KR100748098B1 - Pre-excavation bored steel pile used by prevention plate adhered to end and the construction method of this - Google Patents

Pre-excavation bored steel pile used by prevention plate adhered to end and the construction method of this Download PDF

Info

Publication number
KR100748098B1
KR100748098B1 KR1020060014507A KR20060014507A KR100748098B1 KR 100748098 B1 KR100748098 B1 KR 100748098B1 KR 1020060014507 A KR1020060014507 A KR 1020060014507A KR 20060014507 A KR20060014507 A KR 20060014507A KR 100748098 B1 KR100748098 B1 KR 100748098B1
Authority
KR
South Korea
Prior art keywords
steel pipe
pipe pile
blocking plate
attached
embedded steel
Prior art date
Application number
KR1020060014507A
Other languages
Korean (ko)
Inventor
장주원
Original Assignee
(주)내경엔지니어링
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)내경엔지니어링 filed Critical (주)내경엔지니어링
Priority to KR1020060014507A priority Critical patent/KR100748098B1/en
Application granted granted Critical
Publication of KR100748098B1 publication Critical patent/KR100748098B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/60Piles with protecting cases
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/72Pile shoes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • E02D2200/1685Shapes cylindrical
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

A pre-excavation bored steel pile having a blocking plate adhering to an end thereof and a construction method thereof are provided to prevent the waste of cement milk in a steel pile by installing the prevention plate, which includes PVC or steel plate, in the steel pile. A pre-excavation bored steel pile having a blocking plate adhering to an end thereof comprises a prevention plate(20). The prevention plate(20) is fixed to an inner side of a steel pile(10) by bolts(30) to separate upper and lower part of the steel pile(10) from an inner circumferential surface of the steel pile(10). The prevention plate(20) has a diameter identical to that of the steel pile(10), and has a disk(24) and a support. The disk(24) has an air hole(22) at the center thereof, and the support protrudes from a circumference of the disk(24) by a certain height.

Description

선단부에 차단판이 부착된 선굴착 매입 강관말뚝 및 이의 시공방법{pre-excavation bored steel pile used by prevention plate adhered to end and the construction method of this}Pre-excavation bored steel pile used by prevention plate adhered to end and the construction method of this}

도 1은 본 발명에 따른 선단부에 차단판이 부착된 선굴착 매입 강관말뚝을 도시한 사시도,1 is a perspective view showing a pre-drilled buried steel pipe pile attached to the distal end portion in accordance with the present invention,

도 2는 본 발명에 따른 선단부에 차단판이 부착된 선굴착 매입 강관말뚝을 도시한 단면도,Figure 2 is a cross-sectional view showing a pre-drilled embedded steel pipe pile attached to the distal end portion in accordance with the present invention,

도 3은 본 발명에 따른 선단부에 차단판이 부착된 선굴착 매입 강관말뚝을 도시한 평면도,Figure 3 is a plan view showing a pre-drilled embedded steel pipe pile attached to the distal end portion in accordance with the present invention,

도 4는 본 발명에 따른 선단부에 차단판이 부착된 선굴착 매입 강관말뚝의 차단판을 도시한 사시도,Figure 4 is a perspective view showing a blocking plate of the pre-drilled embedded steel pipe pile is attached to the end portion in accordance with the present invention,

도 5a 내지 도 5d는 본 발명에 따른 선단부에 차단판이 부착된 선굴착 매입 강관말뚝을 시공하는 상태를 도시한 공정도.5a to 5d is a process diagram showing a state in which the construction of the pre-drilled embedded steel pipe pile with a blocking plate attached to the tip portion in accordance with the present invention.

-도면의 주요부분에 대한 부호의 설명-Explanation of symbols on the main parts of the drawing

10: 강관말뚝 12: 선단부10: steel pipe pile 12: distal end

20: 차단판 22: 공기구멍20: blocking plate 22: air hole

24: 원판 26: 지지부24: disc 26: support

30: 볼트 D: 직경30: bolt D: diameter

H: 천공홀 M: 혼합물H: Hole M: Mixture

본 발명은 선단부에 차단판이 부착된 선굴착 매입 강관말뚝 및 이의 시공방법에 관한 것으로, 강관말뚝의 선단부 차단판을 설치하여 강관말뚝 길이 내부 전체에 불필요한 시멘트밀크 충전을 방지하도록 한 선단부에 차단판이 부착된 선굴착 매입 강관말뚝 및 이의 시공방법에 관한 것이다.The present invention relates to a pre-drilled embedded steel pipe pile with a blocking plate attached to the tip and a construction method thereof, wherein a blocking plate is attached to the tip to prevent unnecessary cement milk filling in the entire length of the steel pipe pile by installing a tip blocking plate of the steel pipe pile. Pre-drilled embedded steel pipe pile and its construction method.

