KR101073256B1 - System and method for managing production of ship building - Google Patents
System and method for managing production of ship building Download PDFInfo
- Publication number
- KR101073256B1 KR101073256B1 KR1020070131055A KR20070131055A KR101073256B1 KR 101073256 B1 KR101073256 B1 KR 101073256B1 KR 1020070131055 A KR1020070131055 A KR 1020070131055A KR 20070131055 A KR20070131055 A KR 20070131055A KR 101073256 B1 KR101073256 B1 KR 101073256B1
- Authority
- KR
- South Korea
- Prior art keywords
- production
- information
- organization
- work
- management
- Prior art date
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 291
- 238000000034 method Methods 0.000 title claims abstract description 92
- 230000008520 organization Effects 0.000 claims abstract description 131
- 238000007726 management method Methods 0.000 claims abstract description 119
- 238000004458 analytical method Methods 0.000 claims abstract description 32
- 238000010276 construction Methods 0.000 claims abstract description 17
- 239000000284 extract Substances 0.000 claims description 9
- 238000013461 design Methods 0.000 description 5
- 238000004891 communication Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 238000012544 monitoring process Methods 0.000 description 3
- 241000282472 Canis lupus familiaris Species 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000010422 painting Methods 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Human Resources & Organizations (AREA)
- Entrepreneurship & Innovation (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Theoretical Computer Science (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- General Factory Administration (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- General Health & Medical Sciences (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Manufacturing & Machinery (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
Abstract
본 발명은 각 생산 조직별 작업 정보, 실적 정보 및 공정 현황 정보를 실시간으로 체크할 수 있도록 함으로써 효율적인 생산 관리가 가능한 선박 건조시 생산 관리시스템 및 방법에 관한 것으로서,
본 발명에 따른 선박 건조시 생산 관리시스템은 생산 조직 정보, 조직별 생산능력 정보, 조직별 생산작업 정보, 조직별 생산실적 정보, 공정/공종 정보 및 운영정보를 저장하는 DB 블록 및 상기 생산 조직 정보, 조직별 생산능력 정보, 조직별 생산작업 정보, 조직별 생산실적 정보 및 공정/공종 정보의 추출 여부를 선택적으로 관리하여 부하분석 과정, 작업할당 과정, 공정현황 관리 과정 등 상기 선박 건조시 생산 관리시스템 상에서 이루어지는 제반 동작을 총괄적으로 제어하는 역할을 수행하는 생산 관리서버를 포함하여 이루어지며, 상기 DB 블록은, 선박 건조시 투입되는 제반 개별 생산 조직에 대한 정보를 저장하는 생산 조직 DB와, 상기 각 개별 생산 조직의 생산능력 정보를 저장하는 조직별 생산능력 DB와, 상기 각 개별 생산 조직에 부여된 생산작업 정보를 저장하는 조직별 생산작업 DB와, 상기 각 개별 생산 조직의 생산 실적 정보를 저장하는 조직별 생산실적 DB와, 중일정 생산공정별 공종 정보를 저장하는 공정/공종 DB와, 웹 페이지 그래픽 정보, 웹 페이지 설정 정보 등의 웹 페이지를 운영하기 위한 일련의 운영정보를 저장함과 함께 마이크로소프트 엑셀(Microsoft Excel)과 연동되는 운영정보를 저장하는 운영정보 DB를 포함하여 구성되는 것을 특징으로 한다.
부하분석, 작업할당, 공정현황
The present invention relates to a production management system and method for ship construction, which enables efficient production management by checking work information, performance information, and process status information for each production organization in real time.
The production management system for ship construction according to the present invention is a DB block for storing production organization information, production capacity information for each organization, production work information for each organization, production performance information for each organization, process / work information and operation information, and the production organization information. Management of the production of the vessel, such as load analysis process, work assignment process, process status management process, by selectively managing whether the production capacity information by organization, production operation information by organization, production performance information by organization and process / industry information are extracted It comprises a production management server that performs the role of controlling the overall operations made on the system as a whole, wherein the DB block is a production organization DB for storing information about the individual production organization that is input when the ship is built, and each of the Production capacity DB for each organization that stores production capacity information of individual production organizations, and production work assigned to each individual production organization Production work DB for each organization that stores the information, Production performance DB for each organization that stores production performance information for each individual production organization, Process / work DB for storing the job information for each middle production process, Web page graphic information In addition to storing a series of operating information for operating a web page, such as web page setting information, and comprises an operation information DB for storing the operating information linked to Microsoft Excel (Microsoft Excel).
Load analysis, work assignment, process status
Description
본 발명은 선박 건조시 생산 관리시스템 및 방법에 관한 것으로서, 보다 상세하게는 각 생산 조직별 작업 정보, 실적 정보 및 공정 현황 정보를 실시간으로 체크할 수 있도록 함으로써 효율적인 생산 관리가 가능한 선박 건조시 생산 관리시스템 및 방법에 관한 것이다. The present invention relates to a production management system and method for ship construction, and more specifically, production management during ship construction that enables efficient production management by enabling real-time check of work information, performance information, and process status information for each production organization. System and method.
일반적인 선박 건조 흐름을 살펴보면, 먼저 수주된 선박의 종류별, 크기별 등에 따라 초기 설계가 이루어지고 그에 따른 대일정의 생산 계획을 수립하게 된다. 이어, 상세 설계를 함과 아울러 자재의 구매 일정을 수립하고 해당 구매 일정과 연동되도록 중일정의 생산 계획을 수립하게 된다. 마지막 단계로서 생산 설계 및 소일정의 생산 계획을 부서별, 공종별로 수립하고, 자재가 입고되면 실질적인 생산이 진행된다. Looking at the general ship construction flow, first, the initial design is made according to the type, size, etc. of the ordered ships and establish a schedule of production according to the schedule. Subsequently, a detailed design, a purchase schedule of the material is established, and a middle schedule production plan is established to be linked with the corresponding purchase schedule. As a final step, the production design and production schedule of small schedules are established by department and by sector, and when the goods are received, actual production proceeds.
한편, 한 척의 선박을 건조하기 위해서는 다양한 형태의 수많은 생산작업이 필요하다. 이와 같은 수많은 생산작업들은 작업의 종류에 따라 전처리, 절단, 도 장, 용접, 의장설치 등으로 구분할 수 있으며 각각의 작업을 수행하는 개별 생산 조직이 존재한다. On the other hand, in order to build a ship, a number of production operations of various types are required. Many of these production operations can be divided into pretreatment, cutting, painting, welding, and installation according to the type of work. There is an individual production organization that performs each operation.
효율적인 생산 관리를 위해서는 선박 건조시 개별 생산 조직의 계획 대비 실적, 공정 현황 등의 관리가 이루어져야 한다. 즉, 생산 계획, 생산 실적, 공정 현황 등의 정보가 실시간으로 관리되어야 한다. For efficient production management, management of performance, process status, etc., compared to the plans of individual production organizations should be made when ships are built. That is, information such as production plan, production performance, and process status should be managed in real time.
종래의 경우, 생산 계획 정보, 생산 실적 정보, 공정 현황 정보를 각각 별도로 관리함에 따라, 생산 전반에 대한 관리가 효율적으로 이루어지지 않고 있다. In the conventional case, since production plan information, production performance information, and process status information are separately managed, overall management of the production is not performed efficiently.
본 발명은 상기와 같은 문제점을 해결하기 위해 안출한 것으로서, 각 생산 조직별 작업 정보, 실적 정보 및 공정 현황 정보를 실시간으로 체크할 수 있도록 함으로써 효율적인 생산 관리가 가능한 선박 건조시 생산 관리시스템 및 방법을 제공하는데 그 목적이 있다. The present invention has been made in order to solve the above problems, the production management system and method for ship construction that enables efficient production management by enabling to check in real time the work information, performance information and process status information for each production organization The purpose is to provide.
상기의 목적을 달성하기 위한 본 발명에 따른 선박 건조시 생산 관리시스템은 생산 조직 정보, 조직별 생산능력 정보, 조직별 생산작업 정보, 조직별 생산실적 정보, 공정/공종 정보 및 운영정보를 저장하는 DB 블록 및 상기 생산 조직 정보, 조직별 생산능력 정보, 조직별 생산작업 정보, 조직별 생산실적 정보 및 공정/공종 정보의 추출 여부를 선택적으로 관리하여 부하분석 과정, 작업할당 과정, 공정현황 관리 과정 등 상기 선박 건조시 생산 관리시스템 상에서 이루어지는 제반 동작을 총괄적으로 제어하는 역할을 수행하는 생산 관리서버를 포함하여 이루어지며, 상기 DB 블록은, 선박 건조시 투입되는 제반 개별 생산 조직에 대한 정보를 저장하는 생산 조직 DB와, 상기 각 개별 생산 조직의 생산능력 정보를 저장하는 조직별 생산능력 DB와, 상기 각 개별 생산 조직에 부여된 생산작업 정보를 저장하는 조직별 생산작업 DB와, 상기 각 개별 생산 조직의 생산 실적 정보를 저장하는 조직별 생산실적 DB와, 중일정 생산공정별 공종 정보를 저장하는 공정/공종 DB와, 웹 페이 지 그래픽 정보, 웹 페이지 설정 정보 등의 웹 페이지를 운영하기 위한 일련의 운영정보를 저장함과 함께 마이크로소프트 엑셀(Microsoft Excel)과 연동되는 운영정보를 저장하는 운영정보 DB를 포함하여 구성되는 것을 특징으로 한다. Production management system for ship construction according to the present invention for achieving the above object is to store the production organization information, production capacity information by organization, production operation information by organization, production performance information by organization, process / industry information and operation information Selective management of DB block and production organization information, organizational production capacity information, organizational production work information, organizational production performance information, and process / industrial information for load analysis process, work assignment process, process status management process And a production management server which performs a role of collectively controlling all operations performed on the production management system when the ship is constructed, and the DB block stores information on various individual production organizations that are input when the ship is built. A production organization DB, a production capacity DB for each organization that stores production capacity information of each individual production organization, and the respective dogs Production work DB for each organization that stores the production work information assigned to the production organization, production performance DB for each organization that stores production performance information of each individual production organization, and process / work for storing the work information for each mid-term production process In addition to the DB, it stores a set of operation information for operating web pages such as web page graphic information and web page setting information, and an operation information DB for storing operation information linked to Microsoft Excel. It is characterized in that the configuration.
상기 생산 관리서버의 제어 하에 상기 생산 조직 정보, 조직별 생산능력 정보, 조직별 생산작업 정보 및 조직별 생산실적 정보를 상기 DB 블록으로부터 추출하고, 상기 운영정보 DB로부터 웹 페이지 그래픽 정보, 웹 페이지 설정 정보 등과 같은 웹 페이지를 운영하기 위한 일련의 운영정보를 추출하거나 마이크로소프트 엑셀(Microsoft Excel)과 연동되는 운영정보를 추출함으로써 소정의 생산관리 초기 페이지를 생성하고 생성된 생산관리 초기 페이지를 클라이언트에 제공하는 역할을 하는 생산실적 관리모듈을 더 포함할 수 있다. Under the control of the production management server, the production organization information, organization production capacity information, organization production work information and organization production performance information are extracted from the DB block, web page graphic information and web page setting from the operation information DB. By extracting a series of operational information for operating web pages such as information, or extracting operational information linked with Microsoft Excel, a predetermined production management initial page is generated and the generated production management initial page is provided to the client. It may further include a production performance management module to play a role.
상기 생산 관리서버의 제어 하에 상기 생산관리 초기 페이지 상에서 부하분석 이벤트가 발생하면 상기 마이크로소프트 엑셀과 연동하여 특정 기간 내에서의 각 조직별 생산 부하분석을 수행하고, 해당 부하분석 결과를 상기 생산관리 초기 페이지 등에 출력하는 역할을 함과 함께 상기 생산관리 초기 페이지 상에서 소정의 작업할당 이벤트가 발생하면 그에 대응하여 각 조직별 생산작업 정보를 갱신하는 역할을 수행하는 부하분석 및 작업할당 모듈을 더 포함할 수 있다. If a load analysis event occurs on the production management initial page under the control of the production management server, the production load analysis for each organization within a specific period is performed in association with the Microsoft Excel, and the result of the load analysis is initially analyzed. It may further include a load analysis and work assignment module that serves to output a page, and to update the production work information for each organization in response to a predetermined work assignment event occurs on the initial page of the production management. have.
상기 생산 관리서버의 제어 하에 상기 생산 조직 정보 및 공정/공종 정보 등을 추출하여 공정현황 관리 페이지를 생성하고 이를 클라이언트에 제공하는 역할을 함과 함께 해당 공정현황 관리 페이지 상에서 소정의 작업대상 범위선택, 공정현황 메뉴 구성 등에 대한 이벤트가 발생하면 해당 이벤트에 대응하여 DB 블록으로부터 그에 상응하는 생산 조직 정보 및 공정/공종 정보 등을 추출하여 소정의 공정현황 결과물을 클라이언트에 제공하는 역할을 하는 공정현황 관리모듈을 더 포함할 수 있다. Under the control of the production management server extracts the production organization information and process / industry information, etc. to create a process status management page and provide it to the client, and select a predetermined work target range on the process status management page, Process status management module that serves to provide the client with predetermined process status output by extracting corresponding production organization information and process / work information from DB block in response to the event when the process status menu configuration occurs. It may further include.
본 발명에 따른 선박 건조시 생산 관리방법은 상기 DB 블록의 생산 조직 DB, 조직별 생산능력 DB, 조직별 생산작업 DB, 조직별 생산실적 DB, 공정/공종 DB 각각에 생산 조직 정보, 조직별 생산능력 정보, 조직별 생산작업 정보, 조직별 생산실적 정보, 공정/공종 정보를 저장하는 단계와, 클라이언트로부터 생산관리 이벤트가 발생하면 상기 생산실적 관리모듈은 상기 생산 관리서버의 제어 하에 상기 생산 조직 정보, 조직별 생산능력 정보, 조직별 생산작업 정보 및 조직별 생산실적 정보를 상기 DB 블록으로부터 추출하고, 상기 운영정보 DB로부터 웹 페이지 그래픽 정보, 웹 페이지 설정 정보 등과 같은 웹 페이지를 운영하기 위한 일련의 운영정보를 추출하거나 마이크로소프트 엑셀(Microsoft Excel)과 연동되는 운영정보를 추출함으로써 하여 소정의 생산관리 초기 페이지를 생성하고 생성된 생산관리 초기 페이지를 인터페이스 모듈을 통해 클라이언트로 전송하는 단계와, 상기 생산관리 초기 페이지 상에서 부하분석 이벤트가 발생하면 상기 부하분석 및 작업할당 모듈이 상기 생산 관리서버의 제어 하에 상기 마이크로소프트 엑셀과 연동하여 특정 기간 내에서의 각 조직별 생산 부하분석을 수행하고, 해당 부하분석 결과를 상기 생산관리 초기 페이지 상에 출력하는 단계 및 상기 생산관리 초기 페이지 상에서 소정의 작업할당 이벤트가 발생하면 상기 부하분석 및 작업할당 모듈이 상기 작업할당 이벤트에 대응하여 각 조직별 생산작업 정보 즉, 실행 Activity를 갱신하는 단계를 포 함하여 이루어지는 것을 특징으로 한다. Production management method during ship construction according to the present invention is the production organization DB, production capacity DB, organizational production work DB, organizational production performance DB, production / organizational DB of each production process, organizational production in each of the DB block Storing capability information, organizational production work information, organizational production performance information, process / industrial information, and when a production management event occurs from a client, the production performance management module controls the production organization information under the control of the production management server. Extracts the production capacity information by organization, production operation information by organization, and production performance information by organization from the DB block, and operates a series of web pages such as web page graphic information and web page setting information from the operation information DB. Preset production management by extracting operation information or extracting operation information linked with Microsoft Excel Generating a page and transmitting the generated production management initial page to a client through an interface module; and when a load analysis event occurs on the production management initial page, the load analysis and work assignment module is controlled under the control of the production management server. Performing production load analysis for each organization within a specific period in connection with Microsoft Excel, outputting the result of the load analysis on the initial page of the production management, and a predetermined job assignment event occurs on the initial production management page. The load analysis and work assignment module may include updating the production work information for each organization, that is, execution activity in response to the work assignment event.
상기 DB 블록의 생산 조직 DB, 조직별 생산능력 DB, 조직별 생산작업 DB, 조직별 생산실적 DB, 공정/공종 DB 각각에 생산 조직 정보, 조직별 생산능력 정보, 조직별 생산작업 정보, 조직별 생산실적 정보, 공정/공종 정보를 저장하는 단계 이후에, 클라이언트로부터 공정현황 모니터링 이벤트가 발생하면 상기 공정현황 관리모듈이 상기 생산 관리서버의 제어 하에 상기 생산 조직 정보 및 공정/공종 정보 등을 추출하여 공정현황 관리 페이지를 생성하고 이를 클라이언트에 제공하는 단계를 더 포함할 수 있다. Production organization DB, production capacity DB by organization, production work DB by organization, production performance DB by organization, production organization information by process / work DB, production capacity information by organization, production work information by organization, and organization After storing production performance information and process / work information, when a process status monitoring event occurs from a client, the process status management module extracts the production organization information and process / work information under the control of the production management server. The method may further include generating a process status management page and providing the same to a client.
본 발명에 따른 선박 건조시 생산 관리시스템 및 방법은 다음과 같은 효과가 있다. Production management system and method for ship construction according to the present invention has the following effects.
각 생산 조직별 작업 정보, 실적 정보 및 공정 현황 정보를 실시간으로 체크할 수 있도록 함으로써 효율적인 생산 관리가 가능하게 된다. Efficient production management is possible by checking work information, performance information and process status information of each production organization in real time.
이하, 도면을 참조하여 본 발명의 일 실시예에 따른 선박 건조시 생산 관리시스템 및 방법을 상세히 설명하기로 한다. 도 1은 본 발명의 일 실시예에 따른 선박 건조시 생산 관리시스템의 구성도이고, 도 2는 본 발명의 일 실시예에 따른 선박 건조시 생산 관리방법을 설명하기 위한 순서도이다. Hereinafter, a production management system and method for building a ship according to an embodiment of the present invention with reference to the drawings will be described in detail. 1 is a configuration diagram of a production management system when building a ship according to an embodiment of the present invention, Figure 2 is a flow chart illustrating a production management method when building a ship according to an embodiment of the present invention.
먼저, 도 1에 도시한 바와 같이 본 발명의 일 실시예에 따른 선박 건조시 생산 관리시스템은 크게 DB 블록, 생산실적 관리모듈(102), 부하분석 및 작업할당 모듈(103), 공정현황 관리모듈(104) 및 생산 관리서버(101)의 조합으로 이루어진다. First, as shown in Figure 1, the production management system for ship construction according to an embodiment of the present invention is largely DB block, production
상기 DB 블록은 세부적으로 생산 조직 DB(111), 조직별 생산능력 DB(112), 조직별 생산작업 DB(113), 조직별 생산실적 DB(114), 공정/공종 정보 DB(115) 및 운영정보 DB(116)로 구성된다. 참고로, 상기 DB 블록은 선박 건조 업체의 ERP(Enterprise Resource Planning system)으로 구현될 수도 있다. The DB block is a production organization DB (111), production capacity DB (112) by organization, production work DB (113) by organization, production performance DB (114) by organization, process / industry information DB (115) and operation Information DB 116 is configured. For reference, the DB block may be implemented by an enterprise resource planning system (ERP) of a ship building company.
상기 생산 조직 DB(111)는 선박 건조시 투입되는 제반 개별 생산 조직에 대한 정보를 저장한다. 상기 조직별 생산능력 DB(112)는 각 개별 생산 조직의 생산능력 정보를 저장한다. 상기 조직별 생산작업 DB(113)는 각 개별 조직에 부여된 생산작업 정보를 저장하는데, 여기서 생산작업 정보라 함은 실제 실행해야 하는 작업 정보를 일컫는 것으로서 이하에서는, 실행 Activity라 칭하기로 한다. 상기 실행 Activity는 소정의 식별번호(예 : 1753 B201L 6)로 나타낼 수 있다. 상기 조직별 생산실적 DB(114)는 각 개별 생산 조직의 생산 실적 정보를 저장한다. 상기 공정/공종 DB는 중일정 생산공정별 공종 정보를 저장하는 역할을 수행한다. 상기 중일정 생산공정이라 함은, 통상의 선박 건조 과정에 있어서 수주된 선박의 초기 설계 및 대일정 생산계획이 수립되고, 상기 대일정 생산계획을 바탕으로 상세 설계 및 중일정 생산계획을 수립하게 되는데, 상기 중일정 생산계획에 따르는 생산공정을 상기 중일정 생산공정이라 일컫는다. 마지막으로, 상기 운영정보 DB(116)는 웹 페이지 그래픽 정보, 웹 페이지 설정 정보 등과 같은 웹 페이지를 운영하기 위한 일련의 운영정보를 저장함과 함께 마이크로소프트 엑셀(Microsoft Excel)과 연동되는 운영정보를 저장한다. The production organization DB 111 stores information on various individual production organizations that are input during ship construction. The organizational capacity DB 112 stores the capacity information of each individual production organization. The organization-specific production work DB 113 stores production work information assigned to each individual organization. Herein, production work information refers to work information that should be actually executed, and hereinafter, referred to as execution activity. The execution activity may be indicated by a predetermined identification number (for example, 1753 B201L 6). The organizational production performance DB 114 stores production performance information of each individual production organization. The process / work DB plays a role of storing work information for each production schedule. The middle schedule production process, the initial design and large schedule production plan of the vessel received in the normal ship construction process is established, and the detailed design and the middle schedule production plan is established based on the large schedule production plan The production process according to the medium schedule production plan is referred to as the medium schedule production process. Finally, the operation information DB 116 stores a series of operation information for operating a web page such as web page graphic information, web page setting information, etc., and also stores operation information linked with Microsoft Excel. do.
한편, 상기 생산실적 관리모듈(102)은 상기 생산 관리서버(101)의 제어 하에 상기 생산 조직 정보, 조직별 생산능력 정보, 조직별 생산작업 정보 및 조직별 생산실적 정보를 상기 DB 블록으로부터 추출하고, 상기 운영정보 DB(116)로부터 웹 페이지 그래픽 정보, 웹 페이지 설정 정보 등과 같은 웹 페이지를 운영하기 위한 일련의 운영정보를 추출하거나 마이크로소프트 엑셀(Microsoft Excel)과 연동되는 운영정보를 추출함으로써 하여 소정의 생산관리 초기 페이지를 생성하고 생성된 생산관리 초기 페이지를 클라이언트(106)에 제공하는 역할을 한다. On the other hand, the production
상기 부하분석 및 작업할당 모듈(103)은 상기 생산 관리서버(101)의 제어 하에 상기 생산관리 초기 페이지 상에서 부하분석 이벤트가 발생하면 상기 마이크로소프트 엑셀과 연동하여 특정 기간 내에서의 각 조직별 생산 부하분석을 수행하고, 해당 부하분석 결과를 상기 생산관리 초기 페이지 등에 출력하는 역할을 한다. 이와 함께, 상기 부하분석 및 작업할당 모듈(103)은 상기 생산관리 초기 페이지 상에서 소정의 작업할당 이벤트가 발생하면 그에 대응하여 각 조직별 생산작업 정보를 갱신하는 역할을 수행한다. 여기서, 작업할당 이벤트란 상기 생산관리 초기 페이지 상에서 특정 조직에 할당된 실행 Activity가 다른 조직으로 변경되는 이벤트 등을 일컫는다. The load analysis and
상기 공정현황 관리모듈(104)은 상기 생산 관리서버(101)의 제어 하에 상기 생산 조직 정보 및 공정/공종 정보 등을 추출하여 공정현황 관리 페이지를 생성하 고 이를 클라이언트(106)에 제공하는 역할을 한다. 또한, 해당 공정현황 관리 페이지 상에서 소정의 작업대상 범위선택, 공정현황 메뉴 구성 등에 대한 이벤트가 발생하면 해당 이벤트에 대응하여 DB 블록으로부터 그에 상응하는 생산 조직 정보 및 공정/공종 정보 등을 추출하여 소정의 공정현황 결과물을 클라이언트(106)에 제공하는 역할을 한다. The process
상기 생산 관리서버(101)는 상기 생산실적 관리모듈(102), 부하분석 및 작업할당 모듈 및 공정현황 관리모듈(104)을 매개로 상기 생산 조직 정보, 조직별 생산능력 정보, 조직별 생산작업 정보, 조직별 생산실적 정보 및 공정/공종 정보의 추출 여부를 선택적으로 관리함으로써 부하분석 과정, 작업할당 과정, 공정현황 관리 과정 등 상기 선박 건조시 생산 관리시스템 상에서 이루어지는 제반 동작을 총괄적으로 제어하는 역할을 수행한다. The
또한, 상기 생산 관리서버(101)는 인터페이스 모듈(105)을 매개로 클라이언트(106)와 통신연결관계를 형성한다. 이 때, 상기 클라이언트(106)는 유무선 통신망 등을 통해 상기 생산 관리서버(101)와 통신연결관계를 맺는다. In addition, the
이상, 본 발명의 일 실시예에 따른 선박 건조시 생산 관리시스템의 구성에 대해 설명하였다. 이하에서는, 상기 선박 건조시 생산 관리시스템을 이용한 본 발명의 일 실시예에 따른 선박 건조시 생산 관리방법을 설명하기로 한다. In the above, the configuration of the production management system when the ship is built according to an embodiment of the present invention. Hereinafter, a production management method for building a ship according to an embodiment of the present invention using the production management system for building a ship will be described.
먼저, 도 2에 도시한 바와 같이 생산 조직 DB(111), 조직별 생산능력 DB(112), 조직별 생산작업 DB(113), 조직별 생산실적 DB(114), 공정/공종 DB 각각 에 소정의 정보가 기 저장된다(S201). 구체적으로, 상기 생산 조직 DB(111)에는 선박 건조에 투입되는 제반 개별 생산 조직에 대한 정보가 저장되고, 상기 조직별 생산능력 DB(112)에는 각 생산 조직의 생산능력 정보가 저장되며, 상기 조직별 생산작업 DB(113)에는 각 생산 조직의 실행 Activity 정보가 저장되며, 상기 조직별 생산실적 DB(114)에는 각 조직의 생산실적 정보가 저장되며, 상기 공정/공종 DB에는 중일정 생산공정별 공종 정보가 저장된다. 이와 같은 생산 조직 정보, 조직별 생산능력 정보, 조직별 생산작업 정보, 조직별 생산실적 정보 및 공정/공종 정보는 선박 건조 업체의 클라이언트(106)가 선박 건조시 생산 관리시스템에 접속하고, 상기 생산 관리서버(101)의 제어 하에 상기 DB 블록에 선택적으로 저장되도록 진행하는 것이 바람직하다. First, as shown in FIG. 2, the production organization DB 111, the
상기 DB 블록의 생산 조직 DB(111), 조직별 생산능력 DB(112), 조직별 생산작업 DB(113), 조직별 생산실적 DB(114), 공정/공종 DB 각각에 소정의 정보가 기 저장된 상태에서, 클라이언트(106)로부터 생산관리 이벤트가 발생하면((S202) 상기 생산실적 관리모듈(102)은 상기 생산 관리서버(101)의 제어 하에 상기 생산 조직 정보, 조직별 생산능력 정보, 조직별 생산작업 정보 및 조직별 생산실적 정보를 상기 DB 블록으로부터 추출하고, 상기 운영정보 DB(116)로부터 웹 페이지 그래픽 정보, 웹 페이지 설정 정보 등과 같은 웹 페이지를 운영하기 위한 일련의 운영정보를 추출하거나 마이크로소프트 엑셀(Microsoft Excel)과 연동되는 운영정보를 추출함으로써 하여 소정의 생산관리 초기 페이지를 생성하고 생성된 생산관리 초기 페이지를 인터페이스 모듈(105)을 통해 클라이언트(106)로 전송한다(S203). Predetermined information is stored in each of the
이어, 상기 생산관리 초기 페이지 상에서 부하분석 이벤트가 발생하면 상기 부하분석 및 작업할당 모듈(103)은 상기 생산 관리서버(101)의 제어 하에 상기 마이크로소프트 엑셀과 연동하여 특정 기간 내에서의 각 조직별 생산 부하분석을 수행하고, 해당 부하분석 결과를 상기 생산관리 초기 페이지 상에 출력한다(도 3 참조)(S204). 상기 부하분석 결과를 통해 각 생산 조직의 부하상태 즉, 부하지수를 파악할 수 있게 된다. Subsequently, when a load analysis event occurs on the production management initial page, the load analysis and
각 생산 조직의 부하상태가 인지된 상태에서, 각 생산 조직의 부하상태를 평준화시키기 위해 작업할당 이벤트가 발생할 수 있다. 여기서, 작업할당 이벤트란 각 생산 조직에 할당된 생산 작업 즉, 실행 Activity를 상대적으로 부하지수가 낮은 생산 조직에 이관하는 것을 의미하는 것으로서, 실제적으로는 상기 생산관리 초기 페이지 상에서 특정 생산 조직의 실행 Activity가 마우스 드래그에 의해 다른 생산 조직으로 이동되는 것을 일컫는다. With the load status of each production organization known, a work assignment event can occur to level out the load status of each production organization. Here, the work assignment event refers to the transfer of the production work assigned to each production organization, that is, the execution activity, to the production organization having a relatively low load, and in practice, the execution activity of a specific production organization on the initial page of the production management. Refers to moving to another production tissue by dragging the mouse.
상기 생산관리 초기 페이지 상에서 소정의 작업할당 이벤트가 발생하면 상기 부하분석 및 작업할당 모듈(103)은 상기 작업할당 이벤트에 대응하여 각 조직별 생산작업 정보 즉, 실행 Activity를 갱신하는 역할을 수행한다. 이에 따라, 각 조직별 실행 Activity 정보는 도 4에 도시한 바와 같이 재조정되며, 재조정된 각 조직별 생산작업 정보는 상기 DB 블록의 조직별 생산작업 DB(113)에 선택적으로 갱신, 저장된다(S205). 상기 재조정된 각 조직별 생산작업 정보는 도 5에 도시한 바와 같이 생산관리 초기 페이지 상에 구현될 수 있다(도 5의 '수정후' 항목 참조)When a predetermined work assignment event occurs on the production management initial page, the load analysis and
한편, 상술한 생산실적 관리, 부하분석 및 작업할당 과정 이외에 공정현황 모니터링 과정이 진행될 수 있다. Meanwhile, the process status monitoring process may be performed in addition to the above-described production performance management, load analysis, and work assignment process.
구체적으로, 클라이언트(106)로부터 공정현황 모니터링 이벤트가 발생하면(S206) 상기 공정현황 관리모듈(104)은 상기 생산 관리서버(101)의 제어 하에 상기 생산 조직 정보 및 공정/공종 정보 등을 추출하여 도 6과 같은 공정현황 관리 페이지를 생성하고 이를 클라이언트(106)에 제공한다(S207). 상기 공정현황 관리 페이지 상에는 중일정 계획, 자체계획 등의 일정 종류를 선택할 수 있는 항목, 기간을 선택할 수 있는 기간 항목, 생산 조직을 선택할 수 있는 항목, 공정/공종 정보를 선택할 수 있는 항목, 생산실적 정보를 선택할 수 있는 항목 등이 구비된다. In detail, when a process status monitoring event occurs from the client 106 (S206), the process
상기 공정현황 관리 페이지 상에서 상기 각각의 항목에 대한 이벤트 즉, 작업대상 범위선택, 공정현황 메뉴 구성 등등에 대한 이벤트가 발생하면 상기 공정현황 관리모듈(104)은 상기 생산 관리서버(101)의 제어 하에 해당 이벤트에 대응하여 상기 DB 블록으로부터 그에 상응하는 생산 조직 정보 및 공정/공종 정보 등을 추출하여 소정의 공정현황 결과물을 클라이언트(106)에 제공한다(S208). When an event for each item, ie, an operation target range selection, a process status menu configuration, and the like, occurs on the process status management page, the process
도 1은 본 발명의 일 실시예에 따른 선박 건조시 생산 관리시스템의 구성도.1 is a block diagram of a production management system when building a ship according to an embodiment of the present invention.
도 2는 본 발명의 일 실시예에 따른 선박 건조시 생산 관리방법을 설명하기 위한 순서도. Figure 2 is a flow chart for explaining the production management method when the ship in accordance with an embodiment of the present invention.
도 3 내지 도 6은 본 발명의 일 실시예에 따른 선박 건조시 생산 관리방법을 설명하기 위한 참고도. 3 to 6 is a reference diagram for explaining the production management method when the ship is constructed in accordance with an embodiment of the present invention.
<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>
101 : 생산 관리서버 102 : 생산실적 관리모듈101: production management server 102: production performance management module
103 : 부하분석 및 작업할당 모듈 104 : 공정현황 관리모듈103: load analysis and work assignment module 104: process status management module
105 : 인터페이스 모듈 106 : 클라이언트105: interface module 106: client
110 : DB 블록 111 : 생산 조직 DB110: DB block 111: production organization DB
112 : 조직별 생산능력 DB 113 : 조직별 생산작업 DB112: Production capacity by organization DB 113: Production work DB by organization
114 : 조직별 생산실적 DB 115 : 공정/공종 DB114: Production Performance by Organization DB 115: Process / Industry DB
116 : 운영정보 DB116: Operational Information DB
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070131055A KR101073256B1 (en) | 2007-12-14 | 2007-12-14 | System and method for managing production of ship building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070131055A KR101073256B1 (en) | 2007-12-14 | 2007-12-14 | System and method for managing production of ship building |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20090063617A KR20090063617A (en) | 2009-06-18 |
KR101073256B1 true KR101073256B1 (en) | 2011-10-12 |
Family
ID=40992545
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020070131055A KR101073256B1 (en) | 2007-12-14 | 2007-12-14 | System and method for managing production of ship building |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101073256B1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20200107632A (en) | 2019-03-08 | 2020-09-16 | 포항공과대학교 산학협력단 | Management method and system for detail engineering of plant projects |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101034186B1 (en) * | 2009-11-17 | 2011-05-12 | (주)에이시에스 | Production control terminal and its operation method |
KR101245639B1 (en) * | 2011-03-29 | 2013-03-20 | 대우조선해양 주식회사 | Energy management server system for optimal ship fabrication configuration and ship fabrication system using the same |
-
2007
- 2007-12-14 KR KR1020070131055A patent/KR101073256B1/en not_active IP Right Cessation
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20200107632A (en) | 2019-03-08 | 2020-09-16 | 포항공과대학교 산학협력단 | Management method and system for detail engineering of plant projects |
Also Published As
Publication number | Publication date |
---|---|
KR20090063617A (en) | 2009-06-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Ferreira et al. | Product lifecycle management in knowledge intensive collaborative environments: An application to automotive industry | |
US9436922B2 (en) | System and method for integrated workflow scaling | |
Anumba et al. | Cyber—physical systems development for construction applications | |
Mielli et al. | Digital transformation: why projects fail, potential best practices and successful initiatives | |
Zhu et al. | Object/objective‐oriented maintenance management | |
CN106529823A (en) | Management and control system | |
KR101073256B1 (en) | System and method for managing production of ship building | |
KR20180001297A (en) | Project management apparatust | |
Alzraiee et al. | A hybrid framework for modeling construction operations using discrete event simulation and system dynamics | |
JP6932575B2 (en) | Automatic technical instruction generation | |
US8620702B2 (en) | Method and system for research and development management in an enterprise | |
Kang et al. | Discrete event simulation to reduce the effect of uncertainties on project planning | |
Schramm et al. | Conceptual Approach for a Digital Value Creation Chain Within the Timber Construction Industry–Potentials and Requirements | |
KR101357242B1 (en) | Method and system for managing port logistics information by applying business process management system | |
KR101103928B1 (en) | Supplier Load Analysis System and Load Analysis Management Method Using the Same | |
KR20210066362A (en) | System and method for managing task difficulty | |
Balco et al. | Impact of automation to event management efficiency | |
KR101170202B1 (en) | Visual system and method for managing production for ship block | |
Ala-Risku et al. | A solution for the material delivery problems in construction projects | |
Caramihai et al. | A cooperative enterprise agent based control architecture | |
KR101015895B1 (en) | Automatic Execution Method and System of Satellite Operation Procedure | |
KR101193316B1 (en) | System and method for managing the event of enterprise resource planning system for ship building | |
Sadeghi | Construction 5.0: Examining the Challenges and Solutions Related to the Successful Implementation of the CTS with the LPS Technique of the SAAL SC in Iran’s Construction Projects | |
KR20220105356A (en) | System and method for providing progress information for process management | |
Hindmarch et al. | A proposed construction design change management tool to aid in making informed design decisions |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PA0109 | Patent application |
Patent event code: PA01091R01D Comment text: Patent Application Patent event date: 20071214 |
|
PG1501 | Laying open of application | ||
A201 | Request for examination | ||
PA0201 | Request for examination |
Patent event code: PA02012R01D Patent event date: 20100415 Comment text: Request for Examination of Application Patent event code: PA02011R01I Patent event date: 20071214 Comment text: Patent Application |
|
E902 | Notification of reason for refusal | ||
PE0902 | Notice of grounds for rejection |
Comment text: Notification of reason for refusal Patent event date: 20110712 Patent event code: PE09021S01D |
|
E701 | Decision to grant or registration of patent right | ||
PE0701 | Decision of registration |
Patent event code: PE07011S01D Comment text: Decision to Grant Registration Patent event date: 20110930 |
|
GRNT | Written decision to grant | ||
PR0701 | Registration of establishment |
Comment text: Registration of Establishment Patent event date: 20111006 Patent event code: PR07011E01D |
|
PR1002 | Payment of registration fee |
Payment date: 20111006 End annual number: 3 Start annual number: 1 |
|
PG1601 | Publication of registration | ||
LAPS | Lapse due to unpaid annual fee | ||
PC1903 | Unpaid annual fee |
Termination category: Default of registration fee Termination date: 20150909 |