KR100737458B1 - Horizontal draining structures for pore water of soft ground and construction method thereof - Google Patents

Horizontal draining structures for pore water of soft ground and construction method thereof Download PDF

Info

Publication number
KR100737458B1
KR100737458B1 KR1020050100566A KR20050100566A KR100737458B1 KR 100737458 B1 KR100737458 B1 KR 100737458B1 KR 1020050100566 A KR1020050100566 A KR 1020050100566A KR 20050100566 A KR20050100566 A KR 20050100566A KR 100737458 B1 KR100737458 B1 KR 100737458B1
Authority
KR
South Korea
Prior art keywords
soft ground
mat
straw
horizontal
vertical
Prior art date
Application number
KR1020050100566A
Other languages
Korean (ko)
Other versions
KR20070044540A (en
Inventor
김성수
정종민
Original Assignee
김성수
정종민
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김성수, 정종민 filed Critical 김성수
Priority to KR1020050100566A priority Critical patent/KR100737458B1/en
Publication of KR20070044540A publication Critical patent/KR20070044540A/en
Application granted granted Critical
Publication of KR100737458B1 publication Critical patent/KR100737458B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/13Geometrical or physical properties having at least a mesh portion
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0006Plastics
    • E02D2300/001PP
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron
    • E02D2300/0034Steel; Iron in wire form

Abstract

본 발명은 해안갯벌과 같은 연약지반을 준설매립하여 부지를 조성하거나 또는 연약한 원지반 상에 도로, 단지, 제방 및 철도등과 같은 구조물이 건설되는 경우 연약지반내에 일정한 간격을 두고 다수개 설치된 연직배수재 위에 본 발명의 수평배수구조체를 설치하여 상기 연약지반내에 다수개 설치된 연직배수재를 통과하여 상승하는 간극수를 상기 수평배수구조체의 볏짚매트를 이용하여 수평배수를 유도함으로써 연약지반을 예정된 공기내에 압밀침하를 완료시킴과 동시에 상기 연약지반상 수평배수구조체 위로 각종 건설중장비가 출입하여 연약지반을 개량하도록 하기 위한 사전준비작업으로,         The present invention is to construct a site by dredging a soft ground, such as coastal tidal flats, or when a structure such as roads, complexes, embankments, and railways are constructed on a soft ground, on a plurality of vertical drainage installed at regular intervals in the soft ground. The horizontal drainage structure of the present invention is installed and the gap water rising through a plurality of vertical drainages installed in the soft ground is induced by horizontal drainage using a straw mat of the horizontal drainage structure to complete the consolidation settlement of the soft ground in the predetermined air. At the same time, as a preliminary preparation work for the various construction equipment to enter and improve the soft ground on the horizontal ground drainage structure on the soft ground,

상기 연약지반 위에 연약지반 층후에 따라 필요시 폴리플로필렌(Polypropylen)으로 제작된 폴리프로필렌 매트(Polypropylen mat, 이하 P.P mat)를 포설하고, 그 위에 방석형상의 볏짚매트를 다수적층하고, 그 위에 양질의 토사를 일정높이로 성토하여 연약지반내에 함유된 간극수가 상기 볏짚매트를 타고 수평으로 배수되도록하여 간극수 소산을 진행시키면서 연약지반이 압밀되도록 함과 동시에 상기 성토층 위로 자유롭게 중장비등이 출입하면서 연약지반을 개량하여 부지를 조성 및 구조물을 구축하도록 하고, 일정기간이 경과되면 상기 볏짚매트의 볏짚이 부식되도록 한 연약지반간극수 수평배수구조체 및 이의 시공방법에 관한 것이다.         If necessary, the polypropylene mat (Polypropylen mat, hereinafter referred to as PP mat) made of polypropylene (Polypropylen) is laid on the soft ground, and a large number of cushion straw mats are laminated thereon, The soils of the soil are filled to a certain height so that the gap water contained in the soft ground is drained horizontally on the rice straw mat, so that the soft ground is consolidated while the gap water is dissipated, and the heavy equipment and the like freely move in and out of the soil layer. To improve the construction of the site and to build a structure, and a certain time elapses of the soft ground gap number horizontal drainage structure and the construction method of the straw straw to corrode the straw straw mat.

Description

연약지반 간극수 수평배수구조체 및 이의 시공방법{Horizontal draining structures for pore water of soft ground and construction method thereof}Horizontal draining structures for pore water of soft ground and construction method

도 1은 본 발명의 볏짚매트를 전체적으로 보여주는 도면.        1 is a view showing the straw mat mat of the present invention as a whole.

도 2는 도 1의 단면 A-A를 보여주는 도면.        FIG. 2 shows a cross section A-A of FIG. 1. FIG.

도 3(a)(b)는 본 발명의 볏짚매트를 연결시키는 "ㄷ"자형 연결장치와 적용 예를 보여주는 도면.        Figure 3 (a) (b) is a view showing an application example and the "c" shaped connection device for connecting the straw mat of the present invention.

도 4(a)(b)는 본 발명의 또 다른 연결장치인 메쉬형 연결장치와 적용예를 보여주는 도면.        Figure 4 (a) (b) is a view showing a mesh type connecting device and an application example of another connecting device of the present invention.

도 5(a)(b)는 본 발명의 또 다른 연결장치인 돌출형 연결장치와 적용예를 보여주는 도면.        Figure 5 (a) (b) is a view showing an application example with a protruding connection device which is another connection device of the present invention.

도 6(a)(b)(c)(d)(e)는 본 발명의 연약지반 간극수 수평배수 구조체의 시공과정을 보여주는 도면.        Figure 6 (a) (b) (c) (d) (e) is a view showing the construction process of the soft ground clearance multiple drainage structure of the present invention.

<도면의 주요부분에 대한 부호의 설명>        <Description of the symbols for the main parts of the drawings>

10 : 연약지반 간극수 수평배수구조체 11 : 연약지반         10: soft ground pore water horizontal drainage structure 11: soft ground

12 : 폴리플로필렌매트(P.P Mat) 13 : 성토(양질의 토사)         12: polyflourene mat (P.P Mat) 13: fill (quality soil)

14 : 배수구 15 : 연직배수재         14: drain outlet 15: vertical drainage

20 : 볏짚매트 21 : 봉합부         20: straw mat 21: suture

22 : 섬유 23 : 절단볏짚         22: fiber 23: cutting straw

24 : 연결부         24: connection part

30 : "ㄷ"자형연결장치 31 : 철선         30: "c" shaped connector 31: wire

32 : 수평부 33 : 수직부         32: horizontal portion 33: vertical portion

34 : 수평연장부          34: horizontal extension part

40 : 메쉬형연결장치 41 : 가로철선         40: mesh type connecting device 41: horizontal wire

42 : 세로철선 43 : 교차부         42: vertical wire 43: intersection

44 : 수직철선         44: vertical wire

50 : 돌출형 연결장치 51 : 삽입연결판         50: protruding connector 51: insertion connector