일반적으로 선굴착 매입 말뚝에서 PC, PHC 등과 같은 콘크리트 말뚝은 선단부가 막혀있는 구조이나 강관말뚝은 강관의 얇은 두께에 의한 순단면적이 매우 적은 트인 구조이다.In general, concrete piles such as PC, PHC, etc., in the pre-drilled embedded pile have a structure in which the tip end is blocked, but the steel pipe pile has a very small net cross-sectional area due to the thin thickness of the steel pipe.

따라서, 상기한 강관말뚝을 토사층, 매립층, 풍화암층에 설치할 경우에는 지지층을 강관말뚝이 뚫고 들어가는 펀칭(punching)현상으로 침하가 발생하기 때문에 강관말뚝의 선단부 차단을 위하여 강관말뚝 선단부 직경(D)의 2∼4배까지 시멘트밀크를 주입하고 양생하여 선단부 차단을 확보하고 있다.Therefore, when the steel pipe pile is installed in the soil layer, the buried layer, and the weathered rock layer, since the settlement occurs due to the punching phenomenon in which the steel pipe pile penetrates, the steel pipe pile tip diameter (D) is 2 ~ Cement milk is injected and cured up to 4 times to secure the tip block.

그러나, 선단부 차단장치가 없는 강관말뚝의 경우에는 강관말뚝의 외벽과 굴착공벽의 틈새를 시멘트밀크로 충전하여야 주면마찰력이 확보되어 강관말뚝의 지지 기능이 가능하고, 이를 위하여는 굴착깊이 전체 길이에 시멘트밀크를 충전하여야만 강관말뚝의 외벽 틈새까지 완벽하게 충전되므로 선단부 구근에 이용되는 선단부 직경(D)의 2∼4배까지의 이외 부분은 재료 낭비적 요소가 크다.However, in the case of the steel pipe pile without the tip blocking device, the gap between the outer wall of the steel pipe pile and the excavation hole wall should be filled with cement milk to secure the frictional force and to support the steel pipe pile. Only when the milk is filled, it is completely filled to the gap of the outer wall of the steel pipe pile, so the parts other than up to 2 to 4 times the diameter (D) of the tip used for the tip bulb are large wasteful materials.

일부 현장에서 선단부 구근 형성부만 시멘트밀크를 주입 및 양생 후 차후에 강관 외벽과 토사공벽의 틈새에 별도로 호스를 이용하여 시멘트밀크를 주입하는 방법을 시도하고 있으나, 토사층, 매립층, 자갈층 등등은 공벽이 붕괴되어 틈새가 막히고 호스를 통한 시멘트밀크 주입이 곤란하거나 불량하여 설계마찰지지력 확보에 큰 문제를 일으키는 경우가 있으므로 특별한 주의가 요구되는 실정이다.In some sites, only the tip bulb forming part injects and cures cement milk, and later attempts to inject cement milk using a hose separately into the gap between the outer wall of the steel pipe and the earthwork wall, but the soil layer, the landfill layer, the gravel layer, etc. It is necessary to pay special attention because it may cause a big problem in securing design friction bearing capacity because of collapse or gap and clogging of cement milk through hose.

