KR101002255B1 - The vehicle installation type road-marking equipment - Google Patents

The vehicle installation type road-marking equipment Download PDF

Info

Publication number
KR101002255B1
KR101002255B1 KR1020100065174A KR20100065174A KR101002255B1 KR 101002255 B1 KR101002255 B1 KR 101002255B1 KR 1020100065174 A KR1020100065174 A KR 1020100065174A KR 20100065174 A KR20100065174 A KR 20100065174A KR 101002255 B1 KR101002255 B1 KR 101002255B1
Authority
KR
South Korea
Prior art keywords
vehicle
lane
paint
road
rod
Prior art date
Application number
KR1020100065174A
Other languages
Korean (ko)
Inventor
윤원석
Original Assignee
(주)중앙건설
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)중앙건설 filed Critical (주)중앙건설
Priority to KR1020100065174A priority Critical patent/KR101002255B1/en
Application granted granted Critical
Publication of KR101002255B1 publication Critical patent/KR101002255B1/en
Priority to PCT/KR2011/004861 priority patent/WO2012005480A2/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/16Devices for marking-out, applying, or forming traffic or like markings on finished paving; Protecting fresh markings
    • E01C23/166Means for dispensing particulate material on to freshly applied markings or into the marking material after discharge thereof, e.g. reflective beads, grip-improving particles
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/004Devices for guiding or controlling the machines along a predetermined path
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/16Devices for marking-out, applying, or forming traffic or like markings on finished paving; Protecting fresh markings
    • E01C23/163Devices for marking-out, applying, or forming traffic or like markings on finished paving; Protecting fresh markings for marking-out the location of the markings; Guiding or steering devices for marking apparatus, e.g. sights
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/16Devices for marking-out, applying, or forming traffic or like markings on finished paving; Protecting fresh markings
    • E01C23/20Devices for marking-out, applying, or forming traffic or like markings on finished paving; Protecting fresh markings for forming markings in situ
    • E01C23/22Devices for marking-out, applying, or forming traffic or like markings on finished paving; Protecting fresh markings for forming markings in situ by spraying
    • E01C23/222Devices for marking-out, applying, or forming traffic or like markings on finished paving; Protecting fresh markings for forming markings in situ by spraying specially adapted for automatic spraying of interrupted, individual or variable markings

Abstract

PURPOSE: A road marking apparatus of a vehicle mounting type is provided to enable the repetitive painting works of dotted lanes to be automatically performed by vehicle movement using a distance sensor, which can sense the rotating number of the rear wheel of a vehicle. CONSTITUTION: A road marking apparatus of a vehicle mounting type comprises a first lane painting part(1), a second lane painting part(2), a third lane painting part, a fourth lane painting part, a moving body, a distance measuring unit(4) and a plurality of driving guiders(5). The painting part practices the painting of each lane on the road. The moving body moves back and forth by the hydraulic pressure in a vehicle(800) and thus the first to fourth lane painting parts can independently move in both directions of the vehicle. The distance measuring unit is connected to one side of the vehicle body and senses the rotating number of the rear wheel(810) of the vehicle to define the painted length of the dotted lane. The driving guider is connected to the front bumper(802) of the vehicle and thus the position of a pre-marked guide line on the road can be recognized when the vehicle runs.

Description

차량 장착형 도로표시장치{The vehicle installation type road-marking equipment}Vehicle installation type road-marking equipment

본 발명은 도로표시장치에 관한 것으로, 더욱 상세하게는 단번의 도로주행만으로도 3개의 차로가 형성될 수 있도록 도로상에 4개 차선의 동시 마킹(도색)이 가능한 차량 장착형 도로표시장치에 관한 것이다.
The present invention relates to a road marking apparatus, and more particularly, to a vehicle-mounted road marking apparatus capable of simultaneously marking (painting) four lanes on a road so that three lanes can be formed by only one road driving.

도로(道路, Road)라 함은, 사람·차 따위가 다닐 수 있도록 만들어 놓은 비교적 넓은 길을 지칭하는 것으로써, 태고로부터 인류와 함께 발전하여 현재의 고속도로(高速道路, Expressway)에 이르기까지 근대화되어 왔으며, 교통체계(交通體系) 중에서 특히 우리의 생활에 중요한 교통시설이다.Road refers to a relatively wide road made for people and cars, and it has been modernized from ancient times to the present Expressway. It is an important transportation facility in our lives, especially in the transportation system.

이러한 도로에는, 교통에 대한 경계규제나 안내목적으로 노면(路面)에 도로표시(道路表示, Road-marking)가 이루어지게 마련이다. 특히나, 안전표지에 의한 차선도색(車線塗色, Lane painting)을 통하여 차마(車馬, 이하 "차량"이라 함)가 한 줄로 정해진 부분을 통행하도록 구분하는 하나 이상의 차로(車路)가 형성된다.On these roads, road marking is made on the road surface for the purpose of limiting traffic and guiding purposes. In particular, one or more lanes are formed through lane painting by means of safety signs to separate passages through one line. .

한편, 상기한 차선(車線, Lane)은, 도로의 중앙에 표시되어 주행방향을 양방향으로 분리하기 위한 중앙선(中央線, Center line) 및 일 방향으로 주행하는 차로를 구분하는 주행선(走行線, Driving lane)으로 크게 구분되며, 이 밖에도 노견선(路肩線, 갓길)·표시선(表示線)·주차선(駐車線) 등등이 있다.On the other hand, the lane is a driving line that is displayed at the center of the road and divides the center line for separating the driving direction in both directions and the lane driving in one direction. It is divided into lanes, and there are also road tracks, shoulders, indicator lines, and parking lines.

최초의 차선도색 작업공정은, 수레식 도료마킹기를 작업자가 직접 끌고 다니면서 도로상에 차선을 도색하는 작업과정을 취해 왔으나, 이 경우 빠르게 질주하는 차량과의 충돌사고로 작업자가 자칫 목숨을 잃을 수도 있는 인명피해의 발생은 물론 작업인력 추가 고용에 따른 작업인력의 낭비 및 작업진행의 신속성 결여로 인한 공사기간의 장기화를 초래해 왔다.The first lane painting process has been the process of painting a lane on the road while the operator pulls the cart paint marker directly, but in this case, the worker may lose his life due to a collision with a fast-paced vehicle. It has resulted in prolonged construction period due to the occurrence of casualties, waste of workforce due to the hiring of additional workforces and lack of speedy progress.

이러한 제반문제점을 다소나마 해결하기 위하여, 국내등록실용신안 제1995-0001656호를 통해, 차량을 이용한 작업의 신속성 증대와 더불어 차선 폭의 조절이 용이한 차선 도색차량의 노즐위치 조절장치가 개시된바 있다.In order to solve this problem to some extent, through the registration of Korea Utility Model No. 1995-0001656, the nozzle position adjustment device of the lane-painted vehicle is easy to increase the speed of work using the vehicle and to easily adjust the width of the lane .

도 1a는 종래 기술에 따른 노즐위치 조절장치가 장착된 도색차량을 나타낸 측면도이고, 도 1b는 종래 기술에 따른 노즐위치 조절장치의 주요구성을 나타낸 요부사시도이다.Figure 1a is a side view showing a painting vehicle equipped with a nozzle position adjusting device according to the prior art, Figure 1b is a main perspective view showing the main configuration of the nozzle position adjusting device according to the prior art.

상기한 노즐위치 조절장치(900)는, 도 1a 및 도 1b에 도시된 바와 같이, 차체에 고정 설치되는 한 쌍의 플레이트(911)와, 상기 플레이트(911)에 일단부가 힌지되는 아암(912)을 보유하고, 상기 아암(912)은 상기 플레이트(911)에 일단부가 고정설치된 승강실린더(913)에 의해 상,하로 연동되며, 상기 아암(912)의 자유단에는 보조바퀴(914)가 설치된 승강기구(910)와, 상기한 보조바퀴(914)를 둘러 쌓은 요크(921)의 상면에 고정설치되는 수평실린더(920)와, 상기 수평실린더(920)에서 연장된 로드(931)를 갖춘 수평이동기구(930)와, 상기한 로드(931)에 관통현수되는 블럭(940)과, 상기 블럭(940)에 수직으로 관통연장되는 한 쌍의 안내봉(951) 및 나사봉(952)을 보유하되, 상기 안내봉(951)들의 양단은 각각 상판(961)과 하판(962)에 연결고정되고, 상기 나사봉(952)은 상판(961)을 관통하여 축 지지되어 손잡이(963)와 연결된 차선폭조절기구(960)로 이루어진다.As shown in FIGS. 1A and 1B, the nozzle position adjusting device 900 includes a pair of plates 911 fixed to the vehicle body and an arm 912 having one end hinged to the plate 911. The arm 912 is interlocked up and down by an elevating cylinder 913, one end of which is fixed to the plate 911, and an auxiliary wheel 914 is installed at the free end of the arm 912. Horizontal movement with a sphere 910, a horizontal cylinder 920 fixed to the upper surface of the yoke 921 surrounding the auxiliary wheel 914, and a rod 931 extending from the horizontal cylinder 920 And a mechanism 930, a block 940 penetrating the rod 931, a pair of guide rods 951 and a screw rod 952 extending perpendicularly to the block 940. Both ends of the guide rods 951 are fixed to the upper plate 961 and the lower plate 962, respectively, and the screw rod 952 penetrates through the upper plate 961. It is not composed of a handle (963) associated with the lane width adjustment mechanism (960).

종래 기술에 따르면, 차량에 탑승한 운전자가 운전석에 설치된 컨트롤러(도시하지 않음)를 조작하여 상기 승강실린더(913)의 로드 및 수평실린더(920)의 로드(931)를 각각 진,퇴시키게 된다.According to the related art, a driver in a vehicle manipulates a controller (not shown) installed in a driver's seat to move the rod of the lifting cylinder 913 and the rod 931 of the horizontal cylinder 920, respectively.

즉, 상기 승강실린더(913)의 로드를 통해서는 상기 플레이트(911)에 힌지결합된 상기 아암(912)의 자유단을 하강시켜 상기 보조바퀴(914)가 노면에 접지되도록 하고, 상기 수평실린더(920)의 로드(931)를 통하여는 그에 현수된 차선폭조절기구(960)가 차체로부터 원접(遠接)하거나 근접(近接)하도록 한다.That is, the free wheel of the arm 912 hinged to the plate 911 is lowered through the rod of the lifting cylinder 913 so that the auxiliary wheel 914 is grounded on the road surface, and the horizontal cylinder ( Through the rod 931 of the 920, the lane width adjustment mechanism 960 suspended thereon is distant from or close to the vehicle body.

여기서, 노즐이 장착된 상기 차선폭조절기구(960)가 차량 양측에 각각 설치된 배치구조임에 따라, 결국 차선과 차선의 사이 공간(폭)을 임의조정할 수 있는 것이다.Here, the lane width adjusting mechanism 960 equipped with the nozzles are arranged on both sides of the vehicle, so that the space (width) between the lane and the lane can be arbitrarily adjusted.

하지만, 차체의 양측으로부터 각각 단일 차선의 도색만 가능한 관계로 차로 역시 도로상에 하나만 형성될 수밖에 없어, 넓은 도로상에 다수의 차선을 도색하기 위하여는 동일 구간을 반복 주행해야만 하는 번거로움이 있다.However, since only one lane can be painted from both sides of the vehicle body, only one lane can be formed on the road. Therefore, in order to paint multiple lanes on a wide road, it is troublesome to repeatedly travel the same section.

또한, 상기 차선폭조절기구(960)가 상기의 보조바퀴(914)로부터 원거리에 위치된 관계로 인해, 차량주행을 통한 차선도색 작업시 노면으로부터 발생한 충격(진동) 및 차선폭조절기구(960)로부터 발생한 하중으로 상기 로드(931)가 상,하로 심하게 흔들리거나 아래로 처지는 휨변형(Bending deformation)에 의한 상기 수평실린더(920)의 고장유발과 아울러 상기 로드(931)가 흔들릴 경우 차선폭조절기구(960)에 함께 장착된 노즐도 덩달아 흔들려 차선의 도색 폭이 일률적이지 못한 문제점이 발생한다.In addition, due to the relationship between the lane width adjustment mechanism 960 located at a distance from the auxiliary wheel 914, the impact (vibration) and lane width adjustment mechanism 960 generated from the road surface during the lane painting operation through vehicle driving. Lane width adjustment mechanism when the rod 931 is shaken as well as failure of the horizontal cylinder 920 due to bending deformation in which the rod 931 is severely shaken up or down by the load generated from The nozzles mounted together at 960 also wiggle, resulting in a problem that the lane width is not uniform.

