KR100854806B1 - Deck plate - Google Patents

Deck plate Download PDF

Info

Publication number
KR100854806B1
KR100854806B1 KR1020070051703A KR20070051703A KR100854806B1 KR 100854806 B1 KR100854806 B1 KR 100854806B1 KR 1020070051703 A KR1020070051703 A KR 1020070051703A KR 20070051703 A KR20070051703 A KR 20070051703A KR 100854806 B1 KR100854806 B1 KR 100854806B1
Authority
KR
South Korea
Prior art keywords
deck plate
concrete structure
reinforcement
pie
steel wire
Prior art date
Application number
KR1020070051703A
Other languages
Korean (ko)
Inventor
명근학
이기열
송광식
Original Assignee
명근학
이기열
송광식
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 명근학, 이기열, 송광식 filed Critical 명근학
Priority to KR1020070051703A priority Critical patent/KR100854806B1/en
Application granted granted Critical
Publication of KR100854806B1 publication Critical patent/KR100854806B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/28Concrete reinforced prestressed
    • E01D2101/285Composite prestressed concrete-metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

A deck plate reinforced by a PS wire and attached with a pi-shaped reinforcement is provided to make inspection and maintenance easy, to prevent shear cracks effectively, to exclude the additional arrangement of shear bars, and to prevent the formation of cracks by compressive stress pre-applied by PS steel. A deck plate reinforced by a PS wire and attached with a pi-shaped reinforcement comprises a concrete structure(10) forming the external appearance of a deck plate, a PS wire(20) generating compressive stress to the concrete structure, and a pi-shaped reinforcement(30) projected from the concrete structure to function as a shear reinforcement and to arrange slab bars at the top.

Description

피에스 강선으로 보강되고 파이형 보강재가 설치된 데크 플레이트{DECK PLATE}Deck plate reinforced with P.S steel wire and installed with pie type reinforcement {DECK PLATE}

도 1은 종래 데크 플레이트의 설치 단면도, 1 is a cross-sectional view of the conventional deck plate,

도 2는 본 발명에 따른 데크 플레이트의 사시도, 2 is a perspective view of the deck plate according to the present invention,

도 3은 본 발명에 따른 데크 플레이트의 부분 단면도이다. 3 is a partial cross-sectional view of a deck plate according to the present invention.

*도면의 주요부분에 대한 부호의 설명** Description of the symbols for the main parts of the drawings *

10: 콘크리트 구조체10: concrete structure

11: 오목부11: recess

12: 볼록부12: convex

20: 피에스(PS) 강선20: PS liner

30: 파이형 보강재30: pie reinforcement

31: 안착부31: seating part

본 발명은 피에스 강선으로 보강되고 파이형 보강재가 설치된 데크 플레이트 에 관한 것으로, 더욱 상세하게는 점검 및 유지보수가 용이하고 전단균열을 효과적으로 방지하며 전단철근을 추가로 배치할 필요가 없으며 피에스 강재에 의해 사전 도입되는 압축응력에 의해 균열을 방지할 수 있도록 한 피에스 강선으로 보강되고 파이형 보강재가 설치된 데크 플레이트에 관한 것이다. The present invention relates to a deck plate reinforced with a PS steel wire and installed with a pie-shaped reinforcement, and more particularly, is easy to check and maintain, effectively prevents shear cracking, and does not require additional arrangement of shear reinforcing bars. The present invention relates to a deck plate reinforced with a PI steel wire and provided with a pie-shaped reinforcement to prevent cracking by pre-introduced compressive stress.

일반적으로 교량 시공시 주로 구조용 프레임과 프레임 사이에 철판으로 구성된 요철형 데크 플레이트를 횡설하고, 데크 플레이트 상에 콘크리트를 타설하게 된다(도 1 참조).In general, during bridge construction, the uneven deck plate composed mainly of steel plates is laid between the structural frame and the frame, and concrete is poured on the deck plate (see FIG. 1).

이에 따라, 시공 후 콘크리트 구조물의 상태, 즉 균열이나 변형 등이 발생하더라도 데크 플레이트가 콘크리트 구조물의 저면에 위치함으로써 육안으로 이를 확인하거나 발견하기가 곤란하여 교량의 점검 및 유지보수에 많은 어려움이 있었다. Accordingly, even after the construction, even if the state of the concrete structure, that is, cracks or deformations, since the deck plate is located on the bottom of the concrete structure, it is difficult to check or find it with the naked eye, and thus there are many difficulties in checking and maintaining the bridge.

