KR100845492B1 - Brake prevention apparatus for forming large quarts dome - Google Patents
Brake prevention apparatus for forming large quarts dome Download PDFInfo
- Publication number
- KR100845492B1 KR100845492B1 KR1020070016156A KR20070016156A KR100845492B1 KR 100845492 B1 KR100845492 B1 KR 100845492B1 KR 1020070016156 A KR1020070016156 A KR 1020070016156A KR 20070016156 A KR20070016156 A KR 20070016156A KR 100845492 B1 KR100845492 B1 KR 100845492B1
- Authority
- KR
- South Korea
- Prior art keywords
- mold
- dome
- quartz
- lower mold
- fixing
- Prior art date
Links
Images
Classifications
-
- C—CHEMISTRY; METALLURGY
- C03—GLASS; MINERAL OR SLAG WOOL
- C03B—MANUFACTURE, SHAPING, OR SUPPLEMENTARY PROCESSES
- C03B23/00—Re-forming shaped glass
- C03B23/0013—Re-forming shaped glass by pressing
-
- C—CHEMISTRY; METALLURGY
- C03—GLASS; MINERAL OR SLAG WOOL
- C03B—MANUFACTURE, SHAPING, OR SUPPLEMENTARY PROCESSES
- C03B20/00—Processes specially adapted for the production of quartz or fused silica articles, not otherwise provided for
-
- C—CHEMISTRY; METALLURGY
- C03—GLASS; MINERAL OR SLAG WOOL
- C03B—MANUFACTURE, SHAPING, OR SUPPLEMENTARY PROCESSES
- C03B23/00—Re-forming shaped glass
- C03B23/02—Re-forming glass sheets
- C03B23/023—Re-forming glass sheets by bending
- C03B23/03—Re-forming glass sheets by bending by press-bending between shaping moulds
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Materials Engineering (AREA)
- Organic Chemistry (AREA)
- Glass Melting And Manufacturing (AREA)
Abstract
Description
도 1 은 일반적인 벨자의 구성을 나타낸 사시도,1 is a perspective view showing the configuration of a typical bell jar,
도 2a 는 종래의 벨자 제조용 석영판의 예비 가공 상태를 나타낸 평면도,2A is a plan view showing a pre-processing state of a conventional quartz plate for bellza production,
도 2b 는 도 2a 에 의한 단위 석영판을 예비 가공한 상태의 사시도,2B is a perspective view of a state in which the unit quartz plate according to FIG. 2A is preliminarily processed;
도 2c 는 도 2c 의 단위 예비 가공 석영판을 용접하여 돔 형상으로 제조한 돔부의 예시도,2C is an exemplary view of a dome portion manufactured by welding the unit pre-processed quartz plate of FIG. 2C to a dome shape;
도 3 은 종래의 벨자를 제조하는 다른 방식을 나타낸 구성도,3 is a configuration diagram showing another method of manufacturing a conventional bell jar,
도 4 는 종래의 다른 방식으로 사용되는 카본몰드의 단면 예시도,4 is a cross-sectional view of a carbon mold used in another conventional manner;
도 5 는 도 4 의 제조 장치를 나타낸 단면도,5 is a sectional view showing the manufacturing apparatus of FIG. 4;
도 6 은 종래의 또 다른 예를 나타낸 구성도,6 is a configuration diagram showing another conventional example;
도 7 은 도 6 에서 하몰드를 나타낸 평면도,7 is a plan view showing a lower mold in FIG.
도 8 은 본 발명의 단면도,8 is a cross-sectional view of the present invention;
도 9 는 본 발명의 평면도이다.9 is a plan view of the present invention.