이에, 본 발명은 상기한 바와 같은 제문제점을 해결하기 위해 안출된 것으로서, 강관말뚝의 선단부 차단판을 설치하여 강관말뚝 길이 내부 전체에 불필요한 시멘트밀크 충전을 방지하여 경제적으로 큰 절감효과가 보장되며, 선굴착 토사공벽과 강관말뚝 외벽 사이 틈새가 충실하게 충전되어 설계예상지지력 확보가 확실하도록 한 선단부에 차단판이 부착된 선굴착 매입 강관말뚝 및 이의 시공방법을 제공하는데 그 목적이 있다.Therefore, the present invention was devised to solve the problems as described above, by installing a front end blocking plate of the steel pipe pile to prevent unnecessary cement milk filling the entire length of the steel pipe pile economical great savings effect is ensured, The purpose of the present invention is to provide a pre-drilled embedded steel pipe pile with a blocking plate attached to the distal end of the pre-earth excavated earthwork wall and the outer wall of the steel pipe pile to ensure the expected design support.

상기한 목적을 달성하기 위한 본 발명에 따른 선단부에 차단판이 부착된 선굴착 매입 강관말뚝은 강관말뚝의 선단부로부터 내측 상향으로 강관말뚝의 직경의 2∼4배 부분에 해당되는 부위에 강관말뚝의 상부와 하부가 내주면에서 분리되도록 차단판이 볼트를 매개로 고정 설치됨을 특징으로 한다.Pre-drilled embedded steel pipe pile with a block plate attached to the tip portion according to the present invention for achieving the above object is the upper portion of the steel pipe pile in the portion corresponding to 2 to 4 times the diameter of the steel pipe pile inwardly upward from the tip of the steel pipe pile The barrier plate is fixedly installed through the bolt so that the lower part and the lower part are separated from the inner circumferential surface.

또한, 상기한 목적을 달성하기 위한 본 발명에 따른 선단부에 차단판이 부착된 선굴착 매입 강관말뚝 시공방법은 선단부에 차단판이 부착된 선굴착 매입 강관말뚝을 제작하는 단계; 상기 선단부에 차단판이 부착된 선굴착 매입 강관말뚝을 시공할 대상지반을 일정한 깊이 및 직경으로 굴공하여 천공홀을 형성하는 단계; 상기 천공홀에 시멘트밀크, 모르타르, 콘크리트 중의 어느 하나로 이루어지는 혼합물을 충전하는 단계; 상기 혼합물이 충전된 천공홀에 선단부에 차단판이 부착된 선굴착 매입 강관말뚝을 압입하여 설치하는 단계로 이루어짐을 특징으로 한다.In addition, the method of constructing the pre-drilled embedded steel pipe pile with a block plate attached to the tip portion according to the present invention for achieving the above object comprises the steps of preparing a pre-dig embedded steel pipe pile with a block plate attached to the tip; Forming a drilling hole by drilling a target ground to be constructed with a pre-drilled embedded steel pipe pile having a blocking plate attached to the tip portion at a predetermined depth and diameter; Filling the drilling hole with a mixture made of any one of cement milk, mortar, and concrete; It characterized in that the step consisting of pressing the pre-rigged embedded steel pipe pile with a blocking plate attached to the front end in the drilling hole filled with the mixture.

이하, 본 발명을 첨부한 예시도면을 참조하여 상세히 설명한다.Hereinafter, with reference to the accompanying drawings, the present invention will be described in detail.

도 1은 본 발명에 따른 선단부에 차단판이 부착된 선굴착 매입 강관말뚝을 도시한 사시도이며, 도 2는 본 발명에 따른 선단부에 차단판이 부착된 선굴착 매입 강관말뚝을 도시한 단면도이며, 도 3은 본 발명에 따른 선단부에 차단판이 부착된 선굴착 매입 강관말뚝을 도시한 평면도이며, 도 4는 본 발명에 따른 선단부에 차단판이 부착된 선굴착 매입 강관말뚝의 차단판을 도시한 사시도이다.1 is a perspective view showing a pre-drilled embedded steel pipe pile with a blocking plate attached to the tip end according to the present invention, Figure 2 is a cross-sectional view showing a pre-dig embedded steel pipe pile with a blocking plate attached to the tip in accordance with the present invention, Figure 3 Is a plan view showing a pre-rigged embedded steel pipe pile having a blocking plate attached to the tip portion according to the present invention, Figure 4 is a perspective view showing a blocking plate of a pre-rigged embedded steel pipe pile attached to the tip portion in accordance with the present invention.

이들 도면에 도시된 바와 같이, 본 발명에 따른 선단부에 차단판이 부착된 선굴착 매입 강관말뚝은 통상의 강관말뚝에 있어서, 상기 강관말뚝(10)의 선단부(12)로부터 내측 상향으로 강관말뚝(10)의 직경(D)의 2∼4배 부분에 해당되는 부위에 강관말뚝(10)의 상부와 하부가 내주면에서 분리되도록 차단판(20)이 볼트(30)를 매개로 고정 설치된 구조이다.As shown in these drawings, the pre-rigged embedded steel pipe pile with a blocking plate attached to the tip end according to the present invention in a conventional steel pipe pile, the steel pipe pile (10) inward upward from the tip portion 12 of the steel pipe pile (10) The block plate 20 is fixedly installed through the bolt 30 so that the upper and lower portions of the steel pipe pile 10 are separated from the inner circumferential surface at a portion corresponding to a portion 2 to 4 times the diameter D).

여기서, 상기 차단판(20)은 강관말뚝(10)의 직경과 동일한 직경을 가지며, 가운데에 공기구멍(22)이 형성된 원판(24)과; 상기 원판(24)의 주연부로부터 일정 한 높이로 돌출 형성되는 지지부(26)로 구성된다.Here, the blocking plate 20 has a diameter equal to the diameter of the steel pipe pile (10), the disc 24 has an air hole 22 in the center; It consists of a support portion 26 is formed to protrude to a certain height from the peripheral portion of the disc 24.

상기한 바와 같은 구성으로 이루어진 본 발명에 따른 선단부에 차단판이 부착된 선굴착 매입 강관말뚝의 시공에 대해 설명한다.The construction of the pre-drilled embedded steel pipe pile with a blocking plate attached to the tip portion according to the present invention having the configuration as described above will be described.

도 5a 내지 도 5d는 본 발명에 따른 선단부에 차단판이 부착된 선굴착 매입 강관말뚝을 시공하는 상태를 도시한 공정도이다.5A to 5D are process diagrams showing a state of constructing a pre-drilled embedded steel pipe pile having a blocking plate attached to a tip end according to the present invention.

이들 도면에 도시된 바와 같이, 본 발명에 따른 선단부에 차단판이 부착된 선굴착 매입 강관말뚝 시공방법은 선단부(12)에 차단판(20)이 부착된 선굴착 매입 강관말뚝(10)을 제작하는 단계; 상기 선단부(12)에 차단판(20)이 부착된 선굴착 매입 강관말뚝(10)을 시공할 대상지반을 일정한 깊이 및 직경으로 굴공하여 천공홀(H)을 형성하는 단계; 상기 천공홀(H)에 시멘트밀크, 모르타르, 콘크리트 중의 어느 하나로 이루어지는 혼합물(M)을 충전하는 단계; 상기 혼합물(M)이 충전된 천공홀(H)에 선단부(12)에 차단판(20)이 부착된 선굴착 매입 강관말뚝(10)을 압입하여 설치하는 단계로 이루어진다. As shown in these drawings, the pre-excavation embedded steel pipe pile construction method with a block plate attached to the tip portion in accordance with the present invention to produce a pre-rigged embedded steel pipe pile (10) with a block plate 20 attached to the tip portion (12) step; Forming a drilling hole (H) by drilling a target ground to be constructed with a pre-drilled embedded steel pipe pile (10) having a blocking plate (20) attached to the tip (12) to a predetermined depth and diameter; Filling the mixture hole M formed of any one of cement milk, mortar, and concrete into the drilling hole H; In the drilling hole (H) filled with the mixture (M) consists of the step of installing by pressing the pre-excavation embedded steel pipe pile 10 is attached to the front end portion 12 to the front end portion 12.

즉, 본 발명에 따른 선단부에 차단판이 부착된 선굴착 매입 강관말뚝 시공방법은 강관말뚝(10)의 선단부(12)에서 강관말뚝(10)의 직경(D)의 4D깊이 내부에 PVC 또는 철판으로 이루어진 차단판(20)을 설치하여 강관말뚝(10)의 상부 내주면에 시멘트밀크의 낭비를 사전에 제거하고, 강관말뚝(10)이 차단판(20)에 의해서 폐색됨으로 인하여 강관말뚝(10)의 부피가 확보되어서, 이것이 선단부(12)의 시멘트밀크를 압착하면서, 압착된 시멘트밀크는 강관말뚝(10)의 외주면과 천공홀(H) 공벽의 틈새를 충실하게 충전하여, 설계지지마찰력을 충분하게 확보함을 특징으로 한다.That is, the pre-drilled embedded steel pipe pile construction method with a block plate attached to the tip portion according to the present invention is a PVC or iron plate inside the 4D depth of the diameter (D) of the steel pipe pile 10 at the tip portion 12 of the steel pipe pile (10) By installing the blocking plate 20 made of steel pipe pile 10 to remove the waste of cement milk in advance, the steel pipe pile 10 is blocked by the blocking plate 20 of the steel pipe pile 10 As the volume is secured, this presses the cement milk of the tip portion 12, while the compressed cement milk faithfully fills the gap between the outer circumferential surface of the steel pipe pile 10 and the hole hole H wall, thereby sufficiently satisfying the design frictional force. Characterized in securing.

특히, 상기 천공홀(H)내에 충전된 시멘트밀크가 선단부(12)가 차단판(20)에 의해 폐색된 강관말뚝(10)을 하향으로 근입시킬 경우, 차단판(20)의 하부에 에어포켓이 발생되어, 그 부분에 시멘트밀크가 충분하게 충전되지 않아 폐색효과가 불량해 질 수 있으므로 차단판(20)과 시멘트밀크간에 있는 내부공기를 외부로 방출할 수 있도록 공기구멍(22)을 차단판(20)이나 강관말뚝(10)에 형성하여 에어포켓 현상을 원천적으로 방지하는 것이 바람직하다. In particular, when the cement milk filled in the drilling hole (H) is inclined downwardly the steel pipe pile 10 is closed by the blocking plate 20, the air pocket in the lower portion of the blocking plate 20 Is generated, the cement milk is not sufficiently filled in the part, so that the blocking effect may be poor, so that the air hole 22 is blocked to release the internal air between the blocking plate 20 and the cement milk to the outside. It is preferable to form the 20 or the steel pipe pile 10 to prevent the air pocket phenomenon at the source.

이상에서 설명한 바와 같이, 본 발명에 따른 선단부에 차단판이 부착된 선굴착 매입 강관말뚝 및 이의 시공방법은 강관말뚝의 선단부에서 강관말뚝의 직경의 4D깊이 내부에 PVC 또는 철판으로 이루어진 차단판을 설치하여 강관말뚝의 상부 내주면에 시멘트밀크의 낭비를 사전에 제거하고, 강관말뚝이 차단판에 의해서 폐색됨으로 인하여 강관말뚝의 부피가 확보되어서, 이것이 선단부의 시멘트밀크를 압착하면서, 압착된 시멘트밀크는 강관말뚝의 외주면과 천공홀 공벽의 틈새를 충실하게 충전하여, 설계지지마찰력을 충분하게 확보할 수 있는 장점이 있다.As described above, the pre-rigged embedded steel pipe pile with a blocking plate attached to the tip end according to the present invention and its construction method by installing a blocking plate made of PVC or iron plate inside the 4D depth of the diameter of the steel pipe pile at the tip of the steel pipe pile The waste of cement milk is removed in advance on the upper inner circumferential surface of the steel pipe pile, and the volume of the steel pipe pile is secured due to the blockage of the steel pipe pile by the blocking plate, which compresses the cement milk at the tip, and the compressed cement milk is By filling the gap between the outer circumferential surface and the perforated hole wall faithfully, there is an advantage that can sufficiently secure the design support friction.

Claims (5)

통상의 강관말뚝에 있어서,In the normal steel pipe pile, 상기 강관말뚝(10)의 선단부(12)로부터 내측 상향으로 강관말뚝(10)의 직경(D)의 2∼4배 부분에 해당되는 부위에 강관말뚝(10)의 상부와 하부가 내주면에서 분리되도록 차단판(20)이 볼트(30)를 매개로 고정 설치되며,The upper and lower portions of the steel pipe pile 10 are separated from the inner circumferential surface at a portion corresponding to a portion 2 to 4 times the diameter D of the steel pipe pile 10 upwardly from the distal end portion 12 of the steel pipe pile 10. The blocking plate 20 is fixedly installed through the bolt 30, 상기 차단판(20)은 강관말뚝(10)의 직경과 동일한 직경을 가지며, 가운데에 공기구멍(22)이 형성된 원판(24)과; 상기 원판(24)의 주연부로부터 일정한 높이로 돌출 형성되는 지지부(26)로 구성됨을 특징으로 하는 선단부에 차단판이 부착된 선굴착 매입 강관말뚝.The blocking plate 20 has a diameter equal to the diameter of the steel pipe pile 10, and a disk 24 having an air hole 22 in the center thereof; Pre-drilled embedded steel pipe pile with a blocking plate attached to the front end portion, characterized in that consisting of a support portion (26) protruding from the peripheral portion of the disc 24 to a certain height. 삭제delete 선단부(12)에 차단판(20)이 부착된 선굴착 매입 강관말뚝(10)을 제작하는 단계;Manufacturing a pre-drilled embedded steel pipe pile 10 having a blocking plate 20 attached to the tip portion 12; 상기 선단부(12)에 차단판(20)이 부착된 선굴착 매입 강관말뚝(10)을 시공할 대상지반을 일정한 깊이 및 직경으로 굴공하여 천공홀(H)을 형성하는 단계;Forming a drilling hole (H) by drilling a target ground to be constructed with a pre-drilled embedded steel pipe pile (10) having a blocking plate (20) attached to the tip (12) to a predetermined depth and diameter; 상기 천공홀(H)에 시멘트밀크, 모르타르, 콘크리트 중의 어느 하나로 이루어지는 혼합물(M)을 충전하는 단계;Filling the mixture hole M formed of any one of cement milk, mortar, and concrete into the drilling hole H; 상기 혼합물(M)이 충전된 천공홀(H)에 선단부(12)에 차단판(20)이 부착된 선굴착 매입 강관말뚝(10)을 압입하여 설치하는 단계로 이루어짐을 특징으로 하는 선단부에 차단판이 부착된 선굴착 매입 강관말뚝 시공방법.Blocking the tip portion, characterized in that the step of inserting the pre-rigged embedded steel pipe pile 10 is attached to the tip portion 12 in the drilling hole (H) filled with the mixture (M) attached to the tip portion (12) Construction method of pre-drilled embedded steel pipe pile with plate. 제 3항에 있어서,The method of claim 3, wherein 상기 선단부(12)에 차단판(20)이 부착된 선굴착 매입 강관말뚝(10)은 강관말뚝(10)의 선단부(12)로부터 내측 상향으로 강관말뚝(10)의 외경의 2∼4배 부분에 해당되는 부위에 강관말뚝(10)의 상부와 하부가 분리되도록 차단판(20)이 볼트(30)를 매개로 고정 설치됨을 특징으로 하는 선단부에 차단판이 부착된 선굴착 매입 강관말뚝 시공방법.The pre-excavation embedded steel pipe pile 10 having the blocking plate 20 attached to the tip portion 12 is two to four times the outer diameter of the steel pipe pile 10 upwardly from the tip portion 12 of the steel pipe pile 10. Method for constructing a pre-rigged embedded steel pipe pile with a block plate attached to the distal end, characterized in that the block plate 20 is fixed to the upper and lower portions of the steel pipe pile 10 to be separated by a bolt (30). 제 4항에 있어서, The method of claim 4, wherein 상기 차단판은 강관말뚝(10)의 내경과 동일한 외경을 가지며, 가운데에 공기구멍(22)이 형성된 원판(24)과; 상기 원판(24)의 주연부로부터 일정한 높이로 돌출 형성되는 지지부(26)로 구성됨을 특징으로 하는 선단부에 차단판이 부착된 선굴착 매입 강관말뚝 시공방법.The blocking plate has an outer diameter that is the same as the inner diameter of the steel pipe pile 10, and the disc 24 has an air hole 22 in the center; Method of constructing a pre-rigged embedded steel pipe pile with a blocking plate attached to the distal end, characterized in that consisting of a support portion (26) protruding to a certain height from the peripheral portion of the disc (24).
KR1020060014507A 2006-02-15 2006-02-15 Pre-excavation bored steel pile used by prevention plate adhered to end and the construction method of this KR100748098B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020060014507A KR100748098B1 (en) 2006-02-15 2006-02-15 Pre-excavation bored steel pile used by prevention plate adhered to end and the construction method of this

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020060014507A KR100748098B1 (en) 2006-02-15 2006-02-15 Pre-excavation bored steel pile used by prevention plate adhered to end and the construction method of this

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR2020060004233U Division KR200416271Y1 (en) 2006-02-15 2006-02-15 pre-excavation bored steel pile used by prevention plate adhered to end

Publications (1)

Publication Number Publication Date
KR100748098B1 true KR100748098B1 (en) 2007-08-14

Family

ID=38602487

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020060014507A KR100748098B1 (en) 2006-02-15 2006-02-15 Pre-excavation bored steel pile used by prevention plate adhered to end and the construction method of this

Country Status (1)

Country Link
KR (1) KR100748098B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101521558B1 (en) * 2013-10-02 2015-05-19 (주)천마엔지니어링 Underground wall construction method using the wall members
KR20190012676A (en) * 2017-07-28 2019-02-11 박선옥 Support column

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100228223B1 (en) 1996-12-09 1999-11-01 신현준 Friction pile having an outburst member and construction method of friction pile, in site
KR100306028B1 (en) 2000-03-13 2001-11-03 홍성영,이병도 Structure for connecting head of steel pile and concrete footing
KR200359042Y1 (en) 2004-05-14 2004-08-21 이윤주 Structure of Steel Cover Plate on Top of Prestressed High Strength Concrete Pile Consisting Composite Pile

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100228223B1 (en) 1996-12-09 1999-11-01 신현준 Friction pile having an outburst member and construction method of friction pile, in site
KR100306028B1 (en) 2000-03-13 2001-11-03 홍성영,이병도 Structure for connecting head of steel pile and concrete footing
KR200359042Y1 (en) 2004-05-14 2004-08-21 이윤주 Structure of Steel Cover Plate on Top of Prestressed High Strength Concrete Pile Consisting Composite Pile

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101521558B1 (en) * 2013-10-02 2015-05-19 (주)천마엔지니어링 Underground wall construction method using the wall members
KR20190012676A (en) * 2017-07-28 2019-02-11 박선옥 Support column
KR101979507B1 (en) * 2017-07-28 2019-05-16 박선옥 Support column

Similar Documents

Publication Publication Date Title
KR102151009B1 (en) Soil cohesion stake suitable for slopes
KR100923587B1 (en) Micro pile construction method using anchorage appratus of micro pile
KR100657176B1 (en) Extracting casing after lower part curing type cast-in-place pile method
KR100559978B1 (en) A pile for cofferdam and cofferdam method using it
KR100760293B1 (en) Tunnel construction method for shallow overburden tunnel
JP4463140B2 (en) Seismic reinforcement method for masonry walls
US20120301227A1 (en) Foundation pile and installing method thereof
KR101253678B1 (en) Pile foundation and method for constucting the same
KR20090080795A (en) PHC pile having reinforcing shoe adhered to end
JP4898233B2 (en) Manhole floating prevention structure
KR100748098B1 (en) Pre-excavation bored steel pile used by prevention plate adhered to end and the construction method of this
KR101843379B1 (en) Apparatus and method for reinforcing soft ground
JP6158398B1 (en) Composite foundation pile
JP5124007B2 (en) Retaining wall construction method
JP2010150821A (en) Method for reinforcing retaining wall
KR200416271Y1 (en) pre-excavation bored steel pile used by prevention plate adhered to end
KR20070014547A (en) Support reinforcement-machine fot tip of still pile pipe
JPH09316874A (en) Support pile as measure against liquefaction
JP5777435B2 (en) Reinforcement method for foundations for small buildings
JPH07286324A (en) Construction method of pile with drain layer or drain column, and construction device used therefor
KR101435489B1 (en) Helical pile and it's construction method
KR101695720B1 (en) A based pile tip connected type based pile and construction method therefor
JP2690361B2 (en) Pile construction method
KR102146926B1 (en) Constructing method of micropile
KR20130125851A (en) Micro pile with improved end bearing capacity and its construction methods thereof

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
G170 Publication of correction
FPAY Annual fee payment

Payment date: 20120703

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20130801

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20140804

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20150804

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20160728

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20170710

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20190709

Year of fee payment: 13