또한, 전단보강철근 및 슬래브 상부 철근을 추가로 배치하여야 하는 시공상의 번거로움이 있었다. In addition, there was a construction trouble to additionally arrange the shear reinforcing bar and the slab upper bar.

본 발명은 상기의 종래 문제점을 해결하기 위하여 안출된 것으로, 그 목적은 점검 및 유지보수가 용이하고 전단균열을 효과적으로 방지하며 전단철근을 추가로 배치할 필요가 없을 뿐만 아니라 피에스 강재에 의해 사전 도입되는 압축응력에 의해 균열을 방지할 수 있도록 한 피에스 강선으로 보강되고 파이형 보강재가 설치된 데크 플레이트를 제공하는 데 있다. The present invention has been made to solve the above conventional problems, the purpose of which is easy to check and maintain, effectively prevent shear cracking and do not need to arrange additional shear rebar, as well as being introduced in advance by the steel The present invention provides a deck plate reinforced with a PS steel wire and provided with a pie-shaped reinforcement to prevent cracking by compressive stress.

본 발명은 전술한 기술적 과제를 달성하기 위하여, 데크 플레이트의 외관을 형성하는 콘크리트 구조체와, 콘크리트 구조체에 일정 간격으로 배치되되 콘크리트 구조체가 경화되기 전 그 양단에 인장력이 가해지고 경화된 후 콘크리트 구조체가 압축응력을 갖도록 인장력이 제거되는 피에스 강선 및, 콘크리트 구조체로부터 돌출되어 전단 보강재의 역할 및 그 상측에 슬래브 철근을 배근할 수 있도록 파이형 보강재가 구비된 것을 특징으로 한다. The present invention, in order to achieve the above technical problem, the concrete structure to form the appearance of the deck plate, and the concrete structure is disposed at a predetermined interval, but the concrete structure after the tensile force is applied to both ends before the concrete structure is cured It is characterized in that the PI steel wire is removed from the tensile force to have a compressive stress, and the pie type reinforcement to protrude from the concrete structure and to reinforce the slab reinforcement on the upper side.

또한, 파이형 보강재는 피에스 강선 중 양측에 위치한 강선에 그 하단부가 각각 결속되고 그 상단부가 콘크리트 구조체로부터 돌출되되 슬래브 철근을 배근할 수 있도록 안착부가 형성된 것을 특징으로 한다. In addition, the pie-shaped reinforcement is characterized in that the bottom portion is bound to each of the steel wires of the PS steel wire and the upper end protrudes from the concrete structure, the seating portion is formed so as to reinforce the slab reinforcement.

그리고 콘크리트 구조체는 연속적으로 설치할 시 상호 기밀성을 갖도록 일측 연결면에 오목부가 형성되고 타측 연결면에 볼록부가 형성된 것을 특징으로 한다.And the concrete structure is characterized in that the concave portion is formed on one side connection surface and the convex portion is formed on the other connection surface to have mutual airtightness when installed continuously.

이하, 첨부도면을 참조하여 본 발명에 따른 피에스 강선으로 보강되고 파이형 보강재가 설치된 데크 플레이트(이하, '데크 플레이트'라 한다)의 바람직한 실시 예를 상세히 설명한다. Hereinafter, with reference to the accompanying drawings will be described in detail a preferred embodiment of the deck plate (hereinafter referred to as "deck plate") is reinforced with the PS steel wire and the pie-shaped reinforcement is installed according to the present invention.

도 2는 본 발명에 따른 데크 플레이트의 사시도, 도 3은 본 발명에 따른 데크 플레이트의 부분 단면도이다. 2 is a perspective view of the deck plate according to the present invention, Figure 3 is a partial cross-sectional view of the deck plate according to the present invention.

먼저, 도 1 및 2에 도시한 바와 같이 본 발명에 따른 데크 플레이트는 크게 데크 플레이트의 외관을 형성하는 콘크리트 구조체(10)와, 콘크리트 구조체(10)에 압축응력을 발생시키기 위한 피에스 강선(20) 및, 콘크리트 구조체(10)로부터 돌출 되어 그 상단부에 전단 보강재의 역할 및 슬래브 철근(미도시)을 배근할 수 있도록 된 파이형 보강재(30)로 이루어진다. 미설명부호 40은 데크 플레이트의 연속 설치 후 끝단에 위치되는 마감재이다. First, as shown in FIGS. 1 and 2, the deck plate according to the present invention has a concrete structure 10 that largely forms an exterior of the deck plate, and a PS steel wire 20 for generating compressive stress in the concrete structure 10. And, protruding from the concrete structure 10 is composed of a pie-shaped reinforcement (30) to be able to reinforce the role of shear reinforcement and the slab reinforcement (not shown) on the upper end. Reference numeral 40 is a finishing material located at the end after the continuous installation of the deck plate.

상기의 기술적 구성 중 피에스 강선(20)은 콘크리트 구조체(10)에 압축응력을 발생시켜 콘크리트 구조체(10)의 균열을 방지하기 위한 것으로, 이를 위하여 콘크리트 구조체(10)를 성형하기 위한 거푸집(미도시) 내에 일정 간격으로 피에스 강선(20)을 배치하고, 그 양단에 인장력을 가한 다음 거푸집 내에 타설된 콘크리트가 경화되면 피에스 강선(20)에 가해진 인장력을 제거한다. The PS steel wire 20 of the above technical configuration is to prevent the crack of the concrete structure 10 by generating a compressive stress on the concrete structure 10, for this purpose formwork for forming the concrete structure (10) The PS steel wire 20 is disposed at regular intervals in), and a tensile force is applied to both ends thereof, and then when the concrete poured in the form is hardened, the tensile force applied to the PS steel wire 20 is removed.

이에 따라, 콘크리트 구조물(10)과 일체로 고착된 피에스 강선(20)의 수축작용에 의해 콘크리트 구조체(10)는 압축응력을 갖게 된다. Accordingly, the concrete structure 10 has a compressive stress by the contracting action of the PS steel wire 20 fixed to the concrete structure 10 integrally.

상기의 기술적 구성 중 파이형 보강재(30)는 콘크리트 구조체(10)와 슬래브를 일체로 형성시켜 전단 저항 능력을 갖도록 하기 위한 것으로, 이를 위하여 피에스 강선(20) 중 양측에 위치한 강선에 그 하단부가 각각 결속되고 그 상단부가 콘크리트 구조체(10)로부터 돌출되며 슬래브 철근을 배근할 수 있도록 그 상단에 안착부(31)가 형성된다. Pie-shaped reinforcement 30 of the above technical configuration is to form a concrete structure 10 and the slab integrally to have a shear resistance capability, for this purpose, the lower end of each of the steel wires located on both sides of the PS steel wire 20 A binding portion 31 is formed at the upper end thereof so that the upper end thereof may protrude from the concrete structure 10 and reinforce the slab reinforcement.

이에 따라, 콘크리트를 타설하여 슬래브를 완성할 시 파이형 보강재(30)에 의해 데크 플레이트와 슬래브는 일체로 견고히 구축되고, 교량 하부를 구성하는 데크 플레이트의 압축 상항력에 의해 교량 상판을 떠받치는 효과를 가져 옴으로써 교량에 하중이 작용하더라도 내균열성을 갖게 된다. Accordingly, when the slab is completed by placing concrete, the deck plate and the slab are firmly built by the pie-shaped reinforcement 30, and the bridge deck plate is supported by the compression lifting force of the deck plate constituting the lower bridge. By bringing, it has crack resistance even if load is applied to bridge.

한편, 데크 플레이트는 교량 구조용 프레임과 프레임 사이에 연속적으로 설 치되는데, 콘크리트 타설시 데크 플레이트와 데크 플레이트 사이의 틈으로 콘크리트가 흘러내리는 것을 방지할 수 있도록 콘크리트 구조체(10)의 일측 연결면에 오목부(11)가 형성되고 타측 연결면에 볼록부(12)가 형성된다. Meanwhile, the deck plate is continuously installed between the frame for the bridge structure and the frame, and concave on one side of the concrete structure 10 to prevent the concrete from flowing down into the gap between the deck plate and the deck plate when the concrete is placed. The part 11 is formed and the convex part 12 is formed in the other connection surface.

이에 따라, 데크 플레이트의 오목부(11)에 타 데크 플레이트의 볼록부(12)가 위치함으로써, 상호 끼워 맞춰 조립되고 그 결과 데크 플레이트와 데크 플레이트 간 상호 기밀성을 갖게 된다. As a result, the convex portions 12 of the other deck plates are positioned in the recesses 11 of the deck plate, whereby they are assembled to each other, resulting in mutual airtightness between the deck plate and the deck plate.

그리고 본 발명에 따른 데크 플레이트는 그 자체가 일체형 콘크리트 구조체(10)로서, 균열이나 변형 등이 발생할 경우 육안으로 쉽게 확인하거나 발견할 수 있어 점검 및 유지보수가 매우 용이하다. And the deck plate according to the present invention itself is an integrated concrete structure 10, when cracks or deformation occurs, it can be easily identified or found with the naked eye is very easy to check and maintain.

이상에서 상세히 설명한 바와 같이, 본 발명에 따르면 콘크리트 구조체로 제작되어 설치시 교량 하부에 그대로 드러나 균열이나 변형 발생시 육안으로 쉽게 확인하거나 발견할 수 있고, 그에 따라 점검 및 유지보수가 매우 용이하다는 효과가 있다. As described in detail above, according to the present invention is made of a concrete structure is exposed to the lower portion of the bridge during installation, it is easy to check or find with the naked eye when cracks or deformation occurs, there is an effect that the inspection and maintenance is very easy accordingly. .

또한, 본 발명은 내재된 피에스 강선에 의해 콘크리트 구조체에 압축응력이 작용하고, 파이형 보강재에 의해 슬래브와 일체로 구축되며 전단보강철근의 역할을 수행함으로써 전단균열을 효과적으로 방지할 수 있다는 효과가 있다. In addition, the present invention has the effect that the compressive stress acts on the concrete structure by the intrinsic PS steel wire, is integrally constructed with the slab by the pie-shaped reinforcement and can effectively prevent shear cracking by performing the role of shear reinforcing steel. .

Claims (3)

데크 플레이트에 있어서, In deck plate, 데크 플레이트의 외관을 형성하는 콘크리트 구조체와,A concrete structure forming the exterior of the deck plate, 상기 콘크리트 구조체에 일정 간격으로 배치되되 상기 콘크리트 구조체가 경화되기 전 그 양단에 인장력이 가해지고 경화된 후 상기 콘크리트 구조체가 압축응력을 갖도록 인장력이 제거되는 피에스 강선 및,PS steel wire which is disposed on the concrete structure at regular intervals, but the tensile force is applied to both ends before the concrete structure is cured, and the tensile force is removed so that the concrete structure has a compressive stress after curing. 상기 콘크리트 구조체로부터 돌출되어 전단보강철근의 역할 및 그 상측에 슬래브 철근을 배근할 수 있도록 파이형 보강재가 구비된 것을 특징으로 하는 피에스 강선으로 보강되고 파이형 보강재가 설치된 데크 플레이트. The deck plate protruded from the concrete structure is provided with a PI-type reinforcement, characterized in that the reinforcing bar to reinforce the role of the shear reinforcement and the slab reinforcement on the upper side of the deck plate and the pie-shaped reinforcement is installed. 제 1항에 있어서, The method of claim 1, 상기 파이형 보강재는 상기 피에스 강선 중 양측에 위치한 강선에 그 하단부가 각각 결속되고 그 상단부가 상기 콘크리트 구조체로부터 돌출되되 전단보강철근의 역할 및 슬래브 철근을 배근할 수 있도록 안착부가 형성된 것을 특징으로 하는 피에스 강선으로 보강되고 파이형 보강재가 설치된 데크 플레이트. The pie-shaped reinforcement is characterized in that the lower end is bound to each of the steel wires located on both sides of the PS steel wire and the upper end is protruded from the concrete structure, the role of shear reinforcing reinforcement and the seating portion is formed so as to reinforce the slab reinforcement Deck plate reinforced with steel wire and installed with pi reinforcement. 제 1항에 있어서,The method of claim 1, 상기 콘크리트 구조체는 연속적으로 설치할 시 상호 기밀성을 갖도록 일측 연결면에 오목부가 형성되고 타측 연결면에 볼록부가 형성된 것을 특징으로 하는 피에스 강선으로 보강되고 파이형 보강재가 설치된 데크 플레이트.The concrete structure is a deck plate is reinforced with a pie steel reinforcement and pie type reinforcement, characterized in that the concave portion is formed on one side connection surface and the convex portion is formed on the other connection surface to have mutual airtightness when continuously installed.
KR1020070051703A 2007-05-28 2007-05-28 Deck plate KR100854806B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020070051703A KR100854806B1 (en) 2007-05-28 2007-05-28 Deck plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070051703A KR100854806B1 (en) 2007-05-28 2007-05-28 Deck plate

Publications (1)

Publication Number Publication Date
KR100854806B1 true KR100854806B1 (en) 2008-08-27

Family

ID=39878779

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070051703A KR100854806B1 (en) 2007-05-28 2007-05-28 Deck plate

Country Status (1)

Country Link
KR (1) KR100854806B1 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07247610A (en) * 1994-03-14 1995-09-26 Ohbayashi Corp Beam for building using pc wall
KR19980073221A (en) * 1997-03-12 1998-11-05 최훈 Construction method using precast concrete beam members
JPH11152711A (en) 1997-11-25 1999-06-08 Nippon Light Metal Co Ltd Floor slab for structure
KR100593663B1 (en) 2004-09-07 2006-06-26 한국건설기술연구원 Connection method for composite slab
KR100619233B1 (en) * 2004-07-01 2006-09-01 삼성물산 주식회사 Post-tensioned precast concrete structure and a building constructed by using the same and method for constructing a building
KR100720067B1 (en) * 2006-04-13 2007-05-18 오창열 Construction method of composition beam for using arched plate

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07247610A (en) * 1994-03-14 1995-09-26 Ohbayashi Corp Beam for building using pc wall
KR19980073221A (en) * 1997-03-12 1998-11-05 최훈 Construction method using precast concrete beam members
JPH11152711A (en) 1997-11-25 1999-06-08 Nippon Light Metal Co Ltd Floor slab for structure
KR100619233B1 (en) * 2004-07-01 2006-09-01 삼성물산 주식회사 Post-tensioned precast concrete structure and a building constructed by using the same and method for constructing a building
KR100593663B1 (en) 2004-09-07 2006-06-26 한국건설기술연구원 Connection method for composite slab
KR100720067B1 (en) * 2006-04-13 2007-05-18 오창열 Construction method of composition beam for using arched plate

Similar Documents

Publication Publication Date Title
KR101921715B1 (en) Precast concrete panel, manufacturing method of the precast concrete panel and slab construction method using the precast concrete panel
KR20090050520A (en) Libbed half pc slab and manufacturing method of the same
KR101064731B1 (en) Steel-concrete composite girder and constructing method thereof
KR20100012404A (en) Half pc slab having closed lib
KR101328045B1 (en) Reinforced concrete composite columns using precast high-performance fiber-reinforced cement
KR100704055B1 (en) continuous steel bridge having precast concrete slab and construction method thereof
KR20130077191A (en) Prestressed concrete girder with half-depth cantilever and construction method using the same
KR102170635B1 (en) Libbed half PC slab
KR101067717B1 (en) Process for producing prestressed concrete girder and concrete girder structure
KR100854806B1 (en) Deck plate
KR101602155B1 (en) A deck structure
KR100989153B1 (en) Psc girder connection structure with strength connector detail for substitution of rebar placement in deck and bridge construction method using the same
KR101610442B1 (en) Framework for Prestressed concrete girder
KR102210695B1 (en) Precast concrete block for arch structure construction and arch structure using the block and its construction method
KR101688440B1 (en) Reinforcement Member for Beam, Beam Equipped with the Reinforcement Member, Construction Structure Using the Beam
KR101447537B1 (en) Precast slab connection method using connection module
KR101057409B1 (en) Hollow prestressed concrete girder and method for manufacturing thereof
KR101492066B1 (en) Construction method for foundation structure of column
KR101381974B1 (en) Concrete deck slab assembly, Method for making the same and Temporary bridge using the same
KR101888001B1 (en) Superstructure of Girder Bridge, and Constructing Method thereof
JP2019132070A (en) Precast floor slab for replacing pc composite girder and replacing method for pc composite girder precast floor slab
JP5781873B2 (en) Bridge girder
KR101022249B1 (en) Manufacturing method of wall type rahmen bridge
KR102644063B1 (en) Truss girder form for bridge slab construction
KR102445426B1 (en) Apparatus for integrating precast concrete bridge deck with bridge girder using ultra high performance concrete reinforced by steel fiber

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130814

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20140623

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20150819

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20160816

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20190923

Year of fee payment: 12