KR100982694B1 - A remodeling method of ancient and honorable korean-style house for a in the past building - Google Patents

A remodeling method of ancient and honorable korean-style house for a in the past building Download PDF

Info

Publication number
KR100982694B1
KR100982694B1 KR1020090060797A KR20090060797A KR100982694B1 KR 100982694 B1 KR100982694 B1 KR 100982694B1 KR 1020090060797 A KR1020090060797 A KR 1020090060797A KR 20090060797 A KR20090060797 A KR 20090060797A KR 100982694 B1 KR100982694 B1 KR 100982694B1
Authority
KR
South Korea
Prior art keywords
hanok
sculpture
building
traditional
delete delete
Prior art date
Application number
KR1020090060797A
Other languages
Korean (ko)
Inventor
안병권
Original Assignee
안병권
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 안병권 filed Critical 안병권
Priority to KR1020090060797A priority Critical patent/KR100982694B1/en
Application granted granted Critical
Publication of KR100982694B1 publication Critical patent/KR100982694B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0266Enlarging
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/02Dwelling houses; Buildings for temporary habitation, e.g. summer houses

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PURPOSE: A remodeling method is provided to easily remodel a building into a Korean-style house through assembly and installation of members made of a material with excellent workability. CONSTITUTION: A method for remodeling a building into a Korean-style house is as follows. Detailed drawings for a Korean-style house are designed and made into a database(s1,s2). Parts of a structure are cut into the forms indicated in the detailed drawings and assembled together with an adhesive(s3,s4). The joints or junction gaps of the assembled structure are filled up with putty(s5). The projected or rough surfaces are smoothened by sanding(s6). The entire surface of the sanded structure is subject to hard-coating in order to increase the surface strength(s7). A binder is spread on the hard-coating surface and a finishing material is spread on the binder-coated surface(s8,s9).

Description

일반 건축물을 전통 한옥으로 리모델링하는 방법{A remodeling method of ancient and honorable korean-style house for a in the past building}A remodeling method of ancient and honorable korean-style house for a in the past building}

본 발명은 경량이면서 값이 싸고 가공성이 뛰어난 스티로폼 또는 플라스틱으로 전통 한옥의 각종 건축 부재 예컨대 보, 기둥, 서까래 등과, 장식 부재 예컨대 연목, 부연 등의 조형물을 제작함과 아울러 통상의 드라이비트로 전통 한옥의 흙벽에 대체되는 외벽 부재를 제작한 후, 상기의 간편 저렴하고 경량이면서 가공성이 용이한 각종 부재를 기존의 개,보수가 필요한 건물에 간단하게 조립·시공하여 일반 건축물을 전통 한옥으로 새롭게 리모델링하는 방법에 관한 것이다.
보다 상세하게는 전통 한옥을 구성하는 각종 건축 부재와 장식 부재를 조형물로 제작하기 위한 세부도면 설계를 데이터베이스로 구축한 상태에서 이를 토대로 각종 한옥 부재인 조형물을 제조하는 방법과 상기 조형물을 현장에서 시공하는 방법에 관한 것이다.
본 발명에 의해서 종래 한옥 건축에 필수적이었던, 도편수나 대목장 등 전문적인 장인이 없이 기존의 건물을 전통 한옥으로 리모델링 시킬 수 있다.
본 발명에 의해 건축비용의 절감과 아울러 공사기간을 단축시켜 전통 한옥을 보다 간편하고 저렴하게 일반 건축물을 전통 한옥으로 리모델링 할 수 있다.
The present invention is made of styrofoam or plastic, which is lightweight, inexpensive, and excellent in workability, to produce various building members of traditional hanok such as beams, pillars, rafters, etc., and decorative members such as softwood and yeonyeon. After manufacturing the exterior wall member to be replaced with the earthen wall, the simple and cheap, lightweight and easy to process various members can be easily assembled and remodeled in existing buildings that require renovation and remodeling general buildings into traditional hanok. It is about.
More specifically, a detailed drawing design for manufacturing various building members and decorative members constituting the traditional hanok as a database is constructed with a method of manufacturing sculptures which are various hanok members based on this, and construction of the sculptures in the field. It is about a method.
According to the present invention, it is possible to remodel an existing building into a traditional hanok without professional craftsmen, such as Togesu or Daemokjang.
According to the present invention, the construction cost can be reduced and the construction period can be shortened so that the traditional hanok can be remodeled to a traditional hanok more easily and inexpensively.

일반적으로 전통 한옥은 우리나라의 오랜 전통 건축양식에 의하여 시공된 건축물을 말하는데, 이러한 한옥의 건축유형으로는 크게 궁궐, 사찰, 사당, 정자, 일반가옥 등이 있음과 아울러 한옥의 건축구조로는 보식, 귀틀식, 천두식, 조적식 및 일체식 등 그 구조가 매우 다양하며, 그 중에서도 가장 두드러지고 한옥다운 멋이 살아나는 대표적인 구조가 보식 건축물이라고 할 수 있다.In general, traditional hanok refers to a building constructed by Korea's long-standing traditional architectural styles. The types of architecture of Hanok include palaces, temples, shrines, pavilions, and general houses. The structure is very diverse, such as gut-style, chundu-style, masonry and one-piece.

과거에는 전통 한옥이 다소 불편하다는 인식 때문에 일반 수요자들에게 외면 되었으나 최근에는 복고풍에 대한 새로운 가치와 그 기능이 부각됨에 따라 전통 한옥에 대한 선호도가 증가하고 있으며, 따라서 거주할 전통 한옥을 직접 건축하는 경향도 많이 있다.In the past, the traditional hanok was neglected by the general consumer due to the recognition that the traditional hanok was somewhat uncomfortable, but recently, as the new value and function of the retro were highlighted, the preference for the traditional hanok is increasing, thus the tendency to build the traditional hanok to live in person. There are a lot.

그러나 고유의 전통 한옥은 그 구조가 복잡하고, 특별한 지식을 가지고 있지 않는 한 전통 한옥으로 건축하기 어렵다.However, the traditional Korean hanok is difficult to build as a traditional hanok unless its structure is complicated and special knowledge is available.

또한 전통 한옥은 보, 기둥, 서까래 등의 건축 부재 및 연목, 부연 등의 장식 부재를 목재로 가공한 후, 이를 별도의 결합수단 없이 짜맞추어 조립하게 되므로 상기의 각종 건축 부재 및 장식 부재를 가공 및 조립하는 것도 쉽지 않을뿐더러 상기 건축 부재 및 장식 부재를 가공 및 조립하는 전문적인 기술인력도 턱없이 부 족한 실정이다. In addition, the traditional hanok process the building members such as beams, columns, rafters, and decorative members such as softwood, paraffin, etc. made of wood, and then assembled together without a separate coupling means to process the various building members and decorative members It is not only easy to assemble, but also a lack of professional technical personnel to process and assemble the building and decorative members.

따라서 한 동의 전통 한옥을 건축하기 위해서는 반드시 각종 건축 부재 및 장식 부재와 공정을 책임지고 해결하는 대목장 또는 도편수라는 목조건축의 최고 장인이 부재 선정, 부재가공 및 조립 등의 모든 것을 결정하고 각종 부재를 일일이 수작업으로 가공한 후, 짜맞추어 조립하는 방법을 따라 시공이 이루어지므로 그 시공절차가 매우 복잡함은 물론 다수의 인력 소요와 공사기간도 길어지는 단점이 있다.Therefore, in order to build Handong traditional hanok, the chief craftsman of the wooden building, namely, Daemokjang or Doksu Su, which is responsible for solving various building members, decorative parts and processes, decides everything such as selecting members, processing parts and assembling them, and manually After processing by hand, the construction is made according to the method of assembling and assemble, the construction procedure is very complicated, as well as the need for a large number of manpower and construction periods have a disadvantage.

또한 전통 한옥의 주재료인 목재를 톱으로 자르거나 대패로 깎아내고 끌로 구멍을 파는 등의 가공작업을 할 수 있도록 하는 전반적인 작업공정을 치목이라 하는데, 이는 고도의 숙련공을 필요로 하는 공정이며 작업시간도 오래 걸린다는 문제가 있다.In addition, the overall work process that allows the cutting work such as sawing, cutting with a planer, and digging holes with chisels, which is the main material of traditional hanok, is called jingum. The problem is that it takes a long time.

한편, 최근에는 유원지, 공원 등에 전통 한옥 건축양식이 활발히 도입되고 있는 실정이며, 사극 드라마의 영향으로 전통 한옥을 기반으로 한 드라마세트장 건설이 붐을 이루고 있다.Recently, traditional hanok architecture has been actively introduced into amusement parks and parks, and the construction of drama sets based on traditional hanok has been booming under the influence of historical dramas.

그러나 종래와 같은 전통 한옥의 건축방법으로는 건축기간도 오래 걸릴 뿐만 아니라 건축비용도 턱없이 높다는 문제가 있다.However, there is a problem in that the traditional building method of traditional hanok takes not only a long building period but also a high building cost.

현재도 일반 가옥으로 건축하는 전통 한옥의 건축 비용은 여타 현대식 건축물과 비교하여 볼 때, 건축비용이 상당히 높은 것이 사실이며 또한 최근에 한류의 붐과 더불어 전통 한옥의 수출도 중장기적인 핵심사업으로 추진할 필요성이 절실하나 한정된 기술자 확보 및 체계화된 시스템의 부재로 인하여 현재 전통 한옥의 국 제화는 아직까지 이루어지지 못하고 있는 실정이다.The construction cost of traditional hanok, which is still built as a general house, is relatively high compared to other modern buildings, and it is necessary to promote the export of traditional hanok as a core project in the mid to long term. Due to the urgent need for limited technicians and the absence of a systematic system, the current internationalization of traditional hanok has not been achieved yet.

이에 따라 대한민국 특허 공개 제2002-37002호에는 가구식 건축물의 조립식 한옥 건축방법 및 그 한옥구조가 개시되어 있으나, 개시된 한옥 구조는 건축하고자 하는 대지에 흙 파기 등의 기초공사를 한 후, 종래 한옥의 건축시공방법을 순차적으로 정리하여 공사기간을 단축할 수 있도록 구성되어 있다.Accordingly, Republic of Korea Patent Publication No. 2002-37002 discloses a method of building a prefabricated hanok and a hanok structure of a furniture structure, but the disclosed hanok structure after the basic construction such as digging on the ground to be built, The construction method is organized so that the construction period can be shortened.

그러나, 상기의 한옥 구조는 종래 일반적인 한옥을 건축하는 시공단계를 순차적으로 나열한 것으로서, 종래와 같은 문제점을 일목요연하게 해결하기 위한 것이 아닐 뿐 아니라 한옥을 손쉽게 지을 수 있는 구조가 아닌바, 특히 한옥을 구성하는 각종 건축 부재 및 장식 부재인 목재 조형물은 전문적인 목수인 대목장 및 도편수 등이 가공하여야 하므로 건축공기를 단축시 킬 수 없음은 물론 건축비용의 절감을 기할 수 없는 등 전술한 종래의 문제점은 여전히 존재하고 있었다.However, the hanok structure is a sequence of construction steps to build a conventional hanok in the prior art, not only to solve the problems as in the prior art, but also a structure that can easily build a hanok bar, especially constitute a hanok The wood sculptures, which are various building members and decorative members, must be processed by professional carpenters, such as ranches and saw blades, so that the construction air can not be shortened and construction costs can not be reduced. Was doing.

상기의 종래 한옥 제작에 관련된 문제는, 신축되는 전통 한옥에 관련된 것으로서, 기존의 건물을 전통 한옥으로 리모델링하는 경우에 관한 것은 아니며, 상기한 종래의 전통 한옥 건축방식을 통해서는 공기를 단축시 킬 수 없음은 물론 건축비용 절감을 기할 수 없는 문제가 있었고, 개,보수가 필요한 기존 건물을 전통 한옥으로 리모델링 하기 것 자체가 거의 불가능하였다.The problem related to the manufacturing of the traditional hanok is related to the traditional hanok, which is newly constructed, and is not related to the case of remodeling an existing building into the traditional hanok, and it is possible to shorten the air through the traditional hanok construction method. Of course, there was a problem that could not reduce the construction cost, and it was almost impossible to remodel the existing building that needs renovation into a traditional hanok.

본 발명은 상기에서 제시하는 문제점을 해결하기 위한 것으로서, 본 발명의 목적은 간편 저렴하고 가공성이 뛰어난 스티로폼, FRP, GFRC, FRC 또는 플라스틱으로 전통 한옥의 각종 부재인 조형물을 제작하고 이를 기존의 건축물에 조립· 시공하여 전통 한옥으로 손쉽게 리모델링할 수 있도록 하기 위한 것이다.
본 발명의 다른 목적은 전통 한옥을 구성하는 각종 건축 부재 및 장식 부재인 조형물 그리고 외벽부재에 관해 이미 구축된 정보를 사용하여, 설계 단계에서부터 해당 부재의 물량을 산정 관리함으로써 유지보수가 용이한 리모델링 방법을 제고하는 것이다.
본 발명의 또다른 목적은 도편수나 대목장 등 전문적인 기술인력이 없이도 전통 한옥으로 손쉽게 리모델링이 가능한 현장 시공 방법을 제공하려는 것이다.
The present invention is to solve the problems presented above, an object of the present invention is to make a variety of members of the traditional Hanok made of styrofoam, FRP, GFRC, FRC or plastic of simple and inexpensive and excellent processability and to the existing buildings It is intended to be easily remodeled into a traditional Hanok by assembling and constructing it.
Another object of the present invention is easy to maintain the remodeling method by calculating the quantity of the member from the design stage by using the information already established about the various building members and decorative members and the outer wall member constituting the traditional hanok To improve.
Still another object of the present invention is to provide a site construction method that can be easily remodeled into a traditional hanok without professional technical personnel such as the number of swords and ranch.

상기 목적을 달성하기 위한 본 발명의 리모델링 방법은, 리모델링 전제 과정 중 가장 핵심이 되는 한옥 조형물 제조방법과 상기 제작된 조형물로써 현장에서 시공할 수 있는 시공 방법에 관한 것이다.
기존 건축물을 한옥으로 리모델링하기 위한 전체적인 공정을 설명하면 아래와 같다.
먼저 전통 한옥으로 리모델링하기 위해서는 기존 건물에 관한 도면을 구축해야 하는바, 이를 평면 및 입면 설계단계라고 칭한다.
기존 건물의 평면도 및 입면도를 구축하기 위해 기존건물 구조에 대한 분석이 사전에 수행되어야 한다. 이 과정은 기존 건물을 한옥으로 리모델링하기 위한 가장 기본적인 과정으로서 기존 건물에 대한 정보인 건물 높이, 폭, 문의 크기 형태 치수 등과 같은 기초적인 자료의 확보단계이다.
이 과정은 모든 리모델링에 수반되는 공지의 과정이며, 여기서 확보된 자료는 컴퓨터에 데이터베이스화 된다.
The remodeling method of the present invention for achieving the above object relates to a method of manufacturing a hanok sculpture which is the core of the remodeling prerequisite process and a construction method that can be constructed in the field as the manufactured sculpture.
The overall process for remodeling an existing building into a hanok is described below.
First of all, in order to remodel the traditional hanok, it is necessary to construct a drawing of an existing building, which is called a plan and elevation design stage.
In order to establish the floor plan and elevation of the existing building, the analysis of the existing building structure should be performed in advance. This process is the most basic process for remodeling an existing building into Hanok. It is a basic step of securing basic data such as the height, width, size of the door, shape, and dimensions of the existing building.
This process is a well-known process that accompanies any remodeling, and the data obtained is databased on a computer.

전통 한옥의 기초형식에 관해서는, 다음과 같은 한옥에 대한 기초정보가 확보되어 컴퓨터로 데이터베이스화 되어 있어야 한다.
즉 한옥의 칸 수 및 상기 칸의 배치형식에 대한 간살이 정보, 보식, 귀틀식, 천두식, 조적식 및 일체식과 같은 전통 한옥의 건축양식 정보, 기둥, 보 및 도리의 수를 결정하기 위한 단면형식 정보, 합각지붕, 박공지붕, 모임지붕, 우진각지붕, 겹지붕, 달개지붕, 육모지붕, 다각지붕, 상층지붕, 솟을지붕, 정자지붕 및 층단지붕과 같은 지붕양식 정보, 여닫이문, 미닫이문, 접이문, 붙박이 문과 같은 창호양식 등의 기초정보가 수집되어 있어야 하며 이러한 자료는 컴퓨터에 데이타베이스화 되어야 한다. 본 발명에서는 기존 건축물의 외관에 대해 한옥으로 리모델링을 수행하므로 한옥의 외관에 관련된 자료만을 구축하면 된다.
Regarding the basic form of traditional hanok, the following basic information on hanok should be secured and computerized.
In other words, the cross section for determining the number of columns, beams, and torii of traditional hanok, such as the information on the number of hanoks and the layout of the spaces, the information of the traditional hanoks such as bosik, gutlet, cheondu, masonry, and monolithic. Type information, roof shape information such as haptic roof, gable roof, collection roof, woojin roof, double roof, moon roof, hair growth roof, polygon roof, upper roof, tower roof, sperm roof and floor roof, sliding door, sliding door Basic information such as windows, doors, doors and doors, etc. should be collected, and these data should be computerized. In the present invention, since the remodeling is performed with the hanok on the exterior of the existing building, only the data related to the appearance of the hanok need to be constructed.

그다음 단계에서는, 상기와 같이 입수된 기존 건물과 전통 한옥에 대한 기초정보를 분석하여 어떠한 형태로 기존 건물을 전통 한옥 모델로 변경할 것인지 선정하게 된다.In the next step, the basic information on the existing buildings and the traditional hanok obtained as described above is analyzed to select how to change the existing building into the traditional hanok model.

그 다음으로 상기 단계에서 선정된, 전통 한옥 모델에 대해 평면도 및 입면도 등의 설계도면을 구축하는, 평면 및 입면 설계단계 과정을 거치게 되며 전통 한옥의 각종 건축 부재 및 장식 부재인 조형물의 필요 물량 산정을 하게 되며 이러한 필요물량 역시 컴퓨터에 데이터베이스화 된다.
이러한 필요물량 산정시, 기존 건물을 전통 한옥으로 리모델링 변환하기 위한 철 구조물에 대한 물량 산정도 포함됨은 물론이다.
이로써 한옥 리모델링에 필요한 부재의 종류, 갯수 그리고 기존 건물에 대한 정보 등이 모두 컴퓨터에 데이터베이스화 된다.
Next, plan and elevation design stages are constructed to build design drawings such as floor plans and elevations for the traditional hanok model selected in the above steps. These requirements are also databased on the computer.
When calculating the required quantity, it is of course included to calculate the quantity of steel structure for remodeling the existing building into a traditional Hanok.
As a result, the type, number, and information on the existing buildings required for remodeling the hanok are all databased on the computer.

삭제delete

삭제delete

삭제delete

삭제delete

상기 데이터베이스로 구축된 정보들은, 건축 부재 등의 조형물을 제작하는 공장으로 송부되며, 동시에 시공현장에도 상기 정보들이 송부된다.
다음으로, 상기 데이터베이스로 구축되어 체계화된 정보를 통해 기존 건물을 전통 한옥으로 리모델링하기 위한 리모델링 시행단계가 필요하며, 본 발명의 기술적 요지를 이룬다.
상기 리모델링 시행단계는 전통 한옥의 조형물의 제작단계와 이러한 조형물을 현장에서 시공하는 현장시공단계로 구성된다.
The information constructed in the database is sent to a factory that manufactures sculptures, such as building members, and at the same time, the information is also sent to the construction site.
Next, a remodeling execution step for remodeling an existing building into a traditional hanok through the information structured and organized in the database is required, thereby achieving the technical gist of the present invention.
The remodeling step is composed of the manufacturing step of the traditional Hanok sculpture and the field construction step of constructing the sculpture in the field.

삭제delete

삭제delete

삭제delete

상기 조형물 제작 단계는 다음과 같은 과정을 거친다.
즉 각종 건축부재, 장식부재인 조형물의 세부도면 설계단계; 상기 설계 결과물을 컴퓨터 프로그래밍을 통해 데이터베이스로 구축하는 단계; 상기 데이터베이스로 구축된 조형물의 설계도면이 CNC기에 입력되고, 입력된 정보에 의하여 설계에 표기된 형상으로 커팅작업 되는 단계; 상기 커팅된 각종 조형물이 접착제에 의해 부착되는 조형물 조립단계; 상기 조립된 조형물의 이음부의 공극을, 퍼티로써 메우는 단계; 상기 조형물 조립 및 공극을 메우는 단계에서 돌출되거나 거칠어진 표면을 매끄럽게 하기 위하여 샌딩 처리하는 단계; 상기 샌딩 처리된 조형물의 표면을 하드 코팅하여, 표면 강도를 강화하는 단계; 상기 조형물 표면의 강도가 강화된 하드 코팅면을 마감재로 도포하기 전에, 마감재와의 박리현상을 차단하기 위하여 바인더로 도포하는 단계; 상기 바인더 도포면에 마감재를 도포하여 조형물로 완성하는 단계; 를 포함하는 것을 특징으로 한다.
상기 완성된 조형물을 운반할 때 오염되지 않도록 비닐포장 하는 것이 바람직하다.
The sculpture manufacturing step goes through the following process.
That is, the detailed drawing design step of the sculptures of various building members, decorative members; Building the design output into a database through computer programming; A design drawing of the sculpture constructed by the database is input to the CNC machine, and the cutting operation is performed in the shape indicated in the design by the input information; A sculpture assembly step of attaching the cut various sculptures by an adhesive; Filling the voids of the joint of the assembled sculpture with putty; Sanding to smooth the protruding or roughened surface in the assembly and filling of the voids; Hard coating a surface of the sanded sculpture to enhance surface strength; Before applying the hard coating surface of which the strength of the surface of the sculpture is strengthened with a finishing material, applying with a binder to block peeling with the finishing material; Applying a finishing material to the binder coating surface to complete a sculpture; Characterized in that it comprises a.
It is preferable to pack the vinyl so as not to be contaminated when transporting the finished sculpture.

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete


상기와 같이 조형물이 완성된 후에는 현장시공 단계를 거치게 된다. 현장시공단계는 아래와 같이 진행된다.
현장시공 단계는 데이터베이스화된 기존 건물에 대한 자료들을 이용하여, 건물 외부에 돌출된 지장물인 가스배관, 에어컨 실외기 등을 철거하는 단계부터 시작된다. 이때 한옥 리모델링 현장시공에 필요한 비계, 드라이비트, 각종 조형물 등은 용도별로 미리 구별되어 설치,정리되어 있는 것이 작업효율상 바람직하다.
특히 상기 철거작업을 위해서는 사전에 비계가 설치되어야 한다.

After the sculpture is completed as described above is subjected to a site construction step. The site construction phase proceeds as follows.
The site construction phase begins with the removal of gas pipelines, air conditioners, and outdoor units, which are obstacles protruding from the outside of the building, using data on the existing buildings in the database. At this time, scaffolding, dry bits, various sculptures, etc. necessary for the construction of the hanok remodeling are preferably distinguished and installed and arranged according to the use in view of work efficiency.
In particular, scaffolding must be installed in advance for the demolition work.

삭제delete

삭제delete

삭제delete

삭제delete

또한 시공에 따른 안전확보를 위하여 철 구조물인 빔, 각관, C 형강 등의 골조 제작 단계가 필요하다. In addition, it is necessary to make a framework for the construction of beams, square tubes, and C-beams, which are steel structures, to secure safety during construction.

특히, 상기 기존 건물의 상부에는 전통 기와지붕의 선형을 맞추기 위한 수단으로서, 목재골조 보강작업이 필요하다. 통상의 슬라브 집은 전통기와 지붕과는 완전히 다른 구조를 취하기 때문이다.In particular, the upper part of the existing building as a means for matching the linear of the traditional tile roof, wooden frame reinforcement work is required. This is because a typical Slavic house has a completely different structure from the traditional roof.

다음으로 기존 건물의 처마 하부 면에 내수합판을 고르게 부착한 후, 기존의 지붕과 철구조물이 정면에서 보이지 않도록, 아연 철판(Galvanized Iron)을 접어 내수합판 처마 끝 선에 맞추는 처마보강작업 단계를 거치게 된다.
Next, after attaching the plywood evenly to the lower surface of the eaves of the existing building, the galvanized iron is folded to meet the end of the plywood eaves so that the existing roof and the steel structure cannot be seen from the front. do.

다음으로 상기 처마보강작업을 한 위에, 처마용 조형물을 지붕 경사각에 맞추어 부착하는 처마완성 단계를 거침으로써, 처마 리모델링이 완성된다.
Next, the eaves remodeling is completed by performing the eave completion step of attaching the eaves to the roof inclination angle on the eaves reinforcing work.

한편 상기 목재골조 보강작업 후에는, 지붕 기와를 끼워 맞춰 빗물이 새지않도록 하는 지붕재 시공단계를 거치게 된다.On the other hand, after the timber frame reinforcement work, go through the roofing construction step to fit the roof tile so that rain water does not leak.

이하 벽면 시공을 설명한다.
기존 건물의 외벽에 몰탈본드를 이용하여, 드라이비트를 수직면이 되도록 부착하는 건물 외벽면 수직작업이 행해지며, 이어서 상기 수직작업 된 기존 건물의 외벽면에, 전통 한옥의 대형조형물인 도리, 보, 창방, 인방, 기둥 등을 몰탈본드를 이용하여 부착하는 대형조형물 부착·조립 단계를 먼저 수행한다.
이어서 상기 기존 건물 외벽면에 심미감을 표현하기 위하여 선택된 마감재인 도료로 지정된 색상의 칼라도장을 하는 칼라도장 및 단청작업 단계가 수행된다.
The wall construction will be described below.
Using the mortar bond on the outer wall of the existing building, the building outer wall surface vertical work to attach the dry bit to the vertical surface is carried out, and then to the outer wall surface of the existing vertical work, the large sculptures of traditional hanok, torii, beam, Attaching and assembling large sculptures that attach windows, lintels, columns, etc. using mortar bonds is first performed.
Subsequently, the color painting and mono working steps are performed to apply a color coating of a color designated as paint, which is a finishing material selected in order to express an aesthetic feeling on the outer wall surface of the existing building.

삭제delete

삭제delete

상기 칼라도장 및 단청작업이 완료되면, 외벽면에 전통 한옥의 소형 조형물 인 연목, 부연, 익공, 다포, 주두, 주초 등을 몰탈본드를 이용하여 부착·조립하는 소형조형물 부착·조립 단계를 거치게 된다.When the color painting and mono work are completed, the small sculptures attached and assembled are attached to the outer wall by attaching and assembling the small sculptures of traditional hanok, such as softwood, yeonyeon, Ikgong, Dapo, poncho, poncho, etc. using mortar bonds. .

삭제delete

본 발명에 따른 한옥 리모델링 방법에 의해 간편 저렴하고 가공성이 용이한 스티로폼, FRP, GFRC, FRC 또는 플라스틱으로 전통 한옥의 각종 부재인 조형물을 제작하고 이를 기존의 건축물에 조립· 시공하여 전통 한옥으로 손쉽게 리모델링할 수 있다. 또한 비교적 부피가 작아 운반이 용이한 조형물은 공장에서 미리 사전 제작 및 조립되어 시공현장에 인도되고, 비교적 부피가 커 운반이 용이하지 못한 조형물은 시공현장에서 바로 제작 및 조립이 가능하여 전통 한옥을 대중화하는데 획기적인 기여를 할 수 있게 되는 효과가 있다.
본 발명에 따른 한옥 리모델링 방법에 의해, 전통 한옥을 구성하는 각종 건축 부재 및 장식 부재인 조형물 그리고 외벽부재에 관해 이미 구축된 정보를 사용하여, 설계 단계에서부터 해당 부재의 물량을 산정 관리함으로써 유지보수가 용이하다.
본 발명에 따른 한옥 리모델링 방법에 의해 도편수나 대목장 등 전문적인 기술인력이 없이도 전통 한옥으로 손쉽게 리모델링이 가능하다. 종래에는 한옥 조형물 제작이 지나치게 복잡하며 통일화되지 못했으나, 본 발명에 의하면 미리 데이터베이스로 구축된 조형물에 대한 정보를 빠르고 용이하게 이용하게 이용할 수 있다.
By using the hanok remodeling method according to the present invention, it is simple and inexpensive and easy to process. can do. In addition, sculptures that are relatively small in volume and easy to transport are pre-manufactured and assembled at the factory and delivered to the construction site, while sculptures that are relatively large and not easy to transport can be manufactured and assembled at the construction site to popularize traditional Hanok. There is an effect that can make a significant contribution to.
According to the method of remodeling the hanok according to the present invention, by using the information already constructed about the various building members and decorative members constituting the traditional hanok and the outer wall member, the maintenance of the member by calculating and managing the quantity of the member from the design stage It is easy.
By the remodeling method of the hanok according to the present invention, it is possible to easily remodel into a traditional hanok without professional technical personnel such as Togesu or Daemokjang. In the past, the production of hanok sculptures was too complicated and unified, but according to the present invention, information on sculptures previously constructed as a database can be used quickly and easily.

삭제delete

삭제delete

삭제delete

이하, 본 발명의 바람직한 실시예를 첨부된 도면과 관련하여 구체적으로 설명하면 다음과 같다.
본 발명의 특허청구범위에서는 이하 도 2와 도 3과 관련된 작업단계인 조형물제작단계 및 현장시공단계를 본 발명의 권리범위로 청구하고자 한다.
Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.
In the claims of the present invention will be claimed as the scope of the present invention to the sculpture production step and the site construction step, which is a work step associated with Figure 2 and 3 below.

도 2는 본 발명에 따른 한옥의 각종 조형물의 제작단계를 나타내는 도면이고, 도 3은 본 발명에 따른 기존 건물을 한옥으로 리모델링하는 현장시공단계를 나타내는 도면이다. (도 1은 삭제)2 is a view showing a manufacturing step of the various sculptures of the hanok according to the present invention, Figure 3 is a view showing a site construction step for remodeling an existing building according to the invention to a hanok. (Figure 1 is deleted)

(전체공정)
기존 건축물을 한옥으로 리모델링하기 위한 전체적인 공정을 설명하면 아래와 같다.
전통 한옥으로 리모델링하기 위한 기존 건물의 평면 및 입면 설계내용의 분석이 사전에 수행되어야 한다. 이 과정은 기존 건물을 한옥으로 리모델링하기 위한 가장 기본적인 과정으로서 기존 건물에 대한 정보인 건물 높이, 폭, 문의 크기 형태 치수 등과 같은 기초적인 자료의 확보단계이다. 이 과정은 모든 리모델링에 수반되는 공지의 과정으로서 확보된 자료는 컴퓨터에 데이터베이스화 된다.
전통 한옥의 기초형식에 관해서는, 다음과 같은 한옥에 대한 기초정보가 미리 확보되어 컴퓨터로 데이터베이스화 되어 있어야 한다.
즉 한옥의 칸 수 및 상기 칸의 배치형식에 대한 간살이 정보, 보식, 귀틀식, 천두식, 조적식 및 일체식과 같은 전통 한옥의 건축양식 정보, 기둥, 보 및 도리의 수를 결정하기 위한 단면형식 정보, 합각지붕, 박공지붕, 모임지붕, 우진각지붕, 겹지붕, 달개지붕, 육모지붕, 다각지붕, 상층지붕, 솟을지붕, 정자지붕 및 층단지붕과 같은 지붕양식 정보, 여닫이문, 미닫이문, 접이문, 붙박이 문과 같은 창호양식 등의 기초정보가 수집되어 있어야 하며 이러한 자료는 컴퓨터에 데이타베이스화 되어야 한다.
그다음 단계에서는, 상기와 같이 입수된 기존 건물과 전통 한옥에 대한 기초정보를 분석하여 어떠한 형태로 기존 건물을 전통 한옥 모델로 변경할 것인지 선정하게 된다.
그 다음으로 상기 단계에서 선정된, 전통 한옥 모델에 대해 평면도 및 입면도 등의 설계도면을 구축하는 평면 및 입면 설계단계 과정을 거치게 되며 전통 한옥의 각종 건축 부재 및 장식 부재인 조형물의 필요 물량 산정을 하게 되며 이러한 필요물량 역시 컴퓨터에 데이터베이스화 된다.
이러한 필요물량 산정시, 기존 건물을 전통 한옥으로 리모델링 변환하기 위한 철 구조물에 대한 물량 산정도 포함됨은 물론이다.
이로써 한옥 리모델링에 필요한 부재의 종류, 갯수 그리고 기존 건물에 대한 정보 등이 모두 컴퓨터에 데이터베이스화 된다.
그 다음 단계로서, 상기 데이터베이스로 구축된 정보들이, 건축 부재 등의 조형물을 제작하는 공장 및 한옥 리모델링 시공현장에 상기 정보들이 송부되는 단계를 거친다. 본 발명은 BM(Business Model)발명이 아니므로, 상기 정보의 송부는 온라인 또는 온프라인 송부 중 어느 방법이든 무방하다.
그 다음 단계는, 이미 데이터베이스로 구축된 정보인 한옥 조형물에 관한 정보 및 기존건물에 정보를 이용하여 실제 리모델링이 이루어지는 단계이다.
이하, 본 발명의 기술적 요지를 이루는 리모델링 시행단계에 대해 상세히 설명하되 도 2와 도 3을 참조한다. 리모델링 시행은 첫째, 전통 한옥의 조형물의 제작단계 둘째 상기 제작된 조형물을 현장에서 시공하는 현장시공단계로 구성된다.
(Whole process)
The overall process for remodeling an existing building into a hanok is described below.
An analysis of the plan and elevation design of the existing building for remodeling with traditional Hanok should be performed in advance. This process is the most basic process for remodeling an existing building into Hanok. It is a basic step of securing basic data such as the height, width, size of the door, shape, and dimensions of the existing building. This process is a well-known process that accompanies all remodeling, and the data obtained is databased on a computer.
Regarding the basic form of traditional hanok, the following basic information about hanok should be secured in advance and computerized.
In other words, the cross section for determining the number of columns, beams, and torii of traditional hanok, such as the information on the number of hanoks and the layout of the spaces, the information of the traditional hanoks such as bosik, gutlet, cheondu, masonry, and monolithic. Type information, roof shape information such as haptic roof, gable roof, collection roof, woojin roof, double roof, moon roof, hair growth roof, polygon roof, upper roof, tower roof, sperm roof and floor roof, sliding door, sliding door Basic information such as windows, doors, doors and doors, etc. should be collected, and these data should be computerized.
In the next step, the basic information on the existing buildings and the traditional hanok obtained as described above is analyzed to select how to change the existing building into the traditional hanok model.
Next, the plan and elevation design stages for constructing the design drawings such as floor plans and elevations for the traditional hanok model selected in the above steps are performed, and the required quantity of sculptures, which are various building and decorative members of the traditional hanok, can be calculated. These requirements are also databased on the computer.
When calculating the required quantity, it is of course included to calculate the quantity of steel structure for remodeling the existing building into a traditional Hanok.
As a result, the type, number, and information on the existing buildings required for the remodeling of the hanok are all databased on the computer.
As a next step, the information constructed in the database is sent to the factory for manufacturing sculptures such as building members and the hanok remodeling construction site. Since the present invention is not a BM (Business Model) invention, the transmission of the information may be either online or on-line.
The next stage is the actual remodeling process using information on the hanok sculpture, which is already built into the database, and information on the existing building.
Hereinafter, the remodeling implementation steps forming the technical gist of the present invention will be described in detail with reference to FIGS. 2 and 3. The remodeling consists of firstly, the stage of manufacturing traditional Hanok's sculptures, and secondly, the site construction stage of constructing the above-mentioned sculptures on site.

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

(부분공정 1: 조형물 제작단계)(Part 1: process of sculpture production)

조형물제작 단계는 컴퓨터 데이터베이스로 이미 구축된 한옥 조형물의 종류 수량 색상을 포함한 정보 및 리모델링 대상이 되는 기존건물에 대한 크기, 치수, 수량 등의 정보를 활용하여 실시되는, 한옥 조형물의 세부도면이 설계되는 단계(s1); Sculpture production phase is a detailed drawing of hanok sculptures, which is carried out using information including the type, quantity, and color of the hanok sculptures already constructed by computer database, and information on the size, dimensions, and quantity of the existing buildings to be remodeled. Step s1;

상기 조형물의 세부도면 설계 결과가 컴퓨터 프로그래밍을 통해 데이터베이스로 구축되는 단계(s2); A detailed drawing design result of the sculpture is built into a database through computer programming (s2);

상기 데이터베이스로 구축된 설계도면이 CNC기에 입력되고, 입력된 정보에 의하여 세부도면 설계에 표기된 형상으로 커팅되는 단계(s3); (S3) a design drawing constructed by the database is input to the CNC machine and cut into the shape indicated in the detailed drawing design by the input information;

상기 커팅된 조형물의 각 부품이 접착제를 통해 부착,조립되는 조형물 조립단계(s4); A sculpture assembly step of attaching and assembling each part of the cut sculpture through an adhesive (s4);

상기 조립된 조형물의 이음부 또는 접합부 공극이 퍼티로 메워지는 단계(s5); A step (s5) in which the gaps of the joint or the joint of the assembled sculpture are filled with putty;

상기 이음부또는 접합부가 메워지는 단계에서, 돌출된 표면이나 거칠어진 표면을 매끄럽게 샌딩처리하는 단계(s6); (S6) smoothly sanding the protruding surface or the roughened surface in the step of filling the joint or junction;

상기 샌딩 처리된 조형물의 표면 전체를 하드 코팅하여 조형물 표면의 강도를 강화하는 단계(s7); Hard coating the entire surface of the sanded sculpture to enhance the strength of the surface of the sculpture (s7);

상기 조형물 표면의 강도가 강화된 하드 코팅면을 마감재로 도포하기전, 마감재와의 박리현상을 차단하기 위하여 바인더로 도포하는 단계(s8)와; Before applying the hard coating surface of which the strength of the surface of the sculpture is reinforced with the finishing material, applying with a binder to block peeling with the finishing material (s8);

상기 바인더의 도포면에 마감재를 도포하는 단계(s9);
를 포함하는 것을 특징으로 한다.
상기 조형물 표면의 강도를 강화하는 단계(s7)에서 하드 코팅은 특수제작된 폴리우레탄을 도포하여 표면의 강도를 강화시킨다.
Applying a finish to the coated surface of the binder (s9);
Characterized in that it comprises a.
In the step (s7) of strengthening the strength of the surface of the sculpture, the hard coating is coated with a specially manufactured polyurethane to enhance the strength of the surface.

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

상기 하드 코팅면에 마감재를 도포할 때, 마감재와의 박리현상을 차단하기 위하여 먼저 바인더를 도포시켜 전처리하게 되는데, 이때 도포 되는 바인더는 우레탄을 사용한다.When applying the finish to the hard coating surface, in order to block the peeling phenomenon with the finish first to apply a binder to the pre-treatment, wherein the binder is applied is urethane.

CNC기에서의 커팅 작업후 세밀하게 커팅안된 부분은 수작업으로 입체조각을 하며, 조각된 조형물을 세부도면대로 접착제를 통해 부착시켜 1차 조립하게 되며, 1차 조립이 안 된 조형물에 대하여는 골조도면대로 절개시켜 골조를 용접 및 볼트 조임으로 다시 2차 조립하게 된다.
상기 조형물의 이음매 부분 또는 접합부분 공극을 퍼티로 메우는 작업을 할때 다음과 같이 행한다.
즉 조형물 조립 및 공극을 메우는 단계에서 돌출되거나 거칠어진 표면을 샌딩 처리하면서 조립된 조형물의 질감을 표현 조각한 후, 다시 샌딩 작업으로 질감의 마무리 작업을 하게 된다.
이하 상기 샌딩작업(s6) 이후의 작업에 대해 구체적으로 설명한다.
샌딩 작업으로 질감의 마무리 작업이 완료된 각종 조형물의 표면 전체를 하드코팅 하게 되는데, 이때 상기의 하드코팅은 곡선부재 조형물이나 소형 조형물에는 조형물 전용 우레탄을 스프레이 방식으로 도포한다
이때 도포의 두께는 1∼5mm를 기준으로 하여 그 허용오차는 +-0.5mm로 하고, 우레탄 코팅은 스프레이 분사를 통해 섭씨 5도 이상 습도 70% 이하의 조건에서 작업하며, 상기 코팅은 계속적으로 분사하여 기준 도포의 두께에 이르도록 하여야하고, 조형물의 질감의 형태 및 강도에 따라 규사를 병행하여 동시 분사하게 되며, 평면부재나 직선부재(소형 조형물은 제외)는 드라이비트 공법으로 표면 강화처리 하게 된다.
그리고나서, 마감작업인 프라이머 작업을 수행하게 되는데, 상기와 같은 스프레이분사 방법에 의하되, 수성페인트 또는 특수효과를 위한 페인트를 사용하게 된다.
참고적으로 공지된 "드라이비트공법"은 널리 알려진 것으로서'드라이 비트'란 영어 'DRY'와 불어 'VIT'(= QUICK)의 합성어로 "빨리 마르다"의 뜻을 가진 것으로 외단열공법의 대명사로 불러지고 있으며, 기존구조체 위에 E.P.S 단열판이나 불연성 암면을 대고 유리섬유인 메쉬(MESH)를 붙인 후 외부마감재로 처리하는 외단열공법이다. 드라이비트공법의 주요 구성은 단열재, 메쉬, 접착몰탈, 마감재로 구성되고 단열재는 스티로폼이나 불연성 암면을 주로 사용하며, 메쉬로 불리는 유리섬유는 고(高) 인장강도를 가진 소재로 단열재를 보호하기 위하여 사용된다.
이하에서는 상기와 같이 완성된 조형물을 현장에서 실제 시공하는 방법을 설명한다.
After cutting on the CNC machine, the uncut parts are three-dimensionally sliced by hand, and the carved sculptures are attached by adhesive with the adhesive as the detailed drawing, and the first assembly is performed. The cuts are then reassembled again by welding and bolting the framework.
When filling the seam of the joint or the joint part of the sculpture with a putty is carried out as follows.
In other words, while expressing and carving the texture of the assembled sculpture while sanding the protruding or rough surface at the step of assembling the sculpture and filling the voids, the finishing of the texture is performed by sanding again.
Hereinafter, the operation after the sanding operation s6 will be described in detail.
Hard coating is performed on the entire surface of various sculptures that have finished the finishing work of the texture by sanding. At this time, the hard coating is applied to the curved member moldings or the small moldings by spraying urethane exclusively for the moldings.
At this time, the thickness of the coating is based on 1 ~ 5mm, the tolerance is + -0.5mm, urethane coating works under the conditions of more than 5 degrees Celsius and humidity of 70% or less through spray spraying, the coating is continuously sprayed The thickness of the standard coating is to be reached, and the sand sand is sprayed in parallel according to the shape and strength of the texture of the sculpture. The flat or straight members (except for the small sculptures) are surface-reinforced by the dry bit method. .
Then, the finishing work is carried out a primer work, by the spray injection method as described above, using water paint or paint for special effects.
For reference, the well-known "dry bit method" is widely known. "Dry bit" is a compound word of English "DRY" and French "VIT" (= QUICK). It is called, and it is an external heat insulation method that attaches EPS (Insulation plate) or non-combustible rock wool to the existing structure, and attaches mesh (MESH), which is glass fiber, and treats it with external finish. The dry bit method consists of insulation, mesh, adhesive mortar, and finishing material. The insulation material mainly uses styrofoam or incombustible rock wool. The glass fiber, called mesh, is a material with high tensile strength. Used.
Hereinafter, a method of actually constructing the completed sculpture as described above in the field will be described.

(부분공정 2: 현장시공 단계)
현장시공 단계는 다음과 같이 이루어진다.
컴퓨터 프로그래밍을 통해 데이터베이스화된 기존 건물에 관한 자료들을 이용하여, 기존 건물의 외부로 돌출된 지장물(가스배관, 에어컨, 실외기, 전선 및 전화선 물 홈통 등)을 철거하는 단계(s-1);
(Part 2: Field Construction Stage)
The site construction phase is as follows.
Demolishing obstacles (gas pipes, air conditioners, outdoor units, wire and telephone wire troughs, etc.) protruding out of the existing building using data on the existing building databased through computer programming (s-1);

삭제delete

상기의 리모델링에 필요한 자재(비계 일체, 드라이비트 일체, 철 구조물 일체, 판넬 및 지붕재 그리고 각종 건축 부재 및 장식 부재인 조형물 등)를 용도별로 구분하는 단계(s-2);(S-2) classifying the materials necessary for the remodeling (including scaffolding, dry bit, steel structure, panel and roofing, and various building and decorative members);

자재 및 공간이동이 원활하도록 하고, 보행자 및 작업자에게 낙하물이 떨어지지 않도록 하기 위해, 비계를 설치하는 단계(s-3); Installing a scaffold to smoothly move materials and spaces and to prevent falling objects from falling to pedestrians and workers (s-3);

상기 기존 건물을 전통 한옥으로 형상변경 함에 따른 구조적 안전을 위하여 철 구조물(빔, 각관, C 형강 등)의 골조가 설치되는 단계(s-4); A step of installing a frame of an iron structure (beam, square tube, C-shaped steel, etc.) for structural safety by changing the shape of the existing building into a traditional hanok (s-4);

상기 기존 건물의 상부에 전통 기와지붕의 선형을 맞추기 위해 실시되는, 목재골조 보강작업 단계(s-5); The wood frame reinforcement step (s-5) which is carried out to fit the linear of the traditional tile roof on top of the existing building;

상기 기존 건물인 처마의 하부 면에 내수합판을 고르게 부착한 후, 기존의 지붕과 철구조물이 정면에서 보이지 않도록 아연 철판을 접어 내수합판의 처마 끝 선에 맞추는 처마보강작업 단계(s-6); An eaves reinforcement step (s-6) of evenly attaching the water-resistant plywood to the lower surface of the eaves of the existing building, and then folding the zinc iron plate so that the existing roof and the steel structure are not seen from the front;

상기 처마보강작업을 한 위에 입면 설계에 의한 처마용 건축 부재인 조형물을 지붕 경사각에 맞추어 부착하는 처마완성 단계(s-7); An eave completion step of attaching a sculpture, which is a building member for eaves according to the elevation design on the eave reinforcing work, according to the roof inclination angle (s-7);

상기 목재골조 보강작업 후, 지붕 기와를 끼워 맞춰 빗물이 새지않도록 하는 지붕재 시공단계(s-8); After the timber frame reinforcement work, roofing construction step to fit the roof tile so that rain water does not leak (s-8);

상기 기존 건물의 외벽에 몰탈본드를 이용하여 스티로폼, 메쉬, 마감재를 포함하는 드라이비트를 부착하는, 건물 외벽면 수직작업 단계(s-9); Attaching a dry bit including a styrofoam, a mesh, and a finishing material to the exterior wall of the existing building by using a mortar bond; building exterior wall vertical work step (s-9);

기존 건물의 외벽면에 전통 한옥의 대형 조형물(도리, 보, 창방, 인방, 기둥 등)이 몰탈본드로써, 부착·조립되는 대형조형물 부착·조립 단계(s-10); Attaching and assembling the large sculptures (s-10) to which the large sculptures (traditional beams, beams, windows, lintels, pillars, etc.) of the traditional hanok are attached and assembled as mortar bonds on the outer wall of the existing building (s-10);

상기 기존 건물의 외벽면에 심미감을 표현하기 위해, 칼라도장과 단청작업을 하는 칼라도장 및 단청작업 단계(s-11):  In order to express an aesthetic feeling on the outer wall surface of the existing building, the color painting and mono working steps of the color painting and mono working (s-11):

상기 칼라도장 및 단청작업이 완료된 후, 전통 한옥의 소형 조형물(연목, 부연, 익공, 다포, 주두, 주초 등)을 몰탈본드를 이용하여 부착·조립하는 소형조형물 부착·조립 단계(s-12);
폐기물 처리 등 시공 마무리단계(s-13단계);
를 포함하는 것을 특징으로 한다.
After completion of the color coating and mono work, attaching and assembling the small sculptures of traditional hanok (softwood, paraffin, pike, dapo, poncho, poncho, etc.) using mortar bonds (s-12) ;
Construction finishing stages such as waste treatment (s-13 stage);
Characterized in that it comprises a.


상기 현장시공 단계를 이하에서 보다 구체적으로 설명한다.
현장시공에 있어서 최우선으로 할 작업은, 먼저 골조도면에 의한 베이스를 삼각형태로 구축하는 것이다. 이때 조형물의 형태 및 크기에 따라 조형물 및 바닥면적의 1:1로 구축하며, 앵커의 지름은 베이스 판 두께의 3배수 이상으로 시공하여, 베이스 앵커의 안정성을 도모한다. 단, 주변환경에 의하여 그 면적은 가감된다.
상기 처마보강작업 단계(s-6)에서 처마는 외벽에서 지붕선 끝까지의 직선거리가 최소 1,200mm 이상 확보되어야 하며, 외벽과 지붕의 경사각은 60∼80도를 유지하여 전통 가옥의 느낌을 주도록 한다.

The field construction step will be described in more detail below.
The first priority in the field construction is to construct the base based on the skeleton drawing in a triangular form. At this time, the shape and size of the sculptures and the floor area of the 1: 1 to build the construction, the diameter of the anchor is constructed more than three times the thickness of the base plate, the stability of the base anchor. However, the area is added or subtracted by the surrounding environment.
In the eaves reinforcing step (s-6), the eaves should have a minimum distance of at least 1,200 mm from the outer wall to the end of the roof line, and the inclination angle of the outer wall and the roof should be maintained at 60 to 80 degrees to give a traditional house feel.

삭제delete

상기 처마보강작업 단계(s-6)에서 처마의 하부에 부착되는 내수합판은 10mm이상 두께를 사용하여 강도를 확보하며, 아연 철판을 내수합판 처마끝선 5∼50mm에서 마무리하도록 한다.The water-resistant plywood attached to the lower part of the cornice in the eaves reinforcing operation step (s-6) to secure the strength using a thickness of 10mm or more, and to finish the zinc iron plate at the end of the water-resistant plywood board 5 to 50mm.


상기 지붕재 시공 단계(s-8)에서 지붕재는 강판민속 기와, 플라스틱민속 기와, 시멘트전통 기와, 점토전통 기와 중에서 어느 하나를 선택할 수 있는데, 강판민속 기와는 작업시 암막새와 숫막새 및 처마기와 밑이 표면과 다른 색으로 구분되기 때문에 시공 전에 무광 검은색 라카로 사전에 스프레이 하며, 지붕재 고정용 못은 빗물이 누수되지 않도록 실리카 처리함을 특징으로 한다.

In the roofing construction step (s-8), the roofing material may be selected from steel sheet folk tile, plastic folk roof tile, cement traditional roof tile, and clay traditional roof tile. Because it is different from the color, it is sprayed in advance with a matte black lacquer before construction, and the roofing nail is characterized by being treated with silica to prevent water from leaking.

삭제delete

상기 기존 건물 외벽에 몰탈본드를 이용하여 스티로폼, 메쉬, 마감재를 포함하는 드라이비트를 부착하는 기존 건물 외벽면 수직작업 단계(s-9)에서 드라이비트용 스티로폼은 10mm 이상을 사용한다.Styrofoam for dry bits in the existing building outer wall surface vertical work step (s-9) to attach the dry bit, including styrofoam, mesh, finishing material using a mortar bond to the existing building outer wall uses 10mm or more.

한편, 상기와 같이 데이터베이스로 구축된 모든 자료를 토대로 작업이 진행되는데 기존 건물의 주변 바닥의 수평을 유지시키고 고정앵커 시공을 위한 기초면적을 넓게 확보함이 바람직하며, 가능한 앵커의 기본 면적은 기존 건물 바닥면적의 1.5배 이상이 가장 바람직하게 된다.On the other hand, the work is proceeded based on all the data constructed in the database as described above, it is desirable to maintain the horizontal level of the surrounding floor of the existing building and to secure a large base area for fixed anchor construction, the basic area of the anchor possible Most preferably, at least 1.5 times the floor area.

삭제delete

삭제delete

삭제delete

외부 가설공사로서 기존 건물의 바탕 벽면에서 30cm 이격시켜 발판설치 공사를 하며, 이때 발판 설치용 수평비계의 상·하 부재 설치 간격은 1.8∼2.0m를 유지함이 바람직하다.As an external temporary construction, scaffolding is installed 30cm away from the base wall of an existing building. At this time, it is desirable to maintain the height of the upper and lower members of the scaffold installation horizontally from 1.8 to 2.0m.


한편, 각종 건축 부재 및 장식 부재인 조형물의 이동이나 설치는 형태나 크기 중량 또는 설치장소의 고저 및 현장의 상황에 따라야 하는바, 즉 비교적 부피가 커서 운반이 용이하지 않은 건축 부재인 보나 기둥 등의 조형물은 공장에서 직접 제작하지 않고 시공현장에서 바로 제작하면서 기존 건물에 직접 조립·설치하고, 비교적 부피가 작은 장식 부재는 공장에서 사전 제작하여 시공현장에 운반한 후, 기존 건물의 부착 면에 직접 조립·설치한다.

On the other hand, the movement or installation of sculptures, which are various building members and decorative members, should depend on the shape, size, weight, height of the installation site, and the situation of the site, that is, a beam or column, which is a relatively bulky building member, which is not easy to carry. Sculptures are manufactured directly at the construction site, not directly at the factory, but assembled and installed directly on the existing building, and relatively small decorative members are pre-fabricated at the factory and transported to the construction site, and then assembled directly on the surface of the existing building. Install.

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

베이스 앵커와 대형인 조형물과의 접합시 볼트의 조임은 충분히 조여 주어야 하며, 앵커의 접합부분이 공기 중에 노출되지 않도록 실리콘 또는 시멘트나 우레탄으로 덮어주고, 조형물이 설치된 후, 3일 내에 총체적 안전성에 대하여 직접 점검을 실시함이 바람직하다.When joining the base anchor with a large sculpture, the bolt should be tightened sufficiently. Cover the joint of the anchor with silicon or cement or urethane so that it is not exposed to the air. It is preferable to carry out the inspection.

삭제delete

도 2는 도 1의 전체공정에 포함되는 부분공정 1로 한옥의 각종 조형물의 제작단계를 플로우챠트로 나타내는 도면,FIG. 2 is a flow chart showing the manufacturing steps of various sculptures of hanok in partial process 1 included in the overall process of FIG. 1;

도 3은 도 1의 전체공정에 포함되는 부분공정 2로 현장 시공단계를 플로우챠트로 나타내는 도면이다.3 is a flowchart illustrating a site construction step by a partial process 2 included in the overall process of FIG.

<도면 중 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

s1 : 조형물의 세부도면 설계단계s1: Detailed drawing design stage of sculpture

s2 : 세부도면 설계를 데이터베이스화하는 단계s2: Database detail drawing design

s3 : 조형물의 커팅 작업 단계 s3: cutting work stage of the sculpture

s4 : 조형물 조립단계s4: Assembly step

s5 : 조형물 공극을 메우는 단계s5: filling the cavity of the sculpture

s6 : 조형물 표면의 샌딩 처리 단계 s6: sanding step on the surface of the sculpture

s7 : 조형물 표면의 강도강화 단계s7: Strengthening step of the surface of the sculpture

s8 : 우레탄 바인더 도포 단계 s8: urethane binder coating step

s9 : 조형물 완성단계s9: sculpture completion stage

삭제delete

삭제delete

s-1 : 지장물 철거단계 s-1: Dismantling of obstacles

s-2 : 자재 정리·정돈단계s-2: Material Arrangement

s-3 : 비계설치 단계 s-3: scaffolding installation steps

s-4 : 철 구조물 골조제작 설치단계s-4: Installation step of fabricating steel structure

s-5 : 목재골조 보강작업 단계 s-5: Wood frame reinforcement work step

s-6 : 처마보강작업 단계s-6: Eaves reinforcement step

s-7 : 처마완성 단계 s-8 : 지붕재 시공단계s-7: Eave completion stage s-8: Roofing construction stage

s-9 : 건물 외벽면 수직작업 단계 s-9: Building exterior wall vertical work stage

s-10 : 대형조형물 부착·조립 단계s-10: Attaching and Assembling Large Sculptures

s-11 : 칼라도장 및 단청작업 단계 s-11: Color painting and mono work steps

s-12 : 소형조형물 부착·조립 단계s-12: Attaching and assembling small sculptures

s-13 : 시공마무리 단계s-13: Finishing step

Claims (12)

삭제delete 기존 건물의 외관을 한옥으로 리모델링하기 위해, 다음의 각 단계별 작업 공정으로 이루어지는 조형물 제작단계와 현장시공 단계를 포함하는, 일반 건축물을 전통한옥으로 리모델링하는 방법.In order to remodel the exterior of an existing building into a hanok, a method of remodeling a general building into a traditional hanok, which includes a sculpture production step and a site construction step, which consists of the following work steps. [조형물 제작단계][Sculpture production stage] s1단계s1 step 컴퓨터 데이터베이스로 구축된 한옥 조형물의 종류 수량 색상 등의 정보 및 리모델링 대상이 되는 기존건물에 대한 크기, 치수, 수량 등의 정보를 활용하여, 한옥 조형물의 세부도면이 설계되는 단계The detailed drawing of the hanok sculptures is designed by utilizing the information such as the quantity, color, and quantity of the hanok sculptures constructed by computer database and the size, dimensions, and quantity of the existing buildings to be remodeled. s2단계 s2 step 상기 조형물의 세부도면 설계 결과가 컴퓨터 프로그래밍을 통해 데이터베이스로 구축되는 단계The detailed drawing design result of the sculpture is built into a database through computer programming s3단계 s3 steps 상기 데이터베이스로 구축된 설계도면이 CNC기에 입력되고, The design drawings constructed with the database are entered into the CNC machine, 스티로폼, FRP, GFRC, FRC 또는 플라스틱 중에서 선택된 재료를 사용하여 조형물을 제작하되, 상기 CNC에 입력된 정보에 의하여 세부도면 설계에 표기된 형상으로 조형물이 커팅되는 단계Sculpture is produced using a material selected from styrofoam, FRP, GFRC, FRC or plastic, the sculpture is cut into the shape indicated in the detailed drawing design by the information input to the CNC s4단계 s4 step 상기 커팅된 조형물의 각 부품을 접착제를 사용 부착하여 1차 조립하고, 1차 조립이 안된 조형물은 골조도면대로 절개시켜, 골조를 용접 및 볼트 조임으로 2차 조립하는 조형물 조립단계Each assembly of the cut sculpture is attached to the primary assembly by using an adhesive, and the first assembly is not assembled to cut the frame according to the skeleton drawing, the second assembly assembly by welding and bolt tightening s5단계 s5 step 상기 조립된 조형물의 이음부 또는 접합부 공극이 퍼티로 메워지는 단계Filling the seam of the joint or joint of the assembled sculpture with a putty s6단계 s6 step 상기 이음부또는 접합부가 메워지는 단계에서, 돌출된 표면이나 거칠어진 표면을 매끄럽게 샌딩처리하는 단계In the step of filling the seam or joint, smoothly sanding the protruding surface or the rough surface s7단계 s7 step 상기 샌딩 처리된 조형물의 표면 전체를 하드 코팅하여 조형물 표면의 강도를 강화하는 단계로서, 곡선부재 조형물이나 소형 조형물에는 우레탄을 스프레이 방식으로 도포하되, 섭씨 5도 이상 및 습도 70% 이하의 조건에서 도포하고, 상기 도포의 두께는 1∼5mm를 기준으로 하여 그 허용오차는 +-0.5mm로 하고, 상기 우레탄 코팅시 규사를 함께 분사하게 되며, 평면부재나 직선부재(소형조형물은 제외)는 드라이비트 공법으로 표면의 강도를 강화하는 단계Hard coating the entire surface of the sanded sculptures to enhance the strength of the surface of the sculpture, the urethane is applied to the curved member sculptures or small sculptures in a spray method, but applied under conditions of 5 degrees Celsius or more and humidity of 70% or less The thickness of the coating is based on 1 to 5mm, the tolerance is + -0.5mm, the silica sand is sprayed together during the urethane coating, the flat member or the linear member (except small sculpture) dry bit Step to strengthen the surface strength s8단계 s8 steps 상기 조형물 표면의 강도가 강화된 하드 코팅면을 마감재로 도포하기전, 마감재와의 박리현상을 차단하기 위하여 우레탄 바인더로 도포하는 단계Applying a urethane binder to block the peeling phenomenon with the finish before applying the hard coating surface of the strength of the sculpture surface to the finish material s9단계 s9 steps 상기 바인더의 도포면에 마감재를 도포하여 조형물로 완성하는 단계Applying a finish on the coated surface of the binder to complete the molding [현장시공 단계][Site Construction Stage] s-1단계s-1 step 컴퓨터 프로그래밍을 통해 데이터베이스화된 기존 건물에 관한 자료들을 이용하여, 기존 건물의 외부로 돌출된 지장물(가스배관, 에어컨, 실외기, 전선 및 전화선 물 홈통 등)을 철거하는 단계Demolish obstacles (gas pipelines, air conditioners, outdoor units, wire and telephone wire troughs, etc.) protruding out of the existing building, using data on existing buildings that are databased through computer programming. s-2단계s-2 상기의 리모델링에 필요한 자재(비계 일체, 드라이비트 일체, 철 구조물 일체, 판넬 및 지붕재 그리고 각종 건축 부재 및 장식 부재인 조형물 등)를 용도별로 구분하는 단계Classifying the materials necessary for the remodeling (including scaffolding, dry bits, steel structures, panels and roofing materials, and various building and decorative members, etc.) by use. s-3단계s-3 자재 및 공간이동이 원활하도록 하고, 보행자 및 작업자에게 낙하물이 떨어지지 않도록 하기 위해, 비계를 설치하는 단계Steps to install scaffolding to facilitate material and space movement and to prevent falling objects from falling on pedestrians and workers s-4단계s-4 상기 기존 건물을 전통 한옥으로 형상변경 함에 따른 구조적 안전을 위하여 철 구조물(빔, 각관, C 형강 등)의 골조가 설치되는 단계Frame construction of steel structures (beams, square tubes, C-beams, etc.) is installed for structural safety by changing the shape of the existing building into a traditional Hanok. s-5단계s-5 상기 기존 건물의 상부에 전통 기와지붕의 선형을 맞추기 위해 실시되는, 목재골조 보강작업 단계Wood frame reinforcement work step is carried out to fit the linear of the traditional tile roof on top of the existing building s-6단계s-6 상기 기존 건물 처마의 하부 면에 내수합판을 고르게 부착한 후, 기존의 지붕과 철구조물이 정면에서 보이지 않도록 아연 철판을 접어 내수합판의 처마 끝 선에 맞추는 처마보강작업 단계Eave reinforcement step of evenly attaching the water-resistant plywood to the lower surface of the existing building eaves, folding the zinc iron plate so that the existing roof and the steel structure is not visible from the front side of the eaves plywood s-7단계s-7 steps 상기 처마보강작업을 한 위에 입면 설계에 의한 처마용 건축 부재인 조형물을 지붕 경사각에 맞추어 부착하는 처마완성 단계Eave completion step of attaching the sculpture, which is a building member for eaves by the elevation design on the eave reinforcement work, according to the roof inclination angle s-8단계s-8 상기 목재골조 보강작업 후, 지붕 기와를 끼워 맞춰 빗물이 새지않도록 하는 지붕재 시공단계After the timber frame reinforcement work, roofing construction step to fit the roof tile so that rain water does not leak s-9단계s-9 상기 기존 건물 외벽에 몰탈본드를 이용하여 스티로폼, 메쉬, 마감재를 포함하는 드라이비트를 부착하는, 건물 외벽면 수직작업 단계Attaching a dry bit including a styrofoam, mesh, and finishing material to the existing outer wall of the building by using a mortar bond, a building outer wall surface vertical work step s-10단계s-10 steps 기존 건물의 외벽면에 전통 한옥의 대형 조형물(도리, 보, 창방, 인방, 기둥 등)이 몰탈본드로써, 부착·조립되는 대형조형물 부착·조립 단계 The large-scale sculptures (traditional beams, beams, windows, lintels, pillars, etc.) of traditional hanok are attached and assembled on the exterior walls of existing buildings as mortar bonds. s-11단계s-11 steps 상기 기존 건물의 외벽면에 심미감을 표현하기 위해, 칼라도장과 단청작업을 하는 칼라도장 및 단청작업 단계  In order to express the aesthetics on the outer wall surface of the existing building, color painting and mono working steps s-12단계s-12 steps 상기 칼라도장 및 단청작업이 완료된 후, 전통 한옥의 소형 조형물(연목, 부연, 익공, 다포, 주두, 주초 등)을 몰탈본드를 이용하여 부착·조립하는 소형조형물 부착·조립 단계After completion of the color coating and mono work, attaching and assembling the small sculptures of the traditional hanok (softwood, paraffin, pock, dapo, poncho, poncho, etc.) using mortar bonds s-13단계s-13 steps 폐기물 처리 등 시공 마무리단계.Construction finishing stage including waste disposal. 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 청구항 2에 있어서,The method according to claim 2, 상기 처마보강작업 단계(s-6)에서 처마는 외벽에서 지붕선 끝까지의 직선거리가 최소 1,200mm 이상 확보되어야 하며, 외벽과 지붕의 경사각은 60∼80도를 유지하고,In the eave reinforcing step (s-6), the eaves should have a minimum distance of at least 1,200 mm from the outer wall to the end of the roof line, and maintain the inclination angle of the outer wall and the roof at 60 to 80 degrees. 상기 처마보강작업 단계(s-6)에서 처마의 하부에 부착되는 내수합판은 10mm이상 두께를 사용하여 강도를 확보하며, 아연 철판을 내수합판 처마끝선 5∼50mm에서 마무리하며,The water-resistant plywood attached to the lower part of the cornice in the eaves reinforcing step (s-6) to secure the strength using a thickness of 10mm or more, and finish the zinc iron plate at 5 ~ 50mm of the plywood cornice end line, 상기 지붕재 시공 단계(s-8)에서 지붕재로서 강판민속 기와, 플라스틱민속 기와, 시멘트전통 기와, 점토전통 기와 중에서 어느 하나를 선택할 수 있고, 상기강민속 기와는 시공 전에 무광 검은색 라카로 사전에 스프레이 하며, 지붕재 고정을 하기 위한 못은 빗물이 누수되지 않도록 실리카 처리하고,In the roofing construction step (s-8), any one of the steel sheet tile, plastic folk tile, cement traditional tile, and clay traditional tile can be selected as the roofing material, and the steel folk tile is sprayed in advance with a matt black laca before construction. And nails for fixing roofing materials are treated with silica to prevent rain water from leaking, 상기 기존 건물 외벽에 몰탈본드를 이용하여 드라이비트를 부착하는 기존 건물 외벽면 수직작업 단계(s-9)에서 드라이비트용 스티로폼은 10mm 이상을 사용하는 것을 특징으로 하는, 일반 건축물을 전통한옥으로 리모델링하는 방법.Styrofoam for dry bits is more than 10mm in the existing building exterior wall vertical step (s-9) of attaching the dry bits to the existing building exterior wall using mortar bonds, remodeling a general building into a traditional hanok How to. 삭제delete 삭제delete 삭제delete 삭제delete
KR1020090060797A 2009-07-03 2009-07-03 A remodeling method of ancient and honorable korean-style house for a in the past building KR100982694B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090060797A KR100982694B1 (en) 2009-07-03 2009-07-03 A remodeling method of ancient and honorable korean-style house for a in the past building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090060797A KR100982694B1 (en) 2009-07-03 2009-07-03 A remodeling method of ancient and honorable korean-style house for a in the past building

Publications (1)

Publication Number Publication Date
KR100982694B1 true KR100982694B1 (en) 2010-09-16

Family

ID=43010224

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090060797A KR100982694B1 (en) 2009-07-03 2009-07-03 A remodeling method of ancient and honorable korean-style house for a in the past building

Country Status (1)

Country Link
KR (1) KR100982694B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101261976B1 (en) 2012-11-05 2013-05-08 (주)건축사사무소위드웍스 Steel frame structure for point system constructing curved exterior articles on atypical architecture and method for constructing atypical architecture using the same

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09317206A (en) * 1996-05-30 1997-12-09 Matsushita Electric Ind Co Ltd Building reform assisting device
KR20050033957A (en) * 2003-10-07 2005-04-14 김종헌 Bracket constructing structure of steel-structure
KR100633146B1 (en) 2006-02-16 2006-10-11 김인수 Method of fabricating standardized building element of korean-style house
KR100860166B1 (en) * 2007-12-05 2008-09-24 조전환 Construction method of hanok

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09317206A (en) * 1996-05-30 1997-12-09 Matsushita Electric Ind Co Ltd Building reform assisting device
KR20050033957A (en) * 2003-10-07 2005-04-14 김종헌 Bracket constructing structure of steel-structure
KR100633146B1 (en) 2006-02-16 2006-10-11 김인수 Method of fabricating standardized building element of korean-style house
KR100860166B1 (en) * 2007-12-05 2008-09-24 조전환 Construction method of hanok

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101261976B1 (en) 2012-11-05 2013-05-08 (주)건축사사무소위드웍스 Steel frame structure for point system constructing curved exterior articles on atypical architecture and method for constructing atypical architecture using the same

Similar Documents

Publication Publication Date Title
Weeks et al. The Secretary of the Interior's Standards for the Treatment of Historic Properties: With Guidelines for Preserving, Rehabilitating, Restoring & Reconstructing Historic Buildings
Grimmer The Secretary of the Interior's standards for the treatment of historic properties: With guidelines for preserving, rehabilitating, restoring & reconstructing historic buildings
Thomas et al. Comparing the performance of brick and timber in residential buildings–The case of Australia
KR100902642B1 (en) Arbor
Gibbons How a House Is Built (New & Updated)
Te Roopu Taurima Development and efficiency of prefabricated building components
CA2944427C (en) Building structure in which korean-style house and wooden house are introduced to contemporary architecture
KR100967300B1 (en) Traditional korean-style house having reinforced concrete and wood and its construction method
KR100982694B1 (en) A remodeling method of ancient and honorable korean-style house for a in the past building
US9453344B2 (en) Modular insulated facade
Plunkett Construction and Detailing for Interior Design Second Edition
KR101292748B1 (en) Tailor-Made Manufacturing Method for Furniture-style Buildings and Traditional Korean-style Structure
CN107642169B (en) Light steel structure assembly decoration integrated building
JPH05195575A (en) Panel and framework precut panel built-in construction method
RU2611129C1 (en) Method for low-rise structure erection
Lugowski Ferrocement super-insulated shell house design and construction
Arsenault et al. Creative Design Alternatives Using Metal Building Systems
CN218933444U (en) Assembled mounting structure of scene is built to exhibition ancient times
Dimkov Contemporary variant of a traditional Macedonian bondruck house
Spoormans et al. The NEMAVO Airey system: A wealth of options
Xue et al. Preservation and adaptive reuse of historical buildings: A case study of the Lin Hall at the former site of Dongwu University
Moisio et al. Comparison of a concrete and wooden school–examinations based on carbon footprint
Inabnit Future Residential Construction An Exploration of Cross-Laminated Timber
CN104895189A (en) Efficient manufacturing and installation method of light steel structure
Dodoo et al. Wälludden as a case study for three new wood building systems

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E902 Notification of reason for refusal
E601 Decision to refuse application
J201 Request for trial against refusal decision
J301 Trial decision

Free format text: TRIAL DECISION FOR APPEAL AGAINST DECISION TO DECLINE REFUSAL REQUESTED 20100623

Effective date: 20100721

S901 Examination by remand of revocation
E902 Notification of reason for refusal
GRNO Decision to grant (after opposition)
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130910

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20140911

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20151007

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20160909

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20170908

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20190910

Year of fee payment: 10