이와 함께, 상기 손잡이(963)의 수동조작에 의해서만 노즐의 높낮이 조절이 가능함에 따라 차선 폭 조절시 차량주행을 잠시 멈추어야만 하는 한편, 차선의 도색범위 설정을 위한 측정장비의 미구비로 차선도색 작업 이전에 도색거리를 미리 표기해 두어야 하는 부가작업으로 작업시간이 지체될 수밖에 없는 폐단이 뒤따랐다.
In addition, as the height of the nozzle can be adjusted only by manual operation of the handle 963, the vehicle must be stopped for a while when the lane width is adjusted, and the lane painting operation is performed due to the lack of measuring equipment for setting the paint range of the lane. Previously, the additional work that had to be marked with the painting distance was followed, which resulted in the delay of working hours.

본 발명의 목적은 상기와 같은 제반 문제점을 해결하기 위한 것으로, 차체 양측으로부터의 진출작용으로 다수의 차선도색부를 각 차선의 도색위치까지 각각 독립적으로 이동배치시키기 위한 이격동체를 구비하여, 도로 특성에 따라 다양한 차선도색 작업을 용이케 하면서도 단번의 차량주행만으로도 최대 3차로를 도로상에 형성 가능토록 한 차량 장착형 도로표시장치를 제공함에 있다.SUMMARY OF THE INVENTION An object of the present invention is to solve the above-mentioned problems, and is provided with a spaced body for independently moving and arranging a plurality of lane paint parts to the paint position of each lane by the advancing action from both sides of the vehicle body. Accordingly, the present invention provides a vehicle-mounted road marking device that facilitates a variety of lane painting operations and allows a maximum of three lanes to be formed on a road with only one driving.

본 발명의 다른 목적은, 차량주행을 통한 차선도색 작업의 시작과 동시에 노면에 고압기체를 분사하는 기체분사노즐 및 차량 후륜의 회전수 감지를 위한 거리측정기의 추가 구비로, 차선도색 과정 직전에 도로상에 남아있는 이물질의 제거와 함께 차량의 주행거리 측정에 따른 점선형 차선의 도색작업을 용이하게 실시할 수 있도록 한 차량 장착형 도로표시장치를 제공함에 있다.
Another object of the present invention is the addition of a gas injection nozzle for injecting a high-pressure gas on the road surface and a distance measuring device for detecting the rotational speed of the vehicle rear wheel at the same time as the start of the lane painting operation by driving the vehicle, the road immediately before the lane painting process The present invention provides a vehicle-mounted road marking apparatus which can easily carry out painting work of a dotted line lane according to a mileage measurement of a vehicle together with removal of foreign matter remaining on the vehicle.

상기한 목적을 달성하기 위하여 본 발명은, 운전자에 의한 차량주행으로 차선도색 작업을 실시하는 통상의 차량 장착형 도로표시장치에 있어서, 상기 차량의 차체 좌측으로부터 우선 진출이동 배치된 상태로, 도로의 중앙선 또는 좌측 첫 번째 차선의 도색을 위한 1차선도색부와; 상기 1차선도색부에 이어 차체 좌측으로부터 추가 진출이동 배치된 채로, 좌측 두 번째 차선의 도색을 통해 도로상에 1차로가 형성되도록 한 2차선도색부와; 상기 차량의 차체 우측으로부터 우선 진출이동 배치된 상태로, 차로와 갓길의 경계선이나 도로상 우측 첫 번째 차선의 도색을 위한 4차선도색부와; 상기 4차선도색부에 이어 차체 좌측으로부터 추가 진출이동 배치된 채로, 좌측 세 번째 차선의 도색을 통해 도로상에 2,3차로가 구분 형성되도록 한 3차선도색부와; 상기 차량의 차체 내에서 유압으로 진,퇴 작용하여, 상기 1,2,3,4차선도색부가 차체 양방향으로 각각 독립 진출,입 이동 배치 가능케 하는 이격동체와; 상기 차량의 차체 일측에 구비결합된 상태로, 차량 후륜의 회전수를 감지하여 점선형 차선의 도색길이를 설정토록 한 거리측정기와; 그리고, 상기 차량의 프론트범퍼에 구비결합됨으로써, 차량주행시 노면에 미리 표기한 가이드라인의 위치를 파악할 수 있게 하는 복수의 주행가이더;를 포함하여 구성된 것을 특징으로 한다.
In order to achieve the above object, the present invention is a vehicle-mounted road display device for performing a lane painting operation by driving a vehicle, the center line of the road in the state that the first move forward is arranged from the left side of the vehicle body of the vehicle Or a first lane painting unit for painting the left first lane; A second lane painting unit configured to form a primary road on the road through the painting of the second lane on the left side while being further moved from the left side of the vehicle body after the first lane painting unit; A four-lane painting unit configured to firstly move outward from the right side of the vehicle body and to paint the boundary between the lane and the shoulder or the first lane on the right side of the vehicle; A three-lane painting unit configured to separate two or three lanes on the road through the painting of the third lane on the left side while being further moved from the left side of the vehicle body after the four-lane painting unit; A spaced body that allows the 1,2,3,4 lane paint parts to independently move in and out of the vehicle body in both directions by moving forward and backward hydraulically in the vehicle body; A distance measuring device configured to detect the number of revolutions of the rear wheels of the vehicle and set the painted length of the dotted line lane in a state of being coupled to one side of the vehicle body; And, by being coupled to the front bumper of the vehicle, a plurality of driving guides to determine the position of the guideline marked in advance on the road surface when driving the vehicle; characterized in that it comprises a.

이상의 설명에서 분명히 알 수 있듯이, 본 발명의 차량 장착형 도로표시장치는, 1,2,3,4차선도색부를 이용한 멀티 차선의 도색작업을 통하여, 최소 1차로부터 최대 3차로 형성에 이르기까지 다양한 차선도색작업의 도모와 같은 작업의 우수성 증대효과를 발휘한다.As apparent from the above description, the vehicle-mounted road marking apparatus of the present invention has various lanes ranging from the minimum primary to the maximum three lanes through the multi-lane painting operation using the 1,2,3,4 lane painting units. It has the effect of increasing the excellence of the work such as planning the painting work.

또한, 차량 후륜의 회전수 감지가 가능한 거리측정기를 이용하여, 동일한 도색길이를 갖는 점선형 차선의 반복적 도색작업을 인력을 동원하지 않고도 차량주행만으로도 무인자동화로 실시할 수 있음에 따른 인건비 절감 및 작업의 신속성을 나타내는 효과가 있다.In addition, by using a distance measuring device capable of detecting the number of revolutions of the rear wheel of the vehicle, it is possible to reduce the labor cost and work as the repetitive painting work of the dashed lanes having the same painting length can be performed by unmanned automation only without driving personnel. This has the effect of indicating the rapidity.

이와 함께, 1,2,3,4차선도색부마다 황색과 백색 그리고 수용성과 유용성 도료를 구분하여 분사시킬 수 있는 도료분사기의 구비로, 도로 특성에 따라 그에 적합한 공법적용으로 작업의 효율성을 극대화할 수 있는 아주 유용한 발명이다.
In addition, it is equipped with a paint sprayer that can spray yellow, white, water-soluble and oil-soluble paints for each of 1,2,3,4 lane paint parts, and maximize the efficiency of work by applying the appropriate method according to the characteristics of the road. It is a very useful invention.

도 1a는 종래 기술에 따른 노즐위치 조절장치가 장착된 도색차량을 나타낸 측면도.
도 1b는 종래 기술에 따른 노즐위치 조절장치의 주요구성을 나타낸 요부사시도.
도 2a 내지 도 2c는 본 발명에 따른 도로표시장치가 차량에 장착된 상태를 나타낸 측면도 및 정면도.
도 3은 본 발명에 따른 차량 장착형 도로표시장치에 있어서, 1차선도색부 및 4차선도색부의 상세구조를 나타낸 요부확대사시도.
도 4는 본 발명에 따른 차량 장착형 도로표시장치에 있어서, 2차선도색부 및 3차선도색부의 상세구조를 나타낸 요부확대사시도.
도 5는 본 발명에 따른 차량 장착형 도로표시장치에 있어서, 거리측정기의 상세구조를 나타낸 요부확대도.
도 6은 본 발명에 따른 차량 장착형 도로표시장치에 있어서, 주행가이더의 상세구조를 나타낸 요부확대사시도.
도 7a는 본 발명에 따른 차량 장착형 도로표시장치에 있어서, 도료분사기의 높낮이 조절관계를 나타낸 요부확대도.
도 7b는 본 발명에 따른 차량 장착형 도로표시장치에 있어서, 비드분사건의 높낮이 조절관계를 나타낸 요부확대도.
도 8a 내지 도 8c는 본 발명에 따른 차량 장착형 도로표시장치의 실시단계를 나타낸 사용상태도.
도 9는 본 발명에 따른 차량 장착형 도로표시장치의 다른 실시예를 나타낸 사용상태도.
Figure 1a is a side view showing a painting vehicle equipped with a nozzle position adjusting device according to the prior art.
Figure 1b is a main portion perspective view showing the main configuration of the nozzle position adjusting device according to the prior art.
2A and 2C are side and front views illustrating a state in which a road display apparatus according to the present invention is mounted on a vehicle.
Figure 3 is an enlarged perspective view of the main portion showing the detailed structure of the first lane paint portion and the four lane paint portion in the vehicle-mounted road display device according to the present invention.
Figure 4 is an enlarged perspective view of the main portion showing the detailed structure of the two-lane paint portion and the three-lane paint portion in the vehicle-mounted road display device according to the present invention.
Figure 5 is an enlarged view of the main portion showing the detailed structure of the range finder in the vehicle-mounted road display device according to the present invention.
Figure 6 is an enlarged perspective view of the main portion showing the detailed structure of the driving guide in the vehicle-mounted road display device according to the present invention.
7A is an enlarged view illustrating main parts of a height control relationship of a paint sprayer in a vehicle-mounted road marking apparatus according to the present invention;
7B is an enlarged view illustrating main parts of a height control relationship of a bead injection event in a vehicle-mounted road marking apparatus according to the present invention;
8a to 8c is a use state diagram showing an embodiment of the vehicle-mounted road marking apparatus according to the present invention.
9 is a use state diagram showing another embodiment of the vehicle-mounted road display device according to the present invention.

이하, 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자가 본 발명을 용이하게 실시할 수 있을 정도로 본 발명의 바람직한 실시 예를 첨부된 도면을 참조하여 상세하게 설명하면 다음과 같다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings such that those skilled in the art may easily implement the present invention.

첨부도면 중 도 2a 내지 도 2c는 본 발명에 따른 도로표시장치가 차량에 장착된 상태를 나타낸 측면도 및 정면도이고, 도 3은 본 발명에 따른 차량 장착형 도로표시장치에 있어서 1차선도색부 및 4차선도색부의 상세구조를 나타낸 요부확대사시도이며, 도 4는 본 발명에 따른 차량 장착형 도로표시장치에 있어서 2차선도색부 및 3차선도색부의 상세구조를 나타낸 요부확대사시도이고, 도 5는 본 발명에 따른 차량 장착형 도로표시장치에 있어서 거리측정기의 상세구조를 나타낸 요부확대도이며, 도 6은 본 발명에 따른 차량 장착형 도로표시장치에 있어서 주행가이더의 상세구조를 나타낸 요부확대사시도이고, 도 7a는 본 발명에 따른 차량 장착형 도로표시장치에 있어서 도료분사기의 높낮이 조절관계를 나타낸 요부확대도이며, 도 7b는 본 발명에 따른 차량 장착형 도로표시장치에 있어서 비드분사건의 높낮이 조절관계를 나타낸 요부확대도이고, 도 8a 내지 도 8c는 본 발명에 따른 차량 장착형 도로표시장치의 실시단계를 나타낸 사용상태도이며, 도 9는 본 발명에 따른 차량 장착형 도로표시장치의 다른 실시예를 나타낸 사용상태도이다.2A through 2C are side and front views illustrating a state in which a road display apparatus according to the present invention is mounted on a vehicle, and FIG. 3 is a first lane painting unit and a 4 lane in a vehicle mounted road display apparatus according to the present invention. An enlarged perspective view of the main part showing the detailed structure of the paint portion, Figure 4 is an enlarged perspective view of the main portion showing the detailed structure of the two-lane paint portion and the three-lane paint portion in the vehicle-mounted road display device according to the invention, Figure 5 Fig. 6 is an enlarged view showing the detailed structure of the distance measuring device in the vehicle-mounted road display device, and Fig. 6 is an enlarged perspective view showing the detailed structure of the driving guider in the vehicle-mounted road display device according to the present invention. In the vehicle-mounted road marking apparatus according to the present invention, there is shown an enlarged part showing a height control relationship of the paint sprayer, and FIG. 7B shows a vehicle according to the present invention. 8 is an enlarged view illustrating a height control relationship of a bead injection event in a mounted road display device, and FIGS. 8A to 8C are use state diagrams showing implementation steps of the vehicle-mounted road display device according to the present invention, and FIG. The use state diagram showing another embodiment of the vehicle-mounted road display device according to.

도 2a 내지 도 2c에 도시된 바와 같이, 본 발명에 따른 차량 장착형 도로표시장치는, 차량의 차체 좌측으로부터 우선 진출이동 배치된 상태로 도로의 중앙선 또는 좌측 첫 번째 차선의 도색을 위한 1차선도색부(1)와, 상기 1차선도색부(1)에 이어 차체 좌측으로부터 추가 진출이동 배치된 채로 좌측 두 번째 차선의 도색을 통해 도로상에 1차로가 형성되도록 한 2차선도색부(2)와, 상기 차량의 차체 우측으로부터 우선 진출이동 배치된 상태로 차로와 갓길의 경계선이나 도로상 우측 첫 번째 차선의 도색을 위한 4차선도색부(1-1)와, 상기 4차선도색부(1-1)에 이어 차체 좌측으로부터 추가 진출이동 배치된 채로 좌측 세 번째 차선의 도색을 통해 도로상에 2,3차로가 구분 형성되도록 한 3차선도색부(2-1)와, 상기 차량의 차체 내에서 유압으로 진,퇴 작용하여 상기 1,2,3,4차선도색부(1)(2)(2-1)(1-1)가 차체 양방향으로 각각 독립 진출,입 이동 배치 가능케 하는 이격동체(3)와, 상기 차량의 차체 일측에 구비결합된 상태로 차량 후륜의 회전수를 감지하여 점선형 차선의 도색길이를 설정토록 한 거리측정기(4)와; 그리고, 상기 차량의 프론트범퍼에 구비결합됨으로써 차량주행시 노면에 미리 표기한 가이드라인의 위치를 파악할 수 있게 하는 복수의 주행가이더(5)로 구성된다.As shown in Figure 2a to 2c, the vehicle-mounted road display device according to the present invention, the first lane paint portion for painting the center line of the road or the first lane on the left in the state of firstly moved out from the left side of the vehicle body (1), and a two-lane paint section (2) in which a first lane is formed on the road through the painting of the second lane on the left side with the additional lane moving from the left side of the vehicle following the first lane paint section (1); The four-lane paint section 1-1 and the four-lane paint section 1-1 for painting the boundary lines of the lanes and shoulders or the first lane on the road in a state of firstly moving out from the right side of the vehicle body of the vehicle. Subsequently, the three-lane paint section 2-1 which separates the second and third lanes on the road through the painting of the third lane on the left side with the additional advance movement arranged from the left side of the vehicle body, and hydraulically in the vehicle body 1,2, 3 and 4 lane paint parts (1) (2) (2-1) (1-1) are separately coupled to the vehicle body on one side of the vehicle and a spaced body (3) allowing independent advancement and entrance movement of the vehicle in both directions. A distance measuring unit (4) configured to detect the number of revolutions of the rear wheel of the vehicle and to set the painting length of the dotted line lane in a closed state; In addition, the plurality of driving guides 5 are coupled to the front bumper of the vehicle so as to determine the position of the guideline previously marked on the road surface when the vehicle is driven.

여기서, 차선도색을 위한 각종 재료와 장비는 상기 차량(800)의 적재함에 탑재되는바, 도료(塗料, Paint and varnish)가 저장되는 도료탱크(810), 글라스비드(Glass beads)가 저장되는 비드탱크(820), 상기 도료탱크(810) 내에 저장된 도료가 일정 점도(Coefficient of viscosity)를 유지하도록 가열 용융(鎔融, Melting)시키기 위한 보일러(830), 용융된 도료를 임시저장 후 상기 1,2,3,4차선도색부(1)(2)(2-1)(1-1)로 공급하게 된 챔버(840), 압축공기의 생성 후 상기 1,2,3,4차선도색부(1)(2)(2-1)(1-1)로 공급하는 콤프레셔(850), 도료의 분출 및 상기 이격동체(3) 구동을 위한 압력유가 저장된 유압탱크(860), 상기 챔버(840)의 내부압력 편차유발을 통해 도료의 분사량을 조절토록 한 에어리스펌프(870), 운전자가 장치 전반을 제어할 수 있게 차량 운전석에 설치된 통합컨트롤러(880), 각종 압력 측정 및 조절을 위한 게이지컨트롤러(890)를 포함한다.Here, various materials and equipment for lane painting are mounted in the loading box of the vehicle 800, a paint tank 810 in which paint and varnish are stored, and beads in which glass beads are stored. The tank 820, the boiler 830 for melting the paint stored in the paint tank 810 to maintain a constant viscosity (Coefficient of viscosity), after temporarily storing the molten paint 1, Chamber 840, which is supplied to the 2,3,4 lane paint section (1) (2) (2-1) (1-1), after the generation of the compressed air. 1) Compressor 850 for supplying to (2) (2-1) (1-1), hydraulic tank 860 in which pressure oil for ejecting paint and driving the spaced body 3 is stored, and the chamber 840 Air pressure pump 870 to adjust the injection volume of the paint through the variation of the internal pressure of the controller, the integrated controller 880 installed in the driver's seat so that the driver can control the overall device, various pressure measurement and A gauge controller 890 for adjustment.

한편, 상기 도료탱크(810)와 비드탱크(820)는, 차선을 도색하는 도로의 특성에 따라 도료 및 글라스비드를 수용성(水溶性)과 유용성(油溶性)으로 각각 구분하여 저장한다.On the other hand, the paint tank 810 and the bead tank 820, the paint and the glass bead according to the characteristics of the road to paint the lane and stores the water and water (soluble), respectively.

더하여, 상기 도료탱크(810) 내에 저장된 도료가 상기 보일러(830)와 챔버(840)를 거쳐 상기 1,2,3,4차선도색부(1)(2)(2-1)(1-1)로 각각 공급되도록 하는 다수의 도료공급호스(H-1)가 연결되고, 상기 비드탱크(820)에 저장된 글라스비드를 상기 1,2,3,4차선도색부(1)(2)(2-1)(1-1)로 공급하게 된 다수의 비드공급관(H-2)이 연결되며, 상기 콤프레셔(850)에 의해 생성된 압축공기를 상기 에어리스펌프(870)와 상기 1,2,3,4차선도색부(1)(2)(2-1)(1-1)로 공급하기 위한 다수의 기체공급호스(H-3)가 연결됨이 바람직하다.In addition, the paint stored in the paint tank 810 passes through the boiler 830 and the chamber 840 to the 1,2,3,4 lane paints (1) (2) (2-1) (1-1). A plurality of paint supply hoses (H-1) to be supplied to each of the plurality of paint supply hoses (H-1) are connected to the glass beads stored in the bead tank (820) in the 1,2,3,4 lane paints (1) (2) (2). A plurality of bead supply pipe (H-2) to be supplied to the (-1) (1-1) is connected, the compressed air generated by the compressor 850 and the airless pump 870 and 1,2,3 Preferably, a plurality of gas supply hoses H-3 for supplying to the four-lane paint unit 1, 2, 2-1, and 1-1 are connected.

아울러, 상기 차량(800)의 적재함에는 도로공사 현황을 나타내기 위한 경광등(L)과 상황판(B)이 전,후방 각각에 더 설치됨이 바람직하다.In addition, in the loading box of the vehicle 800, the warning light (L) and the status plate (B) for indicating the road construction status is preferably installed in each of the front and rear.

1,2,3,4차선도색부(1)(2)(2-1)(1-1)는, 상기 이격동체(3)에 연계장착되는 위치 및 구조적인 형상만 상이할 뿐 구성관계가 동일한바, 차량 차체의 좌측 및 우측에 각각 배치되고 상기 이격동체(3)에 연계장착된 상태로 상기 이격동체(3)의 작동시 차체의 각 좌,우로부터 진출,입 이동배치 가능케 된 베이스암(11)(21)과, 상기 베이스암(11)(21)의 일측 선단에 힌지결합됨에 따라 타 선단이 상,하 회전을 이루게 된 회동암(12)(21)과, 상기 회동암(12)(21)의 회동 선단에 일체로 형성되되, 도로상에 밀착시 노면을 타고 도는 회동륜(131)(231)을 구비한 륜하우징(13)(23)으로 구성된다.The 1,2,3,4 lane paint parts (1) (2) (2-1) (1-1) differ only in the position and structural shape which are mounted and mounted in the spaced body (3). The same base bar is arranged on the left side and the right side of the vehicle body, and the base arm is enabled to move in and out from each of the left and right sides of the vehicle body when the spaced body 3 is operated in a state of being connected to the spaced body 3. (11) (21), the rotational arm (12) (21) and the pivoting arm (12) where the other end is rotated up and down as the hinge is coupled to one end of the base arm (11) (21) It is formed integrally with the rotational tip of the (21), it is composed of a wheel housing (13, 23) having a rotation wheel (131, 231) to ride on the road surface in close contact with the road.

또한, 상기 베이스암(11)(21)의 상측에 몸체부 말단이 힌지결합되고 상기 회동암(12)(22)의 하부 일단에 로드 선단이 연계결합됨으로써 고압기체의 주입시 진,퇴 작용하는 상기 로드를 이용하여 상기 륜하우징(13)(23)의 상,하 이동을 이룰 수 있도록 한 제1공압실린더(14)(24)와, 상기 륜하우징(13)(23)의 외측 전방에 구비된 상태로 상기 유압탱크(860)로부터 공급된 고압기체의 분사를 통해 도료분사 직전 노면 상의 각종 이물질을 날려보내는 기체분사노즐(15)(25)과, 상기 륜하우징(13)의 외측에 더 구비된 채로 상기 챔버(840)로부터 공급된 도료를 분출시키는 차선도색을 위한 도료분사기(16)(26)와, 상기 륜하우징(13)(23)의 외측 후방에 구비된 상태에서 도료표면의 보호 및 차선의 시인성(Visibility) 증대목적으로 도색된 차선 위에 글라스비드를 분사하는 비드분사건(17)(27)과, 상기 도료분사기(16)(26)의 전동식 높낮이 조절을 통한 도료 분사범위 변화에 따른 차선도색의 폭을 달리하기 위한 제1높이조절구(18)(28)와, 상기 비드분사건(17)(27)의 수동식 높낮이 조절로 글라스비드의 분사범위를 변경할 수 있는 제2높이조절구(19)(29)로 구성된다.In addition, the end of the body portion is hinged to the upper side of the base arm (11) (21) and the rod end is coupled to the lower end of the pivot arm (12) (22) by the forward and retracting action of the injection of high-pressure gas First pneumatic cylinders (14) and (24) to achieve the up and down movement of the wheel housings (13) and (23) by using the rod, and provided in the outer front of the wheel housings (13) (23) Gas injection nozzles (15) and (25) for blowing out various foreign substances on the road surface immediately before paint spraying through the injection of the high pressure gas supplied from the hydraulic tank (860), and the outer side of the wheel housing (13). Protection of the paint surface in a state of being provided on the outer rear of the paint sprayer (16) and (26) for lane painting to eject the paint supplied from the chamber (840) with Bead Injection (17) Spraying Glass Beads on Painted Lanes to Increase Lane Visibility (17 (27), the first height adjusting holes (18) and (28) for varying the width of the lane paint according to the paint spraying range change through the electric height adjustment of the paint sprayer (16, 26), and the bead Manual height adjustment of the spray guns (17, 27) is composed of a second height adjustment port (19, 29) that can change the injection range of the glass bead.

그리고, 상기 베이스암(11)의 최상단과 상기 베이스암(21)의 중앙부에는, 상기 이격동체(3)와의 연결조립을 위한 결착브래킷(111)(211)이 각각 구비결합되고, 상기 회동암(12)(22) 각각의 일측단에는 상기 제1공압실린더(14)(24)의 로드 선단을 연계결합하기 위한 힌지편(122)(222)이 돌출형성되어 있다.And, at the top end of the base arm 11 and the central portion of the base arm 21, binding brackets 111 and 211 for connection assembly with the spaced body 3 are respectively provided and coupled, the rotation arm ( 12 and 22, hinge pieces 122 and 222 for interlocking the rod ends of the first pneumatic cylinders 14 and 24 are protruded.

