KR101000567B1 - 급류하천바닥 유속감속시설 - Google Patents
급류하천바닥 유속감속시설 Download PDFInfo
- Publication number
- KR101000567B1 KR101000567B1 KR1020100029189A KR20100029189A KR101000567B1 KR 101000567 B1 KR101000567 B1 KR 101000567B1 KR 1020100029189 A KR1020100029189 A KR 1020100029189A KR 20100029189 A KR20100029189 A KR 20100029189A KR 101000567 B1 KR101000567 B1 KR 101000567B1
- Authority
- KR
- South Korea
- Prior art keywords
- concrete
- base concrete
- flow rate
- base
- speed reduction
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/12—Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
- E02B3/122—Flexible prefabricated covering elements, e.g. mats, strips
- E02B3/123—Flexible prefabricated covering elements, e.g. mats, strips mainly consisting of stone, concrete or similar stony material
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/02—Stream regulation, e.g. breaking up subaqueous rock, cleaning the beds of waterways, directing the water flow
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/12—Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
- E02B3/14—Preformed blocks or slabs for forming essentially continuous surfaces; Arrangements thereof
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
Abstract
본 발명에 따르면, 하천바닥에 상부베이스 콘크리트와 베이스 콘크리트들을 순차적으로 장착하여 유속에 따른 세굴현상 및 토사붕괴 현상이 발생하는 것을 방지할 수 있을 뿐만 아니라 상부베이스 콘크리트와 베이스 플레이들의 상부에 유속감속보 콘크리트 구조물들을 장착하여 유속의 흐름을 감소시킬 수 있는 효과가 있다.
Description
도 2는 본 발명에 따른 급류하천바닥 유속감속시설의 구성을 나타낸 분해사시도.
도 3은 본 발명에 따른 급류하천바닥 유속감속시설을 구성하는 베이스 콘크리트의 다른 실시 예를 나타낸 단면도.
도 4는 본 발명에 따른 급류하천바닥 유속감속시설의 설치상태를 나타낸 정면도.
도 5는 본 발명에 따른 급류하천바닥 유속감속시설의 사용상태를 나타낸 상세도.
21 : 체결공, 30 : 상부베이스 콘크리트,
31 : 체결공, 32 : 고정부,
40 : 유속감속보 콘크리트 구조물, 41 : 결합공,
42 : 유속감속부, 50 : 상류바닥보강 콘크리트,
60 : 키 옹벽, 70 : 돌붙임,
80 : 감속수단.
Claims (3)
- 급류하천바닥 유속감속시설(10)에 있어서,
하천바닥(B)의 상면에 순차적으로 장착되고 내부에는 간격을 두고 다수개의 체결공(21)이 형성되는 베이스 콘크리트(20)들과,
최상단에 위치한 베이스 콘크리트(20)의 측면에 장착되고, 상단 측면에는 하천바닥(B)에 매설되는 고정부(32)가 돌출형성되며, 내부에는 간격을 두고 다수개의 체결공(31)이 형성되는 상부베이스 콘크리트(30)와,
상기 베이스 콘크리트(20)와 상부베이스 콘크리트(30) 및 상기 베이스 콘크리트(20)와 베이스 콘크리트(20)의 상면에 순차적으로 장착되고, 상기 체결공(21, 31)과 대응하는 위치에는 볼팅(100) 결합될 수 있도록 결합공(41)들이 형성되며, 상면 중앙부분에는 반달형상의 유속감속부(42)가 돌출형성되는 유속감속보 콘크리트 구조물(40)들과,
상기 상부베이스 콘크리트(30)의 측면과 유속감속보 콘크리트 구조물(40)의 측면에 연결장착되고 상면이 수평형성되는 상류바닥보강 콘크리트(50)와,
최하단에 위치한 베이스 콘크리트(20)와 유속감속보 콘크리트 구조물(40)의 일측이 지지되고 반대 측에는 돌붙임(70)이 연결설치되는 키 옹벽(60)을 포함하여 이루어진 것을 특징으로 하는 급류하천바닥 유속감속시설.
- 청구항 1에 있어서,
상기 유속감속부(42)의 측면 상단에 위치한 유속감속보 콘크리트 구조물(40)에 유속을 감속시킬 수 있도록 감속수단(80)이 각각 장착되되,
상기 감속수단(80)은 유속감속보 콘크리트 구조물(40)의 양측에 설치되는 지지대(81)와, 상기 지지대(81)의 사이에 장착되는 회전축(82)과, 상기 회전축(82)에 장착되고 외주면에 간격을 두고 날개(84)들이 형성되는 감속날개(83)로 구성되는 것을 특징으로 하는 급류하천바닥 유속감속시설.
- 청구항 1에 있어서,
상기 베이스 콘크리트(20)의 일측면에는 전·후 방향으로 장착홈(22)들이 형성되고 반대쪽 측면에는 상기 장착홈(22)들과 대응하는 위치에 장착돌기(23)들이 형성되어 끼움 결합될 수 있도록 한 것을 특징으로 하는 급류하천바닥 유속감속시설.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020100029189A KR101000567B1 (ko) | 2010-03-31 | 2010-03-31 | 급류하천바닥 유속감속시설 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020100029189A KR101000567B1 (ko) | 2010-03-31 | 2010-03-31 | 급류하천바닥 유속감속시설 |
Publications (1)
Publication Number | Publication Date |
---|---|
KR101000567B1 true KR101000567B1 (ko) | 2010-12-14 |
Family
ID=43512765
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020100029189A KR101000567B1 (ko) | 2010-03-31 | 2010-03-31 | 급류하천바닥 유속감속시설 |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101000567B1 (ko) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101342128B1 (ko) | 2013-06-28 | 2013-12-18 | 주식회사 옥토기술단 | 생태 하천의 유속 저감시설 |
KR20200041196A (ko) * | 2018-10-11 | 2020-04-21 | 정민시 | 유체의 운동에너지를 이용하기 위한 기초모듈 및 그 시공방법 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200410821Y1 (ko) | 2005-12-30 | 2006-03-08 | 주식회사 수성엔지니어링 | 하천바닥 세굴방지용 수중보 설치구조 |
KR100576133B1 (ko) | 2005-10-06 | 2006-05-03 | 한국기술개발 주식회사 | 하천 제방 세굴방지 블럭 |
KR100668128B1 (ko) | 2006-10-19 | 2007-01-16 | (주)평화엔지니어링 | 하천의 바닥에 설치되는 유속저감 및 어류서식블럭 |
-
2010
- 2010-03-31 KR KR1020100029189A patent/KR101000567B1/ko active IP Right Grant
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100576133B1 (ko) | 2005-10-06 | 2006-05-03 | 한국기술개발 주식회사 | 하천 제방 세굴방지 블럭 |
KR200410821Y1 (ko) | 2005-12-30 | 2006-03-08 | 주식회사 수성엔지니어링 | 하천바닥 세굴방지용 수중보 설치구조 |
KR100668128B1 (ko) | 2006-10-19 | 2007-01-16 | (주)평화엔지니어링 | 하천의 바닥에 설치되는 유속저감 및 어류서식블럭 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101342128B1 (ko) | 2013-06-28 | 2013-12-18 | 주식회사 옥토기술단 | 생태 하천의 유속 저감시설 |
KR20200041196A (ko) * | 2018-10-11 | 2020-04-21 | 정민시 | 유체의 운동에너지를 이용하기 위한 기초모듈 및 그 시공방법 |
KR102234888B1 (ko) * | 2018-10-11 | 2021-04-02 | 정민시 | 유체의 운동에너지를 이용하기 위한 기초모듈 및 그 시공방법 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP3230318U (ja) | 洋上風力発電用単杭の複合基礎構造 | |
JP5475182B1 (ja) | 堰堤型の発電装置 | |
CN113417252B (zh) | 一种驳岸加固设施及其施工方法 | |
KR101000567B1 (ko) | 급류하천바닥 유속감속시설 | |
KR100639128B1 (ko) | 방파제 기초의 세굴방지대 | |
Wang et al. | An experimental study of the local scour protection methods around the monopile foundation of offshore wind turbines | |
CN202482911U (zh) | 螺旋借力河道破淤扬沙清淤装置 | |
KR20060100315A (ko) | 상류부 옹벽식 필댐 | |
Bharadwaj et al. | Countermeasures for local scour around the bridge pier: a review | |
CN211872914U (zh) | 一种多砂石河流上的水电站枢纽拦石透水导砂装置 | |
CN210887090U (zh) | 一种自带消能的防波堤 | |
KR102038913B1 (ko) | 급류 유속 완화장치 및 이의 시공방법 | |
CN106930242A (zh) | 桩基溢流坝与铅丝石笼护坦 | |
CN209989781U (zh) | 一种粉细砂地层防洪堤坝新型结构 | |
CN106120640A (zh) | 一种防治山区河流桥梁基础冲刷的施工方法 | |
KR20110083935A (ko) | 친환경 복합 사방댐 | |
Chee et al. | STABLE PROFILES OF PLUNGE BASINS 1 | |
KR200413124Y1 (ko) | 수중 구조물 세굴(洗掘) 방지용 헥사포드 | |
Nielsen et al. | Submerged groynes for beach stabilisation | |
CN220888543U (zh) | 一种应对沟道下切侵蚀和溯源侵蚀作用的格栅坝 | |
WO2019200128A1 (en) | Modular hydropower unit | |
CN115075288B (zh) | 一种海洋工程重力式基础 | |
Chen et al. | Sluices and barrages | |
KR100647521B1 (ko) | 해안 방호용 파도 억제 시설 | |
JP7282949B1 (ja) | 石や岩による自然の土砂堆積を利用する洗掘防止工法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
A302 | Request for accelerated examination | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20131206 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20141209 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20151207 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20161207 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20171206 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20181206 Year of fee payment: 9 |