KR100746558B1 - Appratus and method for connection between concrete pile head and concrete footing - Google Patents
Appratus and method for connection between concrete pile head and concrete footing Download PDFInfo
- Publication number
- KR100746558B1 KR100746558B1 KR1020050011196A KR20050011196A KR100746558B1 KR 100746558 B1 KR100746558 B1 KR 100746558B1 KR 1020050011196 A KR1020050011196 A KR 1020050011196A KR 20050011196 A KR20050011196 A KR 20050011196A KR 100746558 B1 KR100746558 B1 KR 100746558B1
- Authority
- KR
- South Korea
- Prior art keywords
- pile
- steel wire
- foundation
- reinforcing bar
- installation groove
- Prior art date
Links
Images
Classifications
-
- G—PHYSICS
- G09—EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
- G09G—ARRANGEMENTS OR CIRCUITS FOR CONTROL OF INDICATING DEVICES USING STATIC MEANS TO PRESENT VARIABLE INFORMATION
- G09G3/00—Control arrangements or circuits, of interest only in connection with visual indicators other than cathode-ray tubes
- G09G3/20—Control arrangements or circuits, of interest only in connection with visual indicators other than cathode-ray tubes for presentation of an assembly of a number of characters, e.g. a page, by composing the assembly by combination of individual elements arranged in a matrix no fixed position being assigned to or needed to be assigned to the individual characters or partial characters
- G09G3/34—Control arrangements or circuits, of interest only in connection with visual indicators other than cathode-ray tubes for presentation of an assembly of a number of characters, e.g. a page, by composing the assembly by combination of individual elements arranged in a matrix no fixed position being assigned to or needed to be assigned to the individual characters or partial characters by control of light from an independent source
- G09G3/3406—Control of illumination source
- G09G3/3413—Details of control of colour illumination sources
-
- G—PHYSICS
- G02—OPTICS
- G02F—OPTICAL DEVICES OR ARRANGEMENTS FOR THE CONTROL OF LIGHT BY MODIFICATION OF THE OPTICAL PROPERTIES OF THE MEDIA OF THE ELEMENTS INVOLVED THEREIN; NON-LINEAR OPTICS; FREQUENCY-CHANGING OF LIGHT; OPTICAL LOGIC ELEMENTS; OPTICAL ANALOGUE/DIGITAL CONVERTERS
- G02F1/00—Devices or arrangements for the control of the intensity, colour, phase, polarisation or direction of light arriving from an independent light source, e.g. switching, gating or modulating; Non-linear optics
- G02F1/01—Devices or arrangements for the control of the intensity, colour, phase, polarisation or direction of light arriving from an independent light source, e.g. switching, gating or modulating; Non-linear optics for the control of the intensity, phase, polarisation or colour
- G02F1/13—Devices or arrangements for the control of the intensity, colour, phase, polarisation or direction of light arriving from an independent light source, e.g. switching, gating or modulating; Non-linear optics for the control of the intensity, phase, polarisation or colour based on liquid crystals, e.g. single liquid crystal display cells
- G02F1/133—Constructional arrangements; Operation of liquid crystal cells; Circuit arrangements
- G02F1/1333—Constructional arrangements; Manufacturing methods
- G02F1/133308—Support structures for LCD panels, e.g. frames or bezels
-
- G—PHYSICS
- G02—OPTICS
- G02F—OPTICAL DEVICES OR ARRANGEMENTS FOR THE CONTROL OF LIGHT BY MODIFICATION OF THE OPTICAL PROPERTIES OF THE MEDIA OF THE ELEMENTS INVOLVED THEREIN; NON-LINEAR OPTICS; FREQUENCY-CHANGING OF LIGHT; OPTICAL LOGIC ELEMENTS; OPTICAL ANALOGUE/DIGITAL CONVERTERS
- G02F1/00—Devices or arrangements for the control of the intensity, colour, phase, polarisation or direction of light arriving from an independent light source, e.g. switching, gating or modulating; Non-linear optics
- G02F1/01—Devices or arrangements for the control of the intensity, colour, phase, polarisation or direction of light arriving from an independent light source, e.g. switching, gating or modulating; Non-linear optics for the control of the intensity, phase, polarisation or colour
- G02F1/13—Devices or arrangements for the control of the intensity, colour, phase, polarisation or direction of light arriving from an independent light source, e.g. switching, gating or modulating; Non-linear optics for the control of the intensity, phase, polarisation or colour based on liquid crystals, e.g. single liquid crystal display cells
- G02F1/133—Constructional arrangements; Operation of liquid crystal cells; Circuit arrangements
- G02F1/1333—Constructional arrangements; Manufacturing methods
- G02F1/133382—Heating or cooling of liquid crystal cells other than for activation, e.g. circuits or arrangements for temperature control, stabilisation or uniform distribution over the cell
-
- G—PHYSICS
- G02—OPTICS
- G02F—OPTICAL DEVICES OR ARRANGEMENTS FOR THE CONTROL OF LIGHT BY MODIFICATION OF THE OPTICAL PROPERTIES OF THE MEDIA OF THE ELEMENTS INVOLVED THEREIN; NON-LINEAR OPTICS; FREQUENCY-CHANGING OF LIGHT; OPTICAL LOGIC ELEMENTS; OPTICAL ANALOGUE/DIGITAL CONVERTERS
- G02F1/00—Devices or arrangements for the control of the intensity, colour, phase, polarisation or direction of light arriving from an independent light source, e.g. switching, gating or modulating; Non-linear optics
- G02F1/01—Devices or arrangements for the control of the intensity, colour, phase, polarisation or direction of light arriving from an independent light source, e.g. switching, gating or modulating; Non-linear optics for the control of the intensity, phase, polarisation or colour
- G02F1/13—Devices or arrangements for the control of the intensity, colour, phase, polarisation or direction of light arriving from an independent light source, e.g. switching, gating or modulating; Non-linear optics for the control of the intensity, phase, polarisation or colour based on liquid crystals, e.g. single liquid crystal display cells
- G02F1/133—Constructional arrangements; Operation of liquid crystal cells; Circuit arrangements
- G02F1/1333—Constructional arrangements; Manufacturing methods
- G02F1/1335—Structural association of cells with optical devices, e.g. polarisers or reflectors
- G02F1/1336—Illuminating devices
- G02F1/133602—Direct backlight
- G02F1/133603—Direct backlight with LEDs
Abstract
본 발명은 콘크리트 말뚝의 두부정리 장치와 그 방법에 관한 것으로, 그 목적은 지면으로부터 일정 높이 이상 돌출된 부분이 절단 제거된 콘크리트 말뚝의 상단부에 설치홈을 형성한 후 상기 설치홈에 콘크리트 말뚝에 삽입된 강선과 연결되도록 하는 보조철근을 구비한 철근연결수단을 설치함으로써 콘크리트 말뚝 내부의 강선을 노출시키기 위하여 말뚝의 두부를 파쇄할 필요가 없이 손쉽게 말뚝의 두부를 정리하는 것으로, 말뚝 내부의 강선을 노출시키는 과정에서 말뚝의 두부에 종방향의 균열이 발생하고 그로 인해 말뚝의 강도가 저하되는 것을 방지해주는 말뚝의 두부정리 장치와 그 방법을 제공함에 있다.The present invention relates to an apparatus for arranging the head of a concrete pile and a method thereof, and an object thereof is to insert an installation groove into the concrete groove after forming an installation groove in the upper end of the concrete pile from which a portion protruding more than a certain height from the ground is removed. By installing reinforcing bar with auxiliary reinforcing bar to connect with steel wire, it is easy to clean up the head of pile without exposing the head of pile to expose steel wire inside concrete pile. The present invention provides a head arranging device and method for preventing piles from causing longitudinal cracks in the head of the pile and thereby reducing the strength of the pile.
상기 목적을 달성하기 위한 본 발명은 건축구조물의 기초로 사용되는 콘크리트 말뚝이 지반에 설치된 상태에서 지면으로부터 일정 높이에서 말뚝을 완전히 절단한 후 지반에 설치된 말뚝의 상단면에 소정의 깊이로 함몰되는 설치홈을 형성하여 말뚝 내부에 배근된 강선의 상단부가 외부로 노출되도록 하고, 상기 설치홈으로 노출된 강선에 고정됨과 동시에 구조물의 바닥기초를 형성하는 기초철근과 연결될 수 있도록 상부방향으로 연장되는 보조철근을 구비한 보조철근 연결수단을 이용하여 콘크리트 말뚝의 상단부와 구조물의 바닥기초가 연결되도록 하는 것을 그 기술적 요지로 한다.The present invention for achieving the above object is an installation groove that is recessed to a predetermined depth in the upper surface of the pile installed on the ground after cutting the pile at a certain height from the ground in a state where the concrete pile used as a foundation of the building structure is installed on the ground To form an upper end of the steel wire that is reinforced inside the pile exposed to the outside, and the secondary reinforcement extending in the upper direction to be connected to the base reinforcement to be fixed to the steel wire exposed to the installation groove and to form the bottom foundation of the structure The technical gist of the upper base of the concrete pile and the bottom foundation of the structure is connected by using the auxiliary reinforcing bar provided.
콘크리트 말뚝, 강선, 설치홈, 보조철근, 기초철근, 용접결합, 나사결합Concrete pile, steel wire, mounting groove, auxiliary reinforcing bar, foundation reinforcing bar, welding joint
Description
도 1 은 말뚝의 강선이 외부로 노출되도록 말뚝의 두부를 파쇄과정에서 말뚝에 종방향 균열이 발생한 상태를 나타낸 예시도,1 is an exemplary view showing a state in which the longitudinal crack occurred in the pile during the fracture of the head of the pile so that the steel wire of the pile is exposed to the outside,
도 2 는 지면으로부터 일정 높이 이상 돌출된 부분이 절단 제거된 후에 말뚝 상단부의 형상을 나타낸 예시도,Figure 2 is an exemplary view showing the shape of the upper end of the pile after the portion that protrudes more than a predetermined height from the ground,
도 3 은 본 발명에 있어 말뚝에 배근된 강선이 외부로 노출되도록 말뚝의 상단부에 설치홈을 형성한 상태도,Figure 3 is a state in which an installation groove is formed in the upper end of the pile so that the steel wire that is placed on the pile exposed to the outside in the present invention,
도 4 는 본 발명에 있어 외부로 노출된 강선과 보조철근이 캡구조의 용접결합된 상태를 나타낸 예시도,Figure 4 is an exemplary view showing a state in which the steel wire exposed to the outside and the secondary reinforcing bar welded in the cap structure,
도 5 는 본 발명에 있어 외부로 노출된 강선과 보조철근이 캡구조의 나사결합된 상태를 나타낸 예시도Figure 5 is an exemplary view showing a screwed state of the cap structure of the steel wire and the secondary reinforcement exposed to the outside in the present invention
도 6 은 본 발명에 있어 외부로 노출된 강선에 수나사부를 형성한 후 제1연결부재를 나사결합시킨 상태를 나타낸 예시도,Figure 6 is an exemplary view showing a state in which the first connection member is screwed after forming a male thread on the steel wire exposed to the outside in the present invention,
도 7 은 본 발명에 있어 외부로 노출된 강선에 제2연결부재를 설치하고 이들 을 용접결합시킨 상태를 나타낸 예시도,Figure 7 is an exemplary view showing a state in which the second connecting member is installed on the steel wire exposed to the outside and welded to them in the present invention,
도 8 은 본 발명의 제2연결부재의 결합상태를 나타낸 상세도,8 is a detailed view showing a coupling state of the second connection member of the present invention;
도 9 는 본 발명에 있어 외부로 노출된 강선과 보조철근을 구비한 덮개판의 결합을 나타낸 사시도,9 is a perspective view showing the coupling of the cover plate provided with steel wire and auxiliary rebar exposed to the outside in the present invention,
도 10 은 본 발명에 있어 외부로 노출된 강선과 보조철근을 구비한 덮개판의 결합을 나타낸 정면도,10 is a front view showing the coupling of the cover plate having a steel wire and auxiliary rebar exposed to the outside in the present invention,
도 11 은 본 발명에 의한 콘크리트 말뚝과 기초철근과의 연결 예를 나타낸 예시도,11 is an exemplary view showing a connection example of the concrete pile and the foundation reinforcement according to the present invention,
<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>
(10) : 말뚝 (11) : 강선(10): pile (11): steel wire
(12) : 콘크리트 (20) : 설치홈(12): Concrete (20): mounting groove
(30) : 상부캡 (31) : 하부캡(30): upper cap (31): lower cap
(32) : 보조철근 (33)(34)(35) : 용접고정(32): auxiliary rebar (33) (34) (35): welding fixing
(40) : 제1연결부재 (41)(41a) : 암나사부40: first connecting member 41 (41a): female thread portion
(42)(42a) : 수나사부 (50) : 제2연결부재(42) (42a): Male thread portion 50: Second connection member
(51) : 절개부 (52) : 삽입홀(51): incision 52: insertion hole
(60) : 덮개판 (61) : 끼움돌기 (60): cover plate 61: fitting protrusion
(62) : 몸체부 (70) : 바닥기초(62): body part 70: bottom foundation
(71) : 기초철근 (100) : 철근연결수단(71): basic reinforcing bar (100): reinforcing bar connecting means
(101) : 균열 (102) : 파쇄기101: crack 102: crusher
본 발명은 콘크리트 말뚝의 두부정리 장치와 그 방법에 관한 것으로, 보다 상세하게는 지반에 설치된 콘크리트 말뚝의 두부와 구조물의 바닥기초를 연결하는 과정에서 말뚝 내부의 강선을 도출하기 위하여 말뚝의 두부를 파쇄하지 않고 지반에 설치된 콘크리트 말뚝을 지면으로부터 일정 높이에서 절단한 후 말뚝의 상단부에 구조물 바닥기초의 기초철근과 연결될 수 있도록 보조철근을 구비한 두부연결장치를 설치하는 것을 특징으로 하는 말뚝의 두부정리 장치와 그 방법에 관한 것이다.The present invention relates to a device for cleaning the head of the concrete pile and method thereof, and more particularly, to break the head of the pile in order to derive the steel wire inside the pile in the process of connecting the head of the concrete pile installed on the ground and the bottom foundation of the structure After cutting the concrete pile installed on the ground at a certain height from the ground without the head to clean the device to install the head connecting device having a secondary reinforcing bar to be connected to the foundation reinforcement of the foundation of the structure at the top of the pile And how to do it.
일반적으로 지지층이 깊은 지반에 토목 및 건축구조물을 시공할 때 구조물의 하중을 충분히 지지하기 위하여 콘크리트 말뚝을 지지층까지 근입시킨 후 말뚝의 상부에 콘크리트 바닥기초를 형성하고 그 위에 각종 구조물을 시공하게 된다. 이 과정에서 구조물에 작용하는 하중을 말뚝에 효율적으로 전달하기 위해서는 말뚝의 두부를 구조물의 바닥기초와 견고하게 연결해야만 한다.In general, when constructing civil engineering and building structures in deep ground, the concrete piles are pushed up to the supporting layer in order to fully support the load of the structure, and then concrete foundations are formed on top of the piles and various structures are constructed thereon. In order to efficiently transfer the load acting on the structure in the process, the head of the pile must be firmly connected to the base of the structure.
이를 위하여 종래에는 도 1 에서와 같이 지지층까지 근입된 콘크리트 말뚝 (10)의 머리부 중 지면으로부터 일정 높이 이상 돌출된 부분을 파쇄기(100)와 인력으로 파쇄해서 말뚝 내부에 배근된 강선(11)을 일정 길이만큼 노출시키고, 이렇게 노출된 강선을 기초철근과 연결한 후 바닥기초를 타설하는 방법으로 말뚝과 바닥기초를 일체화시켜 왔다.To this end, conventionally, as shown in Figure 1 of the head of the
그러나 상기와 같이 말뚝 내부의 강선을 노출시키기 위하여 말뚝의 머리부를 파쇄하는 과정에서 말뚝에 종방향의 균열이 발생하게 되며, 이로 인해 말뚝의 기계적인 강도가 저하됨은 물론 균열을 통해 침투한 수분에 의해 말뚝 내부에 배근된 강선이 부식됨으로써 말뚝의 구조적 안정성이 위협받게 된다. However, in the process of crushing the head of the pile in order to expose the steel wire inside the pile as described above, the longitudinal cracking occurs in the pile, thereby deteriorating the mechanical strength of the pile as well as by the moisture penetrated through the crack The corroded steel wire is corroded, which threatens the structural stability of the pile.
또한 상기와 같이 파쇄기나 인력으로 말뚝의 머리부를 파쇄해서 말뚝 내부의 강선을 노출시키는 경우 대부분의 작업을 사람이 수행하기 때문에 작업중에 안전사고의 발생 가능성이 높아지고 작업시간의 과다 소요로 인해 공사기간이 길어지는 문제점도 있다.In addition, when the head of the pile is crushed with a crusher or manpower as described above to expose the steel wire inside the pile, most of the work is performed by humans, which increases the possibility of a safety accident during work and the construction period due to excessive work hours. There is also a problem.
본 발명은 상기와 같은 종래의 문제점을 해결하기 위하여 창출된 것으로, 지면으로부터 일정 높이 이상 돌출된 부분이 절단 제거된 콘크리트 말뚝의 상단부에 설치홈을 형성한 후 상기 설치홈에 콘크리트 말뚝에 삽입된 강선과 연결되도록 하는 보조철근을 구비한 철근연결수단을 설치함으로써 콘크리트 말뚝 내부의 강선을 노출시키기 위하여 말뚝의 두부를 파쇄할 필요가 없이 손쉽게 말뚝의 두부를 정리하는 것으로, 말뚝 내부의 강선을 노출시키는 과정에서 말뚝의 두부에 종방향의 균 열이 발생하고 그로 인해 말뚝의 강도가 저하되는 것을 방지해주는 말뚝의 두부정리 장치와 그 방법을 제공함을 목적으로 한다.
The present invention was created in order to solve the conventional problems as described above, the steel wire inserted into the concrete pile in the installation groove after the installation groove is formed in the upper end of the concrete pile is cut off the portion protruding from the ground above a certain height The process of exposing the steel wire inside the pile by easily arranging the head of the pile without the need to break the head of the pile to expose the steel wire inside the concrete pile by installing the reinforcing bar with auxiliary reinforcing rods to be connected to the It is an object of the present invention to provide a pile head arranging device and a method for preventing longitudinal cracks in the head of the pile and thereby reducing the strength of the pile.
상기 목적을 달성하기 위한 본 발명은 구조물의 기초를 형성하도록 지중에 설치된 후 지면으로부터 일정 높이 이상 돌출된 부분이 절단 제거된 말뚝과, 상기 말뚝의 상단면에 형성되되, 말뚝의 내부에 배근된 강선의 상단부가 외부로 노출되도록 천공장치에 의해 소정의 깊이로 함몰되어 형성되는 다수의 설치홈과, 상기 설치홈에 끼워지도록 말뚝의 상부에 설치되어 상기 강선과 구조물의 바닥기초에 배근된 기초철근을 연결해주는 철근연결수단으로 구성된 것을 특징으로 한다. The present invention for achieving the above object is installed in the ground to form the foundation of the structure and then the portion protruding from the ground over a predetermined height is formed of the pile and the top surface of the pile, the steel wire is arranged in the interior of the pile A plurality of installation grooves formed by being recessed to a predetermined depth by a punching device to expose the upper end of the foundation, and installed on an upper portion of the pile so as to fit into the installation grooves, and the foundation reinforcement is reinforced on the bottom foundation of the steel wire and the structure. Characterized in that consisting of reinforcing bar connecting means for connecting.
또한 본 발명은 건축구조물의 기초를 형성하도록 말뚝을 지중에 설치한 후 지면으로부터 일정 높이 이상 돌출된 말뚝의 머리부를 절단 제거하는 단계, 상기 머리부가 잘려진 말뚝의 상단면에서 강선 주위로 천공장치를 이용해서 소정의 깊이로 함몰되는 설치홈을 형성하여 말뚝의 내부에 배근된 강선의 상단부가 외부로 노출되도록 하는 단계, 상기 설치홈에 의해 외부로 노출된 강선과 구조물의 바닥기초를 형성하는 기초철근이 연결되도록 하는 철근연결수단을 설치하는 단계로 이루어진 것을 특징으로 한다.In another aspect, the present invention is to install the pile in the ground to form the foundation of the building structure to cut and remove the head of the pile protruding more than a certain height from the ground, using the fabric mill around the steel wire from the top surface of the pile cut head Forming an installation groove recessed to a predetermined depth so that the upper end of the steel wire which is placed inside the pile is exposed to the outside, and the steel reinforcement exposed to the outside by the installation groove and the foundation reinforcement forming the bottom foundation of the structure Characterized in that the step consisting of installing the reinforcing bar connecting means to be connected.
이하, 본 발명에 대하여 구성 및 작용을 첨부도면과 연계하여 상세히 설명한다.Hereinafter, the configuration and operation of the present invention will be described in detail with reference to the accompanying drawings.
도 2 는 지면으로부터 일정 높이 이상 돌출된 부분이 절단 제거된 후에 말뚝 상단부의 형상을 나타낸 예시도로서, 구조물의 하중을 지지하기 위해 말뚝(10)을 지지층까지 근입시킨 후 구조물의 바닥기초와 말뚝(10)의 두부를 연결하기 위해 지면으로부터 일정 높이 이상 돌출된 부분의 말뚝을 제거함으로써 일정 높이만큼의 말뚝(10)만을 지상에 노출시킨다. 이때 상기 말뚝(10)은 중심부가 중공된 콘크리트(12) 말뚝으로서 가장자리부 둘레를 따라 강선(11)이 배근된 형태이다.2 is an exemplary view showing the shape of the upper end of the pile after the portion protruding above a certain height from the ground is cut off, the base and the pile of the structure after the
본 발명은 상기 말뚝(10)의 두부를 파쇄하지 않고 지면으로부터 일정 높이 이상 돌출된 부분이 절단 제거된 말뚝(10)의 상단부에 도 3 에서와 같이 말뚝(10)에 배근된 강선(11)이 외부로 노출되도록 천공장치에 의해 파내어져 강선(11)의 둘레를 따라 함몰되도록 형성되는 설치홈(20)과, 상기 설치홈(20)을 통해 말뚝의 상부에 설치되어 상기 강선과 구조물의 바닥기초(70)에 배근된 기초철근(71)을 연결해주는 철근연결수단(100)으로 구성된다. In the present invention, the
상기 철근연결수단(100)은 도 4, 도 5 에서와 같이 설치홈(20)에 의해 말뚝(10)의 상단으로 노출된 강선(11)이 중앙부를 관통하도록 설치홈(20)에 끼움결합되어 강선(11)과 용접고정(33)되는 하부캡(31)과, 상기 하부캡(31)에 하단부가 고정되고, 상단부에는 구조물 바닥기초의 기초철근(70)과 연결되도록 상부로 연장되는 보조철근(32)이 구비된 상부캡(30)으로 구성된다.The reinforcing bar connecting means 100 is fitted to the
이때 상기 상부캡(30)과 하부캡(31)은 수평면을 기준으로 대칭형상으로 형성되는 구조로서, 상부캡(30)의 하단부와 하부캡(31)의 상단부가 용접고정(34)되는 것으로 구성된다.At this time, the
또한 상기 상부캡(30)은 내부 둘레를 따라 암나사부(41)를 형성하고, 상기 하부캡(31)은 외부둘레를 따라 수나사부(42)를 형성하여 상기 상부캡(30)의 내측으로 하부캡(31)이 삽입되어 나사 결합되는 것으로 구성된다.In addition, the
한편 상기 하부캡(31)은 강선(11)과의 용접결합시 하부캡(31)의 중심부를 관통한 강선(11)의 외주면과 하부캡(31)의 내면을 용접하여 하부캡(31)이 강선(11)에 고정됨에 따라 설치홈(20)에서 이탈되지 않게 한다.Meanwhile, the
한편 또 다른 본 발명의 철근연결수단(100)은 도 6에서와 같이 말뚝(10)의 상단면에 형성된 설치홈(20)에 의해 적절한 높이만큼 외부로 노출되는 강선(11)의 외주면에 수나사부(42a)를 형성하고, 상기 수나사부(42a)에 결합되는 암나사부(41a)가 하단부 내측에 구비되며, 상단부에는 구조물의 바닥기초를 형성하는 기초철근(71)과 연결되도록 상부로 연장되는 보조철근(32)이 구비된 제1연결부재로 구성되어 상기 제1연결부재(40)의 암나사부(41a)가 강선(11)의 수나사부(42a)에 끼워져 나사 결합된다. Meanwhile, the reinforcing bar connecting means 100 according to another embodiment of the present invention has a male thread portion on the outer circumferential surface of the
이때 상기 제1연결부재(40)는 사각형 또는 육각형의 평단면 형상을 갖도록 형성되어 강선(11)과의 나사결합시 조임이 용이하도록 구성된다.At this time, the
한편 본 발명의 다른 철근연결수단(100)은 도 7, 도8 에서와 같이 원형블록 구조이고, 상단부에는 상부로 연장되어 구조물의 바닥기초(70)를 형성하는 기초철근(71)과 연결되는 보조철근(32)이 구비되고, 하단부에는 상기 말뚝(10)의 강선 (11)이 삽입되는 삽입홀(52)이 구비되며, 상기 삽입홀(52)로 삽입된 강선(11)의 상단부가 보조철근(32)의 하단부와 맞접하는 위치에서 상기 강선(11)과 보조철근(32)의 일부가 외부로 노출되도록 삽입홀(52)의 일부분이 절개되어 형성된 절개부(51)가 구비된 제2연결부재(50)를 상기 삽입홀(52)을 통해 강선(11)에 끼워지도록 끼움결합하여 강선(11)의 상단부와 보조철근(32)의 하단부가 맞접하도록 하며, 상기 강선(11)과 보조철근(32)이 맞접하는 상태에서 절개부(51)를 통해 보조철근(32)과 강선(11) 및 제2연결부재(50)가 일체가 되도록 용접 고정되는 것으로 구성된다.Meanwhile, the other reinforcing bar connecting means 100 of the present invention is a circular block structure, as shown in Figure 7, Figure 8, the upper end is connected to the
상기 절개부(51)는 보조철근(32)의 하단부와, 설치홈(20)으로 노출된 강선(11)의 상단부가 동일하게 노출되도록 절개하는 것이 바람직하다.The
또한 상기 절개부(51)는 제2연결부재(50)의 수직방향 중심축에 대칭이 되도록 절개하는 것이 바람직하다. 이는 절개부(51)의 용접 후 외력에 의해 제2연결부재(50)가 어느 한 방향으로 전도되지 않도록 하기 위함이다.In addition, the
또한 강선(11)의 상단부와 맞접하는 보조철근(32)의 하단부를 중심축을 향해 테이퍼 지도록 형성하여 절개부(51)를 용접할 경우 상기 보조철근(32)과 강선(11)이 상호 용접되는 단면적이 증가되도록 하여 보다 견고히 용접될 수 있도록 한다.In addition, the lower end of the
한편 본 발명의 다른 철근연결수단(100)은 도9, 도10에서와 같이 구조물의 바닥기초(70)를 형성하는 기초철근(71)과 연결되도록 하는 상부방향으로 연장된 보조철근(32)을 구비한 덮개판(60)을 상기 말뚝(10)의 설치홈(20)에 끼워지도록 설치한 후 상기 강선(11)과 용접고정 되는 것으로 구성된다.On the other hand, the other reinforcing bar connecting means 100 of the present invention as shown in Figs. 9, 10 and the
상기 덮개판(60)은 상단면에 결합되는 중심부가 천공되어 있는 원형 테 형상의 몸체부(62)와, 상기 몸체부(62)의 둘레를 따라 하부방향으로 함몰되도록 형성되고 상기 설치홈(20)에 의해 외부로 노출된 강선(11)이 중앙부를 관통하여 끼워진 후 강선(11)과 용접되는 다수의 끼움돌기(61)와, 상기 끼움돌기(61)와 인접하는 끼움돌기(61) 사이에서 구조물 바닥기초(70)의 기초철근(71)과 연결되도록 상기 몸체부(62)의 상부로 연장 설치되는 보조철근(32)으로 구성되어, 상기 덮개판의 끼움돌기가 설치홈(20)에 끼워진 후 강선(11)과 끼움돌기(61)를 용접하여 말뚝(10)의 상부에 고정된다.The
상기 덮개판(60)의 외경은 말뚝(10)의 외경과 동일하도록 구성하는 것이 바람직하고, 상기 끼움돌기(61)는 말뚝(10)에 형성된 설치홈(20)과 동일한 개수로 형성하거나, 필요에 따라 선택된 설치홈(20)에만 끼워지도록 형성한 후 설치홈(20)에 삽입하여 강선(11)과 용접 고정되도록 구성한다.The outer diameter of the
상기와 같은 구성을 참조하여 본 발명의 시공방법 및 작용을 설명하면 다음과 같다.Referring to the construction as described above the construction method and operation of the present invention.
말뚝의 두부를 정리하기 위한 방법은, 구조물의 기초를 형성하도록 말뚝(10)을 지중에 설치한 후 지면으로부터 일정 높이 이상 돌출된 말뚝(10)의 머리부를 절단 제거하는 단계, 상기 머리부가 잘려진 말뚝(10)의 상단면에서 천공장치를 이용하여 강선(11) 주위로 소정의 깊이로 함몰되는 설치홈(20)을 형성하여 말뚝(10)의 내부에 배근된 강선(11)의 상단부가 적절한 높이만큼 외부로 노출되도록 하는 단 계, 상기 설치홈(20)에 의해 외부로 노출된 강선(11)과 구조물의 바닥기초(70)를 형성하는 기초철근(71)이 연결되도록 하는 철근연결수단(100)을 설치하는 단계로 이루어진다.Method for arranging the head of the pile, the
상기 철근연결수단(100)은 설치홈(20)에 의해 외부로 노출된 강선(11)이 중앙부를 관통하도록 설치홈(20)에 하부캡(31)을 끼운 다음 상기 강선(11)의 외주면과 하부캡(31)의 내면을 용접고정(33)하고, 상기 강선(11)에 용접된 하부캡(31)에 구조물의 기초철근(71)과 연결되는 보조철근(32)을 구비한 상부캡을 고정함으로써 설치된다.The reinforcing bar connecting means 100 is fitted with a
이때 상기 상부캡(30)과 하부캡(31)의 고정방법은 상부캡(30)의 하단부와 하부캡(31)의 상단부가 서로 접해지도록 위치시킨 다음 접합면을 용접 결합하여 상부캡(30)과 하부캡(31)을 고정한다. 또한 상부캡(30)과 하부캡(31)은 상기 하부캡(31)의 외부둘레를 따라 수나사부(42)를 형성하고, 상기 하부캡(31)의 수나사부(42)에 끼워질 수 있도록 상부캡(30)의 하단부에 암나사부(41)를 형성하여 상부캡(30)과 하부캡(31)을 나사 결합하여 고정한다.At this time, the fixing method of the
이와 같은 철근연결수단(100)은 하부캡(31)과 상부캡(30)을 나사결합 또는 용접결합을 통해 상호 고정해 줌에 따라 캡의 설치가 간편하여 설치시간을 줄일 수 있어, 전체적인 시공시간을 줄일 수 있다.As the reinforcing bar connection means 100 is fixed to the
한편 상기 철근연결수단(100)은 말뚝의 상단면에 형성된 설치홈을 통해 외부로 노출된 강선의 외부면 둘레를 따라 수나사부(42a)를 형성하고 상기 수나사부(42a)가 형성된 강선(11)에 제1연결부재(40)를 나사결합한 후 상기 제1연결부재 (40)에 구비된 보조철근(32)을 구조물의 바닥기초를 형성하는 기초철근(71)과 연결하도록 한다.Meanwhile, the reinforcing bar connecting means 100 forms a
또한 상기 설치홈(20)을 통해 외부로 돌출된 강선(11)에 끼워지도록 제2연결부재(50)를 설치하여 상기 제2연결부재(50)에 형성된 절개부(51)를 통해 보조철근(32)과 강선(11) 및 제2연결부재(50)가 일체가 되도록 용접결합한 후 상기 제2연결부재(50)의 상부로 연장된 보조철근(32)과 구조물의 바닥을 형성하는 기초철근(71)을 연결하도록 한다.In addition, by installing the second connecting
한편 상기 철근연결수단(100)은 중심부가 천공된 원형 테 형상으로 형성되고 둘레를 따라 다수의 끼움돌기(61)가 구비되며 상기 끼움돌기(61)와 인접하는 끼움돌기(61) 사이에 상부로 연장되는 보조철근(32)을 구비한 덮개판(60)을 말뚝(10)의 상단에 설치하되, 상기 말뚝(10)의 외부로 노출된 강선(11)이 끼움돌기(61)의 중앙부를 관통하도록 끼움돌기(61)가 설치홈(20)에 끼워져 결합한 후 강선(11)과 끼움돌기(61)를 용접하여 덮개판(60)이 말뚝(10)의 상단부에 고정되도록 한다.On the other hand, the reinforcing bar connecting means 100 is formed in a circular frame having a perforated center and is provided with a plurality of
한편 도 11 은 본 발명에 의한 콘크리트 말뚝과 기초철근과의 연결 예를 나타낸 예시도로서, 지면으로부터 일정 높이 이상 돌출된 부분이 절단 제거된 말뚝(10)의 내부에 배근되어 있는 강선(11)이 외부로 노출되도록 강선(11)의 주위둘레를 따라 설치홈(20)을 형성하고, 상기 설치홈(20)을 통해 상기 강선(11)과 결합되어 구조물의 바닥기초(70)를 형성하는 기초철근(71)과 연결되도록 하는 철근연결수단(100)을 설치한 후 상기 철근연결수단(100)에 구비된 보조철근(32)을 기초철근 (71)과 연결한다.On the other hand, Figure 11 is an exemplary view showing an example of the connection between the concrete pile and the foundation reinforcement according to the present invention, the
상기와 같이 보조철근(32)이 기초철근(71)과 상호 연결되면 지면으로부터 일정 높이까지 버림콘크리트를 타설하고, 다시 구조물의 바닥을 형성하기 위해 말뚝(10)이 덮여지도록 콘크리트를 타설한 것이다.As described above, when the secondary reinforcing
한편 상기와 같이 구성된 본 발명의 보조철근(32)은 통상 40cm 정도의 길이로 연장되는 것이 바람직하다 Meanwhile, the
이와 같은 본 발명은 지반에 근입된 말뚝(10)을 구조물의 기초와 일체화하기 위하여 말뚝(10)의 내부에 배근된 강선(11)을 구조물 바닥기초(70)의 기초철근(71)과 연결하는 과정에서 강선(11)의 노출을 위해 말뚝(10)의 두부를 파쇄하지 않고 말뚝에 배근된 강선(11)과 건축물의 기초에 배근되는 기초철근(71)이 연결되도록 함으로써 말뚝(10) 파쇄시 발생하는 말뚝의 종방향 균열을 방지하여 말뚝이 구조적으로 안정하도록 하기 위함이다.The present invention connects the
본 발명은 상술한 특정의 바람직한 실시예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형실시가 가능한 것은 물론이고, 그와 같은 변경은 청구범위 기재의 범위 내에 있게 된다.The present invention is not limited to the above-described specific preferred embodiments, and various modifications can be made by any person having ordinary skill in the art without departing from the gist of the present invention claimed in the claims. Of course, such changes will fall within the scope of the claims.
상기와 같은 구성 및 작용에 의해 기대할 수 있는 본 발명의 효과는, 지상으 로 과다하게 노출된 부분이 절단 제거된 말뚝의 상단부에 강선의 둘레를 따라 작은 크기의 설치홈을 형성한 후 말뚝 내부의 강선과 구조물의 기초철근을 손쉽게 연결할 수 있도록 구성함에 따라, 말뚝과 구조물 기초간의 연결과정에서 말뚝의 구조적인 강도저하를 방지하고, 파쇄기와 같은 대형장비를 사용하지 않고 작업자가 손쉽게 설치 가능하여 시공성이 향상된 매우 유용한 발명이다.
The effect of the present invention can be expected by the configuration and action as described above, after forming an installation groove of a small size along the circumference of the steel wire in the upper end of the pile is cut off excessively exposed to the ground inside the pile As it is configured to easily connect the steel wire and the foundation reinforcement of the structure, it prevents the structural strength degradation of the pile in the process of the connection between the pile and the foundation of the structure, and it can be easily installed by the worker without using large equipment such as a crusher. It is an improved and very useful invention.
Claims (16)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020050011196A KR100746558B1 (en) | 2005-02-07 | 2005-02-07 | Appratus and method for connection between concrete pile head and concrete footing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020050011196A KR100746558B1 (en) | 2005-02-07 | 2005-02-07 | Appratus and method for connection between concrete pile head and concrete footing |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20060090381A KR20060090381A (en) | 2006-08-10 |
KR100746558B1 true KR100746558B1 (en) | 2007-08-06 |
Family
ID=37571591
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020050011196A KR100746558B1 (en) | 2005-02-07 | 2005-02-07 | Appratus and method for connection between concrete pile head and concrete footing |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100746558B1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101194382B1 (en) | 2010-02-26 | 2012-10-24 | 최승선 | Concrete Pile, Device of Manufacturing and Method of Manufacturing for the Same |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101426874B1 (en) * | 2014-03-05 | 2014-08-06 | 오종헌 | Construction structure and method for concrete pile |
KR101624706B1 (en) * | 2016-01-20 | 2016-06-07 | (주)엠에스티통상 | Foundation structure for pillar and construction method thereof |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20050000710A (en) * | 2003-06-24 | 2005-01-06 | 한국주강 주식회사 | A connection device to connect concrete piles |
-
2005
- 2005-02-07 KR KR1020050011196A patent/KR100746558B1/en not_active IP Right Cessation
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20050000710A (en) * | 2003-06-24 | 2005-01-06 | 한국주강 주식회사 | A connection device to connect concrete piles |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101194382B1 (en) | 2010-02-26 | 2012-10-24 | 최승선 | Concrete Pile, Device of Manufacturing and Method of Manufacturing for the Same |
Also Published As
Publication number | Publication date |
---|---|
KR20060090381A (en) | 2006-08-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5408595B1 (en) | PC seismic joint structure and PC seismic joint method for columns and beams using steel pins | |
KR100746558B1 (en) | Appratus and method for connection between concrete pile head and concrete footing | |
KR101080923B1 (en) | Structure and method for anchorage of micro pile head | |
KR101893658B1 (en) | Apparatus for a mold for joint part between case in place uper end of pile and rear bridge for monopile construnction | |
KR100583880B1 (en) | Method for constructing foundation work using concrete pile | |
KR101623377B1 (en) | Reinforcing structure for pipe head | |
JP2004293281A (en) | Construction method for permanent anchor-applied wall structure and permanent anchor-applied wall structure | |
KR101493495B1 (en) | reinforcement structure for PHC pile and constructing method of PHC pile using thereof | |
JP5133650B2 (en) | Joint structure of column and steel pipe pile | |
JP4420697B2 (en) | Standing structure of steel pipe columns | |
JP5226603B2 (en) | Pile head reinforcement jig for prefabricated piles | |
KR101127475B1 (en) | Device for connecting wales | |
JP5749620B2 (en) | Seismic isolation method for existing buildings | |
KR101016455B1 (en) | Leveling apparatus of concrete pile head | |
KR20130113067A (en) | Basic-level fixed anchor and it using construction method | |
KR100922121B1 (en) | Construction Structure of Footing using Hybrid Pile having Various Cross-section | |
CN113914333A (en) | Slope protection monomer component, slope protection structure and slope protection construction method | |
JP6341027B2 (en) | Floor slab widening method | |
KR101298399B1 (en) | Support for a upper reinforcing bar of footings | |
KR100960610B1 (en) | Reinforcing structure of head part in steel pipe pile for dispersing external force | |
KR20090055731A (en) | The connectors for steel pile head embedded inconcrete footing with double cap and thereof structure | |
KR100771837B1 (en) | Reinforcing apparatus for head of steel pipe pile | |
KR20090052527A (en) | The reinforcement structure of the head of concrete pile | |
CN220644876U (en) | Stable reinforced post-increased stem structure | |
CN216713003U (en) | Cast-in-place pile construction node without removing pile head |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20120627 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20130801 Year of fee payment: 7 |
|
LAPS | Lapse due to unpaid annual fee |