KR101068742B1 - A collect system for floating abject - Google Patents

A collect system for floating abject Download PDF

Info

Publication number
KR101068742B1
KR101068742B1 KR1020100122121A KR20100122121A KR101068742B1 KR 101068742 B1 KR101068742 B1 KR 101068742B1 KR 1020100122121 A KR1020100122121 A KR 1020100122121A KR 20100122121 A KR20100122121 A KR 20100122121A KR 101068742 B1 KR101068742 B1 KR 101068742B1
Authority
KR
South Korea
Prior art keywords
river
collection device
collection
chain gear
chain
Prior art date
Application number
KR1020100122121A
Other languages
Korean (ko)
Inventor
최동림
최동주
Original Assignee
최동주
최동림
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 최동주, 최동림 filed Critical 최동주
Priority to KR1020100122121A priority Critical patent/KR101068742B1/en
Application granted granted Critical
Publication of KR101068742B1 publication Critical patent/KR101068742B1/en
Priority to PCT/KR2011/008941 priority patent/WO2012074240A2/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B5/00Artificial water canals, e.g. irrigation canals
    • E02B5/08Details, e.g. gates, screens
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B15/00Cleaning or keeping clear the surface of open water; Apparatus therefor
    • E02B15/04Devices for cleaning or keeping clear the surface of open water from oil or like floating materials by separating or removing these materials
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B8/00Details of barrages or weirs ; Energy dissipating devices carried by lock or dry-dock gates
    • E02B8/02Sediment base gates; Sand sluices; Structures for retaining arresting waterborne material
    • E02B8/023Arresting devices for waterborne materials

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Cleaning Or Clearing Of The Surface Of Open Water (AREA)
  • Filtration Of Liquid (AREA)

Abstract

장마철이면 하천 상류에서부터 유입되는 쓰레기나 거푸집 및 공사자재와 같은 각종 부유물이 유입되어 교각 등에 적체되어 물흐름이나 소통이 원활하지 못해 범람으로 이어지고, 하천오염의 주요 원인으로 상류로부터 떠내려온 각종 부유물을 거두어내는데 많은 예산과 인력이 소요되는 점을 감안하여,본 발명은 부유물의 유입이 예상되는 큰 하천이나 지천 등에 설치하는 하천의 부유물수거장치를 제공하고자 하는 것으로 본 발명의 특징은 연속식으로 수거효율을 높이고자, 1단계 수거장치는 연속컨베이어방식으로 하천 양의 하천 수면위에 순환하는 갈고리에 의해서 주로 부피가 큰 부유물을 포집하고, 2단계 수거장치로는 수거네트로 하천 양안에 좌우로 반복해서 횡단 양망되는 방식으로 부피가 적은 부유물을 순차적으로 수거시키는 것이 특징으로 1단계 수거장치는 하천 양안중 일측에 1개소의 원동모터부 기초석에 마련된 출력체인기어와 이측에 2개소의 아이들체인기어 기초석에 마련된 아이들체인기어에는 어태치먼트붙이 하이피치체인을 3점 설치시켜 수류저항이 크게 발생하는 경우라도 안정적으로 지탱되도록 하며, 2단계 수거장치의 수거네트의 그물코는 부유물의 종류별로 다양한 크기의 그물코로 이루어진 수거네트를 채택시켜 1단계 수거장치에서 수거하지 못한 부유물을 최종 포집하도록 해 설치와 철거 등이 용이한 친환경적인 하천의 부유물수거장치인 것이다. During the rainy season, various floats such as garbage, formwork and construction materials from the upper streams flow into the bridges, resulting in flooding due to poor water flow and communication. In view of the fact that it takes a lot of budget and manpower to produce, the present invention is to provide a floating water collection device of a river installed in a large river or stream where the inflow of the floating water is expected to be characterized by a continuous collection efficiency In order to increase, the 1st stage collection device collects bulky float mainly by hooks circulating on the river surface of the river in a continuous conveyor method, and the 2nd stage collection device repeatedly crosses the right and left sides of the river with the collection net. Characterized in that the collection of low-volume floats sequentially The low-stage one-stage collection device consists of output chain gears provided on one base of the motor-drive part on both sides of the river and two high-pitch chains with attachments on the idle chain gears of the two idle-chain gears on the other side. Even if a large resistance occurs, it is stably supported and the net of the collection net of the second stage collection device adopts a collection net composed of various sizes of nets for each type of floating material, so that the final collection of the floating material that has not been collected by the first stage collection device It is an environment-friendly river floating water collection device that is easy to install and dismantle.

Figure R1020100122121
Figure R1020100122121

Description

하천의 부유물 수거장치{a collect system for floating abject}Stream Collector for Float {a collect system for floating abject}

본 발명은 하천의 부유물수거장치에 관한 것으로, 장마철이면 상류에서부터 유입되는 쓰레기나 거푸집 및 공사자재와 같은 각종 부유물이 유입되어 교각 등에 적체되어 물흐름이나 소통이 원활하지 못해 범람으로 이어지고, 하천오염의 주요 원인이였으며, 상류로부터 떠내려온 각종 부유물이 댐이나 수문에 적체되는 실태로 이를 거두어내는데 많은 예산과 인력이 소요되는 실태이다.The present invention relates to a floating water collection device of a river, and in the rainy season, various floating materials such as garbage and formwork and construction materials introduced from the upstream flow into the bridge piers, resulting in flooding due to poor water flow and communication, It was the main cause, and various floating materials floated upstream were accumulated in dams and floodgates, which required much budget and manpower.

또한, 강으로부터 유입된 각종 부유물들로 인해 하구갑문에서는 매년 막대한 인력과 예산을 들어 하천 양안에서 또는 선박을 띄워 쓰레기나 부유물을 수거하는 하는 실정이다. In addition, due to various floats introduced from the river, the estuary lock has a huge manpower and budget every year to collect garbage or floats in both rivers or by floating ships.

이에 본 발명에서는 부유물의 유입이 예상되는 큰 하천이나 지천에 설치하는 하천의 부유물수거장치를 제공하고자 하는 것으로 연속식으로 수거효율을 높이고, 1,2단계의 부유물 수거장치를 통해 크고 작은 부유물을 순차선별 수거시켜 수거장치에 부하를 줄이며, 수거된 각종 부유물을 선별해 집하 배출하도록 하는 친환경적인 하천의 부유물수거장치를 제공하고자 하는 것이다. Accordingly, the present invention is to provide a floating water collection device of a river installed in a large river or a stream that is expected to inflow of floating water continuously to increase the collection efficiency, and sequentially through the first and second stage floating material collection device to float large and small floats It is intended to provide an environment-friendly river floating water collection device to reduce the load on the collection device by sorting and to collect and discharge the collected various suspended matter.

매년 장마철이나 집중호우시 소하천이나 지천에서부터 유입되는 각종쓰레기나 거푸집과 같은 공사자재를 비롯하여, 비닐이나 농약 병과 같은 농자재와 스티로폼과 같은 각종 생활쓰레기 등이 유입되어 강과 바다의 수질을 오염시키는 실정이다.Each year, various materials such as garbage and formwork, which come from small rivers and streams during the rainy season or heavy rains, as well as agricultural materials such as plastic and pesticide bottles, and various kinds of household waste such as styrofoam, are polluted.

이를 위해 종전기술의 일례로 등록특허 10-0620429호에서는 수개의 부력체에 지지되고 고정되는 레일부를 물에 뜨도록 고정하되 흘러가지 않도록 하천변에 와이어로 고정설치하고 설치된 레일프레임을 따라 거름망이 부유물을 포집하여 레일프레임을 따라 하천변으로 이동시켜 부유물을 수거하는 장치가 있으나,거름망을 한쪽으로 당기는 동안에 부유물이 통과되는 관계로 수거율이 높지 않을 것으로 판단된다.To this end, as an example of the prior art in the Patent Registration No. 10-0620429 is fixed to the floating portion of the rail portion that is supported and fixed to several buoyancy body to install the wire to the riverside so as not to flow and the sieve is suspended along the installed rail frame There is a device to collect and move the stream along the rail frame to the riverside, but the collection rate is not high because the float is passed while pulling the strainer to one side.

또, 하나는 등록특허 10-074929호에서는 하천수면의 부유물 및 기름수거기구로서 무게추로 중심이 잡히는 원통형상의 부력체의 외면에 다수의 유입구를 형성하고 유입구를 통해 포집한 부유물 및 기름 등을 집수관을 통해 펌프로 포집해 분리조로 배출하는 방식이나, 기름을 제외한 일반 부유물들을 회수하는데 부적합함을 알 수 있다.In addition, in Korean Patent No. 10-074929, a plurality of inlets are formed on the outer surface of a cylindrical buoyancy body centered with a weight as a float and oil collection mechanism on a river surface, and the suspended matter and oil collected through the inlet are collected. It can be seen that it is not suitable to collect the pump through the water pipe and discharge it to the separation tank, or to recover ordinary suspended matter except oil.

한편, 국내 등록특허 제10-0899572호에서는 하천의 제방 사이에 하천의 폭 전체에 걸쳐 설치하는 부유물수거장치로 강폭에 이르는 직사각의 틀에 부력체를 구비시키고 틀의 좌우와 하단을 고정지지시키는 망체 상단에는 부구를 하단에는 무게추를 구비한 부유물수거장치가 있으나, 이는 연속수거 방식이 아닌 저인망식 그물로 적게는 수미터에서 수백미터에 이르는 강폭에 상기와 같은 수거장치를 설치하는 것은 부적합하며, 더구나 토사를 포함한 부유물들이 적체되면 그물이 견디지 못해 터져버리는 염려와 더불어 유속이 빠른 하천에 설치하는 것은 부적합함을 알 수 있다.On the other hand, Korean Patent No. 10-0899572 is a floating water collecting device installed across the width of the river between the banks of the river is provided with a buoyancy body in a rectangular frame leading to the width of the river and fixed to support the left and right and the bottom of the frame There is a float collection device with a float at the top and a weight at the bottom, but it is not suitable for installing such a collection device in river widths ranging from several meters to hundreds of meters, which is not a continuous collection method. In addition, it can be seen that it is not suitable to install in a river with high flow rate, with the fear that the net will not be able to endure if the floating material including earth and sand accumulates.

또, 다른 기술로 등록실용신안 제20-0255925호에서는 강변에 근접하여 수직으로 설치한 지주로 모터의 동력을 받아 회전되는 구동축과 강의 중심부에 수직으로 세워 설치한 각각의 지주에 베어링으로 지지되는 회전관이 장착된 종동축에 연속으로 회전하는 걸름망을 설치하여 강폭을 양분한 길이로 물의 흐름에 따라 경사지게 설치해 부유물을 강의 일측으로 이송시켜 수거하는 방식이지만, 설치된 걸름망은 수면일정깊이에 수하된 상태로 유속에 의하여 수압을 많이 받는 상태로 강변이나 강중심부에 설치하는 지주는 더욱 보강구조로 구축비용이 과다하게 요구되며, 하상에 상시 설치되는 지주들로 인하여 수상운항에 지장을 초래할 수 있는 구조이다.In addition, in another technique, registered utility model No. 20-0255925, a support shaft installed vertically near a riverside is driven by a motor and rotated by bearings on each support shaft vertically installed at the center of the river. It is a method of installing the net that rotates continuously on the driven shaft equipped with the pipe and installing the slant along the river with the width of the river bisected to transfer the floats to one side of the river, but the net is installed at a certain depth of water. Shore that is installed in the riverside or river center under high water pressure due to the flow rate is more reinforcing structure, and excessive construction cost is required.

[문헌 1] KR 10-0620429 B1(2006.08.29)[Reference 1] KR 10-0620429 B1 (2006.08.29) [문헌 2] KR 10-0749929 B1(2007.08.09)[Document 2] KR 10-0749929 B1 (2007.08.09) [문헌 3] KR 10-0899572 B1(2009.05.20)[Reference 3] KR 10-0899572 B1 (2009.05.20) [문헌 4] KR 20-0255925 Y1(2001.11.19)[Document 4] KR 20-0255925 Y1 (Nov. 19, 2001)

본 발명은 상기와 같은 종전 하천 부유물수거장치들의 문제점을 감안하여, 본 발명에서는 장치면에 있어서는 하천 양안의 수면위에 설치한 연속컨베이어 방식으로 순환하는 갈고리로 부유물을 포집하고, 2단계에서는 1단계에서 수거하지 못하고 빠져나온 부유물을 역시 하천 양안에서 좌우반복 횡단 방식으로 순환하는 네트로 크기가 작은 부유물을 최종 수거처리함을 목적으로 한다.In the present invention, in consideration of the problems of the conventional river floating material collection device as described above, in the present invention, the floating surface is collected by hooks circulating in a continuous conveyor method installed on both sides of the river in the device surface, and in the first step in the second step The purpose of the final collection process is to collect small floats that are circulated in both streams in a crosswise manner.

또, 본 발명에서는 물의 흐름을 방해하는 일체의 구조물을 하상에 설치하지 않는 방식으로 시공이 간편하며, 장마철이 지나 장비의 철거 내지 유지 보수도 용이하게 원상 복구할 수 있어 하천을 운항하는데 지장이 없도록 함을 목적으로 한다. In addition, in the present invention, the construction is simple in such a way that it does not install any structure that obstructs the flow of water on the lower floor, and it is possible to easily restore the original shape even after the rainy season, so that the operation of the river can be restored so that it does not interfere with the operation of the river. For the purpose of

상기와 같은 목적을 이루기 위하여, 본 발명에서는 하천 양안의 어느 한쪽 지면에는 모터(102)의 원동체인기어(102a)와; 감속기(101)의 입력체인기어(101a)에 구동체인(102b)을 체결시키고, 상기 감속기(101)의 출력체인기어(101b)는 베어링(101d)이 상하로 내재된 출력축보강관(101c)을 일정높이 돌출된 출력축(101e)에 조립시켜 앵커볼트 체결되는 원동모터부 기초석(103)을 설치하고,In order to achieve the above object, in the present invention, any one surface of both sides of the river and the drive chain gear (102a) of the motor (102); The drive chain 102b is fastened to the input chain gear 101a of the reducer 101, and the output chain gear 101b of the reducer 101 has an output shaft reinforcement pipe 101c having a bearing 101d up and down. Install the base motor 103 of the motor motor unit is assembled to the anchor bolt fastened by assembling the output shaft (101e) protruding a certain height,

하천 대향편에는 기설치된 원동모터부 기초석(103)이 설치된 지점과는 하류쪽으로 2개의 아이들체인기어 기초석(104b)을 일정간격 설치하되, 각 설치된 아이들체인기어 기초석에는 앵커볼트로 아이들체인기어축 베어링(105a)이 상하로 내재된 아이들체인기어 보강관(104a)을 조립한 아이들체인기어축(105)에 아이들체인기어(104)를 조립시키고, On the opposite side of the river, two idler chain gear foundation stones 104b are installed at a predetermined interval downstream from the point where the pre-installed motor motor foundation foundation stone 103 is installed. Assembling the idle chain gear 104 to the idle chain gear shaft 105 assembled with the idle chain gear reinforcement pipe (104a) of the upper and lower parts (105a),

조립된 1개소의 출력체인기어(101b)와 2개소의 아이들체인기어(104)에는 어태치먼트붙이 하이피치체인(120)을 3점 설치시키되, 설치된 하이피치체인의 어태치먼트에는 일정간격으로 체결볼트(131)로 조립한 갈고리브라켓트(130)에는 갈고리부싱(141)과 일체로 직교설치된 갈고리(140)를 힌지축(143)으로 조립시키되, 부싱 상단과 일체로 형성된 갈고리체결꼭지(142)와 일정 체적의 부력볼(110) 하방에 일체로 형성된 볼체결꼭지(111)에는 소정길이의 링크체인(150)을 카라비나(151)로 체결시켜 이루어지는 1단계 수거장치(100)와;The output chain gear 101b and the two idle chain gears 104 are assembled with three high pitch chains 120 with attachments, and fastening bolts 131 are attached to attachments of the installed high pitch chains at regular intervals. The hook bracket (130) assembled with the hook hook (141) orthogonal to the hook 140 is installed integrally with the hinge shaft (143), but hook hook 142 and a fixed volume formed integrally with the bushing top Ball fasteners 111 formed integrally below the buoyancy ball 110, the first stage collection device 100 is made by fastening the link chain 150 of a predetermined length with a carabiner 151;

상기 1단계 수거장치(100)와 인접된 하천 하류방향 양안의 각 지면에는 출력축에 양망보빈 원동체인기어(224)를 조립한 감속기부착형 클러치모터(210)와 양망보빈 브라켓트(226)에 양망보빈축 베어링(227)으로 축조립된 양망보빈(220)의 양망보빈축(221)에 조립된 양망보빈 종동체인기어(225)와 상기 양만보빈원동체인기어에 양망체인(222)을 체결시켜, 앵커볼트로 양망보빈 기초석(223)에 조립시키고, 대향설치된 각 양망보빈(220)의 전측으로는 지면에 설치한 롤가이드(232) 사이 일정높이에 롤(231)을 설치한 롤컨베이어부(230)가 마련되며, 양망보빈(220) 폭의 네트본줄(241)에 일정간격으로 부레(242)가 설치된 수거네트(240)를 양편의 양망보빈(220)에 권취시켜 이루어지는 2단계 수거장치(200)를 포함함을 특징으로 하는 하천의 부유물수거장치에 의하여, 1단계로는 하천 양안의 수면위에 설치한 연속컨베이어 방식으로 순환하는 갈고리로 부유물을 포집하고, 2단계에서는 1단계에서 수거하지 못하고 빠져나온 부유물을 역시 하천 양안에서 좌우반복 횡단 방식으로 순환하는 네트로 크기가 작은 부유물을 최종 수거처리시키도록 한 것이다.On both grounds in the downstream downstream direction of the first-stage collection device 100, the reduction gear-mounted clutch motor 210 and the two-way bobbin bracket 226, which assembled the two-way bobbin motive chain gear 224 on the output shaft, were double-beamed. The two-way bobbin driven chain gear 225 assembled to the two-way bobbin shaft 221 of the two-way bobbin 220 axially assembled with the hollow shaft bearing 227 and the two-way chain 222 to the two-way bobbin drive chain gear, anchors Roll conveyor unit 230, which is assembled to the basic bobbin bobbin stone 223 with bolts, and the roll 231 is installed at a predetermined height between the roll guides 232 installed on the ground on the front side of each of the two opposing bobbins 220, respectively. There is provided, the two-stage collection device 200 is formed by winding the collection net 240 installed in the net 242 of the width of the two wire bobbin 220 at a predetermined interval on both sides of the bobbin 220 of both sides of the bobbin (220) By the floating water collection device of the river, characterized in that it comprises a stream Collects floats by hooks circulating on the inner surface of the water, and collects small floats that circulate through the left and right loops in both rivers. To be processed.

본 발명에 따른 하천의 부유물수거장치는 장마철이나 집중호우시 소하천이나 지천에서부터 유입되는 각종쓰레기나 거푸집과 같은 공사자재를 비롯하여, 비닐이나 농약 병과 같은 농자재와 스티로폼과 같은 각종 생활쓰레기 등이 유입되어 강과 바다의 수질을 오염시켜, 식수원의 적조현상과 오염 및 바다로 흘러들어 바다를 오염시키거나 양식장을 오염시키는 각종 부유물들을 효과적으로 수거하기 위하여, 1단계로는 하천 양안의 수면위에 설치한 연속컨베이어 방식으로 순환하는 갈고리로 부유물을 포집하고, 2단계에서는 1단계에서 수거하지 못하고 빠져나온 부유물을 역시 하천 양안에서 좌우반복 횡단 방식으로 순환하는 수거네트로 크기가 작은 부유물을 최종 수거처리하는 방식으로 부유물의 부피나 종류에 따라서 효과적으로 대처하고 수거효율이 높다는 효과와 더불어, 설치시공도 종전처럼 하상에 지주 등을 설치하는 방식이 아닌 수면이나 수면일정깊이 수하된체, 연속컨베이어방식 또는 좌우반복 횡단하는 방식으로 설치비가 기존에 비하여 저렴하고 또, 상시에는 하천을 운항하는데 방해되는 요소를 배제시키기 위해 철거가 용이하도록 하는 부유물 수거장치로 하천이용 효율도 높일 수 있도록 한 유용한 발명인 것이다.The floating water collecting device of the river according to the present invention is a construction material such as various wastes and formwork flowing from the small rivers or streams during the rainy season or heavy rains, agricultural materials such as vinyl or pesticide bottles and various household wastes such as styrofoam, etc. In order to contaminate the water quality of the sea, and to effectively collect the red tide and pollution of the drinking water source and the various floats that flow into the sea to contaminate the sea or the farm, the first step is a continuous conveyor system installed on the water surface of both rivers. The floating hook is collected by circulating hooks, and in the second stage, a floating net that circulates from the first stage, which is not collected in the left and right, is also circulated in both sides of the river in a crosswise manner. Effective handling and collection depending on the type In addition to the effect that the rate is high, the installation cost is cheaper than the conventional way of installing the struts on the riverbed, as in the past, by the method of lowering the surface of the water, the surface of the water, the continuous conveyor method, or repeating the right and left repeatedly. It is a useful invention to enhance the efficiency of river use as a floating material collection device that facilitates dismantling in order to exclude the elements that interfere with the operation of the river at all times.

도 1은 본 발명에 따른 장치의 기본 배치도
도 2는 본 발명의 주요부인 1단계 수거장치 사시도
도 3은 본 발명에 따른 1단계 수거장치 주요부인 부유물수거수단의 부분 발췌 사시도
도 4는 도 3의 분해사시도
도 5는 본 발명에 따른 2단계 수거장치 사시도
도 6은 본 발명에 따른 ⅰ)은 출력축보강관과 ⅱ)아이들체인기어보강관의 내부구조를 나타낸 참고단면도
1 is a basic layout of the device according to the invention
Figure 2 is a perspective view of the primary stage 1 collection device of the present invention
Figure 3 is a perspective view of a part of the floating water collecting means that is the main part of the first stage collection device according to the present invention
4 is an exploded perspective view of FIG.
5 is a perspective view of a two-stage collection device according to the present invention
Figure 6 is a reference cross-sectional view showing the internal structure of the output shaft reinforcement pipe and ii) idle chain gear reinforcement pipe according to the present invention.

상기와 같은 목적을 이루기 위하여, 이하 첨부된 도면에 의하여 본 발명의 일 실시 구성을 알아 보고자한다.In order to achieve the above object, it will be described one embodiment configuration of the present invention by the accompanying drawings.

도 1은 본 발명에 따른 장치의 기본 배치도로 하천 양안의 상류에 설치하는 1단계 수거장치(100)와; 1단계 수거장치와 일정 인접거리의 하천 하류에 설치하는 2단계 수거장치(200)로 이루어진다.1 is a one-stage collection apparatus 100 installed upstream of both rivers in a basic layout diagram of the apparatus according to the present invention; It consists of a first-stage collection device and a two-stage collection device 200 installed downstream of a certain distance.

그리고 상기 1단계 수거장치와 2단계 수거장치가 설치된 하천 양안에는 차양막(50a;50b;50c;50d) 구조물이 마련되며, 차양막(50a;50c;50d) 내부에는 상기 1단계 수거장치와 2단계 수거장치의 분리 집하 구간(100B;200B)에서의 작업공간 제공과, 공지와 같이 수거된 부유물들을 실어나르는 차량(10), 크레인(20), 분리수거함(30), 상차컨베이어(40) 등이 구비된다. In addition, the both sides of the river in which the first-stage collection device and the second-stage collection device are installed are provided with a sunshade film (50a; 50b; 50c; 50d) structure, the inside of the sunshade (50a; 50c; 50d) and the second-stage collection device Providing a work space in the separate collection section (100B; 200B) of the device, and the vehicle 10, the crane 20, the separate collection box 30, the loading conveyor 40, and the like to carry the collected floating as well known do.

다음으로 본 발명의 주요부로 먼저 상기 1단계 수거장치(100)를 알아본다.Next, as a main part of the present invention, the first stage collection apparatus 100 will be described.

도 2는 본 발명의 주요부인 1단계 수거장치 사시도,도 3은 본 발명에 따른 1단계 수거장치 주요부인 부유물수거수단의 부분 발췌 사시도 및 도 3의 분해사시도인 도 4에 도시된 바와 같이,2 is a perspective view of a one-stage collection device, which is a main part of the present invention, and FIG. 3 is an exploded perspective view of a partially extracted perspective view of the floating water collection means, which is a main part of a one-stage collection device according to the present invention, and FIG.

하천 양안 어느 한쪽 지면에는 모터(102)의 원동체인기어(102a)와; 감속기(101)의 입력체인기어(101a)에 구동체인(102b)을 체결시키고, 상기 감속기(101)의 출력체인기어(101b)는 베어링(101d)이 상하로 내재된 출력축보강관(101c)을 일정높이 돌출된 출력축(101e)에 조립시켜 앵커볼트체결되는 원동모터부기초석(103)을 설치하고,On either side of the river there is a driving chain gear 102a of the motor 102; The drive chain 102b is fastened to the input chain gear 101a of the reducer 101, and the output chain gear 101b of the reducer 101 has an output shaft reinforcement pipe 101c having a bearing 101d up and down. Install the motor base section 103, which is assembled to the output shaft (101e) protruding a certain height and fastened to the anchor bolt,

하천 대향편에는 기설치된 원동모터부기초석(103)이 설치된 지점과는 하류쪽으로 2개의 아이들체인기어기초석(104b)을 일정간격 설치하되, 각 설치된 아이들체인기어기초석에는 앵커볼트로 아이들체인기어축베어링(105a)이 상하로 내재된 아이들체인기어보강관(104a)을 조립한 아이들체인기어축(105)에 아이들체인기어(104)를 조립시키고, On the opposite side of the river, two idler chain gear corners 104b are installed at a predetermined interval downstream from the point where the pre-installed motor-driven foundation stone 103 is installed, and each installed idler gear shaft bearing with anchor bolts in the idler chain gear corners. Assembling the idle chain gear 104 to the idle chain gear shaft 105 assembled with the idle chain gear reinforcement tube (104a) in which (105a) is embedded up and down,

조립된 1개소의 출력체인기어(101b)와 2개소의 아이들체인기어(104)에는 어태치먼트붙이 하이피치체인(120)을 3점 설치시키되, 설치된 하이피치체인의 어태치먼트에는 일정간격으로 체결볼트(131)로 조립한 갈고리브라켓트(130)에는 갈고리부싱(141)과 일체로 직교설치된 갈고리(140)를 힌지축(143)으로 조립시키되, 부싱 상단에 일체로 형성된 갈고리체결꼭지(142)와 일정체적의 부력볼(110) 하방에 일체로 형성된 볼체결꼭지(111)에는 소정길이의 링크체인(150)을 카라비나(151)로 체결시켜 1단계 수거장치(100)를 설치한다. The output chain gear 101b and the two idle chain gears 104 are assembled with three high pitch chains 120 with attachments, and fastening bolts 131 are attached to attachments of the installed high pitch chains at regular intervals. The hook bracket (130) assembled with the hook hook (141) orthogonal to the hook 140 is installed integrally with the hinge shaft (143), the hook hook 142 integrally formed on the upper end of the bushing and a certain volume In the ball fastener 111 formed integrally under the buoyancy ball 110, the link chain 150 of a predetermined length is fastened to the carabiner 151 to install a one-step collection device 100.

다음으로 상기 구성의 1단계 수거장치(100)와 인접된 하천 하류방향 양안에 횡단설치하는 2단계 수거장치를 알아보면 다음과 같다.Next, look for a two-stage collection device that is installed in both the downstream downstream direction of the first stage collection device 100 of the configuration as follows.

하천 양안의 각 지면에는 출력축에 양망보빈원동체인기어(224)를 조립한 감속기부착형 클러치모터(210)와 양망보빈 브라켓트(226)에 양망보빈축베어링(227)으로 축조립된 양망보빈(220)의 양망보빈축(221)에 조립된 양망보빈 종동체인기어(225)와, 상기 양만보빈 원동체인기어에 양망체인(222)을 체결시켜, 앵커볼트로 양망보빈 기초석(223)에 조립시키고, 조립되어 대향된 각 양망보빈(220)의 전측으로는 지면에 설치한 롤가이드(232) 일정높이 바닥에 롤(231)을 설치한 롤컨베이어부(230)를 설치하여, 양망보빈(220) 폭의 네트본줄(241)에 일정간격으로 부레(242)가 설치된 수거네트(240)를 양망보빈에 권취시켜 2단계 수거장치(200)를 설치완성하는 것이다.Two ground bobbins (220) which are shaft-assembled with a reduction gear-mounted clutch motor (210) with a reduction gear-mounted clutch motor (210) assembled with an output shaft on both sides of an output shaft, and a double bobbin shaft bearing (227) on a double bobbin bracket (226). And fastening the two-way bobbin driven chain gear 225 assembled to the two-way bobbin shaft 221 and the two-way bobbin driven chain gear, and then connecting the two-way chain 222 to the two-wing bobbin base stone 223 with anchor bolts. The roll conveyor 232 installed on the ground is installed on the front side of each of the assembled and opposed opposing bobbins 220, and a roll conveyor 230 having rolls 231 installed on the bottom of a predetermined height, and the width of the bobbin bobbins 220, respectively. It is to complete the installation of the second-stage collection device 200 by winding the collection net 240 installed on the net main line 241 at a predetermined interval on the bobbin 240, both wire bobbins.

본 발명에 따른 수거네트(240)의 그물코는 부유물의 종류별로 다양한 크기의 그물코로 이루어진 수거네트를 채택시켜 1단계 수거장치에서 수거하지 못한 부유물을 최종 포집하도록 하는 것이다.The mesh of the collecting net 240 according to the present invention is to adopt a collecting net consisting of various sizes of meshes for each type of floating material to finally collect the floating material that is not collected in the first-stage collecting device.

상세히는 부유물의 종류에 따라서,상기 수거네트 단일 시트상의 네트 또는 2겹 3겹의 서로 다른 그물코로 이루어진 복합시트상의 수거네트중 선택되는 어느 하나의 수거네트로 대체할 수 있음은, 본 발명이 이루고자하는 기술적인 구성수단이 동일 유사한 범주라 할 것이다.In detail, according to the type of suspended solids, it is possible to replace with any one of the collection net selected from the collection net on the single sheet of the collecting net or a composite sheet consisting of two layers of three layers of different meshes, Technical constructs will be referred to as similar categories.

상기와 같이 구성된 본 발명에 따른 부유물 수거장치를 통한 부유물수거과정을 알아보면 다음과 같다.Looking at the floating matter collection process through the floating matter collection apparatus according to the present invention configured as described above are as follows.

도 1에 도시된 바와 같이, 하천 양안의 상류에 설치하는 1단계 수거장치(100)와; 1단계 수거장치와 일정 인접거리의 하천 하류에 설치하는 2단계 수거장치(200)가 설치된 하천의 부유물 수거장치는 1단계 수거장치(100)는 하천 양안중 일측에 1개소의 원동모터부기초석(103)에 마련된 출력체인기어(101b)와 이측에 2개소의 아이들체인기어 기초석(104b)에 마련된 아이들체인기어(104)에는 어태치먼트붙이 하이피치체인(120)을 3점 설치시켜 부유물을 수거하는 과정에서 수류저항이 크게 발생하는 경우라도 안정적으로 지탱되도록 하는 것이다.As shown in FIG. 1, the first stage collection device 100 is installed upstream of both rivers; The 1st stage collection device and the 2nd stage collection device 200 installed in the downstream of the river at a certain adjacent distance are installed in the floating water collection device of the 1st stage collection device 100 on one side of the river. The process of collecting floating objects by installing three points of high pitch chains 120 with attachments on the output chain gear 101b provided at 103) and the idle chain gear 104 provided at two idler chain gear foundation stones 104b on the back side. Even if a large current flow resistance occurs in the stable to be supported.

특히, 물의 흐름방향으로 비스듬히 설치된 부유물수거구간(100A)은 물 흐름방향으로 어태치먼트붙이 하이피치체인(120)을 구동시킴으로서 부유물에 미치는 수류저항을 완화시켜 감속기(101)의 부하를 줄이도록 한 것이다.In particular, the floating water collection section 100A installed obliquely in the water flow direction is to drive the high-pitch chain 120 with attachment in the water flow direction to alleviate the water flow resistance on the floating water to reduce the load of the reducer 101.

한편, 본 발명에 따른 어태치먼트붙이 하이피치체인(120)에 일정간격 조립된 갈고리브라켓트(130)의 힌지축(143)에 조립된 갈고리(140) 끝단은 물의 흐름에 따라 전후로 유동되는 방식으로 갈고리에 포집된 부유물에 의하여 어태치먼트붙이 하이피치체인(120)에 미치는 물의 저항을 감쇄시켜 내구성을 유지시키도록 하는 것이다.On the other hand, the end of the hook 140, which is assembled to the hinge shaft 143 of the hook bracket 130, which is assembled at regular intervals on the attachment high pitch chain 120 according to the present invention to the hook in a way that flows back and forth according to the flow of water By the collected suspended matter to reduce the resistance of the water on the attachment high pitch chain 120 to maintain durability.

한편, 부유물이 포집된 상태에서 하천 지면에 일정간격 이격 설치된 2개소의 아이들체인기어 기초석(104b)에 마련된 각 아이들체인기어 보강관(104a)에 조립된 아이들체인기어(104)가 경유하는 분리집하구간(100B)은 갈고리에 의해 수거된 부유물을 하치 분리하는 작업구간으로 차양막(50a) 내부에서 이루어진다.On the other hand, in the state in which the float is collected, the separate collection via the idle chain gear 104 assembled in each idle chain gear reinforcement pipe 104a provided in the two idler chain gear foundation stones 104b spaced at regular intervals on the river surface. The section 100B is a work section for separating the floats collected by the hooks into the shade film 50a.

상기 차양막은 기둥과 지붕만 설치된 막구조물로 이루어짐이 바람직한 것으로, 우기나 장마기간에 본 수거작업이 이루어지는 점을 감안하였고, 모터 및 감속기와 같은 장치들에 대해서도 비가림막을 제공하여 부식과 누전을 방지하도록 하는 효과를 제공하는 것이다.It is preferable that the awning film is composed of a membrane structure provided with only a pillar and a roof. In view of the fact that the collection work is performed during the rainy season or the rainy season, a rain screen is also provided for devices such as a motor and a reducer to prevent corrosion and short circuit. To provide an effect.

또, 상기 분리집하구간(100B)에서는 수작업 또는 크레인(20)으로 분리수거를 마친후, 재활용품은 분리수거함(30)으로 선별처리하고 배출해 소각시키거나, 폐기기 처리될 부유물은 상차컨베이어(40)를 통해 차량(10)으로 적재시켜 배출처리하도록 한다.In addition, after the segregation collection section 100B by hand or after the separate collection by the crane 20, the recycled products are sorted and discharged by incineration of the separate collection bin 30, or the suspended solids to be disposed of are disposed on the conveyor 40 Through the loading to the vehicle 10 to be discharged.

한편, 본 발명에 따른 어태치먼트붙이 하이피치체인(120)에 설치된 부력볼(110)은 하천폭이 넓어짐에 따라, 어태치먼트붙이 하이피치체인이 수면 일정깊이 이하로 처짐을 방지하기 위해 3점 설치되는 것이다.On the other hand, the buoyancy ball 110 installed in the attachment high pitch chain 120 according to the present invention is to be installed three points to prevent the high pitch chain with attachments to sag below a certain depth of water as the river width is widened. .

본 발명에 설치 적용한 부력볼(110)은 하천에 유입되는 부유물의 종류에 따라 부력볼의 부력을 달리하여 교체가 용이하고 수하 깊이를 조정하도록 갈고리의 갈고리체결꼭지와 부력볼의 볼체결꼭지에는 소정길이의 링크체인(150) 양단에 카라비나(151)로 조립되게 한 점이 특징으로 부유물집하구간(100B)에서 부유물을 수거하면서 작업자에 의해서 부유물에의 유입종류에 따라 부력볼을 용이하게 교체가능하도록 한 것이다.The buoyancy ball 110 installed and applied to the present invention is easy to replace by changing the buoyancy of the buoyancy ball according to the type of floating water flowing into the river and the hook fastening of the hook and buoyancy ball of the buoyancy ball to adjust the depth of loading It is characterized in that the carabiner 151 is assembled at both ends of the link chain 150 of the length, so that the buoyancy ball can be easily replaced by the operator according to the type of inflow into the float while collecting the float from the float collection section 100B. will be.

참고로, 본 발명에 적용되는 어태치먼트붙이 하이피치체인(120)이나 링크체인(150),갈고리브라켓트(130),갈고리(140)등의 소재는 부식을 방지하기 위하여 소재는 스테인레스제로 구비되도록 한다.For reference, materials such as the high pitch chain 120 or the link chain 150, the hook bracket 130, the hook 140, and the like, which are applied to the present invention, are made of stainless steel to prevent corrosion.

상기와 같이, 부피가 큰 부유물들이 1단계 수거장치(100)의 갈고리(140)를 통해 1차로 연속컨베이어식으로 회전 수거되고, 부피가 작은 부유물들은 2차로 수거네트(240)가 설치된 2단계 수거장치에 의해서 연속수거시키는 것으로, 상기 2단계 수거장치는 하천 양안을 수거네트(240)가 좌우로 반복하여 횡단 양망 된다.As described above, the bulky floats are first collected in a continuous conveyor type through the hook 140 of the first-stage collection device 100, and the bulky floats are second-stage collected with the second collection net 240. By the continuous collection by the device, the two-stage collection device is cross-linked both sides of the river net 240 to the left and right repeatedly.

상기 양망보빈 기초석(223)에 각 설치된 양망보빈(220)은 2개의 감속기부착형 클러치모터(210)의 회전은 일측이 일정속도로 정방향으로 권취되는 동안 이측의 감속기부착형 클러치모터(210)도 정방향으로 일정속도로 회전되면서 수거네트(240)를 풀어주어 하천 양안을 수거네트(240)가 반복적으로 횡단 양망 되는 것으로 상기 수거네트(240)는 최대한 수면에 근접하도록 팽팽히 긴장된 상태로 회전 양망 되는 조건에서 작업이 진행되어야 한다.Each of the double bobbin 220 installed in the double bobbin base stone 223 is the rotation of the two reducer-mounted clutch motor 210, while one side is wound in the forward direction at a constant speed, the reducer-mounted clutch motor 210 is also on the other side. Loosening the collecting net 240 while being rotated at a constant speed in the forward direction, and the collecting net 240 is repeatedly crossing both streams in the river. Work should be done at.

상기 수거네트의 네트본줄(241)에 일정간격으로 설치된 부레(242)는 수거네트를 수면상에서 띄우는 부구로 양망보빈(220)의 감속기부착형 클러치모터(210)의 부하를 줄일 수 있도록 한다.The bridle 242 installed at a predetermined interval on the net line 241 of the collecting net to reduce the load of the reducer-mounted clutch motor 210 of the double bobbin 220 as a float floating on the surface of the collecting net.

본 발명에 적용된 수거네트(240)는 도면상 단일 시트상으로만 제시되였으나, 2겹 3겹의 서로 다른 그물코로 이루어진 복합 시트상의 수거네트로 임의로 교체시켜 하천에 유입되는 부유물의 종류와 크기에 따라 현지에서 교체 설치할 수 있도록 함으로서 수거효율을 높이도록 하는 것이다. The collector net 240 applied to the present invention was presented as a single sheet only in the drawings, but it was arbitrarily replaced by a composite sheet collector net consisting of two layers of three layers of different meshes, depending on the type and size of the suspended solids flowing into the stream. It is possible to improve the collection efficiency by allowing replacement installation in the field.

한편, 수거네트(240)는 하천 양안에 횡단설치하는 것으로 하천폭의 최소 2.5∼3배 범위내에 길이로 양망 방향을 좌우로 반복시켜 롤컨베이어부(230) 구간인 분리집하구간(200B)에서 작업자가 부유물을 수거하도록 하는 것으로 네트본줄(241) 양 끝단은 양망보빈(220)에 결속시키도록 한다.On the other hand, the collecting net 240 is installed in both sides of the river by repeating both sides in the direction of the length in the range of at least 2.5 to 3 times the width of the river width in the separate collection section 200B of the roll conveyor section 230 The end of the net line 241 to be to collect the float to bind to the bobbin bobbin 220.

역시, 본 발명에 따라 설치된 2단계 수거장치가 설치된 하천 양안에는 차양막(50c;50d)을 설치해 비가림이나 햇빛가림으로 작업자들의 수거작업과 감속기부착형 클러치모터(210)와 같은 구동장치의 부식이나 누전을 방지하도록 하는 것이다.In addition, the two-stage collection device installed in accordance with the present invention is installed on both sides of the river is installed the sunshade membrane (50c; 50d) by the rain or sunshine obstruction of the collection of workers and the reduction of the drive device such as the clutch motor 210 with a reduction gear or It is to prevent a short circuit.

또한, 2단계 수거장치내의 차양막(50c;50d) 내부에도 1단계수거장치의 차양막(50a)에 구비되는 크레인(20), 분리수거함(30), 상차컨베이어(40), 차량(10)등을 배치해 운용하도록 하는 것이다.In addition, the crane 20, the separate collection box 30, the loading conveyor 40, the vehicle 10, etc., which are provided in the awning film 50c of the second-stage collecting device 50c; To deploy and operate.

이상과 같이 작동운용되는 본 발명에 따른 부유물수거장치는 장마철이나 우기가 아닌 평시에는 어태치먼트붙이 하이피치체인(120)이나, 수거네트(240)를 분리해 부유물수거장치가 설치된 하천 수면을 통행하는 각종 보트의 운항이나 이용에 지장이 없도록 한 것이다. The floating water collecting device according to the present invention operated as described above is not a rainy season or rainy season in normal, high-pitch chain 120 with attachments, or collecting net 240 to pass through the water surface of the river installed floating water collection device The boat will not interfere with the operation or use of the boat.

100:1단계수거장치 200:2단계수거장치
10:차량 20:크레인
30:분리수거함 40:상차컨베이어
50a;50b;50c;50d:차양막
100A;200A:부유물수거구간 100B;200B:분리집하구간
101:감속기 101a:입력체인기어
101b:출력체인 101c:출력축보강관
102:모터 102a:원동체인기어
102b:구동체인
103:원동모터부 기초석 104:아이들체인기어
104a:아이들체인기어 보강관 104b:아이들체인기어 기초석
105:아이들체인기어축 105a:아이들체인기어축베어링
110:부력볼 111:볼체결꼭지
120:어태치먼트붙이 하이피치체인 130:갈고리브라켓트
131:체결볼트 140:갈고리
141:갈고리부싱 142:갈고리체결꼭지
143:힌지축 150:링크체인
151:카라비나
210:감속부착형클러치모터 220:양망보빈
221:양망보빈축 222:양망체인
223:양망보빈 기초석 224:양망보빈 원동체인기어
225:양망보빈 종동체인기어 226:양망보빈 브라켓트
227:양망보빈 축베어링
230:롤컨베이어부 231:롤
232:롤가이드 240:수거네트
241:네트본줄 242:부레
100: 1stage collection unit 200: 2stage collection unit
10: vehicle 20: crane
30: Waste sorting container 40: Car loading conveyor
50a; 50b; 50c; 50d: awnings
100A; 200A: Float collection section 100B; 200B: Separate collection section
101: Reducer 101a: Input Chain Gear
101b: output chain 101c: output shaft reinforcement pipe
102: motor 102a: drive chain gear
102b: Drive chain
103: basic motor drive base 104: children chain gear
104a: child chain gear reinforcement tube 104b: child chain gear basic seat
105: kids chain gear shaft 105a: kids chain gear shaft bearing
110: buoyancy ball 111: ball fastener
120: high pitch chain with attachment 130: hook bracket
131: fastening bolt 140: hook
141: hook bush 142: hook fastener
143: hinge axis 150: link chain
151: carabiner
210: deceleration type clutch motor 220: double bobbin
221: Double-wing bobbin shaft 222: Double-chain chain
223: YangYang bobbin basic stone 224: YangYang bobbin original chain gear
225: Double bobbin driven chain gear 226: Double bobbin bracket
227: Double bobbin shaft bearing
230: roll conveyor unit 231: roll
232: Roll guide 240: Collection net
241: net line 242: bure

Claims (3)

부유물수거시설장비로 차량(10), 크레인(20), 분리수거함(30), 상차컨베이어(40) 등이 구비된 하천 양안에 황단 설치하는 부유물 수거장치에 있어서,
하천 양안의 어느 한쪽 지면에는 모터(102)의 원동체인기어(102a)와; 감속기(101)의 입력체인기어(101a)에 구동체인(102b)을 체결시키고, 상기 감속기(101)의 출력체인기어(101b)는 베어링(101d)이 상하로 내재된 출력축보강관(101c)을 일정높이 돌출된 출력축(101e)에 조립시켜 앵커볼트 체결되는 원동모터부기초석(103)을 설치하고,
하천 대향편에는 기설치된 원동모터부기초석(103)이 설치된 지점과는 하류쪽으로 2개의 아이들체인기어기초석(104b)을 일정간격 설치하되, 각 설치된 아이들체인기어 기초석에는 앵커볼트로 아이들체인기어축베어링(105a)이 상하로 내재된 아이들체인기어보강관(104a)을 조립한 아이들체인기어축(105)에 아이들체인기어(104)를 조립시키고,
조립된 1개소의 출력체인기어(101b)와 2개소의 아이들체인기어(104)에는 어태치먼트붙이 하이피치체인(120)을 3점 설치시키되, 설치된 하이피체인의 어태치먼트에는 일정간격으로 체결볼트(131)로 조립한 갈고리브라켓트(130)에는 갈고리부싱(141)과 일체로 직교설치된 갈고리(140)를 힌지축(143)으로 조립시키되, 부싱 상단과 일체로 형성된 갈고리체결꼭지(142)와 일정 체적의 부력볼(110) 하방에 일체로 형성된 볼체결꼭지(111)에는 소정길이의 링크체인(150)을 카라비나(151)로 체결시켜 이루어지는 1단계 수거장치(100)와;
상기 1단계 수거장치(100)와 인접된 하천 하류방향 양안의 각 지면에는 출력축에 양망보빈원동체인기어(224)를 조립한 감속기부착형 클러치모터(210)와 양망보빈 브라켓트(226)에 양망보빈축베어링(227)으로 축조립된 양망보빈(220)의 양망보빈축(221)에 조립된 양망보빈 종동체인기어(225)와 상기 양만보빈 원동체인기어에 양망체인(222)을 체결시켜, 앵커볼트로 양망보빈 기초석(223)에 조립시키고, 대향설치된 각 양망보빈(220)의 전측으로는 지면에 설치한 롤가이드(232) 사이 일정 높이 롤(231)을 설치한 롤컨베이어부(230)가 마련되며, 양망보빈(220) 폭의 네트본줄(241)에 일정간격으로 부레(242)가 설치된 수거네트(240)를 양편의 양망보빈(220)에 권취시켜 이루어지는 2단계 수거장치(200)를 포함함을 특징으로 하는 하천의 부유물수거장치.
In the floating water collecting device to be installed in both sides of the river equipped with a vehicle 10, a crane 20, a separate collection box 30, a vehicle conveyor 40, etc. as a floating water collection equipment,
On either side of the river, the prime mover gear 102a of the motor 102; The drive chain 102b is fastened to the input chain gear 101a of the reducer 101, and the output chain gear 101b of the reducer 101 has an output shaft reinforcement pipe 101c having a bearing 101d up and down. Install the base motor unit 103, which is assembled to the anchor bolt fastened by assembling the output shaft 101e protruding a certain height,
On the opposite side of the river, two idler chain gear foundations 104b are installed at a predetermined interval downstream from the point where the pre-installed base motor 103 is installed, and each installed idler gear shaft bearing is installed with anchor bolts in the foundation chain of the idler chain gear. Assembling the idle chain gear 104 to the idle chain gear shaft 105 assembled with the idle chain gear reinforcement tube (104a) in which (105a) is embedded up and down,
The output chain gear 101b and the two idle chain gears 104 are assembled with three high pitch chains 120 with attachments, and the fastening bolts 131 are attached to the attached high pitch chains at regular intervals. The hook bracket (130) assembled with the hook hook (141) orthogonal to the hook 140 is installed integrally with the hinge shaft (143), but hook hook 142 and a fixed volume formed integrally with the bushing top Ball fasteners 111 formed integrally below the buoyancy ball 110, the first stage collection device 100 is made by fastening the link chain 150 of a predetermined length with a carabiner 151;
On both grounds in the downstream downstream direction of the first-stage collection device 100, the reduction gear-mounted clutch motor 210 and the two-way bobbin bracket 226, which assembled the two-way bobbin drive chain gear 224 on the output shaft, have both wires. The two-way bobbin driven chain gear 225 assembled to the two-way bobbin shaft 221 of the two-way bobbin 220 axially assembled with the empty shaft bearing 227 and the two-way chain 222 to the two-way bobbin motive chain gear, anchor The roll conveyor 230, which is assembled to the basic bobbin bobbin stone 223 with bolts, and has a fixed height roll 231 between the roll guides 232 installed on the ground, is provided on the front side of each of the opposing double bobbins 220 installed on the ground. The two-stage collection device 200 is formed by winding a collection net 240 having a bridle 242 installed at a predetermined interval on a net main line 241 having a width of both wire bobbins 220 on both wire bobbins 220 of both sides. Floating water collection device of the river comprising a.
삭제delete 제1항에 있어서, 수거네트(240)는 하천 양안에 횡단설치하는 것으로 하천폭의 최소 2.5∼3배 범위의 길이로 양망 방향을 좌우로 반복시켜 롤컨베이어부(230) 구간인 분리집하구간(200B)에서 작업자가 부유물을 수거하도록 함을 특징으로 하는 하천의 부유물수거장치.According to claim 1, the collecting net 240 is to be installed in both sides of the river to cross the direction of both sides to the left and right in the direction of at least 2.5 to 3 times the width of the river width separation section of the rolling conveyor section 230 ( The floating material collection device of the river, characterized in that for the worker to collect the floating material at 200B).
KR1020100122121A 2010-12-02 2010-12-02 A collect system for floating abject KR101068742B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
KR1020100122121A KR101068742B1 (en) 2010-12-02 2010-12-02 A collect system for floating abject
PCT/KR2011/008941 WO2012074240A2 (en) 2010-12-02 2011-11-23 Apparatus for collecting suspended matter in a river

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020100122121A KR101068742B1 (en) 2010-12-02 2010-12-02 A collect system for floating abject

Publications (1)

Publication Number Publication Date
KR101068742B1 true KR101068742B1 (en) 2011-09-28

Family

ID=44958052

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020100122121A KR101068742B1 (en) 2010-12-02 2010-12-02 A collect system for floating abject

Country Status (2)

Country Link
KR (1) KR101068742B1 (en)
WO (1) WO2012074240A2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104478021A (en) * 2014-12-11 2015-04-01 浙江竟成环保科技有限公司 Combined pollution source control device and method
CN107761683A (en) * 2017-11-01 2018-03-06 河北工程大学 A kind of rolling screen type water delivery open channel sewage blocking device
CN114753329A (en) * 2022-03-28 2022-07-15 平顶山市水利勘测设计院 Multifunctional river channel suspension garbage treatment device

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ITRM20130586A1 (en) * 2013-10-24 2015-04-24 Gabriele Palmieri AUTOMATIC SYSTEM FOR DETECTION AND BLOCKING OF POLLUTING SUBSTANCES LOST IN ENVIRONMENTAL SITES.
CN104790365B (en) * 2015-04-28 2017-06-06 绍兴文理学院 A kind of automatic sewage blocking device in the river course of biasing
CN106836162B (en) * 2017-04-14 2023-01-31 山东省水电设备厂 Double-rope reciprocating type ultra-deep trash remover
CN108221897A (en) * 2018-01-30 2018-06-29 刘路清 A kind of device for cleaning water surface rubbish
CN113106928A (en) * 2021-04-23 2021-07-13 白乌日娜 Water conservancy water and electricity dam water inlet floater cleaning device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200200178Y1 (en) * 2000-05-08 2000-10-16 주식회사고려선박기술 Inflow apparatus for the trash on the water
KR200255925Y1 (en) 2001-08-18 2001-12-20 남기준 a take away system for floating trash
KR200301097Y1 (en) * 2002-08-20 2003-01-24 이주희 The Equipment clean the trash on the river
KR20050032090A (en) * 2005-03-14 2005-04-06 (주)씨에스티개발 Apparatus of removal pollutant for environment

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100342850B1 (en) * 2000-02-07 2002-07-02 국천표,오의진 apparatus for removing floating trash on river
KR100596216B1 (en) * 2006-05-08 2006-07-05 (주)경동기술공사 Exclude apparatus of floating matter using river

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200200178Y1 (en) * 2000-05-08 2000-10-16 주식회사고려선박기술 Inflow apparatus for the trash on the water
KR200255925Y1 (en) 2001-08-18 2001-12-20 남기준 a take away system for floating trash
KR200301097Y1 (en) * 2002-08-20 2003-01-24 이주희 The Equipment clean the trash on the river
KR20050032090A (en) * 2005-03-14 2005-04-06 (주)씨에스티개발 Apparatus of removal pollutant for environment

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104478021A (en) * 2014-12-11 2015-04-01 浙江竟成环保科技有限公司 Combined pollution source control device and method
CN107761683A (en) * 2017-11-01 2018-03-06 河北工程大学 A kind of rolling screen type water delivery open channel sewage blocking device
CN114753329A (en) * 2022-03-28 2022-07-15 平顶山市水利勘测设计院 Multifunctional river channel suspension garbage treatment device
CN114753329B (en) * 2022-03-28 2023-08-04 平顶山市水利勘测设计院 Multi-functional river course suspension garbage treatment device

Also Published As

Publication number Publication date
WO2012074240A2 (en) 2012-06-07
WO2012074240A3 (en) 2012-07-19

Similar Documents

Publication Publication Date Title
KR101068742B1 (en) A collect system for floating abject
KR100624085B1 (en) Remove apparatus of floating mine using river
DE60226064T2 (en) Filter system for water abstraction from surface waters
JP2010248785A (en) River suspended dust automatic recovery device
MX2014006148A (en) Improvement to installation for removing pollutant materials and/or substances from watercourses.
KR20140043427A (en) Purifying point pollutants and nonpoint pollutants that completely removes and reuses or cleans various wastes and contaminants contained in river water and rainwater.
US20030010727A1 (en) Method of controlling contaminant flow into water reservoir
KR101520633B1 (en) Apparatus for eliminating floating garbage
MXPA03009186A (en) Adjustable porous structures and method for shoreline and land mass reclamation.
US20120003045A1 (en) Floating oil containment and absorbent barrier system
DE102012011491A1 (en) Underwater-compressed air-energy storage for storage of energy and for its regenerative recovery in power supply networks, has closed pressure receptacle for accommodating and storage of compressed air or such gaseous medium
KR20090099382A (en) System for removing the floating matters on the river, and the construction process for the same
KR20070076579A (en) Nature-friendly engineering method to puryfy pollouted water
KR100541071B1 (en) A removing device for floating matter using floating separator
KR20070108451A (en) Nature-friendly engineering method to puryfy pollouted water
KR20140051878A (en) A collect system for floating abject by net controlling
CN1928247B (en) Method for treating sewage of water
CN202899110U (en) Folding type watercourse garbage sweeper
BRPI0802735A2 (en) improvement in floating fence of containment of supernatant pollutants contained in watercourses
KR20140025566A (en) Nature-friendly eco-friendly method that restores natural ecosystem while purifying polluted river water by using multi-stage automatic fishery and river ecosystem restoration system
KR20070108472A (en) Nature-friendly engineering method to puryfy pollouted water
CN219586691U (en) Fence with filtering capability
CN219011151U (en) Dirt-cleaning fence
KR20070108454A (en) Nature-friendly engineering method to puryfy pollouted water
CN206427242U (en) A kind of anti-pollution vessel

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E90F Notification of reason for final refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20140919

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20150911

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20180917

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20190903