KR100833527B1 - Non-cementation concrete forming structure of capsule type or cave type underground structure - Google Patents
Non-cementation concrete forming structure of capsule type or cave type underground structure Download PDFInfo
- Publication number
- KR100833527B1 KR100833527B1 KR1020070011486A KR20070011486A KR100833527B1 KR 100833527 B1 KR100833527 B1 KR 100833527B1 KR 1020070011486 A KR1020070011486 A KR 1020070011486A KR 20070011486 A KR20070011486 A KR 20070011486A KR 100833527 B1 KR100833527 B1 KR 100833527B1
- Authority
- KR
- South Korea
- Prior art keywords
- concrete
- type
- underground structure
- deck
- underground
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/04—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for structures of spherical, spheroid or similar shape, or for cupola structures of circular or polygonal horizontal or vertical section; Inflatable forms
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/002—Workplatforms, railings; Arrangements for pouring concrete, attached to the form
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
- E04G2011/067—Integrated forms comprising shuttering skin, bracing or strutting arrangements, workplatforms and railings
Abstract
본 발명은 캡슐형 또는 동굴형 지하구조물의 미경화 콘크리트 성형틀에 관한 것으로, 굴착된 지하구조물 내에서 구간별로 슬라이딩 이동시키면서 단계적으로 단일 또는 복수 복공벽 지하구조물의 콘크리트 벽체를 성형작업을 실시할 수 있도록 함으로서, 지하구조물의 성형시에 소요되는 공사시간을 대폭적으로 단축시킬 수 있으면서도 작업성과 경제성도 향상시킬 수 있다. 기술적 수단으로는 중앙에 승강통로(21)가 형성되고 지하구조물(90a)(90b)로부터 지하수가 유입되는 물탱크(60)가 설치된 미들데크(20)와, 지하구조물(90a)(90b)의 수직방향에 대해 설치되면서 요크장치(80a)(80b)를 매개로 작동잭(70)의 구동과 함께 상기 지하구조물(10a)(10b)에 대해 승강 이동되는 행거데크(10a)(10b)와, 지하구조물(90a)(90b)의 아치형 천정면에 대해 위치하면서 상기 미들데크(20) 및 행거데크(10a)(10b) 상측으로 일체 구조화된 아치데크(30)와, 상기 요크장치(80a)(80b) 위쪽에 설치되면서 상기 물탱크(60)로부터의 이송관(81)이 연결되는 배수홀(51) 및 콘크리트철근(91)이 통과되는 철근홀(52) 및 상기 작동잭의 잭로드(71)가 통과되는 로드홀(53)이 관통된 다용도작업대(50)를 기본적으로 포함하여 이루어짐을 특징으로 한다.The present invention relates to an unhardened concrete molding frame of a capsule or cave-type underground structure, and can perform the step of forming concrete walls of single or multiple perforated wall underground structures while slidingly moving section by section within the excavated underground structure. By doing so, it is possible to drastically shorten the construction time required for the molding of underground structures, while also improving workability and economic efficiency. As a technical means, the elevating passage 21 is formed at the center of the middle deck 20 provided with a water tank 60 through which the groundwater flows from the underground structures 90a and 90b, and the underground structures 90a and 90b. Hanger decks (10a) and (10b), which are installed in the vertical direction and moved up and down relative to the underground structures (10a) and (10b) together with the operation of the operation jacks (70) via the yoke devices (80a) (80b), The arch deck 30 and the yoke device 80a (which are integrally structured above the middle deck 20 and the hanger decks 10a and 10b) while being positioned with respect to the arched ceiling surfaces of the underground structures 90a and 90b. 80b) being installed above the reinforcing hole 52 through which the drainage hole 51 to which the transfer pipe 81 from the water tank 60 is connected, and the concrete reinforcement 91, and the jack rod 71 of the operation jack; It is characterized in that the rod hole 53 is passed through the multi-purpose work table 50 is basically made.
복공벽. 지하구조물, 아치데크, 앵커볼트, 콘크리트 성형틀, 승강윈치 Perforated wall. Underground Structure, Arch Deck, Anchor Bolt, Concrete Forming Frame, Lift Winch
Description
도 1은 캡슐형 또는 동굴형 복수 복공벽 지하구조물에 대한 미경화 콘크리트의 타설작업을 단일 시스템으로 실시할 수 있는 본 발명의 기본 실시예에 의한 일체형 성형틀 구조도.1 is a unitary molding frame structure diagram according to the basic embodiment of the present invention that can be carried out in a single system for the pouring of unhardened concrete for the capsule or cave-type multiple perforated wall underground structure.
도 2는 도 1의 미경화 콘크리트 성형틀을 구성하는 미들테크 평면도.Figure 2 is a middle-tech plan view constituting the uncured concrete forming mold of Figure 1;
도 3은 도 2의 A부분 확대도.3 is an enlarged view of a portion A of FIG. 2;
도 4는 본 발명의 미경화 콘트리트 성형틀을 구성하는 행거데크 구조도.Figure 4 is a hanger deck structure diagram constituting the uncured concrete molding frame of the present invention.
도 5는 본 발명의 미경화 콘트리트 성형틀을 구성하는 다용도작업대 평면도.5 is a plan view of the multi-purpose workbench constituting the uncured concrete forming mold of the present invention.
도 6은 도 5의 B부분 확대도.6 is an enlarged view of a portion B of FIG. 5;
도 7은 도 5의 단면도.7 is a cross-sectional view of FIG.
도 8은 캡슐형 또는 동굴형 단일벽 지하구조물의 미경화 콘크리트를 타설하기 위한 본 발명의 다른 실시예에 의한 성형틀 구조도.8 is a structural view of the mold according to another embodiment of the present invention for pouring uncured concrete of a capsule or cave type single wall underground structure.
도 9는 도 8의 미경화 콘크리트 성형틀을 구성하는 행거데크 구조도.Figure 9 is a hanger deck structure diagram constituting the uncured concrete forming mold of Figure 8;
도 10은 캡슐형 또는 동굴형 복공벽 지하구조물에 대한 미경화 콘크리트의 타설작업을 콘크리트펌프카를 통해 단일 시스템으로 실시할 수 있는 본 발명의 응 용 실시예에 의한 일체형 성형틀 구조도.Figure 10 is a unitary molding frame structure according to an embodiment of the present invention that can be carried out in a single system through the concrete pump car to place the unhardened concrete for the capsule or cave-type perforated wall underground structure.
도 11a 및 11b는 본 발명의 또 다른 실시예를 나타낸 성형틀 구조도.Figure 11a and 11b is a molding frame structure showing another embodiment of the present invention.
<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>
10a,10b : 행거데크 20 : 미들데크10a, 10b: hanger deck 20: middle deck
21 : 승강통로 30 : 아치데크21: lift passage 30: arch deck
31 : 경사지지대 32 : 앵커볼트31: inclined support 32: anchor bolt
33 : 수평지지대 40 : 공급호퍼33: horizontal support 40: supply hopper
41 : 타설슈트 42 : 승강윈치41: pour chute 42: lifting winch
50 : 다용도작업대 51 : 배수홀50: multipurpose work table 51: drainage hole
52 : 철근홀 53 : 로드홀52: reinforcing hole 53: road hole
60 : 물탱크 61 : 살수노즐60: water tank 61: water spray nozzle
70 : 작동잭 71 : 잭로드70: working jack 71: jack rod
72 : 유압제어박스 80a,80b : 요크장치72:
81 : 이송관 90a,90b : 지하구조물81:
91 : 콘크리트철근91: concrete rebar
본 발명은 지하에 굴착된 구조물의 콘크리트 성형벽 거푸집 또는 성형틀에 관한 것으로, 보다 상세하게는 굴착된 캡슐형 또는 동굴형 지하구조물의 전체 벽면에 대해 성형틀을 단계적으로 슬라이딩 이동시키면서 아치형 천정면에 대한 별도의 거푸집 사용 없이도 지하구조물의 전체 벽면의 미경화 콘크리트 타설작업을 실시할 수 있어 공사시간의 단축과 함께 작업성과 안정성을 획기적으로 향상시킨 안정된 작업구조의 캡슐형 또는 동굴형 지하구조물의 미경화 콘크리트 성형틀에 관한 것이다.The present invention relates to a concrete formed wall formwork or mold of the structure excavated underground, more specifically, to the arched ceiling surface while slidingly sliding the forming frame with respect to the entire wall surface of the excavated capsule or cave-type underground structure Uncured concrete pouring works for the entire walls of underground structures without the use of additional formwork for the construction of the encapsulated or cave-type underground structures of the stable work structure, which drastically improved workability and stability while reducing construction time. It relates to a concrete mold.
잘 알려져 있는 바와 같이, 슬립폼(Slip form) 공법은 거푸집 공법의 일종으로 슬라이딩폼(Sliding form)이라고 불려 지기도 하는데, 수평적 또는 수직적으로 반복된 구조물을 시공이음이 없이 균일한 형상으로 시공하기 위하여 거푸집을 연속적으로 이동시키면서 콘크리트를 타설하여 구조물을 시공하는 공법으로, 수직터널이나 원자력 발전소의 원자로격납용기(Containment vessel)와 같은 지하구조물의 원지반을 보호하고 안정화시키기 위하여 지하구조물의 내측면을 따라 일정두께의 콘크리트 벽체를 시공이음이 없이 시공하고 있다.As is well known, the slip form method is also called a sliding form, which is a formwork method, in order to construct a horizontal or vertically repeated structure into a uniform shape without construction joints. A method of constructing a structure by pouring concrete while continuously moving formwork. It is fixed along the inner side of the underground structure to protect and stabilize the base of the underground structure such as a vertical tunnel or a reactor vessel of a nuclear power plant. The concrete wall of thickness is constructed without construction joint.
이와 같은 슬리폼 공법은 시공이음이 없고 연속시공이 가능하며, 공사기간의 단축 및 공사비 절감이 가능하고, 자동계측 및 제어시스템으로 시공 중에 발생할 수 있는 모든 상황에 신속히 대응할 수 있어 고품질의 콘크리트 구조물을 건설할 수 있다는 장점이 있다. 그러나 공사가 시작되면 완료될 때까지 연속으로 작업해야 하므로 필요한 인원이나 자재 반입 등의 계획을 세워야 함에 따라 시공 중에는 설계변경이 곤란하므로 준비작업을 철저히 해야 하는 단점이 있다.This slim form method can be used without construction joints, continuous construction is possible, construction time can be shortened and construction cost can be reduced, and automatic measurement and control system can quickly respond to any situation that may occur during construction to produce high quality concrete structures. The advantage is that it can be constructed. However, when construction starts, work must be done continuously until completion, and thus, a plan for carrying out necessary personnel or materials is required. Therefore, design changes are difficult during construction. Therefore, preparation work must be thoroughly performed.
특히 이러한 슬립폼 공법에 적용되고 있는 지금까지의 슬립폼 장치(성형틀) 를 보면, 통상 지하구조물의 바닥면과 수직 벽체면에 대해 슬립폼 장치를 통해 미경화 콘크리트를 타설시킨 다음, 아치형의 천정면에 대해서는 슬립폼 장치를 적용시키지 못하고 별도의 거푸집을 설치하여 미경화 콘크리트를 타설하는 추가작업이 요구되었으며, 이는 지하구조물의 미경화 콘크리트 타설작업이 연속적인 단일공정으로 실시되지 못해 공사시간이 늘어날 수밖에 없어, 결과적으로 지하구조물의 콘크리트를 타설함에 있어 작업성과 경제성은 물론 작업자의 안정성이 떨어지는 요인이 되고 있다.In particular, the conventional slip foam apparatus (forming mold) applied to such a slip foam method is usually cast on uncured concrete through the slip foam apparatus to the bottom surface and vertical wall surface of the underground structure, and then the arched cloth For the facade, additional work was needed to install the uncured concrete by installing a separate formwork without applying the slip foam device, which would increase the construction time because the uncured concrete pouring work of underground structures was not carried out in a single continuous process. Inevitably, when placing concrete in underground structures, workability and economics as well as workers' stability are declining.
따라서 본 발명은 상기한 바와 같은 지금까지 슬립폼 장치가 해결하지 못한 제반 문제점들을 구조적으로 해결할 수 있도록 개발된 것으로, 굴착된 캡슐형 또는 동굴형 지하구조물 내에서 구간별로 성형틀을 슬라이딩 이동시키면서 단계적으로 단일벽 또는 복수 복공벽 지하구조물의 콘크리트 벽체의 콘크리트 타설작업을 실시할 수 있도록 함으로서, 캡슐형 또는 동굴형 지하구조물의 성형시에 소요되는 공사시간을 대폭적으로 단축시킬 수 있으면서도 작업성과 경제성도 향상시킬 수 있는 안정된 작업구조의 캡슐형 또는 동굴형 지하구조물의 미경화 콘크리트 성형틀을 제공함에 그 목적이 있다.Therefore, the present invention was developed to structurally solve all the problems that the slipform apparatus has not solved as described above, and step by step while sliding the molding frame by section in the excavated capsule-type or cave-type underground structure By enabling concrete pouring of concrete walls of single-walled or multi-porous walled underground structures, construction time for the formation of capsule- or cave-type underground structures can be greatly reduced, while also improving workability and economy. It is an object of the present invention to provide an unhardened concrete molding frame of a capsule or cave type underground structure of a stable working structure.
본 발명은 상기와 같은 목적을 달성하기 위하여 중앙에 승강통로가 형성되고 지하구조물로부터 지하수가 유입되는 물탱크가 설치된 수평방향의 미들데크와, 지하구조물의 수직방향에 대해 설치되면서 요크장치를 매개로 작동잭의 구동과 함께 상기 지하구조물에 대해 승강 이동되는 행거데크와, 지하구조물의 아치형 천정면에 대해 위치하면서 상기 미들데크 및 행거데크 상측으로 일체 구조화된 아치데크와, 상기 요크장치 위쪽에 설치되면서 상기 물탱크로부터의 이송관이 연결되는 배수홀 및 콘크리트철근이 통과되는 철근홀 및 상기 작동잭의 잭로드가 통과되는 로드홀이 관통된 다용도작업대를 기본적으로 포함하여 이루어진 구성관계를 기술적 특징으로 한다.The present invention provides a horizontal middle deck in which the elevating passage is formed in the center and a water tank into which groundwater flows from the underground structure, and installed in the vertical direction of the underground structure, through the yoke device to achieve the above object. Hanger deck that is moved up and down with respect to the underground structure with the operation of the operation jack, the arch deck structured integrally to the middle deck and the hanger deck upper side while being located against the arched ceiling surface of the underground structure, and installed above the yoke device The technical feature is a configuration relationship comprising a multi-purpose workbench basically through the drainage hole to which the transfer pipe from the water tank is connected, the reinforcing hole through which the concrete rebar passes, and the rod hole through which the jack rod of the operation jack passes. .
그리고 상기 행거데크는 지하구조물 벽체를 형성하게 되는 미경화 콘크리크가 타설슈트를 통해 공급 타설될 수 있도록 아치데크의 수평지지대를 매개로 설치된 공급호퍼와 상기 타설슈트가 연결된다. 또한 아치데크는 지하구조물 전체 벽면에 대해 콘크리트펌프카를 통해 미경화 콘크리트가 공급 타설될 수 있도록 중앙 저부에 고정된 앵커볼트를 매개로 설치되어 작동되는 승강윈치에 콘크리트펌프카로부터의 타설슈트가 연결된것을 구성관계를 이룬다.In addition, the hanger deck is connected to the supply hopper and the pour chute installed through the horizontal support of the arch deck so that the uncured concrete that forms the underground structure wall can be poured through the pour chute. In addition, the arch deck is constructed by connecting the casting chute from the concrete pump car to the lifting winch which is installed and operated by anchor bolt fixed to the center bottom so that the unhardened concrete can be poured through the concrete pump car to the entire wall of the underground structure. Build relationships.
또한 상기 아치데크는 지하구조물의 아치형 천정면으로 타설되는 미경화 콘크리트가 일정 진동에 의해 균등하게 분포될 수 있도록 있도록 경사지지대에 다수의 다짐기(바이브레이터)가 설치된다. 또한 상기 행거데크는 지하구조물로의 미경화 콘크리트가 타설되면서 물탱크로부터의 지하수가 살수될 수 있도록 살수노즐이 설치된 것을 특징으로 한다. 나아가 다용도작업대는 낙하되는 지하수가 흘러넘치지 않고 이송관을 통해 물탱크로 유입되도록 지하구조물쪽의 단부가 조금 높게 돌출된 구성관계를 통해 기존의 슬립폼 장치들과 차별화된다.In addition, the arch deck is provided with a plurality of compactors (vibrators) on the inclined support so that the unhardened concrete poured into the arched ceiling surface of the underground structure can be evenly distributed by a certain vibration. In addition, the hanger deck is characterized in that the spraying nozzle is installed so that the ground water from the water tank can be sprayed while the unhardened concrete is poured into the underground structure. Furthermore, the multipurpose workbench is differentiated from the existing slip foam devices through a configuration in which the end portion of the underground structure protrudes slightly higher so that the falling groundwater does not overflow into the water tank through the transfer pipe.
이하, 굴착된 단일벽 또는 복공벽의 캡슐형 또는 동굴형 지하구조물(90a)(90)의 전체 벽면에 대해 성형틀을 단계적으로 슬라이딩 이동시키면서 아치형 천정면에 대한 별도의 거푸집 사용 없이도 미경화 콘크리트 타설작업을 실시할 수 있는 본 발명의 구체적인 구성관계 및 작동을 첨부한 바람직한 실시예의 도면을 참조하여 상세히 설명한다.In the following, the uncured concrete is poured without the use of a separate formwork for the arched ceiling while slidingly moving the molding frame with respect to the entire wall of the encapsulated or cave-type underground structure (90a) (90) of the excavated single wall or perforated wall. With reference to the accompanying drawings of the preferred embodiment of the present invention the specific configuration and operation of the operation that can be carried out will be described in detail.
우선 도 1 내지 도 7의 도면은 캡슐형 또는 동굴형 지하구조물의 천정면에 대한 별도의 거푸집 사용 없이도 지하구조물(90a)(90b)의 전체 벽면에 대해 성형틀이 단계적으로 슬라이딩 이동되면서 공급호퍼(40)로부터의 타설슈트(41)를 통해 미경화 콘크리트를 타설작업할 수 있는 본 발명의 기본 실시예에 의한 성형틀을 도시한 것으로, 기본적으로 중앙에 승강통로(21)가 형성되고 복수 복공벽 지하구조물(90a)(90b)로부터 지하수가 유입되는 물탱크(60)가 설치된 수평방향의 미들데크(20)와, 지하구조물(90a)(90b)의 수직방향에 대해 설치되면서 요크장치(80a)(80b)를 매개로 작동잭(70)의 구동과 함께 상기 지하구조물(90a)(90b)에 대해 승강 이동되는 행거데크(10a)(10b)와, 지하구조물(90a)(90)의 아치형 천정면에 대해 위치하면서 상기 미들데크(20) 및 행거데크(10a)(10b) 상측으로 일체 구조화된 아치데크(30)와, 상기 요크장치(80a)(80b) 위쪽에 설치되면서 상기 물탱크(60)로부터의 이송관(81)이 연결되는 배수홀(51) 및 콘크리트철근(91)이 통과되는 철근홀(52) 및 상기 작동잭의 잭로드(71)가 통과되는 로드홀(53)이 관통된 다용도작업대(50)를 포함하여 시스템 구성된다.First, the drawings of FIGS. 1 to 7 show that the feed hopper (sliding) is moved stepwise with respect to the entire wall of the underground structures (90a, 90b) without using a separate formwork for the ceiling surface of the capsule or cave-type underground structure. 40 shows a forming mold according to the basic embodiment of the present invention capable of pouring unhardened concrete through the
아울러 도 8 및 도 9는 캡슐형 또는 동굴형의 단일벽 지하구조물(90a)의 미경화 콘크리트를 타설하기 위한 본 발명의 다른 실시예에 의한 성형틀의 전체적인 시스템 구조 및 행거테크(10a)의 구조를 각각 도시한 것으로, 도 1 내지 도 7의 기본 실시예와 전체적으로 동일한 구성관계로서 다만 복수 복공벽이 아닌 단일벽의 지하구조물(90a)에 적용하므로 상기 행커데크(10a)가 복수가 아닌 단일의 구성관계로 이루어지는 차이만 있다.8 and 9 are the overall system structure of the mold according to another embodiment of the present invention and the structure of the
도면에서 보는 바와 같이, 캡슐형 또는 동굴형 지하구조물(90a)(90b)의 전체 벽면에 대해 단일 시스템으로 미경화 콘크리트를 타설할 수 있는 본 발명의 미경화 콘크리트 성형틀은 기본적으로 지금까지 소개된 슬립폼 장치들에서는 전혀 적용되지 않은 아치데크(30)를 일체 구조화시킴으로서, 캡슐형 아치형 천정면의 타설작업시 별도의 거푸집을 설치하는 번거로움을 구조적으로 없앨 수 있을 있을 뿐만 아니라 일원화된 시스템의 적용으로 전체적인 타설작업이 안정화될 수 있으면서 작업시간도 획기적으로 줄일 수 있는 작업성 및 경제성은 물론, 중단 없이 연속적으로 콘크리트의 타설작업이 이루어질 수 있어 안정된 콘크리트 양생면도 당연히 제공할 수 있다.
상기한 아치데크(30)의 외측에는 그 아치데크(30)를 감싸면서 외면부(34)가 구비되는데, 이에 이와같은 외면부(34)는 종래의 거푸집과 동일한 기능을 수행하는 것으로서, 상기 아치데크(30)에 별도의 거푸집을 설치하지 않은 상태에서 콘크리트의 타설작업이 가능하게 된다.(도면 중 미설명부호 34:외면부)As shown in the figure, the uncured concrete forming mold of the present invention, which can cast uncured concrete in a single system for the entire wall of the encapsulated or cave-type
An
먼저 행거데크(10a)(10b)는 작업자가 탑승하여 타설슈트(41)를 통해 공급되면서 지하구조물(90a)(90b)로 타설되는 미경화 콘크리트의 타설작업이 정확히 이루어질 수 있도록 수직방향의 상기 지하구조물(90a)(90b)에 대해 위치하게 되며, 상기 행거데크(10a)(10b) 안쪽으로는 수평방향의 미들데크(20)가 구성된다.First, the
특히 미들데크(20)는 중앙에 아치데크(30) 위쪽의 지하구조물(90a)에 고정시 킨 앵커볼트(32a)를 매개로 승강동작되면서 제반 부속물을 운반될 수 있도록 승강통로(21)가 관통되며, 측방의 행거데크(10a)(10b)쪽으로는 각각 지하구조물(90a)(90b)부터 낙하되는 지하수가 다용도작업대(50)의 이송관(81)을 통해 유입되어 저장될 수 있도록 물탱크(60)가 설치된다. 물론 상기 물탱크(60)는 행거데크(10a)(10b)의 저부에 설치된 살수노즐(61)가 연결되어 미경화 콘크리트의 타설작업시 외부로부터의 물을 이용하는 번거로움 없이 지하수로서 사용할 수 있도록 한다.In particular, the
그리고 작업자가 탑승하는 행거테크(10a)(10b)는 요크장치(80a)(80b)를 매개로 작동잭(70)의 구동에 따라 잭로드(71)와 함께 승강될 수 있으며, 이러한 요크장치(80a)(80b)는 통상의 슬립폼 장치에 적용되는 요크장치의 구성관계에 준하여 그 작동구조가 이루어진다. 아울러 이들 요크장치(80a)(80b)는 별도의 유압제어박스(72)의 제어신호에 따라 작동 조절됨은 물론이다.And the hanger tech (10a) (10b) that the operator boards can be elevated with the
그리고 상기 요크장치(80a)(80b) 위쪽으로 설치되는 다목적작업대(50)는 작동잭(70)의 잭로드(71)가 통과되는 로드홀(53)과 함께 콘크리트철근(91)이 통과되는 철근홀(52) 및 물탱크(60) 쪽으로의 이송관(81)이 연결된 배수공(51)이 관통 형성되고, 지하구조물(90a)(90b)쪽으로부터 낙하되는 지하수가 흘러넘치지 않고 상기 이송관(81)을 통해 물탱크(60)로 유입되도록 지하구조물(90a)쪽의 외측 단부가 조금 높게 돌출됨이 바람직하다.And the
특히 본 발명의 미경화 콘크리트 성형틀에 적용시켜 구성된 아치데크(30)는 타설되는 지하구조물(90a)의 천정면 저부 중앙으로 부속물의 지지수단인 앵커볼 트(32a)가 고정 설치되면서 전체적으로 안정된 지지구조와 타설되는 콘크리트가 원활하게 공급될 수 있도록 경사지지대(31)와 수평지지대(33)가 결합되며, 상기 수평지지대(33)를 매개로 공급호퍼(40)가 설치되어 먼저 지하구조물(90a)(90b)를 이루는 수평방향의 바닥면과 수직방향의 벽체면에 대해 타설슈트(41)를 통해 미경화 콘크리트가 타설된다. 아울러 아치형의 천정면에 대해서는 별도의 콘크리트펌프카(도면도시 생략)로부터의 경사지지대(31)를 통한 미경화 콘크리트 공급으로 천정면의 콘크리트 타설작업이 이루어진다.In particular, the
또한 아치데크(30)는 지하구조물(90a)(90b)의 천정면에 대한 콘크리트 타설이 균등하게 이루어질 수 있도록 경사지지대(31)에 다수의 다짐기(바이브레이터)가 설치됨이 바람직하며, 이는 지하구조물(90a)(90b)의 아치형 천정면으로 타설되는 미경화 콘크리트가 일정 진동에 의해 균등하게 분포될 수 있도록 한다.In addition, the
한편, 도 1 내지 도 9의 기본 실시예와 달리 지하구조물(90a)(90b)의 아치형 천정면을 포함한 전체 벽면에 대해 콘크리트펌프카로서 미경화 콘크리트를 타설시킬 수 있도록 도 10에서와 같은 응용 실시예가 적용될 수 있다. 즉, 아치데크(30)의 수평지지대(33)에 구성되는 공급호퍼(40) 대신에 상기 아치테크(30) 저부에 고정시킨 앵커볼트(32b)를 매개로 승강윈치(42)를 설치하고, 상기 승강윈치(42)를 매개로 타설슈트(41)가 승강 이동될 수 있도록 함으로서 콘크리트펌프카로부터 공급되는 미경화 콘크리트가 상기 타설슈트(41)를 통해 지하구조물(90a)(90b)의 전체 벽면에 대해 단일 시스템으로서 타설될 수도 있다.On the other hand, unlike the basic embodiment of Figures 1 to 9 the application embodiment as shown in Figure 10 to be able to pour uncured concrete as a concrete pump car for the entire wall including the arched ceiling surface of the underground structures (90a, 90b) Can be applied. That is, instead of the
도 11a 및 11b는 본 발명의 또 다른 실시예를 나타낸 성형틀 구조도.Figure 11a and 11b is a molding frame structure showing another embodiment of the present invention.
도 11a 및 11b를 참조하면, 다단으로 형성된 상기 지하구조물(90a)(90b)에 상기 미들데크(20)의 길이를 가변시켜 설치하게 된다. 즉 상기 미들데크(20)의 양단부와 연결프레임(22)을 연결편에 의해 상호 나사체결하여 장,탈착가능하게 설치하게 된다. 다시말해 도11a에서와 같이 좁은 폭(L1)의 지하구조물(90a)(90b)에서 넓은 폭(L2)의 지하구조물(90a)(90b)로 이동시 상기 미들데크(20)의 양단부에 연결프레임(22)을 설치하게 되고, 반대로 도11b에서와 같이 넓은 폭(L2)의 지하구조물(90a)(90b)에서 좁은 폭(L1)의 지하구조물(90a)(90b)로 이동시 미들데크(20)에 결합된 연결프레임(22)을 해체하게 됨으로써, 다양한 폭(L1,L2)을 같는 지하구조물(90a)(90b)을 시공할 수 있게 된다.Referring to FIGS. 11A and 11B, the
이상에서 설명한 바와 같이 본 발명에 따른 캡슐형 또는 동굴형 지하구조물의 미경화 콘크리트 성형틀은, 굴착된 캡슐형 또는 동굴형 지하구조물 내에서 구간별로 성형틀이 슬라이딩 이동시키면서 단계적으로 단일벽 또는 복수 복공벽 지하구조물의 콘크리트 벽체에 대한 콘크리트 타설의 성형작업을 실시할 수 있도록 함으로서, 캡슐형 또는 동굴형 지하구조물의 성형시에 소요되는 공사시간(작업공기)을 대폭적으로 단축시킬 수 있으면서도 작업성과 경제성도 향상시킬 수 있는 안정된 작업구조를 제공할 수 있다.As described above, the uncured concrete molding frame of the capsule-type or cave-type underground structure according to the present invention is a single wall or a plurality of steps in stages while the mold is slidingly moved by section in the excavated capsule-type or cave-type underground structure. By making concrete casting work for concrete wall of hollow wall underground structure, it is possible to drastically shorten the construction time (working air) required for molding capsule or cave type underground structure, while also improving workability and economic efficiency. It can provide a stable work structure that can be improved.
이와 같은 본 발명의 미경화 콘크리트 성형틀은 특히, 지하구조물의 바닥면을 콘트리트 타설한 후에 수직방향의 벽체면과 아치형의 천정면에 대한 콘크리트 타설작업을 위한 별도의 거푸집을 설치하는 번거로움은 물론 작업의 불안정성을 구조적으로 개선할 수 있어 복잡한 형태의 어떠한 지하구조물에도 폭넓게 적용시킬 수 있는 다양한 효과가 제공될 수 있을 것으로 기대된다.Such uncured concrete forming mold of the present invention, in particular, after concrete pouring the bottom surface of the underground structure, the cumbersome work of installing a separate formwork for concrete placing work on the vertical wall surface and the arched ceiling surface, as well as It is expected that the instability of the work can be structurally improved to provide various effects that can be applied to a wide range of complex structures.
Claims (8)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR20060038654 | 2006-04-28 | ||
KR1020060038654 | 2006-04-28 |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20070106386A KR20070106386A (en) | 2007-11-01 |
KR100833527B1 true KR100833527B1 (en) | 2008-05-29 |
Family
ID=39062367
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020070011486A KR100833527B1 (en) | 2006-04-28 | 2007-02-05 | Non-cementation concrete forming structure of capsule type or cave type underground structure |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100833527B1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101013450B1 (en) | 2010-11-11 | 2011-02-14 | (주)유경기술단 | Apparatus for forming underground concrete structure in which dome is integrated to vertical tunnel and constructing method using the same |
CN103255866A (en) * | 2013-05-15 | 2013-08-21 | 中建八局大连建设工程有限公司 | Manufacturing method of roof circular arc-shaped dome structure |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108979130A (en) * | 2018-07-30 | 2018-12-11 | 中铁十六局集团北京轨道交通工程建设有限公司 | A kind of the side wall unilateral side vertical mold device and construction method of adjustable formwork height |
CN110299058A (en) * | 2019-06-06 | 2019-10-01 | 甘肃工业职业技术学院 | Pipe gallery system under a kind of land for teaching |
CN110397274A (en) * | 2019-08-12 | 2019-11-01 | 常嘉建设集团有限公司 | A kind of circle concrete is interior to receive the outer formwork erecting structure supportted |
CN112942154B (en) * | 2021-02-28 | 2022-06-21 | 广西路建工程集团有限公司 | Culvert cover plate movable type support-free cast-in-place device and construction method thereof |
CN117230738B (en) * | 2023-11-14 | 2024-02-02 | 山西八建集团有限公司 | Construction device and method for supporting-free disassembly-free formwork of trench cover plate |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5164734A (en) | 1974-12-03 | 1976-06-04 | Tobishima Construct Co Ltd | KATSUDO KATAWAKUSOCHI |
JPS53100629A (en) | 1977-02-15 | 1978-09-02 | Obayashi Gumi Kk | Slip form unit |
JPH0518106A (en) * | 1991-07-17 | 1993-01-26 | Mitsubishi Heavy Ind Ltd | Constructing device for concrete building |
JPH11311021A (en) | 1998-04-28 | 1999-11-09 | Ohbayashi Corp | Fall preventing device in slip form construction method |
KR100307914B1 (en) | 1998-10-08 | 2001-11-30 | 고엄식 | Yoke equipment for slip foam to mold excavation side in vertical tunnel |
-
2007
- 2007-02-05 KR KR1020070011486A patent/KR100833527B1/en not_active IP Right Cessation
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5164734A (en) | 1974-12-03 | 1976-06-04 | Tobishima Construct Co Ltd | KATSUDO KATAWAKUSOCHI |
JPS53100629A (en) | 1977-02-15 | 1978-09-02 | Obayashi Gumi Kk | Slip form unit |
JPH0518106A (en) * | 1991-07-17 | 1993-01-26 | Mitsubishi Heavy Ind Ltd | Constructing device for concrete building |
JPH11311021A (en) | 1998-04-28 | 1999-11-09 | Ohbayashi Corp | Fall preventing device in slip form construction method |
KR100307914B1 (en) | 1998-10-08 | 2001-11-30 | 고엄식 | Yoke equipment for slip foam to mold excavation side in vertical tunnel |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101013450B1 (en) | 2010-11-11 | 2011-02-14 | (주)유경기술단 | Apparatus for forming underground concrete structure in which dome is integrated to vertical tunnel and constructing method using the same |
CN103255866A (en) * | 2013-05-15 | 2013-08-21 | 中建八局大连建设工程有限公司 | Manufacturing method of roof circular arc-shaped dome structure |
CN103255866B (en) * | 2013-05-15 | 2015-05-13 | 中建八局大连建设工程有限公司 | Roof circular arc-shaped dome structure and manufacturing method |
Also Published As
Publication number | Publication date |
---|---|
KR20070106386A (en) | 2007-11-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100833527B1 (en) | Non-cementation concrete forming structure of capsule type or cave type underground structure | |
CN102383628B (en) | Construction device and construction method for post construction of depressing cone of silo structure | |
CN107059920B (en) | Loess formation piping lane construction technology | |
CN108505645B (en) | CL composite concrete shear wall cast-in-place construction method | |
CN106013776A (en) | Hydraulic climbing type elevator shaft finalization operation platform and construction method | |
US3754066A (en) | Method of coating or lining a structural surface | |
CN209384639U (en) | A kind of impression-taking apparatus applied to house sliding formwork molding machine | |
CN212176540U (en) | Hydraulic climbing formwork system formwork | |
JP6966853B2 (en) | How to place concrete on an inclined surface and mobile formwork equipment | |
CN108755972A (en) | Prefabricated component feet and its application method | |
CN106042173A (en) | Bridge production system | |
CN107724671A (en) | A kind of monoblock type climbing form system and its construction method | |
CN202064281U (en) | Slip form frame | |
CN113266397A (en) | Hydraulic formwork trolley for small-section chamber lining and construction method | |
CN105064500A (en) | Balcony beam slab inner side filling wall body and main body structure integral casting construction method | |
CN112160770B (en) | Tunnel reinforced concrete center ditch construction equipment and construction method thereof | |
CN102605988B (en) | Synchronous construction method for chimney lining external concrete | |
KR100448221B1 (en) | Movable Steel Form for Constructing Culvert and Continuous Constructing Method of Culvert Using the Same | |
CN109610354B (en) | Cast-in-situ slab culvert template system and construction method applying same | |
CN114809703B (en) | Column-pulling conversion reinforcing structure and construction method thereof | |
CN113931444B (en) | Post-cast edge beam integral type template structure and construction method thereof | |
CN217327341U (en) | Self-propelled long-span variable cross-section hydraulic formwork trolley | |
CN112012473B (en) | Integrated steel formwork for wall body of cantilever rib type of sewage pool | |
CN211849445U (en) | Construction system of river levee dam concrete bed course | |
CN107160542A (en) | Bracket type inner form support system construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20120522 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20130524 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20141125 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20151124 Year of fee payment: 8 |
|
LAPS | Lapse due to unpaid annual fee |