상기 1,4차선도색부(1)(1-1)의 도료분사기(16)는, 도로상 중앙선과 같은 좌측 첫 번째 차선 또는 갓길 경계선과 같은 우측 첫 번째 차선의 도색을 목적으로, 도 3에 도시된 바와 같이, 황색 도료와 백색 도료를 분리 배출시킬 수 있도록 한 복수의 제1솔레노이드밸브(161) 및 제2솔레노이드밸브(162)로 구성됨과 더불어, 상기 제1,2솔레노이드밸브(161)(162) 각각의 하단부에는 도료의 고압분사를 위한 도료분사노즐(161-1)(162-1)이 각각 더 구비결합되어 있다.The paint spraying machine 16 of the 1,4 lane painting unit (1) (1-1) is shown in FIG. 3 for the purpose of painting the first left lane such as a center line on the road or the right first lane such as a shoulder boundary. As shown, the first and second solenoid valves 161 and the second solenoid valve 162 and the first and second solenoid valves 161 to separate and discharge the yellow paint and the white paint, as well as the first and second solenoid valves 161 ( Each of the lower end portions of the paint spray nozzles 161-1 and 162-1 for high-pressure spraying of the paint is further provided.

반면, 상기 2,3차선도색부(2)(2-1)의 도료분사기(26)는, 도 4에 도시된 바와 같이, 백색 도료를 배출시키기 위한 제3솔레노이드밸브(261-1)로 구성함과 아울러, 상기 제1,2솔레노이드밸브(161)(162)와 마찬가지로, 도료의 고압분사를 위한 도료분사노즐(261-1)이 하단부에 구비결합된다.On the other hand, the paint spraying machine 26 of the second and third lane paint parts 2 and 2-1 includes a third solenoid valve 261-1 for discharging the white paint, as shown in FIG. In addition, similar to the first and second solenoid valves 161 and 162, a paint spray nozzle 261-1 for high pressure spraying of the paint is provided at the lower end thereof.

한편, 상기 비드분사건(17)(27)의 각 선단부에는, 글라스비드의 분사범위를 일정하게 유지시켜주기 위한 산포가이더(171)(271)가 더 부착됨이 바람직하다.On the other hand, it is preferable that the dispersing guider 171, 271 for further maintaining the spray range of the glass bead to the front end of the bead injection (17, 27).

상기 제1높이조절구(18)(28)는, 도 7a에 도시된 바와 같이, 외부전력의 공급으로 회전구동하는 모터가 내장된 모터박스(181)(281)와, 상기 모터박스(181)(281)의 모터 축에 연결되는 동시에 하향 돌출된 채로 상기한 모터의 구동시 동시 회동하는 스크류샤프트(182)(282)와, 상기 스크류샤프트(182)(282)와 근접한 상기 모터박스(181)(281)의 양측으로부터 하방으로 더 돌출구비된 복수의 가이드샤프트(183)(283)와, 상기 스크류샤프트(182)(282) 및 상기 가이드샤프트(183)(283)를 수직으로 관통하도록 구비결합되는 지지블럭(184)(284)과, 상기 스크류샤프트(182)(282)의 선단이 중앙 상단에 힌지조립되고 복수의 상기 가이드샤프트(183)(283)의 각 선단은 상단 양측에 고정결합된 승강블럭(185)(285)과, 상기 륜하우징(13)(23) 전방 상단에 일측이 고정조립되고 타측이 상기 지지블럭(184)(284)의 측부에 삽입조립됨에 따른 상기 모터박스(181)(281)의 현수조립을 위한 지지대(186)(286)와, 상기 승강블럭(185)(285)의 외단부로부터 돌출형성됨으로써 상기 제1,2,3솔레노이드밸브(161)(162)(261)를 각각 고정장착시킬 수 있도록 한 지지봉(187)(287)으로 구성된다.As shown in FIG. 7A, the first height adjustment holes 18 and 28 include a motor box 181 and 281 in which a motor that drives rotation by supply of external power is installed, and the motor box 181. Screw shafts 182 and 282 which are connected to the motor shaft of 281 and are simultaneously rotated when the motor is driven while protruding downward, and the motor box 181 which is close to the screw shafts 182 and 282. A plurality of guide shafts 183 and 283 further protruding downward from both sides of the 281 and the screw shafts 182 and 282 and the guide shafts 183 and 283 to be vertically penetrated. The support blocks 184 and 284 and the tip ends of the screw shafts 182 and 282 are hinge-assembled at the top of the center, and each end of the plurality of guide shafts 183 and 283 is fixedly coupled to both sides of the upper end. Elevating blocks 185 and 285 and one side of the wheel housing 13 and 23 are fixedly assembled at the upper end and the other side of the support blocks 184 and 284. The first and second parts 186 and 286 for suspension assembly of the motor boxes 181 and 281 and protruding from the outer ends of the lifting blocks 185 and 285 are inserted into the side parts. And 3 rod solenoid valves 161, 162, and 261, each of which has a supporting rod 187 and 287 for fixed mounting.

이와 함께, 상기 1,4차선도색부(1)(1-1)의 기체분사노즐(15)은 상기 승강블럭(185)의 전방에 일체로 결합되고, 상기 2,3차선도색부(2)(2-1)의 기체분사노즐(25)은 상기 회동암(22)의 중앙부 전방에 일체로 결합됨이 바람직하다.In addition, the gas injection nozzles 15 of the first and fourth lane paint parts 1 and 1-1 are integrally coupled to the front of the lifting block 185, and the second and third lane paint parts 2 are provided. It is preferable that the gas injection nozzle 25 of (2-1) is integrally coupled to the front of the center of the pivot arm 22.

한편, 상기 2,3차선도색부(2)(2-1)의 제1높이조절구(28)에는, 상기 지지봉(287)에 더 조립됨에 따라 노면에 미리 표기한 가이드라인에 맞춰 상기 도료분사기(26)의 배치위치를 설정할 수 있도록 한 마킹포인터(288)가 더 구비되어 있다.On the other hand, in the first height adjustment hole 28 of the 2,3 lane paint portion (2) (2-1), the paint sprayer in accordance with the guidelines previously marked on the road surface as it is further assembled to the support rod (287) A marking pointer 288 is further provided to set the arrangement position of the (26).

상기 제2높이조절구(19)(29)는, 상기 륜하우징(13)(23) 각각의 후방 상단에 일측이 고정조립되고 타측이 외부로 일정길이 돌출되는 수평대(191)(291)와, 상기 수평대(191)(292)의 선단 일측에 수직하게 구비된 수직대(192)(292)와, 상기 수평대(191)(291)와 수직대(192)(292)의 일체 결합 및 상기 수직대(192)(292)의 상,하 위치조절을 가능케 한 마운팅블럭(193)(293)과, 상기 수직대(192)(292)의 말단 일측으로부터 소정길이 외부 돌출됨에 따라 상기 비드분사건(17)(27)을 고정장착할 수 있는 장착봉(194)(294)으로 구성된다.The second height adjustment port (19, 29), and the horizontal stage (191) (291) and one side is fixed and assembled on the rear upper end of each of the wheel housing (13, 23) and the other side protrudes a certain length to the outside; Integral coupling of the vertical stand 192, 292 and the horizontal stand 191, 291 and the vertical stand 192, 292 provided vertically on one side of the front end of the horizontal stand 191, 292 and Mounting blocks 193 and 293 to enable the vertical and horizontal positioning of the riser 192 and 292 and the bead powder as a predetermined length is protruded outward from one end of the riser 192 and 292. It consists of mounting rods 194 and 294 that can be fixed to the case (17) (27).

이격동체(3)는, 상기 1,2,3,4차선도색부(1)(2)(2-1)(1-1)들을 차량(800)의 차체 양측으로부터 각각 독립적으로 진,퇴 이동시켜 각 차선을 도색하는 위치로 배치시키기 위한 이동수단으로, 도 2c에 도시된 바와 같이, 상기 차량(800)의 차체 내에 각각의 실린더부(도시하지 않음)가 수용장착된 제1,2,3,4실린더로드(31)(33)(35)(37)를 구성하되, 상기 제1실린더로드(31)의 선단에는 상기 1차선도색부(1)가 장착되고, 상기 제2실린더로드(33)의 선단에는 상기 2차선도색부(2)가 장착되며, 상기 제3실린더로드(35)의 선단에는 상기 4차선도색부(1-1)가 장착되고, 상기 제4실린더로드(37)의 선단에는 상기 3차선도색부(2-1)가 장착된다.The spaced body 3 moves the 1,2,3,4 lane paint sections 1, 2, 2-1, and 1-1 independently from both sides of the vehicle 800, respectively. As shown in FIG. 2C, the first, second, and third cylinders (not shown) are accommodated in the vehicle body of the vehicle 800. 4 cylinder rods 31, 33, 35, and 37, wherein the first cylinder rod 1 is mounted at the tip of the first cylinder rod 31, and the second cylinder rod 33 2) the second lane paint portion 2 is mounted at the tip end thereof, and the four lane paint portion 1-1 is mounted at the tip end of the third cylinder rod 35. At the front end, the three-lane paint part 2-1 is mounted.

더하여, 상기 제1,2,3,4실린더로드(31)(33)(35)(37)에 의해 상기 1,2,3,4차선도색부(1)(2)(2-1)(1-1)가 각각 차체로부터의 진출 이동시 발생하는 하중을 감당하기 위하여, 상기 차량(800)의 차체 내에 각각의 본체부(도시하지 않음)가 수용장착된 상태로 차체 외부로 진,퇴 작동하는 제1,2가이드레일(32)(38) 및 제1,2가이드로드(34)(36)를 구성하되, 상기 제1가이드레일(32)의 선단에는 상기한 1차선도색부(1)가 더 연계장착되고, 상기 제1가이드로드(34)의 선단에는 상기의 2차선도색부(2)가 더 연계장착되며, 상기 제2가이드레일(38)의 선단에는 상기한 4차선도색부(1-1)가 더 연계장착되고, 상기 제2가이드로드(36)의 선단에는 상기의 3차선도색부(2-1)가 더 연계장착된다.In addition, the first, second, third and fourth cylinder rods 31, 33, 35, 37 are used to make the 1,2,3,4 lane paint sections (1) (2) (2-1) ( In order for 1-1) to bear the load generated when the vehicle moves out from the vehicle body, the main body (not shown) is moved in and out of the vehicle body in a state where the respective body parts (not shown) are mounted in the vehicle body of the vehicle 800. The first and second guide rails 32 and 38 and the first and second guide rods 34 and 36 may be configured, and the first line paint part 1 may be formed at the front end of the first guide rail 32. It is further interlocked and mounted, the second line paint portion (2) is further attached to the front end of the first guide rod 34, the four lane paint portion (1) to the front end of the second guide rail 38 -1) is further interlocked and the third guide rod 2-1 is further interlocked and mounted at the tip of the second guide rod 36.

거리측정기(4)는, 차량(800) 주행시 후륜(801)의 회전수 감지를 통한 차선 도색거리를 측정 및 도색범위의 설정을 용이하게 하기 위한 것으로, 도 5에 도시된 바와 같이, 차량(800)의 차체 일측으로부터 하방으로 일정길이 돌출형성된 중심대(41)와, 상기 중심대(41)의 최말단과 힌지결합되는 힌지편(421)을 중심으로 양단이 회전작동하게 된 회전대(42)와, 상기 회전대(42)의 최말단에 일체로 형성되되, 상기 후륜(801)의 트래드면(타이어 바닥면)에 밀착상태로 대응 회전하는 연동휠(431)이 구비된 휠하우징(43)과, 상기 연동휠(431)의 회동축에 결합되어 회전수를 인식하게 된 감지센서(44)와, 상기 차량(800)의 차체에 몸체가 힌지결합된 채로 고압기체 주입시 몸체로부터 진,퇴 작용하는 로드의 선단이 상기 회전대(42)의 최상단에 힌지결합하는 제2공압실린더(45)로 구성된다.The distance measurer 4 is to facilitate the measurement of the lane paint distance through the detection of the rotation speed of the rear wheel 801 and the setting of the paint range when the vehicle 800 is driven. As shown in FIG. 5, the vehicle 800 And a swivel table 42 whose ends are rotated about the hinge piece 421 hinged to the end of the center stool 41, the center stage 41 protruding a predetermined length downward from one side of the vehicle body; The wheel housing 43 is integrally formed at the end of the swivel table 42 and provided with an interlocking wheel 431 corresponding to the tread surface (tire bottom surface) of the rear wheel 801 in a state of close contact. The sensor 44 coupled to the rotational shaft of the interlocking wheel 431 recognizes the rotational speed, and moves forward and backward from the body when the high pressure gas is injected while the body is hinged to the vehicle body of the vehicle 800. The tip of the rod is composed of a second pneumatic cylinder 45 hinged to the upper end of the swivel table 42 The.