도면의 주요 부분에 대한 부호의 설명Explanation of symbols for the main parts of the drawings
100;하몰드 101;돔돌부 102;수직부 110;받침링 111;하고정홈 112;하몰드 받 침턱 120;고정폴 130;석영판 131;대형석영돔 140;에지몰드 141;링홈 142;상몰드 받침턱 150;상몰드 151;돔홈 152;수평에지부 153;손잡이부 160;폴고정링 161;상고정홈 100;
본 발명은 반도체 제조용 벨자를 이루는 대형 석영돔의 몰드 성형후 냉각시 파손방지하도록 하몰드가 위로 돌출한 돔돌부를 이루고 상몰드는 아래가 오목한 돔홈을 이루며, 상하몰드 사이에 에지몰드와 석영판을 두고, 하몰드의 테두리는 수직부를 두어 성형완료시, 에지몰드에 의하여 성형물의 직선 구간 형성할 때 상몰드의 테두리 부분이 공간을 두도록 되어, 대형 석영돔의 냉각시 수축 팽창율의 차이로 인한 차이를 공간이 흡수토록 함으로써 석영관의 냉각시 파손을 방지토록 하는 대형 석영돔의 몰드 성형후 냉각시 파손방지장치에 관한 것이다.The present invention forms a domed protrusion protruding from the top of the lower mold to prevent damage during cooling after molding a large quartz dome forming a bell for semiconductor manufacturing. When the molding is completed, the edge of the lower mold has a vertical part, and when the straight section of the molding is formed by the edge mold, the edge of the upper mold has a space. The present invention relates to a device for preventing breakage during cooling after mold molding of a large quartz dome which prevents breakage during cooling of the quartz tube.
일반적으로 석영 제품은 화학적 안정성, 높은 내열성, 높은 광 투시성 및 전기적 안정성 등의 특징을 지녀 전기, 전자,정보통신, 자동차등 산업 전반에 걸쳐 광범위하게 사용되고 있다. 석영 제품은 반도체 제조에도 사용되는바, 모든 반도체생산설비중 각종 전기로에 필요한 벨자 나 아우터튜브(Outer Tube)의 반구형 돔부에 많이 사용된다. 특히 이 재품이 반구형이어야 하는 이유는 모든 반도체의 열처리 조건이 진공상태이어야하므로, 효과적인 진공조건을 이루기 위해서는 튜브의 상부는 반구 형이 효과적인 이유이다. In general, quartz products are widely used in the electrical, electronic, telecommunications, and automotive industries because of their chemical stability, high heat resistance, high light transmission, and electrical stability. Quartz products are also used in semiconductor manufacturing, and are used in the hemispherical dome of Belza or outer tube, which is required for various electric furnaces among all semiconductor production facilities. In particular, the reason for this product to be hemispherical is that all heat treatment conditions of the semiconductor must be vacuum, and the reason why the hemispherical shape is effective at the top of the tube is effective to achieve the effective vacuum condition.
벨자(10)는 도 1 과 같이 관체형 튜브부(11)와, 튜브부(11)의 입구를 이루는 프랜지부(12)와, 튜브부(11)의 상단을 막는 돔부(13)로 이루어진다.The
현재 벨자(10)의 돔부(13)를 제조하는 방식은 도 2a 와 같이 평편한 석영판을 원형으로 절단하고 다시 방사상으로 균등 분할시켜 단위 석영판(1)을 이루게 한다. 단위 삭영판(1)을 각각 도 2b 와 같이 곡면 석영판(2)으로 곡면 성형한다.Currently, the method of manufacturing the
이어 곡면 성형한 곡면 석영판(2)의 측면을 상호 용접하여 돔 형상의 돔부(13)를 이룬 도 2c 형상으로 성형을 완성한다. 이를 도 1 의 돔부(13) 형태로 튜브부(11) 선단에 용접한다.Subsequently, the side surfaces of the
