KR101103554B1 - Apparutus and method for installing underground pipe line - Google Patents

Apparutus and method for installing underground pipe line Download PDF

Info

Publication number
KR101103554B1
KR101103554B1 KR1020100025231A KR20100025231A KR101103554B1 KR 101103554 B1 KR101103554 B1 KR 101103554B1 KR 1020100025231 A KR1020100025231 A KR 1020100025231A KR 20100025231 A KR20100025231 A KR 20100025231A KR 101103554 B1 KR101103554 B1 KR 101103554B1
Authority
KR
South Korea
Prior art keywords
conduit
sand
protective sheet
winding drum
storage hopper
Prior art date
Application number
KR1020100025231A
Other languages
Korean (ko)
Other versions
KR20110106031A (en
Inventor
권세원
Original Assignee
대원전기 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 대원전기 주식회사 filed Critical 대원전기 주식회사
Priority to KR1020100025231A priority Critical patent/KR101103554B1/en
Publication of KR20110106031A publication Critical patent/KR20110106031A/en
Application granted granted Critical
Publication of KR101103554B1 publication Critical patent/KR101103554B1/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/06Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F5/00Dredgers or soil-shifting machines for special purposes
    • E02F5/02Dredgers or soil-shifting machines for special purposes for digging trenches or ditches
    • E02F5/10Dredgers or soil-shifting machines for special purposes for digging trenches or ditches with arrangements for reinforcing trenches or ditches; with arrangements for making or assembling conduits or for laying conduits or cables
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/028Laying or reclaiming pipes on land, e.g. above the ground in the ground
    • F16L1/032Laying or reclaiming pipes on land, e.g. above the ground in the ground the pipes being continuous
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G9/00Installations of electric cables or lines in or on the ground or water
    • H02G9/02Installations of electric cables or lines in or on the ground or water laid directly in or on the ground, river-bed or sea-bottom; Coverings therefor, e.g. tile

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

본 발명은 각종 전기선이나 통신선을 위한 관로를 지중에 기계화하여 매설하기 위한 것으로, 더욱 상세하게는 트럭을 이용하여 운반 사용할 수 있도록 한 별도의 기계화 포설장치를 구비하되, 상기 지중 관로 기계화 포설장치는 전선관 권취드럼과 모래 저장호퍼 및 보호시트 권취드럼으로 이루어져 있어, 상기의 트럭이 이동하는 동시에 전선관이 매설로에 형성되는 것이고 이와 함께 모래의 투입과 보호시트가 풀려지도록 구성함으로써,
트럭을 통해 이동하는 동시에 전선관과 모래 및 보호시트가 동시에 자동으로 풀리거나 투입되면서 전선관 투입과 모래 투입 및 보호시트 펼침 공정이 일시에 이루어지므로 지중 관로 공사가 매우 빠르게 진행되는 것이고, 기존의 전선관 스페이서의 사용이 불필요하므로 공사비의 절감은 물론 공정의 단순화가 가능하여 매우 경제적인 것이며, 인력에 의존하는 부분이 획기적으로 감소하므로 인건비의 절감은 물론 시공 품질을 향상시킬 수 있어 매우 합리적인 것이다.
The present invention is to mechanize and bury the pipelines for various electric lines or communication lines in the ground, and more specifically provided with a separate mechanized installation apparatus to be transported using a truck, the underground pipeline mechanized installation apparatus is a conduit Consists of a winding drum, a sand storage hopper, and a protective sheet winding drum, wherein the conduit is formed at the same time as the truck moves, and the input of the sand and the protective sheet are released.
Underground pipeline construction is very fast because the conduit, sand, and protective sheet are automatically released or introduced simultaneously while moving through the truck, and the conduit, sand, and protective sheet unfolding processes are performed at once. Since it is unnecessary to use, it is very economical because it can reduce the construction cost and simplify the process, and it is very reasonable because it can drastically reduce the labor cost and improve the construction quality since the parts dependent on manpower are greatly reduced.

Description

지중 관로 기계화 포설장치 및 이를 이용한 지중 관로의 기계화 포설공법 {Apparutus and method for installing underground pipe line}Mechanized laying method for underground pipelines and mechanized laying method using underground pipelines {Apparutus and method for installing underground pipe line}

본 발명은 각종 전기선이나 통신선 배선을 위한 지중관로를 기계화하여 매설하기 위한 것으로, 더욱 상세하게는 트럭의 적재함에 올려 사용할 수 있도록 한 지중 관로 기계화 포설장치를 구비하되, 상기 포설장치는 포설 권취드럼과 모래 저장호퍼 및 보호시트 권취드럼으로 이루어져 있어, 지중 관로를 매립하기 위해 터파기가 이루어진 매설로를 따라 상기의 트럭을 이동시킴에 따라 자동으로 전선관이 풀려 안치되는 동시에 모래의 투입과 보호시트의 풀림이 이루어지도록 한 지중 관로의 기계화 포설공법이다.
The present invention is to mechanized and embedded underground pipelines for wiring various electric lines or communication lines, and more specifically provided with a mechanized installation apparatus for underground pipelines to be used in the loading of the truck, the installation apparatus is a winding winding drum and It consists of a sand storage hopper and a protective sheet winding drum, and as the truck moves along the burrow, which is made to dig underground pipes, the conduits are automatically released and placed, and sand is released and the protection sheet is released. It is a mechanized laying method for underground pipelines.

