KR100851675B1 - A watertight connection structure for drainpipe coupling and that production method - Google Patents

A watertight connection structure for drainpipe coupling and that production method Download PDF

Info

Publication number
KR100851675B1
KR100851675B1 KR1020060125523A KR20060125523A KR100851675B1 KR 100851675 B1 KR100851675 B1 KR 100851675B1 KR 1020060125523 A KR1020060125523 A KR 1020060125523A KR 20060125523 A KR20060125523 A KR 20060125523A KR 100851675 B1 KR100851675 B1 KR 100851675B1
Authority
KR
South Korea
Prior art keywords
molding
mold
molded product
connector
blow molding
Prior art date
Application number
KR1020060125523A
Other languages
Korean (ko)
Other versions
KR20080053682A (en
Inventor
김학건
Original Assignee
김학건
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김학건 filed Critical 김학건
Priority to KR1020060125523A priority Critical patent/KR100851675B1/en
Publication of KR20080053682A publication Critical patent/KR20080053682A/en
Application granted granted Critical
Publication of KR100851675B1 publication Critical patent/KR100851675B1/en

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L21/00Joints with sleeve or socket
    • F16L21/02Joints with sleeve or socket with elastic sealing rings between pipe and sleeve or between pipe and socket, e.g. with rolling or other prefabricated profiled rings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C33/00Moulds or cores; Details thereof or accessories therefor
    • B29C33/38Moulds or cores; Details thereof or accessories therefor characterised by the material or the manufacturing process

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Blow-Moulding Or Thermoforming Of Plastics Or The Like (AREA)

Abstract

본 발명은 하수관 연결구용 수밀 연결구조 및 그 제조방법에 관한 것으로, 더욱 상세하게는 브로워 몰딩에 원료를 주입하여 1차 성형품을 성형하고 성형금형에 1차 성형품을 공급하여 벌림금형으로 원하는 형태의 완제품인 관 연결구를 성형할 수 있도록 하여 견고하며 수밀이 안전하게 유지되도록 연결할 수 있는 하수관 연결구용 수밀 연결구조 및 그 제조방법에 관한 것이다.The present invention relates to a watertight connection structure for a sewer pipe connector and a manufacturing method thereof, and more particularly, to a primary molding product by injecting a raw material into a blow molding, and to supplying the primary molding product to a molding mold, the finished product having a desired shape as an open mold. The present invention relates to a watertight connection structure for a sewer pipe connector, and a method of manufacturing the same, which enables to form a phosphorous pipe connector so that the connection can be made to be robust and secure.

이러한 본 발명은 연결구의 양측으로 하수관(30, 31)을 삽입하여 고무링으로 수밀이 유지되도록 연결하는 연결구조에 있어서,In the present invention, in the connection structure for connecting so that the watertight is maintained by the rubber ring by inserting the sewer pipe (30, 31) to both sides of the connector,

브로워 몰딩(50)에서 1차 성형품(60)을 성형하고 성형금형(70)에서 벌림금형(71)으로 2차 성형하여 완제품(40)을 성형하되, 가로 방향과 세로 방향에 반원형으로 보강돌기(11)를 갖고 그 양측에 고무링(14)이 삽입되는 링홈(13)을 형성하며, 양측 선단에는 외측으로 경사지게 돌출된 경사홈(12)을 갖도록 성형함을 특징으로 하는 것이다.The primary molded product 60 is molded in the blow molding 50, and the molded product 70 is secondarily formed from the molding mold 70 to the open mold 71, but the reinforcement protrusions are formed in a semicircle in the horizontal and vertical directions ( 11) having a ring groove 13 into which the rubber ring 14 is inserted at both sides thereof, and is formed to have inclined grooves 12 protruding outwardly at both ends thereof.

관 연결구, 연결관, 하수관 Pipe connector, connector, sewer pipe

Description

하수관 연결구용 수밀 연결구조 및 그 제조방법{A watertight connection structure for drainpipe coupling and that production method}A watertight connection structure for drainpipe coupling and that production method}

도 1 은 본 발명의 브로워 몰딩에 대한 단면도1 is a cross-sectional view of a blow molding of the present invention.