이와 함께, 상기 중심대(41)의 말단부 일측에는, 상기 제2공압실린더(45)로부터 진출하는 로드에 의해 상기 회전대(42)가 일방향 회동 후 상기 연동휠(431)이 차량(800)의 후륜(801)에 과다하게 밀착되지 않도록 회전반경 제한을 위한 제지판(411)이 일체로 형성된다.In addition, the interlocking wheel 431 rotates the rear wheel of the vehicle 800 after the swivel table 42 rotates in one direction by a rod extending from the second pneumatic cylinder 45 on one end portion of the center stage 41. The papermaking plate 411 for limiting the radius of rotation is integrally formed so as not to be in close contact with the 801.

또한, 상기 제지판(411)에는, 상기 후륜(801)의 마모시 상기한 회전대(42)의 회전반경을 미세하게 연장시켜, 상기 연동휠(431)이 상기한 후륜(801)의 트래드면에 적정 압력으로 밀착하도록 한 간격조절볼트(412)가 구비결합된다.In addition, the paper plate 411 extends the rotation radius of the swivel table 42 finely when the rear wheel 801 wears, so that the interlocking wheel 431 is provided on the tread surface of the rear wheel 801. An interval adjusting bolt 412 is attached to be in close contact with the appropriate pressure.

주행가이더(5)는, 차량(800)에 탑승한 운전자가 노면에 미리 표기한 가이드라인의 위치를 파악 후 차량 주행이 가능토록 하기 위한 안내수단으로, 도 6에 도시된 바와 같이, 차량(800)의 프론트범퍼(802) 양측에 각각 장착결합된 상태로 노면과 수직 및 수평 회동작용을 이룰 수 있는 베이스프레임(51)과, 상기 베이스프레임(51)으로부터 연장진출이 가능한 1차진출봉(52) 및 2차진출봉(53)과, 상기 2차진출봉(53)의 최 선단에 구비결합된 상태로 상기 베이스프레임(51)이 노면과 평행 배치상태 시 운전자가 노면에 미리 표기한 가이드라인의 위치를 용이하게 파악할 수 있도록 한 포지셔너(54)와, 상기 차량(800)의 프론트범퍼(802) 상단에 몸체가 힌지되고 고압기체의 주입시 몸체로부터 진출,입 작용하는 로드의 선단이 상기 베이스프레임(51)의 전방 일측단에 힌지조립됨에 따라 상기 베이스프레임(51)의 수직 및 수평 회동작동을 가능케 하는 제3공압실린더(55)와, 상기 베이스프레임(51)의 수평 배치시 그의 하면을 지탱하기 위한 거치판(56)으로 구성된다.The driving guider 5 is a guide means for enabling the vehicle to be driven after the driver of the vehicle 800 locates the guideline marked in advance on the road surface, as shown in FIG. 6. A base frame 51 capable of vertically and horizontally rotating the road surface while being mounted on both sides of the front bumper 802, and a primary entrance rod 52 capable of extending in and out of the base frame 51. And the guideline marked in advance on the road surface by the driver when the base frame 51 is parallel to the road surface in a state in which the base frame 51 is disposed parallel to the road surface in a state where the base frame 51 is coupled to the outermost end of the secondary advance bar 53. Positioner 54 to easily determine the position of the body, the front of the front bumper 802 of the vehicle 800, the body is hinged and the tip of the rod to advance and inject from the body during injection of the high pressure gas is the base Hinge assembly on one front end of frame 51 According to the third pneumatic cylinder 55 to enable the vertical and horizontal rotational operation of the base frame 51, and the mounting plate 56 for supporting the lower surface of the base frame 51 in the horizontal arrangement .

한편, 상기 2차진출봉(52)의 선단에는, 상기 포지셔너(54)를 끼움조립과 더불어 좌,우로 위치조정을 달리할 수 있게 한 홀더(531)가 일체로 구비결합되어 있다.On the other hand, at the distal end of the secondary advance rod 52, the holder 531, which allows the positioner 54 to be fitted and the position adjustment to the left and right to be different, is integrally provided.

상기 포지셔너(54)는, 상기 홀더(531)에 삽입되는 횡봉(541)과, 상기 횡봉(541)의 일측 선단부로부터 전방을 향하여 일정길이 돌출형성됨에 따라, 상기 차량(800)의 운전자가 노면에 미리 표기한 가이드라인의 위치를 단계적으로 확인할 수 있도록 한 트라이던트(Trident, 542)로 구성됨이 바람직하다.The positioner 54 has a horizontal rod 541 inserted into the holder 531 and a predetermined length protrudes forward from one end portion of the horizontal rod 541, so that the driver of the vehicle 800 is on the road surface. It is preferably composed of a trident (Trident, 542) to check the position of the guideline marked in advance.

미설명부호, (V)는 상기한 도료공급호스, 비드공급관, 기체공급호스 각각에 구비결합됨으로써, 도료와 글라스비드 및 기체의 공급 흐름 제어를 위한 다수의 개폐밸브이다.Unexplained reference numeral (V) is provided in the paint supply hose, the bead supply pipe, and the gas supply hose, respectively, and a plurality of on-off valves for supply flow control of the paint, glass beads and gas.

상기와 같은 구성으로 되는 본 발명에 따른 차량 장착형 도로표시장치의 작용을 구체적으로 설명하면 다음과 같다.Referring to the operation of the vehicle-mounted road display device according to the invention having the above configuration in detail as follows.

우선, 상기 보일러(830)를 가동시켜 도료탱크(820)에 저장된 도료를 가열 용융시켜 일정 점도 유지를 통한 도료의 배출효율 및 도포시의 흡착력이 증대되도록 한다. 이렇게 가열된 도료는 상기 도료분사기(16)(26)를 이용한 고압분사를 위해 상기 챔버(840) 내에 임시저장된다.First, the boiler 830 is operated to heat-melt the paint stored in the paint tank 820 so that the discharge efficiency of the paint and the adsorption force at the time of coating are increased. The heated paint is temporarily stored in the chamber 840 for high pressure spraying using the paint sprayers 16 and 26.

그 후, 운전자에 의한 차량주행과 동시에 도료와 글라스비드를 도로상에 차례로 도포하는 차선도색 작업을 실시하는바, 상기 차량(800)의 차체 양측에 각각 설치된 상기 1,2,3,4차선도색부(1)(2)(2-1)(1-1)의 도료분사기(16)(26) 및 상기 비드분사건(17)(27)을 통해 도로상에 도포(분사)하는 것으로 가능하다.Subsequently, a lane painting operation is performed in which the paint and glass beads are sequentially applied on the road simultaneously with driving of the vehicle, and the 1,2,3,4 lane paintings respectively installed on both sides of the vehicle 800 are provided. It is possible to apply (spray) onto the road through the paint sprayers 16 and 26 and the bead sprayers 17 and 27 of the sub- (1) (2) (2-1) (1-1). .

한편, 상기 비드분사건(17)(27)들로부터 분사되는 글라스비드는 상기 도료분사기(16)(26)에 의해 노면에 미리 도색된 도료(차선)의 표면보호를 위한 코팅(Coating) 및 빛 반사를 이용한 차선의 시인성(Visibility) 증대목적을 위함이다.Meanwhile, the glass beads sprayed from the bead jets 17 and 27 are coated and light for protecting the surface of the paint (lane) previously painted on the road surface by the paint sprayers 16 and 26. This is to increase the visibility of the lane using reflection.

전술한 목적을 달성하기 위하여, 상기 차량(800)에 탑승한 운전자가 시동을 걸어 전력공급이 이루어진 상기 통합컨트롤러(880)를 조작하는 것으로써, 도 2c에 도시된 바와 같이, 각 차선의 도색을 위한 위치마다 상기 1,2,3,4차선도색부(1)(2)(2-1)(1-1)가 배치되게끔 상기 이격동체(3)를 구동시킨다.In order to achieve the above object, the driver boarding the vehicle 800 starts and operates the integrated controller 880 in which power is supplied. As shown in FIG. 2C, the painting of each lane is performed. The spaced body 3 is driven such that the 1,2,3,4 lane paints 1, 2, 2-1, and 1-1 are arranged at each position.

즉, 상기 이격동체(3)의 제1실린더로드(31)의 진출을 통해, 차체의 좌측으로부터 중앙선과 같은 도로상 첫 번째 차선의 도색을 위한 위치까지 상기의 1차선도색부(1)가 우선 이동 배치된다. 이때, 상기 베이스암(11)에 더 연계결합된 상기 제1가이드레일(32)에 의하여 상기 1차선도색부(1)의 이동 배치가 원활히 이루어진다.That is, through the advance of the first cylinder rod 31 of the spaced body 3, the above-mentioned first lane paint section 1 takes precedence from the left side of the vehicle body to a position for painting the first lane on the road such as the center line. Are placed to move. At this time, by the first guide rail 32 which is further coupled to the base arm 11, the movement arrangement of the first lane paint part 1 is smoothly performed.

다음으로, 상기 제2실린더로드(33)의 진출을 통하여는, 상기 1차선도색부(1)에 의해 도색되는 첫 번째 차선으로부터 도로상 우측 두 번째 차선의 도색을 위한 위치로 상기 2차선도색부(2)가 이동 배치되도록 한다. 이때 역시, 상기 제1가이드레일(32)과 마찬가지로 차량(800)의 차체 좌측으로부터 상기 제1가이드로드(34)가 동시 진출 작동함에 따라 상기 2차선도색부(2)의 이동 배치가 원활하게 된다.Next, through the advancing of the second cylinder rod 33, the second lane paint portion from the first lane painted by the first lane paint portion 1 to a position for painting the right second lane on the road. Let (2) be arranged to move. In this case, like the first guide rail 32, as the first guide rod 34 simultaneously moves out from the left side of the vehicle body of the vehicle 800, the arrangement of the second lane paint part 2 is smooth. .

계속해서, 상기 통합컨트롤러(880)를 연속 조작하는 것으로, 상기 1,2차선도색부(1)(1-1)와 동일한 방식으로 상기 3,4차선도색부(2-1)(1-1)를 차체의 우측으로부터 진출 이동시키게 되는바, 상기 제4실린더로드(37)의 진출작동에 의하여는 도로상 갓길이나 우측 첫 번째 차선도색을 위한 위치까지 상기 4차선도색부(1-1)가 우선 이동 배치되도록 하고, 상기 제3실린더로드(35)의 진출작동에 의해서는 상기 2차선도색부(2)에 의해 도색되는 두 번째 차선으로부터 도로상 우측 세 번째 차선의 도색을 위한 위치로 상기 3차선도색부(2-1)가 이동 배치된다.Subsequently, the integrated controller 880 is continuously operated, and the 3, 4 lane paint units 2-1 and 1-1 are operated in the same manner as the 1, 2 lane paint units 1 and 1-1. ) Is moved from the right side of the vehicle body, the fourth lane rod (1-1) by the exit operation of the fourth cylinder rod 37 to the position for the shoulder on the road or the first lane painting on the right First, it is arranged to move, and by the advance operation of the third cylinder rod 35 from the second lane painted by the second lane painting unit 2 to the position for painting the third lane on the right side of the road. The lane paint section 2-1 is arranged to move.

결국, 상기 1,2,3,4차선도색부(1)(2)(2-1)(1-1)를 각각 정해진 위치까지 이동 배치시켜 놓는 것에 따라, 단번의 차량(800) 주행만으로 도로상에 3차로를 형성하는 4개의 차선도색이 동시에 가능하다.As a result, the 1,2,3,4 lane paint sections 1, 2, 2-1, and 1-1 are moved to a predetermined position, respectively, so that the vehicle is driven only by driving of the vehicle 800 once. Four lane paintings forming three lanes on the top are possible at the same time.

이후로부터는, 상기 1,2,3,4차선도색부(1)(2)(2-1)(1-1) 각각의 작동관계를 상세히 설명하되, 상기한 1,4차선도색부(1)(1-1)와 상기 2,3차선도색부(2)(2-1)의 작동관계가 상호 동일함에 따라, 상기 1차선도색부(1)의 작동관계 설명으로 4차선도색부(1-1)의 작동관계를 대신하고, 상기 2차선도색부(2)의 작동관계 설명으로 3차선도색부(2-2)의 작동관계를 대신하기로 한다.Hereinafter, the operation relationship of each of the 1,2,3,4 lane paint units (1) (2) (2-1) (1-1) will be described in detail, but the above 1,4 lane paint units (1) will be described in detail. (1-1) and the second and third lane paint units (2) and (2-1) as the operation relationship is the same, the four-lane paint unit (1) to explain the operation relationship of the first lane paint unit (1) Instead of the operation relationship of -1), the operation relationship of the third lane paint unit 2-2 will be replaced by the operation relationship of the second lane paint unit 2.

먼저, 도 2c에 도시된 바와 같은 구조로, 상기 이격동체(3)를 이용하여 상기한 1,2차선도색부(1)(2)를 이동 배치시켜 놓은 다음에는, 도 8a 및 도 8b에 도시된 바와 같이, 상기 1,2차선도색부(1)(2)의 제1공압실린더(14)(24)에 압축공기를 주입시켜 상기 제1공압실린더(14)(24) 각각의 로드 진출에 의한 상기 륜하우징(13)(23)의 하강으로 상기 회동륜(131)(231)이 노면에 밀착되도록 한다.First, as shown in FIG. 2C, the first and second lane paint parts 1 and 2 are moved and arranged using the spacer 3, and then shown in FIGS. 8A and 8B. As shown in the drawing, compressed air is injected into the first pneumatic cylinders 14 and 24 of the first and second lane paint parts 1 and 2 to advance the rods of each of the first pneumatic cylinders 14 and 24. The rotating wheels 131 and 231 are brought into close contact with the road surface by the lowering of the wheel housings 13 and 23.

여기서, 상기 2차선도색부(2)의 제1높이조절구(28)에 구비결합된 상기 지지봉(287)의 선단이 지면과 수직을 이루게 하고 노면에 미리 표기한 가이드라인에 근접 이동시키는 것으로, 상기 도료분사기(26)가 차선도색 위치에 정확히 배치되도록 한다.Here, the tip of the support rod 287 coupled to the first height adjusting opening 28 of the second lane paint portion 2 is perpendicular to the ground and moved close to the guideline previously marked on the road surface. The paint sprayer 26 is correctly positioned in the lane paint position.

이러한 과정을 통하여, 상기 3,4차선도색부(2-1)(1-1)들 역시 각각의 차선도색 위치로 정확하게 배치되도록 한 상태로 차선도색의 준비작업을 마무리 후 차량운행을 시작하는 동시에, 상기 도료탱크(810)에 저장된 도료가 상기 챔버(840)를 통해 상기 도료분사기(16)(26) 각각의 제1,2,3솔레노이드밸브(161)(162)(261)로 공급된 다음 상기 도료분사노즐(161-1)(162-1)(261-1)을 통한 고압분사로 차선도색 작업이 진행된다.Through this process, the 3,4 lane painting units (2-1) (1-1) also finish the preparation of the lane painting in the state of being correctly arranged in each lane painting position and at the same time start the vehicle operation. The paint stored in the paint tank 810 is supplied to the first, second and third solenoid valves 161, 162 and 261 of the paint sprayers 16 and 26 through the chamber 840. Lane painting is performed by high pressure spraying through the paint spray nozzles 161-1, 162-1, and 26-1.

그 이전에, 도 7a 및 도 7b에 도시된 바와 같이, 상기 제1높이조절구(18)(28)의 높낮이를 미리 조절하여, 도로 특성에 맞는 폭(약 15-16Cm)의 차선도색이 가능하다.Previously, as shown in FIGS. 7A and 7B, the height of the first height adjusting holes 18 and 28 may be adjusted in advance, so that lane coating having a width (about 15-16 cm) suitable for road characteristics is possible. Do.

한편, 차량주행에 앞서, 도로의 양측 가장자리에 도색되는 중앙선이나 갓길과의 경계선 등과 같은 실선형 차선들과 달리, 차로와 차로를 구분하는 동시에 운행차로의 변경이 가능함을 의미하는 점선형 차선의 도색을 위하여는, 도 5에 도시된 바와 같이, 상기 콤프레셔(840)로부터 주입된 압축공기에 의해 상기 제2공압실린더(45)의 로드가 상기한 회전대(42) 상단을 밀어 제치는 작용으로 상기 휠하우징(43)의 연동휠(431)이 차량(800)의 후륜(801)에 밀착되도록 한다.On the other hand, prior to driving, unlike the solid line lanes such as the center line or shoulder line painted on both edges of the road, the painting of the dotted line means that it is possible to distinguish the lane and the lane and to change the driving lane. 5, the rod of the second pneumatic cylinder 45 pushes the upper end of the swivel table 42 by compressed air injected from the compressor 840 to remove the wheel. The interlocking wheel 431 of the housing 43 is in close contact with the rear wheel 801 of the vehicle 800.

이로써, 차량주행시 노면을 타고 도는 상기 후륜(801)에 맞닿아 역회전하는 상기 연동휠(431)의 회전수를 감지한 상기 감지센서(44)가 신호로써 상기 통합컨트롤러(880)에 송출하고 그 신호를 송출 받은 상기 통합컨트롤러(880)는 상기 도료분사기(26)의 제3솔레노이드밸브(261)의 개폐동작을 제어하여 상기 도료분사노즐(261-1)로부터의 도료 분사를 간헐적으로 이루어 점선형 차선의 도색이 가능케 되는 것이다.As a result, the detection sensor 44 which detects the rotational speed of the interlocking wheel 431 in contact with the rear wheel 801 which rides on the road surface while driving is sent out to the integrated controller 880 as a signal. The integrated controller 880 receiving the signal controls the opening / closing operation of the third solenoid valve 261 of the paint spraying machine 26 to intermittently spray paint from the paint spraying nozzle 261-1. Lane painting is possible.

동시에, 도 8c에 도시된 바와 같이, 상기 주행가이더(5)를 차량(800)의 프론트범퍼(802)로부터 지면과 평행하도록 위치시켜, 차량(800)을 운전하는 운전자가 상기 포지셔너(54)의 트라이던트(542)를 통해 노면에 미리 표기한 가이드라인의 위치파악을 통해, 차선도색을 위한 차량주행 궤도의 이탈없이 차선도색을 원활히 이룰 수 있다. 한편, 노면에 미리 표기한 가이드라인의 위치에 따라 복수의 상기 트라이던트(542) 중 어느 하나를 선택 활용한다.At the same time, as shown in FIG. 8C, the driving guider 5 is positioned parallel to the ground from the front bumper 802 of the vehicle 800 such that the driver who drives the vehicle 800 may move to the positioner 54. Through the location of the guideline marked in advance on the road surface through the trident 542, lane painting can be smoothly performed without departure of the vehicle driving track for lane painting. Meanwhile, any one of the plurality of tridents 542 is selected and used according to the position of the guideline previously marked on the road surface.

마지막으로, 도 9에 도시된 바와 같이, 상기 3차선도색부(2-1)의 진출 이동 배치를 생략하고, 상기 1차선도색부(1)와 2차선도색부(1)(2)의 상호 배치간격만큼 상기 2차선도색부(2)로부터 상기의 4차선도색부(1-1)를 이동 배치한 상태로, 2차로 형성을 위한 3개 차선의 도색작업도 용이하게 실시할 수 있다.Finally, as shown in FIG. 9, the advance movement arrangement of the three-lane paint part 2-1 is omitted, and the first and second lane paint parts 1 and 2 are mutually interchangeable. In the state where the above-mentioned four-lane painting unit 1-1 is moved from the second-lane painting unit 2 by the arrangement interval, the three-lane painting work for forming the second lane can be easily performed.

이상에서와 같이 본 발명을 바람직한 실시 예를 이용하여 상세히 설명하였으나, 본 발명의 범위는 특정 실시 예에 한정되는 것은 아니며, 첨부된 특허청구범위에 의하여 해석되어야 할 것이다. 또한, 이 기술분야에서 통상의 지식을 습득한 자라면, 본 발명의 범주와 사상을 벗어나지 않는 범위 내에서 다양한 변형실시가 가능함은 물론이다.
As described above, the present invention has been described in detail by using a preferred embodiment, but the scope of the present invention is not limited to the specific embodiment, it should be interpreted by the appended claims. In addition, those of ordinary skill in the art that various modifications can be made without departing from the scope and spirit of the present invention.

1 : 1차선도색부, 1-1 : 4차선도색부
2 : 2차선도색부, 2-1 : 3차선도색부
3 : 이격동체, 4 : 거리측정기
5 : 주행가이더, 11, 21 : 베이스암
12, 22 : 회동암, 13, 23 : 륜하우징
14, 24 : 제1공압실린더, 15, 25 : 기체분사노즐
16, 26 : 도료분사기, 17, 27 : 비드분사건
18, 28 : 제1높이조절구, 19, 29 : 제2높이조절구
31 : 제1실린더로드, 32 : 제1가이드레일
33 : 제2실린더로드, 34 : 제1가이드로드
35 : 제3실린더로드, 36 : 제2가이드로드
37 : 제4실린더로드, 38 : 제2가이드레일
41 : 중심대, 42 : 회전대
43 : 휠하우징, 44 : 감지센서
45 : 제2공압실린더, 51 : 베이스프레임
52 : 1차진출봉, 53 : 2차진출봉
54 : 포지셔너, 55 : 제3공압실린더
56 : 거치판, 111, 211 : 결착브래킷
122, 222, 421 : 힌지편, 131, 231 : 회동륜
161 : 제1솔레노이드밸브, 161-1, 162-1, 261-1 : 도료분사노즐
162 : 제2솔레노이드밸브, 171, 271 : 산포가이더
181, 281 : 모터박스, 182, 282 : 스크류샤프트
183, 283 : 가이드샤프트, 184, 284 : 지지블럭
185, 285 : 승강블럭, 185-1 : 고정파이프
186, 286 : 지지대, 187, 287 : 지지봉
191, 291 : 수평대, 192, 292 : 수직대
193, 293 : 마운팅블럭, 194, 294 : 장착봉
261 : 제3솔레노이드밸브, 288 : 마킹포인터
288-1, 531 : 홀더, 411 : 제지판
412 : 간격조절볼트, 431 : 연동휠
541 : 횡봉, 542 : 트라이던트
1: 1 lane paint section, 1-1: 4 lane paint section
2: 2 lane paint part, 2-1: 3 lane paint part
3: spaced body, 4: distance measuring instrument
5: driving guider, 11, 21: base arm
12, 22: Hoeam Rock, 13, 23: Wheel Housing
14, 24: 1st pneumatic cylinder, 15, 25: gas injection nozzle
16, 26: paint sprayer, 17, 27: bead spraying
18, 28: the first height adjustment, 19, 29: the second height adjustment
31: first cylinder rod, 32: first guide rail
33: second cylinder rod, 34: first guide rod
35: 3rd cylinder rod, 36: 2nd guide rod
37: 4th cylinder rod, 38: 2nd guide rail
41: center stage, 42: swivel
43: wheel housing, 44: detection sensor
45: second pneumatic cylinder, 51: base frame
52: 1st advance rod, 53: 2nd advance rod
54: positioner, 55: third pneumatic cylinder
56: mounting plate, 111, 211: binding bracket
122, 222, 421: hinge piece, 131, 231: rotating wheel
161: first solenoid valve, 161-1, 162-1, 261-1: paint spray nozzle
162: second solenoid valve, 171, 271: dispersion guider
181, 281: motor box, 182, 282: screw shaft
183, 283: guide shaft, 184, 284: support block
185, 285: lifting block, 185-1: fixed pipe
186, 286: support, 187, 287: support rod
191, 291: horizontal stand, 192, 292: vertical stand
193, 293: mounting block, 194, 294: mounting rod
261: third solenoid valve, 288: marking pointer
288-1, 531: holder, 411: paper plate
412: Space adjusting bolt, 431: Interlocking wheel
541: side bar, 542: trident

Claims (13)