일반적으로 다양한 전기선이나 통신선 등의 전선은 통상적으로 전주를 이용하여 공중 설치되는 것이 보편적이었다. 그러나 근자에 들어서는 상기와 같은 전주와 공중의 전선으로 인해 도시 미관을 해치는 문제점으로 인해 지중 매설 형태의 전선로 구성이 증가하는 추세이다.In general, wires such as various electric lines or communication lines have been commonly installed in the air using electric poles. However, in recent years, due to the problem of harming the aesthetics of the city due to the electric poles of the electric poles and the air as described above, the construction of underground wires is increasing.

이와 같이 각종 전선을 지중 매설하기 위해서는 상기의 전선을 보호하기 위한 전선관을 먼저 매립한 상태에서 이들 전선관으로 각종 전선을 삽입하여 설치하게 되는 것인데, 상기와 같은 전선관의 매립 공정은 100% 인력에 의존하여 시공되고 있는 실정이다.In order to embed various electric wires in the ground, the electric wires for protecting the electric wires are buried first, and various electric wires are inserted into these electric wires. The electric wire embedding process is 100% dependent on manpower. It is being constructed.

즉, 백호우 등의 장비에 의해 전선관이 매설될 지점에 대한 터파기를 수행한 상태에서, 전선관이 매설된 터파기 지점에 대하여 일정 간격으로 스페이서를 설치하게 된다. 이때, 상기의 스페이서는 합성수지를 사출 성형하여 만들어지는 것으로서 매설로 내에 위치하게 될 전선관이 유동하거나 일측으로의 쏠림 현상이 발생하는 것을 억제하기 위한 것이다.That is, the spacer is installed at regular intervals with respect to the trench point in which the conduit is embedded in the state in which the trench is burnished by the equipment such as a backhoe. At this time, the spacer is made by injection molding the synthetic resin is to suppress the phenomenon that the conduit to be located in the buried passage flows or the phenomenon of one side pull.

이어, 상기와 같은 스페이서에 대한 설치가 완료되면 상기의 스페이서에 전선관을 고정하는 형태로 매설로 전체에 대한 전선관의 설치가 이루어지게 되는 것이고, 전선관의 배관이 이루어지면 상기 매설로에 대한 성토작업을 수행하게 된다.Subsequently, when the installation of the spacer is completed, the installation of the conduit for the entire buried furnace is performed in the form of fixing the conduit to the spacer, and when the conduit of the conduit is made, the filling work for the buried furnace is performed. Will perform.

이때, 모래에 의해 이루어지는 성토작업은 전선관 상부로 일정 높이까지만 이루어지는 것인데, 이는 상기의 성토층 표면에 별도의 보호시트를 펼쳐 매립하기 위한 것이다, 즉, 상기와 같이 지면보다는 낮은 상태의 성토층이 마련되면 그 성토층의 표면에 대하여 필름지 형태로 된 보호시트를 깔아 형성한 상태에서 나머지 매설로에 대한 되메우기 작업 및 다짐 작업을 순차적으로 수행하여 완료되는 것이다.At this time, the filling work made by sand is to be made only up to a certain height above the conduit, which is to bury a separate protective sheet on the surface of the fill layer, that is, the fill layer is lower than the ground as described above When the protective sheet in the form of a film on the surface of the fill layer is formed by completing the backfilling and compacting work for the remaining buried road in sequence.

여기서, 상기의 보호시트는 케이블 매설에 따른 굴착시의 위험을 알리기 위한 역할을 수행하는 것인데, 상기와 같이 전선관이 매설된 상태에서 추후에 다양한 원인으로 인해 해당 지점에 대한 굴착이 이루어질 경우, 굴착 과정에서 상기의 보호시트가 먼저 드러나게 될 것이므로 작업자는 상기의 보호시트에 의해 해당 지점에 전선관이 매설된 상태임을 즉시 알 수 있을 것이므로 상기와 같은 추후 굴착 작업시 전선관 및 내부의 전선이 파손되거나 절단되는 실수로 인해 야기되는 다양한 문제점을 예방하고자 투입되는 것이다.Here, the protective sheet serves to inform the danger of the excavation due to the laying of the cable, when the excavation to the point due to various causes later in the state of the conduit buried, the excavation process In the above protective sheet will be revealed first, the operator will immediately know that the conduit is buried at the point by the protective sheet, so that during the subsequent excavation work, the conduit and the wire inside it is broken or cut It is put to prevent various problems caused by the.