도 2 는 본 발명의 브로워 몰딩에 원료를 공급하는 상태의 단면도2 is a cross-sectional view of a state in which raw materials are supplied to a blow molding of the present invention.

도 3 은 본 발명의 브로워 몰딩에 에어를 주입하여 성형하는 상태의 단면도3 is a cross-sectional view of a state of molding by injecting air into the blow molding of the present invention

도 4 는 본 발명의 도 3 에 대한 주요부분의 확대 단면도4 is an enlarged cross-sectional view of the main part of FIG. 3 of the present invention;

도 5 는 본 발명의 1차 성형품에 대한 단면도5 is a cross-sectional view of the primary molded product of the present invention

도 6 은 본 발명의 1차 성형품을 성형금형에 삽입한 상태의 단면도6 is a cross-sectional view of a state in which the primary molded product of the present invention is inserted into a molding mold.

도 7 은 본 발명의 성형금형에 대한 조립상태의 단면도Figure 7 is a cross-sectional view of the assembled state of the molding die of the present invention

도 8 은 본 발명의 성형금형에 벌림금형을 조립하는 상태의 단면도8 is a cross-sectional view of a state of assembling the open mold to the molding mold of the present invention.

도 9 는 본 발명의 벌림금형에 대한 삽입상태 단면도Figure 9 is a cross-sectional view of the insertion state of the opening mold of the present invention

도 10 은 본 발명의 벌림금형에 대한 작동상태 단면도10 is a cross-sectional view of an operating state of the opening mold of the present invention.

도 11은 본 발명의 벌림금형으로 완성한 연결구의 요부확대 단면도Figure 11 is an enlarged cross-sectional view of the main portion of the connector completed by the opening mold of the present invention

도 12 는 본 발명의 관 연결구에 대한 분리 사시도Figure 12 is an exploded perspective view of the tube connector of the present invention

도 13 은 본 발명의 관 연결구에 대한 단면도13 is a cross-sectional view of the tube connector of the present invention.

도 14 는 본 발명의 관 연결구에 대한 요부확대 단면도Figure 14 is an enlarged cross-sectional view of the main part of the pipe connector of the present invention

도 15 는 본 발명의 관 연결구에 하수관을 삽입한 상태의 요부확대 단면도Figure 15 is an enlarged cross-sectional view of the main portion of the sewer pipe inserted into the pipe connector of the present invention.

[도면의 주요 부분에 대한 부호의 설명][Description of Symbols for Main Parts of Drawing]

10 : 관 연결구 11 : 보강돌기10: pipe connector 11: reinforcement protrusion

12 : 경사홈 13 : 링홈12: inclined groove 13: ring groove

14 : 고무링 15 : 테프론14: rubber ring 15: teflon

16 : 고정돌기 17 : 밀폐돌기16: fixing protrusion 17: sealing protrusion

18 : 요철돌기 40 : 완제품18: uneven protrusions 40: finished product

50 : 보로워 몰딩 51 : 주입구 50: boring molding 51: injection hole

52 : 원료 60 : 1차 성형품52: raw material 60: primary molded product

70 : 성형금형 71 : 벌림금형70: molding mold 71: opening mold

본 발명은 하수관 연결구용 수밀 연결구조 및 그 제조방법에 관한 것으로, 더욱 상세하게는 브로워 몰딩에 원료를 주입하여 1차 성형품을 성형하고 성형금형에 1차 성형품을 공급하여 벌림금형으로 원하는 형태의 완제품인 관 연결구를 성형할 수 있도록 하여 견고하며 수밀이 안전하게 유지되도록 연결할 수 있는 하수관 연결구용 수밀 연결구조 및 그 제조방법에 관한 것이다.The present invention relates to a watertight connection structure for a sewer pipe connector and a manufacturing method thereof, and more particularly, to a primary molding product by injecting a raw material into a blow molding, and to supplying the primary molding product to a molding mold, the finished product having a desired shape as an open mold. The present invention relates to a watertight connection structure for a sewer pipe connector, and a method of manufacturing the same, which enables to form a phosphorous pipe connector so that the connection can be made to be robust and secure.