도료탱크, 비드탱크, 보일러, 챔버, 콤프레셔, 유압탱크, 에어리스펌프, 게이지컨트롤러가 적재함에 탑재되고, 장치 전반을 제어하기 위한 통합컨트롤러가 운전석에 설치되어, 운전자에 의한 차량주행으로 차선도색 작업을 실시하는 통상의 차량 장착형 도로표시장치에 있어서,
상기 차량의 차체 좌측으로부터 우선 진출이동 배치된 상태로, 도로의 중앙선 또는 좌측 첫 번째 차선의 도색을 위한 1차선도색부와;
상기 1차선도색부에 이어 차체 좌측으로부터 추가 진출이동 배치된 채로, 좌측 두 번째 차선의 도색을 통해 도로상에 1차로가 형성되도록 한 2차선도색부와;
상기 차량의 차체 우측으로부터 우선 진출이동 배치된 상태로, 차로와 갓길의 경계선이나 도로상 우측 첫 번째 차선의 도색을 위한 4차선도색부와;
상기 4차선도색부에 이어 차체 좌측으로부터 추가 진출이동 배치된 채로, 좌측 세 번째 차선의 도색을 통해 도로상에 2,3차로가 구분 형성되도록 한 3차선도색부와;
상기 차량의 차체 내에서 유압으로 진,퇴 작용하여, 상기 1,2,3,4차선도색부가 차체 양방향으로 각각 독립 진출,입 이동 배치 가능케 하는 이격동체와;
상기 차량의 차체 일측에 구비결합된 상태로, 차량 후륜의 회전수를 감지하여 점선형 차선의 도색길이를 설정토록 한 거리측정기와; 그리고,
상기 차량의 프론트범퍼에 구비결합됨으로써, 차량주행시 노면에 미리 표기한 가이드라인의 위치를 파악할 수 있게 하는 복수의 주행가이더;를 포함하여 구성된 것을 특징으로 하는 차량 장착형 도로표시장치.
Paint tanks, bead tanks, boilers, chambers, compressors, hydraulic tanks, airless pumps, and gauge controllers are installed in the loading compartment, and an integrated controller for controlling the entire device is installed in the driver's seat, and lanes are painted by the driver. In the normal vehicle-mounted road display device to be carried out,
A first lane painting unit for painting the center line of the road or the first lane on the left in a state in which the vehicle is first moved out from the left side of the vehicle body;
A second lane painting unit configured to form a primary road on the road through the painting of the second lane on the left side while being further moved from the left side of the vehicle body after the first lane painting unit;
A four-lane painting unit configured to firstly move outward from the right side of the vehicle body and to paint the boundary between the lane and the shoulder or the first lane on the right side of the vehicle;
A three-lane painting unit configured to separate two or three lanes on the road through the painting of the third lane on the left side while being further moved from the left side of the vehicle body after the four-lane painting unit;
A spaced body that allows the 1,2,3,4 lane paint parts to independently move in and out of the vehicle body in both directions by moving forward and backward hydraulically in the vehicle body;
A distance measuring device configured to detect the number of revolutions of the rear wheels of the vehicle and set the painted length of the dotted line lane in a state of being coupled to one side of the vehicle body; And,
And a plurality of driving guides which are coupled to the front bumper of the vehicle to determine the position of the guideline previously marked on the road surface when the vehicle is driven.
제 1항에 있어서,
상기 1,2,3,4차선도색부는, 상기 차량의 차체 양측으로부터 각각 독립 진출,입 이동 배치가 가능토록 상기 이격동체에 구비결합되는 베이스암과,
상기 베이스암의 일측 선단에 힌지결합됨에 따라, 타 선단이 상,하 회전을 이루게 된 회동암과,
상기 회동암의 회동 선단에 일체로 형성되되, 도로상에 밀착시 노면을 타고 도는 회동륜을 구비한 륜하우징과,
상기 베이스암의 상측에 몸체부 말단이 힌지결합되고 상기 회동암의 하부 일단에 로드 선단이 연계결합됨으로써, 고압기체 주입시 진,퇴 작용하는 상기 로드에 의해 상기 륜하우징의 상,하 이동을 이룰 수 있도록 한 제1공압실린더와,
상기 륜하우징의 외측 전방에 구비된 상태로, 상기 유압탱크로부터 공급된 고압기체의 분사를 통해 도료분사 직전 노면 상의 각종 이물질을 날려보내는 기체분사노즐과,
상기 륜하우징의 외측에 더 구비된 채로, 상기 챔버로부터 공급된 도료를 분출시키기 위한 도료분사기와,
상기 륜하우징의 외측 후방에 구비된 상태에서, 도료 표면에 글라스비드를 추가 분사하게 된 비드분사건과,
상기 도료분사기의 전동식 높낮이 조절을 통한 도료 분사범위 변화로 차선도색의 폭을 달리하도록 한 제1높이조절구와,
상기 비드분사건의 수동식 높낮이 조절로 글라스비드의 분사범위를 변경할 수 있는 제2높이조절구로 구성됨을 특징으로 하는 차량 장착형 도로표시장치.
The method of claim 1,
The 1,2,3,4 lane paint portion is a base arm which is coupled to the spaced body so as to be able to independently move in and out and move from both sides of the vehicle body;
As the hinge is coupled to one end of the base arm, the other end is a rotational arm to be rotated up and down,
A wheel housing formed integrally with the pivoting tip of the pivotal arm and having a rotation wheel turning on the road when it is in close contact with the road;
The upper end of the base arm is hinged coupled to the end of the body and the rod end is coupled to the lower end of the pivotal arm, thereby to achieve the up and down movement of the wheel housing by the rod acting forward and backward when injecting high pressure gas The first pneumatic cylinder,
A gas injection nozzle which is provided at the outer front of the wheel housing and blows away various foreign substances on the road surface immediately before paint spraying by spraying a high pressure gas supplied from the hydraulic tank;
A paint spraying machine for ejecting the paint supplied from the chamber while being further provided outside the wheel housing;
In the state provided in the outer rear of the wheel housing, the bead spray incident to further spray the glass bead on the paint surface,
A first height adjusting device configured to vary the width of the lane paint by changing the paint spraying range through the electric height adjustment of the paint sprayer;
The vehicle-mounted road marking apparatus, characterized in that the second height adjustment port for changing the spraying range of the glass bead by the manual height adjustment of the bead injection.
제 1항에 있어서,
상기 이격동체는, 상기 차량의 차체 내에 실린더부가 각각 수용장착된 상태로 상기 실린더부로부터 유압에 의해 차체 외부로 진출,입하는 제1,2,3,4실린더로드와, 상기 차량의 차체 내에 본체부가 각각 수용장착된 상태로 상기 차체 외부로 진,퇴 작동하는 제1,2가이드레일 및 제1,2가이드로드로 구성되되,
상기 제1실린더로드 및 상기 제1가이드레일의 각 선단에는 상기 1차선도색부가 동시 장착되고,
상기 제2실린더로드 및 상기 제1가이드로드의 각 선단에는 상기 2차선도색부가 동시 장착되며,
상기 제3실린더로드 및 상기 제2가이드레일의 각 선단에는 상기 4차선도색부가 동시 장착되고,
상기 제4실린더로드 및 상기 제2가이드로드의 각 선단에는 상기 3차선도색부가 동시 장착됨을 특징으로 하는 차량 장착형 도로표시장치.
The method of claim 1,
The spaced body may include first, second, third and fourth cylinder rods which move in and out of the vehicle body by hydraulic pressure from the cylinder portion in a state where the cylinder portions are accommodated and mounted in the vehicle body of the vehicle, and the main body in the vehicle body. The first and second guide rails and the first and second guide rods which move forward and backward to the outside of the vehicle body, respectively, are mounted and accommodated.
The first line paint part is mounted at the front end of each of the first cylinder rod and the first guide rail simultaneously.
The second line paint part is simultaneously mounted to each end of the second cylinder rod and the first guide rod.
The four-lane paint part is simultaneously mounted to each end of the third cylinder rod and the second guide rail,
And the three-lane paint part is simultaneously mounted to each end of the fourth cylinder rod and the second guide rod.
제 1항에 있어서,
상기 거리측정기는, 상기 차량의 차체 일측으로부터 하방으로 일정길이 돌출형성된 중심대와,
상기 중심대의 최말단과 힌지결합되는 힌지편을 중심으로 양단이 회전작동하게 된 회전대와,
상기 회전대의 최말단에 일체로 형성되되, 상기 차량 후륜의 트래드면에 밀착상태로 대응 회전하는 연동휠을 구비한 휠하우징과,
상기 연동휠의 회동축에 결합되어 회전수를 인식하게 된 감지센서와,
상기 차량의 차체에 몸체가 힌지결합된 채로, 고압기체 주입시 상기 몸체로부터 진,퇴 작용하는 로드의 선단이 상기 회전대의 최상단에 힌지결합하는 제2공압실린더로 구성됨을 특징으로 하는 차량 장착형 도로표시장치.
The method of claim 1,
The distance measuring unit, and a center bar protruding a predetermined length downward from one side of the vehicle body of the vehicle,
A swivel both ends rotated around a hinge piece hinged to the end of the center;
A wheel housing integrally formed at the end of the swivel and having a linkage wheel that rotates in close contact with the tread surface of the rear wheel of the vehicle;
A detection sensor coupled to the rotating shaft of the interlocking wheel to recognize the rotation speed;
Vehicle-mounted road marking, characterized in that the body is hinged to the vehicle body of the vehicle, the tip of the rod acting forward and backward from the body when the high-pressure gas injection is composed of a second pneumatic cylinder hinged to the upper end of the swivel Device.
제 1항에 있어서,
상기 주행가이더는, 상기 차량의 프론트범퍼 전방 양측에 각각 장착결합된 상태로 노면과 수직 및 수평 회동작용을 이룰 수 있는 베이스프레임과,
상기 베이스프레임으로부터 연장진출이 가능한 1차진출봉 및 2차진출봉과,
상기 2차진출봉의 최 선단에 구비결합된 상태로, 상기 베이스프레임이 노면과 평행 시 운전자가 노면에 미리 표기한 가이드라인의 위치를 파악할 수 있도록 한 포지셔너와,
상기 프론트범퍼 상단에 몸체가 힌지되고 고압기체의 주입시 상기 몸체로부터 진출,입 작용하는 로드의 선단이 상기 베이스프레임의 전방 일측단에 힌지조립됨에 따라 상기 베이스프레임의 수직 및 수평 회동작동을 가능케 하는 제3공압실린더와,
상기 베이스프레임의 수평 배치시 하단 지탱을 위한 거치판으로 구성됨을 특징으로 하는 차량 장착형 도로표시장치.
The method of claim 1,
The driving guider may include a base frame capable of vertically and horizontally rotating the road surface while being coupled to the front bumper front side of the vehicle, respectively,
A primary advance rod and a secondary advance rod capable of extending from the base frame;
A positioner which is coupled to the leading end of the secondary advancement rod so that the driver can grasp the position of the guideline previously marked on the road surface when the base frame is parallel to the road surface;
The body is hinged to the top of the front bumper, and when the injection of the high-pressure gas, the front end of the rod which enters and injects from the body is hinged to the front one end of the base frame to enable the vertical and horizontal rotational operation of the base frame The third pneumatic cylinder,
Vehicle mounting type road display device characterized in that consisting of a base plate for supporting the bottom when the horizontal arrangement of the base frame.
제 1항에 있어서,
상기 1,4차선도색부의 도료분사기는, 황색 도료와 백색 도료의 분리배출을 위한 복수의 제1솔레노이드밸브 및 제2솔레노이드밸브로 구성되고,
상기 2,3차선도색부의 도료분사기는, 백색 도료를 배출시키기 위한 제3솔레노이드밸브로 구성되되,
상기 제1,2,3솔레노이드밸브 각각의 하단부에는, 도료를 고압으로 분출시킬 수 있는 도료분사노즐이 각각 더 구비됨을 특징으로 하는 차량 장착형 도로표시장치.
The method of claim 1,
The paint sprayer of the 1,4 lane paint portion is composed of a plurality of first solenoid valves and second solenoid valves for separating and discharging the yellow paint and the white paint,
The paint sprayer of the two- and three-lane paint part is composed of a third solenoid valve for discharging the white paint,
The lower end of each of the first, second, third solenoid valves, the vehicle-mounted road display device further comprises a paint spray nozzle for ejecting the paint at a high pressure.
제 2항에 있어서,
상기 비드분사건의 각 선단부에는, 글라스비드의 분사범위를 일정하게 유지시켜주기 위한 산포가이더가 더 부착됨을 특징으로 하는 차량 장착형 도로표시장치.
The method of claim 2,
Each distal end portion of the bead injection, the vehicle-mounted road display device further comprises a scattering guide for maintaining a constant spray range of the glass bead.
제 2항에 있어서,
상기 2,3차선도색부의 제2높이조절구에는, 노면에 미리 표기한 가이드라인에 맞춰 상기 도료분사기의 배치위치를 설정할 수 있도록 한 마킹포인터가 더 구비됨을 특징으로 하는 차량 장착형 도로표시장치.
The method of claim 2,
The second height adjustment port of the two- and three-lane paint section, the vehicle-mounted road display device further comprises a marking pointer for setting the arrangement position of the paint sprayer in accordance with the guidelines previously marked on the road surface.
제 2항에 있어서,
상기 제2높이조절구는, 상기 륜하우징의 후방 상단에 일측이 고정조립되고 타측이 외부로 일정길이 돌출되는 수평대와,
상기 수평대의 선단 일측에 수직하게 구비된 수직대와,
상기 수평대와 상기 수직대의 일체 결합 및 상기 수직대의 상,하 위치조절을 가능케 한 마운팅블럭과,
상기 수직대의 말단 일측으로부터 일정길이 외부 돌출됨에 따라, 상기 비드분사건을 고정장착할 수 있는 장착봉으로 구성됨을 특징으로 하는 차량 장착형 도로표시장치.
The method of claim 2,
The second height adjustment port, and the horizontal stage that one side is fixed and assembled to the rear upper end of the wheel housing and the other side protrudes a predetermined length to the outside,
A vertical stand provided perpendicularly to one end of the horizontal stand;
A mounting block for integrally coupling the horizontal stage and the vertical stage and adjusting the vertical position of the vertical stage;
The vehicle-mounted road display device, characterized in that consisting of a mounting rod that can be fixed to the bead injection incident as a predetermined length protrudes from the end of the vertical stand.
제 4항에 있어서,
상기 중심대의 말단부 일측에는, 상기 제2공압실린더의 로드에 의해 회동하는 상기 회전대의 회전반경 제한을 위한 제지판이 일체로 형성됨을 특징으로 하는 차량 장착형 도로표시장치.
The method of claim 4, wherein
On one end of the center portion, the vehicle-mounted road display device characterized in that the paper plate for limiting the radius of rotation of the rotating table rotated by the rod of the second pneumatic cylinder is integrally formed.
제 5항에 있어서,
상기 포지셔너는, 상기 2차진출봉 선단에 횡으로 관통결합되는 횡봉과,
상기 횡봉의 일측 선단부로부터 전방 돌출형성된 상태로, 차량 운전자가 노면에 미리 표기한 가이드라인의 위치를 파악할 수 있도록 한 트라이던트로 구성됨을 특징으로 하는 차량 장착형 도로표시장치.
6. The method of claim 5,
The positioner, and a transverse rod is transversely coupled to the tip of the secondary advance rod,
The vehicle-mounted road display device, characterized in that configured as a trident so that the vehicle driver can grasp the position of the guideline pre-marked on the road surface in a state of protruding forward from one side of the side bar.
제 6항에 있어서,
상기 제1높이조절구는, 외부전력의 공급으로 회전구동하는 모터가 내장된 모터박스와,
상기 모터박스의 모터 축에 연결되는 동시에 하향 돌출된 채로, 상기 모터의 구동시 동시 회동하는 스크류샤프트와,
상기 스크류샤프트와 근접한 상기 모터박스의 양측으로부터 하방으로 더 돌출구비된 복수의 가이드샤프트와,
상기 스크류샤프트 및 상기 가이드샤프트를 수직으로 관통하도록 구비결합되는 지지블럭과,
상기 스크류샤프트의 선단이 중앙 상단에 힌지조립되고, 상기 가이드샤프트의 각 선단은 상단 양측에 고정결합된 승강블럭과,
상기 륜하우징 전방 상단에 일측이 고정조립되고, 타측이 상기 지지블럭의 측부에 삽입조립됨에 따른 상기 모터박스의 현수조립을 위한 지지대와,
상기 승강블럭의 외단부로부터 돌출형성됨으로써, 상기 제1,2,3솔레노이드밸브를 각각 고정장착시킬 수 있도록 한 지지봉으로 구성됨을 특징으로 하는 차량 장착형 도로표시장치.
The method of claim 6,
The first height adjustment port, and the motor box is built in the motor for rotationally driven by the supply of external power;
A screw shaft which is connected to the motor shaft of the motor box and simultaneously protrudes downward, while simultaneously rotating when the motor is driven;
A plurality of guide shafts further protruded downward from both sides of the motor box in proximity to the screw shaft,
A support block provided to penetrate the screw shaft and the guide shaft vertically;
A tip of the screw shaft is hinge-assembled at the top of the center, and each tip of the guide shaft is a lifting block fixedly coupled to both sides of the top;
A support for suspension assembly of the motor box according to one side is fixedly assembled at the front end of the wheel housing and the other side is inserted and assembled at the side of the support block;
And a support rod configured to protrude from the outer end of the elevating block so as to fix and mount the first, second and third solenoid valves, respectively.
제 10항에 있어서,
상기 제지판에는, 상기 회전대의 회전반경 제한위치를 미세조정할 수 있도록 한 간격조절볼트가 더 구비결합됨을 특징으로 하는 차량 장착형 도로표시장치.
The method of claim 10,
The papermaking plate, the vehicle-mounted road display device characterized in that the coupling is further provided with an interval adjusting bolt to finely adjust the rotation radius limit position of the swivel.
KR1020100065174A 2010-07-07 2010-07-07 The vehicle installation type road-marking equipment KR101002255B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
KR1020100065174A KR101002255B1 (en) 2010-07-07 2010-07-07 The vehicle installation type road-marking equipment
PCT/KR2011/004861 WO2012005480A2 (en) 2010-07-07 2011-07-04 Vehicle-mounted road marking device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020100065174A KR101002255B1 (en) 2010-07-07 2010-07-07 The vehicle installation type road-marking equipment

