KR100750386B1 - Dam concrete injection method - Google Patents

Dam concrete injection method Download PDF

Info

Publication number
KR100750386B1
KR100750386B1 KR1020060096676A KR20060096676A KR100750386B1 KR 100750386 B1 KR100750386 B1 KR 100750386B1 KR 1020060096676 A KR1020060096676 A KR 1020060096676A KR 20060096676 A KR20060096676 A KR 20060096676A KR 100750386 B1 KR100750386 B1 KR 100750386B1
Authority
KR
South Korea
Prior art keywords
concrete
forming
central
dam
coupling groove
Prior art date
Application number
KR1020060096676A
Other languages
Korean (ko)
Inventor
임종아
Original Assignee
주식회사 삼안
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 삼안 filed Critical 주식회사 삼안
Priority to KR1020060096676A priority Critical patent/KR100750386B1/en
Application granted granted Critical
Publication of KR100750386B1 publication Critical patent/KR100750386B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02Fixed barrages
    • E02B7/04Dams across valleys
    • E02B7/08Wall dams
    • E02B7/10Gravity dams, i.e. those in which the weight of the structure prevents overturning

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Revetment (AREA)

Abstract

A method for placing concrete for the construction of a dam is provided to shorten a period of construction and to prevent the erosion of concrete by water permeation by constructing a dam using footing concrete, central concrete and upper concrete. The method for placing concrete for the construction of a dam comprises the steps of: forming footing concrete(20) by forming a form(3) to be narrowed from the bottom of a river to the upper part and installing ÝÀ-shaped frames(60) on the inside of the form at regular intervals, placing concrete in the form and laying a seal(50) under the top of the placed concrete and curing the concrete(S10); forming central concrete(30) in many stages by repeating the process of forming a form to be narrowed from the top of the cured footing concrete to the upper part, installing ÝÀ-shaped frames on the inside of the form at regular intervals, placing concrete in the form, placing a seal on the top of the placed concrete and curing the concrete(S20); and forming upper concrete(40) by forming a form to be narrowed from the top of the cured central concrete to the upper part, placing concrete in the form and curing the concrete. Hereon a coupling groove(23) is formed on the top of the footing concrete, a coupling groove(31) is formed on the top of the central concrete and a coupling projection(33) is formed on the bottom of the central concrete and inserted to the coupling groove of the footing concrete, and a coupling projection is formed on the bottom of the upper concrete and inserted to the coupling groove of the central concrete.

Description

댐 콘크리트 타설 공법{DAM CONCRETE INJECTION METHOD}DAM CONCRETE INJECTION METHOD

도 1은 본 발명의 실시예에 따른 댐 콘크리트 타설 공법을 나타낸 흐름도이다.1 is a flow chart showing a dam concrete pouring method according to an embodiment of the present invention.

도 2는 본 발명의 실시예에 따른 댐 콘크리트 타설 공법에 의하여 조성된 댐을 나타낸 단면도이다.2 is a cross-sectional view showing a dam formed by the dam concrete pouring method according to an embodiment of the present invention.

도 3은 본 발명의 실시예에 따른 댐 콘크리트 타설 공법에 의하여 조성된 댐을 나타낸 사시도이다.3 is a perspective view showing a dam formed by the dam concrete pouring method according to an embodiment of the present invention.

♠ 도면의 주요 부분에 대한 부호의 설명 ♠♠ Explanation of symbols for the main parts of the drawing ♠

10 : 콘크리트 블록 20 : 기초 콘크리트10: concrete block 20: foundation concrete

21 : 매입부 30 : 중앙 콘크리트21: embedded part 30: central concrete

40 : 상부 콘크리트 23, 33 : 결합홈40: upper concrete 23, 33: coupling groove

31, 41 : 결합돌기 50 : 지수재31, 41: coupling protrusion 50: index material

60 : 프레임 61 : 차수패드60: frame 61: order pad

본 발명은 댐 콘크리트 타설 공법에 관한 것으로, 더욱 상세하게는 소하천에 댐을 건설할 때 댐을 다수의 콘크리트블록을 조립하는 조적식으로 축조하여 댐의 시공기간을 단축함과 동시에 콘크리트의 부식을 줄일 수 있는 댐 콘크리트 타설 공법에 관한 것이다.The present invention relates to a dam concrete casting method, and more particularly, when constructing a dam in a small river, the dam is constructed as a masonry to assemble a plurality of concrete blocks, thereby shortening the construction period of the dam and reducing corrosion of concrete. It is about dam concrete pouring method.