일반적으로 하수관은 내부에 하나의 중공이 형성된 프로파일을 나선형으로 공급하여 성형하는 이중벽 하수관, 다수의 중공과 열십자형의 보강대가 형성된 프로파일을 나선형으로 공급하여 성형하는 복층벽 하수관, 채워진 프로파일을 나선형으로 공급하여 성형하는 적층벽 하수관, 단일구조 또는 다양한 형상이나 이중 또는 삼중구조로 압출에 의해 성형하는 하수관 등 다양한 하수관이 제공되고 있으며, 이러한 다양한 하수관은 주로 지하에 매설되어 하수나 오폐수 등 다양한 액체류를 공급하는데 사용하고 있다.In general, the sewer pipe is a double wall sewer pipe that is formed by spirally supplying a profile in which one hollow is formed, and a multi-walled sewer pipe that is formed by spirally supplying a profile in which a plurality of hollow and crisscross reinforcements are formed. Various sewer pipes are provided, such as laminated wall sewer pipes that are formed by molding, and sewage pipes that are formed by extrusion into a single structure or various shapes or double or triple structures, and these various sewer pipes are mainly buried underground to supply various liquids such as sewage and wastewater. We use to

이러한 하수관을 연결하기 위한 다양한 관 연결구가 제안된 바 있으나 이러한 관 연결구는 사출성형하는 것이므로 안전성을 향상시키기 위하여 매우 두꺼운 형태로 성형하게 되므로 사출 후 냉각하는 것이 어렵고, 냉각시간의 소모가 많아서 냉각되는 동안 수축이 발생하여 외부의 기온에 따라서 정확한 치수의 제품을 제공할 수 없는 결점이 있었다.Various pipe connectors have been proposed for connecting such sewer pipes, but since these pipe connectors are injection molded, they are molded in a very thick form to improve safety, so it is difficult to cool after injection, and it takes a lot of cooling time while cooling. Shrinkage occurred and there was a drawback that it was not possible to provide products of the correct dimensions depending on the outside temperature.

그리고 최근에는 연결구의 내부에 고무링을 삽입하고 양측에서 하수관을 삽입하는 연결방법이 사용되고 있다.In recent years, a connection method for inserting a rubber ring into a connector and inserting a sewer pipe from both sides has been used.

그러나 이러한 연결방법은 하수관을 삽입하기가 어려울 뿐만 아니라 하수관이 원료의 특성상 외경이 일정하게 유지되지 못하여 삽입한 후 많은 공간으로 수밀의 유지가 어려운 결점이 발생하게 되었다.However, this connection method is not only difficult to insert the sewage pipe, but the sewage pipe is difficult to maintain the watertight in many spaces after inserting because the outer diameter is not kept constant due to the characteristics of the raw material.

그리고 연결구는 사출성형에 의해 제조하는 것이므로 원하는 형상을 제대로 제공할 수 없으며, 고무링을 견고하게 설치할 수 없으므로 접착제를 이용하여 고정 하는 경우에도 하수관을 삽입할 때 설치 위치가 변경되어 제대로 누수를 방지할 수 없는 것이었다.And since the connector is manufactured by injection molding, it can't provide the desired shape properly and the rubber ring can't be installed firmly, so even when fixing with adhesive, the installation position is changed when inserting the sewer pipe to prevent leakage. I could not.

본 발명은 이러한 종래의 결점을 해소하기 위하여 안출된 것으로, 관 연결구를 사출성형하지 않고 브로워 몰딩으로 성형하여 요구하는 다양한 형상을 성형하여 하수관의 삽입 후 고무링으로만 수밀이 유지되는 연결구를 제공함을 목적으로 한다.The present invention has been made to solve the above-mentioned drawbacks, and to provide a connector that is maintained watertight only by the rubber ring after the insertion of the sewage pipe by molding the various shapes required by molding the tube connector by blow molding without injection molding. The purpose.

본 발명은 관 연결구를 브로워 몰딩으로 성형할 때 정확한 형상과 모양으로 성형되지 않으므로 브로워 몰딩으로 1회 성형한 후 성형금형에 1차 성형품을 공급하여 벌림금형으로 한번 더 성형하는 작업을 통하여 원하는 형태의 안정되고 견고하며 정확한 관 연결구를 제공함을 목적으로 한다.The present invention is not molded into the exact shape and shape when forming the pipe connector by the blow molding, so once molded by the blow molding after supplying the primary molded product to the molding die once more through the operation of forming the open mold of the desired shape Its purpose is to provide stable, robust and accurate pipe connections.

