KR100955531B1 - scaffolding for railroad track - Google Patents

scaffolding for railroad track Download PDF

Info

Publication number
KR100955531B1
KR100955531B1 KR1020080049242A KR20080049242A KR100955531B1 KR 100955531 B1 KR100955531 B1 KR 100955531B1 KR 1020080049242 A KR1020080049242 A KR 1020080049242A KR 20080049242 A KR20080049242 A KR 20080049242A KR 100955531 B1 KR100955531 B1 KR 100955531B1
Authority
KR
South Korea
Prior art keywords
frame
scaffolding
wheel means
scaffold
main
Prior art date
Application number
KR1020080049242A
Other languages
Korean (ko)
Other versions
KR20090123261A (en
Inventor
김대현
이종석
유재경
Original Assignee
(주)부경개발
부산교통공사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)부경개발, 부산교통공사 filed Critical (주)부경개발
Priority to KR1020080049242A priority Critical patent/KR100955531B1/en
Publication of KR20090123261A publication Critical patent/KR20090123261A/en
Application granted granted Critical
Publication of KR100955531B1 publication Critical patent/KR100955531B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61DBODY DETAILS OR KINDS OF RAILWAY VEHICLES
    • B61D15/00Other railway vehicles, e.g. scaffold cars; Adaptations of vehicles for use on railways
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61FRAIL VEHICLE SUSPENSIONS, e.g. UNDERFRAMES, BOGIES OR ARRANGEMENTS OF WHEEL AXLES; RAIL VEHICLES FOR USE ON TRACKS OF DIFFERENT WIDTH; PREVENTING DERAILING OF RAIL VEHICLES; WHEEL GUARDS, OBSTRUCTION REMOVERS OR THE LIKE FOR RAIL VEHICLES
    • B61F13/00Rail vehicles characterised by wheel arrangements, not otherwise provided for
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • E04G2001/242Scaffolds movable on wheels or tracks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • E04G2001/242Scaffolds movable on wheels or tracks
    • E04G2001/244Scaffolds movable on wheels or tracks mechanically operated
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • E04G2001/242Scaffolds movable on wheels or tracks
    • E04G2001/244Scaffolds movable on wheels or tracks mechanically operated
    • E04G2001/246Scaffolds movable on wheels or tracks mechanically operated human powered

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Transportation (AREA)
  • Movable Scaffolding (AREA)

Abstract

본 발명은 철도차량이 이동하는 지하역사나 터널 내부의 벽면이나 천정의 공사를 위해 사용되는 철도선로용 틀비계에 관한 것으로; 철도선로의 길이방향을 따라 안내되는 메인바퀴수단이 구비되는 철도선로용 틀비계에 있어서, 상기 메인바퀴수단과 교차하는 방향으로 이동 가능한 보조바퀴수단이 더 구비되는 것을 특징으로 한다.The present invention relates to a frame rail for scaffolding used for the construction of walls or ceilings in underground stations or tunnels in which railroad cars move; In the frame scaffold for railway lines provided with a main wheel means guided along the longitudinal direction of the railway line, it characterized in that the auxiliary wheel means movable further in the direction intersecting with the main wheel means.

본 발명에 따르면 틀비계를 철도선로상의 제1 및 제2레일상에서 이동시키거나 이탈시키는 경우 보조바퀴수단과 가이드부재를 이용하여 용이하게 이동할 수 있도록 하여 틀비계의 이동이 용이한 장점이 있다. According to the present invention, when the frame scaffold is moved or detached from the first and second rails on the railway track, the frame scaffold can be easily moved by using the auxiliary wheel means and the guide member.

틀비계 Frame scaffolding

Description

철도선로용 틀비계 { scaffolding for railroad track }Scaffolding for railroad track}

도 1은 종래 일반적인 철도선로용 틀비계를 도시한 도면이고, 1 is a view showing a frame rail for a conventional general railroad line,

도 2는 본 발명에 따른 철도선로용 틀비계를 도시한 도면이고, 2 is a view showing a frame scaffold for railway lines according to the present invention,

도 3은 본 발명에 따른 철도선로용 틀비계의 일측면도이고, 3 is a side view of a frame scaffold for railway lines according to the present invention;

도 4는 본 발명에 따른 철도선로용 틀비계의 하측 평면도이고,4 is a bottom plan view of a frame scaffold for railway lines according to the present invention;

도 5는 본 발명에 따른 철도선로용 틀비계를 레일상에 위치시킨 상태를 도시한 도면이고, 5 is a view showing a state in which the frame scaffolding for railroad tracks according to the present invention on a rail,

도 6은 본 발명의 다른 실시 예에 따른 철도선로용 틀비계의 요부 단면도이고, 6 is a cross-sectional view of main parts of a frame scaffold for railway lines according to another embodiment of the present invention;

도 7은 본 발명의 또 다른 실시 예에 따른 철도선로용 틀비계의 요부 단면도이고,7 is a cross-sectional view of main parts of a frame scaffold for railway lines according to another embodiment of the present invention;

도 8은 본 발명에 따른 철도선로용 틀비계를 타측선로 이동시키는 상태도이고,8 is a state diagram for moving the frame scaffold for railway lines according to the present invention to the other side line,

도 9는 본 발명에 따른 철도선로용 틀비계의 작업발판을 확장하기 위한 요부 단면도이고,Figure 9 is a cross-sectional view of the main part for extending the working scaffolding of the frame scaffold for railway lines according to the present invention,

도 10은 본 발명에 따른 철도선로용 틀비계의 작업발판의 높이를 조절하기 위한 구성도이다. 10 is a configuration diagram for adjusting the height of the working scaffolding of the frame scaffolding for railway lines according to the present invention.

***도면의 주요 부분에 대한 부호의 설명****** Description of the symbols for the main parts of the drawings ***

1: 제1레일 2: 제2레일1: first rail 2: second rail

100: 틀비계 110: 지지대100: scaffold 110: support

120: 받침대 140: 메인바퀴수단120: base 140: main wheel means

143: 제1메인축 146: 제2메인축143: first main axis 146: second main axis

150: 브레이크수단 200: 보조바퀴수단150: brake means 200: auxiliary wheel means

300: 가이드부재 400: 승강수단300: guide member 400: lifting means

본 발명은 철도선로용 틀비계에 관한 것으로, 더 상세하게는 철도차량이 이동하는 지하역사나 터널 내부의 벽면이나 천정의 공사를 위해 사용되는 철도선로용 틀비계에 관한 것이다.The present invention relates to a frame scaffold for railroad tracks, and more particularly, to a rail track frame scaffold used for construction of a wall or ceiling inside an underground station or tunnel in which a railroad vehicle moves.

일반적으로 건축물의 높은 지점에서 작업자가 내외장 공사를 하는 경우 용이하게 작업할 수 있도록 하기 위해 틀비계가 사용된다.In general, frame scaffolding is used to make it easier for workers to work inside and outside at high points of buildings.

이와 같은 틀비계는 통상 통상적으로 다수의 철재 파이프를 용접 등의 방식 으로 견고하게 결합하여 일정 높이의 지지대를 형성하고, 그 지지대의 상단에는 작업자가 활동할 수 있도록 일정 면적의 판재가 설치되는 받침대가 구비된다.Such a frame scaffolding is usually formed by a rigid combination of a plurality of steel pipes, such as by welding to form a support of a certain height, the top of the support is provided with a base plate is installed a certain area so that the operator can be active. do.

그리고, 상기 받침대의 둘레에는 작업자의 추락을 방지하기 위한 펜스가 구비되며, 상기 지지대의 하단에는 이동이 용이하게 캐스터가 구비된다.In addition, a fence for preventing a worker from falling is provided around the pedestal, and a lower end of the support is provided with a caster for easy movement.

따라서, 작업자가 작업위치를 이동하기 위해서는 지지대의 일측을 당기거나 밀어줌으로써, 지면에 접촉되는 캐스터에 의해 용이하게 이동이 가능해진다.Therefore, the operator can easily move by the caster in contact with the ground by pulling or pushing one side of the support in order to move the working position.

한편, 도시철도 등을 포함하는 일반적인 철도차량이 이동하는 지하역사나 터널 내부 벽면 또는 천정의 공사를 위해 사용되는 틀비계의 일예가 도 1에 도시되어 있다.On the other hand, Figure 1 is an example of a frame scaffold used for the construction of the underground station or tunnel interior walls or ceiling to move a typical railway vehicle, including urban railways and the like.

이를 참고하면, 철도선로용 틀비계는 철도차량이 이동하는 한쌍의 제1 및 제2레일(1,2) 상면에 접촉되어 제1 및 제2레일(1,2)을 따라 회전되는 4개의 바퀴(10,11,12,13)가 구비된다.Referring to this, the frame scaffold for railroad tracks has four wheels which are rotated along the first and second rails (1,2) in contact with the upper surfaces of the pair of first and second rails (1,2) on which the railroad cars move. (10, 11, 12, 13) are provided.

상기 4개의 바퀴(10,11,12,13)는 지지대(20)의 하단에 상기 제1 및 제2레일(1,2)의 길이방향에 대해 교차하는 방향으로 일정 간격을 유지하며 평행하게 제1 및 제2지지축(21,22)이 구비되고, 상기 제1지지축(21)의 양단에는 제1 및 제2레일(1,2)상에 각각 접촉되는 제1 및 제2바퀴(10,11)가 회전이 자유롭게 축설되고, 상기 제2지지축(22)의 양단에는 제1 및 제2레일(1,2)상에 각각 접촉되는 제3 및 제4바퀴(12,13)가 회전이 자유롭게 축설되는 구조로 이루어진다.The four wheels 10, 11, 12, and 13 are parallel to each other at a lower end of the support 20 in a direction intersecting the longitudinal direction of the first and second rails 1 and 2. First and second support shafts 21 and 22 are provided, and the first and second wheels 10 which contact the first and second rails 1 and 2 on both ends of the first support shaft 21, respectively. 11 is freely rotated, and third and fourth wheels 12 and 13 contacting the first and second rails 1 and 2 respectively rotate at both ends of the second support shaft 22. It consists of a structure which is freely built up.

따라서, 제1 및 제2레일(1,2)의 길이방향을 따라 상기 틀비계의 일측을 밀거나 당기는 경우 제1 및 제2레일(1,2)상에서 용이하게 이동할 수 있게 된다.Therefore, when pushing or pulling one side of the frame scaffolding along the longitudinal direction of the first and second rails (1, 2) it can be easily moved on the first and second rails (1, 2).

한편, 철도차량이 이동하는 제1 및 제2레일(1,2)상에 틀비계가 설치되므로 철도차량이 이동시에는 틀비계를 제1 및 제2레일(1,2)상에서 다른 지점으로 이동시켜야 한다.On the other hand, since the frame scaffold is installed on the first and second rails (1, 2) that the railroad car moves, the frame scaffold should be moved to another point on the first and second rails (1,2) when the railroad car moves. do.

하지만, 이와 같은 구조의 틀비계는 제1 및 제2레일(1,2)을 벗어나게 하거나 또는 타측 선로의 제1 및 제2레일(1,2)상으로 이동시키기 위해서는 틀비계를 완전히 들어올려 다른 지점으로 이동시켜야 하므로 다수의 작업자가 필요한 단점을 갖고 있다. However, the frame scaffold of such a structure may be lifted completely by lifting the frame scaffold to move out of the first and second rails (1, 2) or to move on the first and second rails (1, 2) of the other track. Since it has to move to a branch has a disadvantage that requires a large number of workers.

특히, 틀비계를 들어올린 상태에서 이동시키는 중에 틀비계가 전복될 위험성이 커 작업자의 안전에도 부담이 되고 있는 실정이다. In particular, there is a high risk of overturning the frame scaffold while moving the frame scaffold in a lifted state, which also burdens the safety of the worker.

따라서, 이러한 문제점들을 해결하기 위한 것으로서, 본 발명의 목적은 철도차량이 이동하는 지하역사나 터널 내부의 벽면이나 천정의 공사를 위해 사용되는 틀비계를 레일상에서 용이하게 이동시킬 수 있는 구조의 철도선로용 틀비계를 제공하는데 있다.Accordingly, to solve these problems, an object of the present invention is for a railway track of a structure that can easily move the frame scaffold used for the construction of the wall or ceiling inside the tunnel or underground station that the railway vehicle is moving on the rail. To provide a framework.

또한, 본 발명의 다른 목적은 틀비계를 철도선로의 레일상에서 외부로 이동시 전복의 위험이 없는 구조의 철도선로용 틀비계를 제공하는데 있다.In addition, another object of the present invention is to provide a frame scaffold for the railway line structure of the structure there is no risk of overturning when moving the frame scaffold on the rail of the railway line to the outside.

이와 같은 목적을 달성하기 위한 본 발명은; The present invention for achieving the above object;

철도선로의 길이방향을 따라 안내되는 메인바퀴수단이 구비되는 철도선로용 틀비계에 있어서, 상기 메인바퀴수단과 교차하는 방향으로 이동 가능한 보조바퀴수단이 더 구비되는 것을 특징으로 한다.In the frame scaffold for railway lines provided with a main wheel means guided along the longitudinal direction of the railway line, it characterized in that the auxiliary wheel means movable further in the direction intersecting with the main wheel means.

여기서, 상기 보조바퀴수단은; 제1메인축과 제2메인축을 결합하는 연결프레임의 양 측단부에 지지 고정되는 제1 내지 제4보조바퀴로 이루어지는 것을 특징으로 한다.Here, the auxiliary wheel means; The first main shaft and the second main shaft is characterized by consisting of the first to fourth auxiliary wheels that are supported and fixed to both side ends of the connection frame for coupling.

그리고, 상기 제1 내지 제4보조바퀴는 제1 내지 제4지지브라켓에 의해 회전이 자유롭게 지지되는 것을 특징으로 한다.The first to fourth auxiliary wheels may be freely rotated by the first to fourth support brackets.

또한, 상기 제1 내지 제4보조바퀴는 외주연에 안착홈이 각각 형성되는 것을 특징으로 한다.In addition, the first to fourth auxiliary wheels are characterized in that the seating groove is formed on the outer periphery, respectively.

그리고, 상기 안착홈은 반원형, 삼각형 및 사각형 중 어느 하나인 것을 특징으로 한다.And, the seating groove is characterized in that any one of semi-circular, triangular and square.

한편, 상기 보조바퀴수단은 가이드부재에 의해 이동하는 것을 특징으로 한다.On the other hand, the auxiliary wheel means is characterized in that moved by the guide member.

그리고, 상기 메인바퀴수단은 제1, 2메인축에 고정 결합되고, 상기 제1, 2메인축의 양단은 연결프레임에 의해 연결 결합되는 것을 특징으로 한다.The main wheel means is fixedly coupled to the first and second main shafts, and both ends of the first and second main shafts are connected to each other by a connecting frame.