댐은 하천의 물량을 조절하기 위해서 인공적으로 하천을 담수하기 위하여 만든 것으로, 여유가 있을 때 물을 저수하였다가 유량이 부족할 때 방류하는 것이다. 이러한 댐은 기능목적에 따라 단일목적댐과, 다목적댐으로 분류되며, 건설재료 형식에 따라서는 콘크리트댐과, 필댐으로 분류된다.Dams are made to artificially freshen rivers to control the volume of the rivers. The dams store water when there is room and discharge it when the flow rate is insufficient. These dams are classified into single-purpose dams and multi-purpose dams according to their functional purposes, and concrete dams and peel dams depending on the type of construction material.

그리고 우리나라와 같이 건기와 우기에 따라 강수량의 차이가 많은 나라에서는 물의 효율적인 이용을 위하여 여러 가지 형태의 댐이 많이 건설되어 있으며, 현재도 건설을 추진하고 있다. 더욱이, 우리나라는 기후의 특성상 여름철 홍수기인 6월에서 8월 사이에는 단기간 내에 많은 폭우가 쏟아지므로, 홍수피해를 최소화하기 위해서는 댐의 건설이 절실히 요구되고 있다.  In addition, many types of dams have been constructed for efficient use of water in countries with a large amount of precipitation due to dry season and rainy season. Moreover, in Korea, due to the nature of the climate, heavy rains pour out in a short period of time between June and August, which are summer flooding periods, so the construction of dams is urgently needed to minimize flood damage.

일반적으로, 댐을 공사할 때에는 토사와 자갈을 이용하여 성토된 지반을 견고하게 다진 후 그 위에 암괴 등을 축조하여 차수벽공사를 시공하여 건설하고 있다. 그런데, 그 폭이 좁은 하천에 상기와 같은 방법으로 댐을 조성하기에는 그 비용 많이 소요될 뿐만 아니라, 댐을 제거할 때 그 분해가 어려운 단점이 있다. 그래서 최근 소하천에 축조되는 댐은 콘크리트의 타설에 의하여 제작되는 것이 대부분이다.In general, when the dam is constructed, soil walls are made by using soil and gravel, and then the rock walls are constructed by constructing a rock mass on it. However, it is not only expensive to construct the dam in the narrow river in the above manner, but also has a disadvantage in that the decomposition is difficult when removing the dam. Therefore, most dams constructed in small rivers are mostly manufactured by pouring concrete.

그러나 콘크리트를 타설하여 댐을 건설하려면 콘크리트의 양이 많으므로 그 양생기간이 길어져 댐 축조기간이 오래 소요될 뿐만 아니라, 양생되는 콘크리트에 물이 침투하여 콘크리트의 강도를 저하시키는 문제점이 내포되어 있는 실정이다.However, in order to construct a dam by pouring concrete, the amount of concrete is long, so the curing period is long, and the dam construction period is long, and the problem of deteriorating the strength of concrete by infiltrating water into the cured concrete is implied. .

본 발명은 상기와 같은 종래의 문제점을 해결하기 위하여 안출된 것으로, 본 발명의 목적은 댐의 콘크리트기초가 타설되는 지반에 지주를 설치하여 기초 콘크리트가 타설되는 지반의 침하를 방지함과 동시에 지반과 콘크리트의 결합력을 현저하게 향상시킬 수 있도록 한 댐의 콘크리트 타설 공법을 제공하는데 있다.The present invention has been made in order to solve the above conventional problems, the object of the present invention is to install a strut on the ground on which the concrete foundation of the dam is placed to prevent the settlement of the ground on which the foundation concrete is placed and at the same time It is to provide a concrete pouring method for dams that can significantly improve the bonding strength of concrete.

상기한 목적을 달성하기 위하여 본 발명의 실시예에 따른 댐 콘크리트 타설 공법은 하천 바닥면에서 상측으로 갈수록 폭이 좁아지도록 거푸집을 형성하고, 상기 거푸집의 내측에 "U"자형 틀을 일정간격으로 설치하고, 상기 거푸집의 내부에 콘트리트를 타설한 후, 상기 타설된 콘크리트의 상면에 지수재를 매입하여 상기 콘크리트를 양생시켜 기초콘크리트를 형성하는 단계와; 양생된 상기 기초콘크리트의 상면에서 상측으로 갈수록 폭이 좁아지도록 거푸집을 형성하고, 상기 거푸집의 내측에 "U"자형 틀을 일정간격으로 설치하고, 상기 거푸집의 내부에 콘트리트를 타설한 후, 상기 타설된 콘크리트의 상면에 지수재를 매입하여 상기 콘크리트를 양생시키는 과정을 반복하여 상기 기초콘크리트의 상측에 다수의 중앙콘크리트를 형성하는 단계와; 양생된 상기 중앙콘크리트의 상면에서 상측으로 갈수록 폭이 좁아지도록 거푸집을 형성하고, 상기 거푸집의 내부에 콘트리트를 타설한 후, 상기 콘크리트를 양생시켜 상부콘크리트를 형성하는 단계;를 포함한다.In order to achieve the above object, the dam concrete pouring method according to the embodiment of the present invention forms a form so that the width becomes narrower from the river bottom toward the upper side, and install the "U" shaped frame at a predetermined interval inside the formwork. And pouring concrete into the formwork, and embedding an index material on an upper surface of the cast concrete to cure the concrete to form a foundation concrete; Forming the form so that the width becomes narrower from the upper surface of the cured base concrete to the upper side, install a "U" shaped frame at a predetermined interval inside the formwork, and after placing the concrete in the formwork, Forming a plurality of central concrete on the upper side of the foundation concrete by repeating the process of curing the concrete by purchasing the index material on the upper surface of the concrete; Forming a form so that the width becomes narrower from the upper surface of the cured central concrete to the upper side, and after pouring the concrete in the form, curing the concrete to form the upper concrete; and including.

상기와 같은 방법에 의하여 조성되는 댐은 상측으로 갈수록 폭이 좁아지는 형상의 조적식 구조로, 하천의 바닥면에 마련되어 있는 기초콘크리트(20)와, 상기 기초콘크리트와 일정 간격으로 이격되어 있는 상부콘크리트(40) 및 상기 기초 콘크리트(20)와 상기 상부 콘크리트(40)사이에 다수 적층되어 있는 중앙 콘크리트(30)로 구성되어 있으며, 상기 기초콘크리트(20)의 상면 및 상기 상부콘크리트(40)의 하면에는 결합홈(23, 33) 및 결합돌기(31, 41)가 각각 형성되어 있고, 상기 중앙콘크리트(30)의 상면 및 하면에는 적층되는 상기 중앙콘크리트(30)를 상호 조립할 수 있도록 결합홈(23, 33) 및 결합돌기(31, 41)가 각각 형성되어 있으며, 상기 기초콘크리트, 상부콘크리트 및 중앙콘크리트의 접합부에는 지수재가 구비되어 있다.The dam formed by the above method is an masonry structure having a shape narrowing toward the upper side, the base concrete 20 provided on the bottom surface of the river, and the upper concrete spaced apart from the base concrete at regular intervals. 40 and a plurality of central concretes 30 stacked between the foundation concrete 20 and the upper concrete 40, the upper surface of the foundation concrete 20 and the lower surface of the upper concrete 40 Coupling grooves 23 and 33 and coupling protrusions 31 and 41 are respectively formed in the coupling grooves 23 so as to assemble the central concrete 30 stacked on the upper and lower surfaces of the central concrete 30. , 33) and coupling projections 31 and 41 are formed, respectively, and the water-reducing material is provided at the joint portion of the basic concrete, the upper concrete, and the central concrete.

본 발명의 특징 및 이점들은 첨부도면에 의거한 다음의 상세한 설명으로 더욱 명백해질 것이다. 이에 앞서, 본 명세서 및 청구범위에 사용된 용어나 단어는 발명자가 그 자신의 발명을 가장 최선의 방법으로 설명하기 위해 용어의 개념을 적절하게 정의할 수 있다는 원칙에 입각하여 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다. The features and advantages of the present invention will become more apparent from the following detailed description based on the accompanying drawings. Prior to this, the terms or words used in the present specification and claims are defined in the technical spirit of the present invention on the basis of the principle that the inventor can appropriately define the concept of the term in order to explain his invention in the best way. It must be interpreted to mean meanings and concepts.

이하, 본 발명의 실시예에 따른 댐 콘크리트 타설 공법을 첨부된 도면을 참조하여 상세하게 설명한다.Hereinafter, a dam concrete pouring method according to an embodiment of the present invention will be described in detail with reference to the accompanying drawings.

도 1 내지 도 3을 참조하면, 본 실시예에 따른 댐(10) 콘크리트 타설 공법은 기초콘크리트(20)를 형성하는 단계(S10)와, 이 기초콘크리트의 상측에 다수의 중앙콘크리트(30)를 형성하는 단계(S20)와, 상기 중앙콘크리트(30)의 상측에 상부콘크리트(40)를 형성하는 단계(S30)를 포함한다.1 to 3, the concrete placing method of the dam 10 according to the present embodiment includes forming a foundation concrete 20 (S10), and a plurality of central concrete 30 on the upper side of the foundation concrete. Forming step (S20), and forming the upper concrete 40 on the upper side of the central concrete (30) (S30).

기초콘크리트(20)를 형성하는 단계(S10)에서는 하천 바닥면에서 상측으로 갈 수록 폭이 좁아지도록 거푸집(3)을 형성하고, 거푸집(3)의 내측에 "U"자형 틀(60)을 일정간격으로 설치한다. 그리고 거푸집(3)의 내부에 콘트리트를 타설한 후, 타설된 콘크리트의 상면에 지수재(50)를 매입하여 콘크리트를 양생시킨다. 이때, 지수재(50)는 기초콘크리트(20)의 상측으로 노출되도록 매입한다. 한편, 기초콘크리트(20)를 양생시킨 후, 틀(60)을 제거하면 기초콘크리트(20)의 상면에는 결합홈(23)이 형성된다. 이는 기초콘크리트(20)의 상측에 양생되는 중앙콘크리트(30)와의 결합력을 높이기 위함이다. 또한, 기초콘크리트(20)의 형성할 때 하면 일부가 하천 바닥면에 매설되도록 매입부(21)를 형성하는 것이 바람직하다.In the step (S10) of forming the foundation concrete 20 forms a form (3) so that the width becomes narrower toward the upper side from the bottom of the river, and the "U" shaped frame 60 inside the form (3) constant Install at intervals. Then, after pouring concrete into the formwork 3, the index member 50 is embedded in the upper surface of the poured concrete to cure concrete. At this time, the index member 50 is embedded so as to be exposed to the upper side of the base concrete 20. On the other hand, after curing the foundation concrete 20, if the mold 60 is removed, the coupling groove 23 is formed on the upper surface of the foundation concrete 20. This is to increase the coupling force with the central concrete 30 is cured on the upper side of the base concrete (20). In addition, when forming the base concrete 20, it is preferable to form the buried portion 21 so that a portion of the lower surface is embedded in the river bottom.

중앙콘크리트(30)를 형성하는 단계(S20)에서는 양생된 기초콘크리트(20)의 상면에서 상측으로 갈수록 폭이 좁아지도록 거푸집(3)을 형성하고, 거푸집(3)의 내측에 "U"자형 틀(60)을 일정간격으로 설치하고, 상기 거푸집의 내부에 콘트리트를 타설한 후, 상기 타설된 콘크리트의 상면에 지수재(50)를 매입하여 콘크리트를 양생시킨다. 이러한 과정을 반복하여 다수의 중앙콘크리트(30)를 다단으로 양생시킨다. 그리고 틀(60)을 제거하여 중앙콘크리트(30)의 상면에 결합홈(31)을 형성한다. 한편, 중앙콘크리트(30)의 하면에는 기초콘크리트(20)의 결합홈(23)에 삽입된 결합돌기(33)가 형성된다.Forming the central concrete 30 (S20) forms the formwork 3 so as to narrow the width from the upper surface of the cured foundation concrete 20 to the upper side, the "U" shaped frame inside the formwork (3) 60 is installed at regular intervals, and after the concrete is poured into the formwork, the index material 50 is embedded in the upper surface of the cast concrete to cure the concrete. This process is repeated to cure a plurality of central concrete 30 in multiple stages. And remove the mold 60 to form a coupling groove 31 on the upper surface of the central concrete (30). On the other hand, the lower surface of the central concrete 30 is formed with a coupling protrusion 33 inserted into the coupling groove 23 of the base concrete 20.

상부콘크리트(40)를 형성하는 단계(S30)에서는 양생된 중앙콘크리트(30)의 상면에서 상측으로 갈수록 폭이 좁아지도록 거푸집(3)을 형성하고, 거푸집(3)의 내부에 콘트리트를 타설한 후, 콘크리트를 양생시켜 상부콘크리트(40)를 형성한다. 그러면, 상부콘크리트(40)의 하면에는 중앙콘크리트(30)의 결합홈(31)에 삽입된 결 합돌기(41)가 형성된다.In the step of forming the upper concrete 40 (S30) after forming the formwork (3) to narrow the width toward the upper side from the upper surface of the cured central concrete 30, after pouring the concrete in the formwork (3) , Curing the concrete to form the upper concrete (40). Then, a coupling protrusion 41 inserted into the coupling groove 31 of the central concrete 30 is formed on the lower surface of the upper concrete 40.

삭제delete

다음으로, 상기와 같은 본 발명의 실시예에 따른 방법에 의하여 조성된 댐의 구조를 상세히 설명한다.Next, the structure of the dam formed by the method according to the embodiment of the present invention as described above will be described in detail.

본 실시예에 따른 댐은 상측으로 올라갈수록 폭이 좁아지는 형상의 조적식 구조를 가진다. 댐(10)은 하천의 바닥면에 설치되는 기초 콘크리트(20)와 이 기초 콘크리트(20)의 상단에 다수 적층되어 결합되는 중앙 콘크리트(30) 및 이 중앙 콘크리트(30)의 상면에 결합되는 상부 콘크리트(40)를 포함하여 이루어진다.The dam according to the present embodiment has an masonry structure of a shape that becomes narrower as it goes up. The dam 10 has a base concrete 20 installed on the bottom surface of the river, a central concrete 30 stacked on top of the base concrete 20 and coupled to the upper portion coupled to the upper surface of the central concrete 30. It includes concrete 40.

기초 콘크리트(20)는 그 하단부가 하천 바닥에 매립되어 있으며, 일측 하단부에 매입부(21)가 돌출 형성되어 있다. 매입부(21)는 기초 콘크리트(20)이 하천 바닥면에서 유동되는 것을 방지함과 동시에 물이 하천 바닥과 기초 콘크리트(20) 사이로 누수되는 것을 방지한다. 또한, 기초 콘크리트(20)의 상단에는 중앙 콘크리트(30)를 용이하게 적층하여 결합함과 동시에 결합력이 향상되도록 결합홈(23)이 형성되어 있다.The base concrete 20 has its lower end embedded in the bottom of the river, and the buried portion 21 protrudes from one lower end thereof. The buried portion 21 prevents the foundation concrete 20 from flowing on the river bottom and at the same time prevents water from leaking between the river bottom and the foundation concrete 20. In addition, the coupling groove 23 is formed on the upper end of the foundation concrete 20 so that the central concrete 30 is easily laminated and bonded, and the bonding force is improved.

기초 콘크리트(20)에 다수 적층되는 중앙 콘크리트(30)는 다수 적층할 수 있도록 상면 및 하면에 결합홈(33) 및 결합돌기(31)가 각각 형성되어 있다. 중앙 콘크리트(30)의 하면에 돌출되어 있는 결합돌기(31)는 기초 콘크리트(20)의 결합홈(23)에 삽입되며, 상면에 형성된 결합홈(33)에는 이웃하여 적층되는 다른 하나의 중앙 콘크리트(30)의 상면 결합돌기(31)가 삽입되어 진다.Coupling grooves 33 and coupling projections 31 are formed on the upper and lower surfaces of the central concrete 30 to be stacked on the base concrete 20 so as to be stacked in a plurality. The coupling protrusion 31 protruding from the lower surface of the central concrete 30 is inserted into the coupling groove 23 of the foundation concrete 20, and the other central concrete stacked adjacent to the coupling groove 33 formed on the upper surface. The upper surface engaging projection 31 of 30 is inserted.

상부 콘크리트(40)의 하면에는 적층되는 중앙 콘크리트(30) 중 최상측에 위치되는 중앙 콘크리트(30)의 결합홈(33)에 삽입되는 결합돌기(41)가 돌출 형성되어 있다.The lower surface of the upper concrete 40 has a coupling protrusion 41 is inserted into the coupling groove 33 of the central concrete 30 which is located at the top of the central concrete 30 to be stacked protruding.

이상에서 설명한 것은 본 발명을 실시하기 위한 하나의 실시예에 불과한 것으로서, 본 발명은 상기한 실시예에 한정되지 않고, 이하의 특허청구범위에서 청구하는 바와같이 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변경 실시가 가능한 범위까지 본 발명의 기술적 정신이 있다고 할 것이다.What has been described above is only one embodiment for carrying out the present invention, and the present invention is not limited to the above-described embodiment, and the present invention is made without departing from the gist of the present invention as claimed in the following claims. Anyone with ordinary knowledge in this field will have the technical spirit of the present invention to the extent that various modifications can be made.

이상에서 설명한 바와 같이, 본 발명의 실시예에 따른 댐 콘크리트 타설 공법에 의하면, 적층되는 기초 콘크리트, 중앙 콘크리트 및 상부 콘크리트에 의하여 댐이 조성되므로, 댐의 시공기간을 대폭적으로 단축할 수 있을 뿐만 아니라, 콘크리트 사이로 물이 침투되는 것을 방지할 수 있어 콘크리트의 부식이 줄어드는 효과가 있다.As described above, according to the dam concrete pouring method according to the embodiment of the present invention, since the dam is formed by the stacked base concrete, the central concrete and the upper concrete, the construction period of the dam can be significantly shortened as well. In addition, water can be prevented from penetrating between concretes, thereby reducing the corrosion of concrete.

Claims (2)

하천 바닥면에서 상측으로 갈수록 폭이 좁아지도록 거푸집을 형성하고, 상기 거푸집의 내부에 콘트리트를 타설한 후, 상기 타설된 콘크리트의 상면에 지수재를 매입하여 상기 콘크리트를 양생시켜 기초콘크리트를 형성하는 단계와;Forming a form so that the width becomes narrower from the bottom of the river toward the upper side, and after the concrete is poured into the form, by embedding the index material on the upper surface of the cast concrete to cure the concrete to form the foundation concrete Wow; 양생된 상기 기초콘크리트의 상면에서 상측으로 갈수록 폭이 좁아지도록 거푸집을 형성하고, 상기 거푸집의 내부에 콘트리트를 타설한 후, 상기 타설된 콘크리트의 상면에 지수재를 매입하여 상기 콘크리트를 양생시키는 과정을 반복하여 상기 기초콘크리트의 상측에 다수의 중앙콘크리트를 형성하는 단계와;Forming a form so that the width becomes narrower from the upper surface of the cured base concrete to the upper side, and after pouring concrete into the interior of the formwork, the process of curing the concrete by purchasing the index material on the upper surface of the cast concrete Repeatedly forming a plurality of central concrete on the upper side of the base concrete; 양생된 상기 중앙콘크리트의 상면에서 상측으로 갈수록 폭이 좁아지도록 거푸집을 형성하고, 상기 거푸집의 내부에 콘트리트를 타설한 후, 상기 콘크리트를 양생시켜 상부콘크리트를 형성하는 단계로 이루어지는 댐 콘크리트 타설 공법에 있어서, 상기 각 단계의 콘크리트를 타설하기 전 단계의 거푸집 내측이 조적식 적층되는 콘크리트마다 "U"자형의 결합홈을 형성하기 위한 결합홈 형성단계와, 상기 각 단계에서 양성된 콘크리트 상면의 결합홈에 끼움 결합하기 위해 상측 콘크리트 거푸집의 내부에 결합돌기를 형성하는 결합돌기 형성단계를 더 포함하여 이루어지는 것을 특징으로 한 댐 콘크리트 타설 공법.In the dam concrete pouring method comprising the step of forming a form so that the width becomes narrower from the upper surface of the cured central concrete to the upper side, the concrete is poured into the form, and curing the concrete to form the upper concrete The coupling groove forming step for forming a "U" -shaped coupling groove for each concrete that the formwork of the step before placing the concrete of each step is laminated masonry, and in the coupling groove of the concrete upper surface nurtured in each step The dam concrete pouring method further comprises a coupling protrusion forming step of forming a coupling protrusion in the interior of the upper concrete formwork for coupling. 삭제delete
KR1020060096676A 2006-09-30 2006-09-30 Dam concrete injection method KR100750386B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020060096676A KR100750386B1 (en) 2006-09-30 2006-09-30 Dam concrete injection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020060096676A KR100750386B1 (en) 2006-09-30 2006-09-30 Dam concrete injection method

Publications (1)

Publication Number Publication Date
KR100750386B1 true KR100750386B1 (en) 2007-08-27

Family

ID=38614842

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020060096676A KR100750386B1 (en) 2006-09-30 2006-09-30 Dam concrete injection method

Country Status (1)

Country Link
KR (1) KR100750386B1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100908673B1 (en) * 2008-12-09 2009-07-22 대한민국 Assembly w-type block debris barrier
KR101396504B1 (en) * 2013-03-06 2014-05-19 한국철도기술연구원 Concrete curing device
CN110485382A (en) * 2019-09-20 2019-11-22 中国电建集团成都勘测设计研究院有限公司 The leakage preventing structure of core-wall concrete cover and core-wall and dam foundation contact site
CN111549725A (en) * 2020-05-29 2020-08-18 大连理工大学 Waterproof horizontal water leakage structure for roller compacted concrete dam intermittent layer in severe cold area
KR20220091026A (en) 2020-12-23 2022-06-30 한국수자원공사 Concrete dam

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH055361A (en) * 1991-06-27 1993-01-14 Taisei Corp Multi-step placing and form device for concrete structure
KR100560986B1 (en) 2005-11-02 2006-03-17 대한민국 Multifunctional erosion control dam and its construction method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH055361A (en) * 1991-06-27 1993-01-14 Taisei Corp Multi-step placing and form device for concrete structure
KR100560986B1 (en) 2005-11-02 2006-03-17 대한민국 Multifunctional erosion control dam and its construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100908673B1 (en) * 2008-12-09 2009-07-22 대한민국 Assembly w-type block debris barrier
KR101396504B1 (en) * 2013-03-06 2014-05-19 한국철도기술연구원 Concrete curing device
CN110485382A (en) * 2019-09-20 2019-11-22 中国电建集团成都勘测设计研究院有限公司 The leakage preventing structure of core-wall concrete cover and core-wall and dam foundation contact site
CN111549725A (en) * 2020-05-29 2020-08-18 大连理工大学 Waterproof horizontal water leakage structure for roller compacted concrete dam intermittent layer in severe cold area
KR20220091026A (en) 2020-12-23 2022-06-30 한국수자원공사 Concrete dam

Similar Documents

Publication Publication Date Title
KR100750386B1 (en) Dam concrete injection method
KR100936668B1 (en) A composite pile for earth retaining wall and centrifugal force type earth retaining wall using it
KR101710304B1 (en) Method of repairing and reinforcing scour and separation of underwater concrete structure
KR100654936B1 (en) Method for constructing retaining wall
JP3502081B2 (en) Seawall structure and seawall construction method, and seawall structure and seawall construction method
KR100831879B1 (en) Nature-friendly bank protection engineering method
KR200403455Y1 (en) Block for plants
JP6931876B2 (en) How to build a permeable wall for slope reinforcement
JPH0583688B2 (en)
KR20210046935A (en) Concrete block for retaining wall, manufacturing method, and construction method thereof
KR101685153B1 (en) River foundation with eco-corridor
KR100480508B1 (en) Waterway
JP3890557B2 (en) Method for manufacturing stone-clad concrete blocks
JP3297096B2 (en) Seawall material
KR200464296Y1 (en) Mat embankment block
CN212656066U (en) Assembled greening curb road shoulder board
JP2622897B2 (en) Construction method of wall and drainage method of soil behind wall
CN112359675B (en) Pavement concrete expansion reinforcing belt and construction method thereof
KR100859294B1 (en) Composite a breast wall and construction method using thereby
KR100577851B1 (en) Road drainpipe protection apparatus for secession prevention
KR100724286B1 (en) Block assembly for plants
JPH0342095Y2 (en)
JP2006125007A (en) Revetment block and its manufacturing method
KR100661627B1 (en) Method for paving field constrnction type grass block and shore protection block
KR200406823Y1 (en) Block for green tract of land

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
N231 Notification of change of applicant
E902 Notification of reason for refusal
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
N231 Notification of change of applicant
FPAY Annual fee payment

Payment date: 20120801

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20130806

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20140801

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20160728

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20170727

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20180730

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20190723

Year of fee payment: 13