이에 따라 상기와 같은 종래의 전선관 매설 과정은 100% 인력에 의존하여야 하므로 작업 시간이 매우 길어질 뿐만 아니라 전선관과는 별개의 스페이서를 반드시 사용하므로 극히 비경제적인 것이고, 작업자의 인력에 의존하므로 전선관의 매설 상태 및 보호시트의 펼침 상태 또는 성토층의 높이가 일정하지 아니하여 고품질의 시공 상태를 유지할 수 없는 문제점을 갖고 있는 것이다.
Accordingly, the conventional conduit buried process as described above has to depend on 100% manpower, which not only increases work time but also uses a separate spacer from the conduit, which is extremely uneconomical. And the unfolded state of the protective sheet or the height of the fill layer is not a constant has a problem that can not maintain a high quality construction state.

본 발명은 전기한 바와 같은 문제점을 개선한 것으로서, 트럭을 이용하여 운반 사용할 수 있도록 한 별도의 기계화 포설장치를 구비하되, 상기 지중 관로 기계화 포설장치는 전선관 권취드럼과 모래 저장호퍼 및 보호시트 권취드럼으로 이루어져 있어, 상기의 트럭이 이동하는 동시에 전선관이 매설로에 형성되는 것이고 이와 함께 모래의 투입과 보호시트가 풀려지도록 구성함으로써,The present invention improves the problems as described above, provided with a separate mechanized installation apparatus for transporting using a truck, the underground pipeline mechanized installation apparatus is a conduit winding drum and sand storage hopper and protective sheet winding drum Consisting of the truck, the conduit is formed in the buried furnace at the same time the sand is introduced and the protective sheet is configured to be released,

기존의 스페이서 설치공정과 스페이서와 전선관의 고정공정이 불필요해짐은 물론 인력에 의존하던 전선관 배치공정과 모래를 사용한 성토작업 및 보호시트 작업이 동시에 이루어지므로 매우 빠르고 효율적으로 지중 관로 설치가 이루어지도록 한 포설장치 및 그 포설공법을 제공함에 본 발명의 목적이 있는 것이다.
Existing spacer installation process and fixing process of spacer and conduit are unnecessary, as well as conduit arrangement process and sand filling work and protection sheet work that depended on manpower are performed at the same time. It is an object of the present invention to provide an apparatus and its installation method.

상기한 바와 같은 목적을 달성하기 위한 본 발명은, 프레임 골조로 된 지지틀 상에 전선관 권취드럼과 모래 저장호퍼 및 보호시트 권취드럼을 각기 장착하되,In order to achieve the above object, the present invention, while mounting the conduit winding drum and sand storage hopper and the protective sheet winding drum on the frame frame support frame, respectively,

상기 전선관 권취드럼 내에 감겨진 상태의 전선관은 모래 저장호퍼의 하측을 따라 외향 인출되게 하고, 모래 저장호퍼는 일측으로 배출관을 형성하여 모래 저장호퍼 내의 모래가 배출되게 하며, 상기 보호시트 권취드럼에 감겨진 상태의 보호시트는 상기 배출관의 상부로부터 풀리도록 구성함에 따라, 상기의 지지틀이 적재함에 안치된 상태의 트럭이 미리 작업된 매설로를 따라 이동하면 그 매설로의 내부에 하측으로부터 전선관을 포설하고 전선관 상측 10cm까지 모래를 깔고 전선관 상부 30cm 상에 보호시트가 상향 순차적으로 풀리거나 투입되도록 구성하여 이루어지는 것이다.
The conduit wound in the conduit winding drum is drawn outward along the lower side of the sand storage hopper, and the sand storage hopper forms a discharge pipe to one side so that sand in the sand storage hopper is discharged and wound on the protective sheet winding drum. Since the protective sheet in the closed state is configured to be released from the upper portion of the discharge pipe, when the truck placed in the loading frame moves along the pre-loaded roadway, the conduit is laid from the lower side of the roadway. And the sand to the upper side of the conduit is made of sand and the protective sheet on the upper conduit 30cm to be configured to be released or sequentially sequentially upward.

본 발명은, 트럭을 통해 이동하는 동시에 전선관과 모래 및 보호시트가 동시에 자동으로 풀리거나 투입되면서 전선관 포설과 모래 투입 및 보호시트 펼침 공정이 일시에 이루어지므로 지중 관로 공사가 매우 빠르게 진행되는 것이고, 기존의 전선관 스페이서의 사용이 불필요하므로 공사비의 절감은 물론 공정의 단순화가 가능하여 매우 경제적인 것이며, 인력에 의존하는 부분이 획기적으로 감소하므로 인건비의 절감은 물론 시공 품질을 향상시킬 수 있어 매우 합리적인 것이다.
The present invention is a underground pipeline construction proceeds very quickly because the conduit pipe laying and sand and protective sheet unfolding process is made at the same time as the conduit and sand and the protective sheet is automatically released or injected at the same time while moving through the truck. The use of conduit spacers is unnecessary, so it is possible to reduce the construction cost and simplify the process, and it is very economical. Since the parts dependent on manpower are greatly reduced, it is very reasonable to reduce labor costs and improve construction quality.

도 1은 본 발명에 따른 지중 관로 기계화 포설장치의 전체 사시도
도 2는 본 발명에 따른 지중 관로 기계화 포설장치의 측면 전체도
도 3은 본 발명에 따른 지중 관로 기계화 포설장치의 호퍼 개폐부 상세도
도 4는 본 발명에 따른 지중 관로 기계화 포설장치의 사용 예시도
1 is a perspective view of the underground pipeline mechanized laying apparatus according to the present invention
Figure 2 is an overall side view of the underground pipeline mechanized laying apparatus according to the present invention
Figure 3 is a detailed view of the hopper opening and closing portion of the underground pipeline mechanized laying apparatus according to the present invention
Figure 4 is an illustration of the use of underground pipeline mechanized laying apparatus according to the present invention

본 명세서 및 청구범위에 사용된 용어나 단어는 통상적이거나 사전적인 의미로 한정해서 해석되어서는 아니 되며, 발명자는 자신의 발명을 가장 최선의 방법으로 설명하기 위해 용어의 개념을 적절하게 정의할 수 있다는 원칙에 입각하여 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다.
The terms and words used in the present specification and claims should not be construed as limited to ordinary or dictionary meanings and the inventor may properly define the concept of the term to describe its invention in the best possible way And should be construed in accordance with the principles and meanings and concepts consistent with the technical idea of the present invention.

이하 첨부된 도면을 참조하여 본 발명의 바람직한 실시예를 상세히 설명하기로 한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명에 따른 지중 관로 기계화 포설장치의 전체 사시도이고, 도 2는 본 발명에 따른 지중 관로 기계화 포설장치의 측면 전체도이며, 도 3은 본 발명에 따른 지중 관로 기계화 포설장치의 호퍼 개폐부 상세도이다.1 is an overall perspective view of the underground pipeline mechanized installation apparatus according to the present invention, Figure 2 is a side view of the underground pipeline mechanized installation apparatus according to the present invention, Figure 3 is a hopper opening and closing portion of the underground pipeline mechanized installation apparatus according to the present invention Detailed view.

도시와 같이 본 발명에 따른 지중 관로 기계화 포설장치는, 트럭(100)의 적재함 상에 올려질 정도의 크기를 갖는 프레임 골조 형태의 지지틀(10)을 구비하고, 그 지지틀(10)의 상부에는 각각 전선관 권취드럼(20)과 모래 저장호퍼(30) 및 보호시트 권취드럼(40)을 장착 형성한 것이다.The underground pipeline mechanized installation apparatus according to the present invention, as shown in the drawing, is provided with a support frame 10 in the form of a frame frame having a size enough to be placed on the loading box of the truck 100, and the upper portion of the support frame 10. The conduit winding drum 20, the sand storage hopper 30 and the protective sheet winding drum 40 are formed respectively.

이때, 상기의 지지틀(10)의 상부에는 전선관 권취드럼(20)과 모래 저장호퍼(30)의 하부에 위치하는 수평롤러(11)와 경사롤러(12)(12')을 일정 간격으로 연속하여 장착 형성한 것인데, 지지틀(10)의 상측 중앙부에 수평롤러(11)를 장착하고 그 수평롤러(11)의 양측으로 끝단이 상측으로 올라간 경사롤러(12)(12')를 배치함에 따라 상기 전선관 권취드럼(20)으로부터 풀려지는 전선관(50)이 지지틀(10)의 중앙부로부터 일정하게 안내 배출될 수 있도록 한 것이다.At this time, the horizontal roller 11 and the inclined roller 12, 12 'located at the lower portion of the conduit winding drum 20 and the sand storage hopper 30 in the upper portion of the support frame 10 at a constant interval The horizontal roller 11 is mounted on the upper center portion of the support frame 10, and the inclined rollers 12 and 12 'whose ends are raised to both sides of the horizontal roller 11 are disposed. The conduit 50, which is released from the conduit winding drum 20, is to be constantly guided and discharged from the center portion of the support frame (10).