52 : 구멍 53 : 돌출연결판         52: hole 53: protruding connecting plate

54 : 돌출부 55 : 탄성돌출핀         54: protrusion 55: elastic protrusion pin

56 : 지지부          56 support

본 발명은 해안갯벌과 같은 연약지반을 준설매립하여 부지를 조성하거나 또는 원지반이 연약지반인 부지내에 도로, 단지, 제방 및 철도등과 같은 구조물이 건설되는 경우 연약지반내에 일정한 간격을 두고 다수개 설치된 연직배수재 위에 본 발명의 수평배수구조체를 설치하여 상기 연약지반내에 다수개 설치된 연직배수재를 통과하여 상승하는 간극수를 상기 수평배수구조체의 볏짚매트를 이용하여 수평배수를 유도 함으로써 연약지반을 예정된 공기내에 압밀침하를 완료시키고 동시에 상기 연약지반상 수평배수구조체위로 각종 건설중장비가 출입하여 연약지반을 개량하도록 하기 위한 것이다.         The present invention is to construct a site by dredging a soft ground, such as coastal tidal flat, or when a structure such as roads, complexes, embankments, and railways are constructed in the site where the ground is a soft ground, a plurality of spaces are installed at regular intervals in the soft ground. The horizontal drainage structure of the present invention is installed on the vertical drainage to condense the soft ground into the predetermined air by inducing horizontal drainage using a straw mat of the horizontal drainage structure to increase the pore water rising through the plurality of vertical drainages installed in the soft ground. It is to complete the settlement and at the same time to the various ground heavy construction equipment on the horizontal ground drainage structure on the soft ground to improve the soft ground.

상기 연약지반 위에 폴리플로필렌(Polypropylen)으로 제작된 폴리프로필렌 매트(Polypropylen mat, 이하 P.P mat)를 포설하고, 그 위에 방석형상의 볏짚매트를 다수적층하고, 그 위에 양질의 토사를 일정높이로 성토하여 연약지반내에 함유된 간극수가 상기 볏짚매트를 타고 수평으로 배수되도록하여 간극수 소산을 진행시키며 상기 성토층 위로 자유롭게 중장비등이 출입하면서 연약지반을 개량하여 부지를 조성 및 구조물을 구축하도록 하고, 일정기간이 경과되면 상기 볏짚매트의 볏짚이 부식되도록 한 연약지반간극수 수평배수구조체 및 이의 시공방법에 관한 것이다.         A polypropylene mat (hereinafter referred to as PP mat) made of polypropylene (Polypropylen) is installed on the soft ground, and a large number of cushion straw mats are laminated thereon, and high quality soil is deposited at a predetermined height. The gap water contained in the soft ground is drained horizontally by the straw straw mat, and the gap water is dissipated and the soft ground is improved while the heavy equipment, etc., freely enters the fill layer, thereby constructing the site and constructing the structure. When the elapsed time, and relates to a soft ground clearance horizontal drainage structure and the construction method of the straw straw to corrode the straw straw mat.

상기 연약지반 수평배수구조체의 시공방법은 굵은 삼실로 짠 토목시공용 부직포를 이용하여 일정한 크기의 포대형상으로 제작하고, 상기 포대내에 일정한 규격으로 잘게 자른 볏짚을 충전하도록 하면서 일정한 두께의 방석형태의 매트가 되도록 성형한 다음, 상기 매트에 일정한 간격을 두고 봉합부를 설치한 볏짚매트를 제작하고,        The method of construction of the horizontal ground drainage structure of the soft ground is produced in a bag shape of a certain size using a nonwoven fabric for civil construction woven with a thick twine, and filling the straw straw chopped to a certain size in a certain size while cushioning mat of a certain thickness After forming to be, and then to produce a straw mat mat was installed at a certain interval on the mat,

상기 제작된 볏짚매트를 연약지반 상에 포설된 섬유매트인 폴리플로필렌 매트(Polypropylen mat, P.P mat) 위에 필요 정도에 따라 볏짚매트를 5 ~ 6개층이되도록 적층설치하면서, 상기 볏짚매트를 적층설치할 때 상기 볏짚매트를 수평으로 상호 연결하거나 또는 상하 및 수평으로 상호 연결하도록 하는 연결장치에 의한 연결부가 상하에서 서로 겹쳐져 형성되지 않도록 지그재그로 연결부가 형성되도록 설치하고, 상기 적층설치된 볏짚매트 위에 양질의 토사를 일정한 두께가 되도록 성토한 지반이 형성되도록 한다.        The rice straw mat is laminated on the rice straw mat while being installed on a polypropylene propylene mat (Polypropylen mat, PP mat) which is laid on the soft ground so that 5 to 6 layers of rice straw mats are needed. When the rice straw mat is horizontally interconnected or installed by the connecting device to be connected to each other up and down and horizontally so that the connecting portion is formed in a zigzag so as not overlapping with each other in the upper and lower sides, and the quality earth and sand on the stacked straw mat So that the ground is formed to be a constant thickness.

본 발명의 목적은 볏짚매트를 연약지반 위에 일정한 두께가 되도록 적층설치하고, 성토체 시공 후 압밀 시작과 함께 연직배수재에 의하여 연직으로 배수되어지는 간극수가 상기 섬유매트인 폴리플로필렌 매트(P.P Mat)를 타고 수평으로 배수되어 양측면에 형성된 배수구를 통하여 외부로 배출되도록 하여 연약지반이 예정된 공기내에 개량 완료되도록함과 동시에 부지내 작업이 필요한 각종 건설중장비의 주행성을 향상시켜 원할한 출입을 가능케하여 연약지반 개량공정을 완수하고, 압밀 완료 후 일정기간이 경과되면 상기 볏짚이 부식되도록 한 친환경 소재인 볏짚을 이용토록하는 연약지반 수평배수구조체의 시공방법을 제공하는데 있다.        An object of the present invention is to install a straw mat mat so as to have a predetermined thickness on the soft ground, the number of pores vertically drained by the vertical drainage with the start of consolidation after the construction of the earthen body polyflophylene mat (PP Mat) It is drained horizontally and discharged to the outside through drain holes formed on both sides, so that the soft ground can be improved and completed in the predetermined air, and the smoothness of the ground is improved by improving the runability of various heavy equipments that need work on the site. It is to provide a construction method of the soft ground horizontal drainage structure to complete the improvement process, using a straw straw, which is an environmentally friendly material that the rice straw is corroded after a certain period of time after the consolidation is completed.

초기에는 연약지반 위에 대나무를 엮은 패널을 설치하고 그 위로 중장비가 운행하도록 하고 있으나, 연약지반에 포함된 간극수를 대나무가 원활히 배출하지 못해 간극수에 의한 일정구간이 스폰지현상을 일으키는등 주행성에 심각한 영향을 주고 있으며, 또한 대나무를 엮은 소재가 풀리거나 끊어져 대나무의 패널이 해체되는등 강도의 저하 및 주행성이 악화되는 등의 심각한 문제점이 상존하여 왔다.         Initially, we installed bamboo-woven panels on the soft ground and allowed heavy equipment to run on it.However, the gaps in the soft ground did not discharge the bamboo smoothly, which caused some sponges to cause severe sponges. In addition, serious problems such as deterioration in strength and deterioration in driving performance, such as dismantling or breaking the bamboo woven material and dismantling the panel of bamboo, have existed.

근래에는 모래를 이용하여 수평배수 기능 및 주행성을 증진하였으나 모래 등 세골재의 생산능력은 한정되어 있으며, 자재의 원활한 수급이 어려운 현장의 경우 발생하는 경제성 측면의 문제점 등이 대두되고 있다.        In recent years, the horizontal drainage function and the driving performance have been improved by using sand, but the production capacity of fine aggregates such as sand is limited, and economic problems that occur in the field where materials are not easily supplied are emerging.

본 발명은 상기와 같은 문제점을 개선하기 위하여 제안된 발명으로서, 일정한 크기와 두께로 제작된 방석형태의 볏짚매트를 연약지반 위에 일정한 두께가 되도록 적층설치하여 압밀이 진행됨에 따라 연약층에서 상승하는 간극수를 상기 볏짚매트를 통하여 수평으로 배출 할 수 있는 배수층을 형성함과 동시에 폴리플로필렌 매트(Polypropylen mat, P.P mat)와 함께 시공하여 연약지반 개량공정에 필요한 각종 건설중장비의 주행성을 향상시키도록 하는 친환경소재인 볏짚을 이용토록하는 연약지반 간극수 수평배수구조체의 시공방법을 제공하는데 있다.        The present invention has been proposed to improve the problems as described above, by stacking the straw-shaped straw mat made of a certain size and thickness to a certain thickness on the soft ground by installing a consolidation to increase the number of gaps in the soft layer as the consolidation proceeds An eco-friendly material that forms a drainage layer that can be discharged horizontally through the straw mat, and is constructed with polypropylen mat (PP mat) to improve the runability of various heavy construction equipment required for the soft ground improvement process. The present invention provides a method for constructing a soft ground horizontal drainage structure using straw.

본 발명은 섬유(22)를 이용하여 일정한 크기의 포대형상으로 제작하고, 상기 포대내에 일정한 규격으로 잘게 자른 볏짚(23)을 충전하도록 하면서 일정한 두께의 방석형태의 매트가 되도록 성형한 다음, 상기 매트를 일정한 간격을 두고 상하의 섬유를 봉합하는 봉합부(21)를 설치한 볏짚매트(20)를 제작하고,        The present invention is produced in a bag shape of a certain size using the fibers 22, and molded into a mat of a cushion thickness of a certain thickness while filling the straw straw chopped to a predetermined standard in the bag, and then the mat To prepare a straw mat 20 provided with a suture portion 21 for sealing the upper and lower fibers at regular intervals,

상기 연약지반 내에 일정한 간격을 두고 다수개 설치된 연직배수기둥 위에 포설된 섬유매트(12)인 폴리플로필렌매트(P.P Mat) 위에 볏짚매트(20)를 연약지반의 두께에 따라 5 ~ 6개층이되도록 적층설치하면서, 상기 볏짚매트(20)를 적층설치 할 때 상기 볏짚매트(20)를 수평으로 상호 연결하거나 또는 상하 및 수평으로 상호 연결하도록 하는 연결장치(30,40, 50)에 의한 연결부(24)가 상하에서 서로 겹쳐져 형성되지 않도록 지그재그로 형성되도록 설치하고, 상기 적층설치된 볏짚매트(20) 위에 양질의 토사를 15 ~ 20㎝정도의 두께가 되도록 성토(13)하여, 상기 볏짚매트에 의하여 간극수가 수평으로 배수되록 함과 동시에 압밀 완료 후 일정한 강도를 갖는 지반을 형성하도록 하는 연약지반 간극수 수평배수구조체의 시공방법인 것에 특징이 있다.        The straw straw mat 20 on the polyfloorene mat (PP Mat), which is a fiber mat 12 installed on a plurality of vertical drainage pillars installed at regular intervals in the soft ground, may be 5 to 6 layers depending on the thickness of the soft ground. While stacking installation, the connection portion 24 by the connecting device (30, 40, 50) to interconnect the rice straw mat 20 horizontally or vertically and horizontally when the rice straw mat 20 is stacked installation ) Is installed so as to be formed in a zigzag so as not to overlap each other in the upper and lower sides, and the earth (13) to the thickness of about 15 to 20 cm on the laminated rice straw mat 20 to the thickness of about 15 to 20 cm, by the straw straw mat Is a method of constructing a soft ground pore-numbered horizontal drainage structure that allows the drainage to be horizontally and simultaneously forms a ground having a certain strength after the consolidation is completed.

이하, 본 발명의 구성 및 작용을 첨부된 도면에 의하여 상세히 설명하면 다음과 같다.        Hereinafter, the configuration and operation of the present invention will be described in detail by the accompanying drawings.

도 1은 본 발명의 볏짚매트를 전체적으로 보여주는 도면으로서, 섬유(22)를 이용하여 일정한 크기의 포대형상으로 제작하고, 상기 포대내에 일정한 규격으로 잘게 자른 볏짚(23)을 충전하도록 하면서 일정한 두께의 방석형상의 매트가 되도록 성형한 다음, 상기 제작된 매트를 일정한 간격을 두고 상하의 섬유를 봉합하는 봉합부(21)를 설치한 것이다.        1 is a view showing the straw straw mat of the present invention as a whole, using a fiber 22 to produce a bag size of a constant size, while filling the straw straw chopped to a predetermined standard in the bag to a certain standard cushion of a certain thickness After molding to form a mat, the prepared mat is provided with a sealing portion 21 for sealing the upper and lower fibers at regular intervals.

상기 섬유(22)는 부직포 또는 굵은 삼실로 짠 직물을 이용한 것이며, 특히 강도 및 반복되는 하중에 견딜 수 있는 강도를 갖는 내구성 있는 직물로서 상기에서 예를 든 것 이외에도 상기의 기준에 부합되는 모든 종류의 섬유를 이용하도록 한다.        The fiber 22 is made of a nonwoven fabric or a coarse twine woven fabric, and is a durable fabric having strength and strength that can withstand repeated loads. Use fiber.

자연상태의 볏짚을 일정한 길이로 잘게 절단한 볏짚(23)을 이용하도록 하는데, 자른 길이는 5 ~ 7㎝길이로 가공한 것을 이용하도록 한다.        Natural straw rice straw to be cut to a predetermined length to use a straw (23), the cut length is to use the processed 5 ~ 7 ㎝ length.

상기와 같은 길이로 자른 것을 사용하는 이유는 포대내에 삽입하기가 좋으며, 특히 연약지반의 간극수가 매트내의 볏짚(23)으로 침투할 때 보다 많은 접촉면적이 형성되도록 하여 보다 많이 형성된 접촉면적을 타고 볏짚과 볏짚사이로 간극수가 침투하여 수평으로 원활히 배수되도록 하기 위함이다.        The reason for using the cut to the above length is good to insert into the bag, especially when the pore number of the soft ground penetrates into the straw (23) in the mat, so that more contact area is formed on the rice straw on the more formed contact area This is to allow the gap water to penetrate through the rice straw and to drain smoothly horizontally.

상기 볏짚매트(20)는 방석형상으로서 두께 5㎝, 폭 150㎝ 및 길이 12m이상으로 제작하도록 하는데 상기와 같이 크기를 한정하는 것은 아니고 일반적으로 상기의 규격에 의한 매트가 포설이 용이하고 적업성이 우수하므로 상기의 규격을 제시한 것이며, 현장의 여건등에 따라 매트의 규격은 다양하게 정하여 제작사용할 수 있다.        The rice straw mat 20 is a cushion shape to be manufactured in a thickness of 5cm, width 150cm and length 12m or more, but not limited to the size as described above, in general, the mat according to the standard is easy to install and workability Since it is excellent, the above standards are presented, and according to the conditions of the site, the specifications of the mat can be variously determined and used.

상기 봉합부(21)는 포대형상으로 제작된 것의 내부에 볏짚(23)을 충전하도록 하고 이것을 방석형상으로 상하부가 평평하도록 상기 볏짚(23)을 편 다음 일정한 간격을 두고 상하부의 섬유(22)를 봉재하도록 한 봉합부(21)를 다수개 설치하도록 한다.        The suture portion 21 is to fill the straw straw 23 in the inside of the thing made in a bag shape and folds the straw straw 23 so that the upper and lower portions are flat in a cushion shape, and then the fibers 22 of the upper and lower portions at regular intervals. It is to be installed a plurality of sutures 21 for sewing.

상기와 같은 봉합부(21)를 설치하는 이유는 포대형상으로서 상하부의 섬유(22)사이에 삽입된 볏짚(23)의 이동을 방지하도록 함과 동시에 포설시에 한군데로 몰리는 것을 방지하도록 하면서 볏짚매트(20)의 두께를 균일하게 하도록 하는 데 그 목적이 있다.         The reason for installing the suture 21 as described above is a straw-shaped straw mat while preventing the movement of the rice straw 23 inserted between the fibers 22 of the upper and lower portions and at the same time to prevent them from being gathered in one place at the time of laying. The purpose is to make the thickness of (20) uniform.

도 2는 도 1의 단면 A-A를 보여주는 도면으로서, 상기 도 1의 볏짚매트(20)를 어떻게 방석형태로 제작하는지 봉합부(21) 및 볏짚(23)의 설치를 자세히 보여주기 위함이다.        Figure 2 is a view showing a cross-section A-A of Figure 1, to show in detail the installation of the suture 21 and rice straw 23 how to produce the straw mat mat 20 of Figure 1 in the form of a cushion.

상기 매트의 상하부의 섬유를 봉재하도록 하여 상하에 설치된 섬유 사이에 충전된 볏짚이 한쪽으로 몰리는 것을 방지하기 위한 것이다.         It is to prevent the rice straw filled between the fibers installed on the upper and lower parts to seal the fibers of the upper and lower parts of the mat to one side.

도 3(a)(b)는 본 발명의 볏짚매트를 연결시키는 "ㄷ"자형연결장치와 적용예를 보여주는 도면으로서, 개량하고자 하는 면적의 연약지반 위에 포설된 섬유매트(12)를 다수개 연이어서 포설할 때 인접한 볏짚매트(20)를 상호 연결하기 위한 장치로서 수평부(32)의 양측단부에서 일정길이 직각으로 하향절곡된 수직부(33)를 형성하고 상기 각각의 볏짚매트(20)의 단부에 상기 수직부(33)를 삽입관통하여 상호 연결한 다음 상기 관통되어 외부로 돌출된 수직부(33)의 단부를 수평으로 일정길이 절곡하여 연장한 수평연장부(34)가 형성되도록 한 "ㄷ"자형연결장치(30)이다.        Figure 3 (a) (b) is a view showing the "c" shaped connection device and application example for connecting the rice straw mat of the present invention, a plurality of fiber mat 12 laid on the soft ground of the area to be improved Subsequently, as a device for interconnecting adjacent rice straw mats (20) when laid, the vertical portions (33) are bent downwardly at a predetermined length at both ends of the horizontal portion (32), and each of the straw mats (20) is formed. The horizontal portion 34 is formed by interconnecting the vertical portion 33 through an end thereof and then extending the vertical portion 33 of the vertical portion 33 horizontally by a predetermined length. C "-shaped connecting device 30.

상기 "ㄷ"자형연결장치(30)를 인접하여 설치된 각각의 볏짚매트(20)의 단부에 상기 수직부(33)를 각각 삽입관통한 다음 상기 볏짚매트(20)를 관통한 수직부(33)의 하부를 수평으로 일정길이 연장한 수평연장부(34)를 두도록하여 상기 연결된 볏짚매트(20)가 분리되어 이탈되지 않도록 하여 수평으로 간극수가 원활히 배수되도록 하기 위함임과 동시에 볏짚매트(20) 위에 중장비가 운행할 때 연결부(24)의 연속성을 주도록 하여 상기 연결장치(30)에 의하여 강도가 보강되도록 하기 위함이다.         The vertical part 33 penetrates the vertical part 33 at the end of each rice straw mat 20 installed adjacent to the “c” -shaped connecting device 30, and then penetrates the rice straw mat 20. A horizontal extension part 34 extending horizontally to a lower part of the lower part is arranged so that the connected rice straw mat 20 is not separated and separated so that the gap water is smoothly drained horizontally and at the same time the heavy equipment on the rice straw mat 20. This is to give the continuity of the connecting portion 24 when the driving is to be reinforced by the connecting device 30.

상기 "ㄷ"자형 연결장치(30)는 수평으로 연이어서 설치된 볏짚매트(20)를 상호 연결하면서 상하로 적층하도록 하는 것이다.        The "c" shaped connection device 30 is to be stacked vertically while interconnecting the straw mat mat (20) installed horizontally connected.

도 (b)는 인접하여 연이어서 설치된 볏짚매트(20)를 "ㄷ"자형 연결장치(30)로 상호연결하는 실시예를 보여주는 것이다.         Figure (b) shows an embodiment of interconnecting the rice straw mat 20 is installed next to each other by the "c" shaped connecting device 30.

도 4(a)(b)는 본 발명의 또 다른 연결장치인 메쉬형연결장치와 적용예를 보여주는 도면으로서, 상기 도 3과 다른 연결장치(40)를 이용하여 종으로 설치되는 볏짚매트(20)를 상호 연결하면서 상하로 적층되는 볏짚매트(20)도 연결고정될 수 있도록 하는 연결장치(40)인 것이다.        Figure 4 (a) (b) is another view showing a mesh type connecting device and an application example of the present invention, rice straw mat 20 is installed as a species using the connecting device 40 and the other Fig. ) Is a connecting device 40 to be connected to the straw mat mat 20 is stacked up and down while connecting to each other.

상기 연결장치(40)는 가로(41) 및 세로철선(42)을 일정한 간격으로 상호 직교하도록 하여 메쉬형태로 제작한 다음 상기 가로 및 세로철선이 직교하여 형성된 교차부(43)에 상하로 일정길이 돌출되도록 용접부착한 수직철선(44)을 설치한 메쉬형연결장치(40)이다.        The connecting device 40 is made of a mesh shape by making the horizontal 41 and the vertical wire 42 to be perpendicular to each other at regular intervals, and then have a predetermined length up and down at an intersection 43 formed by the horizontal and vertical wire being perpendicular to each other. It is a mesh-type connection device 40 provided with a vertical welded wire 44 to protrude.

도 (b)는 인접하여 연이어 설치된 볏짚매트(20)의 단부와 그 위에 설치되는 볏짚매트(20)와의 사이에 일정한 넓이로 제작된 메쉬형연결장치(40)를 설치하여, 상기 메쉬형연결장치(40)의 교차부(43)에 상하로 부착설치된 수직철선(44)이 상기 인접한 볏짚매트(20)의 단부에 박혀 상호 연결고정하도록 하면서 상하로 적층된 볏짚매트(20)의 상하면에 상기 수직철선(44)이 박혀 상하에 설치된 볏짚매트(20)를 연결고정하도록 하여 간극수가 원활히 수평으로 배수되도록 하기 위한 것이며,         (B) is installed between the end of the rice straw mat (20) adjacently installed and the rice straw mat 20 is installed on it to install a mesh-type connecting device 40 made of a predetermined width, the mesh-type connecting device Vertical wires 44 vertically attached to the intersections 43 of the 40 are embedded at the ends of the adjacent straw mats 20 so as to be interconnected and fixed to the upper and lower surfaces of the straw mats 20 stacked vertically. The iron wire 44 is embedded to fix the straw mat mat 20 installed in the upper and lower so as to smoothly drain the horizontal gap,

또한, 상기 연약지반(11) 위에 성토(13)된 토사위로 건설중장비가 운행할 때 무거운 장비의 하중에 의하여 상호 연결된 볏짚매트(20)의 연결부(24) 및 상하로 적층된 부분이 취약부가 되는 것을 상기 일정한 크기로 제작된 메쉬형 연결장치(40)가 좌우 및 상하로 각각 고정연결되도록 하면서 상기 메쉬형연결장치(40)의 메쉬가 보강재 역할도 겸하도록 하여 성토(13)부의 주행성을 향상시켜주도록 하기 위 함이다.        In addition, when the heavy construction equipment is running on the soil pile 13 filled on the soft ground 11, the connection portion 24 and the vertically stacked portion of the straw mat mat 20 interconnected by the load of heavy equipment becomes a weak part. The mesh-type connection device 40 is made of the predetermined size is fixed to the left and right and up and down, respectively, while the mesh of the mesh-type connection device 40 also serves as a reinforcing material to improve the runability of the fill 13 part To give.

상기 상하로 적층되면서 형성되는 볏짚매트(20)의 연결부(24)는 지그재그로 설치되도록 하여 한 부분에 연결부(24)가 집중설치되는 것을 방지하도록 하여 상기 연결부에 의한 주행성을 저하시키는 것을 방지하도록 한다.         The connection part 24 of the straw mat 20 formed while being stacked up and down is installed in a zigzag to prevent the connection part 24 from being concentrated in one part so as to prevent deterioration of the runability by the connection part. .

도 5(a)(b)는 본 발명의 볏짚매트를 연결시키는 돌출형연결장치와 적용예를 보여주는 도면으로서, 개량하고자 하는 면적의 연약지반 위에 포설된 섬유매트인 폴리플로필렌 매트(12)를 다수개 연이어서 포설할 때 인접한 볏짚매트(20)를 상호 연결하기 위한 장치로서 직사각형의 판상 위에 일정한 간격을 두고 지지부(56)가 설치되고 상기 지지부(56)의 상단에 탄성을 갖는 탄성돌출핀(55)인 돌출부(54)가 설치된 돌출연결판(53)과, 직사각형의 판상 위에 일정한 간격을 갖되 상기 돌출부(54)가 삽입될 수 있는 위치에 구멍(52)이 형성된 삽입연결판(51)으로 구성된 돌출형 연결장치(50)이다.        Figure 5 (a) (b) is a view showing a projecting connection device and an application example for connecting the straw mat mat of the present invention, a polyflopylene mat 12 which is a fiber mat installed on the soft ground of the area to be improved Apparatus for interconnecting adjacent rice straw mats 20 when laid in succession, and a support part 56 is installed at regular intervals on a rectangular plate shape, and an elastic protrusion pin having elasticity on an upper end of the support part 56 ( 55 is a protruding connecting plate 53 provided with a protruding portion 54, and an insertion connecting plate 51 having a hole 52 formed at a position where the protruding portion 54 can be inserted at regular intervals on a rectangular plate. Protruding connector 50 is configured.

상기 돌출형 연결장치(50)를 인접하여 설치된 각각의 볏짚매트(20)의 하부단부에 상기 돌출부(54)를 볏짚매트의 상부로 삽입관통시킨 다음, 상기 관통된 돌출부(54)가 삽입연결판(51)의 구멍(52)내에 삽입관통되도록 하여 볏짚매트를 단부에서 상호 연결하도록 한 것이다.        The protrusion 54 is inserted into the upper portion of the straw mat at the lower end of each straw mat 20 provided adjacent to the protrusion coupling device 50, and then the penetrated protrusion 54 is inserted into the insertion plate. The straw mat is inserted into the hole 52 of the 51 so as to interconnect the straw mat at the end.

이렇게 하므로서 연결된 볏짚매트(20)가 분리되어 이탈되지 않도록 하여 간극수가 수평으로 원활히 배수되도록 위함임과 동시에 볏짚매트(20) 위에 중장비가 운행할 때 연결부(24)의 연속성을 주도록 하여 상기 연결장치(30)에 의하여 강도가 보강되도록 하기 위함이다.         In this way, the connected straw straw mat 20 is not separated and separated so that the gap number is smoothly drained horizontally, and at the same time, when the heavy equipment is running on the straw straw 20, the connection unit 24 is provided to provide continuity. This is to strengthen the strength by).

상기 지지부(56)의 상단에 형성된 돌출부(54)는 탄성을 갖는 원뿔형 형태의 탄성돌출핀(55)을 설치하여 상기 구멍(52)에 의하여 상기 탄성돌출핀(55)이 삽입되도록 하여 원뿔형태인 상부는 뾰족하고 그 하부는 넓게 하여 일단 구멍(52)에 탄성에 의하여 관통된 후에는 원뿔형태의 하부의 넓은 부분이 구멍(52)의 직경외부로 돌출되도록 하여 어떠한 힘을 주더라도 연결된 돌출형 연결장치(50)의 돌출연결판(53)과 삽입연결판(51)이 이탈분리되는 것을 방지할 수 있도록 한다.         Protruding portion 54 formed on the upper end of the support portion 56 is provided with an elastic protrusion pin 55 having a conical shape of elasticity so that the elastic protrusion pin 55 is inserted by the hole 52 to the conical upper portion Is pointed and its lower part is wide so that once the hole 52 is elastically penetrated, the wide part of the lower part of the conical shape protrudes out of the diameter of the hole 52 so that no force is applied. The protruding connecting plate 53 and the insertion connecting plate 51 of the 50 can be prevented from being separated.

도 (b)는 인접하여 연이어서 설치된 볏짚매트(20)를 돌출형 연결장치(50)로 상호연결하여 연결부(24)가 형성된 실시예를 보여주는 것이다.        (B) shows an embodiment in which the connection part 24 is formed by interconnecting the rice straw mats 20 installed adjacent to each other with the protruding connection device 50.

도 6(a)(b)(c)(d)(e)는 본 발명의 연약지반 간극수 수평배수구조체의 시공과정을 보여주는 도면으로서, 도 (a)는 연직배수재가 다수개 설치된 연약지반(11) 위에 섬유매트인 폴리플로필렌 매트(12)를 포설하도록 하고, 그 위에 볏짚매트(20)를 "ㄷ"자형 연결장치(30) 또는 메쉬형연결장치(40) 또는 돌출형 연결장치(50)를 이용하여 수평, 또는 상하 및 수평연결하면서 상하로 일정한 개수의 볏짚매트(20)로 적층설치하되 상하의 연결부(24)가 겹치지 않도록 지그재그로 연결설치하도록 하고,         Figure 6 (a) (b) (c) (d) (e) is a view showing the construction process of the soft ground clearance multiple drainage structure of the present invention, Figure (a) is a soft ground 11 is installed a plurality of vertical drainage material ) To install a polyfloppyene mat 12 is a fibrous mat, and the straw mat 20 on the "c" shaped connector 30 or mesh connector (40) or protruding connector (50) thereon Using a horizontal, or vertically and horizontally connected to install a vertical number of straw mats (20) stacked up and down, but installed in a zigzag connection so that the upper and lower connecting portions 24 do not overlap,

도 (b)와 (c)와 (d)는 볏짚매트(20)를 수평설치 및 상하로 적층시 수평 및 상하 연결고정하도록 하기 위한 것으로서, 상기 도 (a)에서 각각 언급한 연결장치이며, 이에 대한 상세한 구조 및 기능은 상기 도 3, 도 4 및 도 5에서 상세히 언급한바와 같이 연이어서 설치된 볏짚매트(20)를 상호 연결하거나 또는 연이어서 설치된 볏짚매트를 상호 연결함과 동시에 상하로 적층된 볏짚매트(20)도 동시에 연결고 정하도록 한 것이다.        Figures (b) and (c) and (d) is to ensure the horizontal and vertical connection fixed when the straw mat 20 is installed horizontally and vertically stacked, the connecting device mentioned in each of the above (a), The detailed structure and function of the straw straw stacked up and down at the same time as interconnecting the straw mat mat 20 installed in succession, or interconnected the straw mat mat installed in succession as described in detail in FIGS. 3, 4 and 5 The mat 20 is also to be fixed at the same time.

도 (e)는 적층설치된 볏짚매트(20) 위에 양질의 토사를 15 ~ 20㎝의 두께가 되도록 성토(13)한 것으로서, 상기 연약지반내에 함유된 간극수가 상기 볏짚매트를 타고 수평으로 배수, 배수구(14)를 통하여 외부로 배출되도록 하면서 성토(13)부위로 연약지반을 개량하기 위한 중장비가 운행하도록 하면서 연약지반(11)개량공정을 수행하도록 하기 위한 것이다.        Figure (e) is a pile 13 of good quality earth and sand to the thickness of 15 ~ 20cm on the stacked straw mat 20, the number of voids contained in the soft ground drained horizontally, drainage drainage It is to perform the soft ground (11) improvement process while the heavy equipment to improve the soft ground to the fill (13) area while being discharged to the outside through the (14).

상기 볏짚매트(20)를 연약지반(11)위에 포설하는 폭은 연약지반(11)의 전체면적에 포설하도록 한 후에         After spreading the straw mat 20 on the soft ground 11 to the entire area of the soft ground (11)

그 위에 양질의 토사를 일정높이로 성토(13)하여 연약지반내(11)에 함유된 간극수가 상기 볏짚매트를 타고 수평으로 배수되도록하여 간극수 소산을 진행시키며 상기 성토층(13) 위로 자유롭게 중장비등이 출입하면서 연약지반(11)을 개량하여 부지를 조성 및 구조물을 구축하도록 하고, 일정기간이 경과되면 상기 볏짚매트(20)의 볏짚이 부식되도록 한 연약지반간극수 수평배수구조체 및 이의 시공방법이 있다.On top of that, high quality earth and sand are deposited to a certain height (13) so that the pore water contained in the soft ground (11) is drained horizontally on the rice straw mat to proceed to dissipate the pore water. There is a soft ground horizontal drainage structure and its construction method to improve the soft ground (11) while entering and leaving the site and to build a structure, so that the straw straw of the rice straw mat 20 is corroded after a certain period of time. .

상기 방법이외에 상기 방법을 절충하는 방법도 사용할 수 있다. 이러한 방법의 선택사용은 현장의 여건에 따라 선택적으로 사용하도록 한다.        In addition to the above method, a method of compromising the above method can also be used. Selective use of these methods may be used selectively depending on site conditions.

상기 연결장치의 재료는 철을 주재료로 하거나 또는 강도가 있는 프라스틱을 이용하여 제작하여 사용할 수도 있다.        The material of the connecting device may be produced by using iron as the main material or plastic having strength.

본 발명은 일정한 크기와 두께로 제작된 방석형태의 볏짚매트를 연약지반 위에 일정한 두께가 되도록 적층설치하고, 그 위에 토사를 성토하면, 연약지반내에 포함된 간극수가 볏짚매트의 볏짚을 타고 수평으로 배수, 배수구를 통하여 외부로 배출되도록 하여 연약지반내에 포함된 간극수가 배출되어 압밀침하가 진행되어 연약지반의 안정화를 이루도록 하면서, 상기 성토부 위로 각종 건설중장비가 원활히 출입하여 연약지반을 개량할 수 있도록 주행성을 향상시키고 친환경소재인 볏짚을 이용토록하는 시공성이 뛰어나며 효율성이 향상된 연약지반 간극수 수평배수구조체 시공방법인 것이다.        The present invention is installed by stacking a straw-shaped rice straw mat made of a certain size and thickness so as to have a predetermined thickness on the soft ground, and the earth and sand is deposited on it, drainage horizontally by riding the rice straw straw straw mat contained in the soft ground It is discharged to the outside through the drain hole, and the gap water contained in the soft ground is discharged, so that the consolidation settlement progresses to stabilize the soft ground, and various construction equipment can be smoothly moved in and out of the fill section to improve the soft ground. It is a construction method of horizontal ground drainage structure of soft ground pore water with excellent workability and improved efficiency to use rice straw which is environmentally friendly material.

Claims (9)

연약지반을 개량하는 연약지반개량에서, 상기 연약지반내에 다수개 설치된 연직배수재 상에 포설된 섬유매트인 폴리플로필렌매트(P.P mat) 위에 수평으로 연이어서 설치함과 동시에 일정한 개수로 적층설치된 볏짚매트와, 상기 볏짚매트를 좌우 및 좌우와 상하로 상호연결하도록 하는 연결장치와, 상기 적층설치된 볏짚매트 위에 일정한 두께가 형성되도록 성토된 양질의 토사로 이루어진 수평배수구조체에 있어서,         In the soft ground improvement to improve the soft ground, the straw mat mat is horizontally installed on the polyfloorene mat (PP mat), which is a fiber mat installed on the vertical drainage material installed in the plurality of soft grounds, and stacked in a predetermined number at the same time. And, in the horizontal drainage structure consisting of a connection device for interconnecting the rice straw mat left and right and left and right and up and down, and high quality earth and sand to be formed so that a certain thickness is formed on the stacked straw straw mat, 상기 연결장치는 수평부의 양측단부에서 일정길이 직각으로 하향절곡된 수직부를 형성하고, 상기 각각의 볏짚매트의 단부에 상기 수직부를 삽입관통한 다음, 상기 관통된 수직부의 단부를 수평으로 일정길이 절곡하여 연장한 수평연장부가 형성된 “ㄷ”자형연결장치인 것에 특징이 있는 연약지반 간극수 수평배수구조체.           The connecting device forms a vertical portion bent downward at a predetermined length at right angles at both ends of the horizontal portion, inserts the vertical portion through the end of each straw mat, and then horizontally bends the end portion of the vertical portion through the vertical portion. A soft ground horizontal drainage structure characterized by being a "c" shaped connector with an extended horizontal extension. 삭제delete 삭제delete 삭제delete 제 1항에 있어서,        The method of claim 1, 상기 연결장치는 가로 및 세로철선을 일정한 간격으로 상호 직교하도록 하여 메쉬형태로 제작한 다음 상기 가로 및 세로철선이 직교하여 형성된 교차부에 상하로 일정길이 돌출되도록 용접부착한 수직철선을 설치한 메쉬형 연결장치인 것에 특징이 있는 연약지반 간극수 수평배수구조체.        The connecting device is manufactured in the form of a mesh so that the horizontal and vertical wires are perpendicular to each other at regular intervals, and then a mesh-type connection in which the vertical wires are welded and installed to protrude a predetermined length up and down at an intersection formed by the horizontal and vertical wires are perpendicular to each other. A soft ground horizontal drainage structure characterized by being a device. 제 1항에 있어서,        The method of claim 1, 상기 연결장치는 직사각형의 판상 위에 일정한 간격을 두고 지지부가 설치되고 상기 지지부의 상단에 탄성을 갖는 탄성돌출핀인 돌출부가 설치된 돌출연결판과, 직사각형의 판상 위에 일정한 간격을 갖되 상기 돌출부가 삽입될 수 있는 위치에 구멍이 형성된 삽입연결판으로 구성된 돌출형 연결장치인 것에 특징이 있는 연약지반 간극수 수평배수구조체.        The connecting device may include a protruding connecting plate provided with support portions at regular intervals on a rectangular plate, and a protruding portion having an elastic protrusion pin having elasticity on the upper end of the support portion, and having a predetermined interval on the rectangular plate and having the protrusions inserted therein. Soft ground clearance horizontal drainage structure, characterized in that the projecting connecting device consisting of a connecting connecting plate formed with a hole in the position. 제 1항에 있어서,        The method of claim 1, 상기 연결장치에 의하여 볏짚매트를 좌우로 연결하여 형성된 연결부는 상하로 적층될 때 지그재그로 형성되도록 하여 연결부가 상하로 연속되어 형성되는 것을 방지하도록 하는 것에 특징이 있는 연약지반 간극수 수평배수구조체.        The connecting portion formed by connecting the straw mat mat left and right by the connecting device is formed in a zigzag when stacked up and down so that the soft ground gap number horizontal drainage structure characterized in that the connection is prevented from being formed continuously up and down. 연약지반을 개량하는 연약지반 개량방법에 있어서,         In the soft ground improvement method for improving the soft ground, (a) 다수개 연직배수재가 타설된 연약지반 위에 섬유매트인 폴리플로필렌매트(P.P mat)를 포설하도록 하고,          (a) To lay a fiber mat polyflopylene mat (P.P mat) on the soft ground in which a plurality of vertical drainage is poured, (b) 상기 섬유매트 위에 5 ~ 7cm로 절단가공된 볏짚을 이용하여 제작한 볏짚매트를 수평으로 “ㄷ”자형연결장치로 상호 연결하거나 또는 돌출형 연결장치를 이용하여 상호연결하거나 또는 수평으로 상호연결하면서 상하로 적층된 볏짚매트를 메쉬형연결장치로 상하, 좌우연결고정하는 것 중에서 어느 한가지의 연결장치를 이용하여 연결하면서, 5 ~6개의 볏짚매트로 적층설치하되, 상하의 연결부가 겹치지 않도록 지그재그로 연결설치하도록 하고,          (b) horizontally interconnected rice straw mats made of rice straw cut to 5 to 7 cm on the fiber mat horizontally using a “c” shaped connecting device or interconnected using a protrusion connecting device or horizontally interconnected. While connecting the straw mats stacked up and down with a mesh-type connecting device by using any one of the connecting device up and down, left and right connection, while installing by stacking 5 to 6 straw mats, the top and bottom connections are zigzag To install, (c) 상기 적층설치된 볏짚매트 위에 양질의 토사를 15 ~ 20㎝의 두께가 되도록 성토한 것으로서, 상기 연약지반 위에 설치된 볏짚매트내 볏짚사이의 간극을 타고 연약지반내에서 연직배수재 또는 배수층을 통해 수직 상승한 간극수가 수평으로 이동 배수구를 통하여 외부로 배출되도록 함과 동시에 연약지반 개량 공정을 위한 중장비가 월활하게 운행하도록 하면서 연약지반을 개량하기 위한 것에 특징이 있는 연약지반 간극수 수평배수구조체의 시공방법.        (c) the quality of the earth and sand to the thickness of 15 ~ 20 ㎝ on the stacked straw straw mat, the vertical gap through the vertical drainage or drainage layer in the soft ground riding the gap between the straw straw in the straw straw mat installed on the soft ground A method for constructing a soft ground horizontal drainage structure characterized by improving the soft ground while allowing the raised pore water to be discharged to the outside through a horizontal moving drain and allowing the heavy equipment for the soft ground improvement process to run smoothly. 제 8항에 있어서,        The method of claim 8, 상기 연결장치는 수평부의 양측단부에서 일정길이 직각으로 하향절곡된 수직부를 형성하고 상기 각각의 볏짚매트의 단부에 상기 수직부를 삽입관통한 다음, 상기 관통된 수직부의 단부를 수평으로 일정길이 절곡하여 연장한 수평연장부가 형성된 "ㄷ"자형 연결장치인 것이거나, 직사각형의 판상 위에 일정한 간격을 두고 지지부가 설치되고 상기 지지부의 상단에 탄성을 갖는 탄성돌출핀인 돌출부가 설치된 돌출연결판과, 직사각형의 판상 위에 일정한 간격을 갖되 상기 돌출부가 삽입될 수 있는 위치에 구멍이 형성된 삽입연결판으로 구성된 돌출형 연결장치인 것이거나 또는 가로 및 세로철선을 일정한 간격으로 상호 직교하도록 하여 메쉬형태로 제작한 다음 상기 가로 및 세로철선이 직교하여 형성된 교차부에 상하로 일정길이 돌출되도록 용접부착한 수직철선을 설치한 것중의 어느 한가지의 메쉬형연결장치인 것에 특징이 있는 볏짚매트를 이용한 연약지반 개량용 수평배수 구조체의 시공방법.        The connecting device forms a vertical portion bent downward at a predetermined length at right angles at both ends of the horizontal portion, and penetrates the vertical portion at the ends of each rice straw mat, and then extends the horizontal portion by bending the end portion of the vertical portion horizontally. It is a "c" shaped connecting device formed with a horizontal extension, or a rectangular plate-like projection plate and a support plate is provided at regular intervals and the projecting connecting plate is provided with a protrusion, which is an elastic protrusion pin having elasticity on top of the support plate, rectangular plate-like It is a protruding connecting device composed of an insertion connecting plate having a hole at a position where the protrusion can be inserted at a predetermined interval thereon, or manufactured in the form of a mesh so that horizontal and vertical wires are perpendicular to each other at regular intervals, and then the horizontal And a welded portion to protrude a predetermined length up and down at an intersection portion formed by orthogonal vertical wire Construction method of any one of the mesh type connection device is a horizontal drain structure for improving soft ground using a straw mat is characterized in one of the things the vertical wire installation.
KR1020050100566A 2005-10-25 2005-10-25 Horizontal draining structures for pore water of soft ground and construction method thereof KR100737458B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020050100566A KR100737458B1 (en) 2005-10-25 2005-10-25 Horizontal draining structures for pore water of soft ground and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020050100566A KR100737458B1 (en) 2005-10-25 2005-10-25 Horizontal draining structures for pore water of soft ground and construction method thereof

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR2020050030263U Division KR200405526Y1 (en) 2005-10-25 2005-10-25 Horizontal draining structures for pore water of soft ground

Publications (2)

Publication Number Publication Date
KR20070044540A KR20070044540A (en) 2007-04-30
KR100737458B1 true KR100737458B1 (en) 2007-07-12

Family

ID=38178413

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050100566A KR100737458B1 (en) 2005-10-25 2005-10-25 Horizontal draining structures for pore water of soft ground and construction method thereof

Country Status (1)

Country Link
KR (1) KR100737458B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100888883B1 (en) * 2008-09-04 2009-03-17 신보로드주식회사 Paving structure and method with block
KR20180096939A (en) * 2017-02-22 2018-08-30 영원산업개발 주식회사 A connector of a mat using of coconut and the establishment method using it

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104372789B (en) * 2014-11-26 2016-04-13 盐城工学院 For carrying out the drainage system of discharging consolidation to high-moisture percentage mud and new barged-in fill
CN105019426B (en) * 2015-06-19 2016-08-17 盐城工学院 Fluidised form mud silting blocking fast vacuum prepressing consolidation method with straw as displacement hull

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH073798A (en) * 1993-06-16 1995-01-06 Nittoc Constr Co Ltd Method of banking
JPH116140A (en) * 1997-06-13 1999-01-12 Penta Ocean Constr Co Ltd Draining method for soft soil and extensible draining material
JPH11172666A (en) 1997-12-08 1999-06-29 Amano:Kk Horizontal drain and connecting body thereof and execution method thereof
KR200254605Y1 (en) * 2001-07-28 2001-12-01 주식회사 성웅 A mat block for floor
KR200315757Y1 (en) * 2003-02-26 2003-06-09 송기현 Outer layer strengthening mat dehydration admission equipment

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH073798A (en) * 1993-06-16 1995-01-06 Nittoc Constr Co Ltd Method of banking
JPH116140A (en) * 1997-06-13 1999-01-12 Penta Ocean Constr Co Ltd Draining method for soft soil and extensible draining material
JPH11172666A (en) 1997-12-08 1999-06-29 Amano:Kk Horizontal drain and connecting body thereof and execution method thereof
KR200254605Y1 (en) * 2001-07-28 2001-12-01 주식회사 성웅 A mat block for floor
KR200315757Y1 (en) * 2003-02-26 2003-06-09 송기현 Outer layer strengthening mat dehydration admission equipment

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100888883B1 (en) * 2008-09-04 2009-03-17 신보로드주식회사 Paving structure and method with block
KR20180096939A (en) * 2017-02-22 2018-08-30 영원산업개발 주식회사 A connector of a mat using of coconut and the establishment method using it
KR101984534B1 (en) * 2017-02-22 2019-05-31 영원산업개발 주식회사 A connector of a mat using of coconut and the establishment method using it

Also Published As

Publication number Publication date
KR20070044540A (en) 2007-04-30

Similar Documents

Publication Publication Date Title
US10407837B2 (en) Pavement systems with geocell and geogrid
KR100981258B1 (en) The retaining wall block and the construction method of retaining wall with retaining wall block and geogrid
KR101873313B1 (en) Geo cell for improving workability and increasing strength using functional connector, and method for constructing this same
JP6335569B2 (en) Ground preparation method and ground structure
KR970065905A (en) Construction method of construction structure using reinforcement frame and reinforcement frame for structure
KR100737458B1 (en) Horizontal draining structures for pore water of soft ground and construction method thereof
KR20050115211A (en) Environmental vegetation mats and establishment method of environmental vegetation mats
JP6192763B1 (en) Geogrid / Honeycomb Retaining Wall
KR200405526Y1 (en) Horizontal draining structures for pore water of soft ground
KR20090039258A (en) Green block and supporting structure of reinforced earth wall
JP6676462B2 (en) Embankment reinforcement method
KR100317701B1 (en) a reinforcement land method of construction to using tires
KR200448481Y1 (en) Structure of retaining wall having a possible planting for cutting slope
KR100780216B1 (en) Method for constructing a honeycomb-shaped mat
KR102194293B1 (en) Breast wall structure
RU34945U1 (en) Device for strengthening the slope of the soil structure
CN107700500B (en) Slope retaining structure and slope supporting drain integral system
CN217460125U (en) Bidirectional plastic grid
KR100725274B1 (en) Lattice-type framework for reinforcing slope
JP7266086B2 (en) honeycomb reinforced slope
KR100647137B1 (en) Block construction method
RU42547U1 (en) DEVICE FOR STRENGTHENING THE SOIL MILL
CN110939141A (en) Supporting construction of side slope
JP3665896B2 (en) Reinforced embankment body and its construction method
KR102576395B1 (en) Reinforced earth walls

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
G170 Publication of correction
FPAY Annual fee payment

Payment date: 20120810

Year of fee payment: 6

LAPS Lapse due to unpaid annual fee