또한, 상기 연결프레임에는 틀비계를 승강시키는 승강수단이 더 구비되는 것을 특징으로 한다.In addition, the connecting frame is characterized in that the lifting means for further lifting the frame scaffolding.

한편, 상기 승강수단은 상기 지지대에 일체로 설치되되 상하방향의 가이드공이 형성되고 그 가이드공에는 암나사산이 형성되는 가이드부재와, 상기 가이드부재 의 가이드공에 관통설치되되 그 외주연에는 수나사산이 형성되고 상단에는 손잡이가 구비되는 회전축부재로 이루어지는 것을 특징으로 한다.On the other hand, the elevating means is integrally installed on the support, the guide hole in the vertical direction is formed and the guide hole is formed through the guide member and the guide hole of the guide member, the female thread is formed, the male thread is formed on the outer periphery And the upper end is characterized in that consisting of a rotating shaft member provided with a handle.

그리고, 상기 회전축부재의 하단에는 캐스터가 더 구비되는 것을 특징으로 한다.And, the lower end of the rotating shaft member is characterized in that the caster is further provided.

또한, 상기 메인바퀴수단은 제1 내지 제4메인바퀴로 구성되되, 상기 제1 내지 제4메인바퀴는 내측에는 플랜지 형성되고, 외측에는 외측플랜지가 형성되는 것을 특징으로 한다.In addition, the main wheel means is composed of the first to fourth main wheel, the first to fourth main wheel is characterized in that the flange is formed on the inside, the outer flange is formed on the outside.

그리고, 상기 제1, 2메인축의 양단이 연장 형성된 것을 특징으로 한다.In addition, both ends of the first and second main shafts may be extended.

이하, 본 발명에 따른 철도선로용 틀비계를 첨부한 도면을 참고로 하여 이하에 상세히 기술되는 실시 예에 의하여 그 특징들을 이해할 수 있을 것이다.Hereinafter, with reference to the accompanying drawings, the frame rail for scaffolding according to the present invention will be understood by the embodiments described in detail below.

이때, 도 2는 본 발명에 따른 철도선로용 틀비계를 도시한 도면이고, 도 3은 본 발명에 따른 철도선로용 틀비계의 일측면도이고, 도 4는 본 발명에 따른 철도선로용 틀비계의 하측 평면도이고, 도 5는 본 발명에 따른 철도선로용 틀비계를 레일상에 아동시킨 상태를 도시한 도면이고, 도 6은 본 발명의 다른 실시 예에 따른 철도선로용 틀비계의 요부 단면도이고, 도 7은 본 발명의 또 다른 실시 예에 따른 철도선로용 틀비계의 요부 단면도이다. At this time, Figure 2 is a view showing a frame rail for scaffolding according to the present invention, Figure 3 is a side view of the frame scaffolding for railroad line according to the present invention, Figure 4 is a view of the frame scaffolding for rail line according to the present invention 5 is a view showing a state in which the rail frame scaffolding according to the present invention is a child on the rail, Figure 6 is a cross-sectional view of the main portion of the frame rail for scaffolding according to another embodiment of the present invention, 7 is a cross-sectional view of main parts of a frame scaffold for railway lines according to another embodiment of the present invention.

도 2 내지 도 5에 의하면, 본 발명에 따른 철도선로용 틀비계(100)는 철도차량이 이동하는 지하역사나 터널 내부 벽면 또는 천정의 공사를 위해 사용된다.2 to 5, the frame rail scaffold 100 according to the present invention is used for the construction of the underground station or tunnel inner wall or ceiling to move the railway vehicle.

이와 같은 틀비계(100)는 다수의 철재 파이프를 용접 등의 방식으로 견고하게 결합하거나, 조립이 가능한 구조로 하여 일정 높이의 지지대(110)를 형성하고, 그 지지대(110)의 상단에는 작업자가 활동할 수 있도록 판재가 설치되는 일정 면적의 받침대(120) 및 펜스(130)가 구비되고, 상기 지지대(110)의 하부에는 철도차량이 이동하는 한쌍의 제1 및 제2레일(1,2) 상면에 안착 회전함으로써 제1 및 제2레일(1,2)의 길이 방향을 따라 상기 틀비계(100)를 용이하게 이동시킬 수 있도록 하는 메인바퀴수단(140)이 구비된다.Such frame scaffolding 100 is a structure capable of assembling or assembling a plurality of steel pipes by welding, or the like to form a support 110 of a certain height, the operator at the top of the support 110 A pedestal 120 and a fence 130 having a predetermined area in which a plate is installed to be active are provided, and a lower portion of the support 110 has a pair of upper and upper surfaces of the pair of first and second rails 1 and 2 to which the railway vehicle moves. The main wheel means 140 is provided so that the frame scaffold 100 can be easily moved along the longitudinal direction of the first and second rails 1 and 2 by seating and rotating.

그리고, 상기 지지대(100)는 작업장소가 높은 곳에 위치할 때에는 다단으로 적층하여 그 높이를 적정하게 유지한다.In addition, the support 100 is stacked in multiple stages when the work place is located at a high place to maintain the height appropriately.

이와 같은 메인바퀴수단(140)은 회전이 자유롭게 4개의 제1 내지 제4메인바퀴(141,142,143,144)가 일정 간격을 유지하며 구비된다.The main wheel means 140 as described above is provided with four free to rotate the first to fourth main wheels (141, 142, 143, 144) at a constant interval.

이때, 상기 메인바퀴수단(140)은 지지대(110)의 하단에 상기 제1 및 제2레일(1,2)의 길이방향에 대해 교차하는 방향으로 일정 간격을 유지하며 평행하게 제1 및 제2메인축(145,146)과, 상기 제1메인축(145)의 양단에 회전이 자유롭게 구비되어 제1 및 제2레일(1,2)상에 각각 접촉되는 제1 및 제2메인바퀴(141,142)와, 상기 제2메인축(146)의 양단에 회전이 자유롭게 구비되어 제1 및 제2레일(1,2)상에 각각 접촉되는 제3 및 제4메인바퀴(143,144)로 이루어진다.At this time, the main wheel means 140 at the lower end of the support 110 maintains a predetermined interval in the direction crossing with respect to the longitudinal direction of the first and second rails (1, 2) and the first and second in parallel First and second main wheels 141 and 142 which rotate freely at both ends of the main shafts 145 and 146 and the first main shaft 145 and are in contact with the first and second rails 1 and 2, respectively. The rotation of the second main shaft 146 is freely provided at both ends, and includes third and fourth main wheels 143 and 144 contacting the first and second rails 1 and 2, respectively.

이때, 상기 제1메인축(145)과 제2메인축(146)은 U형 클램프(165)에 의해 연결프레임(160)에 결합 고정되게 된다.At this time, the first main shaft 145 and the second main shaft 146 are fixed to the connection frame 160 by the U-shaped clamp 165.

따라서, 상기 틀비계(100)의 일측을 밀거나 당기면 상기 제1 및 제2레 일(1,2)의 길이방향을 따라 수평이동할 수 있게 된다.Therefore, when one side of the frame scaffold 100 is pushed or pulled, the first and second rails 1 and 2 can be moved horizontally along the length direction.

이때, 상기 제1 내지 제4메인바퀴(141,142,143,144)가 설치되는 제1 및 제2메인축(145,146)상에는 상기 틀비계(100)를 원하는 작업 위치로 이동시킨 후, 움직이지 않도록 하기 위해 적어도 하나 이상의 브레이크수단(150)이 구비된다.In this case, on the first and second main shafts 145 and 146 in which the first to fourth main wheels 141, 142, 143 and 144 are installed, the frame scaffold 100 is moved to a desired working position, and then at least one or more in order not to move. Brake means 150 is provided.

