KR101073256B1 - System and method for managing production of ship building - Google Patents
System and method for managing production of ship building Download PDFInfo
- Publication number
- KR101073256B1 KR101073256B1 KR1020070131055A KR20070131055A KR101073256B1 KR 101073256 B1 KR101073256 B1 KR 101073256B1 KR 1020070131055 A KR1020070131055 A KR 1020070131055A KR 20070131055 A KR20070131055 A KR 20070131055A KR 101073256 B1 KR101073256 B1 KR 101073256B1
- Authority
- KR
- South Korea
- Prior art keywords
- production
- information
- organization
- work
- management
- Prior art date
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Human Resources & Organizations (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- General Factory Administration (AREA)
- Marketing (AREA)
- Entrepreneurship & Innovation (AREA)
- Theoretical Computer Science (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- General Health & Medical Sciences (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Primary Health Care (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Health & Medical Sciences (AREA)
- Manufacturing & Machinery (AREA)
Abstract
The present invention relates to a production management system and method for ship construction, which enables efficient production management by checking work information, performance information, and process status information for each production organization in real time.
The production management system for ship construction according to the present invention is a DB block for storing production organization information, production capacity information for each organization, production work information for each organization, production performance information for each organization, process / work information and operation information, and the production organization information. Management of the production of the vessel, such as load analysis process, work assignment process, process status management process, by selectively managing whether the production capacity information by organization, production operation information by organization, production performance information by organization and process / industry information are extracted It comprises a production management server that performs the role of controlling the overall operations made on the system as a whole, wherein the DB block is a production organization DB for storing information about the individual production organization that is input when the ship is built, and each of the Production capacity DB for each organization that stores production capacity information of individual production organizations, and production work assigned to each individual production organization Production work DB for each organization that stores the information, Production performance DB for each organization that stores production performance information for each individual production organization, Process / work DB for storing the job information for each middle production process, Web page graphic information In addition to storing a series of operating information for operating a web page, such as web page setting information, and comprises an operation information DB for storing the operating information linked to Microsoft Excel (Microsoft Excel).
Load analysis, work assignment, process status
Description
The present invention relates to a production management system and method for ship construction, and more specifically, production management during ship construction that enables efficient production management by enabling real-time check of work information, performance information, and process status information for each production organization. System and method.
Looking at the general ship construction flow, first, the initial design is made according to the type, size, etc. of the ordered ships and establish a schedule of production according to the schedule. Subsequently, a detailed design, a purchase schedule of the material is established, and a middle schedule production plan is established to be linked with the corresponding purchase schedule. As a final step, the production design and production schedule of small schedules are established by department and by sector, and when the goods are received, actual production proceeds.
On the other hand, in order to build a ship, a number of production operations of various types are required. Many of these production operations can be divided into pretreatment, cutting, painting, welding, and installation according to the type of work. There is an individual production organization that performs each operation.
For efficient production management, management of performance, process status, etc., compared to the plans of individual production organizations should be made when ships are built. That is, information such as production plan, production performance, and process status should be managed in real time.
In the conventional case, since production plan information, production performance information, and process status information are separately managed, overall management of the production is not performed efficiently.
The present invention has been made in order to solve the above problems, the production management system and method for ship construction that enables efficient production management by enabling to check in real time the work information, performance information and process status information for each production organization The purpose is to provide.
Production management system for ship construction according to the present invention for achieving the above object is to store the production organization information, production capacity information by organization, production operation information by organization, production performance information by organization, process / industry information and operation information Selective management of DB block and production organization information, organizational production capacity information, organizational production work information, organizational production performance information, and process / industrial information for load analysis process, work assignment process, process status management process And a production management server which performs a role of collectively controlling all operations performed on the production management system when the ship is constructed, and the DB block stores information on various individual production organizations that are input when the ship is built. A production organization DB, a production capacity DB for each organization that stores production capacity information of each individual production organization, and the respective dogs Production work DB for each organization that stores the production work information assigned to the production organization, production performance DB for each organization that stores production performance information of each individual production organization, and process / work for storing the work information for each mid-term production process In addition to the DB, it stores a set of operation information for operating web pages such as web page graphic information and web page setting information, and an operation information DB for storing operation information linked to Microsoft Excel. It is characterized in that the configuration.
Under the control of the production management server, the production organization information, organization production capacity information, organization production work information and organization production performance information are extracted from the DB block, web page graphic information and web page setting from the operation information DB. By extracting a series of operational information for operating web pages such as information, or extracting operational information linked with Microsoft Excel, a predetermined production management initial page is generated and the generated production management initial page is provided to the client. It may further include a production performance management module to play a role.
If a load analysis event occurs on the production management initial page under the control of the production management server, the production load analysis for each organization within a specific period is performed in association with the Microsoft Excel, and the result of the load analysis is initially analyzed. It may further include a load analysis and work assignment module that serves to output a page, and to update the production work information for each organization in response to a predetermined work assignment event occurs on the initial page of the production management. have.
Under the control of the production management server extracts the production organization information and process / industry information, etc. to create a process status management page and provide it to the client, and select a predetermined work target range on the process status management page, Process status management module that serves to provide the client with predetermined process status output by extracting corresponding production organization information and process / work information from DB block in response to the event when the process status menu configuration occurs. It may further include.
Production management method during ship construction according to the present invention is the production organization DB, production capacity DB, organizational production work DB, organizational production performance DB, production / organizational DB of each production process, organizational production in each of the DB block Storing capability information, organizational production work information, organizational production performance information, process / industrial information, and when a production management event occurs from a client, the production performance management module controls the production organization information under the control of the production management server. Extracts the production capacity information by organization, production operation information by organization, and production performance information by organization from the DB block, and operates a series of web pages such as web page graphic information and web page setting information from the operation information DB. Preset production management by extracting operation information or extracting operation information linked with Microsoft Excel Generating a page and transmitting the generated production management initial page to a client through an interface module; and when a load analysis event occurs on the production management initial page, the load analysis and work assignment module is controlled under the control of the production management server. Performing production load analysis for each organization within a specific period in connection with Microsoft Excel, outputting the result of the load analysis on the initial page of the production management, and a predetermined job assignment event occurs on the initial production management page. The load analysis and work assignment module may include updating the production work information for each organization, that is, execution activity in response to the work assignment event.
Production organization DB, production capacity DB by organization, production work DB by organization, production performance DB by organization, production organization information by process / work DB, production capacity information by organization, production work information by organization, and organization After storing production performance information and process / work information, when a process status monitoring event occurs from a client, the process status management module extracts the production organization information and process / work information under the control of the production management server. The method may further include generating a process status management page and providing the same to a client.
Production management system and method for ship construction according to the present invention has the following effects.
Efficient production management is possible by checking work information, performance information and process status information of each production organization in real time.
Hereinafter, a production management system and method for building a ship according to an embodiment of the present invention with reference to the drawings will be described in detail. 1 is a configuration diagram of a production management system when building a ship according to an embodiment of the present invention, Figure 2 is a flow chart illustrating a production management method when building a ship according to an embodiment of the present invention.
First, as shown in Figure 1, the production management system for ship construction according to an embodiment of the present invention is largely DB block, production
The DB block is a production organization DB (111), production capacity DB (112) by organization, production work DB (113) by organization, production performance DB (114) by organization, process / industry information DB (115) and operation Information DB 116 is configured. For reference, the DB block may be implemented by an enterprise resource planning system (ERP) of a ship building company.
The production organization DB 111 stores information on various individual production organizations that are input during ship construction. The organizational capacity DB 112 stores the capacity information of each individual production organization. The organization-specific production work DB 113 stores production work information assigned to each individual organization. Herein, production work information refers to work information that should be actually executed, and hereinafter, referred to as execution activity. The execution activity may be indicated by a predetermined identification number (for example, 1753 B201L 6). The organizational production performance DB 114 stores production performance information of each individual production organization. The process / work DB plays a role of storing work information for each production schedule. The middle schedule production process, the initial design and large schedule production plan of the vessel received in the normal ship construction process is established, and the detailed design and the middle schedule production plan is established based on the large schedule production plan The production process according to the medium schedule production plan is referred to as the medium schedule production process. Finally, the operation information DB 116 stores a series of operation information for operating a web page such as web page graphic information, web page setting information, etc., and also stores operation information linked with Microsoft Excel. do.
On the other hand, the production
The load analysis and
The process
The
In addition, the
In the above, the configuration of the production management system when the ship is built according to an embodiment of the present invention. Hereinafter, a production management method for building a ship according to an embodiment of the present invention using the production management system for building a ship will be described.
First, as shown in FIG. 2, the production organization DB 111, the
Predetermined information is stored in each of the
Subsequently, when a load analysis event occurs on the production management initial page, the load analysis and
With the load status of each production organization known, a work assignment event can occur to level out the load status of each production organization. Here, the work assignment event refers to the transfer of the production work assigned to each production organization, that is, the execution activity, to the production organization having a relatively low load, and in practice, the execution activity of a specific production organization on the initial page of the production management. Refers to moving to another production tissue by dragging the mouse.
When a predetermined work assignment event occurs on the production management initial page, the load analysis and
Meanwhile, the process status monitoring process may be performed in addition to the above-described production performance management, load analysis, and work assignment process.
In detail, when a process status monitoring event occurs from the client 106 (S206), the process
When an event for each item, ie, an operation target range selection, a process status menu configuration, and the like, occurs on the process status management page, the process
1 is a block diagram of a production management system when building a ship according to an embodiment of the present invention.
Figure 2 is a flow chart for explaining the production management method when the ship in accordance with an embodiment of the present invention.
3 to 6 is a reference diagram for explaining the production management method when the ship is constructed in accordance with an embodiment of the present invention.
<Explanation of symbols for the main parts of the drawings>
101: production management server 102: production performance management module
103: load analysis and work assignment module 104: process status management module
105: interface module 106: client
110: DB block 111: production organization DB
112: Production capacity by organization DB 113: Production work DB by organization
114: Production Performance by Organization DB 115: Process / Industry DB
116: Operational Information DB
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070131055A KR101073256B1 (en) | 2007-12-14 | 2007-12-14 | System and method for managing production of ship building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070131055A KR101073256B1 (en) | 2007-12-14 | 2007-12-14 | System and method for managing production of ship building |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20090063617A KR20090063617A (en) | 2009-06-18 |
KR101073256B1 true KR101073256B1 (en) | 2011-10-12 |
Family
ID=40992545
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020070131055A KR101073256B1 (en) | 2007-12-14 | 2007-12-14 | System and method for managing production of ship building |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101073256B1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20200107632A (en) | 2019-03-08 | 2020-09-16 | 포항공과대학교 산학협력단 | Management method and system for detail engineering of plant projects |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101034186B1 (en) * | 2009-11-17 | 2011-05-12 | (주)에이시에스 | Terminal for production management and method for managing the same |
KR101245639B1 (en) * | 2011-03-29 | 2013-03-20 | 대우조선해양 주식회사 | Energy management server system for optimal ship fabrication configuration and ship fabrication system using the same |
-
2007
- 2007-12-14 KR KR1020070131055A patent/KR101073256B1/en not_active IP Right Cessation
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20200107632A (en) | 2019-03-08 | 2020-09-16 | 포항공과대학교 산학협력단 | Management method and system for detail engineering of plant projects |
Also Published As
Publication number | Publication date |
---|---|
KR20090063617A (en) | 2009-06-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9436922B2 (en) | System and method for integrated workflow scaling | |
Anumba et al. | Cyber—physical systems development for construction applications | |
Zhu et al. | Object/objective‐oriented maintenance management | |
Mielli et al. | Digital transformation: why projects fail, potential best practices and successful initiatives | |
CN105678522A (en) | Workflow engine and project management system based on workflow | |
KR101073256B1 (en) | System and method for managing production of ship building | |
JP6932575B2 (en) | Automatic technical instruction generation | |
Kononenko et al. | The project management methodology and guide formation's method | |
US7421372B1 (en) | Maintenance scheduling method | |
McHugh et al. | On the role of lean in digital construction | |
US11500760B2 (en) | Operation management server, development operation support system, method thereof, and non-transitory computer readable medium storing program thereof | |
US20100063859A1 (en) | Method and system for research and development management in an enterprise | |
Kang et al. | Discrete event simulation to reduce the effect of uncertainties on project planning | |
KR101357242B1 (en) | Method and system for managing port logistics information by applying business process management system | |
KR101103928B1 (en) | System and method for analysis a load of subcontract company | |
KR20100047987A (en) | Managing system for optimizing medium plan of ship building | |
KR101072739B1 (en) | System and method for managing materials requirement | |
KR20210066362A (en) | System and method for managing task difficulty | |
KR20070027091A (en) | Enterprise resource planning system | |
KR101193266B1 (en) | Apparatus and method for managing replacement an order by surplus steel | |
Caramihai et al. | A cooperative enterprise agent based control architecture | |
KR20130093858A (en) | System for managing stocking list | |
KR101015895B1 (en) | Method and system to automate the satellite operation procedure | |
KR101170202B1 (en) | Visual system and method for managing production for ship block | |
Schramm et al. | Conceptual Approach for a Digital Value Creation Chain Within the Timber Construction Industry–Potentials and Requirements |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration | ||
GRNT | Written decision to grant | ||
LAPS | Lapse due to unpaid annual fee |