벨자(10)를 만드는 다른 방식으로는 도 3 과 같이 벨자의 내면 형상과 동일한 끼움지그(4)와, 끼움지그(4)를 지지하고 회전시키는 회전수단(5)과, 끼움지그(4)에 끼워지는 튜브형 석영관(6)과, 상기 석영관(6)의 상단을 가열하는 버너(8)와. 상기 석영관(6)의 상단을 끼움지그(4)의 상단 돔 형태를 이루도록 프레싱 하는 프레스 툴(7)로 이루어진다. 그런데 이러한 방식은 돔 부위를 지속적으로 균일한 형태로 성형 작업을 할 수 없어 후처리 가공시 자동화가 않 되어 전적으로 수작업에 의존할 수밖에 없어 생산성이 낮아지고 품질관리에 어려움을 주며 분할작업으로 인한 용접면 증가는 후처리 가공기간을 증가시키는 요인이 된다. 또한 홈을 가지는 링 형 다이에 원판 상의 석영 글래스 판을 안치시키고 돌출형 중량체를 올려놓고 연화점으로 열처리하여 돔형상의 석영돔을 만드는 기술이 일본 공개특허 평 8-295522호에서 알려져 있으나, 단순히 중량체를 올려놓는 것이어서 석영 등의 두께가 일정하 지않는 문제점이 있다.As another method of making the
돔 형상의 홈을 가진 카본 몰드 상단에 석영판을 안치시키고, 진공로 내에 투입한 후 석영판을 연화점 이상으로 가열한 후 프레스로 프레싱 하여 균일한 두께의 돔 형상의 돔부를 제조토록 하는 기술이 알려졌는바, 이는 도 4 와 같이 카본몰드(20) 위에 원형의 석영판(21)을 안치시킨 상태를 나타낸 단면도로, 카본몰드(20)의 상면에 돔홈(22)을 형성시키고, 돔홈(22)을 덮도록 석영판(21)을 안치시킨 구성이다.It is known that a quartz plate is placed on top of a carbon mold having a dome-shaped groove, put into a vacuum furnace, heated to a softening point or more, and then pressed into a press to produce a dome portion having a uniform thickness. Bar, which is a cross-sectional view showing a state in which the
도 5 는 도 4 상태의 카본몰드(20)를 진공로(30) 내에 안치시킨 상태를 나타낸 도면으로, 진공로(30) 내에는 내장한 히터(40)가 외부로 열 발산 하는 것을 차단하는 챔버(50)를 수장하고, 챔버(50) 및 히터(40)는 카본 몰드(20)의 출입을 안내하는 도어수단과 결합한다. 상기 챔버(50) 및 히터(40)의 상단에는 하단에 돔헤드(61)를 가지는 프레스 로드(60)가 안내되도록 하는 안내공(51, 41)을 가지며, 상기 프레스 로드(60)의 상단의 진공로(30) 외부 일측에는 프레스 로드(60)의 신장 및 복원을 가능토록 하는 프레싱 수단(62)을 설치한다.FIG. 5 is a view showing a state in which the
이와 같은 구성의 작동을 설명하면, 도 4 와 같이 카본몰드(20)의 돔홈(22)을 덮도록 석영판(21)을 안치시키고(단계(S1)), 이를 도 5 와 같이 진공로(30) 내의 챔버(50) 내로 안치시켜 진공로(30)의 도어(도시하지 않음)를 닫고 챔버(50) 내에 내장한 히터(40)를 가열시킨다. 아울러 진공로(30) 내의 공기를 진공펌프를 이용하여 빼내 진공(- 3 내지 - 5 토르의 압력을 유지) 상태가 된 후 질소가스를 투입하여 질소분위기를 만든다. 그리고 가열을 시작한다. Referring to the operation of this configuration, the
이어 진공로(30) 내의 급격한 온도 상승은 열충격에 의해 내부 성형물을 파손시킬 우려가 있으므로 석영판의 연화점인 약 1600도에 이르기까지 3단계로 구분하여 온도를 상승시키는데 바람직하기는 약 500도 구간으로 구분하여 상승시킴이 좋다(단계(S2)). 물론 온도의 상승은 내부에 설치한 온도계나 센서 등을 사용하여 감지 가능하다. Subsequently, the rapid temperature rise in the
이어 프레스 로드(60)를 신장시키도록 프레싱 수단(62)(예를 들어 실린더)을 작동시키면 설정치까지 프레스 로드(60)를 신장시켜, 석영판(21)을 누르면 돔헤드(61)가 석영판(21)을 눌러 돔홈(22)과 일치하는 형태로 프레싱 한다. 따라서 연화점 이상으로 가열된 석영판(21)은 돔 형상으로 찌그러져 성형 된다(단계(S3)). 이렇게 성형이 완료되면, 히터(40)의 전원을 차단하여 열 공급을 중지하고 개스 냉각장치로 상온까지 냉각시킨다(단계(S4)). Then, when the pressing means 62 (for example, a cylinder) is operated to stretch the
최근에는 분할 하부 금형 테두리에 석영판을 안치시키고, 하중의 의한 프레싱으로 성형하는 방식이 사용되는바, 이는 도 6 과 같은 단면도와, 도 7 과 같은 평면도로 이루어지고, 4개로 분할되는 단위 하몰드(71)의 조합을 하단에서는 하몰드 하부 결합링(75)으로 결합하고, 상부에서는 상부 결합링(80)으로 결합된 구성의 하몰드(70)를 완성한다. 상부 결합링(81) 역시 단위 결합호(85)가 각각의 단부에서 결합판(81)을 덧대고, 각 결합판(81)은 결합나사(82)로 각각의 단위 결합호(85)를결합토록 고정한다.Recently, a quartz plate is placed on the divided lower mold rim, and a method of forming by pressing under load is used. The unit lower mold is divided into four sections and a plan view as shown in FIG. Combination of the (71) is coupled to the lower mold
이를 사용할 때는 진공 상태의 가열로에서 석영판의 용융 온도인 1600도에 이르도록 가열하고 상몰드(87)의 하중에 의하여 판상의 석영판(90)은 용융되면서 하강하여 하몰드(70)의 내부 공간과 상몰드(87)의 하단 형상의 형태가 이루어진다. 그러나 이러한 방식은 12인치와 같은 대형 규격을 성형하고자할 때는 금형이 커져야하고, 진공로의 용량도 커져야 하므로, 생산성 효율에도 문제가 있다. When using this, in a vacuum furnace, it is heated up to 1600 degrees, which is the melting temperature of the quartz plate, and the plate-
본 발명은 이를 해결하고자 하는 것으로, 본 발명의 목적은 냉각시 성형된 석영돔과 성형을 위한 몰드의 팽창 및 수축율의 차이로 인한 대형의 성형 석영돔의 파손을 막도록 상몰드의 수축율 차이를 상몰드를 지지하는 에지몰드와 상몰드의 하강으로 인한 성형시 상몰드와 에지몰드가 상하가 이격되도록 분리시켜 대형 석영돔의 냉각시 파손을 방지토록 하여 생산성을 향상시킨 대형 석영돔의 몰드 성형 후 냉각시 파손방지장치를 제공하려는 것이다.The present invention is to solve this problem, an object of the present invention is to increase the shrinkage rate of the upper mold to prevent breakage of the large shaped quartz dome due to the difference in the expansion and shrinkage rate of the molded quartz dome and the molding for cooling. Cooling after molding of large quartz dome which improved productivity by separating upper mold and edge mold so that the upper and lower parts are separated from the upper and lower spaces during molding due to the falling of edge mold and upper mold supporting mold. It is to provide a breakage prevention device.
이를 위한 본원발명은 하몰드를 상단이 돌출부를 이루고 측면이 수직부를 이루도록 하고,The present invention for this purpose is to make the lower mold to the top of the protrusion forming a vertical portion,
돌출부에는 석영판을 두고, 석영판 테두리 위에는 석영판의 테두리를 성형하는 에지몰드를 두고,Put the quartz plate on the protrusion, and the edge mold forming the edge of the quartz plate on the quartz plate border,
에지몰드에는 에지몰드와 함께 석영판을 눌러 성형하고 상기 하몰드 돌출부에 대응하는 돔홈을 가지는 상몰드를 두고,The edge mold is formed by pressing a quartz plate together with the edge mold and forming an upper mold having a dome groove corresponding to the lower mold protrusion.
상기 받침링에는 수직의 고정폴을 두어 상단에서 폴고정링으로 고정하고,The bearing ring has a vertical fixing pole fixed at the top with a pole fixing ring,
상기 고정폴에는 에지몰드가 상하 이동 가능토록 이루어진 대형 석영돔의 몰드 성형후 냉각시 파손방지장치를 제공한다.The fixed pole provides a breakage prevention device during cooling after mold molding of a large quartz dome made of an edge mold capable of vertical movement.
이하 본원 발명의 실시예를 도면을 참조하여 상세히 설명한다.Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.
도 8 은 본 발명의 요부 단면도, 도 9 는 도 8 의 평면도로,8 is a cross-sectional view of main parts of the present invention, FIG. 9 is a plan view of FIG. 8;
상부에 돔돌부(101)를 가지고 측면은 수직부(102)를 이룬 하몰드(100)와;A
하몰드(100)를 받치며 성형할 석영판(130)을 받치는 공간을 두고 수직으로 고정폴(120)을 입설하는 받침링(110)과;A
상기 고정폴(120)을 따라 상하 이동하며 내경이 석영판(130)의 직경 보다 작은 에지몰드(140)와;An
에지몰드(140)의 내경보다는 큰 상몰드 받침턱(142)에 받쳐지며 저면이 돔홈(151)을 이룬 상몰드(150); 및An
상기 고정폴(120)의 상단을 고정하는 링상의 폴고정링(160)을 포함하도록 구성한다.It is configured to include a
상기 받침링(110)에는 하몰드(100)의 하단을 정 위치에 고정하는 하몰드 받침턱(112)을 형성한다.The
상기 하몰드(100)의 수직부(102)는 하몰드 받침턱(112)의 높이(a)와, 상몰드 받침턱(142)의 깊이(b)의 합보다 크며, 상몰드(150)의 돔홈(151) 단부의 수평 에지부(152)는 최종 성형시 상몰드 받침턱(142)과 이격거리(c)를 갖도록 구성한다.The
이와 같이 구성한 본원발명은 진공로에서 가열시 석영돔의 형상이 상하몰드(150)(100)의 형상대로 잘 이루어진다.The present invention configured as described above is well formed in the shape of the upper and
그러나 본원발명은 성형 후 냉각시 수축 팽창율의 차이로 인하여 하몰드(100)위에 성형된 대형 석영돔(131)을 가압한다 할지라도, 도 8 과 같이 성형된 대형 석영돔(131)의 수직부에서 상몰드 받침턱(142)의 깊이(b)와의 이격거리(c)만큼의 이격을 두므로, 이 이격거리(c)부위에서 성형시에는 에지몰드(140) 내경 부분이 용융 석영판(130)의 외면 테두리 부분을 평평하게 성형하는 작용을 하고, 일단 성형이 되면 노출된 공간에 의하여 수축 팽창에 따른 팽창율의 차이를 냉각시 흡수하여 발산하므로 대형의 석영돔을 성형하여도 성형된 대형 석영돔(131)의 냉각시 파손 없이 냉각 성형을 가능토록 한다.However, the present invention, although pressing the
즉, 상몰드(150)의 돔홈(151)이 하몰드(100)의 돔돌부(101) 대응 부위만 덮는 형상이지만, 별도의 추가 에지몰드(140)가 상몰드(150)와 함께 하강하다가 상몰드(150)가 돔돌부(101)에 의하여 하강을 멈춘다 하여도, 자중에 의하여 도 8 의 점선 상태로 추가 하강하므로, 대형 석영돔(131)의 에지부분이 수직부(102) 형상에 대응하도록 매끈하게 성형이 완료된다. 이 경우 최종 성형이 완료되면 이격 거리(c) 만큼 상몰드(150) 하단의 에지몰드(140)와 하강한 점선 상의 에지몰드 받침턱(142)이 거리를 두므로, 상몰드(150)하단과 에지몰드(140)가 상호 이격되고, 이 상태에서 냉각을 시작하면서 발생하는 수축 팽창율의 차이를 이격거리(c)부위에서 흡수토록 하는 것이다.That is, although the
이상과 같이 본원발명은 냉각시 성형된 대형 석영돔과 성형을 위한 몰드의 팽창 및 수축율의 차이로 인한 성형 대형 석영돔의 파손을 막도록 하몰드의 테두리 수직부가 에지몰드와 상몰드와의 합보다 크도록 하여 성형된 대형 석영돔의 수직부 에 이격거리가 생기도록 함으로써 수축율 차이를 이격 거리 부위에서 흡수토록 함으로써 석영돔의 생산성을 향상시킨다.As described above, the present invention is characterized in that the vertical edge of the lower mold is less than the sum of the edge mold and the upper mold so as to prevent breakage of the molded large quartz dome due to the difference in expansion and shrinkage rate of the molded large quartz dome and the mold for cooling. By increasing the separation distance to the vertical part of the large-size quartz dome molded to be large, the productivity of the quartz dome is improved by absorbing the shrinkage difference at the separation distance.
또한 본원발명은 에지몰드가 고정폴에서 상하 이동토록 함으로써 정위치에서 대형 석영돔의 에지부를 돌출부 대응 형상 외에 추가 성형함으로써 대형 석영돔 이라도 일정한 형상의 석영돔을 이룰 수가 있고, 에지부를 분리하여 성형하는 방식이므로 그 만큼 상몰드의 무게를 줄일 수 있어 작업성을 향상시킨다.In addition, the present invention by forming the edge mold of the large quartz dome in addition to the protruding shape of the large quartz dome in the right position by allowing the edge mold to move up and down in the fixed pole, even a large quartz dome can form a quartz dome of a certain shape, and to separate the edge portion Because of this method, the weight of the upper mold can be reduced by that amount, improving workability.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070016156A KR100845492B1 (en) | 2007-02-15 | 2007-02-15 | Brake prevention apparatus for forming large quarts dome |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070016156A KR100845492B1 (en) | 2007-02-15 | 2007-02-15 | Brake prevention apparatus for forming large quarts dome |
Publications (1)
Publication Number | Publication Date |
---|---|
KR100845492B1 true KR100845492B1 (en) | 2008-07-11 |
Family
ID=39824280
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020070016156A KR100845492B1 (en) | 2007-02-15 | 2007-02-15 | Brake prevention apparatus for forming large quarts dome |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100845492B1 (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5651827A (en) | 1996-01-11 | 1997-07-29 | Heraeus Quarzglas Gmbh | Single-wafer heat-treatment apparatus and method of manufacturing reactor vessel used for same |
JP2002234747A (en) | 2001-02-06 | 2002-08-23 | Kyokko Seiko Co Ltd | Method and device for manufacturing quartz glass product of semispherical dome shape |
KR20050012884A (en) * | 2005-01-14 | 2005-02-02 | 서태일 | The making method of the quartz which uses the vacuum and device |
-
2007
- 2007-02-15 KR KR1020070016156A patent/KR100845492B1/en not_active IP Right Cessation
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5651827A (en) | 1996-01-11 | 1997-07-29 | Heraeus Quarzglas Gmbh | Single-wafer heat-treatment apparatus and method of manufacturing reactor vessel used for same |
JP2002234747A (en) | 2001-02-06 | 2002-08-23 | Kyokko Seiko Co Ltd | Method and device for manufacturing quartz glass product of semispherical dome shape |
KR20050012884A (en) * | 2005-01-14 | 2005-02-02 | 서태일 | The making method of the quartz which uses the vacuum and device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1128707C (en) | Forming method of heatproof container | |
TWI447080B (en) | Method and apparatus for manufacturing curved glass sheet | |
CN109111091B (en) | Graphite mold, 3D glass hot bending device and 3D glass hot bending method | |
KR101858367B1 (en) | Mold preheating apparatus having near-infrared ray heater | |
KR100845492B1 (en) | Brake prevention apparatus for forming large quarts dome | |
US6928838B2 (en) | Apparatus and method for forming silica glass elements | |
EP2902131A1 (en) | Method for warm working stainless steel foil and mold for warm working | |
US20050092024A1 (en) | Method and device for non-contact moulding of fused glass gobs | |
KR101804394B1 (en) | Glass foaming apparatus | |
JPH0812355A (en) | Apparatus for producing quartz glass article | |
JP3778250B2 (en) | Method of forming quartz glass | |
JP4184468B2 (en) | Manufacturing method of quartz glass container | |
KR101555619B1 (en) | Mold for flange pipe and molding method of flange pipe using the same | |
US5653779A (en) | Method for manufacturing quartz glass components and molding frame therefor | |
JP2005028627A (en) | Method and apparatus for continuously molding crystalline resin | |
KR100337612B1 (en) | Method of bell jar for making semiconductor device | |
JP3874637B2 (en) | Glass element molding method and molding apparatus | |
JP4571840B2 (en) | Mold press molding apparatus and method for manufacturing molded body | |
JP2006248843A (en) | Forming apparatus and forming method | |
JPH06305744A (en) | Apparatus for production of optical element | |
KR100506807B1 (en) | Method of manufacturing inner case for refrigerator | |
CN214081978U (en) | Special make-up machine of carbon-carbon composite crucible | |
KR102238967B1 (en) | Vehicle door cushion forming methed | |
KR0171663B1 (en) | Method for manufacturing quartz glass components | |
KR20050018517A (en) | Press mold having cooling device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
N231 | Notification of change of applicant | ||
FPAY | Annual fee payment |
Payment date: 20120530 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20130701 Year of fee payment: 6 |
|
LAPS | Lapse due to unpaid annual fee |