그리고, 상기 제1 내지 제4메인바퀴(141,142,143,144)는 레일(1,2)에 안착되되 상기 레일(1,2)과 접촉하는 답면부는 테이프가 형성되고, 답면부의 내측에는 상기 제1 내지 제4메인바퀴(141,142,143,144)가 레일(1,2)을 탈선하지 않도록 답면부의 내측에 플랜지(141a,142a,143a,144a)가 형성되고, 답면부의 외측에는 외측플랜지(141b,142b,143b,144b)가 형성된다. The first to fourth main wheels 141, 142, 143, and 144 are seated on the rails 1 and 2, but the answering surface portion in contact with the rails 1 and 2 is formed with a tape, and the first to fourth main wheels are formed inside the answering surface portion. Flanges 141a, 142a, 143a and 144a are formed inside the answering surface so that the main wheels 141, 142, 143 and 144 do not derail the rails 1 and 2, and outer flanges 141b, 142b, 143b and 144b outside the answering surface. Is formed.

이와 같은 브레이크수단(150)은 상기 제1 및 제2메인축(145,146)상에 설치되는 암나사산이 형성되는 너트부재(151)와, 상기 너트부재(151)에 체결되되 손잡이를 회전시키면 상기 너트부재(151)에 체결되어 상기 제1 내지 제4메인바퀴(141,142,143,144)의 플랜지부(141a,142a,143a,144a)를 가압하도록 전후진되는 볼트부재(152)로 이루어진다.The brake means 150 is a nut member 151 having a female thread formed on the first and second main shafts 145 and 146, and the nut member 151 is fastened to the nut member 151. And a bolt member 152 that is fastened to 151 and pushed forward and backward to press the flange portions 141a, 142a, 143a, and 144a of the first to fourth main wheels 141, 142, 143, and 144.

이때, 상기 브레이크수단(150)은 상기 제1 및 제2메인축(145,146)의 외측에 설치되는 별도의 보스부재(미도시)에 고정되어 제1 및 제2메인축(145,146)의 회전에 지장을 주지 않도록 설치되게 된다.In this case, the brake means 150 is fixed to a separate boss member (not shown) installed outside the first and second main shafts 145 and 146, thus preventing rotation of the first and second main shafts 145 and 146. It will be installed so as not to give.

한편, 철도차량이 이동하는 제1 및 제2레일(1,2)상에 틀비계(100)가 설치되므로 철도차량이 통행하기 위해서는 틀비계(100)를 제1 및 제2레일(1,2)상에서 일탈되는 다른 지점으로 이동시켜야 한다.On the other hand, since the frame scaffolding 100 is installed on the first and second rails 1 and 2 on which the railway vehicles move, the frame scaffold 100 is connected to the first and second rails 1 and 2 in order for the railway vehicle to pass. You must move to another point that deviates from).

따라서, 상기 틀비계(100)를 상기 제1 또는 제2레일(1 또는 2)의 일측으로 이동시 신속하고 용이하게 이동시키며, 이동시 전복위험을 최소화하기 위해 상기 틀비계(100)의 지지대(110) 하부에는 상기 제1 및 제2레일(1,2)과 교차하는 방향으로 이동가능한 보조바퀴수단(200)이 설치된다.Thus, the support 110 of the frame scaffold 100 in order to quickly and easily move the frame scaffold 100 to one side of the first or second rail (1 or 2), to minimize the risk of overturning during movement. An auxiliary wheel means 200 which is movable in a direction intersecting the first and second rails 1 and 2 is installed below.

좀더 구체적으로는, 상기 보조바퀴수단(200)은 상기 제1 및 제2메인축(145,146)을 결합 지지하는 연결프레임(160)의 일측 하단에 일체로 구비되는 제1 및 제3지지브라켓(210,230)에 회전이 자유롭게 지지되는 제1 및 제3보조바퀴(212,232)와, 상기 연결프레임(160)의 타측 하단에 일체로 구비되는 제2 및 제4지지브라켓(220,240)에 회전이 자유롭게 지지되는 제2 및 제4보조바퀴(222,242)로 이루어진다.More specifically, the auxiliary wheel means 200 is first and third support brackets 210 and 230 integrally provided at one side lower end of the connection frame 160 for supporting the first and second main shafts 145 and 146. The first and third auxiliary wheels 212 and 232, the rotation of which is freely supported), and the second and fourth support brackets 220 and 240, which are integrally provided at the lower end of the other side of the connection frame 160. And second and fourth auxiliary wheels 222 and 242.

한편, 상기 보조바퀴수단(200)의 제1 내지 제4보조바퀴(212,222,232,242)는 안정적으로 안내되어 제1 및 제2레일(1,2)에서 이탈되어야 한다. 이를 위해 상기 제1 및 제2레일(1,2)과 교차되어 상기 제1 내지 제4보조바퀴(212,222,232,242)를 안내하는 가이드부재(300)가 더 구비된다. Meanwhile, the first to fourth auxiliary wheels 212, 222, 232 and 242 of the auxiliary wheel means 200 should be stably guided and separated from the first and second rails 1 and 2. To this end, the guide member 300 is further provided to cross the first and second rails 1 and 2 to guide the first to fourth auxiliary wheels 212, 222, 232, and 242.

물론, 상기 가이드부재(300)는 제1 및 제2레일(1,2)과 교차설치되되 좀더 정확히는 상기 제1 및 제2레일(1,2)과 90°의 직각을 이루도록 설치됨이 바람직하다.Of course, the guide member 300 is preferably installed to cross the first and second rails (1,2) more precisely at a right angle of 90 ° with the first and second rails (1,2).

이때, 상기 제1 내지 제4보조바퀴(212,222,232,242)는 외주연에 안착홈(212a,222a,232a,242a)이 각각 형성되며, 상기 가이드부재(300)는 상기 안착홈(212a,222a,232a,242a)이 밀착되도록 그 상단면이 안착홈(212a,222a,232a,242a)과 대응되도록 형성되어 상기 제1 내지 제4보조바퀴(212,222,232,242)가 이탈되는 것을 방지하게 된다. At this time, the first to fourth auxiliary wheels (212, 222, 232, 242) is formed on the outer periphery of the mounting grooves (212a, 222a, 232a, 242a), respectively, the guide member 300 is the mounting grooves (212a, 222a, 232a, The upper surface of the 242a is formed to correspond to the seating grooves 212a, 222a, 232a, and 242a so as to prevent the first to fourth auxiliary wheels 212, 222, 232, and 242 from being separated.

이와 같은 가이드부재(300)는 원형의 제1 및 제2파이프(310,320)로 구성된다. The guide member 300 is composed of circular first and second pipes 310 and 320.

즉, 상기 제1파이프(310)의 상부에는 제1 및 제2보조바퀴(212,222)가 접촉되고, 상기 제2파이프(320)의 상부에는 32 및 제4보조바퀴(232,242)가 접촉된다.That is, first and second auxiliary wheels 212 and 222 are in contact with the upper portion of the first pipe 310, and 32 and fourth auxiliary wheels 232 and 242 are in contact with the upper portion of the second pipe 320.

