KR100898272B1 - 폐 알루미늄 캔에서 알미늄 미립자 제조장치 - Google Patents
폐 알루미늄 캔에서 알미늄 미립자 제조장치 Download PDFInfo
- Publication number
- KR100898272B1 KR100898272B1 KR20080079568A KR20080079568A KR100898272B1 KR 100898272 B1 KR100898272 B1 KR 100898272B1 KR 20080079568 A KR20080079568 A KR 20080079568A KR 20080079568 A KR20080079568 A KR 20080079568A KR 100898272 B1 KR100898272 B1 KR 100898272B1
- Authority
- KR
- South Korea
- Prior art keywords
- aluminum
- cabinet
- blade
- crusher
- inlet
- Prior art date
Links
Images
Classifications
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22B—PRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
- C22B7/00—Working up raw materials other than ores, e.g. scrap, to produce non-ferrous metals and compounds thereof; Methods of a general interest or applied to the winning of more than two metals
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22F—WORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
- B22F8/00—Manufacture of articles from scrap or waste metal particles
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22F—WORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
- B22F9/00—Making metallic powder or suspensions thereof
- B22F9/02—Making metallic powder or suspensions thereof using physical processes
- B22F9/04—Making metallic powder or suspensions thereof using physical processes starting from solid material, e.g. by crushing, grinding or milling
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P10/00—Technologies related to metal processing
- Y02P10/20—Recycling
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02W—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
- Y02W30/00—Technologies for solid waste management
- Y02W30/50—Reuse, recycling or recovery technologies
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Materials Engineering (AREA)
- Mechanical Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Crushing And Pulverization Processes (AREA)
Abstract
Description
이때, 상기 베이스 플레이트(100)는, 복수의 프레임(110)을 통해 수평으로 설치되는 것으로서, 후술하는 각종 부품이 위치될 수 있는 기초 토대의 기능을 수행한다.
Claims (3)
- 복수의 프레임에 의해 수평으로 설치되며, 일측 상면에 구동모터가 위치된 베이스 플레이트와; 상기 베이스 플레이트의 타측 상면에 위치되는 하부 캐비닛과; 상기 하부 캐비닛의 상부에 결합되며, 상부 일측에 투입구가 마련되고, 하부 일측에는 배출구가 마련된 상부 캐비닛을 하우징으로하는 폐 알루미늄 캔에서의 알미늄 미립자 제조장치에 있어서:상기 상,하부 캐비닛을 관통하여 수직으로 설치되며, 구동모터로 부터의 동력을 벨트 및 풀리를 통해 전달받아 회전하는 회전축과;상기 상부 캐비닛상에 마련되며 투입구로부터 투입되는 알루미늄 캔을 파쇄하여 배출구를 통해 배출시키는 파쇄수단을 포함하되;상기 파쇄수단은, 상기 회전축의 상부측 외주면에 축 지지되어 투입구를 통해 투입된 캔을 초기 파쇄시키는 회전 커터와;상기 회전 커터의 하부측 상부 캐비닛 내주면에 고정 설치되는 제 1 고정날과, 이 제 1 고정날과 소정간격 이격되도록 회전축상에 결합되는 제 1 회전날로 이루어진 제 1 파쇄기와;상기 제 1 파쇄기의 하부에 위치되며, 상부 캐비닛 내주면에 고정 설치되는 제 2 고정날과, 상기 제 2 고정날과 소정간격 이격되도록 회전축 상에 결합되는 제 2 회전날로 이루어며 제 2 회전날과 제 2 고정날간의 간격은 상기 제 1 파쇄기의 회전날과 고정날간의 간격보다 상대적으로 좁게 형성되는 제 2 파쇄기와;상기 제 2 파쇄기의 하부측 회전축상에 위치되며, 파쇄된 알루미늄 캔을 배출구를 통해 배출시키는 배출 날개로 이루어지는 것을 특징으로 하는 폐 알루미늄 캔에서의 알미늄 미립자 제조장치.
- 삭제
- 삭제
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR20080079568A KR100898272B1 (ko) | 2008-08-13 | 2008-08-13 | 폐 알루미늄 캔에서 알미늄 미립자 제조장치 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR20080079568A KR100898272B1 (ko) | 2008-08-13 | 2008-08-13 | 폐 알루미늄 캔에서 알미늄 미립자 제조장치 |
Publications (1)
Publication Number | Publication Date |
---|---|
KR100898272B1 true KR100898272B1 (ko) | 2009-05-18 |
Family
ID=40862235
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR20080079568A KR100898272B1 (ko) | 2008-08-13 | 2008-08-13 | 폐 알루미늄 캔에서 알미늄 미립자 제조장치 |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100898272B1 (ko) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101053754B1 (ko) | 2011-01-06 | 2011-08-02 | 송낙유 | 알루미늄 파우더 제조 방법 및 그 제조 장치 |
KR101349304B1 (ko) * | 2013-02-06 | 2014-01-13 | 한국지질자원연구원 | 강염기성 알루미늄 생산 폐기물의 처리방법 |
KR101366049B1 (ko) | 2013-11-21 | 2014-02-26 | 현대자원산업 주식회사 | 분쇄된 폐 알루미늄 캔을 트윈 롤러에 의해 압착박편으로 성형하는 제조장치 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0813050A (ja) * | 1994-07-05 | 1996-01-16 | Nippon Chuzo Kk | アルミニウム空缶の再生方法及び再生装置 |
JPH10137610A (ja) | 1996-11-13 | 1998-05-26 | Kinki:Kk | 破砕不適物選別破砕方法とその破砕装置 |
KR20030065253A (ko) * | 2002-03-08 | 2003-08-06 | 이찬식 | 용광로에 투입되는 알루미늄 칩 성형장치 |
-
2008
- 2008-08-13 KR KR20080079568A patent/KR100898272B1/ko active IP Right Grant
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0813050A (ja) * | 1994-07-05 | 1996-01-16 | Nippon Chuzo Kk | アルミニウム空缶の再生方法及び再生装置 |
JPH10137610A (ja) | 1996-11-13 | 1998-05-26 | Kinki:Kk | 破砕不適物選別破砕方法とその破砕装置 |
KR20030065253A (ko) * | 2002-03-08 | 2003-08-06 | 이찬식 | 용광로에 투입되는 알루미늄 칩 성형장치 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101053754B1 (ko) | 2011-01-06 | 2011-08-02 | 송낙유 | 알루미늄 파우더 제조 방법 및 그 제조 장치 |
KR101349304B1 (ko) * | 2013-02-06 | 2014-01-13 | 한국지질자원연구원 | 강염기성 알루미늄 생산 폐기물의 처리방법 |
US9126068B2 (en) | 2013-02-06 | 2015-09-08 | Korea Institute Of Geoscience And Mineral Resources | Method of treating strong basic aluminum production waste |
KR101366049B1 (ko) | 2013-11-21 | 2014-02-26 | 현대자원산업 주식회사 | 분쇄된 폐 알루미늄 캔을 트윈 롤러에 의해 압착박편으로 성형하는 제조장치 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2010131473A (ja) | 摩砕機 | |
JP3621386B2 (ja) | 微粉砕機 | |
CN206703350U (zh) | 一种废旧塑料制品自动粉碎装置 | |
RU2558248C1 (ru) | Зерновая дробилка | |
KR100898272B1 (ko) | 폐 알루미늄 캔에서 알미늄 미립자 제조장치 | |
CN205056112U (zh) | 防堵塞的样品破碎机 | |
CN102284324B (zh) | 一种铁基合金的粉碎系统 | |
CN113145247A (zh) | 一种原料粉碎装置及其使用方法 | |
KR200433588Y1 (ko) | 다용도 분쇄 장치 | |
CN102126264B (zh) | 内外筒微细粉碎机 | |
CN206104036U (zh) | 有机肥快速粉碎筛分机 | |
JP2001104928A (ja) | 合わせガラスよりガラスと中間膜とに分離回収する装置 | |
CN2887561Y (zh) | 塑料粉碎机 | |
JP2007216091A (ja) | 粉砕機 | |
JP2000237616A (ja) | 繊維含有材料の縦型粗粉砕装置及びその刃物構造 | |
CN205008081U (zh) | 离心水冷式超微粉碎机 | |
KR101342401B1 (ko) | 고속분쇄 도정장치를 이용한 알루미늄 그래뉼 리사이클링 공정 | |
CN203663958U (zh) | 一种高油脂物料粉碎装置 | |
JPH08229420A (ja) | 竪型粉砕機 | |
CN221268423U (zh) | 一种用于橡胶制品制备的粉碎处理装置 | |
JP2010221128A (ja) | パチンコ機用前面ガラスの処理装置 | |
KR200254467Y1 (ko) | 재활용 캔 분쇄장치 | |
CN208959978U (zh) | 一种大米粉碎装置 | |
CN2900128Y (zh) | 塑料粉碎机 | |
CN220242104U (zh) | 塑料粉碎机 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
A302 | Request for accelerated examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20130226 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20140225 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20160510 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20170224 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20180605 Year of fee payment: 10 |
|
FPAY | Annual fee payment |
Payment date: 20190425 Year of fee payment: 11 |