KR100996724B1 - Means for solidarity reinforcement bar of head part in steel pipe pile and method of foundation structure using thereof - Google Patents

Means for solidarity reinforcement bar of head part in steel pipe pile and method of foundation structure using thereof Download PDF

Info

Publication number
KR100996724B1
KR100996724B1 KR1020100049794A KR20100049794A KR100996724B1 KR 100996724 B1 KR100996724 B1 KR 100996724B1 KR 1020100049794 A KR1020100049794 A KR 1020100049794A KR 20100049794 A KR20100049794 A KR 20100049794A KR 100996724 B1 KR100996724 B1 KR 100996724B1
Authority
KR
South Korea
Prior art keywords
reinforcing
steel pipe
pipe pile
reinforcing bar
plate
Prior art date
Application number
KR1020100049794A
Other languages
Korean (ko)
Inventor
정해용
김형구
김성환
이성열
구정민
정충열
Original Assignee
(주)동명기술공단종합건축사사무소
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)동명기술공단종합건축사사무소 filed Critical (주)동명기술공단종합건축사사무소
Priority to KR1020100049794A priority Critical patent/KR100996724B1/en
Application granted granted Critical
Publication of KR100996724B1 publication Critical patent/KR100996724B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/28Prefabricated piles made of steel or other metals
    • E02D5/285Prefabricated piles made of steel or other metals tubular, e.g. prefabricated from sheet pile elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/223Details of top sections of foundation piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/11Height being adjustable
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/14Geometrical or physical properties resilient or elastic
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • E02D2200/1685Shapes cylindrical
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Foundations (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

PURPOSE: A device for fastening reinforcing rods for steel pile head reinforcement and a foundation construction method using the same are provided to reinforce the head of a steel pile using the existing reinforcing rods without forming thread on the reinforcing rods. CONSTITUTION: A device for fastening reinforcing rods for steel pile head reinforcement comprises a plurality of reinforcing rods(20), a reinforcing bar binding unit, and a pouring finishing board(30). The reinforcing rods join steel pipe piles(10) buried underground and concrete foundation on the ground and reinforce the base structure. The reinforcing bar binding unit fixes the reinforcing rods to the steel piles. The pouring finishing board is installed inside the steel piles and sets a concrete pouring position.

Description

강관말뚝 두부보강용 철근체결장치 및 이를 이용한 기초 시공 방법{MEANS FOR SOLIDARITY REINFORCEMENT BAR OF HEAD PART IN STEEL PIPE PILE AND METHOD OF FOUNDATION STRUCTURE USING THEREOF}Rebar fastening device for steel pipe pile head reinforcement and basic construction method using the same {MEANS FOR SOLIDARITY REINFORCEMENT BAR OF HEAD PART IN STEEL PIPE PILE AND METHOD OF FOUNDATION STRUCTURE USING THEREOF}

본 발명은 강관말뚝의 두부보강용 철근체결장치 및 이를 이용한 기초 시공 방법에 관한 것으로, 더욱 상세하게는 지중에 매설된 강관말뚝의 두부를 보강하고 콘크리트 기초부와 결속하기 위한 철근에 나사산가공, 볼트접합 등을 하지 않고 기성품의 철근과 철근체결장치를 사용하여 강관말뚝의 두부를 보강할 수 있는 두부 보강용 철근체결장치 및 이를 이용한 기초 시공 방법에 관한 것이다.
The present invention relates to a reinforcing rod reinforcing device for a steel pipe pile and a basic construction method using the same, and more particularly, reinforcing the head of a steel pipe pile buried in the ground and threaded to the reinforcing bars to bind with the concrete foundation, bolts The present invention relates to a reinforcing head reinforcing device for reinforcing a head and a method of basic construction using the same, which can reinforce the head of a steel pipe pile using a ready-made reinforcing bar and a reinforcing bar fastener.

강관말뚝기초는 지반에 강관말뚝을 삽입하고, 그 강관말뚝의 두부에 철근 구조물을 설치한 후, 그 철근 구조물의 주위에 거푸집을 설치하고, 콘크리트를 타설함으로써, 강관말뚝과 콘크리트 구조물을 일체로 형성한 기초 구조물을 말한다.The steel pipe pile foundation is formed by inserting steel pipe piles into the ground, installing reinforcing steel structures on the head of the steel pipe piles, installing formwork around the reinforcing steel structures, and pouring concrete to form steel pipe piles and concrete structures integrally. Refers to a foundation structure.

종래의 강관말뚝기초는 예컨대 강관말뚝기초는 지반에 삽입되도록 설치된 강관말뚝의 두부에 복수개의 철근을 설치하고, 상기 강관말뚝과 철근 구조물이 일체로 형성되도록 구성된다.Conventional steel pipe pile foundation, for example, the steel pipe pile foundation is installed so that a plurality of reinforcing bars on the head of the steel pipe pile installed to be inserted into the ground, the steel pipe pile and the reinforcing structure is formed integrally.

종래 기술의 일예로 의한 강관말뚝의 두부보강구조는 철근이 고정되며 강관의 상부에 구비되는 상부원판과, 상기 상부원판과 소정거리 이격되어 상기 강관말뚝내에 강관말뚝 내주면과 접하여 구비되는 하부원판과, 상기 상부원판과 하부원판을 상호 지지하는 다수의 보강부재들을 구비하여 상기 상부원판 및 강관말뚝, 하부원판에 의해 형성된 공간에 콘크리트를 채워 양생시킬 수 있도록 한 것이다.The head reinforcing structure of the steel pipe pile according to an example of the prior art is a reinforcing bar is fixed to the upper disk and provided on the upper portion of the steel pipe, a lower disk spaced apart a predetermined distance from the upper disk and provided in contact with the inner circumferential surface of the steel pipe pile in the steel pipe pile, It is provided with a plurality of reinforcing members for supporting the upper disk and the lower disk to allow the concrete to cure by filling the space formed by the upper disk and the steel pipe pile, the lower disk.

종래 기술에 의한 강관 강관말뚝 두부 보강구조로 예컨대, 국내 등록실용신안공보 제2000-0216366호가 있다.As a steel pipe steel pipe pile head reinforcement structure according to the prior art, there is, for example, domestic registered utility model publication No. 2000-0216366.

상기 종래 기술은 나사부를 형성한 철근이 나사결합되는 체결공을 둘레 일정간격으로 형성한 링형 상부원판과, 상기 상부원판의 저면에 상기 체결공을 피하여 용접되는 보강부재와, 상기 보강부재를 피하여 강관의 4등분된 내면에 용접되는 지지블록과, 상기 지지블록을 보강지지하기 위해 상기 강관내에 횡방향으로 용접되는 +자형 지지간과, 상기 보강부재의 하부위치에서 강관내주면과 접하여, 상기 지지블록의 저면에 용접되어 고정되는 원판으로 구성되어 있다.The prior art is a ring-shaped upper disk formed with a predetermined interval circumferentially the fastening hole is screwed into the reinforcing bar, the reinforcing member welded to avoid the fastening hole on the bottom surface of the upper disk, and the steel pipe avoiding the reinforcing member A support block welded to an inner quadrant of the support block, a + -shaped support rod welded transversely into the steel pipe for reinforcing support of the support block, and a bottom surface of the support block in contact with the inner circumferential surface of the steel pipe at a lower position of the reinforcing member; It consists of a disc which is welded to and fixed to it.

이처럼 종래 기술에 의한 강관말뚝 두부 보강구조는, 철근을 나사식으로 고정하기 위하여 철근의 외주면에 나사부를 가공하거나, 별도의 체결장치를 볼트와 너트로 연결하는 방식으로 구성되어 철근에 나사부를 가공하기 위해서 많은 비용이 소요되어 시공원가가 비싸지며, 각각의 철근 또는 너트를 일일이 돌려서 체결하여야 하므로 설치시간이 길어지는 문제점이 있다.
Thus, the steel pipe pile head reinforcement structure according to the prior art is configured to process the screw portion on the outer circumferential surface of the reinforcing bar to fix the rebar in a threaded manner, or to connect a separate fastening device with a bolt and a nut to process the screw part in the rebar. In order to take a lot of costs for the city park is expensive, and the rebar or nut must be fastened by turning each one, there is a problem that the installation time is long.

본 발명은 전술한 바와 같은 문제점을 해결하기 위한 것으로, 강관말뚝과 기초를 결속하기 위한 철근의 가공을 최소화하여 기성품인 철근을 저렴하고 용이하게 이용할 수 있는 강관말뚝 두부보강용 철근체결장치 및 이를 이용한 기초 시공 방법을 제공하려는데 목적이 있다.The present invention is to solve the problems as described above, to minimize the processing of the reinforcing bars to bind the steel pipe pile and the foundation reinforcement fastening device for reinforcing steel pipe pile tofu and cheaply available ready-made rebar The purpose is to provide a basic construction method.

전술한 바와 같은 목적을 달성하기 위한 본 발명에 따른 강관말뚝 두부보강용 철근체결장치는, 강관말뚝의 둘레부에 원주방향을 따라 배치되며 하단부가 상기 강관말뚝에 원주향을 따라 일정 간격을 두고 형성된 철근삽입공에 삽입되어 하단부가 상기 강관말뚝의 내부에 배치되는 다수의 철근과; 상기 강관말뚝의 내부에 삽입 고정되며 콘크리트의 타설위치를 설정하는 타설마감판과; 상기 다수의 철근을 하나로 결속하는 결속수단을 포함하며, 상기 결속수단은 상기 철근이 삽입 고정되는 다수의 철근고정부가 구비된 철근고정소켓을 포함하는 것을 특징으로 한다.In order to achieve the above object, the present invention provides a reinforcing bar for reinforcing a steel pipe pile head, comprising: a steel pipe pile installed along a circumferential direction of a steel pipe pile and having a lower end formed at a predetermined interval along a circumferential direction of the steel pipe pile; A plurality of reinforcing bars inserted into the reinforcing hole and having a lower end disposed inside the steel pipe pile; A pouring finish plate inserted and fixed inside the steel pipe pile to set a pouring position of concrete; A binding means for binding the plurality of reinforcing bars into one, the binding means is characterized in that it comprises a reinforcing bar fixed socket is provided with a plurality of reinforcing bars to which the reinforcement is inserted.

상기 철근고정소켓은 하부판과 덮개판으로 분리 구성되는 것이 바람직하다.The rebar fixing socket is preferably configured to be separated into a lower plate and a cover plate.

상기 철근고정소켓은 높이가 조정되고, 탄성부재를 통해 탄력 지지되는 것이 바람직하다.The rebar fixing socket is height is adjusted, it is preferable that the elastic support is elastic.

본 발명에 의한 강관말뚝 두부보강용 철근체결장치를 이용한 기초 시공 방법은, 지중에 매설된 강관말뚝의 노출부를 일정하게 절단하고 상기 강관말뚝을 지중에 매설하되, 상기 강관말뚝의 두부가 지상으로 돌출되도록 매설하는 제1단계와;
상기 제1단계에 의해 매설된 강관말뚝의 둘레부에 다수의 철근을 배열함과 아울러 마감판과 철근고정소켓을 상기 강관말뚝 내부에 설치하여 상기 철근을 상기 철근고정소켓에 고정하는 제2단계와; 상기 제2단계 이후 기초부분에 기초철근을 배근하면서 상기 철근과 결속하고, 지상과 상기 강관말뚝의 내부에 콘크리트를 타설하여 상기 강관말뚝과 철근 및 상기 콘크리트를 서로 결속하는 제3단계를 포함하고, 상기 제2단계는, 상기 철근이 수용되는 하부판, 상기 하부판의 상부에 체결구를 통해 결합되어 상기 하부판에 수용된 철근을 고정하는 덮개판으로 이루어진 철근고정소켓을 상기 타설마감판의 상부에 일정 거리를 두고 이격되도록 설치하고, 상기 철근을 상기 강관말뚝에 형성된 철근삽입공에 외부에서부터 내부로 관통시켜 상기 철근고정소켓에 고정하여 설치하는 것을 특징으로 한다.
In the basic construction method using the steel pipe pile head reinforcing reinforcing device according to the present invention, the exposed portion of the steel pipe pile embedded in the ground is constantly cut and the steel pipe pile is buried in the ground, the head of the steel pipe pile protrudes to the ground A first step of embedding;
A second step of arranging a plurality of reinforcing bars at the periphery of the steel pipe pile buried by the first step, and installing a finishing plate and a reinforcing bar fixing socket into the steel pipe pile to fix the reinforcing bar to the reinforcing bar fixing socket; ; And a third step of binding the steel reinforcement to the foundation part after the second step and binding the steel reinforcement, and placing concrete on the ground and the inside of the steel pipe pile to bind the steel pipe pile, the steel reinforcement and the concrete to each other. In the second step, the reinforcing bar fixed socket consisting of a cover plate for fixing the reinforcing steel bars received on the lower plate is coupled to the upper plate of the lower plate, the lower plate to accommodate the reinforcing bar by a certain distance It is installed so as to be spaced apart, and the reinforcing bar is penetrated from the outside to the reinforcing hole formed in the steel pipe pile from the outside to be fixed to the reinforcing bar fixed socket.

