侗族自治县易同云网科技有限公司 Circulating display device is used in building material sale

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01110494A (en) * 1987-10-20 1989-04-27 Asahi Chem Ind Co Ltd Method of gripping block mat
JPH01299189A (en) * 1988-05-26 1989-12-01 Asahi Chem Ind Co Ltd Device for handling block mat
JPH02209389A (en) * 1989-02-10 1990-08-20 Asahi Chem Ind Co Ltd Lifting gear for block mat
JP2005113491A (en) 2003-10-07 2005-04-28 Maeda Kosen Co Ltd Block mat laying apparatus and block mat laying method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01110494A (en) * 1987-10-20 1989-04-27 Asahi Chem Ind Co Ltd Method of gripping block mat
JPH01299189A (en) * 1988-05-26 1989-12-01 Asahi Chem Ind Co Ltd Device for handling block mat
JPH02209389A (en) * 1989-02-10 1990-08-20 Asahi Chem Ind Co Ltd Lifting gear for block mat
JP2005113491A (en) 2003-10-07 2005-04-28 Maeda Kosen Co Ltd Block mat laying apparatus and block mat laying method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102036804B1 (en) 2019-08-30 2019-10-25 주식회사지오환경 Natural stone fixing structure

Also Published As

Publication number Publication date
JP4318621B2 (en) 2009-08-26
JP2006112156A (en) 2006-04-27
KR20060043791A (en) 2006-05-15

Similar Documents

Publication Publication Date Title
KR101155405B1 (en) Construction equipment of the mat with an aggregate of a concrete block, or construction equipment of the mat with an aggregate of a natural stone
KR101798540B1 (en) Versatile cantilever bracket device
JP2014122118A (en) Column connector system
GB2447785A (en) Pile driving and gripping apparatus
JP2003064863A5 (en)
JP3709161B2 (en) Method for producing a concrete structure using a concrete formwork
CN209635745U (en) A kind of construction single-rail crane brake gear
JP3692433B2 (en) PC foundation member position adjustment jig
JP3029411U (en) Formwork attachment device for forming concrete bands and lintels
JP3995258B1 (en) Hanger for articulated block and construction method of articulated block
JP4719517B2 (en) Exterior wall climbing apparatus and exterior wall climbing method
JP2018168599A (en) Installation method of formwork and suspending device for formwork
CN208430792U (en) A kind of portable transfer tool for building
CN209468987U (en) A kind of portable operating platform for assembled main cable and girder
JP4078173B2 (en) Work unit
KR100570742B1 (en) Clamp for transfering heavy block
CN215210581U (en) T-beam erection device applied to double-guide-beam bridge erecting machine in mountainous area
KR101201215B1 (en) Moving tool for mold of concrete building
CN220182544U (en) Steel bar lifting device for bridge construction
CN212222242U (en) Lifting device for constructional engineering construction
CN212665882U (en) Single operable clamp
JP2012229540A (en) Temporary jetty construction method and scaffold device for constructing temporary jetty
CN220767760U (en) Cableway pipe positioning device
CN212474863U (en) Curb transport and mounting tool
CN211393655U (en) Building engineering material lifting machine

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20150316

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20180528

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20190523

Year of fee payment: 8