또한, 상기의 전선관 권취드럼(20)은 상기 지지틀(10)로부터 결합 형성된 지지대(21)의 선단에 그 전선관 권취드럼(20)의 중앙부로부터 돌출된 회전축(22)이 축 결합되어 회전될 수 있는 구조를 갖고 있는 것인데, 그 전선관 권취드럼(20)으로 감겨지는 전선관(50)은 매설시키고자 하는 전선관(50)의 분할 개체수에 따라 각기 다른 내경으로 복수 권취될 수 있을 것이다.In addition, the conduit winding drum 20 may be rotated by a shaft coupled to the rotary shaft 22 protruding from the center portion of the conduit winding drum 20 to the end of the support (21) formed from the support frame (10) It has a structure that is, the conduit 50 wound by the conduit winding drum 20 may be wound in a plurality of different inner diameters depending on the divided number of the conduit 50 to be embedded.

또한, 상기의 모래 저장호퍼(30)는 외측으로부터 하향의 배출관(31)이 결합 형성되어 있는 것으로서, 모래 저장호퍼(30)와 배출관(31)은 별도의 도어(32)에 의해 서로 연통되거나 차단될 수 있는 구조를 갖고 있는 것이고, 상기의 도어(32)는 모래 저장호퍼(30)의 내면에 밀착된 상태에서 모래 저장호퍼(30)의 외부에 장착된 엑츄에이터(33)와 연결되게 함에 따라 상기 엑츄에이터(33)가 작동하면 상기의 도어(32)를 횡방향으로 유동시켜 그에 따라 상기 배출관(31)이 개방되거나 밀폐될 수 있도록 하는 것이다.In addition, the sand storage hopper 30 is a discharge pipe 31 is formed downwardly coupled from the outside, the sand storage hopper 30 and the discharge pipe 31 is communicated with each other by a separate door 32 or blocked. The door 32 is connected to the actuator 33 mounted on the outside of the sand storage hopper 30 while being in close contact with the inner surface of the sand storage hopper 30. When the actuator 33 is operated to flow the door 32 in the lateral direction so that the discharge pipe 31 can be opened or closed accordingly.

특히, 상기의 배출관(31) 저면에는 그 배출관(31)을 따라 연속하여 배치된 다수의 수평 형태로 된 안내롤러(34)를 장착함에 따라, 그 안내롤러(34)는 상기 전선관 권취드럼(20)으로부터 풀려 인출되는 전선관(50)이 상기 배출관(31)과 맞닿아 손상되거나 파손되는 것을 방지하는 동시에 이들의 상호 간섭으로 인해 전선관(50)이 원활하게 인출되지 않는 문제점을 극복하기 위한 것이다.In particular, the lower surface of the discharge pipe 31 is equipped with a plurality of horizontal guide rollers 34 arranged continuously along the discharge pipe 31, the guide roller 34 is the conduit winding drum 20 It is to overcome the problem that the conduit 50 is drawn out from the conduit to prevent the conduit 50 is not drawn smoothly due to their mutual interference at the same time to prevent the conduit 50 is in contact with the discharge pipe 31 to be damaged or broken.

또한, 상기의 보호시트 권취드럼(40)은 상기의 모래 저장호퍼(30)의 외면에 장착 설치되는 것으로서, 별도의 보호시트(70)가 권취되어 있고 그 보호시트(70)는 주지한 바와 같이 추후 굴착 공사가 필요한 경우 해당 지점에 케이블이 매설되어 있음을 알려주는 역할을 하게 된다. 이와 같은 보호시트(70)는 상기의 배출관(31)을 따라 풀려나가며 매설로(110) 내의 모래(60)에 의한 성토층 상에 위치하게 되는 것이다.In addition, the protective sheet winding drum 40 is mounted on the outer surface of the sand storage hopper 30, and a separate protective sheet 70 is wound and the protective sheet 70 is known as If the excavation is needed later, it will serve as a reminder that the cable is buried at that point. The protective sheet 70 is released along the discharge pipe 31 and is located on the fill layer by the sand 60 in the buried furnace 110.

따라서, 상기와 같은 지중 관로 기계화 포설장치를 트럭(100)의 적재함 상에 올려놓은 상태에서, 상기의 트럭(100)을 터파기 공사에 의해 미리 굴착된 상태의 매설로(110)를 따라 이동시키되, 매설로(110)의 처음 시작부에서는 인위적인 힘에 의해 전선관(50)을 끌어당긴 상태에서 상기의 트럭(100)을 이동시키면 도 4의 도시와 같이 모래(60)가 배출관(31)을 따라 배출되면서 전선관(50) 상부에 투입되므로 모래(60)의 압력으로 인해 상기의 전선관(50)은 트럭(100)의 이동 속도에 따라 자동으로 풀려지는 것이고 상기의 모래(60) 역시 전선관(50)을 감싸듯 매설로(110) 내에 투입되면서 그 전선관(50)이 유동할 수 없도록 성토층을 형성하게 되는 것이다.Therefore, while the above-mentioned underground pipeline mechanized installation apparatus is placed on the loading box of the truck 100, the truck 100 is moved along the buried road 110 in a pre-excavated state by the digging work. In the first start of the buried road 110, when the truck 100 is moved in a state in which the conduit 50 is pulled by artificial force, the sand 60 follows the discharge pipe 31 as shown in FIG. As it is discharged into the upper conduit 50, the conduit 50 is automatically released according to the moving speed of the truck 100 due to the pressure of the sand 60, and the sand 60 is also the conduit 50. As enclosed in the buried furnace 110 is to form a fill layer so that the conduit 50 can not flow.

