KR100740213B1 - A Strut apparatus for stairs handrail and execution method thereof - Google Patents

A Strut apparatus for stairs handrail and execution method thereof Download PDF

Info

Publication number
KR100740213B1
KR100740213B1 KR1020050065952A KR20050065952A KR100740213B1 KR 100740213 B1 KR100740213 B1 KR 100740213B1 KR 1020050065952 A KR1020050065952 A KR 1020050065952A KR 20050065952 A KR20050065952 A KR 20050065952A KR 100740213 B1 KR100740213 B1 KR 100740213B1
Authority
KR
South Korea
Prior art keywords
main column
temporary
permanent
coupling device
main
Prior art date
Application number
KR1020050065952A
Other languages
Korean (ko)
Other versions
KR20070010947A (en
Inventor
송인한
Original Assignee
송인한
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 송인한 filed Critical 송인한
Priority to KR1020050065952A priority Critical patent/KR100740213B1/en
Publication of KR20070010947A publication Critical patent/KR20070010947A/en
Application granted granted Critical
Publication of KR100740213B1 publication Critical patent/KR100740213B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F11/181Balustrades
    • E04F11/1817Connections therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F11/181Balustrades
    • E04F11/1817Connections therefor
    • E04F2011/1819Connections therefor between balustrade posts and horizontal or sloping balustrade members
    • E04F2011/1821Connections therefor between balustrade posts and horizontal or sloping balustrade members between balustrade posts and handrails

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Steps, Ramps, And Handrails (AREA)

Abstract

본 발명은 건물을 시공할 시 건물의 내부계단에 작업자의 안전을 위한 임시난간을 용이하고 안전하게 설치할 수 있고, 아울러 건물 내부 공사가 완료되면 임시난간을 해체하여 재활용할 수 있도록 함과 아울러 영구난간을 용이하고 안전하게 설치할 수 있도록 하는 계단 난간용 지주 장치 및 그 시공 방법에 관한 것이다.The present invention can easily and safely install a temporary railing for the safety of the worker on the inner staircase of the building when constructing a building, and also to dismantle and recycle the temporary railing when the construction inside the building is completed, and permanent railing The present invention relates to a stair railing holding device and an installation method thereof that allow easy and safe installation.

본 발명의 계단 난간용 지주 장치에 대한 구성은 건물 바닥면에 임시 주 기둥과 영구적 주 기둥을 교체 가능하게 고정 설치하는 주 기둥 결합 장치(A)를 구성하고; 상기 주 기둥 결합 장치(A)는 건물바닥에 고정되는 받침판(1)과; 상기 받침판(1)에 고정되게 세워 설치되고 상측부에 볼트부(2)가 형성된 나사축(3)과; 상기 나사축(3)에 삽입되고 팽창봉(6)을 지지하는 지지봉(4)과; 상기 나사축(3)에 삽입되어 지지봉(4)에 지지되며 상, 하측에 다수의 절개홈(7)(7a)이 형성되고 외측으로 팽창되는 팽창봉(6)과; 상기 나사축(3)에 삽입되고 상기 팽창봉(6)을 압착하는 조임와셔(8)와; 상기 나사축(3)의 볼트부(2)에 결합하여 체결하는 너트(10)로 구성되는 것을 특징으로 하는 계단 난간용 지주 장치이다.The configuration for the stair handrail holding device of the present invention constitutes a main column coupling device (A) to replace and fix the temporary main column and the permanent main column on the building floor surface; The main column coupling device (A) and the support plate (1) fixed to the building floor; A screw shaft 3 fixedly installed on the support plate 1 and having a bolt portion 2 formed at an upper side thereof; A support rod (4) inserted into the screw shaft (3) and supporting the expansion rod (6); An expansion rod (6) inserted into the screw shaft (3) and supported by a support rod (4) and having a plurality of incision grooves (7) (7a) formed at upper and lower sides and expanding outwardly; A tightening washer (8) inserted into the screw shaft (3) and compressing the expansion rod (6); Stair handrail is a strut device characterized in that it is composed of a nut (10) coupled to and fastened to the bolt portion (2) of the screw shaft (3).

그리고 본 발명에 따른 계단 난간용 지주 장치의 시공 방법은 건물 바닥면에 주 기둥 결합 장치(A)를 설치 구성하는 제1 단계(S1)와; 임시 주 기둥(11)을 구비하여 상기 주 기둥 결합 장치(A)에 삽입하는 제2 단계(S2)와; 상기 주 기둥 결합 장치(A)로써 임시 주 기둥(11)을 고정 결합하는 제3 단계(S3)와; 상기 임시 주 기둥(11)에 임시난간(15)(16)을 설치하여 사용하는 제4 단계(S4)와; 상기 주 기둥 결 합 장치(A)에 의해 임시 주 기둥(11)을 해체하는 제5 단계(S5)와; 상기 주 기둥 결합 장치(A)로부터 임시 주 기둥(11)을 완전히 해체한 상태의 제6 단계(S6)와; 상기 주 기둥 결합 장치(A)에 영구적인 주 기둥(12)을 구비하여 상기 주 기둥 결합 장치(12)에 삽입 결합하는 제7 단계(S7)와; 상기 주 기둥 결합 장치(A)로써 영구적인 주 기둥(12)을 고정 결합하는 제8 단계(S8)와; 상기 주 기둥 결합 장치(A)에 의해 영구적인 주 기둥(12)을 결합 고정하여 완료한 상태의 제9 단계(S9)와; 상기 영구적인 주 기둥(S9)에 영구난간을 설치하여 사용하는 제10 단계(S10)로 이루어지는 것을 특징으로 하는 계단 난간용 지주 장치의 시공 방법이다.And the construction method of the stair handrail holding device according to the present invention comprises the first step (S1) for installing the main column coupling device (A) on the building floor surface; A second step (S2) having a temporary main column (11) and inserted into the main column coupling device (A); A third step (S3) of fixing the temporary main column (11) with the main column coupling device (A); A fourth step (S4) of installing and using temporary handrails (15) and (16) on the temporary main column (11); A fifth step (S5) of dismantling the temporary main column (11) by the main column joining device (A); A sixth step S6 in which the temporary main column 11 is completely dismantled from the main column coupling device (A); A seventh step (S7) of providing a permanent main pillar (12) in the main pillar coupling device (A) and inserting and coupling the main pillar coupling device (12); An eighth step (S8) of fixedly coupling the permanent main column (12) with the main column coupling device (A); A ninth step S9 in which the permanent main pillar 12 is completed by being fixed by the main pillar coupling device A; It is a construction method of the stair handrail strut device comprising a tenth step (S10) to install and use a permanent handrail to the permanent main column (S9).

위와 같은 본 발명은 첫째, 주 기둥 결합 장치(A)에 의해 임시난간(15)(16)이 설치되는 임시 주 기둥(11)과 영구난간이 설치되는 영구적인 주 기둥(12)을 용이하고 안전하며 신속하게 교체하여 설치 사용할 수 있다.The present invention as described above, first, the temporary main pillar (11) and the permanent main pillar 12 is installed permanent permanent rail is installed by the main column coupling device (A) and permanent rail easy and safe It can be replaced and used quickly.

즉, 주 기둥 결합 장치(A)에 의해 임시난간(15)(16)이 설치되는 임시 주 기둥(11)을 결합 고정하여 건물의 내부 공사를 안전하게 하며 내부 공사가 완료되면 상기 임시난간(15)(16)이 설치되는 임시 주 기둥(11)을 해체하여 재활용에 사용하고 영구난간이 설치되는 영구적인 주 기둥(12)을 용이하고 견고하게 교체 설치할 수 있다.That is, by fixing the temporary main pillars (11) on which the temporary handrails (15, 16) are installed by the main column coupling device (A) to secure the internal construction of the building, and when the internal construction is completed the temporary handrails (15) It is possible to dismantle the temporary main column (11) in which (16) is installed and use it for recycling, and replace the permanent main column (12) where permanent railings are installed easily and firmly.

둘째, 주 기둥 결합 장치(A)에 의해 임시 주 기둥(11)과 영구적인 주 기둥(12)의 설치 및 해체에 대한 시공이 간단하고 설치가 견고하며 숙련된 기술자가 아니어도 용이하고 간편하게 작업할 수 있고 공사비용을 절감할 수 있다.Second, the installation and dismantling of the temporary main column 11 and the permanent main column 12 by the main column coupling device (A) is simple, and the installation is solid and easy and convenient to work without a skilled technician Can reduce construction cost.

셋째, 주 기둥 결합 장치(A)에 의해 설치된 영구적인 주 기둥(12)은 차후 사 용도 중 수리가 필요할 경우에 용이하게 교체 설치할 수 있다.Third, the permanent main column 12 installed by the main column coupling device (A) can be easily replaced when the repair is required during future use.

넷째, 상기 임시난간(15)(16)이 설치되는 임시 주 기둥(11)을 해체하여 재활용에 사용되므로 시공비용 등을 절감할 수 있다.Fourth, since the temporary main pillar 11 is installed to dismantle the temporary guardrail (15, 16) is installed can be reduced construction costs and the like.

다섯째, 영구적인 주 기둥(12)을 주 기둥 결합 장치(A)에 의해 설치 시공할 경우 용접 작업 등이 필요치 않아 디자인된 영구적인 주 기둥(12)에 흠집 발생이나 틀어짐 등이 없이 정밀하고 깨끗한 설치 시공을 할 수 있는 등의 효과가 있다.Fifth, when the permanent main column 12 is installed and installed by the main column coupling device (A), no welding work is required and the like, so that the permanent main column 12 is designed without any scratches or distortions on the designed permanent main column 12. It can be used for construction.

Description

계단 난간용 지주 장치 및 그 시공 방법{A Strut apparatus for stairs handrail and execution method thereof}A strut apparatus for stairs handrail and execution method

도 1은 본 발명에 따른 "계단 난간용 지주 장치"에 대한 전체 분해 사시도이다.1 is a full exploded perspective view of the "stair handrail holding device" according to the present invention.

도 2a 및 도 2b는 본 발명에 따른 "계단 난간용 지주 장치"에서 "주 기둥 결합 장치"에 임시 주 기둥을 결합 고정하는 상태를 도시한 단면도이다.2A and 2B are cross-sectional views illustrating a state in which the temporary main column is fixedly coupled to the “main column coupling device” in the “stair handrail strut device” according to the present invention.

도 3은 본 발명에 따른 "계단 난간용 지주 장치"에서 "주 기둥 결합 장치"에 임시난간이 설치된 임시 주 기둥을 결합 고정한 상태를 도시한 단면도이다.Figure 3 is a cross-sectional view showing a state in which the temporary main pillar is installed fixed to the "main pillar coupling device" in the "stair handrail holding device" according to the present invention.

도 4는 본 발명에 따른 "계단 난간용 지주 장치"에서 "주 기둥 결합 장치"에 임시난간이 설치된 임시 주 기둥을 결합 고정한 상태를 도시한 사시도이다.Figure 4 is a perspective view showing a state in which the temporary main pillar is installed fixed to the "main pillar coupling device" in the "stair handrail holding device" according to the present invention.

도 5는 본 발명에 따른 "계단 난간용 지주 장치"에서 "주 기둥 결합 장치"에 영구적인 주 기둥이 설치되는 상태를 도시한 사시도이다.5 is a perspective view showing a state in which a permanent main pillar is installed in the "main pillar coupling device" in the "stair handrail holding device" according to the present invention.

도 6은 본 발명에 따른 "계단 난간용 지주 장치"에서 "주 기둥 결합 장치"에 영구난간이 설치되는 영구적인 주 기둥이 설치된 상태를 도시한 사시도이다.Figure 6 is a perspective view showing a state in which a permanent main pillar is installed in the "main pillar coupling device" in the "stair handrail holding device" according to the present invention is installed.

도 7은 본 발명에 따른 "계단 난간용 지주 장치의 시공 방법"에 대한 공정도이다.7 is a process chart for the "construction method of the stair handrail for holding device" according to the present invention.

도 8은 본 발명에 따른 "계단 난간용 지주 장치의 시공 방법"에 대한 공정 흐름도이다.8 is a process flow chart for "construction method of the stair handrail for holding device" according to the present invention.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

A: 주 기둥 결합 장치A: main pillar coupling device

1: 받침판 2: 볼트부1: base plate 2: bolt part

3: 나사축 4: 지지봉3: screw shaft 4: support rod

5: 경사면 6: 팽창봉5: slope 6: expansion rod

7,7a: 절개홈 8: 조임와셔7,7a: incision groove 8: captive washer

9: 경사면 10: 너트9: slope 10: nut

11: 임시 주 기둥 12: 영구적인 주 기둥11: temporary main pillar 12: permanent main pillar

13: "J" 형 볼트 14: 나비너트13: "J" type bolt 14: butterfly nut

15,16: 임시난간 g: 영구난간15,16 temporary railing g permanent railing

S1: 제1 단계 S2: 제2 단계S1: first step S2: second step

S3: 제3 단계 S4: 제4 단계S3: third step S4: fourth step

S5: 제5 단계 S6: 제6 단계S5: fifth step S6: sixth step

S7: 제7 단계 S8: 제8 단계S7: Seventh Step S8: Eighth Step

S9: 제9 단계 S10: 제10 단계S9: ninth step S10: tenth step

본 발명은 계단 난간용 지주 장치 및 그 시공 방법에 관한 것으로서, 보다 상세하게는 건물을 시공할 시 건물의 내부계단에 작업자의 안전을 위한 임시난간을 용이하고 안전하게 설치할 수 있고, 아울러 건물 내부 공사가 완료되면 임시난간을 해체하여 재활용할 수 있도록 함과 아울러 영구난간을 용이하고 안전하게 설치할 수 있도록 하는 계단 난간용 지주 장치 및 그 시공 방법에 관한 것이다.The present invention relates to a stair railing holding device and a construction method thereof, and more particularly, it is possible to easily and safely install a temporary handrail for the safety of the worker on the internal stairs of a building when constructing a building. When completed, the present invention relates to a staircase railing holding device and a method of constructing the temporary handrail to dismantle and recycle the permanent railing and to easily and safely install the permanent railing.

일반적으로 시공되는 건물의 콘크리트 골조공사 및 콘크리트 슬라브공사가 완료되면 각층을 연결하는 콘크리트 계단에는 작업자가 계단을 오르내리며 여러 가지 내부공사를 할 때 작업자의 추락사고 등을 방지하기 위하여 임시난간을 설치하게 되고 건물의 내부공사가 완료되면 영구난간을 설치하게 된다.In general, when the concrete framing and concrete slab construction of the building is completed, the worker will move up and down the stairs on the concrete stairs connecting the floors, and install temporary railings to prevent the worker's fall accidents during various internal constructions. After the internal construction of the building is completed, permanent railings are installed.

그런데, 상기 임시난간이나 영구난간을 설치하기 위해서는 계단참(Landing)에 주 기둥을 세워 설치하고 이 주 기둥에 상기 임시난간이나 영구난간을 설치하게 되는데, 종래에는 건물 시공시 계단참에 세워 설치한 주 기둥에 임시난간을 설치하여 사용하다가 내부공사가 완료되면 임시난간만을 해체하고 상기 주 기둥의 외부에 영구적으로 설치하기 위한 파이프형의 새로운 주 기둥을 이중으로 끼워 고정한 후 핸드 레일 등의 영구난간을 고정 설치하였다.However, in order to install the temporary railings or permanent railings, the main pillars are installed on the landing and the temporary railings or permanent railings are installed on the main pillars. After installing the temporary railings in the building, when the internal construction is completed, only the temporary railings are dismantled and the new main pillars of pipe type are permanently installed on the outside of the main pillars to fix them. It was.

이러한 종래기술은 외부 기둥의 추가로 인하여 계단난간 설치비용이 상승하여 건축비용이 증가하는 문제가 있었다.This prior art has a problem that the construction cost increases due to the increase in the installation cost of the stair railing due to the addition of the outer column.

이러한 문제를 해결하기 위해 건물 시공시 계단참에 세워 설치하는 주 기둥을 내부 기둥과 외부 기둥으로써 이중으로 끼워 설치하고 이에 임시난간을 설치하여 사용한 다음 내부 공사가 완료되면 주 기둥의 외부 기둥은 분리하고 내부의 주 기둥에 영구난간을 설치하는 기술이 안출되었으나, 이 또한 이중으로 주 기둥을 시 공 설치함에 따른 공정이 증가되는 것이고 복잡한 밴드형의 구조로 임시난간을 설치하는 것이어서 임시난간의 결합 설치와 분리 작업이 불편하고 시간이 많이 걸리는 것이며, 외부 주 기둥을 분리하고 나면 페인트 된 내부 주 기둥에는 흠집 등이 발생하여 다시 페인트 작업을 해야하는 번거로움과 공사기간이 길어지는 등의 문제가 있는 것이었다.In order to solve this problem, the main pillars installed at the landing when installing the building are installed with double pillars as internal and external columns, and temporary railings are installed and used.After the internal construction is completed, the external columns of the main pillars are separated and The technology for installing permanent rails on the main pillars of the company has been devised, but this also increases the process of installing the main pillars in duplicate, and installs temporary railings with a complex band-type structure. The work was inconvenient and time-consuming, and after removing the outer main pillars, the painted inner main pillars had scratches, causing trouble to repaint and lengthening the construction period.

따라서, 본 발명은 상기에서와 같은 종래의 제반 문제점을 해결하기 위하여 발명된 것으로, 본 발명의 목적은 건물의 계단참에 주 기둥의 결합 및 분리를 용이하게 하는 주 기둥 결합 장치를 구성하여 건물을 시공할 때는 임시 주 기둥을 편리하고 안전하게 설치 사용하고 아울러 건물의 내부 공사가 완료되면 영구적인 주 기둥을 용이하고 안전하며 신속하게 교체하여 설치함으로써 상기 임시 주 기둥 및 영구적인 주 기둥에 임시난간 및 영구난간을 용이하고 안전하게 설치할 수 있도록 하는 계단 난간용 지주 장치 및 그 시공 방법을 제공한다.Therefore, the present invention has been invented to solve the conventional problems as described above, the object of the present invention is to construct the main column coupling device to facilitate the coupling and separation of the main column to the landing of the building construction In this case, the temporary main column is installed conveniently and safely, and when the construction of the building is completed, the permanent main column can be easily, safely and quickly replaced and installed. It provides a stair railing holding device and its construction method for easy and safe installation.

상기 본 발명의 목적을 달성하기 위한 제1 실시예로서 건물바닥에 고정되고 금속제로 된 받침판과, 상기 받침판에 고정되게 세워 설치되고 상측부에 볼트부가 형성되며 금속제로 된 나사축과, 상기 나사축에 삽입되고 합성수지제로 된 지지봉과, 상기 나사축에 삽입되어 지지봉에 지지되며 합성수지제로 된 팽창봉과, 상기 나사축에 삽입되고 상기 팽창봉을 압착하며 합성수지제로 된 조임와셔와, 상기 나사축의 볼트부에 결합되며 금속제로 된 너트로 구성되는 주 기둥 결합 장치로 이루어지며, 상기 주 기둥 결합 장치에는 임시난간이 설치되는 임시 주 기둥을 세워지 게 고정 결합하여 설치 구성하고, 또한 영구난간이 설치되는 영구적인 주 기둥을 상기 임시 주 기둥과 교체 결합할 수 있도록 구성하여서 된 것이다.As a first embodiment for achieving the object of the present invention, the support plate is fixed to the floor of the building and made of metal, the screw shaft is installed to stand fixed to the support plate and formed on the upper side of the bolt shaft and the screw shaft, A support rod made of a synthetic resin and supported by a support rod inserted into the screw shaft, supported by a support rod, made of a synthetic resin, and a screw washer inserted into the screw shaft and pressing the expansion rod to press the expansion rod, and a bolt portion of the screw shaft. It is composed of a main pillar coupling device consisting of a metal nut coupled to the main pillar coupling device, the permanent main pillar is installed by fixedly coupling the temporary main pillar to be installed, the permanent rail is installed permanently The pillar is configured to be interchangeable with the temporary main pillar.

상기 본 발명의 목적을 달성하기 위한 제2 실시예로서 건물 바닥면(계단의 바닥면)에 주 기둥 결합 장치를 설치 구성하는 제1 단계와, 임시 주 기둥을 구비하여 상기 주 기둥 결합 장치에 삽입 결합하는 제2 단계와, 상기 주 기둥 결합 장치로써 임시 주 기둥을 고정 결합하는 제3 단계와, 상기 임시 주 기둥에 임시난간을 설치하여 사용하는 제4 단계와, 상기 주 기둥 결합 장치에 의해 임시 주 기둥을 해체하는 제5 단계와, 상기 주 기둥 결합 장치로부터 임시 주 기둥을 완전히 해체한 상태의 제6 단계와, 상기 주 기둥 결합 장치에 영구적인 주 기둥을 구비하여 상기 주 기둥 결합 장치에 삽입 결합하는 제7 단계와, 상기 주 기둥 결합 장치로써 영구적인 주 기둥을 고정 결합하는 제8 단계와, 상기 주 기둥 결합 장치에 의해 영구적인 주 기둥을 결합 고정한 상태의 제9 단계와, 상기 영구적인 주 기둥에 영구난간을 설치하여 사용하는 제10 단계로 이루어진 것이다.As a second embodiment for achieving the object of the present invention, the first step of installing and configuring the main column coupling device on the building floor (floor surface of the staircase) and having a temporary main column inserted into the main column coupling device A second step of coupling, a third step of fixedly coupling the temporary main column by the main column coupling device, a fourth step of installing and using a temporary handrail on the temporary main column, and temporary by the main column coupling device A fifth step of dismantling the main column, a sixth step of completely dismantling the temporary main column from the main column coupling device, and a permanent main column provided in the main column coupling device to be inserted into the main column coupling device; A seventh step of coupling, an eighth step of fixedly coupling the permanent main column by the main column coupling device, and an image of the permanent main column being fixed by the main column coupling device. And a ninth step, been made in step 10 to install it by using a permanent handrail to the main pole permanent.

이하, 바람직한 실시예로서 도시하여 첨부된 도면에 따라 상세히 설명하면 다음과 같다.Hereinafter, described in detail with reference to the accompanying drawings shown as a preferred embodiment as follows.

먼저 본 발명의 제1 실시예로서 도시된 도1 내지 도4에 따라 설명하면 다음과 같다.First, the first embodiment of the present invention will be described with reference to FIGS. 1 to 4 as follows.

건물 바닥면에 임시 주 기둥과 영구적 주 기둥을 교체 가능하게 고정 설치하는 주 기둥 결합 장치(A)를 구성한다.A main column joining device (A) is constructed to replace and fix the temporary main column and the permanent main column on the floor of the building.

상기 주 기둥 결합 장치(A)는 다음과 같은 구성으로 이루어진다.The main column coupling device (A) is configured as follows.

즉, 금속제로 된 받침판(1)에 볼트부(2)가 형성되고 금속제로 된 나사축(3)을 세워지게 용접으로 고정 설치한다.That is, the bolt part 2 is formed in the support plate 1 made of metal, and the screw shaft 3 made of metal is fixed and welded uprightly.

상기 나사축(3)이 고정 설치된 받침판(1)은 도2a 및 도2b에서와 같이 건물바닥(즉, 계단참 바닥면)에 앵커 볼트(b)로 고정하고 그 위에 몰탈(m)과 내장재 바닥면(n)을 시공 처리한다.The base plate 1, on which the screw shaft 3 is fixed, is fixed to the building floor (ie, landing surface) with anchor bolts (b), as shown in FIGS. Construct (n).

상기 나사축(3)에는 합성수지제로 된 지지봉(4)을 삽입 설치하고 상기 지지봉(4)은 상측부에 경사면(5)을 형성한다.The screw shaft 3 is inserted into and installed with a support rod 4 made of synthetic resin, and the support rod 4 forms an inclined surface 5 on its upper side.

상기 지지봉(4)의 상측부에는 상기 나사축(3)을 통해 파이프형의 팽창봉(6)을 삽입하여 상기 지지봉(4)에 지지 설치한다.An upper portion of the supporting rod 4 is inserted into the supporting rod 4 by inserting a pipe-shaped expansion rod 6 through the screw shaft 3.

상기 팽창봉(6)은 그 소재를 합성수지로 하고 도1에서와 같이 상, 하측에 다수의 절개홈(7)(7a)을 형성한다.The expansion rod 6 is made of a synthetic resin material and forms a plurality of cutout grooves 7 and 7a on the upper and lower sides as shown in FIG.

상기 팽창봉(6)의 상측에는 상기 나사축(3)을 통해 조임와셔(8)를 삽입하여 상기 팽창봉(6)을 압착시켜 팽창되도록 한다.The expansion rod 6 is inserted into the captive washer 8 through the screw shaft 3 to compress the expansion rod 6 to expand.

상기 조임와샤(8)는 그 소재를 합성수지로 하고 하측부에 경사면(9)을 형성한다.The tightening washer 8 is made of synthetic resin and forms an inclined surface 9 on the lower side.

그리고, 상기 나사축(3)의 상측 볼트부(2)에는 너트(10)를 체결한다.The nut 10 is fastened to the upper bolt portion 2 of the screw shaft 3.

이상과 같이 하여 주 기둥 결합 장치(A)에 대한 구성을 설명하였다.The configuration of the main column coupling device A was described as described above.

상기 주 기둥 결합 장치(A)에는 임시난간이 설치되는 임시 주 기둥(11)을 삽입하여 세워지게 고정 결합하고, 또한 도5 및 도6에서와 같이 영구난간이 설치되는 영구적인 주 기둥(12)을 상기 임시 주 기둥(11)과 교체 결합하여 구성한다.The main pillar coupling device (A) is inserted into the fixed temporary main pillar 11 to install a temporary handrail is fixed to stand, and also a permanent main pillar 12 is installed permanent rail as shown in Figures 5 and 6 It is configured to replace the temporary main pillar (11).

이상과 같이 구성되는 본 발명은 먼저 상기 주 기둥 결합 장치(A)에 의해 임시 주 기둥(11)을 결합 설치하는 작용을 설명한다.The present invention configured as described above will first explain the operation of coupling the temporary main column 11 by the main column coupling device (A).

즉, 상기 주 기둥 결합 장치(A)에 도 2a에서와 같이 임시 주 기둥(11)을 삽입하고, 도 2b에서와 같이 박스 스패너(box spanner)(X)를 사용하여 너트(10)를 조이면 상기 너트(10)는 조임와셔(8)를 하측으로 압착하게 되고 상기 조임와셔(8)는 팽창봉(6)을 압착하게 되며 동시에 지지봉(4)이 상기 팽창봉(6)의 하측에서 지지되고 있으므로 상기 팽창봉(6)은 절개홈(7)(7a) 부위가 팽창되어 도3에서와 같이 임시 주 기둥(A)을 고정 결합하게 된다.That is, when the temporary main column 11 is inserted into the main column coupling device A as shown in FIG. 2A, and the nut 10 is tightened using a box spanner X as shown in FIG. 2B, The nut 10 presses the tightening washer 8 downward and the tightening washer 8 compresses the expansion rod 6 and at the same time the support rod 4 is supported from the lower side of the expansion rod 6. The expansion rod (6) is the incision groove (7) (7a) portion is expanded is fixed to the temporary main column (A) as shown in FIG.

상기 설명을 부연하면 너트(10)의 조임에 의해 조임와셔(8)가 압착할 시 조임와셔(8)의 경사면(9)과 지지봉(4)의 경사면(5)이 팽창봉(6)의 절개된 절개홈(7)(7a) 부분의 내측으로 밀고 들어가 쇄기 작용을 하게 되어 팽창봉(6)의 절개홈(7)(7a) 외측부가 팽창되어 임시 주 기둥(11)의 내측면에 압착력으로 밀착되어 고정 결합하는 것이다.When the above explanation is added, the inclined surface 9 of the tightening washer 8 and the inclined surface 5 of the support bar 4 are cut in the expansion rod 6 when the tightening washer 8 is compressed by tightening the nut 10. Pushed into the inside of the incision groove (7) (7a) is a wedge action to expand the outer portion of the incision groove (7) (7a) of the expansion rod (6) by pressing force on the inner surface of the temporary main column (11) It is to be tightly coupled.

위와 같이 상기 임시 주 기둥(11)이 주 기둥 결합 장치(A)에 세워지게 고정 결합하여 설치되면 "J" 형 볼트(13)와 나비너트(14)를 이용하여 임시난간(15)(16)을 고정 설치한다(도3 및 도4 참조).When the temporary main pillar 11 is installed to be fixedly coupled to the main pillar coupling device (A) as described above, using the "J" type bolt 13 and the butterfly nut 14 temporary railings (15, 16) To be fixed (see FIGS. 3 and 4).

즉, 도 1에서와 같이 임시 주 기둥(11)의 상측부에 관통공(17)을 형성하여 이에 "J" 형 볼트(13)를 관통시켜 나비너트(14)로써 도4에서와 같이 임시난간(15)(16)을 상측과 하측 방향으로 향하도록 체결 설치한다.That is, as shown in FIG. 1, a through hole 17 is formed in the upper side of the temporary main column 11, and a "J" type bolt 13 penetrates the temporary railing as shown in FIG. (15) (16) Tighten and install so that it may face upward and downward.

이상과 같이 주 기둥 결합 장치(A)에 의해 임시 주 기둥(11)을 세워지게 고정 결합하여 설치하고 상기 임시 주 기둥(11)에는 임시난간(15)(16)을 설치함에 따라 건물의 내부공사를 안전하게 할 수 있게 된다.As described above, the temporary main pillar 11 is fixedly installed and installed by the main pillar coupling device A, and the temporary main pillars 11 are installed on the temporary railings 15 and 16 to install the internal construction of the building. You can make it safe.

건물의 내부공사가 완료되면 "J" 형 볼트(13)로부터 나비너트(14)를 풀어 임시난간(15)(16)을 해체하고 또한 박스 스패너(box spanner)(X)를 사용하여 조였던 너트(10)를 풀어낸다.When the interior work of the building is completed, loosen the butterfly nut (14) from the "J" type bolt (13) to disassemble the temporary handrails (15) and (16) and tighten the nut using a box spanner (X) ( 10) Loosen

이 경우 조임와셔(8)와 지지봉(4)에 의해 팽창봉(6)의 절개홈(7)(7a) 부분에서 팽창되었던 팽창봉(6)은 다시 수축되어 원상태로 복귀되고, 임시 주 기둥(11)을 제한 없이 용이하게 분리한다.In this case, the expansion rods 6 that have been expanded in the cutout grooves 7 and 7a of the expansion rod 6 by the tightening washers 8 and the support rods 4 are contracted again to return to their original state, and the temporary main column ( 11) easily separated without limitation.

위와 같이 임시 주 기둥(11)을 주 기둥 결합 장치(A)로부터 분리해낸 다음 도5에서와 같이 영구적인 주 기둥(12)을 상기 주 기둥 결합 장치(A)에 삽입한 후 상기에서 임시 주 기둥(11)을 고정 결합하는 방법과 동일한 방법으로 고정 결합한다.After separating the temporary main column 11 from the main column coupling device (A) as above, and inserting the permanent main column 12 into the main column coupling device (A) as shown in FIG. (11) is fixedly coupled in the same manner as the fixed coupling.

상기 영구적인 주 기둥(12)을 상기 주 기둥 결합 장치(A)에 의해 세워지게 결합 고정하여 설치하면 도 6에서와 같이 영구적인 주 기둥(12)에는 영구난간(g)이 설치 사용된다.When the permanent main pillar 12 is installed to be fixed by the main pillar coupling device (A) to stand up and installed as shown in Figure 6 permanent rail (g) is used to install the permanent main pillar (12).

다음, 본 발명의 제2 실시예로서 도7 및 도8에 따라 계단난간용 지주장치의 시공방법을 설명하면 다음과 같다.Next, as a second embodiment of the present invention will be described the construction method of the stair handrail according to Figures 7 and 8 as follows.

도면의 부호 중 상기 도1 내지 도6에 따라 설명한 부호와 동일 부호는 동일 부재이므로 중복된 상세한 설명을 생략한다.In the drawings, the same reference numerals as the ones described with reference to FIGS. 1 to 6 are the same members, and thus detailed descriptions thereof will not be repeated.

제1 단계(S1)- 건물 바닥면(계단의 바닥면)에 주 기둥 결합 장치(A)를 설치 구성한다.First step (S1)-Install the main column coupling device (A) on the building floor surface (floor surface of the stairs).

즉, 계단의 바닥면에 임시 주 기둥과 영구적인 주 기둥을 결합 고정하는 주 기둥 결합 장치(A)를 세워지게 고정 설치한다.That is, the main column coupling device (A) for fixing the temporary main column and the permanent main column fixedly installed on the bottom surface of the staircase.

상기 주 기둥 결합 장치(A)는 건물바닥에 고정되고 금속제로 된 받침판(1)과, 상기 받침판(1)에 고정되게 세워 설치되고 상측부에 볼트부(2)가 형성되며 금속제로 된 나사축(3)과, 상기 나사축(3)에 삽입되고 합성수지제로 된 지지봉(4)과, 상기 나사축(3)에 삽입되어 지지봉(4)에 지지되며 합성수지제로 된 팽창봉(6)과, 상기 나사축(3)에 삽입되고 상기 팽창봉(6)을 압착하며 합성수지제로 된 조임와셔(8)와, 상기 나사축(3)의 볼트부(2)에 결합되며 금속제로 된 너트(10)로 구성된다.The main column coupling device (A) is fixed to the floor of the building and made of metal support plate (1), and fixedly installed on the support plate (1), the bolt portion (2) is formed on the upper side of the screw shaft made of metal (3), a support rod (4) inserted into the screw shaft (3) and made of synthetic resin, an expansion rod (6) inserted into the screw shaft (3) and supported on a support rod (4) and made of synthetic resin; Inserted into the screw shaft (3) and crimping the expansion rod (6) with a screw washer (8) made of synthetic resin, and a nut (10) made of metal coupled to the bolt portion (2) of the screw shaft (3) It is composed.

제2 단계(S2)- 임시 주 기둥(11)을 구비하여 상기 주 기둥 결합 장치(A)에 삽입한다.Second Step (S2)-A temporary main column 11 is provided and inserted into the main column coupling device (A).

상기 임시 주 기둥(11)은 금속제로 되고 파이프형으로 이루어진다.The temporary main column 11 is made of metal and has a pipe shape.

제3 단계(S3)- 상기 주 기둥 결합 장치(A)로써 임시 주 기둥(11)을 고정 결합한다.Third Step (S3)-Fix the temporary main column 11 by the main column coupling device (A).

즉, 박스 스패너(box spanner)(X)를 사용하여 주 기둥 결합 장치(A)의 너트(10)를 조여 조임와셔(8)와 지지봉(4)의 쐐기 작용에 의해 팽창봉(6)을 팽창시켜 임시 주 기둥(11)을 고정 결합한다.That is, the expansion rod 6 is inflated by the wedge action of the tightening washer 8 and the support rod 4 by tightening the nut 10 of the main column coupling device A using a box spanner X. To fix the temporary main column (11).

제4 단계(S4)- 상기 임시 주 기둥(11)에 임시난간(15)(16)을 설치하여 사용한다.Step 4 (S4)-Temporary handrails 15 and 16 are installed and used on the temporary main column 11.

즉, 상기 임시 주 기둥(11)에 "J" 형 볼트(13)와 나비너트(14)를 이용하여 임시난간(15)(16)을 고정 설치한다.That is, the temporary handrails 15 and 16 are fixed to the temporary main column 11 using the "J" type bolts 13 and the butterfly nuts 14.

위와 같이 임시 주 기둥(11)에는 임시난간(15)(16)이 설치되면 건물의 내부공사를 안전하게 할 수 있게 된다.Temporary handrails (15, 16) is installed on the temporary main column 11 as described above will be able to secure the internal construction of the building.

제5 단계(S5)- 상기 주 기둥 결합 장치(A)에 의해 임시 주 기둥(11)을 해체한다.Fifth Step (S5)-The temporary main column 11 is dismantled by the main column coupling device (A).

즉, 건물의 내부공사가 완료되면 "J" 형 볼트(13)로부터 나비너트(14)를 풀어 임시난간(15)(16)을 해체하고, 또한 박스 스패너(box spanner)(X)를 사용하여 조였던 너트(10)를 풀어 임시 주 기둥(11)을 분리한다.That is, when the interior work of the building is completed, the butterfly nut 14 is released from the "J" type bolt 13, and the temporary handrails 15 and 16 are dismantled, and a box spanner X is used. Loosen the tightened nut (10) and remove the temporary main column (11).

제6 단계(S6)- 상기 주 기둥 결합 장치(A)로부터 임시 주 기둥(11)을 완전히 해체한다.Step 6 (S6)-Completely dismantle the temporary main column 11 from the main column coupling device (A).

제7 단계(S7)- 상기 주 기둥 결합 장치(A)에 영구적인 주 기둥(12)을 구비하여 상기 주 기둥 결합 장치(A)에 삽입한다.Step 7 (S7)-The main column coupling device (A) is provided with a permanent main column 12 and inserted into the main column coupling device (A).

제8 단계(S8)- 상기 주 기둥 결합 장치(A)로써 영구적인 주 기둥(12)을 세워지게 고정 결합한다.Eighth Step (S8)-The permanent column pillar 12 is fixedly fixed upright by the main column coupling device (A).

즉, 상기 제3 단계(S3)에서와 같이 박스 스패너(box spanner)(X)를 사용하여 주 기둥 결합 장치(A)의 너트(10)를 조여 조임와셔(8)와 지지봉(4)의 쐐기 작용에 의해 팽창봉(6)을 팽창시켜 영구적인 주 기둥(12)을 고정 결합한다.That is, as shown in the third step S3, by using a box spanner X, the nut 10 of the main column coupling device A is tightened, and the wedge of the tightening washer 8 and the supporting rod 4 is removed. By expanding the expansion rod (6) by the action fixed to the permanent main column (12).

제9 단계(S9)- 상기 주 기둥 결합 장치(A)에 의해 영구적인 주 기둥(12)을 세워지게 결합 고정하여 완성한다.9th step (S9)-The main pillar coupling device (A) by the permanent main pillar 12 to stand up and completed to complete.

제10 단계(S10)- 상기 제9 단계(S9)에서와 같이 세워져 결합 고정하여 완성된 영구적인 주 기둥(12)에 영구난간(g)을 설치하여 사용한다.Tenth step (S10)-As in the ninth step (S9), the permanent railings (g) are installed and used in the permanent main column (12) completed by standing and fixing.

이상과 같은 본 발명은 주 기둥 결합 장치(A)에 의해 임시난간(15)(16)이 설치되는 임시 주 기둥(11)을 결합 고정하여 건물의 내부 공사를 안전하게 하며 내부 공사가 완료되면 상기 임시난간(15)(16)이 설치되는 임시 주 기둥(11)을 해체하여 재활용에 사용하고 영구난간이 설치되는 영구적인 주 기둥(12)을 용이하고 안전하며 신속하게 교체하여 설치 사용할 수 있다.The present invention as described above by fixing the temporary main pillars 11, the temporary handrail 15, 16 is installed by the main column coupling device (A) to secure the internal construction of the building and the temporary construction when the internal construction is completed Dismantling the temporary main pillar (11) on which the railings (15) and (16) are installed can be used for recycling, and the permanent main pillar (12) on which the permanent railing is installed can be installed easily and safely.

이상에서 상세히 설명한 바와 같이 본 발명은 다음과 같은 효과를 얻을 수 있다.As described above in detail, the present invention can obtain the following effects.

첫째, 주 기둥 결합 장치(A)에 의해 임시난간(15)(16)이 설치되는 임시 주 기둥(11)과 영구난간이 설치되는 영구적인 주 기둥(12)을 용이하고 안전하며 신속하게 교체하여 설치 사용할 수 있다.First, by the main column coupling device (A) to replace the temporary main pillar (11) on which the temporary railings (15) and 16 are installed and the permanent main pillar (12) on which the permanent railings are installed easily, safely and quickly. Installation can be used.

즉, 주 기둥 결합 장치(A)에 의해 임시난간(15)(16)이 설치되는 임시 주 기둥(11)을 결합 고정하여 건물의 내부 공사를 안전하게 하며 내부 공사가 완료되면 상기 임시난간(15)(16)이 설치되는 임시 주 기둥(11)을 해체하여 재활용에 사용하고 영구난간이 설치되는 영구적인 주 기둥(12)을 용이하고 견고하게 교체 설치할 수 있다.That is, by fixing the temporary main pillars (11) on which the temporary handrails (15, 16) are installed by the main column coupling device (A) to secure the internal construction of the building, and when the internal construction is completed the temporary handrails (15) It is possible to dismantle the temporary main column (11) in which (16) is installed and use it for recycling, and replace the permanent main column (12) where permanent railings are installed easily and firmly.

둘째, 주 기둥 결합 장치(A)에 의해 임시 주 기둥(11)과 영구적인 주 기둥(12)의 설치 및 해체에 대한 시공이 간단하고 설치가 견고하며 숙련된 기술자가 아 니어도 용이하고 간편하게 작업할 수 있고 공사비용을 절감할 수 있다.Second, the installation and disassembly of the temporary main column 11 and the permanent main column 12 by the main column coupling device (A) is simple, and the installation is solid, and even a skilled technician can work easily and conveniently. Can reduce the construction cost.

셋째, 주 기둥 결합 장치(A)에 의해 설치된 영구적인 주 기둥(12)은 차후 사용도 중 수리가 필요할 경우에 용이하게 교체 설치할 수 있다.Third, the permanent main column 12 installed by the main column coupling device (A) can be easily replaced when a repair is required during future use.

넷째, 상기 임시난간(15)(16)이 설치되는 임시 주 기둥(11)을 해체하여 재활용에 사용되므로 시공비용 등을 절감할 수 있다.Fourth, since the temporary main pillar 11 is installed to dismantle the temporary guardrail (15, 16) is installed can be reduced construction costs and the like.

다섯째, 영구적인 주 기둥(12)을 주 기둥 결합 장치(A)에 의해 설치 시공할 경우 용접 작업 등이 필요치 않아 디자인된 영구적인 주 기둥(12)에 흠집 발생이나 틀어짐 등이 없이 정밀하고 깨끗한 설치 시공을 할 수 있는 등의 효과가 있다.Fifth, when the permanent main column 12 is installed and installed by the main column coupling device (A), no welding work is required and the like, so that the permanent main column 12 is designed without any scratches or distortions on the designed permanent main column 12. It can be used for construction.

Claims (4)

건물바닥에 받침판(1)을 고정설치하여 임시 주 기둥과 영구적 주 기둥을 교체 가능하게 고정 설치할 수 있도록 한 것에 있어서,In that the base plate (1) is fixed to the building floor so that the temporary main pillar and permanent main pillar can be fixedly installed, 상기 받침판(1)에 고정되게 세워 설치되고 상측부에 볼트부(2)가 형성된 나사축(3)과;A screw shaft 3 fixedly installed on the support plate 1 and having a bolt portion 2 formed at an upper side thereof; 상기 나사축(3)에 삽입되고 팽창봉(6)을 지지하는 지지봉(4)과;A support rod (4) inserted into the screw shaft (3) and supporting the expansion rod (6); 상기 나사축(3)에 삽입되어 지지봉(4)에 지지되며 상, 하측에 다수의 절개홈(7)(7a)이 형성되고 외측으로 팽창되는 팽창봉(6)과;An expansion rod (6) inserted into the screw shaft (3) and supported by a support rod (4) and having a plurality of incision grooves (7) (7a) formed at upper and lower sides and expanding outwardly; 상기 나사축(3)에 삽입되고 상기 팽창봉(6)을 압착하는 조임와셔(8)와;A tightening washer (8) inserted into the screw shaft (3) and compressing the expansion rod (6); 상기 나사축(3)의 볼트부(2)에 결합하여 체결하는 너트(10)로 구성되는 것을 특징으로 하는 계단 난간용 지주 장치.Stair handrail holding device characterized in that it consists of a nut (10) for coupling to the bolt portion (2) of the screw shaft (3). 삭제delete 삭제delete 삭제delete
KR1020050065952A 2005-07-20 2005-07-20 A Strut apparatus for stairs handrail and execution method thereof KR100740213B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020050065952A KR100740213B1 (en) 2005-07-20 2005-07-20 A Strut apparatus for stairs handrail and execution method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020050065952A KR100740213B1 (en) 2005-07-20 2005-07-20 A Strut apparatus for stairs handrail and execution method thereof

Publications (2)

Publication Number Publication Date
KR20070010947A KR20070010947A (en) 2007-01-24
KR100740213B1 true KR100740213B1 (en) 2007-07-18

Family

ID=38012071

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050065952A KR100740213B1 (en) 2005-07-20 2005-07-20 A Strut apparatus for stairs handrail and execution method thereof

Country Status (1)

Country Link
KR (1) KR100740213B1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100777866B1 (en) * 2006-06-10 2007-11-21 김현구 Newel post assembly for construction work
CN103388396A (en) * 2013-07-25 2013-11-13 苏州金螳螂建筑装饰股份有限公司 Interior large-space wood strip ground installation structure
KR101988242B1 (en) * 2018-12-26 2019-07-03 (주)플랜에이건축사사무소 Architectural stair railing structure

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR960007966A (en) * 1994-08-31 1996-03-22 남해진 Stair railing strut structure and railing construction method
KR200260465Y1 (en) 2001-09-19 2002-01-10 김인숙 Post
KR200382475Y1 (en) 2005-01-19 2005-04-20 쓰리엠안전개발(주) Temporary supporter for stair rail

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR960007966A (en) * 1994-08-31 1996-03-22 남해진 Stair railing strut structure and railing construction method
KR200260465Y1 (en) 2001-09-19 2002-01-10 김인숙 Post
KR200382475Y1 (en) 2005-01-19 2005-04-20 쓰리엠안전개발(주) Temporary supporter for stair rail

Also Published As

Publication number Publication date
KR20070010947A (en) 2007-01-24

Similar Documents

Publication Publication Date Title
KR100809886B1 (en) Coping form system and method for constructing bridge pier using thereof
JP2009174233A (en) Form device for rectangular column-shaped concrete structure, and construction method of rectangular-column-shaped concrete structure using it
KR101193141B1 (en) Fixing unit of baluster
KR20100106282A (en) System form apparatus for full staging method
KR100740213B1 (en) A Strut apparatus for stairs handrail and execution method thereof
KR101704245B1 (en) Steel structure lifting device
KR101289048B1 (en) Built-up high load safety stair using temporary bent
KR102298710B1 (en) A shelter balcony mold and method for building shelter balcony using the same
KR101808460B1 (en) Assemble fence structure for deck load
KR102210981B1 (en) inspection walkway of bridge
JPS61290164A (en) Method and apparatus for supporting beam and slab
KR100903442B1 (en) Supporting structure of railing
JP6590512B2 (en) Staircase temporary scaffolding
KR200298061Y1 (en) divided supporter structure for supporting a mould for forming a concrete united wall
JPH02274962A (en) Temporary hand rail device for stairs
KR200341426Y1 (en) Connecting structure prop for h-beam foundation
CN110847529A (en) Simple to operate&#39;s pin-connected panel railing
KR101162471B1 (en) Built-up working tower
KR200418037Y1 (en) euro foam and aluminium foam having horizontal frame under lower end
CN111893897B (en) Supporting device for bridge capping beam construction and bridge capping beam construction method
JP2013129961A (en) Temporary fixation method for steel staircase and pipe support for supporting steel staircase
KR102447669B1 (en) A climbing cone assembly
KR100760332B1 (en) Temporary cantilever resources, construction method of structure using the same and dismantling method for the same
KR200381298Y1 (en) The joint for a mold
JPH03206265A (en) Temporary handrail device for stair

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
G170 Publication of correction
LAPS Lapse due to unpaid annual fee