본 발명에 의한 강관말뚝 두부보강용 철근체결장치 및 이를 이용한 기초 시공 방법에 의하면, 철근이 철근고정소켓에 끼움식으로 연결 고정되어 철근을 고정하기 위하여 철근에 나사부 등을 가공할 필요가 없으며, 따라서, 기성품의 철근을 그대로 이용할 수 있으므로 시공원가를 절감할 수 있고 철근이나 기타 자재를 설치하기 위하여 다수의 볼트나 너트를 이용하여 연결하지 않고 철근의 삽입작업만을 통해 철근을 설치할 수 있으므로 공기를 단축할 수 있다.
According to the reinforcement fastening device for reinforcing steel pipe pile head reinforcement according to the present invention and the basic construction method using the same, the rebar is connected to the reinforcing bar fixed socket so that it is not necessary to process the threaded part in the reinforcing bar to fix the reinforcing bar. In addition, it is possible to use the ready-made reinforcing bar as it is, and to save the city park price, and to shorten the air by installing the reinforcing bar only by inserting the reinforcing bar without using multiple bolts or nuts to install reinforcing bar or other materials. Can be.

도 1은 본 발명에 의한 강관말뚝 두부보강용 철근체결장치의 종단면도.
도 2는 본 발명에 의한 강관말뚝 두부보강용 철근체결장치에 적용된 철근결속수단의 분해 사시도.
도 3은 본 발명에 의한 두부 보강 장치에 적용된 에지보강링의 다른 예시도.
도 4는 본 발명에 의한 두부 보강 장치에 적용된 철근결속수단의 다른 예시도.
도 5와 도 6은 본 발명에 의한 강관말뚝 두부보강용 철근체결장치에 적용된 철근결속수단의 또 다른 예시도.
1 is a longitudinal sectional view of a steel pipe pile head reinforcing device according to the present invention.
Figure 2 is an exploded perspective view of the reinforcing bar reinforcing means applied to the steel pipe pile head reinforcing reinforcing device according to the present invention.
Figure 3 is another illustration of the edge reinforcing ring applied to the head reinforcement device according to the present invention.
Figure 4 is another illustration of the reinforcing bar binding means applied to the head reinforcement device according to the present invention.
5 and 6 is another exemplary view of the reinforcing bar reinforcing means applied to the reinforcing bar reinforcing steel pipe pile head reinforcement according to the present invention.

도 1과 도 2에서 보이는 바와 같이, 본 발명에 의한 강관말뚝 두부보강용 철근체결장치는, 지중에 매설되는 강관말뚝(10)과 지상의 기초 콘크리트를 서로 결속 및 기초부를 보강하기 위한 다수의 철근(20)(종방향의 보강철근과 띠철근으로 이루어진다), 다수의 철근(20)을 강관말뚝(10)에 고정하는 철근 결속수단, 강관말뚝(10)의 내부에 설치되며 콘크리트의 타설 위치를 설정하는 타설마감판(30)으로 구성된다. As shown in Figure 1 and 2, the steel pipe pile head reinforcing reinforcing device according to the present invention, a plurality of reinforcing bars for binding the steel pipe pile 10 and ground foundation concrete buried in the ground and reinforce each other (20) (consisting of longitudinal reinforcing bars and band reinforcing bars), the reinforcing bar fastening means for fixing a plurality of reinforcing bars 20 to the steel pipe pile (10), installed inside the steel pipe pile (10) And a putting finish plate 30 to be set.

먼저 강관말뚝(10)은 내부가 중공인 강관이 사용되며, 철근(20)을 연결하기 위한 철근삽입공(11)이 원주방향을 따라 일정 간격을 두고 형성된다. First, the steel pipe pile 10 is a hollow steel pipe is used, the reinforcing hole 11 for connecting the reinforcing bar 20 is formed at regular intervals along the circumferential direction.

철근(20)은 통상적으로 사용되는 기성품이며, 나사선 등의 가공이 필요없다는 점에 특징이 있다. 단, 철근(20)을 강관말뚝(10)에 결속 및 나아가서는 다수의 철근(20)을 서로 결속할 수 있도록 철근(20)의 하단부가 벤딩된다(철근(20)을 벤딩하는 것은 나사선을 가공하는 것에 비해 비용이 매우 저렴하고 작업시간이 짧다).The reinforcing bar 20 is a ready-made product which is usually used, and is characterized in that processing such as a screw thread is not necessary. However, the lower end of the reinforcing bar 20 is bent to bind the reinforcing bar 20 to the steel pipe pile 10 and further, to bind the plurality of reinforcing bars 20 to each other (bending the reinforcing bar 20 to process a screw thread. Cost is very low and operation time is short).

상기 철근 결속수단은, 철근(20)의 하단부가 고정되는 철근고정소켓(40)이 포함된다.The reinforcing bar binding means, a reinforcing bar fixed socket 40 is fixed to the lower end of the reinforcing bar 20.

철근고정소켓(40)은 철근(20)이 각각 삽입되는 철근고정부(41)가 형성된다. 예를 들어, 철근고정부(41)는 철근고정소켓(40)의 둘레부에 외부에서부터 연통하는 홈의 형태로 방사형으로 형성되어 철근(20)의 하단부가 끼워 고정되도록 할 수 있다.
The reinforcing bar fixing socket 40 is formed with a reinforcing bar fixing portion 41 into which the reinforcing bar 20 is inserted. For example, the reinforcing bar fixing portion 41 may be radially formed in the form of a groove communicating from the outside to the circumference of the reinforcing bar fixed socket 40 may be fixed to the lower end of the reinforcing bar 20.

철근고정소켓(40)은 철근고정부(41)가 형성된 단일 구조일 수도 있지만, 철근(20)을 보다 견고하게 고정할 수 있도록 하부판(42)과 덮개판(43)으로 분리 구성될 수 있다. 하부판(42)과 덮개판(43)은 철근(20)이 고정되는 철근고정부(41)를 형성하며, 예를 들어, 하부판(42)과 덮개판(43)의 하나 이상에 철근(20)의 곡률과 유사한 홈 형태의 철근고정부(41)가 형성된다. 도면에서는 하부판(42)과 덮개판(43)이 각각 요철 형태로 형성되어 하부판(42)과 덮개판(43)의 결합에 의해 이들(42,43)의 요부가 철근고정부(41)를 형성하는 것으로 도시하였다.The rebar fixing socket 40 may be a single structure in which the rebar fixing part 41 is formed, but may be separated into a lower plate 42 and a cover plate 43 to fix the reinforcing bar 20 more firmly. The lower plate 42 and the cover plate 43 form a reinforcing bar 41 to which the rebar 20 is fixed. For example, the lower plate 42 and the cover plate 43 may include the rebar 20 in one or more of the lower plate 42 and the cover plate 43. Rebar fixing part 41 of the groove shape similar to the curvature of the is formed. In the drawing, the lower plate 42 and the cover plate 43 are formed in the form of irregularities, respectively, and the recesses of these 42 and 43 form the reinforcing bars 41 by the combination of the lower plate 42 and the cover plate 43. As shown.