이때, 상기 제1 및 제2파이프(310,320)는 원형 이외에도 도 6에 도시한 바와 같이 그 단면이 사각인 파이프를 사용할 수 있으며, 도면에 도시하지는 아니하였으나 삼각 파이프를 사용할 수도 있다.In this case, the first and second pipes 310 and 320 may use a pipe having a rectangular cross section as shown in FIG. 6 in addition to a circular shape, but a triangular pipe may be used although not shown in the drawing.

이 경우 상기 가이드부재(300)인 제1 및 제2파이프(310,320)와 제1 내지 제4보조바퀴의 외주연에 형성되는 안착홈(212a,222a,232a,242a)은 동일한 형상을 이루게 된다.In this case, the first and second pipes 310 and 320, which are the guide members 300, and the mounting grooves 212a, 222a, 232a, and 242a formed on the outer periphery of the first to fourth auxiliary wheels have the same shape.

이하, 도 2 내지 도 8을 참고로 본 발명에 따른 철도선로용 틀비계의 사용 예를 상세히 설명한다. Hereinafter, an example of using a frame scaffold for railway lines according to the present invention will be described in detail with reference to FIGS. 2 to 8.

먼저, 틀비계(100)는 작업하고자 하는 선로 상의 임의의 위치의 제1 및 제2레일(1,2) 상에 상기 메인바퀴수단(140)의 제1 내지 제4메인바퀴(141,142,143,144)가 안착되도록 위치되게 한다.First, the frame scaffold 100 is the first to fourth main wheels (141, 142, 143, 144) of the main wheel means 140 is seated on the first and second rails (1, 2) of any position on the track to be worked Position it as possible.

이와 같은 상태에서 지하철 역사나 터널 내부 벽면이나 천장 등의 보수 등의 공사를 작업자가 수행할 수 있다.In such a state, a worker may perform construction such as subway station or tunnel interior wall or ceiling repair.

즉, 원하는 위치로 틀비계(100)를 이동시킨 후, 브레이크수단(150)을 조정하 여 움직이지 않게 고정시킨 후, 소정의 작업을 하게 된다.That is, after moving the frame scaffolding 100 to a desired position, the brake means 150 is adjusted and fixed to move, and then a predetermined work is performed.

여기서, 작업중 상기 틀비계(100)를 타측의 선로 상으로 이동시키고자 할 때에는 가이드부재(300)인 제1 및 제2파이프(310,320)를 틀비계(100)의 하부에 구비되는 보조바퀴수단(200)의 제1 및 제2보조바퀴(212,222)를 레일의 상부로 들어올려 안착홈(212a,222a)을 제1파이프(310)의 상부에 안착되도록 하고, 이어서 제3 및 제4보조바퀴(232,242)를 들어올려 안착홈(232a,242a)이 제2파이프(320)의 상부에 안착되도록 한다.Here, in order to move the frame scaffold 100 on the other side of the track during operation, the first and second pipes 310 and 320, which are guide members 300, are provided on the lower portion of the frame scaffold 100. Lift the first and second auxiliary wheels 212 and 222 of the 200 to the upper portion of the rail so that the seating grooves 212a and 222a are seated on the upper portion of the first pipe 310, and then the third and fourth auxiliary wheels ( Lifting the 232,242 so that the mounting grooves (232a, 242a) is seated on the upper portion of the second pipe (320).

이때, 상기 제1 및 제2파이프(310,320)는 틀비계(100)를 이동시키고자 하는 인접 선로의 제1 및 제2레일(1,2)까지 연장되도록 설치하여 한다.In this case, the first and second pipes 310 and 320 are installed to extend to the first and second rails 1 and 2 of the adjacent track to which the frame scaffold 100 is to be moved.

이와 같은 상태에서, 틀비계(100)의 측면을 밀게 되면, 틀비계(100)가 인접하는 선로 상의 제1 및 제2레일(1,2)쪽으로 이동하게 되며, 이동이 완료되면 상기 제1 및 제2보조바퀴(212,222)를 들어올리고 제1파이프(310)를 제거하여 제1 및 제2보조바퀴(212,222)가 이동하고자 하는 레일 상에 위치되도록 한다.In such a state, when the side of the frame scaffold 100 is pushed, the frame scaffold 100 moves toward the first and second rails 1 and 2 on the adjacent track, and when the movement is completed, the first and second scaffold 100 is moved. The second auxiliary wheels 212 and 222 are lifted and the first pipe 310 is removed so that the first and second auxiliary wheels 212 and 222 are positioned on the rail to be moved.

이후, 상기 제3 및 제4보조바퀴(232,242)를 들어올리고 제2파이프(320)를 제거하여 제3 및 제4보조바퀴(232,242)가 레일 상에 위치되도록 함으로써, 틀비계(l00)의 이동이 완료되게 된다.Thereafter, the third and fourth auxiliary wheels 232 and 242 are lifted and the second pipe 320 is removed so that the third and fourth auxiliary wheels 232 and 242 are positioned on the rails, thereby moving the frame scaffold 100. Will be completed.

한편, 도 7은 본 발명의 또 다른 실시 예에 따른 철도선로용 틀비계를 도시한 도면으로, 상기 틀비계(100)의 지지대(110) 하부의 연결프레임(160)에는 상기 틀비계(100)를 승강시키는 승강수단(400)이 더 구비된다.On the other hand, Figure 7 is a view showing a frame rail scaffolding according to another embodiment of the present invention, the frame scaffold 100 in the connection frame 160 below the support 110 of the frame scaffold 100 Lifting means 400 for elevating is further provided.

즉, 상기 승강수단(400)은 상기 틀비계(100)의 연결프레임(160)에 일체로 설치되되 상하방향의 가이드공(412)이 형성되고 그 가이드공(412)에는 암나사산(미도시됨)이 형성되는 가이드부재(410)와, 상기 가이드부재(410)의 가이드공(412)에 관통설치되되 그 외주연에는 수나사산(422)이 형성되고 상단에는 손잡이(424)가 구비되는 회전축부재(420)로 이루어진다.That is, the elevating means 400 is integrally installed in the connecting frame 160 of the frame scaffold 100 is formed with a guide hole 412 in the vertical direction and the female thread (not shown) in the guide hole 412 The rotating member is formed in the guide member 410 and the guide hole 412 of the guide member 410, the male thread 422 is formed on the outer periphery and the handle 424 is provided on the top 420.

따라서, 상기 손잡이(424)를 회전시키게 되면 상기 회전축부재(420)가 상기 가이드부재(410)의 가이드공(412)에서 상하로 안내되는데, 상기 회전축부재(420)가 하강하는 경우 지면에 그 단부가 밀착되며 상대적으로 틀비계(100)가 상승하게 된다.Accordingly, when the handle 424 is rotated, the rotating shaft member 420 is guided up and down at the guide hole 412 of the guide member 410, and the end of the rotary shaft member 420 is lowered to the ground when it is lowered. Is closely contacted and the mold scaffold 100 is raised.

이와 같은 상태에서 상기 틀비계(100)를 인접 선로로 이동시키기 위해 보조바퀴수단(200)을 가이드부재(300)에 올려놓거나 또는 내려놓는 작업을 용이하게 할 수 있게 된다.In this state, in order to move the frame scaffold 100 to the adjacent track, the auxiliary wheel means 200 can be easily placed on or off the guide member 300.

한편, 상기 틀비계(100)를 들어올린 상태에서 틀비계(100)를 용이하게 좌우로 이동할 수 있도록 하기 위해 상기 회전축부재(420)의 하단에는 캐스터(430)가 구비된다.On the other hand, the caster 430 is provided at the lower end of the rotating shaft member 420 in order to easily move the frame scaffold 100 to the left and right in the state of lifting the frame scaffold 100.

따라서, 상기 틀비계(100)를 들어올린 상태에서 상기 캐스터(430)에 의해 틀비계(100)를 가이드부재(300)로 용이하게 이동할 수 있게 된다.Therefore, the frame scaffold 100 can be easily moved to the guide member 300 by the caster 430 in the state in which the frame scaffold 100 is lifted up.

위에서는 상기 틀비계(100)의 일측에 하나의 승강수단(400)을 도시하였지만, 상기 승강수단(400)을 연결프레임(160)의 양 측단부에 하나씩 설치할 수도 있다.Although one lifting means 400 is shown on one side of the frame scaffold 100 above, the lifting means 400 may be installed one by one on both side ends of the connection frame 160.

이외에도 상기 승강수단(400)은 유압잭을 사용하여 틀비계(100)를 들어 올릴수 있는 등 다양하게 변환할 수 있는 구조로 이루어질 수 있다.In addition, the lifting means 400 may be made of a structure that can be variously converted, such as lifting the frame scaffold 100 using a hydraulic jack.

그리고, 도 9는 본 발명에 따른 철도선로용 틀비계의 작업발판을 확장하기 위한 도면으로서, 상기 틀비계(100)의 상부에 설치되는 작업발판(120)의 작업 폭 을 조절하기 위한 구성이다.And, Figure 9 is a view for extending the working scaffolding of the frame scaffolding for railroad line according to the present invention, a configuration for adjusting the working width of the working scaffold 120 is installed on the upper portion of the frame scaffolding (100).

상기 작업발판(120)의 양 측단부에 폭 조절이 가능하도록 연장부(122)를 더 형성한 것이다.Extension portions 122 are further formed to allow width adjustments at both side ends of the working scaffold 120.

이렇게 함으로써, 레일에서 작업을 하기 위한 벽체까지의 거리가 짧아지게 되어 틀비계의 작업한계를 줄일 수 있게 되고, 이로 인해 작업자의 안전도 높일 수 있게 된다.By doing so, the distance from the rail to the wall for working can be shortened and the working limit of the frame scaffold can be reduced, thereby increasing the safety of the worker.

또한, 도 10은 본 발명에 따른 철도선로용 틀비계의 작업발판의 높이를 조절하기 위한 도면으로서, 상기 틀비계(100)의 지지대(110)에 횡방향으로 다수개의 가로지지대(118)를 더 설치한 것이다.In addition, Figure 10 is a view for adjusting the height of the working scaffolding of the frame scaffolding for railroad line according to the present invention, a plurality of horizontal support 118 in the transverse direction to the support 110 of the frame scaffold 100 It is installed.

이렇게 함으로써, 천장에서 벽체까지 또는 장애물이 있어 작업공간의 확보가 어려운 구간에도 작업발판(120)의 설치 높이를 조절할 수 있어 틀비계(100)의 작업한계를 줄이고, 작업자의 안전도를 높일 수 있게 된다.By doing so, the installation height of the working scaffold 120 can be adjusted even in a section where the ceiling to the wall or an obstacle is difficult to secure the working space, thereby reducing the working limit of the frame scaffold 100 and increasing the safety of the worker. .

먼저, 가이드부재(300)인 제1 및 제2파이프(310,320)는 제1 및 제2레일(1,2) 의 하부를 지지하는 침목(3,4)사이에 일정한 공간(S)이 형성되므로 그 공간(S)을 관통하여 설치한 상태에서, 틀비계(100)의 하부에 구비되는 보조바퀴수단(200)의 제1 및 제3보조바퀴(212,232)의 안착홈(212a,232a)을 제1파이프(310)의 상부에 밀착시키고, 제2 및 제4보조바퀴(222,242)의 안착홈(222a,242a)을 제2파이프(320)의 상부에 밀착시킨다.First, since the first and second pipes 310 and 320 which are the guide members 300 have a predetermined space S between the sleepers 3 and 4 supporting the lower portions of the first and second rails 1 and 2. The mounting grooves 212a and 232a of the first and third auxiliary wheels 212 and 232 of the auxiliary wheel means 200 provided in the lower portion of the frame scaffold 100 are installed in a state where they are installed through the space S. It is in close contact with the upper portion of the first pipe 310, the mounting grooves (222a, 242a) of the second and fourth auxiliary wheels (222, 242) is in close contact with the upper portion of the second pipe (320).

이와 같은 상태에서, 틀비계(100)의 측면을 밀게 되면, 틀비계(100)가 제1 및 제2레일(1,2)쪽으로 이동하게 되며, 상기 제1 및 제2보조바퀴(212,232)가 제1레일(1)의 일측으로 접근하게 된다.In such a state, when the side of the frame scaffold 100 is pushed, the frame scaffold 100 moves toward the first and second rails 1 and 2, and the first and second auxiliary wheels 212 and 232 are moved. Approaching one side of the first rail (1).

이때, 작업자가 틀비계(100)의 제1 및 제2보조바퀴(212,222)쪽을 살짝 들어올려 제1레일(1)을 넘어 제1 및 제2보조바퀴(212,222)를 상기 제1 및 제2파이프(310,320)에 안착시킨 후 틀비계(100)의 측면을 밀게 되어 제1 및 제2보조바퀴(212,222)가 제2레일(2)의 일측으로 접근하게 되면 틀비계(100)를 들어올려 메인바퀴수단(140)의 제1 내지 제4바퀴(141,142,143,144)를 제1 및 제2레일(1,2)면상에 밀착시키게 된다.At this time, the worker slightly lifts the first and second auxiliary wheels 212 and 222 of the mold scaffold 100 and moves the first and second auxiliary wheels 212 and 222 over the first rail 1 to the first and second wheels. After seating on pipes 310 and 320, the sides of the frame scaffold 100 are pushed, and when the first and second auxiliary wheels 212 and 222 approach one side of the second rail 2, the frame scaffold 100 is lifted up to the main side. The first to fourth wheels 141, 142, 143 and 144 of the wheel means 140 are brought into close contact with the surfaces of the first and second rails 1 and 2.

이와 같은 상태에서 지하철 역사나 터널 내부 벽면이나 천장 등의 보수 등의 공사를 작업자가 수행할 수 있다.In such a state, a worker may perform construction such as subway station or tunnel interior wall or ceiling repair.

즉, 원하는 위치로 틀비계(100)를 이동시킨 후, 브레이크수단(150)을 조정하여 움직이지 않게 고정시킨 후, 원하는 작업을 하게 된다.That is, after moving the frame scaffolding 100 to a desired position, the brake means 150 is adjusted to be fixed so as not to move, and then the desired work is performed.

그리고, 상기 틀비계(100)를 제1 및 제2레일(1,2)에서 이탈시키기 위해서는 상기 틀비계(100)의 설치와는 반대로 수행함으로써 이루어질 수 있다.In addition, in order to detach the mold scaffold 100 from the first and second rails 1 and 2, the mold scaffold 100 may be performed in the opposite manner to the installation of the mold scaffold 100.

한편, 도 7은 본 발명의 또 다른 실시 예에 따른 철도선로용 틀비계를 도시한 도면으로, 상기 틀비계(100)의 지지대(110) 하부에는 상기 틀비계(100)를 승강시키는 승강수단(400)이 더 구비된다.On the other hand, Figure 7 is a view showing a rail frame scaffolding according to another embodiment of the present invention, the lifting means for elevating the frame scaffold 100 in the lower portion of the support 110 of the frame scaffold 100 ( 400 is further provided.

즉, 상기 승강수단(400)은 상기 틀비계(100)의 지지대(110)에 일체로 설치되되 상하방향의 가이드공(412)이 형성되고 그 가이드공(412)에는 암나사산(미도시됨)이 형성되는 가이드부재(410)와, 상기 가이드부재(410)의 가이드공(412)에 관통설치되되 그 외주연에는 수나사산(422)이 형성되고 상단에는 손잡이(424)가 구비되는 회전축부재(420)로 이루어진다.That is, the lifting means 400 is integrally installed on the support 110 of the frame scaffold 100, the guide hole 412 in the vertical direction is formed and the female thread (not shown) in the guide hole 412 It is formed through the guide member 410 and the guide hole 412 of the guide member 410, the outer periphery of the male screw thread 422 is formed on the top of the rotating shaft member (424) is provided with a handle (424) ( 420).

따라서, 상기 손잡이(424)를 회전시키게 되면 상기 회전축부재(420)가 상기 가이드부재(410)의 가이드공(412)에서 상하로 안내되는데, 상기 회전축부재(420)가 하강하는 경우 지면에 그 단부가 밀착되며 상대적으로 틀비계(100)가 상승하게 된다.Accordingly, when the handle 424 is rotated, the rotating shaft member 420 is guided up and down at the guide hole 412 of the guide member 410, and the end of the rotary shaft member 420 is lowered to the ground when it is lowered. Is closely contacted and the mold scaffold 100 is raised.

이와 같은 상태에서 상기 틀비계(100)를 상기 제1 및 제2레일(1,2)상에 올려놓거나 또는 내려놓는 작업을 용이하게 할 수 있게 된다.In this state, the frame scaffold 100 may be easily placed on or lowered from the first and second rails 1 and 2.

한편, 상기 틀비계(100)를 들어올린 상태에서 용이하게 이동할 수 있도록 하기 위해 상기 회전축부재(420)의 하단에는 캐스터(430)가 구비된다.On the other hand, the caster 430 is provided at the lower end of the rotary shaft member 420 in order to be able to easily move in the lifting state of the frame scaffold 100.

따라서, 상기 틀비계(100)를 들어올린 상태에서 한쪽방향으로 밀더라도 상기 캐스터(430)에 의해 용이하게 이동할 수 있게 된다.Therefore, even if the frame scaffold 100 is pushed in one direction in the lifted state, it can be easily moved by the caster 430.

이외에도 상기 승강수단(400)은 렉과 피니언을 이용하여 회전운동을 직선운 동으로 변환할 수 있는 다양한 구조로 이루어질 수 있다.In addition, the elevating means 400 may be made of a variety of structures that can convert the rotational movement to linear movement using the rack and pinion.

이상에서는 본 발명의 바람직한 실시 예를 설명하였으나, 본 발명의 권리범위는 이에 한정되지 않으며, 본 발명의 실시 예와 실질적으로 균등한 범위에 있는 것까지 본 발명의 권리범위가 미치는 것으로 본 발명의 정신을 벗어나지 않는 범위 내에서 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자에 의해 다양한 변형 실시가 가능한 것이다.Although the preferred embodiment of the present invention has been described above, the scope of the present invention is not limited thereto, and the scope of the present invention extends to the scope of the present invention to be substantially equivalent to the embodiment of the present invention. Various modifications can be made by those skilled in the art without departing from the scope of the present invention.

이상의 설명에서 알 수 있는 바와 같이, 본 발명에 따르면 틀비계를 철도선로상의 제1 및 제2레일상에 이동시키거나 이탈시키는 경우 보조바퀴수단과 가이드부재를 이용하여 용이하게 이동할 수 있도록 하여 틀비계의 이동이 용이하고, 틀비계의 해체 및 설치에 따른 인력절감으로 공사비를 절감할 수 있는 장점이 있다. As can be seen from the above description, according to the present invention, when the frame scaffold is moved or separated on the first and second rails on the railway track, the frame scaffold can be easily moved by using the auxiliary wheel means and the guide member. It is easy to move, and there is an advantage that can reduce the construction cost by reducing the manpower according to the dismantling and installation of the scaffolding.

아울러, 틀비계를 철도의 제1 및 제2레일상에 이동시키거나 이탈시키는 경우 일부분만 살짝 들어올린 상태에서도 이동이 가능하여 틀비계의 전복위험이 적어 안전하게 사용할 수 있는 장점도 있다.In addition, when the frame scaffold is moved or separated on the first and second rails of the rail, it is possible to move even in a slightly lifted state, so there is an advantage that the frame scaffold can be safely used because there is little risk of overturning the frame scaffold.

Claims (12)

철도선로의 길이방향을 따라 안내되는 메인바퀴수단이 구비되는 철도선로용 틀비계에 있어서,In the frame scaffold for railway tracks provided with main wheel means guided along the longitudinal direction of the railway tracks, 상기 메인바퀴수단과 교차하는 방향으로 이동 가능한 보조바퀴수단이 구비되고,The auxiliary wheel means which is movable in the direction intersecting with the main wheel means is provided, 상기 메인바퀴수단은 제1, 2메인축에 고정 결합되며, 상기 제1, 2메인축의 양단은 연결프레임에 의해 연결 결합되고,The main wheel means is fixedly coupled to the first and second main shaft, both ends of the first and second main shaft are connected and coupled by a connecting frame, 상기 연결프레임에는, 지지대에 일체로 설치되되 상하방향의 가이드공이 형성되고 그 가이드공에는 암나사산이 형성되는 가이드부재와, 상기 가이드부재의 가이드공에 관통설치되되 그 외주연에는 수나사산이 형성되고 상단에는 손잡이가 구비되는 회전축부재로 이루어지는 승강수단이 구비되는 것을 특징으로 하는 철도선로용 틀비계.The connecting frame, which is integrally installed on the support, is formed with a guide hole in the vertical direction, the guide hole is formed with a guide member formed with a female thread, the guide hole of the guide member, the outer periphery of the male thread is formed and the upper end Frame scaffolding for railway tracks, characterized in that the lifting means consisting of a rotating shaft member provided with a handle. 제 1항에 있어서, The method of claim 1, 상기 보조바퀴수단은; 제1메인축과 제2메인축을 결합하는 연결프레임의 양 측단부에 지지 고정되는 제1 내지 제4보조바퀴로 이루어지는 것을 특징으로 하는 철도선로용 틀비계.The auxiliary wheel means; Frame scaffolding for railroad tracks, characterized in that consisting of the first to fourth auxiliary wheels that are supported and fixed to both side ends of the connecting frame for coupling the first main shaft and the second main shaft. 제 2항에 있어서, 3. The method of claim 2, 상기 제1 내지 제4보조바퀴는 연결프레임 양측단부에 형성되는 제1 내지 제4지지브라켓에 의해 회전이 자유롭게 지지되는 것을 특징으로 하는 철도선로용 틀비계.The first to fourth auxiliary wheels are frame scaffolding, characterized in that the rotation is freely supported by the first to fourth support brackets formed on both ends of the connecting frame. 제 2항 또는 제3항에 있어서, The method according to claim 2 or 3, 상기 제1 내지 제4보조바퀴는 외주연에 안착홈이 각각 형성되는 것을 특징으로 하는 철도선로용 틀비계.The first to fourth auxiliary wheels are frame scaffolding, characterized in that the seating groove is formed on the outer periphery, respectively. 제 4항에 있어서,The method of claim 4, wherein 상기 안착홈은 반원형, 삼각형 및 사각형 중 어느 하나인 것을 특징으로 하는 철도선로용 틀비계.The seating groove frame rail scaffolding, characterized in that any one of a semi-circular, triangular and square. 제 1항에 있어서,The method of claim 1, 상기 보조바퀴수단은 가이드부재에 의해 이동하는 것을 특징으로 하는 철도선로용 틀비계.The auxiliary wheel means frame scaffold for railway lines, characterized in that moved by the guide member. 삭제delete 삭제delete 삭제delete 제 1항에 있어서,The method of claim 1, 상기 회전축부재의 하단에는 캐스터가 더 구비되는 것을 특징으로 하는 철도선로용 틀비계.Frame scaffolding for railroad tracks, characterized in that the lower end of the rotary shaft member is further provided with a caster. 제 1항에 있어서,The method of claim 1, 상기 메인바퀴수단은 제1 내지 제4메인바퀴로 구성되되, 상기 제1 내지 제4메인바퀴는 내측에는 플랜지 형성되고, 외측에는 외측플랜지가 형성되는 것을 특징으로 하는 철도선로용 틀비계.The main wheel means is composed of the first to the fourth main wheel, the first to fourth main wheel is a flange formed on the inner side, the outer frame is characterized in that the outer flange is formed on the outside. 제 1항에 있어서,The method of claim 1, 상기 제1, 2메인축의 양단이 연장 형성된 것을 특징으로 하는 철도선로용 틀비계.Frame scaffolding for railroad tracks, characterized in that both ends of the first and second main shaft is extended.
KR1020080049242A 2008-05-27 2008-05-27 scaffolding for railroad track KR100955531B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080049242A KR100955531B1 (en) 2008-05-27 2008-05-27 scaffolding for railroad track

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080049242A KR100955531B1 (en) 2008-05-27 2008-05-27 scaffolding for railroad track

Publications (2)

Publication Number Publication Date
KR20090123261A KR20090123261A (en) 2009-12-02
KR100955531B1 true KR100955531B1 (en) 2010-05-03

Family

ID=41685521

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080049242A KR100955531B1 (en) 2008-05-27 2008-05-27 scaffolding for railroad track

Country Status (1)

Country Link
KR (1) KR100955531B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101314809B1 (en) 2011-12-29 2013-10-14 김명호 Front/rear and left/right movable work platform for repairing rail equipment
KR101991397B1 (en) * 2018-11-15 2019-06-20 주식회사 삼신 Temporary work table for furnace scaffold
WO2019119021A1 (en) * 2017-12-22 2019-06-27 Melvelle Equipment Corp. Pty Ltd Railway track trolley

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101975373B1 (en) * 2016-11-01 2019-05-07 두산중공업 주식회사 Submerged Arc Welding only Transfer-type welding equipment.
CN108755307A (en) * 2018-06-20 2018-11-06 北京磁浮交通发展有限公司 The safety device of track maintenance
CN111456398A (en) * 2020-03-24 2020-07-28 中国五冶集团有限公司 Large-space rail type travelling crane
KR102203793B1 (en) * 2020-08-31 2021-01-15 (주)케이엘산업건설 Removable rail equipment maintenance workbench
KR102389401B1 (en) * 2020-09-15 2022-04-21 대우조선해양 주식회사 Work platform for liquefied gas cargo containment
CN112609950B (en) * 2020-11-28 2022-09-16 中建二局第一建筑工程有限公司 Be used for convenient movable handling frame of outer facade construction
KR102453708B1 (en) * 2021-01-11 2022-10-12 (주)케이엘산업건설 Mobile rail facility repair system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0833815A (en) * 1994-07-25 1996-02-06 Hitachi Kiden Kogyo Ltd Screen guide device in screen circulating type dust collector
JPH11217002A (en) 1998-02-02 1999-08-10 Central Japan Railway Co Truck wheel
KR200221860Y1 (en) 2000-08-22 2001-04-16 지상철 Height adjustable equipment of facility's moving car
KR20030072174A (en) * 2002-03-02 2003-09-13 이기용 traveling a giant swing for railroad

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0833815A (en) * 1994-07-25 1996-02-06 Hitachi Kiden Kogyo Ltd Screen guide device in screen circulating type dust collector
JPH11217002A (en) 1998-02-02 1999-08-10 Central Japan Railway Co Truck wheel
KR200221860Y1 (en) 2000-08-22 2001-04-16 지상철 Height adjustable equipment of facility's moving car
KR20030072174A (en) * 2002-03-02 2003-09-13 이기용 traveling a giant swing for railroad

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101314809B1 (en) 2011-12-29 2013-10-14 김명호 Front/rear and left/right movable work platform for repairing rail equipment
WO2019119021A1 (en) * 2017-12-22 2019-06-27 Melvelle Equipment Corp. Pty Ltd Railway track trolley
GB2583640A (en) * 2017-12-22 2020-11-04 Melvelle Equipment Corp Pty Ltd Railway track trolley
GB2583640B (en) * 2017-12-22 2022-08-17 Melvelle Equipment Corp Pty Ltd Railway track trolley
US11897522B2 (en) 2017-12-22 2024-02-13 Melvelle Equipment Corp. Pty Ltd Railway track trolley
KR101991397B1 (en) * 2018-11-15 2019-06-20 주식회사 삼신 Temporary work table for furnace scaffold

Also Published As

Publication number Publication date
KR20090123261A (en) 2009-12-02

Similar Documents

Publication Publication Date Title
KR100955531B1 (en) scaffolding for railroad track
CA2897863C (en) Low profile drop table
JP7112361B2 (en) Tunnel Ceiling Surface Cleaning Method and Tunnel Ceiling Surface Cleaning and Cleaning Device
CN205638490U (en) A portable platform truck that is used for subway station tread wind channel to pour
DE102006030432B3 (en) Changing method e.g. for changing lower floor panel construction units at rail-mounted vehicles, involves driving entire vehicle on track driven into workshop and which lower floor panel construction unit is loosened
JPH0841828A (en) Bridge girder erection equipment
JP5769961B2 (en) Construction method and removal method of structure
KR20120088449A (en) working vehicle for working in the high position
EP3007955B1 (en) Railway vehicle
CN113279335A (en) Device and method for mounting large-tonnage and wide-width steel box girder across mountain ridge
JP2001159232A (en) Moving scaffold device and installation method using moving scaffold device
JP2010241304A (en) Facility and method for removing carriage of vehicle
CN110937555A (en) Track maintenance car
JP6479640B2 (en) Mobile scaffold equipment
CN112228113A (en) PBA underground excavated station roof longitudinal beam and midspan buckling arch template system and construction method
JP2020082777A (en) Railway vehicle truck exchange equipment
CN220224787U (en) Sideslip system for track equipment
JP2010007243A (en) Railroad girder movement and installation equipment, railroad girder movement and installation method, and railroad girder removal method
JP4956331B2 (en) Bridge girder replacement method
CN217440023U (en) Translation trolley for oversized rectangular jacking pipe joints
CN213510651U (en) Integral type two lining platform trucks for tunnel construction
JP5299982B1 (en) Wall linking band for cylindrical structure construction / repair work, and method for construction / repair of cylindrical structure by moving lifting type scaffolding using the wall linking band
CN214697900U (en) Shed tunnel construction bearing structure
CN114875955B (en) Ultra-long concrete straight retaining wall template mounting device and construction method thereof
CN209855823U (en) Tunnel arch segment assembling equipment

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130412

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20140422

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20150422

Year of fee payment: 6

LAPS Lapse due to unpaid annual fee