KR100971713B1 - A target for measure the displacement in tunnel and method for installation thereof - Google Patents

A target for measure the displacement in tunnel and method for installation thereof Download PDF

Info

Publication number
KR100971713B1
KR100971713B1 KR1020100007999A KR20100007999A KR100971713B1 KR 100971713 B1 KR100971713 B1 KR 100971713B1 KR 1020100007999 A KR1020100007999 A KR 1020100007999A KR 20100007999 A KR20100007999 A KR 20100007999A KR 100971713 B1 KR100971713 B1 KR 100971713B1
Authority
KR
South Korea
Prior art keywords
target
tunnel
shotcrete
block
displacement measurement
Prior art date
Application number
KR1020100007999A
Other languages
Korean (ko)
Inventor
권영억
Original Assignee
권영억
(주)천일기술단
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 권영억, (주)천일기술단 filed Critical 권영억
Priority to KR1020100007999A priority Critical patent/KR100971713B1/en
Application granted granted Critical
Publication of KR100971713B1 publication Critical patent/KR100971713B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B5/00Measuring arrangements characterised by the use of mechanical techniques
    • G01B5/30Measuring arrangements characterised by the use of mechanical techniques for measuring the deformation in a solid, e.g. mechanical strain gauge
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M5/00Investigating the elasticity of structures, e.g. deflection of bridges or air-craft wings
    • G01M5/0033Investigating the elasticity of structures, e.g. deflection of bridges or air-craft wings by determining damage, crack or wear
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N19/00Investigating materials by mechanical methods
    • G01N19/08Detecting presence of flaws or irregularities

Landscapes

  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Immunology (AREA)
  • Aviation & Aerospace Engineering (AREA)
  • General Health & Medical Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Chemical & Material Sciences (AREA)
  • Pathology (AREA)
  • Health & Medical Sciences (AREA)
  • Biochemistry (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

PURPOSE: A target for measuring a tunnel displacement is provided to prevent the measurement fault by minimizing the change of a target. CONSTITUTION: A target for measuring a tunnel displacement comprises: a step of blasting with one target regardless of the formation times of the shotcrete side; a step of preventing the damage of target by the projected target; a step of installing sealing cover corresponded to the thickness of the whole shotcrete; and a step of making the moving space of the target and covering target in the formation of the shotcrete side. A target(100) firstly installed on a first shotcrete side(S1) is stored to the first shotcrete inner side of a tunnel wall side(200) and adjusts the exposed extent.

Description

터널 변위측정용 타켓 및 그 설치방법{a target for measure the displacement in tunnel and method for installation thereof}Target for measuring tunnel displacement and its installation {a target for measure the displacement in tunnel and method for installation

본 발명은 터널의 내공 변위 및 천단 침하를 측정하기 위해 터널의 내부에 설치되는 타켓의 미 사용시 외부 돌출을 방지하여 발파 또는 버럭처리 작업시 타켓의 파손을 미연에 방지할 수 있도록 하는 터널 변위측정용 타켓 및 그 설치방법에 관한 것이다.The present invention is for tunnel displacement measurement to prevent the external protrusion when the target is not used in the interior of the tunnel to measure the internal displacement of the tunnel and the sinking of the tunnel to prevent the damage of the target during the blasting or bagging process It relates to a target and its installation method.

일반적으로, 기차나 차량 등의 운행을 원활하고 사회 간접 자본의 확충을 위해 터널의 시공이 활발히 이루어지고 있는 바, 터널의 시공 공법도 새로운 기술이 개발되어 나날이 발전하고 있는 추세이다.In general, the construction of tunnels is actively performed to smoothly operate trains and vehicles, and to expand social indirect capital. As a result, new technologies are being developed every day.

이러한 터널 시공에는 새로운 첨단 공법이 적용되더라도 여러 가지 불확실한 요소들이 많이 존재하게 되는데, 그 중에서도 지질학적인 불확실성이 가장 중요한 문제점으로서 대두 되고 있으며, 이미 시공된 터널의 경우에도 노후화로 인하여 터널 내공의 변위가 발생하게 되면 터널 구조물의 붕괴에 의해 대형사고가 발생할 가능성이 있다.In this tunnel construction, there are many uncertainties even though the new advanced construction method is applied. Among them, geological uncertainty is emerging as the most important problem, and in the case of tunnels that have already been constructed, displacement of tunnel interior occurs due to aging. In this case, there is a possibility that a major accident occurs due to the collapse of the tunnel structure.

이러한 문제점들을 미연에 방지하기 위해, 최근에는 터널 내공의 변위량을 측정하는 방법이 개발되고 있는데, 대표적인 방법으로서 터널 내공에 반사판을 갖춘 소형의 타겟 구조물을 부착하고, 기준지점에서 레이저 광선을 측정하고자 하는 타겟 구조물에 발사함에 의해, 반사되어 돌아오는 광선의 속도에 의해 길이를 파악하고, 소정의 기준 좌표점과 해당 터널의 측정점과의 각도 변위량을 측정함으로써, 길이와 각도 변위량에 근거한 터널 내부의 내공 변위량을 파악할 수 있도록 하고 있다.In order to prevent these problems, a method of measuring displacement of tunnel holes has recently been developed. As a representative method, a small target structure having a reflector is attached to a tunnel hole and a laser beam is measured at a reference point. By firing on the target structure, the length is determined by the speed of the reflected light and the amount of angular displacement in the tunnel based on the length and the angular displacement is measured by measuring the angular displacement between the predetermined reference coordinate point and the measured point of the tunnel. To understand.

이와 같은 기술과 관련되어 실용신안등록 제446441호에 폴더형 측량 타겟이 개시되어 있으며 그 구성은 도1에서와 같이, 터널면에 고정되는 지지 패널(10)과 타켓이 구비되는 반사판(16)이 볼트 및 너트(24)로서 회전가능하게 연결될 때 그 후면 소정 부위에는 스프링 고리(25,27)가 각각 형성되어 이에 탄성 스프링(29)의 양단이 고정적으로 연결되어 있는 바, 상기 탄성 스프링(29)은 상기 반사판(16)이 외력에 의한 충격으로 전방으로 이동되면 그 자체 복원력에 의해 전방으로 이동된 반사판(16)을 원래 위치로 회동시켜서 복원되도록 하는 역할을 수행하는 구성으로 이루어진다.In connection with such a technique, Utility Model Registration No. 444441 discloses a foldable survey target. The configuration thereof includes a support panel 10 fixed to a tunnel surface and a reflector 16 provided with a target. When it is rotatably connected as a bolt and nut 24, the spring ring (25, 27) is formed in a predetermined portion of the rear surface, so that both ends of the elastic spring 29 is fixedly connected, the elastic spring 29 When the reflecting plate 16 is moved forward by the impact of the external force is made of a configuration that serves to restore by rotating the reflecting plate 16 moved forward by its own restoring force to its original position.

그러나, 상기와 같은 측량 타켓은, 터널의 벽면에서 돌출되어 고정되는 지지패널(10)의 상측에 힌지를 통하여 반사판(6)이 회전가능토록 연결되는 구성으로 타켓이 터널벽면에 완전히 수납되지 못하여 터널 내부의 계속적인 발파를 위해 폭발물이나 대형 굴착기 등으로 작업을 지속하는 과정에서 굴착부로부터 예기치 않게 고속으로 날아오는 바위나 돌 등의 파편을 맞게 되어 파손을 가져오는 단점이 있는 것이다.However, the above-described measurement target is a configuration in which the reflector 6 is rotatably connected to the upper side of the support panel 10 which protrudes from the wall of the tunnel and is fixed so that the target cannot be completely accommodated in the tunnel wall. In order to continue the blasting of the inside of the explosives or large excavators in the process of continuing to receive the fragments of rocks or stones unexpectedly flying at high speed has the disadvantage of causing damage.

또한, 상기 일반적으로 1차 및 2차 숏크리트를 통하여 형성되는 터널에서의 변형 측정을 위해서는 1차숏크리트후 관측 2차 숏크리트후 관측을 수행하여야 하나 타켓의 노출을 최소화하기 위하여 2차 쇼크리트가 완성된 후 타켓을 설치하여야 하여 1차 작업후 철거 등을 필요로 하여 부하가 상승되는 문제점이 있는 것이다.In addition, in order to measure deformation in the tunnel formed through the first and second shotcrete, the first and second shotcrete should be observed after the first shotcrete, but the second shotcrete is completed to minimize the exposure of the target. After the target should be installed after the first work, there is a problem that the load is increased by the need for removal.

상기와 같은 종래의 문제점들을 개선하기 위하여 본 발명은, 숏크리트의 시공횟수에 상관없이 한번의 타켓 설치로서 반복적인 계측작업이 가능토록 하고, 발파나 버럭처리 작업등에 의한 타켓의 손실을 최소화할 수 있도록 하며, 간단한 조작으로 타켓의 노출이 가능토록 하고, 타켓의 변화가 최소화되어 이에 따른 계측불량을 방지할 수 있도록 하는 터널 변위측정용 타켓 및 그 설치방법을 제공하는 데 있다.In order to improve the conventional problems as described above, the present invention, it is possible to repeat the measurement work as a single target installation regardless of the number of shotcrete construction, and to minimize the loss of the target by blasting or bagging work It is to provide a target and a method for installing the tunnel displacement measurement to enable the exposure of the target by a simple operation, and to minimize the change of the target to prevent the measurement failure accordingly.

본 발명의 상기 목적을 달성하기 위하여, 터널의 진행정도에 따라 각각 수행되는 1차숏크리트면에서 터널의 둘레를 따라 정해진 위치에 일정깊이로서 타켓장착수단을 갖는 타켓장착부를 형성하고, 상기 타켓장착부에 장착되는 타켓이 숏크리트의 횟수에 대응되어 그 노출정도가 조절토록 되는 터널 변위측정용 타켓 및 그 설치방법을 제공한다.In order to achieve the above object of the present invention, the target mounting portion having a target mounting means with a predetermined depth at a predetermined position along the circumference of the tunnel in the primary shotcrete surface respectively performed according to the progress of the tunnel, the target mounting portion Provided is a target for measuring the displacement of the tunnel and the installation method of the target to be mounted so that the exposure degree is adjusted corresponding to the number of shotcrete.

그리고, 본 발명의 타켓장착수단은, 앵커볼트로서 1차쇼크리트면에 고정되면서 원터치결합유니트를 갖는 고정블럭으로서 이루어진 터널 변위측정용 타켓 및 그 설치방법을 제공한다.In addition, the target mounting means of the present invention provides a tunnel displacement measurement target and a method of installing the fixed bolt having a one-touch coupling unit while being fixed to the primary shock concrete surface as an anchor bolt.

더하여, 본 발명의 타켓장착수단은, 원터치결합유니트의 외측에 적어도 하나 이상의 연결파이프를 통하여 다단으로 연결되어 신축가능토록 되면서 그 단부에 타켓이 연결되는 연결블럭으로 이루어진 터널 변위측정용 타켓 및 그 설치방법을 제공한다.In addition, the target mounting means of the present invention, a tunnel displacement measuring target consisting of a connection block which is connected to the end of the one-touch coupling unit through the at least one or more connecting pipes in multiple stages to be stretchable while the target is connected to the installation and its installation Provide a method.

또한, 본 발명의 연결블럭은, 내측에 스프링부재가 연결되어 다단 돌출토록 설치되고, 외측에 자바라 형상의 실링커버가 더 부착되는 터널 변위측정용 타켓 및 그 설치방법을 제공한다.In addition, the connection block of the present invention, the spring member is connected to the inner side is installed so as to protrude in multiple stages, and the bellows-shaped sealing cover is further provided on the outside and provides a target for the displacement measurement tunnel and its installation method.

이상과 같이 본 발명에 의하면, 숏크리트의 시공횟수에 상관없이 한번의 타켓 설치로서 반복적인 계측작업이 가능하고, 발파나 버럭처리 작업등에 의한 타켓의 손실을 최소화하며, 간단한 조작으로 타켓의 노출이 가능하고, 타켓의 변화가 최소화되어 이에 따른 계측불량을 방지하는 효과가 있는 것이다.As described above, according to the present invention, it is possible to repeat the measurement work as one target installation regardless of the number of shotcrete construction, minimize the loss of the target due to blasting or bagging work, and the target can be exposed by simple operation. And, the change in the target is minimized, thereby preventing the measurement error.

도1은 종래의 타켓을 도시한 측면도이다.
도2는 본 발명에 따른 타켓 연결상태를 도시한 단면도이다.
도3은 본 발명에 따른 타켓을 도시한 사시도이다.
도4는 본 발명의 다른 실시예에 따른 타켓상태를 도시한 단면도이다.
도5는 본 발명에 따른 타켓을 도시한 사시도이다.
도6은 본 발명의 다른 실시예에 따른 타켓의 설치상태를 도시한 단면도이다.
도7a,b는 각각 본 발명의 또 다른 실시예에 따른 타켓의 설치상태를 도시한 사시도 및 단면도이다.
1 is a side view showing a conventional target.
2 is a cross-sectional view showing a target connection state according to the present invention.
3 is a perspective view showing a target according to the present invention.
4 is a cross-sectional view showing a target state according to another embodiment of the present invention.
5 is a perspective view showing a target according to the present invention.
6 is a cross-sectional view showing an installation state of the target according to another embodiment of the present invention.
7A and 7B are respectively a perspective view and a cross-sectional view showing an installation state of a target according to another embodiment of the present invention.

이하, 첨부된 도면에 의거하여 본 발명의 실시예를 상세하게 설명하면 다음과 같다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도2는 본 발명에 따른 타켓 연결상태를 도시한 단면도이고, 도3은 본 발명에 따른 타켓을 도시한 사시도이며, 도4는 본 발명의 다른 실시예에 따른 타켓상태를 도시한 단면도이고, 도5는 본 발명에 따른 타켓을 도시한 사시도이며, 도6은 본 발명의 다른 실시예에 따른 타켓의 설치상태를 도시한 단면도이고, 도7a,b는 각각 본 발명의 또 다른 실시예에 따른 타켓의 설치상태를 도시한 사시도 및 단면도이다. 2 is a cross-sectional view showing a target connection state according to the present invention, Figure 3 is a perspective view showing a target according to the present invention, Figure 4 is a cross-sectional view showing a target state according to another embodiment of the present invention, Figure 5 is a perspective view showing a target according to the present invention, Figure 6 is a cross-sectional view showing the installation state of the target according to another embodiment of the present invention, Figure 7a, b is a target according to another embodiment of the present invention, respectively Is a perspective view and a cross-sectional view showing the installation state of the.

본 발명은, 터널(T)의 굴착 정도에 따라 각각 수행되는 1차숏크리트면(S1) 및 2차숏크리트면(S2)을 형성한다.The present invention forms a primary shotcrete surface S1 and a secondary shotcrete surface S2 which are respectively performed according to the degree of excavation of the tunnel T.

이때, 상기 터널(T)의 발파에 따른 변형정도를 측정토록 1차숏크리트면(S1) 및 2차숏크리트면(S2)에서 노출토록 하는 타켓(100)을 설치하여 발파등의 외부충격에 의한 터널의 변형을 측정토록 한다.At this time, the target 100 to expose from the primary shotcrete surface (S1) and the secondary shotcrete surface (S2) to measure the deformation degree according to the blasting of the tunnel (T) by the tunnel by the external impact such as blasting Measure the deformation of.

그리고, 본 발명은 1차숏크리트면(S1)에 최초로 설치되는 타켓(100)에 의해 숏크리트면의 형성 횟수에 상관없이 하나의 타켓(100)으로 변형 측정이 가능토록 하면서 발파 및 발파에 의해 형성되는 버럭 처리시 돌출되는 타켓(100)에 의한 타켓(100)의 손상을 방지토록 버럭처리나 발파시 타켓(100)이 터널벽면(200)의 외부즉 1차숏크리트면(S1)의 외측으로 노출되는 않도록 설치한다.In addition, the present invention is formed by the blasting and blasting while enabling the deformation measurement to one target 100 regardless of the number of shotcrete surface formed by the target 100 is first installed on the primary shotcrete surface (S1) The target 100 is exposed to the outside of the tunnel wall surface 200, that is, to the outside of the primary shotcrete surface S1 to prevent damage to the target 100 by the target 100 protruding during the buckle treatment. Install it.

즉, 상기 터널벽면(200)에서 터널의 둘레를 따라 정해진 위치에 일정깊이로서 타켓장착수단(400)을 갖는 타켓장착부(230)를 형성하고, 상기 타켓장착부(230)에 장착되는 타켓(100)이 숏크리트의 횟수에 대응되어 타켓장착수단(400)의 동작에 의해 숏크리트면의 형성 횟수에 상관없이 타켓(100)의 노출정도가 일정하게 조절토록 된다.That is, a target mounting portion 230 having a target mounting means 400 is formed at a predetermined depth along a circumference of the tunnel at the tunnel wall surface 200, and the target 100 is mounted to the target mounting portion 230. Corresponding to the number of shotcrete, by the operation of the target mounting means 400, the exposure degree of the target 100 is constantly adjusted regardless of the number of shotcrete surfaces.

이때, 상기 타켓장착수단(400)은, 앵커볼트(211)로서 1차쇼크리트면에 고정되면서 결합유니트(435)를 갖는 고정블럭(430) 또는 상기 고정블럭(430)에 지지되는 위치결정유니트(450)이 더 구비되는 구성으로 이루어 진다.At this time, the target mounting means 400, the anchor bolt 211 is fixed to the primary shock concrete surface while being fixed to the fixed block 430 having a coupling unit 435 or the positioning unit supported by the fixed block 430 450 is made of a configuration that is further provided.

그리고, 상기 결합유니트(435)은, 나사결합, 억지끼움을 위한 돌기와 홈의조합, 마그네트, 매직테잎 중에서 선택되어 사용된다.The coupling unit 435 is selected from a combination of protrusions and grooves for screw coupling and interference fitting, a magnet, and a magic tape.

이때, 상기 돌기와 홈의 조합은 버튼, 후크, 탄성걸림편중에서 선택되는 어느 하나의 구성을 포함한다.At this time, the combination of the protrusion and the groove includes any one of a button, a hook, and an elastic locking piece selected.

더하여, 상기 위치결정유니트(450)는, 타켓(100)에 고정되는 제1블럭(451)과 상기 제1블럭(451)을 중심으로 회전되거나 이동되어 위치결정되는 제2블럭(453)의 조합으로 이루어지면서 하면에 결합유니트(435)가 구비된다.In addition, the positioning unit 450 is a combination of a first block 451 fixed to the target 100 and a second block 453 that is rotated or moved around the first block 451 for positioning. It is made of a coupling unit 435 is provided on the lower surface.

한편, 상기 타켓장착수단(400)은, 하나 이상의 연결파이프(475)를 통하여 다단으로 연결되어 신축가능토록 되면서 그 일측에는 타켓(100) 및 고정블럭에 결합유니트로서 연결되는 연결블럭(470)으로 이루어진다.On the other hand, the target mounting means 400 is connected to the multi-stage through one or more connecting pipes 475 to be stretchable while the one side is connected to the target block 100 and the fixed block as a coupling block 470 connected to the coupling unit. Is done.

또한, 상기 연결블럭(470)은, 내측에 스프링부재(473)가 더 연결되어 일정한 탄성력으로 압축이 방지토록 설치된다.In addition, the connection block 470, the spring member 473 is further connected to the inside is installed to prevent compression with a constant elastic force.

그리고, 상기 타켓장착부(230)의 외측에 타켓의 보호 및 타켓의 이동공간을확보토록 자바라 형상의 실링커버(450)가 더 구비되는 구성으로 이루어진다.In addition, a sealing cover 450 having a bellows shape is further provided on the outer side of the target mounting unit 230 to secure the target and secure a moving space of the target.

한편, 상기 타켓장착수단(400)은, 타켓(100)이 지지되는 회전부재(480)와 이에 힌지연결되면서 터널에 지지되는 고정부재(460)의 연결구조로 이루어 진다.On the other hand, the target mounting means 400 is made of a connecting structure of the rotating member 480 is supported by the target 100 and the fixing member 460 supported by the hinge while being hinged thereto.

상기와 같은 구성으로 이루어 진 본 발명의 동작을 설명한다.The operation of the present invention made of the above configuration will be described.

도2 내지 도7에서 도시한 바와 같이 본 발명은, 터널(T)의 굴착 정도에 따라 폭약에 의한 발파와 발파후 버럭처리 작업을 수행하면서 1차숏크리트면(S1) 및 2차숏크리트면(S2)을 형성하여 터널을 형성하게 된다.As shown in Figures 2 to 7 the present invention, the first shotcrete surface (S1) and the second shotcrete surface (S2) while performing the blasting and post-blasting processing by the explosive according to the degree of excavation of the tunnel (T) ) To form a tunnel.

그리고, 상기 터널(T)은 발파 후 버럭을 처리한 후 1차숏크리트면(S1)을 형성하여 타켓(100)을 설치한 후 1차 변형을 측정하고, 1차 변형의 측정이 완료되면 다른 1차숏크리트면의 형성 및 1차숏크리트면의 상측에 2차숏크리트면(S2)을 형성하게 된다.After the blasting, the tunnel T forms a primary shotcrete surface S1 after blasting and measures the primary strain after installing the target 100, and when the measurement of the primary strain is completed, the other 1 Formation of the secondary shotcrete surface and the secondary shotcrete surface S2 are formed on the upper side of the primary shotcrete surface.

이때, 상기 타켓(100)은 1,2차숏크리트면의 형성시 돌출되는 정도만큼 노출토록 1차숏크리트면(S1)에 설치된다.At this time, the target 100 is installed on the primary shotcrete surface S1 to expose as much as it protrudes when the primary and secondary shotcrete surfaces are formed.

더하여, 상기 2차숏크리트면(S2)의 상측에 타켓(100)을 설치하여 터널의 변형정도를 측정하여도 된다.In addition, the target 100 may be provided above the secondary shotcrete surface S2 to measure the degree of deformation of the tunnel.

이때, 본 발명은 타켓(100)은 터널벽면(200)의 외부로 노출되는 않도록 설치되어 숏크리트면의 형성 횟수에 상관없이 하나의 타켓(100)으로 변형 측정이 가능토록 하면서 발파 및 발파에 의해 형성되는 버럭(B) 처리시 돌출되는 타켓(100)에 의한 타켓(100)의 손상을 방지토록 한다.At this time, the target 100 is formed by blasting and blasting while the target 100 is installed so as not to be exposed to the outside of the tunnel wall surface 200 so as to measure the deformation to one target 100 regardless of the number of shotcrete surface formation. It is to prevent the damage to the target 100 by the target 100 protruding during the processing (B).

즉, 1차숏크리트면(S1)에 최초로 설치되는 타켓(100)이 상기 1차숏크리트면(S1)에서 그 돌출정도가 조절토록 되어 버럭처리나 발파시 타켓(100)이 손상되는 것을 방지하게 된다.That is, the target 100 is first installed on the primary shotcrete surface (S1) is to be adjusted so that the projecting degree of the primary shotcrete surface (S1) to prevent damage to the target target 100 during the processing or blasting. .

이를 구체적으로 설명하면, 상기 터널벽면(200)에서 터널의 둘레를 따라 정해진 위치에 일정깊이로서 타켓장착수단(400)을 갖는 타켓장착부(230)를 형성하여 이에 결합유니트(435)를 통하여 타켓이 연결되거나 그 돌출정도의 조절이 가능토록 개재되는 위치결정유니트(450)를 통하여 연결되어 이에 연결되는 타켓의 노출정도 조절이 가능토록 된다.In detail, the target wall mounting portion 230 having the target mounting means 400 as a predetermined depth at a predetermined position along the circumference of the tunnel in the tunnel wall surface 200 to the target through the coupling unit 435 It is possible to adjust the exposure degree of the target connected to and connected through the positioning unit 450 interposed so that the adjustment of the degree of protruding or connected.

이때, 상기 타켓장착수단(400)은, 앵커볼트(211)로서 1차숏크리트면에 고정되면서 결합유니트(435)를 갖는 고정블럭(430) 또는 상기 고정블럭(430)에 지지되는 위치결정유니트(450)이 더 구비되는 구성으로 이루어 져 이에 타켓(100)을 연결하면 1차숏크리트면 또는 2차숏크리트면의 외측에 타켓이 노출토록 된다.At this time, the target mounting means 400 is fixed to the primary shotcrete surface as an anchor bolt 211, the fixed block 430 having a coupling unit 435 or a positioning unit supported by the fixed block 430 ( 450 is further provided so that when the target 100 is connected to the target 100, the target is exposed to the outside of the primary shotcrete surface or the secondary shotcrete surface.

그리고, 상기 결합유니트(435)은, 나사결합, 돌기와 홈의조합, 마그네트, 매직테잎 중에서 선택되어 사용되는 구성으로 타켓이나 위치결정유니트가 고정블럭에 한번의 동작에 의해 용이하게 결합 및 분리될 수 있게 된다.In addition, the coupling unit 435 is a screw used, a combination of protrusions and grooves, magnets, magic tapes are selected and used in the target or positioning unit can be easily coupled and separated by a single operation on the fixed block. Will be.

더하여, 상기 위치결정유니트(450)는, 타켓(100)에 고정되는 제1블럭(451)과 상기 제1블럭(451)을 중심으로 회전되거나 이동되어 위치결정되는 제2블럭(453)의 조합으로 이루어지면서 하면에 결합유니트(435)가 구비되는 구성으로 고정블럭에 결합될 때 고정블럭을 중심으로 타켓의 노출정도가 조절된다.In addition, the positioning unit 450 is a combination of a first block 451 fixed to the target 100 and a second block 453 that is rotated or moved around the first block 451 for positioning. When the coupling unit 435 is provided on the bottom surface when coupled to the fixed block, the exposure degree of the target is adjusted around the fixed block.

한편, 상기 타켓장착수단(400)은, 하나 이상의 연결파이프(475)를 통하여 다단으로 연결되어 신축가능토록 되면서 그 일측에는 타켓(100) 및 고정블럭에 결합유니트로서 연결되는 연결블럭(470)으로 이루어 져 타켓장착부(230)에 항상 연결되는 상태에서 연결되는 타켓의 노출정도 조절이 가능토록 된다.On the other hand, the target mounting means 400 is connected to the multi-stage through one or more connecting pipes 475 to be stretchable while the one side is connected to the target block 100 and the fixed block as a coupling block 470 connected to the coupling unit. It is made to be able to adjust the exposure degree of the target to be connected in a state that is always connected to the target mounting portion 230.

또한, 상기 연결블럭(470)은, 내측에 스프링부재(473)가 더 구비되어 다단 돌출토록 설치될 때 외력의 제거시 용이하게 노출된다.In addition, the connection block 470, the spring member 473 is further provided on the inside is easily exposed when removing the external force when installed to protrude in multiple stages.

그리고, 상기 타켓장착부(230)의 외측에 자바라 형상의 실링커버(450)가 더 구비되어 2차숏크리트면(S2)의 형성시 수납되거나 연결되는 타켓이 1차숏크리트면을 중심으로 용이하게 노출된다.In addition, a bellows-shaped sealing cover 450 is further provided on the outer side of the target mounting portion 230 so that a target stored or connected when the secondary shotcrete surface S2 is formed is easily exposed around the primary shotcrete surface. .

한편, 상기 타켓장착수단(400)은, 타켓(100)이 지지되는 회전부재(480)와 이에 힌지연결되면서 터널에 지지되는 고정부재(460)의 연결구조로 이루어져 회전시 제1차숏크리트면(S1)의 외측에 돌출되는 것을 방지하거나 노출시 2차숏크리트면의 외측에 노출되어 타켓의 역활을 수행하게 되는 것이다.On the other hand, the target mounting means 400, consisting of a connecting structure of the rotating member 480 is supported by the target 100 and the fixing member 460 supported in the tunnel while being hinged to the first shotcrete surface during rotation ( It prevents protruding to the outside of S1) or is exposed to the outside of the secondary shotcrete surface when exposed to perform the role of the target.

100...타켓 200...터널벽면
211...앵커볼트 230...터널장착부
435...결합유니트 450...위치결정유니트
475...연결파이프
100 target 200 tunnel walls
211 Anchor bolts 230 Tunnel mounting
435 Binding unit 450 Positioning unit
475 ... connection pipe

Claims (11)

1차숏크리트면(S1)에 최초로 설치되는 타켓(100)이 터널벽면의 1차숏크리트면 내측으로 수납되면서 노출되는 정도의 조절이 가능토록 하여 숏크리트면의 형성 횟수에 상관없이 하나의 타켓(100)으로 발파 및 발파에 의해 형성되는 버럭 처리시 돌출되는 타켓(100)에 의한 타켓(100)의 손상을 방지토록 하고, 상기 타켓에는 전체 숏크리트면의 두께에 대응되어 신축가능한 실링커버가 설치되어 숏크리트면의 형성시 타켓을 커버링하면서 타켓의 동작공간을 확보하도록 설치하는 터널 변위측정용 타켓 설치방법The target 100, which is first installed on the primary shotcrete surface S1, is accommodated inside the primary shotcrete surface of the tunnel wall so that the degree of exposure can be adjusted so that one target 100 can be controlled regardless of the number of shotcrete surfaces. In order to prevent damage to the target 100 by the target 100 protruding during the buckle treatment formed by the blasting and blasting, and the target is equipped with a stretchable sealing cover corresponding to the thickness of the entire shotcrete surface is shotcrete surface Target installation method for tunnel displacement measurement, which is installed to secure the target operating space while covering the target when forming the 제1항에 있어서, 상기 타켓은, 1차숏크리트면에서 분리 및 결합가능토록 되어 발파 또는 버럭처리시 분리토록 하는 것을 특징으로 하는 터널 변위측정용 타켓 설치방법The method of claim 1, wherein the target is detachable and coupled to the primary shotcrete so that the target can be separated during blasting or bagging. 제1항에 있어서, 상기 타켓은, 1차숏크리트면에 일체로 결합되면서 그 노출정도가 조절토록 되어 터널벽면에 노출토록 되는 것을 특징으로 하는 터널 변위측정용 타켓 설치방법The method of claim 1, wherein the target is integrally coupled to the primary shotcrete surface, and the exposure degree is controlled so that the target is exposed to the tunnel wall surface. 삭제delete 터널벽면(200)에서 터널의 둘레를 따라 정해진 위치에 일정깊이로서 타켓장착수단(400)을 갖는 타켓장착부(230)를 형성하고, 상기 타켓장착부(230)에 장착되는 타켓(100)이 숏크리트의 횟수에 대응되어 타켓장착수단(400)의 동작에 의해 그 노출정도가 일정하게 조절토록 설치되며, 상기 타켓장착부(230)는 외측에 자바라 형상의 실링커버(450)가 더 구비되는 구성으로 이루어진 터널 변위측정용 타켓The target wall mounting portion 230 having the target mounting means 400 is formed at a predetermined depth along the circumference of the tunnel at the tunnel wall surface 200, and the target 100 mounted on the target mounting portion 230 is formed of shotcrete. Corresponding to the number of times, by the operation of the target mounting means 400 is installed so that the exposure is constantly adjusted, the target mounting portion 230 is a tunnel consisting of a bellows-shaped sealing cover 450 is further provided on the outside Displacement Measurement Target 제5항에 있어서, 상기 타켓장착수단(400)은, 앵커볼트(211)로서 1차쇼크리트면에 고정되면서 결합유니트(435)를 갖는 고정블럭(430) 또는 상기 고정블럭(430)의 일측에 위치결정유니트(450)가 더 구비되는 구성으로 이루어지는 것을 특징으로 하는 터널 변위측정용 타켓According to claim 5, The target mounting means 400 is fixed to the primary shock concrete surface as an anchor bolt 211, the fixed block 430 having a coupling unit 435 or one side of the fixed block 430 Target for displacement measurement tunnel, characterized in that the positioning unit 450 is further provided in the configuration 제6항에 있어서, 상기 위치결정유니트(450)는, 타켓(100)에 고정되는 제1블럭(451)과 상기 제1블럭(451)을 중심으로 회전되거나 이동되어 위치결정되는 제2블럭(453)의 조합으로 이루어지면서 하면에 결합유니트(435)가 구비되는 것을 특징으로 하는 터널 변위측정용 타켓The method of claim 6, wherein the positioning unit 450, the first block 451 is fixed to the target 100 and the second block which is rotated or moved around the first block 451 for positioning ( Target for tunnel displacement measurement, characterized in that the coupling unit 435 is provided on the lower surface while being made of a combination of 453) 제5항에 있어서, 상기 타켓장착수단(400)은, 하나 이상의 연결파이프(475)를 통하여 다단으로 연결되어 신축가능토록 되면서 그 일측에는 타켓(100) 및 고정블럭에 결합유니트로서 연결되는 연결블럭(470)으로 이루어지고,
상기 연결블럭(470)은, 내측에 스프링부재(473)가 더 연결되어 다단 돌출토록 설치되는 것을 특징으로 하는 터널 변위측정용 타켓
According to claim 5, The target mounting means 400 is connected to the multi-stage through one or more connecting pipes 475 to be stretchable while the one side is connected to the target block 100 and the fixed block as a coupling unit 470,
The connection block 470 is a target for tunnel displacement measurement, characterized in that the spring member 473 is further connected to the inside is installed to protrude in multiple stages.
제6항 내지 제8항중 어느 한 항에 있어서, 상기 결합유니트(435)은, 나사결합, 억지끼움을 위한 돌기와 홈의조합, 마그네트, 매직테잎 중에서 선택되어 사용되는 것을 특징으로 하는 터널 변위측정용 타켓The tunnel displacement measurement method according to any one of claims 6 to 8, wherein the coupling unit 435 is selected from a combination of protrusions and grooves for screwing and interference fitting, a magnet and a magic tape. Target 삭제delete 제5항에 있어서, 상기 타켓장착수단(400)은, 타켓(100)이 지지되는 회전부재(480)와 이에 힌지연결되면서 터널에 지지되는 고정부재(460)의 연결구조로 이루어 지는 것을 특징으로 하는 터널 변위측정용 타켓The method of claim 5, wherein the target mounting means 400, characterized in that the target structure is made of a connecting member of the rotating member 480 is supported and the fixing member 460 supported by the hinge while being hinged thereto Target for Tunnel Displacement Measurement
KR1020100007999A 2010-01-28 2010-01-28 A target for measure the displacement in tunnel and method for installation thereof KR100971713B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020100007999A KR100971713B1 (en) 2010-01-28 2010-01-28 A target for measure the displacement in tunnel and method for installation thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020100007999A KR100971713B1 (en) 2010-01-28 2010-01-28 A target for measure the displacement in tunnel and method for installation thereof

Publications (1)

Publication Number Publication Date
KR100971713B1 true KR100971713B1 (en) 2010-07-22

Family

ID=42645892

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020100007999A KR100971713B1 (en) 2010-01-28 2010-01-28 A target for measure the displacement in tunnel and method for installation thereof

Country Status (1)

Country Link
KR (1) KR100971713B1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101269014B1 (en) * 2010-11-15 2013-05-29 권영억 a target for measure the displacement in tunnel
KR101332970B1 (en) 2012-07-12 2013-11-25 대구도시철도공사 Tunnel displacement measurment device
CN109372552A (en) * 2018-11-26 2019-02-22 蓝传雯 Mould spray apparatus with electromagnetism template
KR102105117B1 (en) 2019-09-06 2020-04-27 (주)에이티맥스 Target unit for measuring the displacement in tunnel
KR20230005573A (en) * 2021-07-01 2023-01-10 미래이엔씨 주식회사 Measurement method of displacement using a measuring target with automatic transport function

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100278367B1 (en) 1998-12-30 2001-02-01 정순착 Rotary target attaching device for measuring internal displacement and shear displacement
KR100463260B1 (en) * 2002-06-17 2004-12-23 코오롱건설주식회사 Methods to measure drilling path and drilling angle of tunnel
KR100685008B1 (en) 2004-11-08 2007-02-22 이근호 Pin apparatus for measuring displacement of tunnel's inner surface
KR20100007354A (en) * 2008-07-14 2010-01-22 한국건설기술연구원 Combination target for 3d modeling

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100278367B1 (en) 1998-12-30 2001-02-01 정순착 Rotary target attaching device for measuring internal displacement and shear displacement
KR100463260B1 (en) * 2002-06-17 2004-12-23 코오롱건설주식회사 Methods to measure drilling path and drilling angle of tunnel
KR100685008B1 (en) 2004-11-08 2007-02-22 이근호 Pin apparatus for measuring displacement of tunnel's inner surface
KR20100007354A (en) * 2008-07-14 2010-01-22 한국건설기술연구원 Combination target for 3d modeling

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101269014B1 (en) * 2010-11-15 2013-05-29 권영억 a target for measure the displacement in tunnel
KR101332970B1 (en) 2012-07-12 2013-11-25 대구도시철도공사 Tunnel displacement measurment device
CN109372552A (en) * 2018-11-26 2019-02-22 蓝传雯 Mould spray apparatus with electromagnetism template
CN109372552B (en) * 2018-11-26 2023-10-31 四川蓝海智能装备制造有限公司 Die spraying device with electromagnetic template
KR102105117B1 (en) 2019-09-06 2020-04-27 (주)에이티맥스 Target unit for measuring the displacement in tunnel
KR20230005573A (en) * 2021-07-01 2023-01-10 미래이엔씨 주식회사 Measurement method of displacement using a measuring target with automatic transport function
KR102589072B1 (en) 2021-07-01 2023-10-16 미래이엔씨 주식회사 Measurement method of displacement using a measuring target with automatic transport function

Similar Documents

Publication Publication Date Title
KR100971713B1 (en) A target for measure the displacement in tunnel and method for installation thereof
JP6414688B2 (en) Tunnel steel support structure
KR101269014B1 (en) a target for measure the displacement in tunnel
JP2012211760A (en) Explosion pressure guide control device
JP2019219333A (en) Tunnel face safety monitoring system and tunnel face safety monitoring method
KR101888331B1 (en) Rotating bracket apparatus for support beam of sheathing structure and construction method of sheathing structure
JP3157301U (en) Tie rod mounting structure
JP2020133118A (en) Tunnel construction management method
JP6524527B2 (en) Measurement system, measurement processing apparatus and measurement method
KR200446441Y1 (en) Folder Type Surveying Target
JP2018179651A (en) Surveying target and method for measuring inner-space displacement
JP2014181948A (en) Reception sensor mounting fixture
JP5856034B2 (en) Mount for tunnel piping
JP2008298433A (en) Prediction method for tunnel final displacement
KR200481015Y1 (en) a target with Compulsion Rotation
JP2015081425A (en) Steel support and structure of lining concrete
JPWO2020217481A1 (en) How to build a tunnel support
JP5508161B2 (en) Overlining winding thickness inspection apparatus and overlining winding thickness inspection method
JP2018131803A (en) Temporary fastening jig and temporary fastening method
JP3210013U (en) Joint lid and locked cylinder used for the joint lid
CN110485223A (en) Ballast track subgrade settlement monitoring device and Ballast track roadbed settlement monitoring method
CN110670602A (en) Compressive deformation control design method for radial support and the like
KR20140136325A (en) Connector Between Struts
JP7366370B2 (en) Tunnel excavator surveying equipment
CN216616003U (en) Digger digital construction guide system

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
N231 Notification of change of applicant
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130715

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20140714

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20170116

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20170717

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20180716

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20200113

Year of fee payment: 10