또한, 상기의 보호시트(70)는 별도의 풀림장치를 적용하여 자동으로 풀려 펼쳐질 수 있도록 구성할 수도 있을 것이나, 트럭(100)의 이동 속도가 가변될 수 있음을 감안할 때 상기 트럭(100)의 후면에 위치하는 작업구간의 시작부분에 작업자가 보호시트(70)를 고정시키면 상기의 보호시트(70)는 별도의 풀림장치가 없더라도 자연스럽게 매설로(110) 내의 성토층 상부에 펼쳐 전개되는 형태를 갖게 될 것이다.In addition, the protective sheet 70 may be configured to be automatically unfolded by applying a separate release device, but considering that the moving speed of the truck 100 can be varied of the truck 100 When the worker secures the protective sheet 70 at the beginning of the work section located at the rear, the protective sheet 70 naturally spreads on the top of the fill layer in the buried furnace 110 even without a separate release device. Will have.

이에 따라, 본 발명의 지중 관로 기계화 포설장치는 차량이 이동함에 따라 전선관(50)의 균일 설치와 모래(60)의 자동 투입 및 보호시트(70)의 펼침이 동시에 이루어질 수 있어 인력에 의존하던 기존의 매설 공사에 비하여 현저히 단축된 작업 시간을 갖게 되는 것이고, 투입되는 인원 역시 최소화되므로 인건비의 절감으로 인한 경제적인 효과가 뛰어난 것이다.Accordingly, in the underground pipeline mechanized installation apparatus of the present invention, as the vehicle moves, uniform installation of the conduit 50 and automatic injection of sand 60 and unfolding of the protective sheet 70 may be simultaneously performed, thus relying on manpower. It will have a significantly shorter working time than the burial work, and since the number of workers will be minimized, it will be economically effective due to the reduction of labor costs.

또한, 더욱 특징적인 것은 전선관(50)에 대한 균일 위치로의 투입을 위한 기존의 스페이서가 불필요함은 물론 전선관과 기존의 스페이서를 서로 고정시켜야 하는 작업이 불필요해지므로 작업 및 공사 시간의 단축은 물론 작업 공정의 단순화가 가능하므로 매우 합리적이고 효율적인 것이며, 트럭(100)을 통해 균일한 속도 및 일정한 간격과 자동의 모래 투입으로 인해 균일하고 안정적으로 전선관을 매설 시공할 수 있어 공사 품질 역시 크게 향상되는 것이다.
In addition, it is more characteristic that the existing spacers for the input to the uniform position to the conduit 50 is not necessary, and the work for fixing the conduit and the existing spacers is unnecessary, so as to reduce the work and construction time, as well as It is very reasonable and efficient because the work process can be simplified, and the construction quality can be greatly improved because the conduit can be laid uniformly and stably due to the uniform speed, constant interval and automatic sand input through the truck 100. .

이상과 같은 본 명세서에 기재된 실시예와 도면에 도시된 구성은 본 발명의 가장 바람직한 일실시예에 불과할 뿐이고 본 발명의 기술적 사상을 모두 대변하는 것은 아니므로, 이들을 대체할 수 있는 다양한 균등물과 변형 예들이 있을 수 있음을 이해하여야 한다.
It is to be understood that both the foregoing general description and the following detailed description of the present invention are exemplary and explanatory and are intended to provide further explanation of the present invention as defined by the appended claims. Examples should be understood.

10 : 지지틀 11 : 수평롤러
12,12' : 경사롤러
20 : 전선관 권취드럼 21 : 지지대
22 : 회전축
30 : 모래 저장호퍼 31 : 배출관
32 : 도어 33 : 엑츄에이터
34 : 안내롤러
40 : 보호시트 권취드럼
50 : 전선관
60 : 모래
70 : 보호시트
100 : 트럭
110 : 매설로
10: support frame 11: horizontal roller
12,12 ': Inclined Roller
20: conduit winding drum 21: support
22: rotating shaft
30: sand storage hopper 31: discharge pipe
32: door 33: actuator
34: guide roller
40: protection sheet winding drum
50: conduit
60: sand
70: protective sheet
100: truck
110: buried road

Claims (7)

