KR100841387B1 - Non-support type prestressed form for constructing beam - Google Patents

Non-support type prestressed form for constructing beam Download PDF

Info

Publication number
KR100841387B1
KR100841387B1 KR1020070058987A KR20070058987A KR100841387B1 KR 100841387 B1 KR100841387 B1 KR 100841387B1 KR 1020070058987 A KR1020070058987 A KR 1020070058987A KR 20070058987 A KR20070058987 A KR 20070058987A KR 100841387 B1 KR100841387 B1 KR 100841387B1
Authority
KR
South Korea
Prior art keywords
formwork
fixed
prestressed
tension member
bobbin
Prior art date
Application number
KR1020070058987A
Other languages
Korean (ko)
Inventor
이원호
김범준
백운학
허갑수
노재천
김형렬
이준
Original Assignee
이원호
김범준
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이원호, 김범준 filed Critical 이원호
Priority to KR1020070058987A priority Critical patent/KR100841387B1/en
Application granted granted Critical
Publication of KR100841387B1 publication Critical patent/KR100841387B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/04Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for lintels, beams, or transoms to be encased separately; Special tying or clamping means therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/12Mounting of reinforcing inserts; Prestressing

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

A non-supporting prestressed form for beams is provided to transfer its self weight as well as pouring pressure and load of concrete to the opposite ends, while enabling fast construction using al lower space of a beam as a working spot during curing of concrete since, since installation of a supporting post is redundant. A non-supporting prestressed form(100) for beams comprises a sheathing board(110), a center fixation(120), and a tensioning member(130). The sheathing board comprises a side sheathing board(112) on lateral sides of a beam and a lower sheathing board(111) to form lateral sides and lower side of the beam. The center fixation is installed in the middle of length direction of the sheathing board, comprising a support(121) fixed to support the sheathing board, and a fixed piece(122) hinged to the support. The tensioning member as a member installed on the outside of side sheathing board on lateral sides of the sheathing board for tensioning, is installed from an upper side of one end of the side sheathing board to an upper side of the other end via the fixed piece of the center fixation.

Description

무지주 프리스트레스트 보거푸집{Non-support type prestressed form for constructing beam}Non-support type prestressed form for constructing beam}

도 1 및 도 2는 본 발명에 따른 무지주 프리스트레스트 보거푸집의 실시예와 이에 적용되는 중간정착대를 도시한 사시도이다.1 and 2 are a perspective view showing an embodiment of the non-prestressed prestressed formwork according to the present invention and the intermediate mounting table applied thereto.

도 3은 본 발명에 따른 무지주 프리스트레스트 보거푸집에서 연결슬리브의 설치상태를 보여주는 도면이다.3 is a view showing the installation state of the connecting sleeve in the non-prestressed prestressed formwork according to the present invention.

도 4는 본 발명에 따른 무지주 프리스트레스트 보거푸집에서 지지바가 더 설치된 상태를 보여주는 도면이다.Figure 4 is a view showing a state in which the support bar is further installed in the non-prestressed prestressed formwork according to the present invention.

도 5는 본 발명의 따른 무지주 프리스트레스트 보거푸집의 설치상태를 보여주는 도면이다.5 is a view showing the installation state of the non-prestressed prestressed formwork according to the present invention.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

100: 무지주 프리스트레스트 보거푸집100: blank pre-stressed dice

110: 보거푸집널 111: 하부면 거푸집널110: boring die 111: bottom side die

112: 측면 거푸집널 115: 연결슬리브112: side formwork 115: connecting sleeve

120: 중간정착대 121: 지지판120: intermediate mounting base 121: support plate

122: 정착구 125: 보강대122: anchorage 125: reinforcement

130: 긴장재 131: 턴버클130: tension member 131: turnbuckle

135: 연결봉 140: 지지바135: connecting rod 140: support bar

300: 기둥 또는 기둥거푸집 310: 브라켓300: pillar or pillar form 310: bracket

본 발명은 프리스트레스를 도입함으로써 부재 자체의 자중은 물론 콘크리트 타설압과 콘크리트 하중을 양단부로 전달할 수 있게 되어 동바리 설치가 불필요한 무지주 프리스트레스트 보거푸집에 관한 것으로, 더욱 상세하게는 1회의 긴장작업만으로도 전체구간의 프리스트레스 도입을 가능케 하여 작업효율성을 향상시킨 무지주 프리스트레스트 보거푸집에 관한 것이다.The present invention relates to the non-prestressed prestressed formwork that does not need to install the clubs by introducing prestresses, which can transfer not only the weight of the member itself but also the concrete placing pressure and the concrete load to both ends. The present invention relates to an unsupported prestressed formwork, which enables the introduction of prestresses in a section and improves work efficiency.

철근콘크리트구조는 철근과 콘크리트를 일체화한 구조로서 가장 보편적인 구조방식이다. 철근콘크리트공사는 철근을 배근하고 거푸집을 설치한 후 콘크리트를 타설하는 방법으로 진행되며, 특히 철근콘크리트보를 시공함에 거푸집 설치과정에는 동바리 설치과정이 필수적으로 수반된다. 즉, 시공위치에 자재를 반입한 후 시공위치에서 설계에 따라 철근을 배근하고, 동바리로 지지하면서 거푸집을 설치하고, 이어 콘크리트를 타설 양생시킨 후 거푸집을 해체하는 것이다.Reinforced concrete structure is the most common structural method integrating reinforcement with concrete. Reinforced concrete works are carried out by reinforcing the reinforcing bars and installing the formwork, and then placing concrete. In particular, the installation process of the formwork is essential in the formwork installation process of the reinforced concrete beams. In other words, after importing the material to the construction site, reinforcing the rebar according to the design at the construction site, install the formwork while supporting with a copper bar, and then cast concrete and then dismantle the formwork.

그러나, 동바리는 거푸집 설치와는 별도로 현장에서 직접 그 높이를 조절하 면서 지지상태를 점검해야 하므로, 그 설치작업이 상당히 번거롭다. 또한, 충분한 양생이 진행된 후에야 비로소 동바리를 제거할 수 있는 바, 동바리가 설치된 해당층에서의 작업은 작업공간 확보에 문제가 있어 제한적일 수밖에 없다. 아울러, 다층 건축물의 시공은 하층부에 사용한 가설자재를 상층부로 운반하면서 이루어지는데, 이때 동바리는 부재 사이즈가 커 자재 운반시 불편함을 초래한다. 이와 같이 동바리 설치과정은 철근콘크리트공사에서 작업 전반에 걸쳐 시공효율성을 떨어뜨리는 하나의 요인이 된다.However, the installation is quite cumbersome because the copper bar has to check its support while adjusting its height directly on site, apart from the formwork installation. In addition, it is only after sufficient curing has been carried out that the barbars can be removed, and the work on the floor where the barbars are installed is limited due to problems in securing a working space. In addition, the construction of a multi-storey building is made while transporting the temporary materials used in the lower layer to the upper layer, where the copper group is large and the size of the member causes inconvenience in material transportation. In this way, the installation process of copper bar is one factor that lowers the construction efficiency in overall work in reinforced concrete construction.

위와 같은 종래 문제해결을 위해 본 발명자들은 철근콘크리트보의 현장시공에서 동바리를 설치하지 않아도 되는 무지주 프리스트레스트 보거푸집과 이의 설치구조를 개발하고 이를 제10-2007-7875호로 특허출원한 바 있다. 하지만, 선출원 기술은 프리스트레스 도입 자체에 주안점을 둔 나머지 프리스트레스의 도입방법의 효율성에 대해서는 미처 고려하지 못했다. 이에, 본 발명자들은 무지주 프리스트레스 보거푸집에 대한 지속적인 연구 중에 프리스트레스를 효율적으로 도입할 수 있는 본 발명을 개발하게 되었다.In order to solve the conventional problems as described above, the present inventors have developed a non-prestressed prestressed formwork and its installation structure that do not need to install the copper bar in the field construction of the reinforced concrete beam, and has filed the patent as No. 10-2007-7875. However, the prior application technology focused on prestressing itself, and did not consider the efficiency of the prestressing method. Accordingly, the present inventors have developed the present invention which can efficiently introduce prestress during the continuous study on the non-holding prestressed formwork.

본 발명은 상기한 종래의 문제점을 개선하고자 안출된 것으로서, 프리스트레스를 도입함으로써 부재 자체의 자중은 물론 콘크리트 타설압과 콘크리트 하중을 양단부로 전달할 수 있게 되어 동바리 설치가 불필요한 무지주 프리스트레스트 보거푸집으로서 1회의 긴장작업만으로도 전체구간의 프리스트레스 도입을 가능케 하 여 작업효율성을 향상시킬 수 있는 시스템을 제공하는데 기술적 목적이 있다.The present invention has been made to improve the above-described conventional problems, by introducing the pre-stress can transfer the self-weight of the member itself, as well as the concrete placing pressure and the concrete load to both ends, as a non-prestressed prestress formwork that does not require the installation of the club 1 The technical goal is to provide a system that improves work efficiency by allowing pre-stressing to be introduced throughout the whole section, even if the meeting is tense.

상기한 목적달성을 위해 본 발명은 현장에서 콘크리트보의 시공을 위해 보 위치에서 설치되는 보거푸집으로서,The present invention for achieving the above object is a formwork installed in the beam position for the construction of concrete beam in the field,

보의 양 측면과 하부면 형성을 위해 양 측면 거푸집과 하부면 거푸집널로 구성된 보거푸집널; 상기 보거푸집널을 받치면서 고정되는 지지판과 지지판에 힌지결합하는 정착구로 구성되며, 상기 보거푸집널의 길이방향 중간에 고정 설치되는 중간정착대; 및, 상기 보거푸집널의 양 측면 거푸집널 외부에 각각 긴장 설치되는 부재로, 측면 거푸집널의 일단부 상부에 정착되면서 상기 중간정착대의 정착구를 지나 측면 거푸집널의 타단부 상부에 정착되는 긴장재;를 포함하여 구성되며,Bogie formwork consisting of both side formwork and lower side formwork for forming both sides and the bottom surface of the beam; An intermediate fixing member configured to be fixed to the support plate and the fixing plate hinged to the support plate while supporting the bobbin, and fixedly installed in the middle of the longitudinal direction of the bobbin; And tension members fixed to the upper ends of the side dies while being fixed to the upper ends of the side dies, respectively, and being fixed to one end of the side dies, passing through the anchorage of the intermediate mounting stand. Including,

상기 긴장재는 중간정착대를 중심으로 구분되어 중간정착대의 정착구에도 정착되도록 설치되고, 중간정착대에 의해 구분되는 어느 한 구간의 긴장재에 턴버클이 장착되는 것을 특징으로 하는 무지주 프리스트레스트 보거푸집을 제공한다.The tension member is divided so as to be centered on the intermediate anchorage is installed so as to be settled in the anchorage of the intermediate anchorage, providing a non-prestressed prestressed formwork, characterized in that the turnbuckle is mounted on any one of the tension members separated by the intermediate anchorage. do.

또한, 본 발명은 현장에서 콘크리트보의 시공을 위해 보 위치에서 설치되는 보거푸집으로서,In addition, the present invention is a formwork installed in the beam position for the construction of the concrete beam in the field,

보의 양 측면과 하부면 형성을 위해 양 측면 거푸집널과 하부면 거푸집널로 구성된 보거푸집널; 상기 보거푸집널을 받치면서 고정되는 지지판과 지지판에 결합되는 롤러 형태의 정착구로 구성되며, 상기 보거푸집널의 길이방향 중간에 고정 설 치되는 중간정착대; 및, 상기 보거푸집널의 양 측면 거푸집널 외부에 각각 긴장 설치되는 부재로, 측면 거푸집널의 일단부 상부에 정착되면서 상기 중간정착대의 정착구를 지나 측면 거푸집널의 타단부 상부에 정착되는 긴장재;를 포함하여 구성되며,Bogie formwork consisting of both side formwork and the bottom side formwork for forming both sides and the bottom surface of the beam; An intermediate fixing stand configured to be fixed to the support plate and the support plate in the form of a roller coupled to the support plate, and to be fixedly installed in the middle of the longitudinal direction of the supporter; And tension members fixed to the upper ends of the side dies while being fixed to the upper ends of the side dies, respectively, and being fixed to one end of the side dies, passing through the anchorage of the intermediate mounting stand. Including,

상기 긴장재는 강선으로 측면 거푸집널의 일단부 상부에서 타단부 상부까지 하나로 이어지도록 설치되고, 중간정착대로 구분되는 어느 한 구간의 긴장재에 턴버클이 장착되는 것을 특징으로 하는 무지주 프리스트레스트 보거푸집을 제공한다.The tension member is a steel wire, which is installed to extend from one end portion of the side formwork to the other end portion, and provides a non-prestressed prestressed formwork, characterized in that the turnbuckle is mounted on the tension member of any section that is divided into an intermediate anchorage. do.

이하, 첨부한 도면 및 바람직한 실시예에 따라 본 발명을 상세히 설명한다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings and preferred embodiments.

도 1 및 도 2는 본 발명에 따른 무지주 프리스트레스트 보거푸집의 실시예와 이에 적용되는 중간정착대를 도시한 사시도로서, 도시하고 있는 바와 같이 본 발명의 무지주 프리스트레스트 보거푸집(100)은 현장에서 콘크리트보의 시공을 위해 보 위치에서 설치되는 보거푸집으로, 프리스트레스가 도입되도록 구성함으로써 동바리 설치를 생략하여도 부재 자체의 자중은 물론 콘크리트 타설압과 콘크리트 자중을 저항할 수 있게 된다는데 기술적 특징이 있다. 이를 위해 본 발명은 보거푸집널(110), 중간정착대(120), 긴장재(130)를 필수적인 구성요소로 포함하며, 특히 긴장작업의 효율성을 극대화하기 위해 중간정착대(120)를 회전가능한 힌지결합구조 또는 롤러형태로 마련하고 있다.1 and 2 is a perspective view showing an embodiment of the non-prestressed prestressed formwork according to the present invention and the intermediate mounting table applied thereto, as shown, the non-supported prestressed formwork 100 of the present invention is As the formwork is installed at the beam location for the construction of concrete beams in the field, the prestress can be introduced to resist the weight of the member itself as well as the concrete placing pressure and the concrete weight even if the installation of the group is omitted. There is this. To this end, the present invention includes the bobbin die 110, the intermediate anchoring plate 120, the tension member 130 as an essential component, in particular, the hinge hinge rotatable intermediate mounting 120 to maximize the efficiency of the tension work It is provided in the form of a coupling structure or a roller.

보거푸집널(110)은 보의 양 측면과 하부면 형성을 위해 도 1(a) 및 도 2(a)에서와 같이 양 측면 거푸집널(112)과 하부면 거푸집널(111)로 구성된다. 상기 보 거푸집널(110)로는 목재, 철재 등 통상적으로 사용하는 어떤 것을 채택해도 무방하며, 여기에는 유로폼 등 조립식 시스템 거푸집으로 채택되는 자재도 물론 포함한다.Bogie board 110 is composed of both side formwork 112 and the lower surface formwork 111 as shown in Figure 1 (a) and 2 (a) to form both sides and the bottom surface of the beam. The beam formwork 110 may be any one commonly used such as wood, steel, etc., and of course, it includes materials adopted as a prefabricated system formwork such as euroform.

중간정착대(120)는 상기 보거푸집널(110)의 길이방향 중간에 고정 설치되는 구성으로, 상기 보거푸집널(110)을 받치면서 고정되는 지지판(121)과 지지판(121)에 마련된 정착구(122)로 구성된다. 이때, 상기 정착구(122)는 도 1(b)에서와 같이 지지판(121)에 힌지결합되거나 도 2(b)에서와 같이 롤러형태로 마련된다. 특히, 도 1(b) 및 도 2(b)에서는 중간정착대(120)가 보거푸집널(110) 너비방향으로 동일한 위치에서 상호 마주보게 배치될 때 중간정착대의 지지판(121) 및/또는 정착구(122)를 상호 연결하는 보강대(125)를 더 설치한 예를 보여주는데, 이와 같이 보강대(125)가 더 설치되면 중간정착대의 정착구(122)에 양 측면 거푸집널(112)을 따라 배치된 긴장재(130)를 동시에 구속할 수 있으므로 양측 긴장재(130)의 긴장상태를 균일하게 맞출 수 있어 유리하다. 상기 중간정착대(120)는 보거푸집널(110) 길이방향으로 1지점 이상 여러 지점에 설치할 수 있으며, 도 1(a) 및 도 2(a)에서는 2지점에 설치한 상태를 보여준다.The intermediate fixing unit 120 has a configuration that is fixed to the middle of the longitudinal direction of the bobbin panel 110, the fixing plate provided in the support plate 121 and the support plate 121 is fixed while supporting the bobbin panel (110) ( 122). In this case, the fixing unit 122 is hinged to the support plate 121 as shown in Figure 1 (b) or is provided in the form of a roller as shown in Figure 2 (b). In particular, in Figures 1 (b) and 2 (b) when the intermediate mounting table 120 is disposed facing each other at the same position in the width direction of the bobbin panel 110, the support plate 121 and / or anchorage of the intermediate mounting table An example of further installing the reinforcing rod 125 interconnecting the 122, when the reinforcing rod 125 is further installed in this way, the tension member disposed along both side formwork 112 on the anchorage 122 of the intermediate anchorage ( 130 can be constrained at the same time, it is advantageous to be able to match the tension state of both tension members 130 uniformly. The intermediate mounting stand 120 may be installed at one or more points in the longitudinal direction of the bobbin panel 110, and in Figure 1 (a) and Figure 2 (a) shows a state installed at two points.

긴장재(130)는 상기 보거푸집널의 양 측면 거푸집널(112) 외부에 각각 긴장 설치되는 구성으로, 측면 거푸집널(112)의 일단부 상부에 정착되면서 상기 중간정착대의 정착구(122)를 지나 측면 거푸집널(112)의 타단부 상부에 정착된다. 이와 같은 긴장재(130)는 전체 보거푸집널(110)의 휨응력을 향상시키면서 중간부분의 하중을 양단부로 전달하는 역할을 한다. The tension member 130 is configured to be tensioned on both sides of the side mold 112 of the boring die, respectively, and is settled on the upper end of the side die 112, while passing through the fixing unit 122 of the intermediate anchorage side. It is fixed to the upper end of the other end of the formwork (112). Such tension member 130 serves to transfer the load of the middle portion to both ends while improving the bending stress of the entire bore panel (110).

도 1(b)에서는 중간정착대의 정착구(122)가 지지판(121)에 힌지결합하는 형태를 보여주는데, 긴장재(130)는 중간정착대(120)를 중심으로 구분되면서 측면 거푸집널(112)은 물론 중간정착대의 정착구(122)에도 정착되도록 설치하게 된다. 이때, 중간정착대(120)에 의해 구분되는 어느 한 구간의 긴장재(130)에는 턴버클(131)이 장착되며, 그 결과 턴버클(131)의 조임에 의해 긴장재(130)가 긴장되면(즉, 턴버클의 조임으로 긴장재의 길이가 단축되면), 힌지결합된 정착구(122)가 회전하면서 다른 구간의 긴장재(130) 또한 긴장시키게 된다. 도 1(a)는 중간정착대(120)가 2지점에 설치된 상태에서 중간정착대(120) 사이 구간(보거푸집의 중간 구간)에 턴버클(131)이 장착된 긴장재(130)를 정착시킨 예로서, 보거푸집의 중간 구간에 배치된 긴장재의 턴버클(131)을 조이면 양쪽 중간정착대의 정착구(122)가 보거푸집의 중간 구간으로 향해 회전하면서 보거푸집의 단부 구간에 배치된 양쪽의 긴장재(130)를 당기는 구조이다.In Figure 1 (b) shows a form in which the fixing unit 122 of the intermediate anchorage hinge hinged to the support plate 121, the tension member 130 is divided into the center anchor 120 (120) as well as the side formwork 112 It is installed to be fixed to the fixing unit 122 of the intermediate mounting. At this time, the turnbuckle 131 is mounted to the tension member 130 of any one section divided by the intermediate fixing unit 120, and as a result, when the tension member 130 is tensioned by tightening the turnbuckle 131 (that is, the turnbuckle) When the length of the tension member is shortened by the tightening of), the hinge-bonded anchorage 122 is rotated, thereby tensioning the tension member 130 in another section. Figure 1 (a) is an example of fixing the tension member 130 is equipped with a turnbuckle 131 in the section (intermediate section of the mold) between the intermediate mounting stand 120 in the state in which the intermediate mounting stand 120 is installed at two points As a tightening of the turnbuckles 131 of the tension member disposed in the middle section of the formwork, both tension members 130 disposed in the end section of the formwork while rotating the fixing unit 122 of both intermediate fixing rod toward the middle section of the formwork. Pulling structure.

도 2(b)에서는 중간정착대의 정착구(122)가 롤러형태로 마련된 형태를 보여주는데, 긴장재(130)는 강선으로 마련되어 측면 거푸집널(112)의 일단부 상부에서 타단부 상부까지 하나로 이어지도록 설치하게 된다. 이때, 마찬가지로 중간정착대(120)에 의해 구분되는 어느 한 구간의 긴장재(강선, 130)에는 턴버클(131)이 장착되는데, 턴버클(131)의 조임에 의해 긴장재(130)가 긴장되면(즉, 턴버클의 조임으로 긴장재의 길이가 단축되면), 다른 구간의 긴장재(130, 강선) 또한 긴장시키게 된다. 도 2(a)는 중간정착대(120)가 2지점에 설치된 상태에서 중간정착대(120) 사이 구간(보거푸집의 중간 구간)에 위치하는 부분의 긴장재(130)에 턴버클(131)이 장착된 예로서, 보거푸집의 중간 구간에 위치한 긴장재의 턴버클(131)을 조이면 양쪽 중간정착대의 정착구(122, 롤러)를 따라 보거푸집의 단부 구간에 위치하는 부분의 긴장재(130)가 함께 당겨지는 구조이다. In Figure 2 (b) shows the fixing fixture 122 of the intermediate fixing stand provided in the form of a roller, the tension member 130 is provided as a steel wire to be installed so as to run from the top of one end of the side formwork 112 to the other end. do. At this time, the turnbuckle 131 is mounted on the tension member (steel wire 130) of any section divided by the intermediate anchoring plate 120, and when the tension member 130 is tensioned by tightening the turnbuckle 131 (that is, If the tension of the tension member is shortened by tightening the turnbuckle, the tension member (130, wire) in the other section is also tensioned. Figure 2 (a) is the turnbuckle 131 is mounted on the tension member 130 in the section (middle section of the mold) between the intermediate mounting stand 120 in the state where the intermediate mounting stand 120 is installed at two points As an example, when the turnbuckle 131 of the tension member located in the middle section of the formwork is tightened together the tension member 130 of the portion located in the end section of the formwork along the fixing holes 122 (rollers) of both intermediate anchorages are pulled together to be.

도 3은 본 발명에 따른 무지주 프리스트레스트 보거푸집(100)에서 연결슬리브(115)의 설치상태를 보여주는데, 상기 연결슬리브(115)는 관형상으로 긴장재(130)가 정착되는 위치의 보거푸집널(110) 내부에 보거푸집널의 양 측면 거푸집널(112)을 연결하도록 설치된다. 상기 연결슬리브(115)는 양 측면 거푸집널(112)을 상호 잡아주기 때문에 콘크리트 타설과정에서 측면 거푸집널(112)이 벌어지지 않게 긴결재로서 역할하기도 하며, 도 3은 연결슬리브(115)를 중공형 슬리브캡(116)으로 결속하여 측면 거푸집널(112)에 고정 설치한 예를 보여준다.Figure 3 shows the installation state of the connecting sleeve 115 in the non-prestressed prestressed formwork 100 in accordance with the present invention, the connecting sleeve 115 is a tubular plate of the position where the tension member 130 is fixed in a tubular shape 110 is installed to connect both side formwork 112 of the formwork. Since the connecting sleeve 115 catches both side formwork 112 with each other, the side formwork 112 may serve as a long binding material so that the side formwork 112 does not open in the concrete placing process, and FIG. 3 shows the hollow connection sleeve 115. Binding to the type sleeve cap 116 shows an example fixed to the side formwork (112).

상기 연결슬리브(115)에는 연결봉(135)이 통과하도록 설치되는데, 연결봉(135)은 보거푸집널의 양 측면 거푸집널(112)을 관통하면서 돌출하도록 설치되어 긴장재(130)가 돌출된 연결봉(135)에 정착하게 된다. 연결봉(135)의 설치로 긴장재(130)와 보거푸집널(110) 간의 구속력이 강화되어 긴장재(130)의 긴장효과를 극대화시킬 수 있으며, 아울러 보거푸집이 부담하는 하중(보거푸집널 자중+콘크리트 타설압+콘크리트 하중)이 균일하게 분산되어 보거푸집의 안정화를 꾀할 수 있게 된다. 물론, 상기 연결봉(135)은 연결슬리브(115)를 통과하면서 설치되므로 콘크리트 타설 후에도 콘크리트에 매입되지 않아 제거한 후 재사용이 가능해진다. 또한, 상기 연결봉(135)은 조립된 상태의 무지주 프리스트레스트 보거푸집(100)을 양중하 는 과정에서 크레인에 연결된 고리를 걸기 위한 장치로서 역할하기도 한다.The connecting sleeve 115 is installed to pass through the connecting rod 135, the connecting rod 135 is installed so as to protrude while passing through both side formwork 112 of the bobbin die connecting rod 135 protruding tension member 130 Settled in). By the installation of the connecting rod 135, the binding force between the tension member 130 and the bobbin panel 110 is strengthened, thereby maximizing the tension effect of the tension member 130, and also the load that the bobbin bears (bogie panel weight + concrete). Pour pressure + concrete load) is uniformly distributed to stabilize the formwork. Of course, since the connecting rod 135 is installed while passing through the connecting sleeve 115 is not embedded in the concrete even after the concrete is placed, can be removed and reused. In addition, the connecting rod 135 also serves as a device for hooking the hook connected to the crane in the process of lifting the unsupported prestress bow formwork 100 in an assembled state.

도 4는 본 발명에 따른 무지주 프리스트레스트 보거푸집(100)에서 지지바(140)가 더 설치된 상태를 보여주는데, 지지바(140)는 보거푸집널(120) 밖으로 돌출된 연결봉(135)과 보거푸집널의 하부면 거푸집널(111)을 서로 연결하도록 설치된다. 상기 지지바(140)는 긴장재(130)의 긴장시 또는 콘크리트 타설시에 보거푸집널(110)이 뒤틀리거나 하부면 거푸집널(111)과 측면 거푸집널(112)이 분리되는 것을 억제하는 역할을 하게 된다. 이때, 지지바(140)의 설치를 위해서는 보거푸집널의 하부면 거푸집널(111)이 보폭보다 넓어 양 측면 거푸집널(112)의 바깥으로 돌출하는 돌출날개(111a)를 가지도록 마련해야 할 것이며, 지지바(140)는 그 일단이 보거푸집널의 측면 거푸집널(112)을 돌출한 연결봉(135)에 고정되면서 그 타단이 상기 보거푸집널의 하부면 거푸집널 돌출날개(111a)에 고정되도록 설치하여야 할 것이다.4 shows a state in which the support bar 140 is further installed in the non-prestressed prestressed formwork 100 according to the present invention, the support bar 140 is a connecting rod 135 and a beam protruding out of the formwork 120. The bottom surface formwork 111 of the formwork is installed to connect with each other. The support bar 140 serves to prevent the bobbin panel 110 from being twisted or the lower surface formwork 111 and the side formwork 112 being separated when the tension member 130 is strained or when concrete is poured. Done. At this time, in order to install the support bar 140, the bottom surface formwork 111 of the bogie boarding plate should be provided to have a protruding wing 111a protruding outward of both side formwork 112 is wider than the stride, The support bar 140 is installed so that one end is fixed to the connecting rod 135 protruding the side formwork 112 of the bobbin, and the other end is fixed to the bottom surface formwork protruding wing 111a of the bobbin. Should.

도 5는 본 발명의 따른 무지주 프리스트레스트 보거푸집(100)의 설치상태를 보여주는 도면이다. 전술한 무지주 프리스트레스트 보거푸집(100)을 설치하기 위해서는 이를 거치하기 위한 거치대가 마련되어야 하는데, 본 발명에서는 거치대로서 브라켓(310)을 제안한다. 즉, 브라켓(310)을 기둥 또는 기둥거푸집 측면에 설치한 후 무지주 프리스트레스트 보거푸집(100)을 상기 브라켓(310) 위에 거치하면서 설치하는 것이다. 이때, 브라켓(310)의 수평길이가 무지주 프리스트레스트 보 거푸집(100)에서 양단부에 정착된 긴장재(130)까지 미치도록 하는 것이 무지주 프리스트레스트 보거푸집(100) 설치상태의 안정성 확보를 위해 바람직하다. 이로써, 무지주 프리스트레스트 보거푸집(100)이 부담해야 하는 하중은 브라켓(310)을 거쳐 최종적으로 기둥 또는 기둥거푸집(300)으로 전달된다. 물론, 무지주 프리스트레스트 보거푸집(100) 내부에 콘크리트가 타설되어 양생되고 나면 무지주 프리스트레스트 보거푸집(100)과 브라켓(310)은 제거된다.5 is a view showing the installation state of the non-prestressed prestressed formwork 100 according to the present invention. In order to install the above-mentioned non-holder prestressed formwork 100, a cradle for mounting it should be provided, and the present invention proposes a bracket 310 as a cradle. In other words, the bracket 310 is installed on the pillar or pillar formwork side, and then the unsupported prestressed formwork 100 is mounted on the bracket 310. At this time, it is preferable for the horizontal length of the bracket 310 to extend from the non-prestressed preform 100 to the tension member 130 fixed to both ends, so as to secure stability of the non-presisted pre-prested 100 formwork. Do. As a result, the load that the unsupported prestressed formwork 100 must bear is finally transferred to the column or the formwork 300 through the bracket 310. Of course, after the concrete is poured and cured in the non-prestressed prestressed mold 100, the non-presisted prestressed mold 100 and the bracket 310 is removed.

이상에서 본 발명은 실시예를 참조하여 상세히 설명되었으나, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자라면 상기에서 설명된 기술적 사상을 벗어나지 않는 범위 내에서 여러가지 치환, 부가 및 변형이 가능할 것임은 당연하며, 이와 같은 변형된 실시 형태들 역시 아래에 첨부한 특허청구범위에 의하여 정하여지는 본 발명의 보호 범위에 속하는 것으로 이해되어야 할 것이다.While the present invention has been described in detail with reference to the embodiments, it will be apparent to those skilled in the art that various substitutions, additions, and modifications are possible within the scope without departing from the spirit as described above. It is to be understood that such modified embodiments also fall within the protection scope of the invention as defined by the appended claims below.

이상과 같은 본 발명에 따르면 다음과 같은 효과를 기대할 수 있다.According to the present invention as described above can be expected the following effects.

첫째, 콘크리트보 시공에서 동바리 설치과정을 생략할 수 있음으로 시공효율성을 향상시킬 수 있으며, 아울러 콘크리트 양생중에도 보 하부공간을 작업공간으로 활용할 수 있어 신속한 공사수행이 가능해진다.First, the construction efficiency can be improved by skipping the installation process of the copper bar in the concrete beam construction, and it is possible to use the lower space of the beam as a work space during the curing of the concrete.

둘째, 1회의 긴장작업만으로도 전체구간의 프리스트레스 도입이 가능해져 작업효율성을 향상시킬 수 있는 이점이 기대된다.Second, the prestress can be introduced in the whole section with only one tension work, which is expected to improve work efficiency.

Claims (5)

현장에서 콘크리트보의 시공을 위해 보 위치에서 설치되는 보거푸집으로서,As the formwork installed in the beam position for the construction of concrete beams on site, 보의 양 측면과 하부면 형성을 위해 양 측면 거푸집널(112)과 하부면 거푸집널(111)로 구성된 보거푸집널(110);Bogie board 110 consisting of both side formwork 112 and the lower surface formwork 111 to form both sides and the bottom surface of the beam; 상기 보거푸집널(110)을 받치면서 고정되는 지지판(121)과 지지판(121)에 힌지결합하는 정착구(122)로 구성되며, 상기 보거푸집널(110)의 길이방향 중간에 고정 설치되는 중간정착대(120); 및,It is composed of a fixing plate 122 hinged to the support plate 121 and the support plate 121 is fixed while supporting the bobbin panel 110, the intermediate fixing is installed fixed in the middle of the longitudinal direction of the bobbin panel 110 Stand 120; And, 상기 보거푸집널(110)의 양 측면 거푸집널(112) 외부에 각각 긴장 설치되는 부재로, 측면 거푸집널(112)의 일단부 상부에 정착되면서 상기 중간정착대의 정착구(122)를 지나 측면 거푸집널(112)의 타단부 상부에 정착되는 긴장재(130);Each member is installed on the outside of both side formwork 112 of the boring die 110, and is fixed to the upper end of the side formwork 112, while passing through the fixing unit 122 of the intermediate mounting stand side Tension member 130 is fixed to the other end of the 112; 를 포함하여 구성되며,It is configured to include, 상기 긴장재는 중간정착대(120)를 중심으로 구분되어 중간정착대의 정착구에도 정착되도록 설치되고, 중간정착대(120)에 의해 구분되는 어느 한 구간의 긴장재(130)에 턴버클(131)이 장착되는 것을 특징으로 하는 무지주 프리스트레스트 보거푸집.The tension member is installed so as to be settled in the anchorage of the intermediate anchoring zone, which is divided around the intermediate anchoring rod 120, and the turnbuckle 131 is mounted on the tension member 130 of any one section divided by the intermediate anchoring rod 120. Non-prestressed pre-stressed dice, characterized in that. 현장에서 콘크리트보의 시공을 위해 보 위치에서 설치되는 보거푸집으로서,As the formwork installed in the beam position for the construction of concrete beams on site, 보의 양 측면과 하부면 형성을 위해 양 측면 거푸집널(112)과 하부면 거푸집널(111)로 구성된 보거푸집널(110);Bogie board 110 consisting of both side formwork 112 and the lower surface formwork 111 to form both sides and the bottom surface of the beam; 상기 보거푸집널(110)을 받치면서 고정되는 지지판(121)과 지지판(121)에 결합되는 롤러 형태의 정착구(122)로 구성되며, 상기 보거푸집널(110)의 길이방향 중간에 고정 설치되는 중간정착대(120); 및,It is composed of a fixing plate 122 of the roller shape coupled to the support plate 121 and the support plate 121 is fixed while supporting the bobbin panel 110, which is fixedly installed in the middle of the longitudinal direction of the bobbin panel 110 Intermediate anchorage 120; And, 상기 보거푸집널(110)의 양 측면 거푸집널(112) 외부에 각각 긴장 설치되는 부재로, 측면 거푸집널(112)의 일단부 상부에 정착되면서 상기 중간정착대의 정착구(122)를 지나 측면 거푸집널(112)의 타단부 상부에 정착되는 긴장재(130);Each member is installed on the outside of both side formwork 112 of the boring die 110, and is fixed to the upper end of the side formwork 112, while passing through the fixing unit 122 of the intermediate mounting stand side Tension member 130 is fixed to the other end of the 112; 를 포함하여 구성되며,It is configured to include, 상기 긴장재(130)는 강선으로 측면 거푸집널(112)의 일단부 상부에서 타단부 상부까지 하나로 이어지도록 설치되고, 중간정착대(120)로 구분되는 어느 한 구간의 긴장재(130)에 턴버클(131)이 장착되는 것을 특징으로 하는 무지주 프리스트레스트 보거푸집.The tension member 130 is installed to run as one from the upper end of the side formwork 112 to the upper end of the other side, the turnbuckle 131 to the tension member 130 of any one section divided by the intermediate anchor 120. ) Prestressed unstained dice, characterized in that is mounted. 제1항 또는 제2항에서,The method of claim 1 or 2, 상기 긴장재(130)가 정착되는 위치의 보거푸집널(110) 내부에는 보거푸집널의 양 측면 거푸집널(112)을 연결하는 관형상의 연결슬리브(115)가 장착되며,Inside the bogie board 110 at the position where the tension member 130 is fixed, tubular connection sleeves 115 for connecting both side die 112 of the bogie board are mounted. 상기 연결슬리브(115)를 통과하면서 보거푸집널의 양 측면 거푸집널(112)을 돌출하도록 연결봉(135)이 보거푸집널의 양 측면 거푸집널(112)을 관통 설치되며,The connecting rod 135 is installed to penetrate both sides of the formwork 112 through the connecting sleeve 115 so as to protrude both side forms 112 of the formwork, 상기 긴장재(130)가 돌출된 연결봉(135)에 정착하는 것을 특징으로 무지주 프리스트레스트 보거푸집.The tension support 130 is fixed to the connecting rod 135 protruding, characterized in that the non-prestressed prestress. 제3항에서,In claim 3, 상기 보거푸집널(110)은 하부면 거푸집널(111)이 보폭보다 넓어 양 측면 거푸집널의 바깥으로 돌출하는 돌출날개(111a)를 가지도록 마련되며,The boring die 110 is provided to have a protruding wing (111a) protruding to the outside of the side formwork because the lower side formwork 111 is wider than the stride, 일단이 보거푸집널의 측면 거푸집널(112)을 돌출한 연결봉(135)에 고정되면서 타단이 상기 보거푸집널의 하부면 거푸집널 돌출날개(111a)에 고정되도록 수직의 지지바(140)가 더 설치되는 것을 특징으로 하는 무지주 프리스트레스트 보거푸집.One end is fixed to the connecting rod 135 protruding the side formwork 112 of the bobbin, while the other end of the vertical support bar 140 is further fixed to the lower surface formwork protruding wing 111a of the bobbin. Non-prestressed prestressed formwork, characterized in that it is installed. 제1항 또는 제2항에서,The method of claim 1 or 2, 상기 중간정착대(120)는 보거푸집널의 하부면 거푸집널(111) 너비방향으로 동일한 위치에서 상호 마주보게 배치되며,The intermediate fixing unit 120 is disposed to face each other at the same position in the width direction of the lower surface formwork 111 of the bobbin, 상호 마주보는 중간정착대의 지지판(121)과 정착구(122) 중 어느 하나 이상을 연결하는 보강대(125)가 더 설치되는 것을 특징으로 하는 무지주 프리스트레스트 보거푸집.Non-prestressed prestressed vowel form, characterized in that the reinforcing rod 125 for connecting any one or more of the support plate 121 and the fixing unit 122 facing each other is installed.
KR1020070058987A 2007-06-15 2007-06-15 Non-support type prestressed form for constructing beam KR100841387B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020070058987A KR100841387B1 (en) 2007-06-15 2007-06-15 Non-support type prestressed form for constructing beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070058987A KR100841387B1 (en) 2007-06-15 2007-06-15 Non-support type prestressed form for constructing beam

Publications (1)

Publication Number Publication Date
KR100841387B1 true KR100841387B1 (en) 2008-06-25

Family

ID=39772493

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070058987A KR100841387B1 (en) 2007-06-15 2007-06-15 Non-support type prestressed form for constructing beam

Country Status (1)

Country Link
KR (1) KR100841387B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101329383B1 (en) * 2011-12-23 2013-11-14 (주)연우건축구조기술사사무소 Non-support type prestressed form and construction structure using the same
KR101569274B1 (en) * 2014-04-08 2015-11-13 가톨릭관동대학교산학협력단 Strengthen structure and method of reinforcing the outside of the reinforced concrete beams with prestressed steel wire
KR101609805B1 (en) * 2015-08-25 2016-04-06 오용환 Freestanding temporary retaining and its construction method with prestressed piles introduced

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55149U (en) 1979-05-07 1980-01-05
JPH01174769A (en) * 1987-12-26 1989-07-11 Tekken Constr Co Ltd Floor plate former
KR100356063B1 (en) 1999-12-03 2002-10-18 (주) 희림종합건축사사무소 Grip for prestressing wire and post-tensioning method using the same
KR100375937B1 (en) 2002-07-25 2003-03-15 Yang Jung Kim Method for reinforcing shear and tension of beam by post-tension of steel wire
KR100788396B1 (en) 2007-01-25 2008-01-02 이원호 Non-support type prestressed form for constructing beam and construction structure using the same

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55149U (en) 1979-05-07 1980-01-05
JPH01174769A (en) * 1987-12-26 1989-07-11 Tekken Constr Co Ltd Floor plate former
KR100356063B1 (en) 1999-12-03 2002-10-18 (주) 희림종합건축사사무소 Grip for prestressing wire and post-tensioning method using the same
KR100375937B1 (en) 2002-07-25 2003-03-15 Yang Jung Kim Method for reinforcing shear and tension of beam by post-tension of steel wire
KR100788396B1 (en) 2007-01-25 2008-01-02 이원호 Non-support type prestressed form for constructing beam and construction structure using the same

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101329383B1 (en) * 2011-12-23 2013-11-14 (주)연우건축구조기술사사무소 Non-support type prestressed form and construction structure using the same
KR101569274B1 (en) * 2014-04-08 2015-11-13 가톨릭관동대학교산학협력단 Strengthen structure and method of reinforcing the outside of the reinforced concrete beams with prestressed steel wire
KR101609805B1 (en) * 2015-08-25 2016-04-06 오용환 Freestanding temporary retaining and its construction method with prestressed piles introduced

Similar Documents

Publication Publication Date Title
CN110847044B (en) Semi-prefabricated assembled bent cap construction method
KR100667921B1 (en) Construction method of pylon using precast concrete beam
US5299445A (en) Method of post-tensioning steel/concrete truss before installation
KR100788396B1 (en) Non-support type prestressed form for constructing beam and construction structure using the same
US8763333B1 (en) Method of making a dual panel composite truss
KR101170922B1 (en) The rahmen bridge construction technique for which tendon and the connection support stand was used
KR20090001261A (en) Prestressed concrete girder bridge having connecting structure using steel bar, and constructing method thereof
JPH11181725A (en) Method for constructing horizontal beam of main tower made of concrete
KR100841387B1 (en) Non-support type prestressed form for constructing beam
CN211421637U (en) Connecting structure of prefabricated gutter
KR101232329B1 (en) Integral bridge and construction method using arched and concrete-filled tube
KR100277606B1 (en) Structural reinforcement method using bidirectional truss
CN110158770A (en) A kind of assembled architecture beam column anchor plate type attachment device and its construction method
CN113622707B (en) Pre-tensioned crossed steel pull rod supporting and reinforcing reinforced concrete frame structure
CN108678248A (en) A kind of modular unit transverse connection structure and its construction technology
KR101726068B1 (en) Precast panel structure and construction method thereof
CN114439202A (en) Thin-wall ultrahigh wall body double-side template operation platform and adjustable fixing system
JP2000303703A (en) Widening construction method for concrete-made structure, construction method for temporary receiving frame on bridge, and reinforcing method for bridge
KR20030069899A (en) Prestressed composite double-T girder bridge
KR100277608B1 (en) Three-dimensional truss floor structure and its construction method
KR20000063515A (en) Pier Structure Construction Method Utilizing Precast Contrete Block And Pier Thereof
KR200240385Y1 (en) PSC Girder having Anchoring Sleeves
CN215977348U (en) Bearing platform setting assembly
CN220100742U (en) Connecting assembly of diagonal bracing for construction of prefabricated shear wall
CN216616571U (en) Steel shell composite cement board dismounting-free mould column

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee