KR101119651B1 - The pro-environmental retaining wall using circular PHC pile with catch pit which is had and construction method using thereby - Google Patents

The pro-environmental retaining wall using circular PHC pile with catch pit which is had and construction method using thereby Download PDF

Info

Publication number
KR101119651B1
KR101119651B1 KR1020090091830A KR20090091830A KR101119651B1 KR 101119651 B1 KR101119651 B1 KR 101119651B1 KR 1020090091830 A KR1020090091830 A KR 1020090091830A KR 20090091830 A KR20090091830 A KR 20090091830A KR 101119651 B1 KR101119651 B1 KR 101119651B1
Authority
KR
South Korea
Prior art keywords
phc pile
retaining wall
plate
eco
friendly retaining
Prior art date
Application number
KR1020090091830A
Other languages
Korean (ko)
Other versions
KR20110034333A (en
Inventor
이현숙
Original Assignee
이현숙
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이현숙 filed Critical 이현숙
Priority to KR1020090091830A priority Critical patent/KR101119651B1/en
Publication of KR20110034333A publication Critical patent/KR20110034333A/en
Application granted granted Critical
Publication of KR101119651B1 publication Critical patent/KR101119651B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/205Securing of slopes or inclines with modular blocks, e.g. pre-fabricated
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/58Prestressed concrete piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0061Production methods for working underwater
    • E02D2250/0076Drilling
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0006Plastics
    • E02D2300/0009PE
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0035Aluminium
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/007Resins including glasfibers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0075Textiles
    • E02D2300/0076Textiles non-woven

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

본 발명은 원형 PHC말뚝을 이용한 집수구가 구비된 친환경 옹벽 및 그 시공공법에 관한 것으로, 더욱 상세하게는 복수 설치된 원형 PHC말뚝; PHC말뚝의 길이방향으로 복수 형성된 원형 띠형태의 강재밴드; PHC말뚝의 일측으로 이격된 판상형 바형태의 플레이트; PHC말뚝에 형성된 강재밴드와 플레이트 사이를 서로 연결고정하는 소정길이를 갖는 복수의 판상형태 스토퍼; 스토퍼 양면에 형성된 판형태의 보조플레이트; 각각의 인접한 PHC말뚝의 스토퍼 사이로 끼움 설치되는 내면 중앙에 일체로 수직연장형성된 집수구가 일체로 구비된 패널; 패널 외측 각각의 플레이트 외면에 고정설치되는 친환경소재를 이용한 외장재; 외장재를 플레이트에 고정설치하는 앵커볼트 및 너트; 및 PHC말뚝 상부를 마감하는 캡콘크리트가 포함된 원형 PHC말뚝을 이용한 집수구가 구비된 친환경 옹벽 및 그 시공공법에 관한 것이다. 따라서, 본 발명은 자립식 친환경 옹벽을 제공하는 효과, 친환경 옹벽의 외관이 미려한 효과, 작업의 편리성, 공기단축 및 공사비 절감의 효과, 및 친환경적 외장재가 사용된 친환경 옹벽을 제공하는 효과가 있는 원형 PHC말뚝을 이용한 집수구가 구비된 친환경 옹벽 및 그 시공공법에 관한 것이다.The present invention relates to an environment-friendly retaining wall and a construction method provided with a catchment using a circular PHC pile, more specifically a plurality of circular PHC pile; Steel band in the form of a plurality of circular bands formed in the longitudinal direction of the PHC pile; Plates of the plate-shaped bar spaced to one side of the PHC pile; A plurality of plate-shaped stoppers having a predetermined length for connecting and fixing the steel band and the plate formed on the PHC pile; Plate-shaped auxiliary plates formed on both sides of the stopper; A panel integrally provided with a water collecting port integrally formed with a vertical extension in the center of the inner surface which is fitted between the stoppers of each adjacent PHC pile; Exterior materials using eco-friendly materials that are fixed to the outer surface of each plate outside the panel; Anchor bolts and nuts for fixing the exterior member to a plate; And it relates to an environmentally friendly retaining wall provided with a water collecting port using a circular PHC pile containing a cap concrete for finishing the upper PHC pile and its construction method. Therefore, the present invention provides a self-sustaining eco-friendly retaining wall, a beautiful appearance of the eco-friendly retaining wall, the convenience of work, the effect of reducing the air and construction costs, and the effect of providing an eco-friendly retaining wall using an eco-friendly exterior material It relates to an eco-friendly retaining wall and a construction method provided with a catchment using a PHC pile.

친환경 옹벽, PHC말뚝, 집수구가 구비된 패널, 스토퍼, 집수구 Eco-Friendly Retaining Wall, PHC Pile, Panel with Sump, Stopper, Sump

Description

원형 PHC말뚝을 이용한 집수구가 구비된 친환경 옹벽 및 그 시공공법{The pro-environmental retaining wall using circular PHC pile with catch pit which is had and construction method using thereby}The pro-environmental retaining wall using circular PHC pile with catch pit which is had and construction method using hence

본 발명은 원형 PHC말뚝을 이용한 집수구가 구비된 친환경 옹벽 및 그 시공공법에 관한 것으로, 더욱 상세하게는 친환경 옹벽의 설치위치를 따라 지중에 소정거리 이격되어 복수 설치된 원형 PHC말뚝; PHC말뚝의 길이방향으로 소정거리 이격되게 복수형성되어 PHC말뚝을 감싸는 소정폭의 원형 띠형태 강재밴드; PHC말뚝의 일측으로 이격되어 일면이 PHC말뚝의 외면의 길이방향과 평행하게 형성된 판상형 바형태의 플레이트; PHC말뚝에 형성된 강재밴드와 플레이트 사이를 서로 연결고정하는 소정길이를 갖는 복수의 판상형태 스토퍼; 스토퍼는 양면에 직각으로 플레이트와 평행한 판형태의 보조플레이트; 각각의 인접한 PHC말뚝의 스토퍼 사이로 끼움 설치되는 내면 중앙에 일체로 수직연장형성된 집수구가 일체로 구비된 패널; 집수구가 구비된 패널 외측 각각의 플레이트 외면에 고정설치되는 친환경소재를 이용한 외장재; 외장재를 플레이트에 고정설치하는 앵커볼트 및 너트; 및 PHC말뚝 상부를 마감하는 캡콘크리트가 포함된 원형 PHC말뚝을 이용한 집수구가 구비된 친환경 옹벽 및 그 시공공법에 관한 것이다. The present invention relates to an environment-friendly retaining wall provided with a catchment using a circular PHC pile and its construction method, and more specifically, a plurality of circular PHC piles spaced a predetermined distance from the ground along the installation location of the eco-friendly retaining wall; A plurality of circular band-shaped steel bands having a predetermined width formed to be spaced apart a predetermined distance in the longitudinal direction of the PHC pile to surround the PHC pile; Plate-shaped bar-shaped plate spaced to one side of the PHC pile is formed parallel to the longitudinal direction of the outer surface of the PHC pile; A plurality of plate-shaped stoppers having a predetermined length for connecting and fixing the steel band and the plate formed on the PHC pile; The stopper includes a plate-shaped auxiliary plate parallel to the plate at right angles to both sides; A panel integrally provided with a water collecting port integrally formed with a vertical extension in the center of the inner surface which is fitted between the stoppers of each adjacent PHC pile; Exterior materials using environmentally friendly materials that are fixed to the outer surface of each plate outside the panel having a catchment; Anchor bolts and nuts for fixing the exterior member to a plate; And it relates to an environmentally friendly retaining wall provided with a water collecting port using a circular PHC pile containing a cap concrete for finishing the upper PHC pile and its construction method.

일반적으로 옹벽이라 함은 땅을 깎거나 흙을 쌓아 생기는 비탈이 흙의 압력으로 무너져 내리지 않도록 만든 벽을 가리킨다. 즉, 배후의 토사의 붕괴를 방지할 목적으로 만들어지는 구조물을 말하는 것이며, 배후의 토압에 대하여 옹벽의 보유내력으로 안정을 유지하는 구조물이다.In general, a retaining wall refers to a wall made so that the slopes formed by cutting the soil or building up soil do not collapse under the pressure of the soil. That is, it refers to a structure made for the purpose of preventing the collapse of the soil behind, and it is a structure that maintains stability with the retaining force of the retaining wall against the soil pressure behind.

이러한, 옹벽의 종류는 무근 콘크리트로 만들어지며 자중에 의해 안정을 유지하는 중력식 옹벽과 철근 콘크리트로 만들어지며 벽체, 뒤판, 앞판으로 구성되고 이들이 각각 캔틸레버로 작용하는 캔틸레버 옹벽, 캔틸레버 옹벽의 후면에 일정한 간격의 부벽을 설치하여 보강한 뒷부벽식 옹벽 및 캔틸레버 옹벽의 전면에 일정한 간격의 부벽을 설치하여 보강한 앞부벽식 옹벽 등이 있다.This type of retaining wall is made of plain concrete, and it is made of gravity retaining wall and reinforced concrete, which is stabilized by its own weight. Rear wall retaining wall reinforced with subwalls and front wall retaining wall reinforced with subwalls at regular intervals in front of the cantilever retaining wall.

전술한, 종래 옹벽 중 가장 널리 이용되는 캔틸레버 옹벽의 시공순서를 살펴보면, 옹벽을 시공할 곳에 터파기를 하고 기초면을 정리한다. 기초면이 정리되면 기초면에 기초 콘크리트를 타설한다. 이때, 기초 콘크리트가 지내력이 부족할 경우 지반개량 또는 파일을 더 설치하여 보강한다. 기초 콘크리트가 타설된 후 바닥 철근을 배근하고 콘크리트를 타설한다. 이렇게 타설된 콘크리트에 벽체 철근을 배근하고 콘크리트를 타설하면 캔틸레버 옹벽이 완성된다.Looking at the construction procedure of the cantilever retaining wall most widely used in the conventional retaining wall described above, the trench and the foundation surface is arranged in the place to install the retaining wall. When the foundation surface is arranged, the foundation concrete is poured on the foundation surface. At this time, if the foundation concrete lacks bearing strength, reinforcement by installing more ground improvement or pile. After the foundation concrete is poured, reinforce the floor reinforcement and pour the concrete. The reinforcing wall reinforcement is placed on the poured concrete and the concrete is poured to complete the cantilever retaining wall.

이상의 캔틸레버 옹벽의 경우에서 알 수 있듯이 옹벽의 설치공법은 터파기 철근의 조립, 거푸집 및 비계의 설치 및 콘크리트의 타설 등으로 이루어진 복잡한 공정을 거쳐 설치가 완료됨을 알 수 있다. 이에 따라, 옹벽을 설치하는 공사기간이 길어지고, 공사비의 증가 및 현장 작업자의 숙련도에 따라 품질이 달라지는 문제점 이 있다.As can be seen in the case of the cantilever retaining wall, the installation method of the retaining wall is completed through a complicated process consisting of assembling the reinforcing bar, installing the formwork and scaffolding, and placing the concrete. Accordingly, the construction period for installing the retaining wall is long, there is a problem that the quality varies depending on the increase in construction cost and the skill of the site workers.

이를 해결하기 위해, 선등록특허 제 10-473375호를 살펴보면, 중심부에 중공부를 갖는 PHC 말뚝과 PHC 말뚝의 상부에 설치되는 캡 콘크리트를 포함하여 구성된다. 이렇게 설치된 옹벽은 토지의 유효 이용이 가능하고, 공기를 단축하는 장점이 있다.In order to solve this problem, looking at the registered Patent No. 10-473375, it comprises a PHC pile having a hollow in the center and the cap concrete is installed on the top of the PHC pile. The retaining wall installed in this way allows the effective use of land and has the advantage of shortening the air.

이와 함께, 옹벽과 같은 지반의 안정 및 지하수의 유입을 막을 수 있도록 다수개의 H빔과 다수개의 토류벽으로 시공되는 기초흙막이 구조를 살펴볼 수 있다. 이러한 일반적인 기초흙막이구조의 문제점을 해소하기 위해 선등록특허 제 10-583939호를 살펴보면, 다수개의 H빔에 각각 연속된 "T"형 연결편을 부착하여 터파기 시공이 이루어지는 테두리부위에 매설하고, "T"형 연결편과 "T" 형 연결편 사이에 제1 토류벽을 항타하여 매설 및 시공하며, 그리고 제1 토류벽의 상부에 다수개의 제2 토류벽을 적층 및 시공하여, 제1, 2 토류벽 설치를 마친 후 굴착작업을 시행하여 기초흙막이 구조를 설치한다. 이에 따라, 작업이 일원화되어 작업효율을 높일 수 있다. 그러나 선등록특허 제 10-583939호는 비하층의 굴착시 우수의 유입을 방지하는 목적, 효과 및 구조를 갖는 것으로 배면의 우수로 인한 수압증가로 인해 옹벽으로서의 경제성 확보 및 기능 발휘를 하지 못하는 문제점이 있었다.In addition, it is possible to look at the foundation mud structure constructed with a plurality of H beams and a plurality of earth walls so as to stabilize the ground such as the retaining wall and prevent the inflow of groundwater. In order to solve the problem of the general basic earthquake structure, look at the registered Patent No. 10-583939, attached to each of the continuous "T" type connecting pieces to a plurality of H-beams, buried in the edge of the trench construction, " After embedding and constructing the first earth wall between the T "type connecting piece and the" T "type connecting piece, and stacking and constructing a plurality of second earth walls on the upper part of the first earth wall, and completing the first and second earth wall installation. Excavation work is carried out to install the foundation mud structure. Accordingly, the work can be unified to increase the work efficiency. However, Patent No. 10-583939 has the purpose, effect, and structure to prevent the inflow of rainwater during excavation of the lower layer, and the problem of failing to secure the economy and function as a retaining wall due to the increase in water pressure due to the rainwater on the back surface. there was.

따라서, 본 발명은 이상의 문제점을 해결하기 위하여 창출된 것으로서, 본 발명의 목적은 다음과 같다.Accordingly, the present invention was created to solve the above problems, the object of the present invention is as follows.

첫째, 본 발명은 원형 PHC말뚝을 소정거리 이격하여 지중에 복수 매립하여 자립식 친환경 옹벽을 제공하는데 그 목적이 있다.First, the present invention has a purpose to provide a self-supporting eco-friendly retaining wall by embedding a plurality of circular PHC pile in the ground spaced a predetermined distance apart.

둘째, 본 발명은 친환경소재로 제작된 집수구가 구비된 패널로 옹벽의 벽면을 형성하고, 상기 패널 외측으로 판체형태의 목재, 판체형태의 광석 및 건축외장재 등을 이용하여 친환경 옹벽의 외관을 미려하게 형성하는데 그 목적이 있다.Secondly, the present invention forms a wall surface of the retaining wall with a panel having a water collecting port made of eco-friendly material, and the exterior of the panel is beautifully made by using plate-like wood, plate-shaped ore and building exterior materials. Its purpose is to form.

셋째, 본 발명은 PHC말뚝들 사이에 적층 설치되는 집수구가 구비된 패널을 PHC말뚝에 고정하는 스토퍼를 이용한 친환경 옹벽의 높이에 따라 시공현장에서 바로 설치하여 친환경 옹벽작업의 편리성을 제공하는데 그 목적이 있다.Third, the present invention is installed directly at the construction site according to the height of the eco-friendly retaining wall using the stopper for fixing the panel provided with the water collecting port to be installed between the PHC pile to the PHC pile to provide the convenience of eco-friendly retaining wall work There is this.

넷째, 본 발명은 친환경 옹벽의 적층된 집수구가 구비된 패널의 내측을 따라 수직으로 집수구를 형성하여 집수구가 구비된 패널 배면의 우수를 배제시켜 친환경 옹벽에 수압이 발생하지 않도록 하는데 그 목적이 있다.Fourth, an object of the present invention is to form a catchment vertically along the inner side of the panel provided with laminated catches of the eco-friendly retaining wall so as to exclude the superiority of the back surface of the panel provided with the catchment so that water pressure does not occur in the eco-friendly retaining wall.

이와 같은, 본 발명의 목적을 달성하기 위한 기술수단은 다음과 같다.As described above, technical means for achieving the object of the present invention is as follows.

친환경 옹벽의 설치위치를 따라 지중에 소정거리 이격되어 복수 설치된 원형 PHC말뚝; PHC말뚝의 길이방향으로 소정거리 이격되게 복수형성되어 PHC말뚝을 감싸는 소정폭의 원형 띠형태 강재밴드; PHC말뚝의 일측으로 이격되어 일면이 PHC말뚝 의 외면의 길이방향과 평행하게 형성된 판상형 바형태의 플레이트; PHC말뚝에 형성된 강재밴드와 플레이트 사이를 서로 연결고정하는 소정길이를 갖는 복수의 판상형태 스토퍼; 스토퍼 양면에 직각으로 플레이트와 평행하게 형성된 판형태의 보조플레이트; 각각의 인접한 PHC말뚝의 스토퍼 사이로 끼움 설치되는 내면 중앙에 일체로 수직연장형성된 집수구가 일체로 구비된 패널; 집수구가 구비된 패널 외측 각각의 플레이트 외면에 고정설치되는 친환경소재를 이용한 외장재; 외장재를 플레이트에 고정설치하는 앵커볼트 및 너트; 및 PHC말뚝 상부를 마감하는 캡콘크리트가 포함되는 것을 특징으로 한다.A plurality of circular PHC piles spaced a predetermined distance from the ground along the installation location of the eco-friendly retaining wall; A plurality of circular band-shaped steel bands having a predetermined width formed to be spaced apart a predetermined distance in the longitudinal direction of the PHC pile to surround the PHC pile; Plates in the form of a plate-shaped bar spaced toward one side of the PHC pile formed in parallel with the longitudinal direction of the outer surface of the PHC pile; A plurality of plate-shaped stoppers having a predetermined length for connecting and fixing the steel band and the plate formed on the PHC pile; A plate-shaped auxiliary plate formed parallel to the plate at right angles to both sides of the stopper; A panel integrally provided with a water collecting port integrally formed with a vertical extension in the center of the inner surface which is fitted between the stoppers of each adjacent PHC pile; Exterior materials using environmentally friendly materials that are fixed to the outer surface of each plate outside the panel having a catchment; Anchor bolts and nuts for fixing the exterior member to a plate; And it characterized in that it comprises a cap concrete for closing the upper PHC pile.

집수구가 구비된 패널은 고밀도 폴리에틸렌, 알루미늄 및 유리섬유강화플라스틱 중 어느 하나인 인 것을 특징으로 한다.The panel provided with the collecting port is characterized in that any one of high density polyethylene, aluminum and glass fiber reinforced plastic.

집수구는 소정길이의 "U" 관로형태로 형성되고, "U" 관로형태의 바닥면에 복수의 집수공이 형성되며, "U" 관로형태의 양측벽 끝단 개구부는 바닥면보다 상대적으로 넓게 형성되며, 그리고 개구부가 형성된 양측벽의 끝단이 집수구가 구비된 패널에 일체로 형성된 것을 특징으로 한다.The water collecting port is formed in a "U" pipeline shape having a predetermined length, and a plurality of water collecting holes are formed in the bottom surface of the "U" pipeline shape, and both end portions of the end wall of the "U" pipeline shape are formed relatively wider than the bottom surface. And the end of the side wall formed with the opening is characterized in that formed integrally with the panel provided with the water collecting port.

집수구는 고밀도 폴리에틸렌, 알루미늄 및 유리섬유강화플라스틱 중 어느 하나의 친환경소재인 것을 특징으로 한다.The catchment is characterized in that it is an environmentally friendly material of any one of high density polyethylene, aluminum and glass fiber reinforced plastics.

집수구는 집수공이 형성된 바닥면 내면 또는 외면에 부직포가 더 구비된 것을 특징으로 한다.The catchment is characterized in that the non-woven fabric is further provided on the inner surface or the outer surface of the water collecting hole is formed.

친환경 옹벽은 각각의 PHC말뚝과 인접한 집수구의 양측벽 사이를 따라 수직으로 수팽창 지수재가 더 구비된 것을 특징으로 한다.Eco-friendly retaining wall is characterized in that it is further provided with a water-expansion index vertically along each side between each PHC pile and the adjacent catchment.

수팽창 지수재는 벤토나이트 및 고무지수재가 혼합된 것을 특징으로 한다.The water expansion index material is characterized in that the bentonite and rubber index material is mixed.

친환경 옹벽은 집수구의 바닥면 외측에 모래층이 더 구비된 것을 특징으로 한다.Eco-friendly retaining wall is characterized in that the sand layer is further provided on the bottom surface of the catchment.

외장재는 판체형태의 목재, 판체형태의 광석 및 아크릴판 중 어느 하나인 것을 특징으로 한다.The exterior member is characterized in that any one of a plate-shaped wood, plate-shaped ore and acrylic plate.

친환경 옹벽에 적층형성된 최하단의 집수구가 구비된 패널은 집수구와 연통된 하단부를 관통하는 적어도 하나의 배수공을 더 구비된 것을 특징으로 한다.The panel provided with the lowermost catchment port laminated on the eco-friendly retaining wall is characterized in that it is further provided with at least one drain hole passing through the lower end communicating with the catchment.

친환경 옹벽을 형성할 지중을 따라 PHC말뚝의 길이방향으로 소정거리 이격되게 복수형성되어 PHC말뚝을 감싸는 소정폭의 원형 띠형태 강재밴드가 일체로 형성된 복수의 원형 PHC말뚝을 소정거리 이격되게 매설하는 단계;Embedding a plurality of circular PHC piles in which a plurality of circular band-shaped steel bands integrally formed with a predetermined width are formed to be spaced apart in a longitudinal direction of the PHC pile along the ground to form an eco-friendly retaining wall. ;

매설된 PHC말뚝 양면 중 친환경 옹벽의 외면이 형성되는 일면을 굴착하는 단계;Excavating one surface of which the outer surface of the eco-friendly retaining wall is formed on both sides of the embedded PHC pile;

굴착된 PHC말뚝 일측으로 이격되어 일면이 PHC말뚝의 외면의 길이방향과 평행하게 형성된 판상형 바형태의 플레이트를 설치하고, 플레이트와 강재밴드 사이를 소정길이를 갖는 복수의 판상형태 스토퍼로 고정설치하며, 그리고, 스토퍼는 양면에 직각으로 플레이트와 평행한 판형태의 보조플레이트를 고정설치하는 단계;The plate-shaped bar-shaped plate is formed so that one side is parallel to the longitudinal direction of the outer surface of the PHC pile, and fixedly installed with a plurality of plate-shaped stoppers having a predetermined length between the plate and the steel band. And, the stopper is fixed to the plate-shaped auxiliary plate parallel to the plate at a right angle on both sides;

각각의 스토퍼 사이에 소정길이의 "U" 관로형태로 형성되고, "U" 관로형태의 바닥면에 복수의 집수공이 형성되며, "U" 관로형태의 양측벽 끝단 개구부는 바닥면보다 상대적으로 넓게 형성되며, 집수공이 형성된 바닥면 내면 또는 외면에 부직포가 더 구비되며; 그리고 바닥면에 인접한 양측벽 외측끝단을 따라 수팽창 지수재가 도포된 집수구가 일체로 구비된 패널을 끼움 설치하는 단계;Each stopper is formed in a predetermined length of "U" conduit, a plurality of collecting holes are formed on the bottom surface of the "U" conduit, the end openings of both side walls of the "U" conduit form relatively wider than the bottom surface It is formed, the non-woven fabric is further provided on the inner surface or the outer surface of the bottom of the water collecting hole; And inserting a panel having integrally provided water collecting ports coated with a water expansion index material along the outer edges of both side walls adjacent to the bottom surface.

집수구가 구비된 패널의 집수구 외측과 굴착면 사이에 형성된 공간에 모래를 매립하여 모래층을 형성하는 단계;Forming a sand layer by burying sand in a space formed between an outer side of the collecting hole and an excavation surface of the panel provided with the collecting hole;

집수구가 구비된 패널 외측 각각의 플레이트 외면에 고정설치되는 친환경소재를 이용한 외장재의 양측단을 앵커볼트 및 너트를 이용하여 각각의 플레이트 일면에 고정설치하는 단계; 및Fixing both ends of the exterior material using environmentally-friendly materials fixedly installed on the outer surface of each plate outside the panel having water collecting holes to one surface of each plate using anchor bolts and nuts; And

친환경 옹벽의 PHC말뚝 상부를 캡콘크리트로 마감하는 단계;를 포함하는 것을 특징으로 한다.And a step of finishing the top of the PHC pile of the eco-friendly retaining wall with cap concrete.

PHC말뚝 설치단계에서 지중에 PHC말뚝을 매설하는 공법은 매입공법인 것을 특징으로 한다.In the PHC pile installation step, the method of embedding the PHC pile in the ground is characterized in that the purchase method.

패널 끼움 설치단계와 모래층 형성단계 사이에,Between the panel fitting step and the sand layer forming step,

집수구가 구비된 패널가 설치된 PHC말뚝 일면을 재굴착하는 단계;Re-excavating one surface of the PHC pile provided with a water collecting port;

굴착된 PHC말뚝 일측으로 이격되어 일면이 PHC말뚝의 외면의 길이방향과 평행하게 형성된 판상형 바형태의 플레이트를 설치하고, 플레이트와 강재밴드 사이를 소정길이를 갖는 복수의 판상형태 스토퍼로 고정설치하며, 그리고, 스토퍼는 양면에 직각으로 플레이트와 평행한 판형태의 보조플레이트를 재고정설치하는 단계; 및The plate-shaped bar-shaped plate is formed so that one side is parallel to the longitudinal direction of the outer surface of the PHC pile, and fixedly installed with a plurality of plate-shaped stoppers having a predetermined length between the plate and the steel band. And, the stopper is a step of re-installing the auxiliary plate of the plate shape parallel to the plate at right angles on both sides; And

집수구가 구비된 패널을 굴착된 바닥까지 이동시키는 단계;가 포함된 재굴착하는 단계;가 더 포함되고, 그리고Moving the panel provided with the catch hole to the excavated bottom; further comprising the re-excavation; and

재굴착단계는 친환경 옹벽의 높이에 따라 적어도 한번 실행되는 것을 특징으 로 한다.The re-excavation step is characterized in that it is carried out at least once depending on the height of the eco-friendly retaining wall.

스토퍼 고정설치단계와 집수구가 구비된 패널 끼움 설치단계 사이에, 각각의 플레이트의 상단부 일면에 직각으로 형성된 판체형태의 보조가이드편을 고정설치하는 단계; 및Fixing a plate-shaped auxiliary guide piece formed at right angles to one surface of an upper end portion of each plate between the stopper fixing installation step and the panel fitting installation step with the catchment port; And

각각의 보조가이드편 상부에 단면의 형상이 "ㄷ"현강, "L"형강 및 "H"현강 중 어느 하나인 가이드바를 고정설치하는 단계를 더 포함하는 것을 특징으로 한다.It characterized in that it further comprises the step of fixing the guide bar of any one of the shape of the cross-section "c", "L" steel and "H" steel on the upper side of each auxiliary guide piece.

모래층 형성단계 이후 보조가이드편 고정설치단계 및 가이드바 고정설치단계에서 설치된 보조가이드편 및 가이드가를 제거하는 단계를 더 포함하는 것을 특징으로 한다.After the sand layer forming step, the auxiliary guide piece fixed installation step and the guide bar fixed installation step characterized in that it further comprises the step of removing the auxiliary guide piece and the guide bar installed.

이상과 같이 본 발명의 효과는 다음과 같다.As mentioned above, the effect of this invention is as follows.

첫째, 본 발명은 소정거리 이격하여 지중에 복수 원형 PHC말뚝을 매립함으로써, 자립식 친환경 옹벽을 제공하는 효과가 있다.First, the present invention has the effect of providing a self-supporting eco-friendly retaining wall by embedding a plurality of circular PHC pile in the ground spaced a predetermined distance apart.

둘째, 본 발명은 친환경소재로 제작된 집수구가 일체로 구비된 패널로 옹벽의 기초벽면을 형성하고, 상기 패널 외측으로 친환경 옹벽의 외관을 판체형태의 목재, 판체형태의 광석 및 아크릴판 등을 이용함으로써, 친환경 옹벽의 외관이 미려한 효과가 있다.Secondly, the present invention forms a base wall surface of the retaining wall as a panel provided with a catchment made of an eco-friendly material integrally, and the exterior of the eco-friendly retaining wall outside the panel using plate-shaped wood, plate-shaped ore and acrylic plate, etc. By doing so, the appearance of the eco-friendly retaining wall has a beautiful effect.

셋째, 본 발명은 집수구가 구비된 패널이 끼움 설치되는 규격화된 플레이트 및 스토퍼를 시공현장에서 별도의 작업 없이 PHC말뚝의 강재밴드에 설치함으로써, PHC말뚝들 사이에 설치되는 친환경 옹벽의 외벽인 집수구가 일체로 구비된 패널을 간편하게 설치할 수 있어 작업의 편리성 및 공기단축의 효과가 있다.Third, the present invention by installing the standardized plate and the stopper fitted with the panel equipped with the catchment in the steel band of the PHC pile without additional work at the construction site, the catchment is an outer wall of the eco-friendly retaining wall installed between the PHC pile The panel provided integrally can be easily installed, which has the effect of convenience of work and reduction of air.

넷째, 본 발명은 친환경 옹벽의 적층된 집수구가 구비된 패널의 내측을 따라 수직으로 일체로 형성된 집수구를 구비함으로써, 친환경 옹벽의 배면에 수압을 감소 및 수압을 배제시키는 효과가 있다.Fourth, the present invention is provided with a water collecting port formed vertically integrally along the inner side of the panel provided with laminated catches of the eco-friendly retaining wall, there is an effect of reducing the water pressure on the back of the eco-friendly retaining wall and excludes the water pressure.

다섯째, 본 발명은 집수구가 물이 유입되면 일정량만 배수하고 나머지는 물은 천천히 배수되도록 물이 집수구에 저류됨으로써, 일시적으로 발생하는 수압의 과부하를 방지함과 동시에 수해를 방지하는 효과가 있다.Fifth, the present invention has the effect of preventing the overload of the water pressure temporarily generated by the water is stored in the water collecting port so that the water drain is drained only a certain amount and the rest of the water is slowly drained when water is introduced.

여섯째, 본 발명은 집수구와 연통된 배출구를 적층된 집수구가 구비된 패널 하부에 하나 설치함으로써, 친환경 옹벽의 미관이 미려한 효과가 있다.Sixth, the present invention by installing one discharge port in communication with the water collecting port in the lower panel provided with a laminated water collecting port, the beauty of the eco-friendly retaining wall has a beautiful effect.

일곱째, 본 발명은 집수구의 재질을 고밀도 폴리에틸렌, 알루미늄 및 유리섬유강화플라스틱 등으로 함으로써, 친환경 옹벽을 제공하는 효과가 있다.Seventh, the present invention has the effect of providing an environmentally friendly retaining wall by using the material of the water collecting port made of high density polyethylene, aluminum and glass fiber reinforced plastic.

여덟째, 본 발명은 집수구와 인접한 PHC말뚝을 수팽창 지수재로 밀폐하고, 집수구의 바닥면에 형성된 집수공 내측 또는 외측에 부직포를 형성함으로써, 누수를 방지하여 집수구로 물이 유입되게 유도하는 효과 및 물에 포함된 토사와 같은 이물질의 진입을 방지하는 효과가 있다.Eighth, the present invention seals the PHC pile adjacent to the catchment with the water expansion index material, by forming a non-woven fabric inside or outside the catchment hole formed on the bottom surface of the catchment, to prevent water leakage to induce water to flow into the catch and It is effective to prevent entry of foreign substances such as soil and sand contained in water.

아홉째, 본 발명은 외장재를 아크릴판을 이용할 경우 패널과 외장재 사이에 LED조명을 설치하여 야간 조명효과와 함께 더욱 미려한 친환경 옹벽을 제공하는 효과가 있다.Ninth, the present invention has an effect of providing a more beautiful eco-friendly retaining wall with a night lighting effect by installing the LED light between the panel and the exterior material when using the acrylic plate for the exterior material.

이하, 첨부된 도면을 참조하여 본 발명의 바람직한 실시예를 상세하게 설명 한다.Hereinafter, with reference to the accompanying drawings will be described in detail a preferred embodiment of the present invention.

<< 실시예에Example 따른 구성> Configuration according to

도 1은 본 발명에 따른 원형 PHC말뚝을 이용한 집수구가 구비된 친환경 옹벽을 도시한 분해사시도이고, 도 2는 본 발명에 따른 원형 PHC말뚝을 이용한 집수구가 구비된 친환경 옹벽을 도시한 결합사시도이다. 도 1과 도 2에 도시한 바와 같이, 본 발명에 따른 친환경 옹벽(1)은 PHC말뚝(2)을 친환경 옹벽(1)의 설치위치를 따라 지중(100)에 소정거리 이격되어 복수 설치한다. 이때, PHC말뚝(2)은 원형태의 기둥으로 형성되어 매입공법으로 지중(100)으로 매설된다. 여기서, 매입공법은 중굴압입공법, SIP공법, SDP공법, PRD공법 등을 이용하는 것이 바람직하다. 이와 함께, PHC말뚝(2)은 PHC말뚝(2)의 길이방향으로 소정거리 이격되게 복수형성되어 PHC말뚝(2)을 감싸는 소정폭의 원형 띠형태 강재밴드(21)를 더 구비한다, 이는, 아래에 설명할 플레이트(22)를 스토퍼(3)로 고정하기 위해 금속재질의 강재밴드(21)를 더 구비하여 시공형장에서 바로 플레이트(22)를 스토퍼(3)를 이용하여 고정설치하기 위함이다. 이때, 강재밴드(21)는 스토퍼(3)와 용접으로 고정설치된다.1 is an exploded perspective view showing an eco-friendly retaining wall provided with a catchment using a circular PHC pile according to the present invention, Figure 2 is a combined perspective view showing an eco-friendly retaining wall provided with a catchment using a circular PHC pile according to the present invention. As shown in Figure 1 and 2, the environmentally friendly retaining wall 1 according to the present invention is installed a plurality of PHC pile 2 spaced apart a predetermined distance in the ground (100) along the installation position of the environmentally friendly retaining wall (1). At this time, the PHC pile 2 is formed of a column-shaped pillar is embedded in the underground 100 by the embedding method. Here, it is preferable to use the medium digging indentation method, SIP method, SDP method, PRD method and the like as the embedding method. In addition, the PHC pile 2 is further provided with a plurality of circular band-shaped steel band 21 of a predetermined width formed to be spaced apart a predetermined distance in the longitudinal direction of the PHC pile (2) surrounding the PHC pile (2), which is, In order to fix the plate 22 using the stopper 3 at the construction site by further comprising a steel band 21 of metal material to fix the plate 22 to be described below with the stopper 3. . At this time, the steel band 21 is fixed to the stopper 3 by welding.

플레이트(22)는 판상형 바형태로 형성된다. 이때, 플레이트(22)는 PHC말뚝(2)의 일측으로 이격되어 일면이 PHC말뚝(2)의 외면의 길이방향과 평행하게 형성된다. 이는 플레이트(22)와 PHC말뚝(2) 사이에 아래에 설명할 집수구(6)가 구비된 패널(4)을 끼움 설치하기 위함이다.The plate 22 is formed in the form of a plate-shaped bar. At this time, the plate 22 is spaced apart to one side of the PHC pile 2, one surface is formed in parallel with the longitudinal direction of the outer surface of the PHC pile (2). This is for fitting the panel 4 provided with the catch 6 to be described below between the plate 22 and the PHC pile 2.

스토퍼(3)는 소정길이를 갖는 판상형태로 형성된다. 이때 , 스토퍼는 PHC말뚝(2)에 형성된 강재밴드(21)와 플레이트(22) 사이를 서로 연결고정한다. 전술한 바와 같이 강재밴드(21)에 스토퍼(3)를 설치하기 때문에 복수의 스토퍼(3)가 형성된다. 이때, 강재밴드(21)에 스토퍼(3)를 고정설치하기 위해 스토퍼(3)의 상?하 길이는 강재밴드(21)의 폭과 동일한 것이 바람직하다. 또한, 스토퍼(3)는 플레이트(22)와 직각으로 결합된다. 즉, 스토퍼(3)와 플레이트(22)가 결합된 부분을 단면으로 보았을 때 "T"형상이다. 이와 함께, 스토퍼(3)는 양면에 직각으로 플레이트(22)와 평행한 판형태의 보조플레이트(23)가 더 구비된다. 이때, 보조플레이트(23)의 길이는 스토퍼(3)의 길이와 같거나 또는 플레이트(22)의 길이와 같다. 그리고 스토퍼(3)에 형성된 플레이트(22)와 보조플레이트(23)가 형성된 단면은 "干(간)"형상이다.The stopper 3 is formed in a plate shape having a predetermined length. At this time, the stopper is connected to each other between the steel band 21 and the plate 22 formed on the PHC pile (2). As described above, because the stopper 3 is provided in the steel band 21, a plurality of stoppers 3 are formed. At this time, in order to fix the stopper 3 to the steel band 21, the upper and lower lengths of the stopper 3 is preferably equal to the width of the steel band 21. In addition, the stopper 3 is coupled to the plate 22 at a right angle. In other words, when the portion where the stopper 3 and the plate 22 are coupled is viewed in cross section, the shape is " T ". In addition, the stopper 3 is further provided with a plate-shaped auxiliary plate 23 parallel to the plate 22 at right angles on both sides. At this time, the length of the auxiliary plate 23 is equal to the length of the stopper 3 or the length of the plate 22. In addition, the cross section in which the plate 22 and the auxiliary plate 23 formed on the stopper 3 are formed is an "middle" shape.

집수구(6)가 구비된 패널(4)은 전술한 각각의 스토퍼 사이에 적어도 하나가 설치된다. 이때, 집수구(6)가 구비된 패널은 각각의 인접한 PHC말뚝(2)의 스토퍼(3) 사이로 끼움 설치된다. 또한, 집수구가 구비된 패널(4) 내면 중앙에 일체로 수직연장형성된 집수구(6)를 일체로 형성하는 것이 바람직하다.At least one panel 4 provided with a water collecting port 6 is provided between the above-described stoppers. At this time, the panel provided with the collecting port 6 is fitted between the stopper (3) of each adjacent PHC pile (2). In addition, it is preferable to integrally form the collecting port 6 integrally formed in the center of the inner surface of the panel 4 provided with the collecting port.

이와 함께, 집수구(6)가 일체로 구비된 패널(4)은 다양한 재질을 이용할 수 있으나, 제조의 편리성, 제작비용 및 친환경 옹벽의 견고성 등을 고려할 때 녹이 발생하지 않도록 친환경소재인 고밀도 폴리에틸렌, 알루미늄 및 유리섬유강화플라스틱 중 어느 하나를 이용할 수 있다.In addition, the panel 4 provided with the sump 6 integrally may use a variety of materials, high density polyethylene, which is an environmentally-friendly material so that rust does not occur in view of the convenience of manufacturing, manufacturing cost, and firmness of the eco-friendly retaining wall. Any one of aluminum and glass fiber reinforced plastic can be used.

이상의 집수구(6)는 소정길이의 "U" 관로형태로 형성되고, "U" 관로형태의 바닥면(61)에 복수의 집수공(611)이 형성되며, "U" 관로형태의 양측벽(62) 끝단 개구부(63)는 바닥면(61)보다 상대적으로 넓게 형성되며, 그리고 개구부(63)가 형성 된 양측벽(62)의 끝단이 집수구가 구비된 패널(4)에 일체로 형성하는 것이 바람직하다. 이때, 집수구(6)는 친환경소재인 고밀도 폴리에틸렌, 알루미늄 및 유리섬유강화플라스틱 중 어느 하나를 사용하는 것이 바람직하다. 또한, 집수구(6)는 전술한 패널(4)와 동일한 재질일 경우 일체로 사출성형이 가능하다. 그리고 집수구(6)는 물과 함께 집수구(6) 내부로 진입하여 집수공(611)이 막히는 것을 방지하기 위해 집수공(611)이 형성된 바닥면(61) 내면 또는 외면에 부직포(64)가 더 구비하는 것이 바람직하다.The above water collecting port 6 is formed in the form of a "U" conduit of a predetermined length, and a plurality of collecting holes 611 are formed on the bottom surface 61 of the "U" conduit form, and both side walls of the "U" conduit form ( 62) The end opening 63 is formed relatively wider than the bottom surface 61, and the ends of both side walls 62 in which the opening 63 is formed are integrally formed in the panel 4 provided with the water collecting port. desirable. At this time, the catch 6 is preferably used any one of high-density polyethylene, aluminum and glass fiber reinforced plastics that are environmentally friendly materials. In addition, when the catchment 6 is made of the same material as the panel 4 described above, injection molding may be integrally performed. In addition, the catch port 6 enters the catch port 6 together with water to prevent the catch 611 from being blocked, and the nonwoven fabric 64 is further formed on the inner surface or the outer surface of the bottom surface 61 on which the catch hole 611 is formed. It is preferable to provide.

캡콘크리트(7)는 PHC말뚝(2)에 형성된 중공을 밀폐하기 위해 PHC말뚝(2)의 상부에 설치되어 친환경 옹벽(1)의 마감을 한다. 이때, 캡콘크리트(7)는 친환경 옹벽의 횡방향 저항을 확보하여 친환경 옹벽을 견고히 하기 위함이다, 이러한, 캡콘크리트(7)는 외부에서 제작하여 상부에서 설치하는 방법을 이용하거나, 또는 거푸집을 이용하여 PHC말뚝(2) 상부에 직접 설치할 수 있다. 이상의 캡콘크리트(7)는 파손을 방지하도록 내구성을 증대하기 위해 내부에 철근 등을 배근할 수 있다.Cap concrete 7 is installed on the top of the PHC pile (2) to seal the hollow formed in the PHC pile (2) to finish the environmentally friendly retaining wall (1). At this time, the cap concrete (7) is to secure the environmentally friendly retaining wall to secure the transverse resistance of the eco-friendly retaining wall, such, the cap concrete (7) is manufactured from the outside using a method installed from the top, or using a formwork Can be installed directly on top of the PHC pile (2). The above-mentioned cap concrete 7 can reinforce the inside of the reinforcing bar to increase the durability to prevent breakage.

수팽창 지수재(9)는 친환경 옹벽(1)은 각각의 PHC말뚝(2)과 인접한 집수구(6)의 양측벽(62) 사이를 따라 수직으로 형성하여 PHC말뚝(2)와 집수구(6)의 양측벽(62) 사이를 밀폐한다. 이는 굴착면에서 배수되는 물이 집수구의 집수공으로 물을 수집하기 위함이다. 또한, 친환경 옹벽(1)이 외면을 물이 배수되지 않도록 하여 친환경 옹벽(1)의 미관을 손상되지 않게 하기 위함이다. 이러한, 수팽창 지수재(9)는 벤토나이트 50중량부 ~ 90중량부 및 고무지수재 10중량부 ~ 50중량부를 혼합하여 사용하게 된다. 이때, 수팽창 지수재(9)는 물과 접속하면 그 부피가 15배 증가하여 방수 및 실링 기능을 함으로써, 앞서 언급한 밀폐역할을 하는 것이다.The water-expandable index member 9 is an eco-friendly retaining wall 1 formed vertically along each side wall 62 of each PHC pile 2 and an adjacent catchment 6 so that the PHC pile 2 and the catch 6 To seal between the side walls (62). This is for the water drained from the excavation surface to collect the water into the catcher of the catchment. In addition, the eco-friendly retaining wall (1) is to prevent water from draining on the outer surface so as not to damage the aesthetics of the eco-friendly retaining wall (1). The water-expandable index 9 is used by mixing 50 parts by weight to 90 parts by weight of bentonite and 10 parts by weight to 50 parts by weight of the rubber index material. At this time, the water-expandable index member (9) increases the volume by 15 times when connected to water, thereby providing a waterproof and sealing function, thereby serving as the above-mentioned sealing role.

외장재(5)는 판체형태로 형성되어 앵커볼트(51)가 설치된 각각의 플레이트(22)에 너트(52)를 이용하여 고정설치되어 친환경 옹벽(1)의 외벽을 형성한다. 이때, 외장재(5)는 외관의 미려함을 위해 친환경적인 재질의 소재를 이용한다. 이때, 외장재(5)의 재질은 인조목재 또는 목재, 판체형태의 화강석 및 대리석 또는 인조화강석 및 인조대리석과 같은 광석 및 아크릴판 중 어느 하나를 이용하는 것이 바람직하다. 전술한, 고정수단으로 실시예에서는 앵커볼트(51) 및 너트(52)을 도시하였으나, 접착제와 같은 고정수단을 이용할 수 있다. 또한, 외장재(5)를 아크릴판으로 고정설치한 경우 패널(4)와 아크릴판인 외장재(5) 사이에 다양한 색상의 LED조명과 같은 빛을 조사하여 밤에 조명역할을 함과 동시에 더욱 미려한 친환경 옹벽을 제공할 수 있다. 이와 함께, 외장재(5)는 다양한 건축외장재의 사용이 가능할 것이다. The exterior member 5 is formed in a plate shape and is fixedly installed to each plate 22 on which the anchor bolts 51 are installed by using a nut 52 to form an outer wall of the eco-friendly retaining wall 1. At this time, the exterior material 5 uses a material of environmentally friendly material for the beauty of the appearance. At this time, the material of the exterior material 5, it is preferable to use any one of ore and acrylic plate, such as artificial wood or wood, granite and marble in the form of plate or artificial marble and artificial marble. Although the anchor bolt 51 and the nut 52 are illustrated in the embodiment as the fixing means described above, fixing means such as an adhesive may be used. In addition, when the exterior material 5 is fixedly installed with an acrylic plate, the panel 4 and the exterior material 5, which is an acrylic plate, are irradiated with light such as LED lighting of various colors to play a role of lighting at night and more beautiful and eco-friendly. Retaining walls can be provided. In addition, the exterior material 5 will be able to use a variety of architectural exterior materials.

모래층(10)은 집수구(6)의 바닥면(61) 외측 즉 굴착면(110)과 집수구(6)의 바닥면(61) 사이 공간에 모래를 매립한다. 이는 지중(100)에서 집수구(6)로 물을 수집하기 원활하기 위해 모래로 매립하는 것이다. 이러한, 모래층(10)은 수팽창 지수재(9)에 의해 밀폐된 PHC말뚝(2), 집수구가 구비된 패널(4) 및 집수구(6)에 의해 형성된 사이 공간에도 모래층(10)을 매립하는 것이 바람직하다.The sand layer 10 embeds sand in the space between the bottom surface 61 of the water collecting port 6, that is, the excavation surface 110 and the bottom surface 61 of the water collecting hole 6. This is to reclaim the sand to facilitate the collection of water from the ground (100) to the catch (6). This sand layer 10 is embedded in the space between the PHC pile (2), the panel 4 provided with the water collecting port and the water collecting hole (6) sealed by the water expansion index material (9) to fill the sand layer (10) It is preferable.

배수공(42)은 친환경 옹벽(1)의 미관에 영향을 주기 때문에 적층된 집수구(6)가 구비된 패널(4)의 최하단에 형성된 집수구(6)가 구비된 패널(4)의 하단부에 하나를 형성한다. 이러한 배수공(42)은 패널(4) 및 외장재(5)를 관통하여 집수 구(6)와 연통되게 형성된다.Since the drain hole 42 affects the aesthetics of the eco-friendly retaining wall 1, one of the drain holes 42 is disposed at the lower end of the panel 4 provided with the water collecting hole 6 formed at the bottom of the panel 4 provided with the stacked water collecting grooves 6. Form. The drain hole 42 penetrates the panel 4 and the exterior member 5 to communicate with the water collecting port 6.

<< 실시예에Example 따른 시공방법> Construction Method>

도 3은 본 발명에 따른 원형 PHC말뚝을 이용한 집수구가 구비된 친환경 옹벽의 시공공법을 도시한 순서도이고, 도 5 내지 도 13은 본 발명에 따른 원형 PHC말뚝을 이용한 집수구가 구비된 친환경 옹벽의 시공공법에 따라 도시한 친환경 옹벽의 평면도이다. 이하, 도 3에 도시한 순서도에 따라 본 발명에 따른 원형 PHC말뚝을 이용한 집수구(6)가 구비된 친환경 옹벽의 시공공법을 설명한다.3 is a flow chart illustrating a construction method of an eco-friendly retaining wall provided with a catchment using a circular PHC pile according to the present invention, Figures 5 to 13 is a construction of an eco-friendly retaining wall provided with a catchment using a circular PHC pile according to the present invention. This is a plan view of the eco-friendly retaining wall shown in accordance with the construction method. Hereinafter, a construction method of an environmentally friendly retaining wall provided with a water collecting port 6 using a circular PHC pile according to the present invention according to the flowchart shown in FIG. 3.

도 3 및 도 5에 도시한 바와 같이, PHC말뚝 매설단계(S100)는 친환경 옹벽(1)을 형성할 지중(100)을 따라 PHC말뚝(2)의 길이방향으로 소정거리 이격되게 복수형성되어 PHC말뚝(2)을 감싸는 소정폭의 원형 띠형태 강재밴드(21)가 일체로 형성된 복수의 원형 PHC말뚝(2)을 소정거리 이격되게 매설한다. 이때, 지중(100)에 PHC말뚝(2)을 매설하는 공법은 매입공법을 이용하는 것이 바람직하다, 여기서, 매입공법은 중굴압입공법, SIP공법, SDP공법, PRD공법 등을 이용할 수 있다.As shown in Figure 3 and 5, the PHC pile buried step (S100) is formed a plurality of PHC spaced apart a predetermined distance in the longitudinal direction of the PHC pile 2 along the ground (100) to form the environmentally friendly retaining wall (1) A plurality of circular PHC piles 2 integrally formed with a circular band-shaped steel band 21 having a predetermined width surrounding the pile 2 are embedded at a predetermined distance. At this time, the method of embedding the PHC pile (2) in the ground (100) is preferably used in the embedding method, the embedding method may be used in the middle digging method, SIP method, SDP method, PRD method and the like.

도 3 및 도 6에 도시한 바와 같이, PHC말뚝 일면 굴착단계(S110)는 매설된 PHC말뚝(2) 양면 중 친환경 옹벽(1)의 외면이 형성되는 일면을 굴착한다. 이와 같이, PHC말뚝(2)이 매설된 상태에서 굴착을 하기 때문에 작업의 안정성을 확보할 수 있다. 이때, 굴착면(110)은 PHC말뚝(2)의 원의 중심을 기준 삼아 굴착면(110)을 형성하는 것이 바람직하다. 이는 후술할 집수구(6)의 설치를 위함이다.As shown in Figure 3 and Figure 6, the PHC pile one surface excavation step (S110) excavates one surface is formed the outer surface of the environmentally friendly retaining wall (1) of both sides of the embedded PHC pile (2). As such, since the excavation is performed in the state in which the PHC pile 2 is embedded, the stability of the work can be ensured. At this time, the excavation surface 110 is preferably to form an excavation surface 110 on the basis of the center of the circle of the PHC pile (2). This is for installation of the water collecting port 6 to be described later.

도 3 및 도 7에 도시한 바와 같이, 스토퍼 용접단계(S120)는 굴착된 PHC말 뚝(2) 일측으로 이격되어 일면이 PHC말뚝(2)의 외면의 길이방향과 평행하게 형성된 판상형 바형태의 플레이트(22)와 강재밴드(21) 사이를 서로 연결고정하는 소정길이를 갖는 복수의 판상형태 스토퍼(3)를 고정설치된다. 이러한, 스토퍼(3)는 친환경 옹벽(1)의 강재밴드와 그 개수를 동일하게 형성한다. 이때, 플레이트와 스토퍼의 결합단면은 "T"형상이 되도록 플레이트 일면에 직각되게 스토퍼를 고정결합한다. 이러한 고정결합방법은 통상의 용접을 이용할 수 있다. 이와 함께 스토퍼(3) 양면에 직각으로 플레이트(22)와 평행한 판형태의 보조플레이트(23)가 고정설치된다. 보조플레이트(23)를 스토퍼(3)에 실치하는 방법은 플레이트(22)의 설치방법과 동일하다. 특히, 보조플레이트(23)이 설치되기 때문에 플레이트와 보조플레이트 사이에 아래에 설명할 집수구(6)가 일체로 구비된 패널(5)의 양측단이 안정적으로 고정된다.As shown in Figure 3 and 7, the stopper welding step (S120) is spaced apart to one side of the excavated PHC pile (2) of one side of the plate-shaped bar formed in parallel with the longitudinal direction of the outer surface of the PHC pile (2) A plurality of plate-shaped stoppers 3 having a predetermined length for connecting and fixing the plate 22 and the steel band 21 to each other are fixedly installed. The stopper 3 forms the same number of steel bands as the environmentally friendly retaining wall 1. At this time, the coupling end of the plate and the stopper is fixed to the stopper to be perpendicular to one side of the plate so that the "T" shape. This fixed coupling method may use a conventional welding. Along with the stopper 3, the plate-shaped auxiliary plate 23 parallel to the plate 22 is fixedly installed. The method of mounting the auxiliary plate 23 on the stopper 3 is the same as the installation method of the plate 22. In particular, since the auxiliary plate 23 is installed, both side ends of the panel 5 having the catchment 6 to be described below are integrally fixed between the plate and the auxiliary plate.

도 3 및 도 8에 도시한 바와 같이, 집수구가 구비된 패널 끼움 설치단계(S130)는 각각의 스토퍼(3) 사이에 소정길이의 "U" 관로형태로 형성되고, "U" 관로형태의 바닥면(61)에 복수의 집수공(611)이 형성되며, "U" 관로형태의 양측벽(62) 끝단 개구부(63)는 바닥면(61)보다 상대적으로 넓게 형성되며, 집수구(6)가 형성된 바닥면(61) 내면 또는 외면에 부직포(64)가 더 구비되며; 그리고 바닥면(61)에 인접한 양측벽(62) 외측끝단을 따라 수팽창 지수재(9)가 도포된 집수구(6)가 일체로 형성된 판형태의 집수구(6)가 일체로 구비된 패널(4)을 끼움 설치한다. 3 and 8, the panel fitting installation step (S130) provided with the catchment is formed in the form of the "U" pipeline of a predetermined length between each stopper (3), the bottom of the "U" pipeline A plurality of catching holes 611 are formed on the surface 61, and end openings 63 of both end walls 62 having a “U” conduit shape are formed relatively wider than the bottom surface 61. The nonwoven fabric 64 is further provided in the inner surface or the outer surface of the formed bottom surface 61; The panel 4 is provided with a plate-shaped catchment 6 integrally formed with an integrally formed catchment 6 with a water-expansion index material 9 applied along the outer end of both side walls 62 adjacent to the bottom surface 61. ) Install.

도 4는 본 발명에 따른 원형 PHC말뚝을 이용한 집수구가 구비된 친환경 옹벽 의 시공공법의 재굴착단계를 도시한 순서도이다. 재굴착단계(S200)는 전술한 바와 같이, 친환경 옹벽(1)의 높이가 집수구가 구비된 패널(4)의 높이보다 높을 경우 패널 끼움 설치단계(S130)와 모래층 형성단계(S140) 사이에 형성된다. Figure 4 is a flow chart illustrating a re-excavation step of the construction method of an environmentally friendly retaining wall provided with a catchment using a circular PHC pile according to the present invention. As described above, the re-excavation step (S200) is formed between the panel fitting installation step (S130) and the sand layer forming step (S140) when the height of the eco-friendly retaining wall 1 is higher than the height of the panel 4 provided with the catchment. do.

PHC말뚝 일면 재굴착단계(S210)는 집수구가 구비된 패널(4)이 설치된 PHC말뚝(2) 일면을 재굴착한다. 이렇게 재굴착에 의해 형성되는 굴착면(110)은 전술한 PHC말뚝(2) 일면 굴착단계(S110)와 연장되게 형성하는 것이 바람직하다.PHC pile one surface re-excavation step (S210) is to re-excavate one surface of the PHC pile 2, the panel 4 is provided with a water collecting port. Thus, the excavation surface 110 formed by re-excavation is preferably formed to extend with the above-described PHC pile 2 surface excavation step (S110).

스토퍼(3)를 재고정설치단계(S220)는 굴착된 PHC말뚝(2) 일측으로 이격되어 일면이 PHC말뚝(2)의 외면의 길이방향과 평행하게 형성된 판상형 바형태의 플레이트(22)를 설치하고, 플레이트(22)와 강재밴드(21) 사이를 소정길이를 갖는 복수의 판상형태 스토퍼를 재고정설치한다. 이때, 스토퍼(3)는 앞의 스토퍼(3) 고정설치단계(S120)에서 형성된 스토퍼(3)와 동일한 간격으로 형성하는 것이 바람직하다. The stopper (3) re-installation step (S220) is a plate-shaped bar-shaped plate 22 formed on one side parallel to the longitudinal direction of the outer surface of the PHC pile 2 is spaced apart to one side of the excavated PHC pile (2) Then, a plurality of plate-shaped stoppers having a predetermined length are installed between the plate 22 and the steel band 21. At this time, the stopper 3 is preferably formed at the same interval as the stopper 3 formed in the previous stopper 3 fixed installation step (S120).

집수구가 구비된 패널 이동단계(S230)는 1차 선 시공된 집수구(6)가 구비된 패널(4)을 아래쪽으로 밀어내어 집수구가 구비된 패널(4)을 굴착면(110)까지 이동시킨다. 이와 함께, 이동된 집수구(6)가 구비된 패널(4)의 자리에는 2차 집수구(6)가 구비된 패널(4)을 끼움 설치됨은 자명할 것이다.In the movement of the panel provided with the catch port (S230), the panel 4 provided with the catch line 6, which is installed in the first line, is pushed downward to move the panel 4 provided with the catch port to the excavation surface 110. In addition, it will be apparent that the panel 4 having the secondary catch 6 is fitted in the seat of the panel 4 provided with the movable catch 6.

이상의 재굴착단계(S200)는 친환경 옹벽(1)의 높이에 따라 적어도 한번 실행된다. 즉, 한 예로 집수구가 구비된 패널(4)의 높이에 대해 친환경 옹벽(1)의 높이가 3배 이상이면 재굴착단계(S200)를 2번 반복시행하고, 친환경 옹벽(1)의 높이가 5배 이상이면 재굴착단계(S200)를 4번 반복시행하는 것이다. 이때, 재굴착단계(S200)에서 친환경 옹벽을 형성하는 집수구가 구비된 패널가 2개이상 적층될 경 우에는, 적층된 집수구가 구비된 패널의 상?하부에 중첩면을 형성하여 중첩면 사이에 수팽창 지수재(9)가 더 도포할 수 있다.The re-excavation step (S200) is performed at least once according to the height of the eco-friendly retaining wall (1). That is, as an example, if the height of the eco-friendly retaining wall 1 is three times or more with respect to the height of the panel 4 provided with the water collecting port, the re-excavation step S200 is repeated twice, and the height of the eco-friendly retaining wall 1 is 5 times. If more than twice is to repeat the re-excavation step (S200) four times. In this case, when two or more panels having water catches for forming an eco-friendly retaining wall are stacked in the re-excavation step (S200), an overlapping surface may be formed between upper and lower portions of the panel provided with stacked catches and may be overlapped between overlapping surfaces. The expansion index material 9 can be further applied.

도 3 및 도 9에 도시한 바와 같이, 모래층 형성단계(S140)는 집수구(6)의 외측에 형성된 굴착면(110)에 모래를 매립하여 모래층(10)을 형성한다. 특히, 모래층(10)을 집수구(6) 외측에 형성하는 것은 지중(100)의 구성성분이 다양하여 물의 배수에 용이하지 않을 경우가 지중(100)의 토압이 증가하는 것을 방지하기 위함이다. 즉, 모래를 굴착면(110)과 집수구(6)의 바닥면(61) 외측 사이 공간에 매립하여 배수성능을 높이기 위함이다. 이와 함께 모래층(10)은 굴착된 PHC말뚝(2), 집수구가 구비된 패널(4) 및 집수구(6)의 양측벽(62)에 사이 공간도 설치되는 것이 바람직하다.As shown in FIGS. 3 and 9, in the sand layer forming step S140, sand is embedded in the excavation surface 110 formed on the outer side of the catchment 6 to form the sand layer 10. In particular, the formation of the sand layer 10 outside the catch port 6 is to prevent the earth pressure of the ground (100) increases when the components of the ground (100) is not easy to drain water due to the various components. That is, the sand is embedded in the space between the excavation surface 110 and the bottom of the bottom surface 61 of the water collecting port 6 to increase drainage performance. In addition, the sand layer 10 is preferably provided with a space between the excavated PHC pile (2), the panel 4 provided with the water collecting port and both side walls 62 of the water collecting hole (6).

도 3 및 도 10에 도시한 바와 같이, 외장재 고정설치단계(S150)는 집수구(6)가 구비된 패널(4) 외측의 각각의 플레이트(22) 외면에 고정설치되는 친환경소재를 이용한 외장재(5)의 양측단 미리 플레이트(22)에 설치된 앵커볼트(51)를 이용하여 각각의 플레이트(22) 일면에 너트(52)를 이용하여 고정설치된다. 이때, 외장재(5) 결합방법은 본 실시예에서는 앵커볼트(51) 및 너트(52)를 이용하였으나, 접착제의 이용도 가능할 것이다. 여기서, 외장재(5)는 판체형태의 인조목재 또는 목재, 판체형태의 화강석 및 대리석 또는 인조화강석 및 인조대리석과 같은 광석 및 아크릴판 중 어느 하나를 이용할 수 있다.As shown in Figure 3 and Figure 10, the exterior material fixing installation step (S150) is an exterior material using an environmentally friendly material that is fixed to the outer surface of each plate 22 on the outside of the panel 4 provided with a water collecting hole (6) Both ends of the c) are fixed to each plate 22 by using a nut 52 using anchor bolts 51 installed on the plate 22 in advance. At this time, the exterior material 5 is coupled to the anchor bolt 51 and the nut 52 in the present embodiment, but the use of an adhesive will be possible. Here, the exterior material 5 may use any one of ore and acrylic plates such as plate-like artificial wood or wood, plate-shaped granite and marble or artificial granite and artificial marble.

캡콘크리트 마감단계(S160)은 앞서 설명한 도 1과 도 2 및 도 11을 참고하여 살펴보면, 캡콘크리트 마감단계(S160)는 집수구(6)가 설치완료된 친환경 옹벽(1)의 PHC말뚝(2) 상부를 캡콘크리트(7)로 마감한다. 이는 PHC말뚝(2)의 경우 길이방향으로 중공을 형성하기 때문에 이를 마감처리 하기 위해 캡콘크리트(7)를 이용하는 것이다.Cap concrete finish step (S160) is described with reference to Figures 1 and 2 and 11 described above, the cap concrete finish step (S160) is the PHC pile (2) upper portion of the eco-friendly retaining wall (1), the water collecting port (6) is completed Finish with cap concrete (7). This is because the PHC pile (2) to form a hollow in the longitudinal direction is to use the cap concrete (7) to finish it.

도 3 및 도 11에 도시한 바와 같이, 스토퍼 고정설치단계(S120)와 패널 끼움 설치단계(S130) 사이에, 보조가이드편(31) 고정설치단계(S121) 및 가이드바(32) 고정설치단계(S122)를 더 포함할 수 있다. 이때, 보조가이드편(31) 고정설치단계(S121)는 각각의 플레이트(22)의 상단부 일면에 직각으로 형성된 판체형태의 보조가이드편(31)을 고정설치한다. 또한, 가이드바(32) 고정설치단계(S122)는 각각의 보조가이드편(31) 상부에 단면의 형상이 "ㄷ"현강, "L"형강 및 "H"현강 중 어느 하나인 가이드바(32)를 고정설치할 수 있다. 이는 PHC말뚝(2)에 스토퍼에 의해 고정된 플레이트(22)의 간격이 변화되는 것을 방지하여 집수구(6)가 구비된 패널(4)의 용이하게 끼움 설치하기 위함이다. 이러한 보조가이드편(31) 고정설치단계(S121) 및 가이드바(32) 고정설치단계(S122)는 모래층 형성단계(S140) 이후 보조가이드편 고정설치단계(S121) 및 가이드바 고정설치단계(S122)에서 설치된 보조가이드편(31) 및 가이드가(32)를 제거하는 단계(S141)에서 제거하는 것이 바람직하다. 즉 친환경 옹벽(1)의 완성전에 제거한다.3 and 11, between the stopper fixing installation step (S120) and the panel fitting installation step (S130), the auxiliary guide piece 31 fixed installation step (S121) and the guide bar 32 fixed installation step It may further include (S122). At this time, the auxiliary guide piece 31 fixed installation step (S121) is fixed to the plate-shaped auxiliary guide piece 31 formed at right angles to one surface of the upper end of each plate (22). In addition, the guide bar (32) fixed installation step (S122) is the guide bar 32, the shape of the cross-section on top of each of the auxiliary guide piece 31 of the "c" port steel, "L" section steel and "H" port steel 32 ) Can be fixed. This is to prevent the change of the interval of the plate 22 fixed by the stopper to the PHC pile (2) for easy installation of the panel (4) provided with the water collecting port (6). The auxiliary guide piece 31 fixed installation step (S121) and the guide bar 32 fixed installation step (S122) after the sand layer forming step (S140) after the auxiliary guide piece fixed installation step (S121) and guide bar fixed installation step (S122) It is preferable to remove in step (S141) to remove the auxiliary guide piece 31 and the guide member 32 installed in the). In other words, the eco-friendly retaining wall 1 is removed before completion.

이상에서 설명한 바와 같이, 본 발명이 속하는 기술분야의 당업자는 본 발명이 그 기술적 사상이나 필수적 특징을 변경하지 않고서 다른 구체적인 형태로 실시될 수 있다는 것을 이해할 수 있을 것이다. 그러므로 상술한 실시예들은 모든 면에 예시적인 것이며 한정적인 것이 아닌 것으로서 이해해야만 한다. 본 발명의 범위는 상세한 설명보다는 후술하는 특허청구범위에 의하여 나타내어지며, 특허청구범위의 의미 및 범위 그리고 등가 개념으로부터 도출되는 모든 변경 또는 변형된 형태가 본 발명의 범위에 포함되는 것으로 해석되어야 한다.As described above, those skilled in the art will understand that the present invention can be implemented in other specific forms without changing the technical spirit or essential features. Therefore, the above-described embodiments are to be understood in all respects as illustrative and not restrictive. The scope of the present invention is defined by the appended claims rather than the detailed description and all changes or modifications derived from the meaning and scope of the claims and their equivalents should be construed as being included within the scope of the present invention.

본 명세서에서 첨부되는 다음의 도면들은 본 발명의 바람직한 실시예를 예시하는 것이며, 발명의 상세한 설명과 함께 본 발명의 기술사상을 더욱 이해시키는 역할을 하는 것이므로, 본 발명은 그러한 도면에 기재된 사항에만 한정되어 해석되어서는 아니 된다.The following drawings, which are attached in this specification, illustrate the preferred embodiments of the present invention, and together with the detailed description thereof, serve to further understand the technical spirit of the present invention, and therefore, the present invention is limited only to the matters described in the drawings. It should not be interpreted.

도 1은 본 발명에 따른 원형 PHC말뚝을 이용한 집수구가 구비된 친환경 옹벽을 도시한 분해사시도.1 is an exploded perspective view showing an environmentally friendly retaining wall provided with a catchment using a circular PHC pile according to the present invention.

도 2는 본 발명에 따른 원형 PHC말뚝을 이용한 집수구가 구비된 친환경 옹벽을 도시한 결합사시도.Figure 2 is a perspective view showing an eco-friendly retaining wall provided with a catchment using a circular PHC pile according to the present invention.

도 3은 본 발명에 따른 원형 PHC말뚝을 이용한 집수구가 구비된 친환경 옹벽의 시공공법을 도시한 순서도.Figure 3 is a flow chart illustrating a construction method of an environmentally friendly retaining wall provided with a catchment using a circular PHC pile according to the present invention.

도 4는 본 발명에 따른 원형 PHC말뚝을 이용한 집수구가 구비된 친환경 옹벽의 시공공법의 재굴착단계를 도시한 순서도.Figure 4 is a flow chart illustrating a re-excavation step of the construction method of an environmentally friendly retaining wall provided with a catchment using a circular PHC pile according to the present invention.

도 5 내지 도 10은 본 발명에 따른 원형 PHC말뚝을 이용한 집수구가 구비된 친환경 옹벽의 시공공법에 따라 도시한 친환경 옹벽의 평면도.5 to 10 is a plan view of the eco-friendly retaining wall shown in accordance with the construction method of the eco-friendly retaining wall provided with a catchment using a circular PHC pile according to the present invention.

도 11은 본 발명에 따른 원형 PHC말뚝을 이용한 집수구가 구비된 친환경 옹벽의 시공방법을 도시한 친환경 옹벽의 분해사시도.Figure 11 is an exploded perspective view of an environmentally friendly retaining wall showing a construction method of an environmentally friendly retaining wall provided with a catchment using a circular PHC pile according to the present invention.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

1: 친환경 옹벽 2: PHC말뚝 21: 강재밴드 22: 플레이트1: eco-friendly retaining wall 2: PHC pile 21: steel band 22: plate

23: 보조플레이트 3: 스토퍼 4: 패널 42: 배수공23: auxiliary plate 3: stopper 4: panel 42: drain hole

5: 외장재 51: 앵커볼트 52: 너트 6: 집수구5: exterior material 51: anchor bolt 52: nut 6: catch hole

61: 바닥면 611: 집수공 62: 양측벽 63: 개구부61: bottom surface 611: water collecting hole 62: both side walls 63: opening

64: 부직포 7: 캡콘크리트 9: 수팽창 지수재 10: 모래층64: nonwoven fabric 7: cap concrete 9: water expansion index 10: sand layer

100: 지중 110: 굴착면100: underground 110: drilling surface

Claims (15)

친환경 옹벽(1)의 설치위치를 따라 지중(100)에 소정거리 이격되어 복수 설치된 원형 PHC말뚝(2);A plurality of circular PHC piles 2 spaced apart a predetermined distance from the ground 100 along the installation position of the eco-friendly retaining wall 1; 상기 PHC말뚝(2)의 길이방향으로 소정거리 이격되게 복수형성되어 상기 PHC말뚝(2)을 감싸는 소정폭의 원형 띠형태 강재밴드(21);A plurality of circular band-shaped steel bands 21 having a predetermined width formed to be spaced apart from each other by a predetermined distance in the longitudinal direction of the PHC pile 2 and surrounding the PHC pile 2; 상기 PHC말뚝(2)의 일측으로 이격되어 일면이 상기 PHC말뚝(2)의 외면의 길이방향과 평행하게 형성된 판상형 바형태의 플레이트(22);Plate-shaped bar-shaped plate 22 is spaced to one side of the PHC pile (2) formed in parallel with the longitudinal direction of the outer surface of the PHC pile (2); 상기 PHC말뚝(2)에 형성된 상기 강재밴드(21)와 상기 플레이트(22) 사이를 서로 연결고정하는 소정길이를 갖는 복수의 판상형태 스토퍼(3);A plurality of plate-shaped stoppers (3) having a predetermined length for connecting and fixing the steel band (21) and the plate (22) formed on the PHC pile (2) to each other; 상기 스토퍼(3) 양면에 직각으로 상기 플레이트(22)와 평행하게 형성된 판형태의 보조플레이트(23);An auxiliary plate 23 having a plate shape formed parallel to the plate 22 at right angles to both surfaces of the stopper 3; 상기 각각의 인접한 PHC말뚝(2)의 상기 스토퍼(3) 사이로 끼움 설치되는 내면 중앙에 일체로 수직연장형성된 집수구(6)가 일체로 구비된 패널(4);A panel (4) integrally provided with a catchment (6) integrally formed in a vertical extension in the center of the inner surface of the adjacent PHC pile (2) between the stoppers (3); 상기 집수구(6)가 구비된 패널(4) 외측 상기 각각의 플레이트(22) 외면에 고정설치되는 친환경소재를 이용한 외장재(5);An exterior member 5 using an environmentally friendly material fixedly installed on an outer surface of each plate 22 outside the panel 4 provided with the water collecting port 6; 상기 외장재(5)의 양측단을 각각의 플레이트(22)에 고정설치된 앵커볼트(51)및 너트(52); 및 Anchor bolts 51 and nuts 52 fixed at both ends of the exterior member 5 to the respective plates 22; And 상기 PHC말뚝(2) 상부를 마감하는 캡콘크리트(7)가 포함되는 것을 특징으로 하는 원형 PHC말뚝을 이용한 집수구가 구비된 친환경 옹벽.Eco-friendly retaining wall provided with a water collecting port using a circular PHC pile, characterized in that the cap concrete (7) finishing the upper portion of the PHC pile (2). 제 1항에 있어서,The method of claim 1, 상기 집수구(6)가 일체로 구비된 패널(4)은 고밀도 폴리에틸렌, 알루미늄및 유리섬유강화플라스틱 중 어느 하나인 인 것을 특징으로 하는 원형 PHC말뚝을 이용한 집수구가 구비된 친환경 옹벽.Panel (4) is integrally provided with the catch port (6) is an environmentally friendly retaining wall provided with a catch port using a circular PHC pile, characterized in that any one of high density polyethylene, aluminum and glass fiber reinforced plastic. 제 1항에 있어서,The method of claim 1, 상기 집수구(6)는 소정길이의 "U" 관로형태로 형성되고, The catchment 6 is formed in the form of a "U" pipe of a predetermined length, 상기 "U" 관로형태의 바닥면(61)에 복수의 집수공(611)이 형성되며, A plurality of water collecting holes 611 are formed on the bottom surface 61 of the “U” pipeline. 상기 "U" 관로형태의 양측벽(62) 끝단 개구부(63)는 상기 바닥면(61)보다 상대적으로 넓게 형성되며, 그리고The end opening 63 of both end walls 62 of the “U” conduit form is relatively wider than the bottom surface 61, and 상기 개구부(63)가 형성된 상기 양측벽(62)의 끝단이 상기 집수구가 구비된 패널(4)에 일체로 형성된 것을 특징으로 하는 원형 PHC말뚝을 이용한 집수구가 구비된 친환경 옹벽.Eco-friendly retaining wall provided with a water collecting port using a circular PHC pile, characterized in that the end of the side wall (62) where the opening (63) is formed integrally with the panel (4) provided with the water collecting hole. 제 1항 또는 제 3항에 있어서,The method according to claim 1 or 3, 상기 집수구(6)는 고밀도 폴리에틸렌, 알루미늄 및 유리섬유강화플라스틱 중 어느 하나의 친환경소재인 것을 특징으로 하는 원형 PHC말뚝을 이용한 집수구가 구비된 친환경 옹벽.The catchment 6 is an eco-friendly retaining wall provided with a catch port using a circular PHC pile, characterized in that any one of the high-density polyethylene, aluminum and glass fiber reinforced plastic material. 제 1항에 있어서,The method of claim 1, 상기 집수구(6)는 집수공(611)이 형성된 바닥면(61) 내면 또는 외면에 부직포(64)가 더 구비된 것을 특징으로 하는 원형 PHC말뚝을 이용한 집수구가 구비된 친환경 옹벽.The catchment 6 is an eco-friendly retaining wall provided with a catch port using a circular PHC pile, characterized in that the non-woven fabric 64 is further provided on the inner surface or the outer surface of the bottom surface 61 in which the catching hole 611 is formed. 제 1항에 있어서,The method of claim 1, 상기 친환경 옹벽(1)은 각각의 상기 PHC말뚝(2)과 인접한 상기 집수구(6)의 양측벽(62) 사이를 따라 수직으로 수팽창 지수재(9)가 더 구비된 것을 특징으로 하는 원형 PHC말뚝을 이용한 집수구가 구비된 친환경 옹벽.The eco-friendly retaining wall (1) is a circular PHC, characterized in that the water expansion index member (9) is further provided vertically along each of the PHC pile (2) and both side walls (62) of the catchment (6) adjacent to each other Eco-friendly retaining wall equipped with a catch basin using piles. 제 6항에 있어서,The method of claim 6, 상기 수팽창 지수재(9)는 벤토나이트 및 고무지수재가 혼합된 것을 특징으로 하는 원형 PHC말뚝을 이용한 집수구가 구비된 친환경 옹벽.The water-expandable index member 9 is an environmentally friendly retaining wall provided with a catchment using a circular PHC pile, characterized in that the mixture of bentonite and rubber index. 제 1항에 있어서,The method of claim 1, 상기 친환경 옹벽(1)은 상기 집수구(6)의 바닥면(61) 외측에 모래층(10)이 더 구비된 것을 특징으로 하는 원형 PHC말뚝을 이용한 집수구가 구비된 친환경 옹벽.The eco-friendly retaining wall (1) is an eco-friendly retaining wall is provided with a water collecting port using a circular PHC pile, characterized in that the sand layer 10 is further provided on the outside of the bottom surface 61 of the water collecting port (6). 제 1항에 있어서,The method of claim 1, 상기 외장재(5)는 판체형태의 목재, 판체형태의 광석 및 아크릴판 중 어느 하나인 것을 특징으로 하는 원형 PHC말뚝을 이용한 집수구가 구비된 친환경 옹벽.The exterior member 5 is an eco-friendly retaining wall provided with a water collecting port using a circular PHC pile, characterized in that any one of a plate-shaped wood, plate-shaped ore and acrylic plate. 제 1항에 있어서,The method of claim 1, 상기 친환경 옹벽(1)에 적층형성된 최하단의 상기 집수구가 구비된 패널은 상기 집수구(6)와 연통된 하단부를 관통하는 적어도 하나의 배수공(42)을 더 구비된 것을 특징으로 하는 원형 PHC말뚝을 이용한 집수구가 구비된 친환경 옹벽.The panel provided with the lowermost catchment port stacked on the eco-friendly retaining wall 1 further includes at least one drain hole 42 penetrating the lower end communicating with the catchment 6. Eco-friendly retaining wall with catchment. 친환경 옹벽(1)을 형성할 지중(100)을 따라 PHC말뚝(2)의 길이방향으로 소정거리 이격되게 복수형성되어 상기 PHC말뚝(2)을 감싸는 소정폭의 원형 띠형태 강재밴드(21)가 일체로 형성된 복수의 원형 PHC말뚝(2)을 소정거리 이격되게 매설하는 단계(S100);A plurality of circular band-shaped steel bands 21 having a predetermined width surrounding the PHC pile 2 are formed in a plurality of spaced apart from each other in the longitudinal direction of the PHC pile 2 along the ground 100 to form the eco-friendly retaining wall 1. Embedding the plurality of circular PHC piles 2 formed integrally with a predetermined distance apart (S100); 상기 매설된 PHC말뚝(2) 양면 중 상기 친환경 옹벽(1)의 외면이 형성되는 일면을 굴착하는 단계(S110);Excavating one surface of which the outer surface of the eco-friendly retaining wall 1 is formed among the both sides of the embedded PHC pile (S110); 상기 굴착된 PHC말뚝(2) 일측으로 이격되어 일면이 상기 PHC말뚝(2)의 외면의 길이방향과 평행하게 형성된 판상형 바형태의 플레이트(22)를 설치하고, 상기 플레이트(22)와 상기 강재밴드(21) 사이를 소정길이를 갖는 복수의 판상형태 스토퍼(3)로 고정설치하며, 그리고, 상기 스토퍼(3)는 양면에 직각으로 상기 플레이트(22)와 평행한 판형태의 보조플레이트(23)를 고정설치하는 단계(S120);The plated bar-shaped plate 22 formed on one side is parallel to the longitudinal direction of the outer surface of the PHC pile 2 is spaced apart to one side of the excavated PHC pile 2, the plate 22 and the steel band A plurality of plate-shaped stoppers 3 having a predetermined length between them are fixedly installed, and the stoppers 3 are plate-shaped auxiliary plates 23 parallel to the plates 22 at right angles to both surfaces thereof. Fixing step (S120); 상기 각각의 스토퍼(3) 사이에 소정길이의 "U" 관로형태로 형성되고, 상기 "U" 관로형태의 바닥면(61)에 복수의 집수공(611)이 형성되며, 상기 "U" 관로형태의 양측벽(62) 끝단 개구부(63)는 상기 바닥면(61)보다 상대적으로 넓게 형성되며, 집수공(611)이 형성된 상기 바닥면(61) 내면 또는 외면에 부직포(64)가 더 구비되며; 그리고 상기 바닥면(61)에 인접한 양측벽(62) 외측끝단을 따라 수팽창 지수재(9)가 도포된 집수구(6)가 일체로 구비된 패널(4)을 끼움 설치하는 단계(S130);Between each stopper (3) is formed in the form of a "U" conduit of a predetermined length, a plurality of collecting holes 611 is formed on the bottom surface 61 of the "U" conduit form, the "U" conduit The end openings 63 of both side walls 62 having a shape are formed relatively wider than the bottom surface 61, and a nonwoven fabric 64 is further provided on the inner surface or the outer surface of the bottom surface 61 on which the collecting hole 611 is formed. Become; And inserting the panel 4 integrally provided with the water collecting port 6 to which the water expansion index material 9 is applied along the outer end of both side walls 62 adjacent to the bottom surface 61 (S130); 상기 집수구가 구비된 패널(4)의 집수구(6) 외측과 굴착면(110) 사이에 형성된 공간에 모래를 매립하여 모래층(10)을 형성하는 단계(S140); 및Forming a sand layer (10) by embedding sand in a space formed between an outer side of the collecting hole (6) and the excavation surface (110) of the panel (4) provided with the collecting hole (S140); And 상기 집수구(6)가 구비된 패널(4) 외측 상기 각각의 플레이트(22) 외면에 고정설치되는 친환경소재를 이용한 외장재(5)의 양측단을 고정볼트를 이용하여 각각의 플레이트 일면에 고정설치하는 단계(S150); 및Both sides of the exterior panel 5 using environmentally friendly materials fixed to the outer surface of each of the plates 22 having the water collecting port 6 are installed on one surface of each plate by using fixing bolts. Step S150; And 상기 친환경 옹벽(1)의 상기 PHC말뚝(2) 상부를 캡콘크리트(7)로 마감하는 단계(S160);를 포함하는 것을 특징으로 하는 원형 PHC말뚝을 이용한 집수구가 구비된 친환경 옹벽의 시공공법.Construction of the eco-friendly retaining wall is provided with a water collecting port using a circular PHC pile; 제 11항에 있어서,The method of claim 11, 상기 PHC말뚝 설치단계(S100)에서 지중에 상기 PHC말뚝을 매설하는 공법은 매입공법인 것을 특징으로 하는 원형 PHC말뚝을 이용한 집수구가 구비된 친환경 옹벽의 시공공법.The construction method of embedding the PHC stake in the ground in the PHC pile installation step (S100) is a buried method, the construction method of the eco-friendly retaining wall provided with a water collecting port using a circular PHC pile. 제 11항에 있어서,The method of claim 11, 상기 고정볼트 체결단계(S140)와 상기 모래층 형성단계(S150) 사이에,Between the fixing bolt fastening step (S140) and the sand layer forming step (S150), 상기 집수구가 구비된 패널(4)이 설치된 상기 PHC말뚝(2) 일면을 재굴착하는 PHC말뚝일면재굴착단계(S210);PHC pile one surface re-excavation step (S210) for re-excavating one surface of the PHC pile (2) provided with a panel (4) having the water collecting port; 상기 굴착된 PHC말뚝(2) 일측으로 이격되어 일면이 상기 PHC말뚝(2)의 외면의 길이방향과 평행하게 형성된 판상형 바형태의 플레이트(22)를 설치하고, 상기 플레이트(22)와 상기 강재밴드(21) 사이를 소정길이를 갖는 복수의 판상형태 스토퍼(3)로 고정설치하며, 그리고, 상기 스토퍼(3)는 양면에 직각으로 상기 플레이트(22)와 평행한 판형태의 보조플레이트(23)를 재고정설치하는 재고정설치단계(S220); 및The plated bar-shaped plate 22 formed on one side is parallel to the longitudinal direction of the outer surface of the PHC pile 2 is spaced apart to one side of the excavated PHC pile 2, the plate 22 and the steel band A plurality of plate-shaped stoppers 3 having a predetermined length between them are fixedly installed, and the stoppers 3 are plate-shaped auxiliary plates 23 parallel to the plates 22 at right angles to both surfaces thereof. Inventory installation step to install inventory (S220); And 상기 집수구(6)가 구비된 패널(4)을 상기 굴착된 바닥까지 이동시키는 패널이동단계(S230);가 포함된 재굴착하는 재굴착단계(S200);가 더 포함되고, 그리고A panel moving step (S230) for moving the panel 4 provided with the water collecting port 6 to the excavated bottom; a re-excavation step (S200) including the; 상기 재굴착단계(S200)는 상기 친환경 옹벽(1)의 높이에 따라 적어도 한번 실행되는 것을 특징으로 하는 원형 PHC말뚝을 이용한 집수구가 구비된 친환경 옹벽의 시공공법.The re-excavation step (S200) is a construction method of an eco-friendly retaining wall provided with a water collecting port using a circular PHC pile, characterized in that is carried out at least once according to the height of the eco-friendly retaining wall (1). 제 11항에 있어서,The method of claim 11, 상기 스토퍼 고정설치단계(S130)와 상기 집수구가 구비된 패널 끼움 설치단계(S140) 사이에, 상기 각각의 플레이트(22)의 상단부 일면에 직각으로 형성된 판체형태의 보조가이드편(31)을 고정설치하는 단계(S131); 및Between the stopper fixing installation step (S130) and the panel fitting installation step (S140) provided with the water collecting port, the plate-shaped auxiliary guide piece 31 formed at right angles to one surface of the upper end of each plate 22 is fixedly installed. Step S131; And 상기 각각의 보조가이드편 상부에 단면의 형상이 "ㄷ"현강, "L"형강 및 "H" 현강 중 어느 하나인 가이드바(32)를 고정설치하는 단계(S132)를 더 포함하는 것을 특징으로 하는 원형 PHC말뚝을 이용한 집수구가 구비된 친환경 옹벽의 시공공법.It characterized in that it further comprises the step (S132) of fixing the guide bar 32, which is any one of the shape of the cross-section "C", "L" steel and "H" steel on the upper side of each auxiliary guide piece Construction method of eco-friendly retaining wall equipped with catchment using circular PHC pile. 제 11항에 있어서,The method of claim 11, 상기 모래층 형성단계(S160) 이후 상기 보조가이드편 고정설치단계(S131) 및 가이드바 고정설치단계(S132)에서 설치된 보조가이드편(31) 및 가이드가(32)를 제거하는 단계(S162)를 더 포함하는 것을 특징으로 하는 원형 PHC말뚝을 이용한 집수구가 구비된 친환경 옹벽의 시공공법.After the sand layer forming step (S160), the auxiliary guide piece fixing installation step (S131) and the guide bar fixing installation step (S132) further removed the step of removing the auxiliary guide piece 31 and the guide piece (32) (S162). Construction method of eco-friendly retaining wall provided with a catchment using a circular PHC pile, characterized in that it comprises a.
KR1020090091830A 2009-09-28 2009-09-28 The pro-environmental retaining wall using circular PHC pile with catch pit which is had and construction method using thereby KR101119651B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090091830A KR101119651B1 (en) 2009-09-28 2009-09-28 The pro-environmental retaining wall using circular PHC pile with catch pit which is had and construction method using thereby

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090091830A KR101119651B1 (en) 2009-09-28 2009-09-28 The pro-environmental retaining wall using circular PHC pile with catch pit which is had and construction method using thereby

Publications (2)

Publication Number Publication Date
KR20110034333A KR20110034333A (en) 2011-04-05
KR101119651B1 true KR101119651B1 (en) 2012-03-13

Family

ID=44042941

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090091830A KR101119651B1 (en) 2009-09-28 2009-09-28 The pro-environmental retaining wall using circular PHC pile with catch pit which is had and construction method using thereby

Country Status (1)

Country Link
KR (1) KR101119651B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160106357A (en) * 2015-03-02 2016-09-12 이상현 PHC Pile having Steel Bands, Retaining Wall using such PHC Piles, and Constructing Method of such Retaining Wall

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103147443B (en) * 2013-03-18 2015-08-05 中国建筑第八工程局有限公司 Foundation pit supporting construction and construction method thereof
KR101701149B1 (en) * 2016-07-26 2017-02-01 신영기술개발(주) Steel pipe post type retaining wall structure and construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200205753Y1 (en) 2000-06-29 2000-12-01 주식회사경보기술단 A breast wall panel for drain and frame
KR20040003580A (en) * 2002-07-03 2004-01-13 한녹희 Retaining wall using phc pile
KR20040099714A (en) * 2003-05-20 2004-12-02 (주) 홍지개발 Sheet Pile and Construction Method thereof
KR100913569B1 (en) 2009-01-29 2009-08-26 (주) 아이제이컨티넨탈엔지니어링 Phc pile for retaining wall

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200205753Y1 (en) 2000-06-29 2000-12-01 주식회사경보기술단 A breast wall panel for drain and frame
KR20040003580A (en) * 2002-07-03 2004-01-13 한녹희 Retaining wall using phc pile
KR20040099714A (en) * 2003-05-20 2004-12-02 (주) 홍지개발 Sheet Pile and Construction Method thereof
KR100913569B1 (en) 2009-01-29 2009-08-26 (주) 아이제이컨티넨탈엔지니어링 Phc pile for retaining wall

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160106357A (en) * 2015-03-02 2016-09-12 이상현 PHC Pile having Steel Bands, Retaining Wall using such PHC Piles, and Constructing Method of such Retaining Wall
KR101684389B1 (en) * 2015-03-02 2016-12-08 이상현 PHC Pile having Steel Bands, Retaining Wall using such PHC Piles, and Constructing Method of such Retaining Wall

Also Published As

Publication number Publication date
KR20110034333A (en) 2011-04-05

Similar Documents

Publication Publication Date Title
KR101112107B1 (en) The retaining wall using circular PHC pile with catch pit which is had and construction method using thereby
KR101274974B1 (en) Earth retaining wall and construction method thereof
KR101590032B1 (en) Column wall using pile and structure construction method therewith
KR101331261B1 (en) Underground prefabricated precast concrete rainwater recycling facility using precast concrete continuous wall in strut structure or earth anchor and construction method of the same
KR101105092B1 (en) A precast retaining panel and construction method of the same with half pc type backfill
KR102131653B1 (en) Retaining wall structure and the construction method using eco-friendly retaining wall panel
KR102099041B1 (en) Block type reinforcement retaining wall structure and it&#39;s construction method
KR101119651B1 (en) The pro-environmental retaining wall using circular PHC pile with catch pit which is had and construction method using thereby
KR101495997B1 (en) Upright type rainwater storaging structure and Rainwater storaging facility having the structure and Method for building the facility
KR102095581B1 (en) Rainwater storage block, rainwater storage structure using the block and its construction method
KR101021137B1 (en) Precast concrete block for expanding sidewalk using micro pile, expanding sidewalk using the same and the constructing method thereof
KR100627403B1 (en) Apartment house foundation work drainage member structure
JP3793434B2 (en) Rainwater storage facilities and infiltration facilities
KR101521558B1 (en) Underground wall construction method using the wall members
KR100758601B1 (en) Reinforced earth retaining wall block
KR101510612B1 (en) Fixtures of block for reinforcement
KR100758231B1 (en) Environmentally friendly sloped block structure for landscaping
CN112609731A (en) Flexible permeable cutting retaining wall and construction method
KR101065726B1 (en) Prefabricated retaining wall
KR200369479Y1 (en) The land-side protection wall panel
KR101306626B1 (en) Retaining wall using block and constructing method thereof
KR200448481Y1 (en) Structure of retaining wall having a possible planting for cutting slope
JP4834649B2 (en) Construction structure of embankment structure, retaining wall block for construction of embankment structure and construction method of embankment structure
CN219690466U (en) Multifunctional ship lock pile wall combined type vertical supporting structure
KR102371284B1 (en) Slurry wall, construction method for the same and wire mesh assembly

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20150127

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20160307

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20170125

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20180129

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20190213

Year of fee payment: 8