KR101077634B1 - 댐퍼의 스프링캡 제작방법 - Google Patents
댐퍼의 스프링캡 제작방법 Download PDFInfo
- Publication number
- KR101077634B1 KR101077634B1 KR1020110004664A KR20110004664A KR101077634B1 KR 101077634 B1 KR101077634 B1 KR 101077634B1 KR 1020110004664 A KR1020110004664 A KR 1020110004664A KR 20110004664 A KR20110004664 A KR 20110004664A KR 101077634 B1 KR101077634 B1 KR 101077634B1
- Authority
- KR
- South Korea
- Prior art keywords
- convex portion
- disc
- forging
- present
- primary hole
- Prior art date
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21K—MAKING FORGED OR PRESSED METAL PRODUCTS, e.g. HORSE-SHOES, RIVETS, BOLTS OR WHEELS
- B21K1/00—Making machine elements
- B21K1/76—Making machine elements elements not mentioned in one of the preceding groups
- B21K1/761—Making machine elements elements not mentioned in one of the preceding groups rings
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21J—FORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
- B21J5/00—Methods for forging, hammering, or pressing; Special equipment or accessories therefor
- B21J5/02—Die forging; Trimming by making use of special dies ; Punching during forging
- B21J5/027—Trimming
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21J—FORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
- B21J5/00—Methods for forging, hammering, or pressing; Special equipment or accessories therefor
- B21J5/06—Methods for forging, hammering, or pressing; Special equipment or accessories therefor for performing particular operations
- B21J5/12—Forming profiles on internal or external surfaces
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21J—FORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
- B21J9/00—Forging presses
- B21J9/02—Special design or construction
- B21J9/04—Piercing presses
Abstract
Description
도 2는 본발명의 볼록부 성형 상세도
도 3은 본발명의 1차구멍 성형 상세도
도 4는 본발명의 오목부 성형 상세도
도 5, 6, 7은 본발명의 홈 성형 상세도
도 8은 본발명의 트리밍공정 상세도
도 9는 본발명의 2차구멍 성형 상세도
도 10은 본발명의 리스트라이크 공정 상세도
도 11은 본발명 댐퍼 사진
도 12는 본발명의 제품사진
상기 원판 볼록부(11) 내부에 오목부(13)를 형성하는 단계는 3단계에 걸쳐 순차적으로 진행되는 것으로, 상기 3단계는 단조가공으로 압축하는 동일공정을 반복하는 것이며,
상기와 같은 방법으로 형성된 오목부(13)의 바닥둘레에 단조가공으로 홈(14)을 형성하여 반제품을 성형한다.
12 : 1차구멍 13 : 오목부
14 : 홈 15 : 2차구멍
50 : 스프링캡 60 : 스톱 스프링
70 : 워킹 스프링 80 : 캡
90 : 피스톤조립체 100 : 스냅 링
1 : 서포트 링 압축측 2 : 디스턴스 디스크
3 : 웨이브 스프링 4 : 커버 디스크
5 : ASD 피스톤 링 6 : ASD 피스톤
7 : 플렌지 부시 8 : 서포트링 신장측
Claims (2)
- 댐퍼의 스프링캡 제작방법에 있어서, 철판을 블랭킹하여 원판(10)을 형성하고, 상기 원판(10)의 중앙부위를 상부로 돌출되게 단조가공하여 볼록부(11)를 형성하고, 상기 볼록부(11)의 중앙부위를 피어싱가공하여 1차구멍(12)을 형성하고, 상기 1차구멍(12)이 형성된 원판 볼록부(11)를 상부로부터 단조가공으로 압축하여 원판 볼록부(11) 내부에 오목부(13)를 형성하되,
상기 원판 볼록부(11) 내부에 오목부(13)를 형성하는 단계는 3단계에 걸쳐 순차적으로 진행되는 것으로, 상기 3단계는 단조가공으로 압축하는 동일공정을 반복하는 것이며,
상기와 같은 방법으로 형성된 오목부(13)의 바닥둘레에 단조가공으로 홈(14)을 형성하여 반제품을 성형한 다음,
상기 반제품의 주위를 트리밍하여 거스러미를 제거한 후,
1차구멍(12)보다 더 큰 지름으로 다시 원판 볼록부(11)의 중앙부위를 피어싱가공하여 2차구멍(15)을 형성하며,
마지막으로 전체를 리스트라이킹 하여 치수를 정확히 만드는 공정;을 포함하는 것을 특징으로 하는 댐퍼의 스프링캡 제작방법 - 삭제
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020110004664A KR101077634B1 (ko) | 2011-01-17 | 2011-01-17 | 댐퍼의 스프링캡 제작방법 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020110004664A KR101077634B1 (ko) | 2011-01-17 | 2011-01-17 | 댐퍼의 스프링캡 제작방법 |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20110011736A KR20110011736A (ko) | 2011-02-08 |
KR101077634B1 true KR101077634B1 (ko) | 2011-10-27 |
Family
ID=43771757
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020110004664A KR101077634B1 (ko) | 2011-01-17 | 2011-01-17 | 댐퍼의 스프링캡 제작방법 |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101077634B1 (ko) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005040798A (ja) | 2003-07-22 | 2005-02-17 | Musashi Seimitsu Ind Co Ltd | 鍛造ケースの成形方法 |
JP2008279458A (ja) | 2007-05-08 | 2008-11-20 | Doha Industry Co Ltd | 締結ナットの製造方法 |
JP2010149182A (ja) | 2008-11-18 | 2010-07-08 | Topy Ind Ltd | 筒状部材の製造方法 |
-
2011
- 2011-01-17 KR KR1020110004664A patent/KR101077634B1/ko active IP Right Grant
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005040798A (ja) | 2003-07-22 | 2005-02-17 | Musashi Seimitsu Ind Co Ltd | 鍛造ケースの成形方法 |
JP2008279458A (ja) | 2007-05-08 | 2008-11-20 | Doha Industry Co Ltd | 締結ナットの製造方法 |
JP2010149182A (ja) | 2008-11-18 | 2010-07-08 | Topy Ind Ltd | 筒状部材の製造方法 |
Also Published As
Publication number | Publication date |
---|---|
KR20110011736A (ko) | 2011-02-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6120006B2 (ja) | 金属板材のプレス成形方法及びプレス成形装置 | |
CN104289599A (zh) | 一种线框冲孔整形模具 | |
CN103212635B (zh) | 汽车变速器同步器齿环精冲和拉深复合成形工艺及模具 | |
CN103624145A (zh) | 轿车地板零件上向上翻边孔的成型冲压工艺 | |
KR101077634B1 (ko) | 댐퍼의 스프링캡 제작방법 | |
KR20150026890A (ko) | 압인 부품을 제조하기 위한 도구와 방법 | |
CN103357783A (zh) | 汽车顶部内纵梁的加工方法 | |
KR101180463B1 (ko) | 댐퍼의 스프링 서포트링 제작방법 | |
CN103736845A (zh) | 一种汽车减震器支架制造工艺 | |
KR101560686B1 (ko) | 원주 방향 비대칭 차량용 쇼크 업소버 커버 제조방법 | |
CN205341637U (zh) | 一种具有缓冲功能的高强度冲孔模具 | |
CN209110080U (zh) | 带有法兰部件的锻造模具 | |
CN207043114U (zh) | 一种盖板落料模具 | |
JP5596073B2 (ja) | 筒壁フランジの形成方法 | |
KR102034525B1 (ko) | 자동차 액츄에이터용 아마츄어 제작방법 | |
KR100701629B1 (ko) | 2단 단조공법에 의한 대형 튜브시트 단강품의 제조방법 | |
CN204817691U (zh) | 一种模板拉筋组件 | |
CN203695753U (zh) | 组成电机转子的冲片的冲压模具 | |
KR101676319B1 (ko) | 구조 개선된 자동차 클러치용 실린더 단조 제조 장치 | |
KR101661458B1 (ko) | 이너레이스와 보스의 복합 단조품의 제조방법 | |
KR102117286B1 (ko) | 베어링 씰을 제조하는 금형 장치 | |
CN203610583U (zh) | 一种t铁成型模具 | |
CN219357639U (zh) | 一种三序合一的复合模具 | |
CN203875218U (zh) | 冲压模具 | |
KR101241812B1 (ko) | 베어링 링 제조방법 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
A302 | Request for accelerated examination | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20141010 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20160629 Year of fee payment: 5 |
|
R401 | Registration of restoration | ||
FPAY | Annual fee payment |
Payment date: 20161017 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20171020 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20181219 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20191017 Year of fee payment: 9 |