Publications (1)

Publication Number Publication Date
KR101002255B1 true KR101002255B1 (en) 2010-12-21

Family

ID=43513068

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020100065174A KR101002255B1 (en) 2010-07-07 2010-07-07 The vehicle installation type road-marking equipment

Country Status (2)

Country Link
KR (1) KR101002255B1 (en)
WO (1) WO2012005480A2 (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101054789B1 (en) 2011-01-05 2011-08-05 주식회사 알에스테크 Traffic lane expression installation equipment
KR101393289B1 (en) * 2013-11-18 2014-05-09 이영선 Improved device for two-component painting lane of the road
KR101771072B1 (en) 2016-08-31 2017-08-24 주식회사 에코리치 Hybrid vehicle for painting line
KR101850546B1 (en) 2017-11-15 2018-04-19 (주)국토해양기술 Imaging system for photograping 3-D image used in image drawing
KR101946565B1 (en) * 2017-04-26 2019-02-14 주식회사 하스라인기계 A lane coating machine
KR102024504B1 (en) 2019-02-13 2019-09-23 정성용 Driving equipment of special vehicles for lane drawing of road
KR102071866B1 (en) * 2018-07-30 2020-01-31 근우테크 주식회사 Auto marking lanes apparatus using dual driving controlling and 3 axial controlling
KR20200116293A (en) * 2019-04-01 2020-10-12 마상훈 A device for safety marking on guardrail
KR20210056057A (en) * 2019-11-08 2021-05-18 (유)프리라인 Multi-functional painting apparatus
CN113250447A (en) * 2021-06-01 2021-08-13 云南穿山机甲能源装备科技有限公司 Sliding form construction linear and elevation detection control system and method
KR102547603B1 (en) * 2023-04-03 2023-06-26 주식회사 국지건설 Uv curing device for paint coating agent for load surface sign of pavement

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103161115B (en) * 2013-03-14 2015-04-29 陈建军 Die fixing device of paver
WO2016099410A1 (en) * 2014-12-17 2016-06-23 Altekma Diş Ticaret Boya Maki̇na Sanayi̇ Anoni̇m Şi̇rketi̇ Road marking machines
CN106638231B (en) * 2016-11-18 2019-08-27 中联重科股份有限公司 Paver
CN108516057B (en) * 2018-05-28 2023-09-01 芜湖恒安钢结构有限公司 Co-directional lane dividing line marking device for large-scale transport ship
CN110106813A (en) * 2019-05-07 2019-08-09 河北广通路桥集团有限公司 A kind of pavement maintenance hard shoulder finishing vehicle
CN113414047B (en) * 2021-06-30 2023-06-23 安本工业涂装(上海)有限公司 Road and bridge construction surface spraying device and application method thereof
CN114293451A (en) * 2021-12-13 2022-04-08 安徽利合建设工程有限责任公司 Road marking method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005046838A (en) 2003-07-15 2005-02-24 Nippon Liner Kk Device and method for coating
KR100721767B1 (en) 2007-02-05 2007-05-25 유재훈 Road line marking vehicle

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020013460A (en) * 2001-12-31 2002-02-20 최장선 vehicle for painting traffic lane
KR101025279B1 (en) * 2008-11-20 2011-03-29 유한회사 삼신기업 Apparatus for Lane Painting

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005046838A (en) 2003-07-15 2005-02-24 Nippon Liner Kk Device and method for coating
KR100721767B1 (en) 2007-02-05 2007-05-25 유재훈 Road line marking vehicle

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101054789B1 (en) 2011-01-05 2011-08-05 주식회사 알에스테크 Traffic lane expression installation equipment
KR101393289B1 (en) * 2013-11-18 2014-05-09 이영선 Improved device for two-component painting lane of the road
KR101771072B1 (en) 2016-08-31 2017-08-24 주식회사 에코리치 Hybrid vehicle for painting line
KR101946565B1 (en) * 2017-04-26 2019-02-14 주식회사 하스라인기계 A lane coating machine
KR101850546B1 (en) 2017-11-15 2018-04-19 (주)국토해양기술 Imaging system for photograping 3-D image used in image drawing
KR102071866B1 (en) * 2018-07-30 2020-01-31 근우테크 주식회사 Auto marking lanes apparatus using dual driving controlling and 3 axial controlling
KR102024504B1 (en) 2019-02-13 2019-09-23 정성용 Driving equipment of special vehicles for lane drawing of road
KR20200116293A (en) * 2019-04-01 2020-10-12 마상훈 A device for safety marking on guardrail
KR102230724B1 (en) * 2019-04-01 2021-03-22 마상훈 A device for safety marking on guardrail
KR20210056057A (en) * 2019-11-08 2021-05-18 (유)프리라인 Multi-functional painting apparatus
KR102320125B1 (en) * 2019-11-08 2021-11-01 (유)프리라인 Multi-functional painting apparatus
CN113250447A (en) * 2021-06-01 2021-08-13 云南穿山机甲能源装备科技有限公司 Sliding form construction linear and elevation detection control system and method
CN113250447B (en) * 2021-06-01 2022-07-26 云南穿山机甲能源装备科技有限公司 Sliding form construction linear and elevation detection control system and method
KR102547603B1 (en) * 2023-04-03 2023-06-26 주식회사 국지건설 Uv curing device for paint coating agent for load surface sign of pavement

Also Published As

Publication number Publication date
WO2012005480A9 (en) 2012-04-05
WO2012005480A3 (en) 2012-05-24
WO2012005480A2 (en) 2012-01-12

Similar Documents

Publication Publication Date Title
KR101002255B1 (en) The vehicle installation type road-marking equipment
US7372247B1 (en) Apparatus and method for locating and marking an underground utility
US6413012B1 (en) Striping apparatus for vehicle travel surfaces
US5951201A (en) Striping apparatus for vehicle travel surfaces
US3987964A (en) Mobile hydraulic jetting device for cleaning large planar surfaces
US4893751A (en) Carbon dioxide powered striping machine for painting long term parking surfaces
EP2152973B1 (en) Line striper with automatic layout
KR101273438B1 (en) Zebra crossing lane obscene system
CN211228032U (en) Bi-component striping machine
CN112461695A (en) Device for detecting road quality
KR102071866B1 (en) Auto marking lanes apparatus using dual driving controlling and 3 axial controlling
CN205941314U (en) Vehicular road surface transverse force friction coefficient test car
US3687371A (en) Mobile spray painting machine
CN110144799B (en) Airport runway crack detection and maintenance equipment
EP0021584B1 (en) Motorised vehicle for effecting a spraying operation
CN108035235B (en) Highway lane line paint supplementing device
KR100760261B1 (en) apparatus for painting letters on road surface
CN218175556U (en) Cold-spraying line marker for road
CN102879324B (en) Road surface friction coefficient measuring device with water sprinkler
CN207685857U (en) A kind of piping lane automatic spray trolley curing means
CN115369733A (en) Wear-resistant marking line spraying equipment and spraying process
KR20100059519A (en) Road marking apparatus
CN212895857U (en) High-efficient road marking line striper
KR200433471Y1 (en) a traffic lane makking apparatus
US5178487A (en) Vehicle surface crackseal train

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20140421

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20140930

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20151211

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20170113

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20171213

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20190103

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20200115

Year of fee payment: 10

R401 Registration of restoration