이러한 목적으로 이루어진 본 발명의 바람직한 실시예를 첨부시킨 도면에 따라서 상세하게 설명하기로 한다.According to the accompanying drawings, preferred embodiments of the present invention made for this purpose will be described in detail.

브로워 몰딩(50)으로 1차 성형한 1차 성형품(60)은, 원통형으로 성형하며 중앙을 기준으로 대칭되는 형태를 갖는 것이며, 내부에는 가로 방향과 세로 방향에 반원형으로 돌출하는 다수개의 보강돌기(11)를 형성하여 충격에 강하도록 성형하였다.The primary molded product 60 molded primarily by the blow molding 50 has a cylindrical shape and is symmetrical with respect to the center, and has a plurality of reinforcing protrusions protruding in a semicircle in the horizontal direction and the vertical direction. 11) was formed and molded to resist impact.

상기 1차 성형품(60)은 보강돌기(11)의 외측으로 고무링(14)을 삽입하는 링홈(13)을 형성하되, 외측에서 중앙으로 갈수록 경사지게 돌출되다 선단에서 안쪽으로 경사가 심하게 형성되도록 설치하고, 이 링홈(13)에는 고무링(14)이 각각 독립되게 삽입되도록 한다.The primary molded product 60 forms a ring groove 13 for inserting the rubber ring 14 into the outer side of the reinforcing protrusion 11, but protrudes inclined toward the center from the outside to be inclined inwardly from the front end. And, the rubber ring 14 is inserted into each of the ring groove 13 independently.

상기 고무링(14)은 외측이 링홈(13)에 일치하도록 조립되며, 내경으로는 한 부분에 고정돌기(16)가 돌출되어 하수관(30, 31)의 외경을 감싸고 중심방향으로 그 안쪽에는 비교적 강한 재질로 이루어진 테프론(15)이 설치되어 견고하게 설치위치를 고수하도록 하며, 그 안쪽에는 밀폐돌기(17)가 중심방향을 향하여 경사지게 돌출하되 고정돌기(16)보다 더 크게 돌출되도록 한다.The rubber ring 14 is assembled so that the outer side is coincided with the ring groove 13, the fixing projection 16 protrudes in one part as the inner diameter to surround the outer diameter of the sewage pipes (30, 31) and relatively inside the center direction. Teflon 15 made of a strong material is installed to firmly adhere to the installation position, the inside of the sealing projections 17 to protrude obliquely toward the center direction, so as to project more than the fixing projections (16).

상기 링홈(13)의 외측에는 원주방향으로 요철돌기(18)가 형성되어 보강하는 것이며, 양쪽 선단에는 외측방향으로 갈수록 경사지게 벌어지는 경사홈(12)이 형성되는 것이다.On the outer side of the ring groove 13 is formed in the circumferential convex protrusions 18 to reinforce, and the inclined groove 12 is formed to be inclined toward the outer direction at both ends.

이러한 1차 성형품(60)을 성형하는 브로워 몰딩(50)은, 양측으로 이등분되어 벌어지거나 결합하는 작용을 할 수 있으며, 상측으로 주입구(51)가 형성되어 있어서 원료(52)의 공급으로 성형하는 것이다.The blow molding 50 for molding the primary molded product 60 may be divided into two parts to open and combine, and an injection hole 51 may be formed on the upper side to be molded by the supply of the raw material 52. will be.

1차 성형품(60)은 관 연결구(10)를 성형할 수 있도록 성형금형(70)을 구성하고 이 성형금형(70)의 내부에 1차 성형품(60)을 공급하여 벌림금형(71)의 삽입 후 벌림금형(71)을 벌려 1차 성형품(60)을 재 성형하여 완제품(40)인 관 연결구(10)를 성형할 수 있도록 하는 것이다.The primary molded product 60 constitutes a molding mold 70 so as to mold the pipe connector 10, and supplies the primary molded product 60 to the inside of the molding mold 70 to insert the opening mold 71. After opening the open mold 71 to re-molded the primary molded product 60 to be able to mold the pipe connector 10 which is the finished product (40).

이러한 구성으로 이루어진 본 발명은 한 쌍의 금형으로 형성되며 벌어져 있 는 브로워 몰딩(50)을 도 2 와 같이 조합하여 주입구(51)에 용융수지인 원료(52)를 를 공급하고, 원료(52)의 내부에 공기를 공급하여 1차 성형품(60)을 성형할 수 있는 것이다.The present invention having such a configuration is formed by a pair of molds and the open blow molding 50 is combined as shown in Figure 2 to supply the raw material 52, which is a molten resin to the injection port 51, the raw material 52 By supplying air in the interior of the primary molded product 60 will be able to be molded.

1차 성형품(60)은 성형금형(70)의 내부에 공급한 후 벌림금형(71)을 이용하여 완제품(40)이 관 연결구(10)를 성형하는 것이다.After the primary molded product 60 is supplied into the molding die 70, the finished product 40 molds the pipe connector 10 by using the opening mold 71.

상기 관 연결구(10)는 보강돌기(11)와 링홈(13) 및 경사홈(12)을 동시에 성형하는 것으로 얇게 성형하지만 다양한 보강돌기(11)와 요철돌기(18)에 의해 견고하게 성형할 수 있는 것이다.The pipe connector 10 is formed by forming the reinforcement protrusion 11, the ring groove 13 and the inclined groove 12 at the same time, but can be molded firmly by a variety of reinforcement protrusions 11 and uneven protrusions (18). It is.

관 연결구(10)를 브로워 몰딩에 의해 일체형으로 성형한 후에는 링홈(13)에 테프론(15)이 삽입된 고무링(14)을 삽입하여 공급한다.After the pipe connector 10 is integrally formed by blow molding, the rubber ring 14 having the Teflon 15 inserted therein is supplied to the ring groove 13.

하수관(30, 31)을 연결하는 경우, 관 연결구(10)의 양측에서 하수관(30, 31)을 각각 강제로 삽입한다.When connecting the sewer pipes (30, 31), the sewer pipes (30, 31) are forcibly inserted at both sides of the pipe connector (10), respectively.

하수관(30, 31)이 삽입되면서 고무링(14)의 고정돌기(16)와 밀폐돌기(17)는 하수관(30, 31)의 진입하는 방향으로 경사지게 이동하면서 하수관(30, 31)의 외경에 밀착되어 수밀을 유지할 수 있는 것이다.As the sewer pipes 30 and 31 are inserted, the fixing protrusions 16 and the sealing protrusions 17 of the rubber ring 14 are inclined in the direction in which the sewer pipes 30 and 31 enter, so as to the outer diameters of the sewer pipes 30 and 31. It is able to keep water tightly.

상기 고무링(14)은 강한 재질의 테프론(15)이 설치되어 있고, 링홈(13)이 비교적 깊게 성형되어 있으므로 하수관(30, 31)의 깊은 삽입에도 움직이지 않고 설치된 위치를 안정되게 고수할 수 있는 것이다.Since the rubber ring 14 is provided with a strong material Teflon 15 and the ring groove 13 is formed relatively deep, the rubber ring 14 can stably adhere to the installed position without moving even in the deep insertion of the sewer pipes 30 and 31. It is.

밀폐돌기(17)는 고정돌기(16)에 비하여 높게 돌출되어 있으므로 하수관(30, 31)의 외경에 밀착되어 수밀을 유지할 수 있는 것이다.Since the sealing protrusion 17 protrudes higher than the fixing protrusion 16, the sealing protrusion 17 is in close contact with the outer diameters of the sewer pipes 30 and 31 to maintain the watertightness.

이와 같이 관 연결구(10)의 양측으로 하수관(30, 31)을 강제로 밀어 넣어 조립함으로써 하수관(30, 31)의 연결을 종료할 수 있는 것이다.Thus, by forcibly pushing the sewage pipes 30 and 31 to both sides of the pipe connector 10, the connection of the sewage pipes 30 and 31 can be terminated.

이러한 관 연결구(10)의 제조과정의 바람직한 실시예를 첨부도면에 따라 상세하게 설명하기로 한다.Preferred embodiments of the manufacturing process of such a pipe connector 10 will be described in detail according to the accompanying drawings.

[실시예]EXAMPLE

(1) 금형 설치과정(1) Mold installation process

브로워 몰딩(50)을 성형하여 이등분한 상태로 설치하며, 이등분한 브로워 몰딩(50)을 결합하여 주입구(51)만 개방하고 나머지는 막힌 상태를 유지하도록 한다.Molding the blow molding 50 is installed in a bisected state, by combining the bisected blow molding 50 to open only the inlet 51 and the rest to remain blocked.

(2) 원료의 공급과정(2) Supply process of raw materials

개방한 주입구(51)로 용융수지인 원료(52)를 소정량 공급하고, 주입구(51)를 통하여 외부에서 에어를 공급하면 원료(52)가 브로워 몰딩(50)의 내벽에 달라붙어서 금형의 형상대로 성형이 이루어진다.When a predetermined amount of the raw material 52, which is a molten resin, is supplied to the open inlet 51, and air is supplied from the outside through the inlet 51, the raw material 52 adheres to the inner wall of the blow molding 50, thereby forming a mold. Molding takes place as it is.

그러나 원료(52)로 인하여 성형하는 1차 성형품(60)의 두께가 두꺼워서 한번에 원하는 형태가 성형되지 않게 되므로 완전하게 성형하지 않은 상태로 성형을 종료한다.However, since the thickness of the primary molded product 60 to be formed due to the raw material 52 is so thick that the desired shape is not molded at one time, the molding is finished in a state that is not completely molded.

(3) 1차 성형품 분리과정(3) Primary molded product separation process

브로워 몰딩(50)에 의하여 1차 성형품(60)을 성형한 후에는 브로워 몰딩(50) 을 양측으로 벌린 후 1차 성형품(60)을 분리한다.After the primary molded product 60 is molded by the blow molding 50, the primary molded product 60 is separated after opening the blow molding 50 to both sides.

(4) 1차 성형품 결합과정(4) Joining Process of Primary Molded Products

1차 성형품을 분리한 후 성형금형(70)에 공급하여 2차 성형을 준비하고, 벌림금형(71)을 공급한다.After separating the primary molded product, it is supplied to the molding die 70 to prepare for secondary molding, and the opening mold 71 is supplied.

(5) 완제품 성형과정(5) Finishing process

벌림금형(71)을 성형금형(70)의 내부에 공급하면 그 외측에 1차 성형품(60)이 외측에 위치하고 있게 되므로 성형금형(70)을 외측으로 벌리게 되면 완제품(40)으로 성형이 이루어지는 것이다.When the opening mold 71 is supplied to the inside of the molding mold 70, the primary molded product 60 is located at the outside thereof, so that when the molding mold 70 is spread outward, the molding is formed into the finished product 40. .

여기서 성형금형(70)의 내부에는 나선형으로 파이프를 설치하여 외부에서 가열된 물이나 유류를 연속해서 공급하여 가열이 이루어지도록 함으로써 완제품(40)이 정확하게 성형되어 관 연결구(10)를 공급할 수 있도록 하는 것이다.Here, the molding die 70 is provided with a spiral pipe to continuously supply externally heated water or oil so that the heating is performed so that the finished product 40 can be accurately molded to supply the pipe connector 10. will be.

본 발명은 관 연결구를 사출성형하지 않고 브로워 몰딩으로 1차 성형품을 성형한 후 성형금형에서 벌림금형을 이용하여 완제품을 성형하므로 요구하는 다양한 형상을 성형하여 하수관의 삽입 후 고무링으로만 수밀이 유지되는 관 연결구를 제공하는 것이다.In the present invention, after molding the primary molded product by blow molding without the pipe connector, the finished product is formed by using the open mold in the molding mold, and thus molding various shapes required to maintain watertightness only with the rubber ring after insertion of the sewer pipe. It is to provide a pipe connector.

본 발명은 다양한 형상을 성형하여 공급하므로 얇은 형상으로 성형한 경우에 도 보강돌기에 의해 강도가 향상되어 얇아도 쉽게 파손되지 않는 관 연결구를 제공하는 것이다.The present invention is to provide a pipe connector that is molded and supplied in various shapes, so that even when molded in a thin shape, the strength is improved by the reinforcement projections, so that even when thin is not easily broken.

Claims (2)

연결구의 양측으로 하수관(30, 31)을 삽입하여 고무링으로 수밀이 유지되도록 연결하는 연결구조에 있어서,In the connection structure to connect the sewer pipes (30, 31) to both sides of the connector so that the watertight is maintained by the rubber ring, 브로워 몰딩(50)에서 1차 성형품(60)을 성형하고 성형금형(70)에서 벌림금형(71)으로 2차 성형하여 완제품(40)을 성형하되, 가로 방향과 세로 방향에 반원형으로 다수개의 보강돌기(11)를 형성하고 보강돌기(11) 양측에 고무링(14)이 삽입되는 링홈(13)을 형성하며, 완제품(40)의 양쪽 끝 부분에는 외측방향으로 갈수록 경사지게 벌어지는 경사홈(12)을 성형함을 특징으로 하는 하수관 연결구용 수밀 연결구조. The primary molded product 60 is formed in the blow molding 50, and the molded product 70 is secondarily formed from the molding mold 70 to the open mold 71, but a plurality of reinforcements are formed in a semicircle in the horizontal and vertical directions. Forming a projection 11 and forming a ring groove 13 is inserted into the rubber ring 14 on both sides of the reinforcement projection 11, the inclined groove 12 is inclined toward the outside toward both ends of the finished product 40 Watertight connection structure for sewer pipe connector, characterized in that the molding. 연결구의 양측으로 하수관(30, 31)을 삽입하여 고무링으로 수밀이 유지되도록 연결하는 연결구의 제조방법에 있어서,In the manufacturing method of the connector for connecting so that the watertight is maintained by the rubber ring by inserting the sewer pipes (30, 31) to both sides of the connector, 브로워 몰딩(50)을 성형하여 이등분한 상태로 설치하며, 이등분한 브로워 몰딩(50)을 결합하여 주입구(51)만 개방하고 나머지는 막힌 상태를 유지하는 금형 설치과정과;Forming the blow molding 50 and installing the bi-divided state, and combining the bisecting blow molding 50 to open only the injection hole 51 and the rest of the mold installation process; 개방한 주입구(51)로 용융수지인 원료(52)를 소정량 공급하고, 주입구(51)를 통하여 외부에서 에어를 공급하면 원료(52)가 브로워 몰딩(50)의 내벽에 달라붙어서 금형의 형상대로 성형하는 원료의 공급과정과;When a predetermined amount of the raw material 52, which is a molten resin, is supplied to the open inlet 51, and air is supplied from the outside through the inlet 51, the raw material 52 adheres to the inner wall of the blow molding 50, thereby forming a mold. Supply process of raw materials to be molded into a mold; 브로워 몰딩(50)에 의하여 1차 성형품(60)을 성형한 후에는 브로워 몰딩(50)을 양측으로 벌린 후 1차 성형품(60)을 분리하는 과정과;After molding the primary molded product 60 by the blow molding 50, the process of separating the primary molded product 60 after opening the blow molding 50 to both sides; 1차 성형품(60)을 분리한 후 성형금형(70)에 공급하여 2차 성형을 준비하고, 벌림금형(71)을 공급하는 1차 성형품 결합과정과;Separating the primary molded product 60 and supplying it to the molding mold 70 to prepare for secondary molding, and combining the primary molded product to supply the opening mold 71; 벌림금형(71)을 성형금형(70)의 내부에 공급하면 그 외측에 1차 성형품(60)이 외측에 위치하고 있게 되므로 성형금형(70)을 외측으로 벌려 가로 방향과 세로 방향에 반원형으로 다수개의 보강돌기(11)를 형성하고 보강돌기(11)의 양측에 고무링(14)이 삽입되는 링홈(13)을 형성하며, 양쪽 끝 부분에는 외측방향으로 갈수록 경사지게 벌어지는 경사홈(12)을 갖는 완제품(40)으로 성형함을 특징으로 하는 하수관 연결구용 수밀 연결구 제조방법.When the opening mold 71 is supplied to the inside of the molding mold 70, the primary molded product 60 is located at the outside thereof, so that the molding mold 70 is spread outwards to a plurality of semicircular shapes in the horizontal and vertical directions. Finished product having a reinforcing protrusion 11 and a ring groove 13 is inserted into the rubber ring 14 is inserted into both sides of the reinforcing protrusion 11, the end product having an inclined groove 12 that is inclined toward the outside toward both ends Watertight connector manufacturing method for sewer pipe connector characterized in that the molding to 40.
KR1020060125523A 2006-12-11 2006-12-11 A watertight connection structure for drainpipe coupling and that production method KR100851675B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020060125523A KR100851675B1 (en) 2006-12-11 2006-12-11 A watertight connection structure for drainpipe coupling and that production method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020060125523A KR100851675B1 (en) 2006-12-11 2006-12-11 A watertight connection structure for drainpipe coupling and that production method

Publications (2)

Publication Number Publication Date
KR20080053682A KR20080053682A (en) 2008-06-16
KR100851675B1 true KR100851675B1 (en) 2008-08-13

Family

ID=39800884

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020060125523A KR100851675B1 (en) 2006-12-11 2006-12-11 A watertight connection structure for drainpipe coupling and that production method

Country Status (1)

Country Link
KR (1) KR100851675B1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102339195B1 (en) * 2020-12-14 2021-12-14 한국지역난방공사 Manufacturing device for pipe plugging and water-soluble polymer pipe plugging manufacturing method using the same
CN115122577A (en) * 2022-07-05 2022-09-30 王宏英 But injection molding machine of automatic discharging continuous production

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR19980024401U (en) * 1996-10-31 1998-07-25 양재신 Rigid reinforcement structure of air hose
JPH1137345A (en) 1997-07-24 1999-02-12 Awaji Sangyo Kk Pipe connection method of high strength and connecting device
KR20040034656A (en) * 2004-03-30 2004-04-28 이병상 Pipe coupler
KR200357234Y1 (en) 2004-04-30 2004-07-23 문원기 Pipe jointing structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR19980024401U (en) * 1996-10-31 1998-07-25 양재신 Rigid reinforcement structure of air hose
JPH1137345A (en) 1997-07-24 1999-02-12 Awaji Sangyo Kk Pipe connection method of high strength and connecting device
KR20040034656A (en) * 2004-03-30 2004-04-28 이병상 Pipe coupler
KR200357234Y1 (en) 2004-04-30 2004-07-23 문원기 Pipe jointing structure

Also Published As

Publication number Publication date
KR20080053682A (en) 2008-06-16

Similar Documents

Publication Publication Date Title
US8302620B2 (en) Water inlet/outlet assembly for faucet
KR100851675B1 (en) A watertight connection structure for drainpipe coupling and that production method
CN101932417A (en) Composite products and methods of making same
CN107532761B (en) Two-stage coupling for corrugated tubing
KR100716063B1 (en) One body type for pipe connection
KR100715393B1 (en) One body type for pipe connection
KR100721938B1 (en) Method for producing plastic pipe connecter using double wall drain
KR200265487Y1 (en) Concrete Drain-pipe Having inner Surface Coated with Synthetic Resin
KR200311988Y1 (en) a
EP4253772A1 (en) Fixing assembly
KR200203024Y1 (en) a
KR100854411B1 (en) Collar pipe onebodytype plastic pipe and the manufacturing method
KR200201936Y1 (en) a
KR101183606B1 (en) Molding device of DC double wall pipe and making method thereof
KR100780444B1 (en) A watertight connection structure for drainpipe
WO2023174741A1 (en) Fixing assembly
KR100746555B1 (en) Extension Manifold buffing thermal Expansion for Molding Plastics
KR100620562B1 (en) Method of manufacturing manhole using connecting pipe
JP3762393B2 (en) Manufacturing method for rib pipe joints
KR100435575B1 (en) Joint device of spiral plastic pipe
KR101265770B1 (en) Molding device of DC double wall pipe and making method thereof
CN211145708U (en) Three-way pipe for kitchen and bathroom
EP1053428B1 (en) Pipe section and tool for manufacturing thereof
US20240326368A1 (en) Method of Manufacturing a Restrained Joint Gasket of Adjustable Length
KR200363329Y1 (en) Concrete Duct with Holes

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee