- KR100819523B1 KR100819523B1 KR1020040047879A KR20040047879A KR100819523B1 KR 100819523 B1 KR100819523 B1 KR 100819523B1 KR 1020040047879 A KR1020040047879 A KR 1020040047879A KR 20040047879 A KR20040047879 A KR 20040047879A KR 100819523 B1 KR100819523 B1 KR 100819523B1
- Authority
- KR
- South Korea
- Prior art keywords
- shaft
- assembled
- cutting
- temporary
- protective device
- Prior art date
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C43/00—Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor
- B29C43/22—Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor of articles of indefinite length
- B29C43/222—Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor of articles of indefinite length characterised by the shape of the surface
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C43/00—Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor
- B29C43/32—Component parts, details or accessories; Auxiliary operations
- B29C43/44—Compression means for making articles of indefinite length
- B29C43/46—Rollers
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C59/00—Surface shaping of articles, e.g. embossing; Apparatus therefor
- B29C59/02—Surface shaping of articles, e.g. embossing; Apparatus therefor by mechanical means, e.g. pressing
- B29C59/04—Surface shaping of articles, e.g. embossing; Apparatus therefor by mechanical means, e.g. pressing using rollers or endless belts
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C43/00—Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor
- B29C43/32—Component parts, details or accessories; Auxiliary operations
- B29C43/44—Compression means for making articles of indefinite length
- B29C43/46—Rollers
- B29C2043/461—Rollers the rollers having specific surface features
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Making Paper Articles (AREA)
Abstract
본 발명은 건축물의 지하구조물을 시공하기 위한 터파기 현장에서 흙벽의 붕괴를 방지하기 위하여 설치하였다가 지하 구조물의 공사가 완료된 후에 제거하는 가설 흙막이에 사용되는 철재의 보강재 파일인 H-빔의 외측을 감싸 H-빔의 파일을 인출할시에 토벽류와 철재빔의 마찰력을 감소시켜 용이하게 H-빔을 인출할 수 있도록 하는 가설 흙막이의 파일을 감싸는 보호구를 만드는 장치와 그 제조장치에 의하여 만들어진 가설 흙막이의 파일을 감싸서 보호하는 보호구에 관한 것이다.
가설 흙막이 공사
The present invention is installed to prevent the collapse of the earth wall at the trench site for the construction of the underground structure of the building, the outer side of the H-beam which is the reinforcement pile of the steel used for the temporary earthquake to remove after construction of the underground structure Hypothesis to reduce the friction between earth walls and steel beams when drawing out the pile of H-beams so that the H-beams can be easily drawn out. It is about a protective device that wraps and protects the pile file.
Temporary wall construction
Description
도 1은 종래의 파일 보호구인 포대를 보인 절개사시도,1 is a cutaway perspective view showing a bag that is a conventional file protector,
도 2는 종래의 파일보호구의 측단면도,2 is a side cross-sectional view of a conventional pile protector,
도 3은 본 발명의 파일보호구를 생산하는 것을 보인 공정계략도,Figure 3 is a process diagram showing the production of the pile protector of the present invention,
도 4는 본 발명을 보인 사시도,4 is a perspective view of the present invention,
도 5는 본 발명의 일부를 보인 확대 사시도,5 is an enlarged perspective view showing a part of the present invention;
도 6은 본 발명의 설치부재와 컷팅부를 보인 분해 사시도,6 is an exploded perspective view showing an installation member and a cutting portion of the present invention;
도7은 본 발명의 칼날을 보이는 단면도,7 is a cross-sectional view showing a blade of the present invention,
도8은 본 발명에 의하여 절단과 절곡부를 보인 골판지의 단면도,8 is a cross-sectional view of the corrugated cardboard showing the cut and bent portion in accordance with the present invention,
도9는 본 발명의 흙막이 보호구를 보인 사시도와 흙막이 보호구의 사용상태도, 9 is a perspective view showing the earthen protector of the present invention and the use state of the earthen protector,
도10a는 본 발명의 컷터의 다른 실시예를 보인 사시도, Figure 10a is a perspective view showing another embodiment of the cutter of the present invention,
10b는 본 발명의 다른 실시예의 컷터에 절단수단의 조립상태를 보인 단면도.10b is a cross-sectional view showing the assembled state of the cutting means in the cutter of another embodiment of the present invention.
<도면의 주요부분에 대한 부호설명><Code Description of Main Parts of Drawing>
100 : 설치부재 101 : 요홈 100: mounting member 101: groove
103 : 고정부재 200 : 컷팅부 103: fixing member 200: cutting portion
210 : 축 220 : 컷터 210: shaft 220: cutter
223 : 고정홀 240 : 조립부재223: fixing hole 240: assembly member
250 : 설치부재 260 : 누룸부재250: installation member 260: nurum member
300 : 이동수단 300: means of transportation
본 발명은 가설 흙막이에 사용되는 파일을 감싸는 보호구 제조장치와 그 장치에 의하여 만들어진 보호구에 관한 것으로 더욱 자세하게는 건축물의 지하구조물을 시공하기 위한 터파기 현장에서 흙벽의 붕괴를 방지하기 위하여 설치하였다가 지하 구조물의 공사가 완료된 후에 제거하는 가설 흙막이에 사용되는 철재의 보강재인 파일인 H-빔의 외측을 감싸 H-빔의 파일을 인출할시에 토벽류와 철재빔의 마찰력을 감소시켜 용이하게 H-빔을 인출할 수 있도록 하는 가설 흙막이의 파일을 감싸는 보호구를 만드는 장치와 그 제조장치에 의하여 만들어진 가설 흙막이의 파일을 감싸서 보호하는 보호구에 관한 것이다. The present invention relates to a protective equipment manufacturing apparatus for protecting the pile used in the temporary mudstone and a protective device made by the apparatus in more detail installed in order to prevent the collapse of the earth wall in the trench site for the construction of the underground structure of the building. H-beam piles are wrapped around the outside of the H-beam, which is a steel reinforcement used for temporary scaffolding to be removed after the construction of the structure is completed. The present invention relates to a device for making a protective device for wrapping a pile of temporary scaffolds to allow the beam to be drawn out, and a protective device for wrapping and protecting a pile of temporary scaffolds produced by the manufacturing apparatus.
일반적으로 토목이나 건축현장에서 구조물의 축조하기 위하여 지반을 굴착할시에 굴착면을 경사지게 굴착하지 않고 거의 수직을 이루면서 굴착하게 되므로 굴착면의 토사 붕괴방지 및 변위를 억제하여 공사현장의 인접주변 지반의 안정성을 유지하기 위하여 지반을 굴착하기 전에 철재로 된 H-빔으로 된 수직파일을 임의의 간격으로 지하에 설치하고, 터파기 작업을 하면서 수직파일들 사이에 토류판을 끼우며 일정 깊이까지 터파기가 이루어지면 수직파일을 설치하고 구조물의 기초공사인 가설 흙막이 공사를 수행한 후에 구조물을 축조하게 되는데 기초공사가 끝난 후에는 가설 흙막이 공사에 사용되었던 H-빔을 제거하는 것이다.In general, when excavating the ground in civil engineering or construction site, the excavation surface is excavated almost vertically instead of inclined excavation surface. Therefore, the earth and sand collapse of the excavation surface is prevented and displacement is suppressed. In order to maintain stability, before the excavation of the ground, vertical piles made of steel H-beams are installed in the basement at random intervals. After the construction of the vertical piles and the construction of the temporary block, the foundation of the structure, the structure is constructed. After completion of the foundation, the H-beams used for the temporary block are removed.
위와 같은 가설 흙막이 공사는 건축물이 많이 시공되어 있는 도심지의 근접시공이 빈번함에 따라 지반굴착으로 인한 인접지반의 침하 및 주변건물의 안전성에 대한 요구가 대두되고 있으며 이에 가설 흙막이 공사의 중요성이 증대되고 있고 지반붕괴방지 및 굴착배면 지하수위 저하 및 이로 인한 토사유출을 방지하여 인접지반의 변위 및 인접건물의 침하를 최소화 할 수 있는 공법을 사용하고 있는 토벽류공법은 연속벽체속에 파일(H-pile)을 삽입하여 토류벽체의 강성을 증대시키기 위한 목적으로 사용되고 있다.As the temporary construction of the temporary cladding as mentioned above frequently occurs in the downtown area where many buildings are constructed, there is a demand for the settlement of adjacent ground due to the ground excavation and the safety of the surrounding buildings. The soil wall flow method uses a method to minimize the displacement of adjacent ground and settlement of adjacent buildings by preventing the ground collapse and preventing the groundwater level from falling down the excavation back and the resulting soil leakage. It is used for the purpose of increasing the rigidity of the earth wall by inserting it.
그러나, 상기한 바와 같은 토류벽 공법에 사용되는 파일은 콘크리트가 양생됨과 동시에 H-빔이 토류벽 내부에 삽입되어 있게 되므로 고가의 파일이 불필요하게 사장되어 파일은 불필요한 자원의 낭비를 초래하게 된다.However, the pile used in the earth wall method as described above, as the concrete is cured and the H-beam is inserted into the earth wall, the expensive pile is unnecessary, and the pile causes waste of unnecessary resources.
또한, 가설 흙막이 공사에 사용되는 H-빔을 제거하지 않고 그대로 방치하는 경우에는 추후 재건축을 시행할시에 지반 굴착 작업시 지반에서 제거되지 않은 H-빔에 의해 지반의 굴착 작업을 하는데 장애를 일으킬 뿐만 아니라, 굴착에 의해 얻어진 파일은 재사용이 불가능하여 산업폐기물로 분류되는 등의 문제점이 있었다.In addition, if the H-beams used for temporary construction are not removed, they may cause obstacles in the excavation work of the ground by the H-beams not removed from the ground during the ground excavation work when the reconstruction is performed later. In addition, the file obtained by excavation was not reused, there was a problem such as being classified as industrial waste.
이와 같은 문제점을 해소하기 위하여 실용신안등록 제340902호가 제안되었고 실용신안등록 제340902호의 구성은 합성수지재 관체상 내측시트지(1)와 상기 내측 시트지(1) 보다는 내측폭이 넓은 관체상 외측시트지(2)를 서로 중첩하고, 중첩된 내측시트지(1)와 외측시트지(2)의 상,하단 주면을 각각 밀봉하되, 내측시트지(1)와 외측시트지(2) 사이의 공간부(3)에 고압의 공기가 충전되게 하고, 상기 내측시트지(1)와 외측시트지(2)의 밀봉 하단부에는 별도의 마감부(4)를 형성하여 이에 의해 근입코자 하는 파일(6)의 길이와 동일한 포대 형상의 이형지(5)로 된 포대를 만들어 사용하여 용이하게 H-빔을 제거할 수 있으나 천막지 등을 이용하여 포대를 만드는데 많은 비용이 소용되어 H-빔에 포대를 넣기 위하여서는 터파기 공사 현장에서 H-빔을 설치할시에 포대를 H빔과 동시에 설치하여야 하므로 안전사고의 위험성이 내재한다.Utility model registration No. 340902 has been proposed to solve such problems, and the construction of utility model registration No. 340902 is a tubular outer sheet paper having a wider inner width than the
또 천막지 등으로 포대로 H-빔을 감싸는 경우에 H-빔을 포대에 넣는 과정에서 H-빔의 날카로운 부분이 포대와 접촉되는 경우에는 천막지가 찢겨지는 경우가 발생하는 등 포대에 H-빔을 넣는 것이 어렵고 많은 시간이 소요되는 문제점이 있었다. If the H-beam is wrapped in a bag with a tent, etc., if the sharp part of the H-beam comes into contact with the bag in the process of placing the H-beam in the bag, the tent may be torn. It was difficult to put a lot of time consuming problems.
본 발명은 상기와 같은 문제점을 해소하기 위한 것으로 보호구를 대량으로 생산할 수 있도록 하는 것을 목적으로 한다.The present invention aims to solve the above problems and to produce a large amount of protective equipment.
다른 목적은 보호구를 H-빔의 형상으로 만들어 H-빔을 보호구에 삽입할시에 용이하게 넣을 수 있게 하는 것을 목적으로 한다. Another object is to make the protective device into the shape of the H-beam so that it can be easily inserted when the H-beam is inserted into the protective device.
상기의 목적은 합성수지를 용융하여 합성수지 골판지를 만드는 압출기의 양측에 부착되어 요홈을 형성하여 컷팅부를 조립하는 설치부재와 일부에는 소정의 간 극을 두고 다수개의 칼날을 형성하고 중앙부에 축홀을 형성하여 축에 조립되는 다수개의 컷터와 중앙에는 축홀이 형성된 조립부재와 일측에 돌기를 만들고 중앙부에 축홀을 형성하여 상기 조립부재와 대응되는 슬라이드부재와 상기 컷터를 조립하고 양단에는 조립부재 및 슬라이드부재를 조립하여 설치부재의 요홈에 조립되는 축으로 된 컷팅부와 상기 컷팅부를 상하로 이동하는 터를 상하로 이동하는 이동수단으로 구성되어 달성된다.The above object is attached to both sides of the extruder to melt the synthetic resin to form a corrugated cardboard is formed in the groove to form a groove to assemble the cutting part and a plurality of blades with a predetermined gap in a portion to form a shaft hole in the center shaft Assembling a plurality of cutters and the assembly member formed with a shaft hole in the center and a projection on one side and forming a shaft hole in the center to assemble the slide member and the cutter corresponding to the assembly member and to assemble the assembly member and the slide member at both ends It consists of a shaft-cutting part assembled in the groove of the installation member and a moving means for moving the cutting means for moving the cutting part up and down.
다른 목적은 합성수지 골판지의 일측면을 소정의 간극을 두고 H-빔을 감싸 H-빔의 형상을 만들 수 있게 조밀하게 컷팅하고 일부는 가압하여 절곡부를 만들어 절곡부의 외측에서 양단을 체결수단으로 체결하여 만든 가설 흙막이에 사용되는 H-빔을 싸는 보호구로 달성된다. Another purpose is to cut one side of the synthetic resin cardboard so as to surround the H-beam with a predetermined gap to form the shape of the H-beam, and to press part to make the bent part and fasten both ends by the fastening means at the outside of the bent part. Achieved as a H-beam enclosing protective device used in the construction hypothesis.
이하 첨부된 도면에 의하여 본 발명의 일 실시예를 상세히 설명하면 다음과 같다. Hereinafter, an embodiment of the present invention will be described in detail with reference to the accompanying drawings.
합성수지를 가열하여 용융하는 용융부(10)와 상기 용융부(10)에서 용융된 합성수지를 넓게 가압인출하는 인출부(20)와 상기 용융 인출되는 합성수지를 다수개의 로울러로 가압하여 성형하는 가압성형부(30)를 거치면서 골판지를 만드는 플라스틱 골판지 제조장치에 있어서,Melting
상기 용융된 합성수지가 인출되고 가압하여 골판지로 만드는 다수개의 로울러가 구비된 가성형압부(30)의 후방에 위치하여 가압성형부(30)의 양측에 고정조립되고 요홈(101)이 형성하여 그 요홈(101)에 컷팅부(200)의 축(210)을 조립하는 설 치부재(100)와, 일부에는 소정의 간극을 두고 다수개의 칼날(221)을 형성하고 중앙부에 축홀(222)을 형성하여 축(210)에 조립되는 다수개의 컷터(220)와 상기 다수개의 컷터(220)를 소정의 간극을 두고 조립하고 양단에는 조립부재(240)와 중앙에 축홀(241)이 형성되어 슬라이드부재(250)와 조립되는 조립부재(240)와 일측에 돌기(251)를 만들고 중앙부에 축홀(252)을 형성하여 상기 조립부재(240)와 대응되어 조립되는 슬라이드부재(250)와 슬라이드부재(250)가 설치부재(100)에 슬라이드되게 조립하여 설치부재(100)의 요홈(101)에 조립되는 축(210)으로 된 컷팅부(200)와, 상기 컷팅부(200)를 상하로 이동하는 이동수단(300)으로 구성되는 가설 흙막이에 사용되는 파일을 싸는 보호구 제조장치에 관한 것이다. The molten synthetic resin is drawn out and pressurized is located at the rear of the provisional pressing
설치부재(100)는 상기 용융부에서 가열하여 용융된 합성수지를 인출부의 넓은 노즐을 통하여 가압 인출한 후에 다수개의 가압로울러를 설치된 여러단계의 가압성형부를 통과하면서도 로울러에 의하여 가압되어 판지로 만드는 가압성형부의 후방 양측에 고정설치되는데 중앙부에는 요홈(101)이 형성하고 설치부재(100)의 내측으로는 조립부재(240)와 외측에는 슬라이드부재(250)를 위치토록 하여 요홈에 축(210)으로 조립한다.The
상기 설치부재(100)의 상부에는 고정부재(103)를 나사(104)로 고정부착하여설치부재(100)의 요홈(101)에 조립 설치하여 컷팅부(200)의 이동을 제한하고 컷팅부(200)를 교환하고자 할 시에 용이하게 교환할 수 있게 하였다.The
컷팅부(200)는 골판지의 일측면을 절단하기 위한 것으로 다각형으로 되어 다각의 모서리에는 다수개의 칼날(221)을 만들고 중앙부에 축홀(222)을 형성하여 소정의 간극으로 축(210)에 고정조립되는 다수개의 컷터(220)와 상기 컷터(220)를 조립하고 양단에는 슬라이드부재(250)를 조립하여 설치부재(100)의 요홈(101)에 조립부재(240)로 슬라이드 되게 설치되는 축(210)으로 구성되어 축(210)을 상하로 이동시켜 컷팅하고자 하는 경우에는 컷팅부(200)를 하부로 이동시켜 일측면을 컷팅하고 컷팅하지 않을시에는 컷팅부(200)를 상부로 이동시켜 컷터(220)가 합성수지 판지로부터 떨어지지 하여 합성수지 판지가 컷팅되지 않게 되는 것이다.The
상기 컷터(220)의 칼날(221) 크기(h2)는 골판지의 두께(h1)보다 적게 만들어 컷터(220)를 골판지의 일측면에 접촉시켜 컷터(220)의 칼날(221)에 의하여 컷팅되는 깊이(h2)가 적어 칼날(221)이 지나가도 골판지가 컷팅되었을시에 골판지의 양면이 완전히 컷팅되어 절단되는 것이 아니고 양면의 사이에 있는 골판지(500)의 지지대(502)를 사이에 두고 지지대(501)의 양측에 부착되어 있는 외면에서 컷터(220)의 칼날(221)와 접촉되는 일측면(502)은 절단(503)되고 타일측면은 절단되지 않도록 하고 또 골판지의 지지대(501)와 지지대(501) 사이를 컷팅하므로 일측면의 컷팅에 의하여 골판지(500)의 형상을 자유롭게 절곡하여 다양한 형상에 대응할 수 있게 하였다.
컷터(220)는 다각형으로 만들어 각각의 모서리에 칼날(221)을 형성하여 다양한 크기에 대응하여 사용할 수 있게 하였다.The
상기 축(210)이 조립하되 설치부재(100)와 근접되는 양쪽 가장자리의 컷터(220)는 다수개의 칼날(221)을 형성하고 그 외측에는 가압돌기(261)가 형성된 누름부(260)를 축(210)에 조립하여 칼날(221)에 의하여 골판지가 컷팅되는 과정에 골판지의 가장자리는 누름부(260)에 만들어진 가압돌기(261)가 골판지를 가압하여 절곡부(504)를 만들어 골판지를 H빔에 사용할시에는 골판지의 양측을 접착결합하여 사용하는데 골판지의 양측을 접착결합시에 골판지가 용이하게 절곡되어 골판지의 양측을 결합하여 사용할 수 있게 하였다.The
상기 컷터(220)의 일부에는 고정홀(223)을 형성하여 컷터(220)를 축(210)에 조립한 후에 고정홀(223)에 고정볼트(225) 등으로 축(210)에 고정조립하여 컷터(220)가 유동되는 것을 방지하였고 또 컷터(220)가 축(210)에 조립되는 컷터(220)와 컷터(220)의 간격을 조절하여 H-빔의 크기에 따라 조밀하게 컷팅되는 부분의 거리를 조절하여 사용할 수 있게 되는 것이다.A part of the
즉 H-빔이 크기가 큰 경우에는 컷터(220)의 조립간격을 넓게 하여 조밀하게 컷팅되는 부분의 간격을 멀리 만들고 H-빔의 크기가 작은 경우에는 컷터(220)의 간격을 좁게하여 조밀하게 컷팅되는 사이의 거리를 좁게하여 다양한 H-빔의 크기에도 용이하게 사용할 수 있게 되는 것이다. That is, when the H-beam is large in size, the assembly interval of the
이와 같이 칼날(221)에 의하여 골판지의 일측면만 컷팅되고 티일측면은 컷팅되지 않아 골판지의 일측면 만이 조밀하게 절단(503)된 것에 의하여 골판지의 일단을 부착조립하여 H-빔의 외측을 감싸 H-빔보호구를 사용할시에 용이하게 구부려서 사용할 수 있게 되므로 H-빔의 형상과 동일한 형상을 만들 수 있게 되는 것이고 절단되지 않는 부분은 견고하게 유지되어 H-빔을 보호하게 되는 것이다. As such, only one side of the cardboard is cut by the
상기 축(210)의 가장자리에 조립된 조립부재(240)와 슬라이드부재(250)는 컷팅부(200)를 설치부재(100)에 조립설치하였을시에 컷팅부(200)가 상하로 용이하게 이동되도록 슬라이드부재(25O)는 돌기(251)를 만들어 설치부재(100)를 사이에 두고 조립부재(240)와 조립 설치한다.When the cutting
상기 슬라이드부재(250)에 만들어진 돌기(251)는 설치부재(100)의 두께보다 약간 큰 높이로 만들어 조립부재(240)를 조립하여 용이하게 상하 이동되도록 하였다. The
이동수단(300)은 실린더를 이용하여 상기 컷팅부(200)를 상하로 이동시키는 것으로 골판지를 컷팅하고자 할 시에는 실린더를 하부로 이동시켜 컷팅부(200)의 칼날(221)이 골판지의 일측면과 접촉되어 골판지가 이동되는 도중에 골판지의 일측면이 절단되게 하고 골판지를 컷팅하지 않을 시에는 실린더를 상부로 이동시켜 칼날(221)이 골판지로부터 이격시키게 되는 것이다.The moving means 300 moves the cutting
상기 축에 조립되는 컷팅부의 칼날의 다른 실시예는 중앙부에는 축(210)에 삽입하는 축홀(401)이 형성되고 상에서 하부로 관통시켜 절단수단(402)을 내삽하는 다수개의 절단수단고정홈(403)이 구비되고 측면에는 컷팅부(400)를 축(210)에 삽입한 후 볼트로 축에 고정하는 고정홀(404)을 만들어 상기 절단수단고정홈(403)에 끼워지는 절단수단(402)의 일부가 돌출되게 설치하여 절단수단의 돌출된 부분에 골판지를 접착시켜 판지를 균등하게 절단할 수도 있게 된다.Another embodiment of the cutting blade is assembled to the shaft is a plurality of cutting
위와 같은 컷팅부(400)는 절단수단(402)이 닳아 무딘 경우에는 절단수단(402)을 용이하게 교환하여 사용하게 되는 것이다. Cutting
합성수지 골판지의 일측면만 컷팅되고 타일측면은 컷팅되지 않아 골판지의 일측면 만이 조밀하게 절단(503)된 것에 의하여 골판지의 일단을 부착조립하여 H-빔의 외측을 감싸 H-빔 형상의 파일 보호구로 사용할시에 용이하게 구부려서 사용할 수 있게 되므로 H-빔의 형상과 동일한 형상을 만들 수 있게 되는 것이고 절단되지 않는 부분은 견고하게 유지되어 H-빔을 보호하게 되는 것이다. Since only one side of the synthetic cardboard is cut and the tile side is not cut, only one side of the cardboard is cut densely (503) so that one end of the cardboard is attached and assembled to wrap the outside of the H-beam into an H-beam-shaped pile protector. When used, it can be easily bent and used to form the same shape as the shape of the H-beam, and the uncut portion is firmly maintained to protect the H-beam.
이상에 설명한 장치를 사용하여 합성수지 골판지(500)의 일측면을 소정의 간극을 두고 조밀하게 절단(503)하고 타측면은 컷팅하지 않고 양단을 체결수단으로 체결하여 만든 가설흙막이의 빔의 형상과 동일한 형상을 만들어 빔의 외각에 위치하여 보호되는 흙막이에 사용되는 파일을 싸는 보호구에 관한 것이다. Using the apparatus described above, one side of the synthetic resin corrugated
상기에서 설명한 바와 같이 합성수지재를 이용하여 골판지의 절곡하고자 하는 부분의 일측면을 조밀하게 절단하고 타측면은 절단하지 않아 흙막이공사에 사용되는 빔의 형상에 관계없이 사용되는 다양한 형상으로 용이하게 만들어 빔의 외부에 위치시켜 파일과 시설물과의 마찰력을 최소화하여 가설흙막이 공사에 사용되었던 파일을 용이하게 빼낼 수 있게 되는 것이다. As described above, one side of the portion to be bent of the corrugated sheet is densely cut using the synthetic resin material, and the other side is not cut, so that the beam is easily made into various shapes used regardless of the shape of the beam used for the earthquake construction. It is located on the outside of the building to minimize the friction between the pile and the facility to facilitate the removal of the pile used in the construction of the temporary soil membrane.
이상에서 설명한 바와 같이 가설 흙막이에 사용되는 H-빔을 보호하는 보호구를 대량으로 생산할 수 있는 효과가 있고 가설 흙막이에 사용되는 H-빔을 흙막이 공사에 사용할시에 보호구를 H-빔의 형상으로 만들어 H-빔을 보호구에 삽입할시에 용이하게 사용할 수 있게 되는 것이다.As described above, it is effective to produce a large amount of protective equipment to protect the H-beams used for temporary mudguards. The H-beam can be easily used when inserting the protective device.
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020040047879A KR100819523B1 (en) | 2004-06-24 | 2004-06-24 | apparatus for producing protective device to wrap up pile using for temporary retaining of earth and protective device made thereby |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020040047879A KR100819523B1 (en) | 2004-06-24 | 2004-06-24 | apparatus for producing protective device to wrap up pile using for temporary retaining of earth and protective device made thereby |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20050123319A KR20050123319A (en) | 2005-12-29 |
KR100819523B1 true KR100819523B1 (en) | 2008-04-07 |
Family
ID=37294930
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020040047879A KR100819523B1 (en) | 2004-06-24 | 2004-06-24 | apparatus for producing protective device to wrap up pile using for temporary retaining of earth and protective device made thereby |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100819523B1 (en) |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06340015A (en) * | 1993-06-02 | 1994-12-13 | Nippon Petrochem Co Ltd | Plastics corrugated fiberboard having hinge and its manufacture |
KR20030094134A (en) * | 2003-10-02 | 2003-12-11 | (주)피에스테크 | Bag for drawing piles for temporary soil sheathing wall |
-
2004
- 2004-06-24 KR KR1020040047879A patent/KR100819523B1/en not_active IP Right Cessation
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06340015A (en) * | 1993-06-02 | 1994-12-13 | Nippon Petrochem Co Ltd | Plastics corrugated fiberboard having hinge and its manufacture |
KR20030094134A (en) * | 2003-10-02 | 2003-12-11 | (주)피에스테크 | Bag for drawing piles for temporary soil sheathing wall |
Also Published As
Publication number | Publication date |
---|---|
KR20050123319A (en) | 2005-12-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100882831B1 (en) | Reformed sheet plate and the method of installation of the same | |
KR20080026014A (en) | Establishment method of soil guard structure | |
KR101057680B1 (en) | Soil retaining wall and construction method of reuse and reinforcement steel panel | |
KR101973565B1 (en) | Sheathing method for constructing both sheathing wall and cutoff collar by welding cutoff plate to phc pile with longitudinal plate | |
JP2015025271A (en) | Boundary wall structure | |
US10557247B2 (en) | Reinforcement unit and methods for creating a footing for supporting a structure | |
KR20120089665A (en) | Earth retaining wall and method of constructing same | |
KR101696854B1 (en) | Various assembling construction methods of E shaped precast concrete block retainning wall | |
JP2018009430A (en) | Device and method for constructing retaining wall in disaster-relief work | |
KR100819523B1 (en) | apparatus for producing protective device to wrap up pile using for temporary retaining of earth and protective device made thereby | |
KR100834920B1 (en) | Sheathing of tapetum sheet and construction method to use the above sheet | |
JP6364211B2 (en) | Construction method of the end structure of the leading element, the reinforcing steel frame and the continuous underground wall | |
KR102072889B1 (en) | Construction method of smallcaliber composite pile wall using small drilling rig at adjacent building proximity section | |
KR100458821B1 (en) | The length adjustable lagging and its using method of braced wall construction | |
KR100583880B1 (en) | Method for constructing foundation work using concrete pile | |
KR101127475B1 (en) | Device for connecting wales | |
JPS6256296B2 (en) | ||
KR101545713B1 (en) | Composite type cutoff wall of steel temporary facility and construction method of the same | |
JP2013057217A (en) | Method for preventing earth-flow disaster | |
KR20100138455A (en) | Block for backfilling and method backfilling by that | |
KR200270268Y1 (en) | The length adjustable lagging | |
KR20090078684A (en) | Composite wall using angled channel and constructing method thereof | |
KR100469536B1 (en) | Deformed covering of pile for temporary retaining wall having extended joint and method for pulling up piles using rhe same | |
KR200225641Y1 (en) | Structure of caisson soil protection four concrete caisson of bridge | |
KR100802164B1 (en) | Structure for reinforcing steel pile head of footing foundation structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
N231 | Notification of change of applicant | ||
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
LAPS | Lapse due to unpaid annual fee |