KR100966148B1 - 지반밀착형 압력식 쏘일 네일 구조 및 이에 의한 지반보강공법 - Google Patents
지반밀착형 압력식 쏘일 네일 구조 및 이에 의한 지반보강공법 Download PDFInfo
- Publication number
- KR100966148B1 KR100966148B1 KR1020090129996A KR20090129996A KR100966148B1 KR 100966148 B1 KR100966148 B1 KR 100966148B1 KR 1020090129996 A KR1020090129996 A KR 1020090129996A KR 20090129996 A KR20090129996 A KR 20090129996A KR 100966148 B1 KR100966148 B1 KR 100966148B1
- Authority
- KR
- South Korea
- Prior art keywords
- nail
- ground
- packer
- fixing
- anchor
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
- E02D5/80—Ground anchors
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/12—Consolidating by placing solidifying or pore-filling substances in the soil
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/46—Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/62—Compacting the soil at the footing or in or along a casing by forcing cement or like material through tubes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2200/00—Geometrical or physical properties
- E02D2200/15—Geometrical or physical properties including at least a hinge
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2200/00—Geometrical or physical properties
- E02D2200/16—Shapes
- E02D2200/1685—Shapes cylindrical
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Agronomy & Crop Science (AREA)
- Environmental & Geological Engineering (AREA)
- Soil Sciences (AREA)
- Piles And Underground Anchors (AREA)
Abstract
Description
Claims (5)
- 삭제
- 지반(E) 보강을 위해 지반천공 후 천공부(P)에 네일(100)을 삽입하고 압력 그라우팅할 수 있도록 하는 패커장치를 구비한 쏘일 네일 구조에 관한 것으로,일단이 상기 천공부(P)에 삽입되고 타단이 지반(E) 외부로 노출되며 외주면에 리브(110)가 형성된 네일(100);천공부(P)에 삽입된 상기 네일(100)의 선단까지 상기 네일(100)에 밀착되어 설치되는 그라우트주입관(120);천공부(P)에 삽입된 상기 네일(100)의 중단까지 상기 네일(100)에 밀착되어 설치되는 배기관(130);전체적으로 단면이 T자 형태로써 중앙에 중공이 형성되어 상기 네일(100)이 관통되며, 천공부(P)에 삽입되는 정착패커(142) 및 지반(E)으로 노출되는 지반밀착패커(144)로 구성되는 패커(140);상기 정착패커(142)의 일단을 물면서 설치되고 자신의 타단이 천공부(P)에 경사지게 고정되는 다수 개의 정착앵커(150);중앙으로 상기 네일(100)이 관통되며 외주면에 상기 정착앵커(150)의 일단이 힌지결합되고 상기 그라우트주입관(120) 또는 상기 배기관(130)이 끼워질 수 있도록 홈이 형성되며, 결합하면 원통을 이루는 반원통형 모양의 한 쌍의 정착앵커체결구(172);상기 지반밀착패커(144)에 설치되는 패커주입관(160);중앙에 중공이 형성되어 상기 네일(100)이 관통되며, 상기 지반밀착패커(144)의 외부에 설치되는 정착판(170);중앙으로 상기 네일(100)이 관통되며 상기 정착판(170)의 외부에 설치되는 것으로, 내주면에 리브홈(182)을 구비하여 상기 네일(100)의 리브(110)가 끼워져 고정되며 외주면에 수나사산을 구비하여 결합하면 원통을 이루는 반원통형 모양의 한 쌍의 네일정착볼트(180);내주면에 암나사산을 구비하여 상기 결합된 한 쌍의 네일정착볼트(180)의 외주면을 감싸면서 고정시켜 주는 네일정착너트(190); 및,상기 천공부(P)와 상기 패커(140)에 주입되는 그라우트재(200);를 포함하여 구성되는 것을 특징으로 하는 지반밀착형 압력식 쏘일 네일 구조.
- 제2항에서,상기 정착앵커체결구(172)는 상호간에 양단이 볼트와 너트로 체결되어 고정되거나, 일단은 힌지결합되고 타단이 볼트와 너트로 체결되어 고정되는 것을 특징으로 하는 지반밀착형 압력식 쏘일 네일 구조.
- 삭제
- 제2항 또는 제3항의 지반밀착형 압력식 쏘일 네일 구조를 이용하여 지반(E)을 보강하는 공법에 관한 것으로,(a) 지반보강이 요구되는 지반(E)을 일정 깊이와 반경으로 천공하는 지반 천공단계;(b) 제2항 또는 제3항의 네일(100), 그라우트주입관(120), 배기관(130), 패커(140), 정착앵커(150), 정착앵커체결구(172) 및 패커주입관(160)의 1차 조립체를 조립하는 1차 네일조립체 조립단계;(c) 상기 천공된 지반(E)에 상기 1차 네일조립체를 삽입하는 1차 네일조립체 삽입단계;(d) 상기 천공된 지반(E)에 삽입된 상기 1차 네일조립체에 제2항 또는 제3항의 정착판(170), 네일정착볼트(180) 및 네일정착너트(190)를 결합하여 설치하는 네일조립체 완성단계;(e) 패커주입관(160)을 통해 패커(140)에 그라우트재(200)를 주입하여 정착 앵커(150)를 펼쳐서 정착앵커(150)의 일단을 천공부(P)에 고정함과 동시에 정착패커(142) 및 지반밀착패커(144)를 각각 천공부(P) 및 지반(E)에 밀착하여 고정시키는 패커 충진단계;(f) 그라우트주입관(120)을 통해 그라우트재(200)를 압력을 이용하여 주입함과 동시에 배기관(130)을 통해 천공부(P) 내부의 공기를 빼내는 그라우팅단계;(g) 상기 그라우트재(200)를 양생하는 양생단계; 및,(h) 지반(E)으로 노출된 지반밀착형 압력식 쏘일 네일 구조의 불필요한 부분을 절단하고 청소하는 정리단계;를 포함하여 이루어진 것을 특징으로 하는 지반밀착형 압력식 쏘일 네일 구조를 이용한 지반보강공법.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020090129996A KR100966148B1 (ko) | 2009-12-23 | 2009-12-23 | 지반밀착형 압력식 쏘일 네일 구조 및 이에 의한 지반보강공법 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020090129996A KR100966148B1 (ko) | 2009-12-23 | 2009-12-23 | 지반밀착형 압력식 쏘일 네일 구조 및 이에 의한 지반보강공법 |
Publications (1)
Publication Number | Publication Date |
---|---|
KR100966148B1 true KR100966148B1 (ko) | 2010-06-25 |
Family
ID=42370458
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020090129996A KR100966148B1 (ko) | 2009-12-23 | 2009-12-23 | 지반밀착형 압력식 쏘일 네일 구조 및 이에 의한 지반보강공법 |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100966148B1 (ko) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106193032A (zh) * | 2016-08-23 | 2016-12-07 | 中国建筑第五工程局有限公司 | 一种抗浮锚杆施工方法 |
CN106381789A (zh) * | 2016-11-11 | 2017-02-08 | 合肥工业大学 | 一种高聚物注浆补强防沉降拓宽路基 |
KR101913493B1 (ko) * | 2017-02-06 | 2018-10-30 | 김영길 | 주열식 말뚝을 이용한 자립공법 |
KR101965406B1 (ko) | 2018-08-03 | 2019-04-03 | 정순국 | 네일 인발각도 조절이 용이한 네일 구조체 및 그를 이용한 네일 시공공법 |
CN109853638A (zh) * | 2019-04-02 | 2019-06-07 | 中建二局第一建筑工程有限公司 | 用于软土层抗浮锚杆使用的快速成孔工艺方法 |
KR20200137169A (ko) | 2019-05-29 | 2020-12-09 | 정구식 | 네일 두부구속장치 및 이를 이용한 쏘일네일링공법 |
KR102269636B1 (ko) * | 2021-01-06 | 2021-06-24 | 권석훈 | 지반 보강용 네일링 조립체 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100697333B1 (ko) | 2006-09-20 | 2007-03-21 | (주) 경화엔지니어링 | 도로 및 단지 사면 안정용 압력 네일링 패커 |
KR20070105742A (ko) * | 2006-04-27 | 2007-10-31 | (주)지성이씨에스 | 이중관을 이용한 가압식 네일링 장치 및 방법 |
KR100908085B1 (ko) * | 2009-01-13 | 2009-07-16 | (주)대한지오이엔씨 | 지반밀착형 압력식 쏘일 네일 구조 및 이에 의한 지반보강공법 |
KR20090101045A (ko) * | 2008-03-21 | 2009-09-24 | 주식회사 대작이앤씨 | 프리텐션 쏘일네일 및 이를 이용한 시공방법 |
-
2009
- 2009-12-23 KR KR1020090129996A patent/KR100966148B1/ko active IP Right Grant
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20070105742A (ko) * | 2006-04-27 | 2007-10-31 | (주)지성이씨에스 | 이중관을 이용한 가압식 네일링 장치 및 방법 |
KR100697333B1 (ko) | 2006-09-20 | 2007-03-21 | (주) 경화엔지니어링 | 도로 및 단지 사면 안정용 압력 네일링 패커 |
KR20090101045A (ko) * | 2008-03-21 | 2009-09-24 | 주식회사 대작이앤씨 | 프리텐션 쏘일네일 및 이를 이용한 시공방법 |
KR100908085B1 (ko) * | 2009-01-13 | 2009-07-16 | (주)대한지오이엔씨 | 지반밀착형 압력식 쏘일 네일 구조 및 이에 의한 지반보강공법 |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106193032A (zh) * | 2016-08-23 | 2016-12-07 | 中国建筑第五工程局有限公司 | 一种抗浮锚杆施工方法 |
CN106193032B (zh) * | 2016-08-23 | 2018-01-05 | 中国建筑第五工程局有限公司 | 一种抗浮锚杆施工方法 |
CN106381789A (zh) * | 2016-11-11 | 2017-02-08 | 合肥工业大学 | 一种高聚物注浆补强防沉降拓宽路基 |
KR101913493B1 (ko) * | 2017-02-06 | 2018-10-30 | 김영길 | 주열식 말뚝을 이용한 자립공법 |
KR101965406B1 (ko) | 2018-08-03 | 2019-04-03 | 정순국 | 네일 인발각도 조절이 용이한 네일 구조체 및 그를 이용한 네일 시공공법 |
CN109853638A (zh) * | 2019-04-02 | 2019-06-07 | 中建二局第一建筑工程有限公司 | 用于软土层抗浮锚杆使用的快速成孔工艺方法 |
KR20200137169A (ko) | 2019-05-29 | 2020-12-09 | 정구식 | 네일 두부구속장치 및 이를 이용한 쏘일네일링공법 |
KR102269636B1 (ko) * | 2021-01-06 | 2021-06-24 | 권석훈 | 지반 보강용 네일링 조립체 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100966148B1 (ko) | 지반밀착형 압력식 쏘일 네일 구조 및 이에 의한 지반보강공법 | |
KR101665515B1 (ko) | 원지반 절취 없는 직천공 강관다단 터널 시공방법 및 구조 | |
KR100913569B1 (ko) | 흙막이벽용 피에이치씨 파일 | |
KR102264250B1 (ko) | 블록식 보강토 옹벽 및 그 시공방법 | |
KR101510297B1 (ko) | 제거 가능한 프리스트레싱 강관 쏘일 네일링 구조 | |
KR20090101045A (ko) | 프리텐션 쏘일네일 및 이를 이용한 시공방법 | |
KR101023477B1 (ko) | 압력그라우팅 쏘일 네일 구조 | |
KR100908085B1 (ko) | 지반밀착형 압력식 쏘일 네일 구조 및 이에 의한 지반보강공법 | |
KR100978629B1 (ko) | 도로 및 단지의 사면보강 네일링 및 이를 이용한 사면 보강 공법 | |
KR100710867B1 (ko) | 수평배수공 역할을 겸한 상향식 지반보강공법 및 그 구조 | |
KR101633505B1 (ko) | 지보재 | |
KR100576053B1 (ko) | 패커식 쏘일 네일체 및 시공방법 | |
KR101078080B1 (ko) | 지지말뚝과 지반보강을 이용한 흙막이벽체 및 그 시공방법 | |
KR100773920B1 (ko) | 정착부 확공 및 고강도 강봉을 이용한 프리-텐션 쏘일네일링 시스템 및 이를 이용한 사면 안정보강 공법 | |
KR20130029906A (ko) | 주변마찰력 증가 장치 | |
KR100697003B1 (ko) | 제거식 프리텐션 쏘일네일 정착 헤드 | |
KR200381572Y1 (ko) | 밀크그라우팅을 이용하여 가압을 할 수 있는 패커 | |
KR200381571Y1 (ko) | 수평배수공 역할을 겸한 상향식 지반보강구조 | |
KR101012756B1 (ko) | 사면보강 그라우팅 앙카용볼트 설치장치 | |
KR101066641B1 (ko) | 프리스트레스형 선지보 터널 시공 방법 및 이에 적합한 장치 | |
KR100823980B1 (ko) | 배수겸용 패커식 가압 그라우팅장치 및 이를 이용한 상향식지반보강공법 | |
KR100862387B1 (ko) | 지압형 영구 앵커의 탑다운 시공을 위한 긴장용 키트와이를 이용한 지압형 영구 앵커의 탑다운 시공 방법 | |
KR100710866B1 (ko) | 밀크그라우팅을 이용한 가압 그라우팅 공법 및 패커 | |
KR100984040B1 (ko) | 이중 보강 공법을 통한 절토용 보강토 옹벽 시공 방법 | |
KR100951872B1 (ko) | 지반 보강 장치 및 이를 이용한 지반 보강 방법 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
A302 | Request for accelerated examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20130507 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20140617 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20150611 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20160704 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20170704 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20180618 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20190715 Year of fee payment: 10 |