이러한 구조에 의하면, 하부판(42)에 철근(20)을 거치하고 덮개판(43)을 하부판(42)의 위에 덮은 후 체결구(44)를 체결함으로써 하부판(42)과 덮개판(43)에 의해 철근(20)을 고정할 수 있다. 체결구(44)는 볼트 또는 너트일 수 있다(볼트 또는 너트를 체결구(44)로 이용하여 하부판(42)과 덮개판(43)을 체결하는 것을 당업자라면 충분히 실시할 수 있다).According to this structure, the reinforcing bar 20 is mounted on the lower plate 42, the cover plate 43 is covered on the lower plate 42, and then the fastener 44 is fastened to the lower plate 42 and the cover plate 43. The rebar 20 can be fixed by this. The fastener 44 may be a bolt or a nut (a person skilled in the art may fully perform the fastening of the lower plate 42 and the cover plate 43 using the bolt or nut as the fastener 44).

도 2에서와 같이, 하부판(42)과 덮개판(43)에 삽입된 철근(20)이 횡방향으로 인발되거나 거동하지 않도록 하부판(42)과 덮개판(43) 중 하나 이상에는 철근(20)의 둘레부에 형성된 마디(21)가 안착되는 마디안착부(42c)가 형성된다(도면에서는 하부판(42)에만 형성된 것으로 도시). 도면에서는 철근(20)의 마디(21)와 마디안착부(42c)를 간략하게 도시하였으나, 철근(20)의 마디(21)는 종횡방향으로 형성되므로 마디안착부(42c)는 종횡방향으로 형성될 수 있고, 마디안착부(42c)는 홈, 돌기, 나사선 등의 형태일 수 있다. 2, reinforcing rods 20 are attached to at least one of the lower plate 42 and the lid plate 43 so that the reinforcing bars 20 inserted into the lower plate 42 and the lid plate 43 are not pulled out or moved in the lateral direction, A node seating portion 42c in which the node 21 formed at the periphery of the seat is seated is formed (shown as being formed only in the lower plate 42 in the drawing). In the drawing, the bar 21 and the node seating portion 42c of the reinforcing bar 20 are briefly illustrated. However, the node 21 of the reinforcing bar 20 is formed in the longitudinal direction, so the node seating portion 42c is formed in the longitudinal direction. The node fitting portion 42c may be in the form of a groove, a protrusion, a thread, or the like.

하부판(42)은 포스트(후술하는 포스트의 형태, 또는 타설마감판(30)의 상면에 형성된 돌기 위에 고정되는 형태 등을 말함)를 통해 타설마감판(30)의 상부에 타설마감판(30)의 상면으로부터 일정 높이 이격되도록 배치될 수도 있고, 다르게는 타설마감판(30)의 상면에 일체로 형성되거나 고정될 수도 있다. The lower plate 42 is a pour finishing plate 30 on the top of the pour finishing plate 30 through a post (in the form of a post to be described later, or a shape fixed to the protrusion formed on the upper surface of the pour finishing plate 30, etc.). It may be arranged to be spaced apart from the upper surface by a predetermined height, or alternatively may be integrally formed or fixed to the upper surface of the pour finish plate 30.

하부판(42)과 덮개판(43)은 각각 기초 콘크리트가 통과 및 충진되는 하나 이상의 충진홀(42a,43a)이 구비될 수 있다. 충진홀(42a,43a)은 콘크리트를 통과시켜 덮개판(43)에 가해지는 콘크리트 압력을 분산시켜 철근고정소켓(40)이 하부로 처지지 않도록 할 수 있다. 철근고정소켓(40)은 콘크리트 압력을 분산하기 위하여 덮개판(43)의 상면이 중앙에서 둘레부로 갈수록 하향 경사지게 형성될 수 있다.The lower plate 42 and the cover plate 43 may be provided with one or more filling holes 42a and 43a through which basic concrete passes and is filled, respectively. Filling holes (42a, 43a) can be passed through the concrete to distribute the concrete pressure applied to the cover plate 43 to prevent the reinforcement fixing socket 40 does not sag below. Reinforcing fixing socket 40 may be formed to be inclined downward as the upper surface of the cover plate 43 from the center to the circumference to disperse the concrete pressure.

그리고, 하부판(42)과 덮개판(43)은 결합시 요부가 일치하도록 하나 이상의 위치설정돌기(42b)와 위치설정홈(43b)이 형성될 수 있다. 위치설정돌기(42b)와 위치설정홈(43b)은 위치가 서로 바뀔 수도 있고, 다르게는 하부판(42)과 덮개판(43)에 복합 형성될 수도 있다.In addition, the lower plate 42 and the cover plate 43 may be formed with one or more positioning protrusions 42b and positioning grooves 43b so that the recesses coincide with each other. The positioning protrusion 42b and the positioning groove 43b may be interchanged with each other, or alternatively, may be formed in the lower plate 42 and the cover plate 43 in combination.

강관말뚝의 절단면이 콘크리트에 바로 접하면 응력집중이 일어나 파괴될 수 있으며, 이를 방지하기 위하여 에지보강링(50)이 적용된다.If the cut surface of the steel pipe pile is directly in contact with the concrete can be stressed and destroyed, the edge reinforcing ring 50 is applied to prevent this.

에지보강링(50)은 강관말뚝(10)의 내부에 콘크리트가 타설될 수 있도록 하나 이상의 구멍을 갖는 형태 예를 들어 링 형태일 수 있고, 철근(20)이 수용되는 철근수용부(51)가 구비되고, 강관말뚝(10)의 상단부에 용접 등으로 고정된다. The edge reinforcing ring 50 may be in the form of one or more holes, for example, in the form of a ring, so that concrete can be poured into the steel pipe pile 10, and the reinforcing bar 51 in which the reinforcing bar 20 is accommodated is formed. It is provided, and fixed to the upper end of the steel pipe pile 10 by welding or the like.

철근수용부(51)는 철근(50)이 관통하는 구멍의 형태이거나 도 3에서와 같이, 철근(20)이 외부에서부터 끼워 고정될 수 있는 홈의 형태일 수 있다.
The reinforcing bar 51 may be in the form of a hole through which the reinforcing bar 50 penetrates, or as shown in FIG. 3, in the form of a groove in which the reinforcing bar 20 may be inserted and fixed from the outside.

본 발명에 두부 보강 장치의 설치 작업은 다음과 같다.The installation work of the head reinforcement device in the present invention is as follows.

타설마감판(30)에 철근고정소켓(40)을 설치한다. 하부판(42) 위에 덮개판(43)을 고정할 때, 위치설정돌기(42b)와 위치설정홈(43b)이 적용된 경우 이들(42b,43b)에 의해 하부판(42)과 덮개판(43)의 요부가 자연스럽게 일치된다.Install the reinforcing bar fixed socket 40 on the finishing plate (30). When fixing the cover plate 43 on the lower plate 42, when the positioning projection 42b and the positioning groove 43b is applied to the lower plate 42 and the cover plate 43 by the 42b, 43b The lugs naturally match.

이때, 철근(20)의 자연스러운 삽입을 유도할 수 있도록 체결구(44)를 느슨하게 체결하여 덮개판(43)이 승강하도록 한다.At this time, the cover plate 43 is elevated by loosely fastening the fastener 44 so as to induce natural insertion of the reinforcing bar 20.

철근(20)을 에지보강링(50)에 거치 및 강관말뚝(10)의 철근삽입공(11)에 삽입하고, 철근고정소켓(40)의 철근고정부(41)에 삽입한다. 철근(20)이 삽입될 때 덮개판(43)은 철근(20)에 의해 상승하여 철근(20)의 삽입을 구속하지 않는다.The rebar 20 is mounted on the edge reinforcing ring 50 and inserted into the reinforcing hole 11 of the steel pipe pile 10, and inserted into the reinforcing fixing part 41 of the reinforcing fixing socket 40. When the reinforcing bar 20 is inserted, the cover plate 43 is raised by the reinforcing bar 20 and does not restrain the insertion of the reinforcing bar 20.

철근(20)의 삽입이 완료되면 체결구(44)를 완전히 체결하여 덮개판(43)을 하부판(42)에 견고하게 조여 고정함으로써 철근(20)이 빠지지 않도록 고정한다. 이로써, 철근(20)의 설치가 완료되며, 지상에 콘크리트를 타설하면, 콘크리트가 강관말뚝(10)의 내부(타설마감판(30)의 위쪽까지)에 타설되며, 콘크리트는 덮개판(43)의 상면을 미끄러지면서 충진되고 충진홀(42a,43a)을 통과하면서 충진되어, 콘크리트 압력에 의해 철근고정소켓(40)이 미끄러지거나 기울어지지 않으므로 철근(20)의 설치 상태를 유지할 수 있다.
When the insertion of the reinforcing bar 20 is completed, the fastener 44 is completely fastened so that the cover plate 43 is firmly tightened and fixed to the lower plate 42 to fix the reinforcing bar 20. Thus, the installation of the reinforcing bar 20 is completed, and when the concrete is poured on the ground, the concrete is poured into the interior of the steel pipe pile 10 (up to the top of the pouring finish plate 30), the concrete cover plate 43 Filled while sliding the upper surface of the filling through the filling holes (42a, 43a), the reinforcement fixing socket 40 is not slipped or inclined due to the concrete pressure can maintain the installation state of the reinforcing bar (20).

이하, 철근고정소켓(40)의 다른 실시예에 대해 설명한다.Hereinafter, another embodiment of the rebar fixing socket 40 will be described.

철근고정소켓(40)은 체결구(44)를 통해 고정되는 것에 한정되지 않고 높이조정가능하게 설치될 수도 있으며, 예를 들어, 도 4에서 보이는 것처럼, 타설마감판(30)에 볼트머리(47)를 갖는 볼트 등의 포스트(45)(포스트(45)가 타설마감판(30)에서 빠지지 않도록 와셔, 너트 등이 사용될 수 있다)가 세워지고, 포스트(45)에 높이조정너트(46)가 나사 체결되어 높이조정너트(46)의 조정을 통해 철근고정소켓(40)의 높이를 조정할 수 있다.Reinforcing fixing socket 40 is not limited to being fixed through the fastener 44 may be installed to be adjustable height, for example, as shown in Figure 4, the bolt head 47 to the finishing plate 30 ), A post 45 such as a bolt (a washer, a nut or the like can be used so that the post 45 does not fall out of the finishing plate 30) is erected, and the height adjustment nut 46 is placed on the post 45. The height of the rebar fixing socket 40 can be adjusted by adjusting the height adjustment nut 46 by screwing.

포스트(45)는 타설마감판(30)에 일체로 형성될 수도 있지만, 제조와 유지보수를 감안하여 타설마감판(30)에 결합되는 단품으로 형성되며, 하단부가 타설마감판(30)에 관통되어 세워 고정될 수 있다.The post 45 may be formed integrally with the pouring final plate 30, but is formed as a single piece coupled to the pouring final plate 30 in consideration of manufacturing and maintenance, and a lower end penetrates the pouring final plate 30. Can be fixed upright.

이때, 체결구(44)는 포스트(45)에 나사 체결되어 철근고정소켓(40)을 높이조정너트(46)측으로 지지하는 너트일 수 있다.At this time, the fastener 44 may be a nut that is screwed to the post 45 to support the reinforcement fixing socket 40 toward the height adjustment nut 46.

철근고정소켓(40)을 높이조정 가능하도록 구성하는 것에 대해서 하부판(42)과 덮개판(43)으로 분리 구성된 것을 예로 들어 설명하였으나, 하부판(42)과 덮개판(43)이 일체형으로 구성된 철근고정소켓(40)도 동일한 방식으로 높이 조정 가능하다.Although the lower plate 42 and the cover plate 43 have been described as an example of being configured so that the height of the reinforcing fixing socket 40 is adjustable, the lower plate 42 and the cover plate 43 are integrally fixed with the reinforcing bar. The socket 40 is also height adjustable in the same manner.

그 이외의 구성은 전술한 철근고정소켓(40)과 동일할 수 있다.
Other configurations may be the same as the reinforcing bar fixing socket 40 described above.

도 5와 도 6에서와 같이, 철근고정소켓(40)의 덮개판(43)은 포스트(45)에 탄성부재(48)(예를 들어 코일스프링)를 통해 탄력적으로 승강할 수 있도록 구성될 수도 있다.5 and 6, the cover plate 43 of the reinforcement fixing socket 40 may be configured to be elastically lifted and lifted through the elastic member 48 (for example, coil spring) to the post 45. have.

탄성부재(48)는 포스트(45)에 끼워지면서 체결구(44)를 통해 가압되어 덮개판(43)을 하부판(42)측으로 눌러 지지한다.The elastic member 48 is pressed through the fastener 44 while being fitted to the post 45 to press and support the cover plate 43 toward the lower plate 42.

탄성부재(48)가 적용된 방식은, 철근(20)이 하부판(42)과 덮개판(43) 사이의 철근고정부(41)에 삽입될 때 덮개판(43)이 철근(20)에 의해 상승하여 탄성부재(48)를 압축함으로써 덮개판(43)을 분리하지 않고도 철근(20)을 삽입할 수 있고, 탄성부재(48)는 탄성력에 의해 덮개판(43)을 철근(20)측으로 가압하여 철근(20)을 견고하게 지지할 수 있다.
The way in which the elastic member 48 is applied is that the cover plate 43 is raised by the reinforcing bar 20 when the reinforcing bar 20 is inserted into the rebar fixing part 41 between the lower plate 42 and the cover plate 43. By compressing the elastic member 48 to insert the reinforcing bar 20 without removing the cover plate 43, the elastic member 48 by pressing the cover plate 43 to the reinforcing bar 20 side by the elastic force The rebar 20 can be firmly supported.

본 발명에 의한 두부 보강 장치를 이용한 기초 시공 방법은 다음과 같다.Basic construction method using the head reinforcement device according to the present invention is as follows.

(S10) 강관말뚝 매설.(S10) Laying steel pipe piles.

토목 구조물이나 건축 구조물을 시공할 때 기초부를 시공하며, 다수의 강관말뚝(10)을 지중에 매설한다. 이때, 지중에 매설된 강관말뚝(10)과 지상의 기초부를 서로 결속하기 위하여 강관말뚝(10)의 두부가 지중에서 지상으로 돌출되도록 매설한다.When constructing civil engineering structures or building structures, the foundation is constructed and many steel pipe piles (10) are buried in the ground. At this time, the head of the steel pipe pile 10 is buried so as to project from the ground to the ground in order to bind the foundation of the steel pipe pile 10 and the ground buried in the ground.

(S20) 철근고정소켓 설치.(S20) Rebar fixing socket installation.

강관말뚝(10)과 기초부(콘크리트)는 철근을 통해 서로 결속되며, 강관말뚝(10)에 설치되는 철근(20)은 지상의 기초부에 배근되는 기초철근(1)과 결속된다. 철근(20)을 강관말뚝(10)에 설치하기 위하여 철근고정소켓(40)을 설치한다. 철근고정소켓(40)에 대해서는 구체적인 실시예들을 전술하였으므로 방법의 설명시에는 구체적인 설명을 생략한다.Steel pipe pile 10 and the foundation (concrete) is bound to each other through the reinforcing bars, the steel reinforcement 20 is installed on the steel pipe pile (10) is bound with the basic reinforcement (1) to be reinforcement to the base of the ground. In order to install the reinforcing bar 20 to the steel pipe pile 10, the reinforcing bar fixed socket 40 is installed. Since the specific embodiments of the reinforcement fixing socket 40 have been described above, a detailed description thereof will be omitted when describing the method.

(S30) 철근 설치.(S30) rebar installation.

철근고정소켓(40)의 설치가 완료되면, 철근(20)을 철근고정소켓(40)에 고정하여 강관말뚝(10)과 결속한다. 구체적으로, 철근(20)을 에지보강링(50)의 철근수용부(51)에 수용하고 하단부의 벤딩부를 강관말뚝(10)의 철근삽입공(11)에 관통시킨 후 철근고정소켓(40)의 철근고정부(41)에 삽입 고정한다. 철근(20)은 하단부가 철근고정소켓(40)에, 하단부로부터 상측으로 이격된 부분이 에지보강링(50)에 고정되어 비틀림없이 세워진 상태를 유지할 수 있다.When the installation of the rebar fixing socket 40 is completed, the reinforcing bar 20 is fixed to the rebar fixing socket 40 to bind with the steel pipe pile 10. Specifically, the reinforcing bar 20 is accommodated in the reinforcing part 51 of the edge reinforcing ring 50 and the bending part of the lower part is passed through the reinforcing hole 11 of the steel pipe pile 10 and then the rebar fixing socket 40. And is inserted and fixed to the reinforcing bar fixing portion 41 of the frame. Reinforcing bar 20 is a lower end portion is fixed to the reinforcement socket 40, the portion spaced upward from the lower end is fixed to the edge reinforcing ring 50 can be maintained in a state without twisting.

(S40) 기초부 타설.(S40) Foundation casting.

지상에 기초철근을 배근한 후 상기 기초철근을 강관말뚝(10)에 설치된 철근(20)과 결속하며, 이어서, 콘크리트를 타설한다. 콘크리트는 강관말뚝(10)의 내부와 지상에 타설되어 양생됨으로써 기초부를 시공한다.After reinforcing the basic reinforcing bar on the ground, the basic reinforcing bar is bound with the reinforcing bar 20 installed in the steel pipe pile 10, and then the concrete is poured. Concrete is built on the ground and cured inside the steel pipe pile (10) to construct the foundation.

10 : 강관말뚝, 11 : 철근삽입공
20 : 철근, 21 : 마디
30 : 타설마감판, 40 : 철근고정소켓
41 : 철근고정부, 42 : 하부판
42a,43a : 충진홀, 42b : 위치설정돌기
42c : 마디안착부, 43 : 덮개판
43b : 위치설정홈, 44 : 체결구
45 : 포스트, 46 : 높이조정너트
47 : 볼트머리, 48 : 탄성부재
50 : 에지보강링,
10: steel pipe pile, 11: rebar insertion hole
20: rebar, 21: node
30: Pour finish plate, 40: Rebar fixing socket
41: reinforcing bar, 42: bottom plate
42a, 43a: Filling hole, 42b: Positioning protrusion
42c: node fitting portion, 43: cover plate
43b: positioning groove, 44: fastener
45: post, 46: height adjustment nut
47: bolt head, 48: elastic member
50: edge reinforcing ring,

Claims (12)

지중에 매설된 강관말뚝(10)의 둘레부에 원주방향을 따라 배치되며 하단부가 상기 강관말뚝(10)에 원주방향을 따라 일정 간격을 두고 형성된 철근삽입공(11)에 삽입되어 상기 강관말뚝의 내부에 배치되는 다수의 철근(20)과;
상기 강관말뚝의 내부에 삽입 고정되며 콘크리트의 타설위치를 설정하는 타설마감판(30)과;
상기 다수의 철근을 하나로 결속하는 철근결속수단을 포함하며,
상기 철근결속수단은,
상기 타설마감판의 상부에 일정거리를 두어 배치되며 상기 다수의 철근이 삽입 고정되는 다수의 철근고정부(41)가 구비된 철근고정소켓(40)을 포함하고,
상기 철근고정소켓은, 상기 철근이 수용되는 하부판(42), 상기 하부판의 상부에 체결구(44)를 통해 결합되어 상기 하부판에 수용된 철근을 고정하는 덮개판(43)으로 이루어진 것을 특징으로 하는 강관말뚝 두부보강용 철근체결장치.
Placed in the circumferential direction on the periphery of the steel pipe pile (10) buried in the ground and the lower end is inserted into the reinforcing hole 11 formed at regular intervals along the circumferential direction to the steel pipe pile (10) of the steel pipe pile A plurality of reinforcing bars 20 disposed therein;
A casting finish plate 30 inserted and fixed in the inside of the steel pipe pile to set a concrete placement position;
And a reinforcing bar binding means for binding the plurality of reinforcing bars together,
The reinforcing bar binding means,
It includes a reinforcing bar fixed socket 40 is disposed at a predetermined distance on the top of the pour finish plate and provided with a plurality of reinforcing fixing parts 41 to which the plurality of reinforcing bars are inserted and fixed,
The reinforcing bar fixed socket, the lower plate 42 is accommodated by the reinforcing bar, the upper plate of the lower plate is coupled through a fastener 44 to the steel plate, characterized in that consisting of a cover plate 43 for fixing the reinforcing bars received in the lower plate Reinforcement device for pile head reinforcement.
삭제delete 청구항 1에 있어서, 상기 하부판과 덮개판 중 하나 이상에는 상기 철근의 둘레부에 형성된 마디(21)가 안착되는 마디안착부(42c)가 형성된 것을 특징으로 하는 강관말뚝 두부보강용 철근체결장치.The reinforcing device for reinforcing steel pipe pile head toe head, characterized in that the at least one of the lower plate and the cover plate is formed with a node seating portion (42c) for seating the node 21 formed on the periphery of the reinforcing bar. 청구항 1 또는 청구항 3에 있어서, 상기 하부판과 덮개판의 마주하는 면에는 위치설정돌기(42b)와 위치설정홈(43b)이 형성되어 상기 하부판과 덮개판이 결합되도록 하는 것을 특징으로 하는 강관말뚝 두부보강용 철근체결장치.The steel pipe pile head reinforcement of claim 1 or 3, wherein a positioning protrusion 42b and a positioning groove 43b are formed on opposite surfaces of the lower plate and the cover plate so that the lower plate and the cover plate are coupled to each other. Rebar fastening device for 청구항 1 또는 청구항 3에 있어서, 상기 하부판과 덮개판에는 콘크리트 및 공기가 통과 및 충진되는 하나 이상의 충진홀(42a,43a)이 형성되는 것을 특징으로 하는 강관말뚝 두부보강용 철근체결장치.4. The reinforcing device for steel pipe pile head reinforcement according to claim 1 or 3, wherein the lower plate and the cover plate are provided with at least one filling hole (42a, 43a) through which concrete and air pass and fill. 청구항 1에 있어서, 상기 철근고정소켓은 상기 타설마감판에 세워지는 포스트(45)에 고정되는 것을 특징으로 하는 강관말뚝 두부보강용 철근체결장치.The rebar fastening device for reinforcing steel pipe pile heads according to claim 1, wherein the reinforcing bar fixing socket is fixed to the post (45) which is erected on the finishing plate. 청구항 6에 있어서, 상기 철근고정소켓은 상기 포스트에 높이 조정 가능하게 설치되는 것을 특징으로 하는 강관말뚝 두부보강용 철근체결장치.The rebar fastening device for reinforcing steel pipe pile heads according to claim 6, wherein the reinforcing bar fixed socket is installed to be adjustable in height in the post. 청구항 7에 있어서, 상기 철근고정소켓은 상기 포스트에 나사 체결되는 높이조정너트를 통해 높이 조정되는 것을 특징으로 하는 강관말뚝 두부보강용 철근체결 장치.
The rebar fastening device for reinforcing steel pipe pile heads according to claim 7, wherein the rebar fixing socket is height-adjusted through a height adjusting nut screwed to the post.
청구항 6 또는 청구항 7에 있어서, 상기 덮개판의 상부에 설치되어 상기 덮개판을 상기 하부판으로 탄력 지지하는 탄성부재(48)가 포함된 것을 특징으로 하는 강관말뚝 두부보강용 철근체결장치.The reinforcing bar fastening device for reinforcing a steel pipe pile head according to claim 6 or 7, wherein an elastic member (48) is provided on an upper portion of the lid plate and elastically supports the lid plate to the lower plate. 청구항 1에 있어서, 원주방향을 따라 일정 간격을 두고 다수의 철근수용부(51)가 형성되어 상기 철근을 지지하며 상기 강관말뚝의 상단부에 결합되는 링 형상의 에지보강링(50)이 포함된 것을 특징으로 하는 강관말뚝 두부보강용 철근체결장치.The method according to claim 1, wherein a plurality of reinforcing bars 51 are formed at predetermined intervals along the circumferential direction to support the reinforcement and ring-shaped edge reinforcement ring 50 is coupled to the upper end of the steel pipe pile Reinforcing device for reinforcing steel pipe pile head. 지중에 매설된 강관말뚝의 노출부를 일정하게 절단하고 상기 강관말뚝을 지중에 매설하되, 상기 강관말뚝의 두부가 지상으로 돌출되도록 매설하는 제1단계와;
상기 제1단계에 의해 매설된 강관말뚝의 둘레부에 다수의 철근(20)을 배열함과 아울러 청구항 1에 따른 강관말뚝 두부보강용 철근체결장치의 마감판(30)과 철근고정소켓(40)을 상기 강관말뚝 내부에 설치하여 상기 철근을 상기 철근고정소켓(40)에 고정하는 제2단계와;
상기 제2단계 이후 기초부분에 기초철근(1)을 배근하면서 상기 철근(20)과 결속하고, 지상과 상기 강관말뚝의 내부에 콘크리트를 타설하여 상기 강관말뚝과 철근 및 상기 콘크리트를 서로 결속하는 제3단계를 포함하고,
상기 제2단계는, 상기 철근이 수용되는 하부판(42), 상기 하부판의 상부에 체결구(44)를 통해 결합되어 상기 하부판에 수용된 철근을 고정하는 덮개판(43)으로 이루어진 철근고정소켓(40)을 상기 타설마감판의 상부에 일정 거리를 두고 이격되도록 설치하고, 상기 철근을 상기 강관말뚝에 형성된 철근삽입공에 외부에서부터 내부로 관통시켜 상기 철근고정소켓에 고정하여 설치하는 것을 특징으로 하는 강관말뚝 두부보강용 철근체결장치를 이용한 기초 시공 방법.
A first step of constantly cutting the exposed portion of the steel pipe pile embedded in the ground and embedding the steel pipe pile in the ground, so that the head of the steel pipe pile protrudes into the ground;
The finishing plate 30 and the rebar fixing socket 40 of the rebar fastening device for reinforcing the steel pipe pile head reinforcement according to claim 1 as well as arranging a plurality of rebars 20 on the periphery of the steel pipe pile buried by the first step A second step of securing the reinforcing bars to the reinforcing steel fixing sockets 40 by installing the reinforcing bars in the steel pipe piles;
The second step is to bind the steel reinforcement (20) while reinforcing the basic reinforcement (1) in the foundation portion, and the concrete to the ground and the inside of the steel pipe pile to bind the steel pipe pile, reinforcement and the concrete to each other Including three levels,
The second step, the reinforcing bar fixed socket 40 consisting of a lower plate 42, the reinforcing bar is received, the cover plate 43 is coupled to the upper portion of the lower plate through a fastener 44 to secure the reinforcing bar accommodated in the lower plate. ) Is installed so as to be spaced apart at a predetermined distance on the upper part of the pour finish plate, and the steel pipe is fixed and installed in the reinforcing bar fixed socket by penetrating from the outside to the reinforcement insertion hole formed in the steel pipe pile Fundamental Construction Method Using Reinforcing Device for Reinforcement of Pile Head.
청구항 11에 있어서, 상기 제2단계에서는, 상기 강관말뚝의 둘레부에 다수의 철근수용부가 구비된 에지보강링(50)을 결합하고, 상기 철근을 상기 에지보강링의 철근수용부에 끼워 고정하면서 상기 철근고정소켓에 고정하는 것을 특징으로 하는 강관말뚝 두부보강용 철근체결장치를 이용한 기초 시공 방법.The method of claim 11, wherein in the second step, the edge reinforcing ring 50 is provided with a plurality of reinforcing bar receiving portion on the periphery of the steel pipe pile, and the reinforcing bar is fixed to the reinforcing bar receiving portion of the edge reinforcing ring Wherein the reinforcing bar is fixed to the reinforcing bar fixing socket.
KR1020100049794A 2010-05-27 2010-05-27 Means for solidarity reinforcement bar of head part in steel pipe pile and method of foundation structure using thereof KR100996724B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020100049794A KR100996724B1 (en) 2010-05-27 2010-05-27 Means for solidarity reinforcement bar of head part in steel pipe pile and method of foundation structure using thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020100049794A KR100996724B1 (en) 2010-05-27 2010-05-27 Means for solidarity reinforcement bar of head part in steel pipe pile and method of foundation structure using thereof

Publications (1)

Publication Number Publication Date
KR100996724B1 true KR100996724B1 (en) 2010-11-25

Family

ID=43410139

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020100049794A KR100996724B1 (en) 2010-05-27 2010-05-27 Means for solidarity reinforcement bar of head part in steel pipe pile and method of foundation structure using thereof

Country Status (1)

Country Link
KR (1) KR100996724B1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101057167B1 (en) 2011-03-28 2011-08-17 (주)동명기술공단종합건축사사무소 Apparatus for reinforcing pile head and construction method of foundation using therof
KR101071405B1 (en) 2011-03-28 2011-10-07 주식회사 삼보기술단 Reinforcing structure for pile head
KR101609168B1 (en) 2014-03-21 2016-04-05 고강이앤씨(주) Small bore steel pipe pile
KR20170024465A (en) 2015-08-25 2017-03-07 주식회사 비비엠코리아 head reinforce equipment of a steel pile
KR101902449B1 (en) * 2016-09-05 2018-09-28 김완철 Means for solidarity reinforcement bar of head part in steel pipe pile
KR102113859B1 (en) * 2019-11-19 2020-05-21 이강수 Pile with head reinforcing device and method therefor

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200314957Y1 (en) 2003-02-19 2003-06-02 비비엠코리아(주) Device for reinforcing the head section of steel pile
KR100461914B1 (en) 2001-07-24 2004-12-14 삼성중공업 주식회사 Device fixing bar and structure for connecting head of steel pile and concrete footing of the same

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100461914B1 (en) 2001-07-24 2004-12-14 삼성중공업 주식회사 Device fixing bar and structure for connecting head of steel pile and concrete footing of the same
KR200314957Y1 (en) 2003-02-19 2003-06-02 비비엠코리아(주) Device for reinforcing the head section of steel pile

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101057167B1 (en) 2011-03-28 2011-08-17 (주)동명기술공단종합건축사사무소 Apparatus for reinforcing pile head and construction method of foundation using therof
KR101071405B1 (en) 2011-03-28 2011-10-07 주식회사 삼보기술단 Reinforcing structure for pile head
KR101609168B1 (en) 2014-03-21 2016-04-05 고강이앤씨(주) Small bore steel pipe pile
KR20170024465A (en) 2015-08-25 2017-03-07 주식회사 비비엠코리아 head reinforce equipment of a steel pile
KR101902449B1 (en) * 2016-09-05 2018-09-28 김완철 Means for solidarity reinforcement bar of head part in steel pipe pile
KR102113859B1 (en) * 2019-11-19 2020-05-21 이강수 Pile with head reinforcing device and method therefor
CN112900429A (en) * 2019-11-19 2021-06-04 李康守 Pile using head reinforcing unit and construction method thereof
CN112900429B (en) * 2019-11-19 2022-12-16 李康守 Pile using head reinforcing unit and construction method thereof

Similar Documents

Publication Publication Date Title
KR100996724B1 (en) Means for solidarity reinforcement bar of head part in steel pipe pile and method of foundation structure using thereof
JP3002107B2 (en) Column base structure and column base construction method
KR101632030B1 (en) Installation structure and method of steel tube columns and brackets
KR101819533B1 (en) A Base Bracket for the Deck-road
JP2003055984A (en) Column base connecting structure
KR101249408B1 (en) Bar Support for Mass Reinforced Concrete Member and Method of Upper Bar Arrangement Using the Same
KR200462716Y1 (en) Curbstone constructing equipment
JP6632290B2 (en) Steel column leg structure and steel column leg construction method
KR102197106B1 (en) Slab unit implanted with means for pressing pile and the method for carrying out the construction of the steel column using it
KR102197107B1 (en) Slab unit implanted with means for pressing pile and the method for carrying out the construction of the reinforced concrete column using it
KR101476511B1 (en) Height adjustment apparatus of column base and height adjustment method using thereof
KR200282684Y1 (en) Head reinforced apparatus for steel pipe piles reinforced with assembled cover plates
KR100655654B1 (en) Device for standing in line pc steel wire and pre-stressing method of psc box girder bridge using the same
KR200430115Y1 (en) A supporter of a road boundary stone
KR101057167B1 (en) Apparatus for reinforcing pile head and construction method of foundation using therof
KR20170111850A (en) Construction structure and method for adjusting slope and height of manhole, manhole
TWM510942U (en) Precasted concrete foundation for upright shape steel post
JPS639622Y2 (en)
JP5386214B2 (en) Foundation structure
JP5345238B1 (en) Construction method of base-isolated base structure and base-isolated base structure
KR20110078593A (en) Support for reinforcing bar, manufacturing method thereof and construction method for foundation using that
KR101322581B1 (en) Spacer for fastening Reinforcement Bar and Hanger Bolt
KR200281867Y1 (en) An iron reinforcing bar prop
KR101940468B1 (en) A pillar and installation method
KR101071405B1 (en) Reinforcing structure for pile head

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20131203

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20141013

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20151119

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20161122

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20171117

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20181115

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20191028

Year of fee payment: 10