프레임 골조로 된 지지틀(10) 상에 회전가능하게 결합된 전선관 권취드럼(20)과 모래 저장호퍼(30) 및 보호시트 권취드럼(40)을 각기 장착하되,
상기 전선관 권취드럼(20) 내에 감겨진 상태의 전선관(50)은 모래 저장호퍼(30)의 하측을 따라 외향 인출되게 하고, 모래 저장호퍼(30)는 일측으로 배출관(31)을 형성하여 엑츄에이터(33)에 의한 도어(32)의 개폐에 의해 모래 저장호퍼(30) 내의 모래(60)가 배출되게 하며, 상기 보호시트 권취드럼(40)에 감겨진 상태의 보호시트(70)는 상기 배출관(31)의 상부로부터 풀려지도록 구성함에 따라, 상기의 지지틀(10)이 적재함에 안치된 상태의 트럭(100)이 미리 작업된 매설로(110)를 따라 이동하면 그 매설로(110)의 내부에 하측으로부터 전선관(50)과 모래(60) 및 보호시트(70)가 상향 순차적으로 풀리거나 투입되도록 구성하여 됨을 특징으로 하는 지중 관로 기계화 포설장치.
Mounting the conduit winding drum 20 and the sand storage hopper 30 and the protective sheet winding drum 40 rotatably coupled to the frame frame support frame 10, respectively,
The conduit 50 wound in the conduit winding drum 20 is drawn outward along the lower side of the sand storage hopper 30, and the sand storage hopper 30 forms an outlet pipe 31 on one side of the actuator ( The sand 60 in the sand storage hopper 30 is discharged by the opening and closing of the door 32 by 33. The protective sheet 70 wound around the protective sheet winding drum 40 is formed in the discharge pipe ( 31 is configured to be released from the upper portion, when the truck 100 in the state in which the support frame 10 is placed in the loading box moves along the previously laid burial path 110, the interior of the burial path 110 Underground pipe line mechanized installation apparatus, characterized in that the conduit 50 and the sand 60 and the protective sheet 70 from the lower side to be configured to be sequentially released or injected upward.
삭제delete 삭제delete 삭제delete 제 1항에 있어서,
지지틀(10)은 상측으로 수평롤러(11)와 그 수평롤러(11)의 측에 배치되는 경사롤러(12)(12')를 결합 형성하여, 상기 전선관 권취드럼(20)으로부터 풀려 인출되는 전선관(50)이 그 수평롤러(11)와 경사롤러(12)(12')에 의해 안내되어 일정 위치로 균일 인출되도록 구성함을 특징으로 하는 지중 관로 기계화 포설장치.
The method of claim 1,
The support frame 10 is formed by combining the horizontal roller 11 and the inclined roller 12, 12 'disposed on the side of the horizontal roller 11 upwardly, and is released from the conduit winding drum 20 and drawn out. Underground pipe mechanized installation apparatus characterized in that the conduit 50 is guided by the horizontal roller 11 and the inclined roller (12) (12 ') to be uniformly drawn to a predetermined position.
제 1항에 있어서,
모래 저장호퍼(30)의 배출관(31) 저면에는 수평의 안내롤러(34)를 연속하여 장착함에 따라 전선관 권취드럼(20)으로부터 매설로(110)를 향해 풀려 인출되는 전선관(50)이 상기 배출관(31)과 간섭되는 것을 방지하도록 구성함을 특징으로 하는 지중 관로 기계화 포설장치.
The method of claim 1,
As the horizontal guide roller 34 is continuously mounted on the bottom surface of the discharge pipe 31 of the sand storage hopper 30, the conduit 50 drawn from the conduit winding drum 20 toward the buried path 110 is drawn out. Underground pipe mechanized installation apparatus, characterized in that configured to prevent interference with (31).
지중 관로를 포설하기 위한 매설로를 형성하기 위한 터파기 공정과; 전선관이 감겨진 권취드럼과 모래가 충입된 저장호퍼 및 보호시트가 감겨진 권취드럼을 갖는 기계화 포설장치를 트럭 내 적재함에 설치하는 공정과; 상기 기계화 포설장치를 갖는 트럭을 터퍼기에 의한 매설로를 따라 이동시키는 공정과; 기계화 포설장치로부터 전선관과 소정의 모래 및 보호시트를 인출하여 초기 세팅하는 공정과; 트럭의 이동과 함께 모래를 배출시켜 모래의 하중에 의해 전선관이 매립되는 동시에 포설된 모래의 표면으로 보호시트가 펼쳐지도록 하는 포설 공정과; 전선관의 매립과 모래에 의한 성토층 및 보호시트가 펼쳐진 매설로를 되메우기하는 공정과; 되메우기 공정에 의해 되메움 된 부분에 대한 다짐 공정;을 순차적으로 수행하여 이루어짐을 특징으로 하는 지중 관로 기계화 포설장치를 이용한 지중 관로의 기계화 포설공법.A digging process for forming a buried furnace for laying underground pipelines; Installing a mechanized installation apparatus having a winding drum in which a conduit is wound, a storage hopper in which sand is filled, and a winding drum in which a protective sheet is wound; Moving the truck having the mechanized laying device along the buried path by means of a trough; Drawing out the conduit and the predetermined sand and the protective sheet from the mechanized laying apparatus and initial setting; A laying step of discharging the sand together with the movement of the truck to allow the conduit to be buried by the load of the sand and to spread the protective sheet onto the surface of the sand; Filling the conduit with the filling layer of the conduit and the fill layer and the protective sheet by sand; Compaction process for the part backfilled by the backfill process; mechanized installation method of underground pipelines using mechanized installation apparatus underground pipes, characterized in that carried out sequentially.
KR1020100025231A 2010-03-22 2010-03-22 Apparutus and method for installing underground pipe line KR101103554B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020100025231A KR101103554B1 (en) 2010-03-22 2010-03-22 Apparutus and method for installing underground pipe line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020100025231A KR101103554B1 (en) 2010-03-22 2010-03-22 Apparutus and method for installing underground pipe line

Publications (2)

Publication Number Publication Date
KR20110106031A KR20110106031A (en) 2011-09-28
KR101103554B1 true KR101103554B1 (en) 2012-01-06

Family

ID=44956117

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020100025231A KR101103554B1 (en) 2010-03-22 2010-03-22 Apparutus and method for installing underground pipe line

Country Status (1)

Country Link
KR (1) KR101103554B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20240018775A (en) 2022-08-03 2024-02-14 한국전력공사 Apparatus for constructing underground pipeline

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107724425B (en) * 2017-09-19 2020-07-17 中建科技有限公司深圳分公司 Mechanized construction equipment and construction method for prefabricated comprehensive pipe gallery
CN115199815B (en) * 2022-07-22 2024-03-08 中国水电基础局有限公司 Pipeline burying device for hydraulic engineering

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0455513A (en) * 1990-06-22 1992-02-24 Takiron Co Ltd Constructing method for underdrainage pipe
JP2005151690A (en) * 2003-11-14 2005-06-09 Tekuton Kk Device for undergrounding electric wire and underground conduit pipe

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0455513A (en) * 1990-06-22 1992-02-24 Takiron Co Ltd Constructing method for underdrainage pipe
JP2005151690A (en) * 2003-11-14 2005-06-09 Tekuton Kk Device for undergrounding electric wire and underground conduit pipe

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20240018775A (en) 2022-08-03 2024-02-14 한국전력공사 Apparatus for constructing underground pipeline

Also Published As

Publication number Publication date
KR20110106031A (en) 2011-09-28

Similar Documents

Publication Publication Date Title
US10851517B2 (en) Multifunctional reel carrier-vac-spoil material handling container and method of trenching and laying cable or duct
US20180156357A1 (en) Buried device identifier fill and method of identifying a burried device using the device identifier fill
EP1309054A1 (en) Method and structure for laying communication cable in underground line, and members used for laying
KR101103554B1 (en) Apparutus and method for installing underground pipe line
KR101415106B1 (en) The back feel grouting apparatus for upper part of tunnel
CN107956221B (en) Precipitation well pipeline protection device and construction method
US20180038071A1 (en) Apparatus for entrenching a flexible elongate member, such as a rope, cable or pipe
JP4748016B2 (en) Underground type multi-story bicycle parking lot
KR101024624B1 (en) Landfill gas discharging apparatus and method for manufacturing the same
KR101582094B1 (en) Ducts for power transmission lines
KR101137778B1 (en) Execution method using installer of manhole pipe
US3830606A (en) Apparatus for installing underground pipelines
KR101016055B1 (en) Undergrond railway laying system for cable
KR101049604B1 (en) Sand filling and stomping equipment for cable construction line
AU731521B2 (en) Method and apparatus for backfilling padded underground structures
JP5155236B2 (en) Installation method of lining board in open shield method
CN113373922A (en) Geothermal energy pile construction equipment and construction method thereof
RU98101728A (en) METHOD AND DEVICE FOR FILLING SPRINKLED UNDERGROUND STRUCTURES
EP2166393A1 (en) Underground storage vault for splice box
RU2370696C2 (en) Method for pipeline embedding
KR102658487B1 (en) underground transmission cable removal new construction method using the deconstruction cutting pulling apparatus of the underground power cable
KR100994242B1 (en) Sand spreader apparatus and method on water
KR101705694B1 (en) Horizontal casing propulsion type underground line construction method
CN215441885U (en) Geothermal energy pile construction equipment
CA2941704A1 (en) Automated below ground cable installation within a select fill

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee