KR100819451B1 - End cutoff type prestressed composition bridge which stairs type strain equipment possesses, and its construction method - Google Patents

End cutoff type prestressed composition bridge which stairs type strain equipment possesses, and its construction method Download PDF

Info

Publication number
KR100819451B1
KR100819451B1 KR1020060084004A KR20060084004A KR100819451B1 KR 100819451 B1 KR100819451 B1 KR 100819451B1 KR 1020060084004 A KR1020060084004 A KR 1020060084004A KR 20060084004 A KR20060084004 A KR 20060084004A KR 100819451 B1 KR100819451 B1 KR 100819451B1
Authority
KR
South Korea
Prior art keywords
composite beam
stepped
fixing device
concrete
stepped end
Prior art date
Application number
KR1020060084004A
Other languages
Korean (ko)
Other versions
KR20080020755A (en
Inventor
김회준
김성일
Original Assignee
(주)스틸엔콘크리트
주식회사 젬콘
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)스틸엔콘크리트, 주식회사 젬콘 filed Critical (주)스틸엔콘크리트
Priority to KR1020060084004A priority Critical patent/KR100819451B1/en
Publication of KR20080020755A publication Critical patent/KR20080020755A/en
Application granted granted Critical
Publication of KR100819451B1 publication Critical patent/KR100819451B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/02Bridges characterised by the cross-section of their bearing spanning structure of the I-girder type
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/14Towers; Anchors ; Connection of cables to bridge parts; Saddle supports
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/28Concrete reinforced prestressed
    • E01D2101/285Composite prestressed concrete-metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

본 발명은 프리스트레스 합성빔의 단부에 계단형의 단부를 형성하고, 상기 계단식 단부에 정착장치를 설치함으로써, 긴장력을 분산시켜 케이싱 콘크리트의 국부파괴를 방지하며, 계단형으로 단부를 형성하여 불필요한 사하중을 제거하며, 필요에 따라 교량 사용중에 재긴장이 가능하며, 계단의 단부 높이만큼 종곡선을 하강시킬 수 있도록 한 정착장치가 구비된 계단식 단부 프리스트레스 합성형빔 및 이를 이용한 교량시공방법을 제공하는데 그 목적이 있다.The present invention forms a stepped end at the end of the prestressed composite beam and installs a fixing device at the stepped end, thereby distributing tension to prevent local destruction of the casing concrete, and forming an end in a stepped step to eliminate unnecessary dead weight. The present invention provides a stepped end prestressed composite beam and a method for constructing a bridge using the same, which can be re-tensioned while the bridge is in use and can be lowered by the height of the end of the stairs. have.

상기한 목적을 달성하기 위한 본 발명에 따른 정착장치가 구비된 계단식 단부 프리스트레스 합성형빔은 양측부에 설치되는 부재의 양측단부에 계단식 단부를 형성하면서 캠버를 도입하지 않고, 중앙의 부재에는 캠버가 도입된 각각의 빔을 일체로 연결한 강재빔과, 상기 강재빔에 하중을 작용하면서 하부플랜지를 일정한 두께로 감싸도록 콘크리트를 타설, 양생한 하부케이싱 콘크리트를 설치하고, 하중을 제거하여 프리스트레스가 도입된 프리스트레스 합성빔과; 상기 프리스트레스 합성빔의 상부플랜지와 복부에 콘크리트를 타설하면서 양단부의 계단식 단부에도 콘크리트를 타설하여 계단식 단부를 설치하고, 상기 양단부의 계단식 단부의 상하에 각각 고정 설치되는 정착구와, 상기 정착구간을 가로질러 고정 설치되는 강선으로 이루어지는 정착장치로 구성됨을 특징으로 한다.Stepped end prestressed composite beam provided with a fixing device according to the present invention for achieving the above object forms a stepped end on both side ends of the member to be installed on both sides without introducing the camber, the camber is introduced into the center member Pre-stressed by installing the steel beam and the concrete beam to cover the lower flange to a certain thickness while applying the load to the steel beam, and the cured lower casing concrete is installed, removing the load A prestressed composite beam; While placing concrete on the upper flange and the abdomen of the prestressed composite beam, the concrete is also placed on the stepped ends of both ends, and the stepped ends are installed, respectively. Characterized in that it consists of a fixing device made of a steel wire fixedly installed.

또한, 상기한 목적을 달성하기 위한 본 발명에 따른 정착장치가 구비된 계단식 단부 프리스트레스 합성형빔을 이용한 교량시공방법은 양측부에 설치되는 부재의 양측단부에 계단식 단부를 형성하면서 캠버를 도입하지 않고, 중앙의 부재에는 캠버가 도입된 각각의 빔을 일체로 연결한 강재빔과, 상기 강재빔에 하중을 작용하면서 하부플랜지를 일정한 두께로 감싸도록 콘크리트를 타설, 양생한 하부케이싱 콘크리트를 설치하고, 하중을 제거하여 프리스트레스가 도입된 프리스트레스 합성빔과; 상기 프리스트레스 합성빔의 상부플랜지와 복부에 콘크리트를 타설하면서 양단부의 계단식 단부에도 콘크리트를 타설하여 계단식 단부를 설치하고, 상기 양단부의 계단식 단부의 상하에 각각 고정 설치되는 정착구와, 상기 정착구간을 가로질러 강선으로 고정설치되는 정착장치로 이루어진 프리스트레스 합성형빔을 제작하는 단계(Ⅰ); 상기 정착장치가 구비된 계단식 단부 프리스트레스 합성형빔의 강선을 긴장하는 단계(Ⅱ); 교대 상에 교좌장치를 설치하는 단계(Ⅲ); 상기 교좌장치 위에 정착장치가 구비된 계단식 단부 프리스트레스 합성형빔을 거치하는 단계(Ⅳ); 상기 정착장치가 구비된 계단식 단부 프리스트레스 합성형빔의 상부에 콘크리트를 타설 및 양생시켜 바닥판을 형성하는 단계(Ⅴ)로 이루어짐을 특징으로 한다.In addition, the bridge construction method using a stepped end prestress composite beam with a fixing device according to the present invention for achieving the above object does not introduce a camber while forming a stepped end on both side ends of the member installed on both sides, The central member is provided with steel beams which integrally connect each beam into which the camber is introduced, and concrete is laid to cover the lower flanges to a certain thickness while acting a load on the steel beams, and cured lower casing concrete is installed. A prestress composite beam in which prestress is introduced by removing the prestress; While placing concrete on the upper flange and the abdomen of the prestressed composite beam, the concrete is also placed on the stepped ends of both ends, and the stepped ends are installed, respectively. Manufacturing a prestressed composite beam comprising a fixing device fixedly installed with steel wires (I); Tensioning the wire of the stepped end prestress composite beam with the fixing device (II); Installing a teaching device on the shift (III); Mounting (IV) a stepped end prestress composite beam comprising a fixing device on the stabilization device; Step (V) is formed by placing and curing concrete on top of the stepped prestressed composite beam provided with the fixing device to form a bottom plate.

계단식 단부의 정착장치, 계단식 단부 프리스트레스 합성형빔. Stepped fixing device, stepped end prestress composite beam.

Description

정착장치가 구비된 계단식 단부 프리스트레스 합성형빔 및 이를 이용한 교량시공방법{End cutoff type prestressed composition bridge which stairs type strain equipment possesses, and its construction method}End cutoff type prestressed composition bridge which stairs type strain equipment possesses, and its construction method

도 1은 본 발명에 따른 정착장치가 구비된 계단식 단부 프리스트레스 합성형빔을 이용한 교량을 도시한 예시도,1 is an exemplary view showing a bridge using a stepped end prestress composite beam equipped with a fixing device according to the present invention,

도 2는 본 발명에 따른 정착장치가 구비된 계단식 단부 프리스트레스 합성형빔의 단부를 확대 도시한 상세도,2 is an enlarged detail view of an end of a stepped end prestress composite beam including a fixing device according to the present invention;

도 3은 도 2의 A-A선 단면도,3 is a cross-sectional view taken along the line A-A of FIG.

도 4는 도 2의 B-B선 단면도,4 is a cross-sectional view taken along the line B-B of FIG.

도 5는 도 2의 C-C선 단면도.5 is a cross-sectional view taken along the line C-C in FIG.

-도면의 주요부분에 대한 부호의 설명-Explanation of symbols on the main parts of the drawing

10: 프리스트레스 합성빔 12: 강재빔10: prestressed composite beam 12: steel beam

14: 하부플랜지 16: 케이싱 콘크리트14: lower flange 16: casing concrete

18: 절취부 20: 정착장치18: cutout 20: fixing device

22: 정착구 24: 강선22: anchorage 24: steel wire

30: 교대 32: 상면30: shift 32: top

34: 교좌장치34: chair

B: 정착장치가 구비된 계단식 단부 프리스트레스 합성형빔 교량B: Stepped endless prestressed beam bridge with fixing device

G: 정착장치가 구비된 계단식 단부 프리스트레스 합성형빔G: stepped end prestress composite beam with fixing device

ℓ: 절취부 폭 ℓ1: 연단거리ℓ: cutting width ℓ1: podium distance

ℓ2: 강재빔의 단부와 교좌장치 끝단까지 폭ℓ2: width of the steel beam to the end of the pedestal

본 발명은 정착장치가 구비된 계단식 단부 프리스트레스 합성형빔 및 이를 이용한 교량시공방법에 관한 것으로, 특히 프리스트레스 합성빔의 단부에 계단식 단부를 형성하고, 상기 계단식 단부에 정착장치를 각각 설치한 정착장치가 구비된 계단식 단부 프리스트레스 합성형빔 및 이를 이용한 교량시공방법에 관한 것이다.The present invention relates to a stepped end prestressed composite beam having a fixing device and a bridge construction method using the same. Particularly, a fixing device having a stepped end formed at an end of the prestressed composite beam and a fixing device provided at each of the stepped ends is provided. And a stepped end prestress composite beam and a bridge construction method using the same.

일반적으로 단순교는 단순교의 형하공간을 확보하기 위해 시공돼 왔으나, 플레이트 거더교가 대부분이며, 콘크리트 교량에서는 찾아볼 수 없고, 단경간의 프리캐스트 빔교 정도가 대부분이다.In general, simple bridges have been constructed to secure the geometry of simple bridges, but most of the plate girder bridges, which are not found in concrete bridges, are mostly precast beam bridges with short spans.

그 이유는 교량의 최대 전단력 발생구간에서는 단면이 작아지므로 플레이트 거더교의 경우에는 강판의 두께를 증가시켜 적용할 수 있지만 콘크리트 교량의 경우에는 단경간에도 불구하고, 단면 변화부에서의 균열 발생을 피할 수 없기 때문이다.The reason is that the cross section becomes smaller in the maximum shear force generation section of the bridge, so in the case of the plate girder bridge, it can be applied by increasing the thickness of the steel sheet. Because.

또한, 상기한 바와 같은 플레이트 거더교는 복부판의 두께 증가에도 교량 자체의 단점인 좌굴이 우려되고, 하천을 횡단하는 플레이트 거더교에서는 교량의 부 식의 우려 등으로 도장 및 재도장으로 인한 유지보수비 및 환경문제가 심각하게 대두되고 있는 실정이다.In addition, the plate girder bridge as described above is concerned about the buckling, which is a disadvantage of the bridge itself, even in the increase of the thickness of the abdominal plate, and in the plate girder bridge crossing the river, maintenance costs and environmental problems due to painting and repainting due to the fear of corrosion of the bridge. Is seriously emerging.

한편, 일반적인 프리스트레스트 합성형교는 PSC교량(Prestressed Concrete Beam Bridge)과 동일하나 플레이트 거더교와는 그 구조가 다르다.Meanwhile, the general prestressed composite bridge is the same as the PSC bridge (Prestressed Concrete Beam Bridge), but the structure is different from the plate girder bridge.

즉, 플레이트 거더교는 주형을 세그먼트(segment)화 하여 한 세그먼트를 가설한 후, 각 주형 사이를 브레이싱과 가로보로 연결하여 교량을 시공하나, 프리스트레스 합성형교는 한 경간에 해당하는 주형을 제작한 후, 상기 주형을 교대 및 교각에 가설하고, 브레이싱이나 가로보가 없는 상태에서 콘크리트를 타설 양생시켜 바닥판을 합성한 후, 가로보가 하중에 거동하는 가설형태이다.In other words, the plate girder bridge constructs a segment by segmenting the mold, and constructs the bridge by connecting bracing and crossbeam between each mold, but the prestressed composite bridge produces a mold corresponding to one span, After the mold is installed on the alternating and pier, the concrete is poured in the absence of bracing or cross beams, and the bottom plate is synthesized.

상기한 프리스트레스 합성형교 가설형태는 캔틸레버 바닥판의 길이와, 중앙부 바닥판의 길이로 인해 바닥판에 해당하는 콘크리트를 타설하면 바닥판 콘크리트에서 비틀림 현상이 발생되어 교좌장치의 심각한 변형을 초래하며, 이 같은 상태에서 하중이 재하되면, 교좌장치의 이탈이 발생할 우려가 있으며, 이러한 교좌장치의 이탈은 곡선부나 사각이 심한 교량일수록 크게 나타나는 문제점이 있다.In the prestress composite bridge construction hypothesis type, when the concrete corresponding to the bottom plate is cast due to the length of the cantilever bottom plate and the length of the center bottom plate, torsional phenomenon occurs in the bottom plate concrete, which causes severe deformation of the seating device. If the load is loaded in the same state, there is a possibility that the deviation of the bridge device may occur, such a deviation of the bridge device is a problem that appears larger as the bridge or the more severe the bridge.

이에, 본 발명은 상기한 바와 같은 제문제점을 해결하기 위해 안출된 것으로서, 프리스트레스 합성빔의 단부를 계단식으로 형성하고, 상기 계단식 단부의 각각에 강선을 연결한 정착장치를 설치함으로써, 긴장력을 분산시켜 케이싱콘크리트의 국부파괴를 방지하며, 단부의 불필요한 사하중을 제거하며, 필요에 따라 교량 사용중에 재긴장이 가능하며, 계단식 단부의 높이만큼 종곡선을 하강시킬 수 있도록 한 정착장치가 구비된 계단식 단부 프리스트레스 합성형빔 및 이를 이용한 교량시공방법을 제공하는데 그 목적이 있다.Accordingly, the present invention has been made to solve the problems described above, by forming the end of the pre-stressed composite beam in a stepped manner, by providing a fixing device connecting the steel wire to each of the stepped end, dispersing the tension force Stepped end prestress with fixing device to prevent local destruction of casing concrete, to eliminate unnecessary dead load at the end, to re-tension during use of the bridge as needed, and to lower the vertical curve by the height of the stepped end Its purpose is to provide a composite beam and a bridge construction method using the same.

상기한 목적을 달성하기 위한 본 발명에 따른 정착장치가 구비된 계단식 단부프리스트레스 합성형빔은 양측부에 설치되는 부재의 양측단부에 계단식 단부를 형성하면서 캠버를 도입하지 않고, 중앙의 부재에는 캠버가 도입된 각각의 빔을 일체로 연결한 강재빔과, 상기 강재빔에 하중을 작용하면서 하부플랜지를 일정한 두께로 감싸도록 콘크리트를 타설, 양생한 하부케이싱 콘크리트를 설치하고, 하중을 제거하여 프리스트레스가 도입된 프리스트레스 합성빔과; 상기 프리스트레스 합성빔의 상부플랜지와 복부에 콘크리트를 타설하면서 양단부의 계단식 단부에도 콘크리트를 타설하여 계단식 단부를 설치하고, 상기 양단부의 계단식 단부의 상하에 각각 고정 설치되는 정착구와, 상기 정착구간을 가로질러 고정 설치되는 강선으로 이루어지는 정착장치로 이루어진다.Stepped end prestressed composite beam with a fixing device according to the present invention for achieving the above object is to form a stepped end on both side ends of the member to be installed on both sides without introducing the camber, the camber is introduced into the center member Pre-stressed by installing the steel beam and the concrete beam to cover the lower flange to a certain thickness while applying the load to the steel beam, and the cured lower casing concrete is installed, removing the load A prestressed composite beam; While placing concrete on the upper flange and the abdomen of the prestressed composite beam, the concrete is also placed on the stepped ends of both ends, and the stepped ends are installed, respectively. It consists of a fixing device made of steel wire fixedly installed.

또한, 상기한 목적을 달성하기 위한 본 발명에 따른 정착장치가 구비된 계단식 단부 프리스트레스 합성형빔을 이용한 교량시공방법은 양측부에 설치되는 부재의 양측단부에 계단식 단부를 형성하면서 캠버를 도입하지 않고, 중앙의 부재에는 캠버가 도입된 각각의 빔을 일체로 연결한 강재빔과, 상기 강재빔에 하중을 작용하면서 하부플랜지를 일정한 두께로 감싸도록 콘크리트를 타설, 양생한 하부케이싱 콘크리트를 설치하고, 하중을 제거하여 프리스트레스가 도입된 프리스트레스 합성빔과; 상기 프리스트레스 합성빔의 상부플랜지와 복부에 콘크리트를 타설하면서 양단부의 계단식 단부에도 콘크리트를 타설하여 계단식 단부를 설치하고, 상기 양단부의 계단식 단부의 상하에 각각 고정 설치되는 정착구와, 상기 정착구간을 가로질러 강선이 고정설치되는 정착장치로 이루어진 프리스트레스 합성형빔을 제작하는 단계(Ⅰ); 상기 정착장치가 구비된 계단식 단부 프리스트레스 합성형빔의 강선을 긴장하는 단계(Ⅱ); 교대 상에 교좌장치를 설치하는 단계(Ⅲ); 상기 교좌장치 위에 정착장치가 구비된 계단식 단부 프리스트레스 합성형빔을 거치하는 단계(Ⅳ); 상기 정착장치가 구비된 계단식 단부 프리스트레스 합성형빔의 상부에 콘크리트를 타설 및 양생시켜 바닥판을 형성하는 단계(Ⅴ)로 이루어짐을 특징으로 한다.In addition, the bridge construction method using a stepped end prestress composite beam with a fixing device according to the present invention for achieving the above object does not introduce a camber while forming a stepped end on both side ends of the member installed on both sides, The central member is provided with steel beams which integrally connect each beam into which the camber is introduced, and concrete is laid to cover the lower flanges to a certain thickness while acting a load on the steel beams, and cured lower casing concrete is installed. A prestress composite beam in which prestress is introduced by removing the prestress; While placing concrete on the upper flange and the abdomen of the prestressed composite beam, the concrete is also placed on the stepped ends of both ends, and the stepped ends are installed, respectively. Manufacturing a prestressed composite beam comprising a fixing device in which steel wires are fixedly installed (I); Tensioning the wire of the stepped end prestress composite beam with the fixing device (II); Installing a teaching device on the shift (III); Mounting (IV) a stepped end prestress composite beam comprising a fixing device on the stabilization device; Step (V) is formed by placing and curing concrete on top of the stepped prestressed composite beam provided with the fixing device to form a bottom plate.

이하, 본 발명을 첨부한 예시도면을 참조하여 상세히 설명한다.Hereinafter, with reference to the accompanying drawings, the present invention will be described in detail.

도 1은 본 발명에 따른 정착장치가 구비된 계단식 단부 프리스트레스 합성형빔을 이용하여 교량을 시공한 것을 도시한 예시도이며, 도 2는 정착장치가 구비된 계단식 단부 프리스트레스 합성형빔의 교대측에 설치한 단부를 보여주는 도면이며, 도 3은 도 2의 A-A선 단면도이며, 도 4는 도 2의 B-B선 단면도이며, 도 5는 도 2의 C-C선 단면도이다.1 is an exemplary view showing the construction of a bridge using a stepped end prestress composite beam with a fixing device according to the present invention, Figure 2 is installed on the alternating side of a stepped end prestress composite beam with a fixing device 3 is a cross-sectional view taken along line AA of FIG. 2, FIG. 4 is a cross-sectional view taken along line BB of FIG. 2, and FIG. 5 is a cross-sectional view taken along line CC of FIG. 2.

이들 도면에 도시된 바와 같이, 본 발명에 따른 정착장치가 구비된 계단식 단부 프리스트레스 합성형빔(G)은 양측부에 설치되는 부재의 양측단부에 계단식 단부를 형성하면서 캠버를 도입하지 않고, 중앙의 부재에는 캠버가 도입된 각각의 빔을 일체로 연결한 강재빔(12)과, 상기 강재빔(12)에 하중을 작용하면서 하부플랜지(14)를 일정한 두께로 감싸도록 콘크리트를 타설, 양생한 하부케이싱 콘크리트를 설치하고, 하중을 제거하여 프리스트레스가 도입된 프리스트레스 합성빔(10)과; 상기 프리스트레스 합성빔(10)의 상부플랜지와 복부에 콘크리트를 타설하면서 양단부의 계단식 단부에도 콘크리트를 타설하여 계단식 단부를 설치하고, 상기 양단부의 계단식 단부의 상하에 각각 고정 설치되는 정착구(22)와, 상기 정착구간을 가로질러 강선(24)이 고정설치되는 정착장치(20)로 이루어진다.As shown in these figures, the stepped end prestressed composite beam G equipped with the fixing device according to the present invention forms a stepped end at both end portions of a member provided at both sides, and does not introduce a camber, but has a central member. The steel beam 12 is integrally connected to each of the beams, the camber is introduced, and the concrete is cast and cured lower casing to cover the lower flange 14 to a certain thickness while applying a load to the steel beam 12 A prestress composite beam 10 in which concrete is installed and prestress is introduced by removing a load; Fixing means 22 are installed in the upper flange and the abdomen of the pre-stressed composite beam 10 while the concrete is also placed on the stepped end of both ends to install a stepped end, and fixed to the top and bottom of the stepped end of the both ends, respectively; It consists of a fixing device 20 that the steel wire 24 is fixed across the fixing section.

즉, 본 발명에 따른 계단식 단부에 정착장치(20)가 구비된 프리스트레스 합성형빔(G)은 프리스트레스 합성빔(10)과 정착장치(20)가 유기적으로 결합되어 이루어진 구조이다.That is, the prestressed composite beam G provided with the fixing device 20 at the stepped end according to the present invention has a structure in which the prestressed composite beam 10 and the fixing device 20 are organically combined.

여기서, 상기 프리스트레스 합성빔(10)은 강재빔(12)과 케이싱 콘크리트(16)로 구성되는바, 상기 강재빔(12)은 그 양단의 일정부분을 계단식으로 절취부(18)를 형성하여 계단식 단부로 형성하되, 이 절취부(18)의 형상은 계단식으로 단차가 형성된 구조로 된 것이다.Here, the prestressed composite beam 10 is composed of a steel beam 12 and the casing concrete 16, the steel beam 12 is a stepped by forming a cutout portion 18 in a stepped portion of both ends Although formed at the end, the shape of the cutout 18 is a stepped structure.

즉, 상기 강재빔(12)은 그 하부플랜지(14) 하면과 교대(30)의 내측 상면(32)과 동일평면상으로 배치되도록 강재빔(12)의 양단 복부단면이 일정한 형상으로 절개되는 절취부(18)가 형성되는데, 이 절취부(18)의 단면형상은 계단식으로 형성된다.That is, the steel beam 12 is cut to cut the abdominal cross-section of both ends of the steel beam 12 to be arranged in the same plane with the lower surface of the lower flange 14 and the inner upper surface 32 of the alternating 30. The part 18 is formed, and the cross-sectional shape of this cutout part 18 is formed stepwise.

특히, 상기 절취부(18)의 폭(ℓ)은 강재빔(12)의 단부와 교좌장치(34) 끝단까지 폭(ℓ2)과 이 (ℓ2) 에 교좌장치 끝단에서 교대(30) 끝단까지 길이(ℓ1)를 합친 길이에 여유폭 10 ~ 20㎝를 더한 길이 값으로 구성된다.In particular, the width l of the cutout 18 is the length l2 of the steel beam 12 and the end of the alternating device 34 and the length l2 of the cutting beam 18 from the end of the alternating device to the end of the alternating 30. It consists of length value which added margin width 10-20cm to length which put (l1) together.

이와 같이 절취부(18)의 폭을 형성하는 이유는 절취부(18)에 설치되는 정착 장치(20)의 긴장을 원활하게 하기 위한 작업공간으로 활용하기 위함이다.The reason why the width of the cutout 18 is formed is to be used as a work space for smoothing the tension of the fixing device 20 installed in the cutout 18.

또한, 상기 케이싱 콘크리트(16)는 고강도 강재빔(12)을 사용하여 캠버를 가짐과 동시에 양단부에 절취부가 형성된 강재빔(12)을 분할제작하고, 탄성한계의 80%까지 일부 분할된 강재빔에 프리플렉션 하중에 의한 프리스트레스를 작용시켜 체결한 후 인장측 하부플랜지(14)에 고강도 콘크리트를 일정한 두께로 타설 양생시켜 강재빔(12)과 일체로 합성이 되도록 한다.In addition, the casing concrete 16 uses the high-strength steel beam 12 to separate the steel beam 12 having a camber and cutouts formed at both ends thereof, and to a partially divided steel beam up to 80% of the elastic limit. After the pre-stress by the pre-flection load is applied to fasten the high-strength concrete to a certain thickness to the lower side flange 14 to be fixed to be integrally combined with the steel beam (12).

한편, 상기 정착장치(20)는 정착구(22)와 강선(24)으로 구성되며, 상기 정착구(22)는 프리스트레스 합성빔(10)의 양단부에서 케이싱 콘크리트(16)의 상하부분 즉, 프리스트레스 합성빔(10)의 양단의 상부와 하부의 절취부(18)에 각각 고정 설치되며, 상기 정착구(22)간을 가로질러 강선(24)이 설치된 구조이다.On the other hand, the fixing device 20 is composed of a fixing unit 22 and a steel wire 24, the fixing unit 22 is the upper and lower portions of the casing concrete 16, that is, the prestress composite beam at both ends of the prestress composite beam 10 It is fixed to each of the upper and lower cutouts 18 of both ends of the (10), the steel wire 24 is installed across the anchorage (22).

이와 같은 정착장치(20)는 프리스트레스콘크리트빔 교량에서는 널리 사용되는 기술이며, 이 기술을 본 발명에 따른 프리스트레스 합성형빔을 이용한 교량에 도입하여, 필요에 따라 정착장치(20)의 강선(24)을 긴장함으로써, 프리스트레스 합성형빔(G)의 양단부 긴장력을 분산시켜 케이싱 콘크리트(16)의 국부파괴를 방지하기 위함이다.Such a fixing device 20 is a technique widely used in prestressed concrete beam bridges, and this technology is introduced into a bridge using a prestressed composite beam according to the present invention, whereby the steel wire 24 of the fixing device 20 is needed. This is to prevent the local breakdown of the casing concrete 16 by dispersing the tension between both ends of the prestressed composite beam G by tension.

상기한 바와 같은 구성으로 이루어진 본 발명에 따른 정착장치(20)가 구비된 계단식 단부 프리스트레스 합성형빔(G)을 이용한 교량(B)시공방법은 양측부에 설치되는 부재의 양측단부에 계단식 단부를 형성하면서 캠버를 도입하지 않고, 중앙의 부재에는 캠버가 도입된 각각의 빔을 일체로 연결한 강재빔(12)과, 상기 강재빔(12)에 하중을 작용하면서 하부플랜지(14)를 일정한 두께로 감싸도록 콘크리트를 타설, 양생한 하부케이싱 콘크리트를 설치하고, 하중을 제거하여 프리스트레스가 도입된 프리스트레스 합성빔(10)과; 상기 프리스트레스 합성빔(10)의 상부플랜지와 복부에 콘크리트를 타설하면서 양단부의 계단식 단부에도 콘크리트를 타설하여 계단식 단부를 설치하고, 상기 양단부의 계단식 단부의 상하에 각각 고정 설치되는 정착구(22)와, 상기 정착구간을 가로질러 강선(24)이 고정설치되는 정착장치(20)로 이루어진 프리스트레스 합성형빔(G)을 제작하는 단계(Ⅰ); 상기 정착장치(20)가 구비된 계단식 단부 프리스트레스 합성형빔(G)의 강선(24)을 긴장하는 단계(Ⅱ); 교대상에 교좌장치(34)를 설치하는 단계(Ⅲ); 상기 교좌장치(34) 위에 정착장치(20)가 구비된 계단식 단부 프리스트레스 합성형빔(G)을 거치하는 단계(Ⅳ); 상기 정착장치(20)가 구비된 계단식 단부 프리스트레스 합성형빔(G)의 상부에 콘크리트를 타설 및 양생시켜 바닥판을 형성하는 단계(Ⅴ)로 이루어진다..Bridge (B) construction method using a stepped end prestress composite beam (G) having a fixing device 20 according to the present invention having the configuration as described above forms a stepped end on both side ends of the member installed on both sides While not introducing a camber, the steel member 12 integrally connects each beam into which the camber is introduced, and the lower flange 14 to a predetermined thickness while applying a load to the steel beam 12. A prestress composite beam 10 in which pre-stress is introduced by placing the cured lower casing concrete to wrap the concrete and removing the load; Fixing means 22 are installed in the upper flange and the abdomen of the pre-stressed composite beam 10 while the concrete is also placed on the stepped end of both ends to install a stepped end, and fixed to the top and bottom of the stepped end of the both ends, respectively; Manufacturing a prestressed composite beam (G) comprising a fixing device (20) in which the steel wire (24) is fixedly installed across the fixing section (I); Tensioning the steel wire (24) of the stepped end prestress composite beam (G) with the fixing device (20); Installing a teaching device 34 on a subject (III); Mounting (IV) a stepped end prestress composite beam (G) provided with a fixing device (20) on the chair device (34); Step (V) is formed by placing and curing concrete on top of the stepped end prestress composite beam G provided with the fixing device 20 to form a bottom plate.

즉, 본 발명에 따른 정착장치(20)가 구비된 계단식 단부 프리스트레스 합성형빔(G)을 이용한 교량(B)시공방법은 양측부에 설치되는 부재의 양측단부에 계단식 단부를 형성하면서 캠버를 도입하지 않고, 중앙의 부재에는 캠버가 도입된 각각의 빔을 일체로 연결한 강재빔(12)과, 상기 강재빔(12)에 하중을 작용하면서 하부플랜지(14)를 일정한 두께로 감싸도록 콘크리트를 타설, 양생한 하부케이싱 콘크리트를 설치하고, 하중을 제거하여 프리스트레스가 도입된 프리스트레스 합성빔(10)과; 상기 프리스트레스 합성빔(10)의 상부플랜지와 복부에 콘크리트를 타설하면서 양단부의 계단식 단부에도 콘크리트를 타설하여 계단식 단부를 설치하고, 상기 양단부의 계단식 단부의 상하에 각각 고정 설치되는 정착구(22)와, 상기 정착구간을 가로질러 강선(24)이 고정설치되는 정착장치(20)로 이루어진 프리스트레스 합성형빔(G)을 제작하는 단계(Ⅰ); 상기 정착장치(20)가 구비된 계단식 단부 프리스트레스 합성형빔(G)의 강선(24)을 긴장하는 단계(Ⅱ); 교대상에 교좌장치를 설치하는 단계(Ⅲ); 상기 교좌장치(34) 위에 정착장치(20)가 구비된 계단식 단부 프리스트레스 합성형빔(G)을 거치하는 단계(Ⅳ); 상기 정착장치(20)가 구비된 계단식 단부 프리스트레스 합성형빔(G)의 상부에 콘크리트를 타설 및 양생시켜 바닥판을 형성함으로써, 긴장력을 분산시켜 케이싱 콘크리트(16)의 국부파괴를 방지하며, 단부의 불필요한 사하중을 제거하며, 필요에 따라 교량의 사용중에 강선(24)의 재긴장이 가능하며, 절취부(18)의 높이만큼 종곡선을 하강시킬 수 있는 작용효과가 있다.That is, the bridge B construction method using the stepped end prestress composite beam G provided with the fixing device 20 according to the present invention does not introduce a camber while forming stepped ends at both end portions of the members installed at both sides. Instead, the center member casts concrete to cover the lower flange 14 to a certain thickness while applying a load to the steel beam 12 and the steel beam 12 integrally connecting each beam into which the camber is introduced. A prestressed composite beam 10 in which the cured lower casing concrete is installed and the prestress is introduced by removing the load; Fixing means 22 are installed in the upper flange and the abdomen of the pre-stressed composite beam 10 while the concrete is also placed on the stepped end of both ends to install a stepped end, and fixed to the top and bottom of the stepped end of the both ends, respectively; Manufacturing a prestressed composite beam (G) comprising a fixing device (20) in which the steel wire (24) is fixedly installed across the fixing section (I); Tensioning the steel wire (24) of the stepped end prestress composite beam (G) with the fixing device (20); Installing a teaching apparatus on a subject (III); Mounting (IV) a stepped end prestress composite beam (G) provided with a fixing device (20) on the chair device (34); By placing and curing concrete on top of the stepped end prestress composite beam G provided with the fixing device 20 to form a bottom plate, by dispersing the tension force to prevent local destruction of the casing concrete 16, Eliminating unnecessary dead weight, re-tension of the steel wire 24 during the use of the bridge, if necessary, there is an effect that can lower the vertical curve by the height of the cutout (18).

이상에서 설명한 바와 같이, 본 발명에 따른 정착장치가 구비된 계단식 단부 프리스트레스 합성형빔 및 이를 이용한 교량시공방법은 다음과 같은 효과가 있다.As described above, the stepped end prestress composite beam with a fixing device according to the present invention and a bridge construction method using the same have the following effects.

첫째, 본 발명은 프리스트레스 합성형빔의 양단부의 긴장력을 분산시켜 케이싱 콘크리트의 국부파괴를 방지하는 이점이 있다.First, the present invention has the advantage of preventing the local destruction of the casing concrete by dispersing the tension of both ends of the pre-stressed composite beam.

둘째, 본 발명은 프리스트레스 합성형빔의 양단부에 계단형상으로 절취부를 형성함으로써, 양단부에서 발생하는 합성형빔 자체의 불필요한 사하중을 제거할 수 있을 뿐만 아니라 계단 단차만큼 종곡선을 하강시킬 수 있는 이점이 있다.Second, the present invention has the advantage that by removing the undesired dead weight of the composite beam itself generated at both ends by forming a cutout at both ends of the prestressed composite beam, as well as lowering the vertical curve by the step difference.

셋째, 본 발명은 정착장치가 구비되어 있음으로, 필요에 따라 교량의 사용중에 재긴장할 수 있으므로 교량의 내구성이 향상되는 이점이 있다.Third, since the present invention is provided with a fixing device, it can be re-tensioned during use of the bridge if necessary, there is an advantage that the durability of the bridge is improved.

Claims (6)

양측부에 설치되는 부재의 양측단부에 계단식 단부를 형성하면서 캠버를 도입하지 않고, 중앙의 부재에는 캠버가 도입된 각각의 빔을 일체로 연결한 강재빔(12)과, 상기 강재빔(12)에 하중을 작용하면서 하부플랜지(14)를 일정한 두께로 감싸도록 콘크리트를 타설, 양생한 하부케이싱 콘크리트를 설치하고, 하중을 제거하여 프리스트레스가 도입된 프리스트레스 합성빔(10)과; 상기 프리스트레스 합성빔(10)의 상부플랜지와 복부에 콘크리트를 타설하면서 양단부의 계단식 단부에도 콘크리트를 타설하여 계단식 단부를 설치하고, 상기 양단부의 계단식 단부의 상하에 각각 고정설치되는 정착구(22)와, 상기 정착구간을 가로질러 강선(24)이 고정설치되는 정착장치(20)로 이루어지되, 상기 강재빔(12)은 그 하부플랜지(14) 하면과 교대(30)의 내측 상면(32)과 동일평면상으로 배치되도록 강재빔(12)의 양단 복부단면이 일정한 형상으로 절개되는 절취부(18)가 계단형상으로 형성되는 계단식단부 프리스트레스 합성형빔에 있어서, The steel beam 12 and the steel beam 12 which integrally connect each beam into which the camber was introduced are formed in the center member, without introducing a camber, forming the stepped end in the both ends of the member provided in the both sides. A prestress composite beam 10 in which concrete is placed to cover the lower flange 14 to a predetermined thickness while acting on a load, a cured lower casing concrete is installed, and a prestress is introduced by removing the load; Fixing means 22 are installed in the upper flange and the abdomen of the pre-stressed composite beam 10, the concrete is also placed on the stepped end of both ends to install a stepped end, and fixed to the top and bottom of the stepped end of the both ends, respectively; The steel wire 24 is fixed to the fixing device 20 is installed across the fixing section, the steel beam 12 is the same as the inner upper surface 32 of the lower flange 14 and the alternating (30). In the stepped end prestressed composite beam in which the cutout portions 18, in which the abdominal cross-sections of both ends of the steel beam 12 are cut in a predetermined shape so as to be arranged in a plane, are formed in a step shape, 상기 절취부(18)의 폭(ℓ)은 강재빔(12)의 단부와 교좌장치(34) 끝단까지의 폭(ℓ2)과 상기 폭(ℓ2)에 교좌장치(34) 끝단에서 교대(30) 끝단까지 길이(ℓ1)를 합친 길이에 여유폭 10 ~ 20cm를 더한 길이값으로 구성됨을 특징으로 하는 정착장치가 있는 구비된 계단식 단부 프리스트레스 합성형빔. The width l of the cutout 18 is alternating 30 at the end of the tumbler 34 at the width l2 and the width l2 to the end of the steel beam 12 and the end of the tumbler 34. Stepped end prestress composite beam with a fixing device, characterized in that the length of the combined length to the end (l1) plus the margin width 10 ~ 20cm. 삭제delete 삭제delete 양측부에 설치되는 부재의 양측단부에 계단식 단부를 형성하면서 캠버를 도입하지 않고, 중앙의 부재에는 캠버가 도입된 각각의 빔을 일체로 연결한 강재빔(12)과, 상기 강재빔(12)에 하중을 작용하면서 하부플랜지(14)를 일정한 두께로 감싸도록 콘크리트를 타설, 양생한 하부케이싱 콘크리트를 설치하고, 하중을 제거하여 제작한 프리스트레스 합성빔(10)과; 상기 프리스트레스 합성빔(10)의 상부플랜지와 복부에 콘크리트를 타설하면서 양단부의 계단식 단부에도 콘크리트를 타설하여 계단식 단부를 설치하고, 상기 양단부의 계단식 단부의 상하에 각각 고정설치되는 정착구(22)와, 상기 정착구간을 가로질러 강선(24)이 고정설치되는 정착장치(20)로 이루어진 프리스트레스 합성형빔을 제작하는 단계(Ⅰ); 상기 정착장치가 구비된 계단식 단부 프리스트레스 합성형빔의 강선을 긴장하는 단계(Ⅱ); 교대상에 교좌장치를 설치하는 단계(Ⅲ); 상기 교좌장치 위에 정착장치가 구비된 계단식 단부 프리스트레스 합성형빔을 거치하는 단계(Ⅳ); 상기 정착장치가 구비된 계단식 단부 프리스트레스 합성형빔의 상부에 콘크리트를 타설 및 양생시켜 바닥판을 형성하는 단계(Ⅴ)로 이루어지되, 상기 정착장치가 구비된 계단식 단부 프리스트레스 합성형빔(G)은 양단부가 계단식으로 단면형상을 갖도록 절취부가 형성됨과 동시에 캠버가 도입된 강재빔(12)과, 상기 강재빔(12)의 하부플랜지(14)를 일정한 두께로 감싸도록 콘크리트가 타설양생된 하부케이싱 콘크리트(16)로 이루어지는 프리스트레스 합성빔(10)과; 상기 프리스트레스 합성빔(10)의 양단부 하부플랜지(14)의 상하에 각각 고정설치되는 정착구(22)와, 상기 정착구(22)간을 가로질러 고정설치되는 강선(34)으로 이루어지는 정착장치(20)로 이루어지는 것에 특징이 있는 계단식 단부 프리스트레스 합성형빔을 이용한 교량시공방법에 있어서,The steel beam 12 and the steel beam 12 which integrally connect each beam into which the camber was introduced are formed in the center member, without introducing a camber, forming the stepped end in the both ends of the member provided in the both sides. A prestressed composite beam 10 formed by placing concrete to cover the lower flange 14 to a certain thickness while applying a load thereto, installing cured lower casing concrete, and removing the load; Fixing means 22 are installed in the upper flange and the abdomen of the pre-stressed composite beam 10, the concrete is also placed on the stepped end of both ends to install a stepped end, and fixed to the top and bottom of the stepped end of the both ends, respectively; Manufacturing a prestressed composite beam comprising a fixing device 20 in which the steel wire 24 is fixedly installed across the fixing section (I); Tensioning the wire of the stepped end prestress composite beam with the fixing device (II); Installing a teaching apparatus on a subject (III); Mounting (IV) a stepped end prestress composite beam comprising a fixing device on the stabilization device; Step (V) is formed by placing and curing concrete on top of the stepped end prestressed composite beam provided with the fixing device, wherein the stepped end prestressed composite beam G provided with the fixing device has both ends thereof. The casing is formed to have a cross-sectional shape in a stepped manner and at the same time the steel beam 12 into which the camber is introduced, and the lower casing concrete 16 in which concrete is poured to cover the lower flange 14 of the steel beam 12 to a predetermined thickness. A prestressed composite beam (10) consisting of; A fixing device 20 comprising a fixing tool 22 fixedly installed at upper and lower ends of the lower flanges 14 at both ends of the prestressed composite beam 10, and a steel wire 34 fixedly installed across the fixing tool 22. In the bridge construction method using a stepped end prestress composite beam characterized in that 상기 절취부(18)의 폭(ℓ)은 강재빔(12)의 단부와 교좌장치(34) 끝단까지의 폭(ℓ2)과 상기 폭(ℓ2)에 교좌장치(34) 끝단에서 교대(30) 끝단까지 길이(ℓ1)를 합친 길이에 여유폭 10 ~ 20cm를 더한 길이값으로 구성됨을 특징으로 하는 정착장치가 있는 구비된 계단식 단부 프리스트레스 합성형빔을 이용한 교량시공방법.The width l of the cutout 18 is alternating 30 at the end of the tumbler 34 at the width l2 and the width l2 to the end of the steel beam 12 and the end of the tumbler 34. Bridge construction method using a stepped end prestress composite beam with a fixing device, characterized in that consisting of a length value plus the length 10 ~ 20cm plus the length to the end (l1) combined. 삭제delete 삭제delete
KR1020060084004A 2006-09-01 2006-09-01 End cutoff type prestressed composition bridge which stairs type strain equipment possesses, and its construction method KR100819451B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020060084004A KR100819451B1 (en) 2006-09-01 2006-09-01 End cutoff type prestressed composition bridge which stairs type strain equipment possesses, and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020060084004A KR100819451B1 (en) 2006-09-01 2006-09-01 End cutoff type prestressed composition bridge which stairs type strain equipment possesses, and its construction method

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR2020060023590U Division KR200435765Y1 (en) 2006-09-01 2006-09-01 End cutoff type prestressed composition bridge which stairs type strain equipment possesses

Publications (2)

Publication Number Publication Date
KR20080020755A KR20080020755A (en) 2008-03-06
KR100819451B1 true KR100819451B1 (en) 2008-04-04

Family

ID=39395530

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020060084004A KR100819451B1 (en) 2006-09-01 2006-09-01 End cutoff type prestressed composition bridge which stairs type strain equipment possesses, and its construction method

Country Status (1)

Country Link
KR (1) KR100819451B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104195933B (en) * 2014-09-26 2016-10-05 广西交通科学研究院 A kind of recoverable PC T beam bridge

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001081727A (en) 1999-09-10 2001-03-27 Japan Highway Public Corp Structure with latticed floor slab and execution therefor
KR200256791Y1 (en) 2001-08-30 2001-12-24 (주)스틸엔콘크리트 prestressed composite beam made by using incrementally prestressing
KR200266433Y1 (en) 2001-11-23 2002-02-28 (주)삼현피에프 prestressed composite beam removed residual stress of girder
KR200281101Y1 (en) 2002-03-27 2002-07-13 (주)스틸엔콘크리트 Prestressed composite beam carried in entire composition by unification of lower casing concrete and reinforcement or steel wire
KR20050090953A (en) * 2005-03-14 2005-09-14 (주)피에스아이테크놀로지 Preflex composite bridges cutting to ending point and method for consturcting thereof
KR20060063221A (en) * 2004-12-07 2006-06-12 주식회사 아이비엘이앤씨 Manufacturing method for represtressed preflex steel composite beam by division-retension

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001081727A (en) 1999-09-10 2001-03-27 Japan Highway Public Corp Structure with latticed floor slab and execution therefor
KR200256791Y1 (en) 2001-08-30 2001-12-24 (주)스틸엔콘크리트 prestressed composite beam made by using incrementally prestressing
KR200266433Y1 (en) 2001-11-23 2002-02-28 (주)삼현피에프 prestressed composite beam removed residual stress of girder
KR200281101Y1 (en) 2002-03-27 2002-07-13 (주)스틸엔콘크리트 Prestressed composite beam carried in entire composition by unification of lower casing concrete and reinforcement or steel wire
KR20060063221A (en) * 2004-12-07 2006-06-12 주식회사 아이비엘이앤씨 Manufacturing method for represtressed preflex steel composite beam by division-retension
KR20050090953A (en) * 2005-03-14 2005-09-14 (주)피에스아이테크놀로지 Preflex composite bridges cutting to ending point and method for consturcting thereof

Also Published As

Publication number Publication date
KR20080020755A (en) 2008-03-06

Similar Documents

Publication Publication Date Title
KR100380637B1 (en) Prestressed concrete girder of adjustable load bearing capacity for bridge and adjustment method for load bearing capacity of bridge
US7373683B2 (en) Construction method for prestressed concrete girder bridges
KR20120073858A (en) Structual member making method using preflex baem and psc beam and the bridge construction method threrewith
KR100755946B1 (en) Composite temporary bridge
KR100728106B1 (en) Cantilever construction structure of slab for bridge and the method thereof
KR100974305B1 (en) Continuous beam bridge construction method using girder for multi-span
KR101165572B1 (en) Middle span plate girder bridge and construction method thereof
KR100592196B1 (en) large number bracket in which supporter was installed is used and it is a bridge, multiplex point installed so that support might be carried out support bracket and its installation method
KR200435765Y1 (en) End cutoff type prestressed composition bridge which stairs type strain equipment possesses
KR100842062B1 (en) The steel composite rahmen bridge construction technique for which preflexion steel girder was used
KR100819451B1 (en) End cutoff type prestressed composition bridge which stairs type strain equipment possesses, and its construction method
JP4585614B1 (en) Method for constructing synthetic steel slab bridge, ribbed steel slab, and synthetic steel slab bridge
KR100566653B1 (en) The middle point part continuous structure and the continuous method of prestressed concrete girder bridge
JP3847604B2 (en) Floor slab replacement method
JP2020063598A (en) Hinge part reinforcement method and reinforcement structure in hinged girder bridge with pc
KR100696646B1 (en) External prestressing method of ps concrete composite girder bridge by tendon anchored/supported to prefabricated cross beam
KR100984247B1 (en) Bridge construction method using strength connector detail joined with rebar of upper flange concrete
KR20060017949A (en) Field-fabricated prestressing steel-composed girder and construction method of continuous bridge using the girder
KR20090007365U (en) Steel beam using perpendicular plate member and tendon member
KR102009704B1 (en) Steel permanent landfill form using upper flange box compound gider and construction method using the same
KR200418183Y1 (en) Joint Structure of Continuous Multi Span Prestressed Steel Composite Beam
KR101121725B1 (en) Construction method for psc girder and slab with precast deck and bridge construction method using the same
KR100310301B1 (en) Leaf-restrest box girder composite bridge
KR100569226B1 (en) Bottom plate reinforcement method of continuous bridge by inclined tension material
KR100555251B1 (en) The bridge construction method of having used girder equipped with the side projection fixing block in which multiple-purpose tension is possible, and this

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20110307

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20140305

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20160304

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20170310

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20180309

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20190304

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20200302

Year of fee payment: 13