KR100699334B1 - A Tie Cable Binding Device - Google Patents

A Tie Cable Binding Device Download PDF

Info

Publication number
KR100699334B1
KR100699334B1 KR1020060078751A KR20060078751A KR100699334B1 KR 100699334 B1 KR100699334 B1 KR 100699334B1 KR 1020060078751 A KR1020060078751 A KR 1020060078751A KR 20060078751 A KR20060078751 A KR 20060078751A KR 100699334 B1 KR100699334 B1 KR 100699334B1
Authority
KR
South Korea
Prior art keywords
binding
tie cable
clip
tie
strand
Prior art date
Application number
KR1020060078751A
Other languages
Korean (ko)
Inventor
심석래
Original Assignee
심석래
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 심석래 filed Critical 심석래
Priority to KR1020060078751A priority Critical patent/KR100699334B1/en
Application granted granted Critical
Publication of KR100699334B1 publication Critical patent/KR100699334B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron
    • E02D2300/0034Steel; Iron in wire form

Abstract

A tie cable binding apparatus is provided to restrict displacement of prestressed concrete strand by firmly fixing the strands of a tie cable with projections of press clips, and to prevent rust of the prestressed concrete strand by restricting moisture and external air from being infiltrated into the prestressed concrete strand and an adapter. A tie cable binding apparatus includes an integrated press clip(20) inserting an end of a prestressed concrete strand(2) of a tie cable(1) to a binding groove(14) of a binding head(12) by pressing the outside, a tie cable binding unit(11) combined with the integrated press clip with the binding groove of the binding head and fixed to an H-beam by assembling a bolt part with a nut(16), a support unit(15) restricted at a rear end of the binding head in the bolt part of the tie cable binding unit and fitted to the front of the nut, and a protection cap(18) sealed and combined with the nut by inserting a sealing ring(17). An individual press clip is formed in the integrated press clip, and the end of the prestressed concrete strand is inserted to the individual press clip.

Description

타이케이블 결속장치{A Tie Cable Binding Device}A tie cable binding device

도 1a 및 도 1b는 종래의 타이케이블 결속장치를 보인 결합 단면도 및 설치상태 단면도.Figures 1a and 1b is a cross-sectional view and the installation state cross-sectional view showing a conventional tie cable binding device.

도 2는 본 발명에 따른 타이케이블 결속장치의 분해 사시도.Figure 2 is an exploded perspective view of the tie cable binding device according to the present invention.

도 3a 내지 도 3c는 도 2에 예시된 본 발명에 따른 타이케이블 결속장치의 결속과정을 보인 예시도.Figures 3a to 3c is an exemplary view showing a binding process of the tie cable binding device according to the invention illustrated in FIG.

도 4는 본 발명에 따른 타이케이블 결속장치의 분해 사시도.Figure 4 is an exploded perspective view of the tie cable binding device according to the present invention.

도 5a 내지 도 5c는 도 2에 예시된 본 발명에 따른 타이케이블 결속장치의 결속과정을 보인 예시도.5a to 5c is an exemplary view showing a binding process of the tie cable binding device according to the present invention illustrated in FIG.

* 도면의 주요부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

1: 타이케이블 2: PC강연선 3: 와이어강선1: tie cable 2: PC stranded wire 3: wire steel wire

4: PE관 5: 어댑터 7: H빔4: PE tube 5: adapter 7: H beam

10.10-1: 타이케이블결속장치 11: 타이케이블결속금구10.10-1: Tie-cable tie down device 11: Tie-cable tie down bracket

12: 결속헤드 13: 볼트부 14: 결속홈12: binding head 13: bolt 14: binding groove

15: 지지구 16: 너트 18: 보호캡15: support 16: nut 18: protective cap

20: 일체형압착클립 21: 개별형압착클립20: integral crimp clip 21: individual crimp clip

본 발명은 토목 및 건축공사에서 터파기를 실시할 때에 흙벽이 토압에 의해 흘러내리거나 무너지는 것을 방지하기 위하여 설치되는 흙막이판을 지지하기 위해 사용되는 타이케이블 결속장치에 관한 것이다.The present invention relates to a tie-cable binding device used to support a retaining plate which is installed to prevent the earth wall from flowing down or collapsing by earth pressure when excavating in civil engineering and building construction.

이를 좀더 더 상세히 설명하면, 흙벽 면에 설치되는 흙막이판에서 대향하는 흙막이판의 사이에 설치되는 타이케이블(Tie Cable)에 있어서, 타이케이블을 형성하는 여러 가닥의 PC강연선의 단부를 일체로 하여 압착클립의 내부에 끼우고 압착하여 일체형으로 형성하고, 각 PC강연선의 단부가 일체로 결합된 압착클립을 결속헤드의 결속홈에 깊게 삽입(결합)시킨 상태에서 결속헤드의 선단부 외면을 압착하여 타이케이블결속금구의 내부에 각 PC강연선의 단부와 압착클립을 일체형으로 결속시키며, 흙막이판을 지지하는 H빔의 장착공에는 타이케이블결속금구의 후단에 형성된 볼트부를 지지구와 함께 삽입하여 H빔의 후면으로 돌출되는 볼트부에 너트를 체결하여 장착하며, 너트의 외측에는 보호캡을 결합시켜서 된 타이케이블 결속장치를 제공하려는 것이다.In more detail, in a tie cable installed between the opposing retaining plates in the retaining plate installed on the earth wall surface, the ends of the multiple strands of PC strands forming the tie cable are integrally compressed. Tie cable by squeezing the outer surface of the end of the binding head by inserting it into the clip and pressing it to form a unitary body, and inserting a crimping clip in which the ends of each PC strand are integrally inserted into the binding groove of the binding head. Tie the end of each PC strand and the crimping clip in one piece inside the binding bracket, and insert the bolt part formed at the rear end of the tie-cable binding bracket together with the support to the back of the H beam in the mounting hole of the H-beam supporting the retaining plate. It is necessary to provide a tie cable fastening device by fastening a nut to a protruding bolt part and engaging a protective cap to the outside of the nut. .

토목 및 건축공사에서 흙벽이 토압에 의해 무너지거나 흘러내리는 것을 방지하기 위한 흙막이판을 설치하여 흙막이벽을 형성하게 되는데, 설치되는 흙막이판 (벽)이 토압에 견딜(저항할) 수 없을 때에는 타이케이블, 와이어 로프, 철근 등을 사용하여 흙막이판(벽)을 보강하고 지지하게 된다.In civil engineering and building construction, the earth wall is formed by installing the earth plate to prevent the earth wall from collapsing or flowing down by earth pressure. When the earth plate (wall) is not able to withstand (resist) earth pressure, tie cable Reinforce and support the retaining plate (wall) using wire rope, rebar, etc.

상기와 같이 사용되는 종래의 타이케이블(Tie Cable)로서는, 국내의 공개실용신안 공개번호 제20-1986-1705호, 공개실용신안 공개번호 제20-1987-14932호, 공개실용신안 공개번호 제20-1988-16341호, 실용신안 등록제 20-277686호, 특허공고번호 제10-1990-7120호, 일본국 특허공보 공고번호 소50-14810호가 알려져 있다.As a conventional tie cable used as described above, Korean Utility Model Publication No. 20-1986-1705, Korean Utility Model Publication No. 20-1987-14932, Utility Model Publication No. 20 1988-16341, Utility Model Registration No. 20-277686, Patent Publication No. 10-1990-7120, and Japanese Patent Publication No. So50-14810 are known.

국내의 공개실용신안 공개번호 제20-1986-1705호의 '파일 버팀용 타이케이블'은, 타이케이블의 양단에는 앵커를 각각 삽입하여 일체형으로 형성하되, 각 앵커의 외면에서 전/후반부에는 요입테와 나사부를 형성하여 요입테를 빔에 삽입하여 결속시키고 나사부에는 너트를 체결하여 장착시키도록 된 것이고, 공개실용신안 공개번호 제20-1987-14932호의 '타이 케이블'과 공개실용신안 공개번호 제20-1988-16341호의 '타이케이블의 앵커'는, 타이케이블의 양단에 앵커를 각각 삽입하여 고정하되 앵커에 형성된 나사부에는 와셔와 너트를 체결하여 빔에 장착시키도록 된 것이다.In Korea Utility Model Publication No. 20-1986-1705, 'Tie Cable for Pile Brace' is formed in one piece by inserting anchors at both ends of each tie cable. The thread was formed to bind the inlet frame to the beam, and the nut was attached to the threaded portion. 'Tie cable' of the Korean Utility Model Publication No. 20-1987-14932 and the Korean Utility Model Publication No. 20- 1988-16341 'anchor of tie cable' is to be fixed by inserting the anchors at both ends of the tie cable, respectively, and to be mounted on the beam by fastening the washer and nut to the threaded portion formed on the anchor.

그러나, 상기와 같이 형성된 이들은, 타이케이블의 양단에 결합 된 앵커를 와셔 및 너트에 의해 빔(H빔 또는 벽체)에 고정시키므로 타이케이블과 앵커의 결속력이 약하여 지지력이 떨어지는 문제가 있고, 타이케이블과 앵커가 분리(이탈)되어 결속력이 해제되는 문제가 있다.However, they are formed as described above, because the anchors coupled to both ends of the tie cable are fixed to the beam (H beam or wall) by washers and nuts, there is a problem that the binding force between the tie cable and the anchor is weak, so that the bearing capacity is lowered. There is a problem that the anchoring force is separated (detached) to release the binding force.

또한, 실용신안 등록제 20-277686호의 '제거형 타이케이블'은, 슬라이드파이프의 내부에 내장되는 강연선(타이케이블) 들의 양단에 앵커헤드를 각각 삽입하여 결합시키고, 각 앵커헤드의 후방으로 돌출되는 각 강연선(타이 케이블)의 단부에는 원뿔형상으로 형성된 웨지를 고정시켜 앵커헤드의 내부에 장전시키되, 강연선(타이케이블)의 일측에 장착된 앵커헤드를 별도로 형성된 고정장착헤드의 내부에 삽입 장전하고 고정장착헤드의 후방에 캡을 씌어서 된 것이다.In addition, the 'removable tie cable' of Utility Model Registration No. 20-277686, each anchor head is inserted into both ends of the strands (tie cable) to be built into the slide pipe, and each projecting to the rear of each anchor head At the end of the stranded wire (tie cable), a wedge formed in a conical shape is fixed and loaded inside the anchor head, but the anchor head mounted on one side of the stranded wire (tie cable) is inserted into the separately mounted fixed mounting head and fixedly mounted. The cap was put on the back of the head.

그러나, 이는 강연선(타이케이블) 들의 양단에 장착되는 앵커헤드 및 고정장착헤드를 빔(H빔 또는 벽체)의 외측에 위치시키므로 빔(H빔 또는 벽체)에 장착(고정)시킬 수 없는 문제가 있고, 강연선(타이케이블)의 길이 및 장력을 조절하기 위해서는 빔(H빔 또는 벽체)의 외측에서 강연선(타이케이블)을 당기면서(인위적 또는 기계적으로) 단부에 결합되는 웨지의 위치를 조정하여야 하므로 강연선(타이케이블)의 길이 및 장력을 용이하게 조절할 수 없는 문제가 있다.However, this is a problem that can not be mounted (fixed) on the beam (H beam or wall) because the anchor head and fixed mounting heads mounted on both ends of the strands (tie cables) are located outside the beam (H beam or wall). In order to adjust the length and tension of the stranded wire (tie cable), it is necessary to adjust the position of the wedge that is joined to the end (pull or artificially) while pulling the stranded wire (tie cable) from the outside of the beam (H beam or wall). There is a problem in that the length and tension of the (tie cable) cannot be easily adjusted.

특허공고번호 제10-1990-7120호의 '타이케이블'은, PC강선케이블의 양단에서 피복층을 탈피시키고, 외부로 노출되는 강선의 단부에 결착구(결착컵)을 인발 또는 압출에 의해 끼워 고정하고, 결착구(결착컵)의 외부에는 나사부가 외면에 형성된 슬리브를 결합시키되 슬리브가 피복층의 단부에 중첩되도록 결합하며, 슬리브의 외면에 형성된 나사부에는 와셔와 너트를 체결(나사 결합)하도록 된 것이다.'Tie cable' of Patent Publication No. 10-1990-7120, peels the coating layer at both ends of the PC steel wire cable, and fixes the binding port (binding cup) to the end of the steel wire exposed to the outside by drawing or extruding To the outside of the fastener (coupling cup), the threaded portion is coupled to the sleeve formed on the outer surface, and the sleeve is coupled to overlap the end of the coating layer, and the threaded portion formed on the outer surface of the sleeve is fastened to the washer and nut (screw coupling).

이는, 결착구(결착컵)의 내부에 PC강선케이블의 양단으로 노출되는 강선을 인발 또는 압출에 의해 끼워 고정시킬 때에 피복층의 단부를 중첩시켜 결합시키므로 밀폐력을 향상시켜 외기(습기)의 유입을 차단시켜 강선에 녹이 발생하는 것을 단소 방지할 수 있다.When the steel wires exposed at both ends of the PC steel wire cable are inserted and fixed by drawing or extrusion, the ends of the coating layers are overlapped and bonded to each other so that the sealing force is improved to block the inflow of outside air (humidity). This can prevent the rust from occurring in the steel wires.

그러나, PC강선케이블의 양단으로 노출되는 강선 전체를 결착구(결착컵)의 내부에 삽입하여 인발 또는 압출에 의해 일체형으로 고정시키므로, 결착구(결착컵)를 강력하게 인발 또는 압출시키더라도 그 내부에 삽입되어 압착되는 강선들의 사이에는 공극(공간)이 발생하게 되고, 결착구(결착컵)의 내부에 억류되는 강선 사이에 공극이 발생하게 되면 결속력이 약화되어 진동에 의해 흔들리면서 틈이 발생하게 될 뿐만 아니라 이탈되는 현상도 발생하게 되며, 이와 같이 발생하는 틈으로 침투하는 습기에 의해 강선에 녹이 발생하여 부식되면서 결속력이 떨어지게 되는 문제가 있다.However, since the entire steel wire exposed to both ends of the PC steel wire cable is inserted into the interior of the binding port (binding cup) and fixed integrally by drawing or extruding, even if the binding cup (binding cup) is drawn or extruded strongly, A gap (space) is generated between the steel wires inserted into the compressed wires, and when a gap is generated between the steel wires held inside the binding hole (binding cup), the binding force is weakened and the gap is generated due to vibration. In addition, there is also a phenomenon that the separation occurs, there is a problem that the binding force is reduced as rust is generated in the steel wire by the moisture penetrating into the gap generated in this way to corrode.

일본국 특허공보 공고번호 소50-14810호의 '타이케이블'은, 여러 가닥의 강선으로 된 PC강선케이블의 외주에 폴리에틸렌 등으로 된 합성수지층을 형성하고, PC강선케이블의 양단에서 피복된 합성수지층을 제거하여 여러 가닥의 강선이 노출되도록 하며, 노출된 여러 가닥 강선의 외측에 슬리브(강관)를 끼워 압착 고정하며, 슬리브(강관)의 외주에는 나사부를 형성하여 와셔와 너트를 체결(나사 결합)하도록 된 것이다.`` Tie Cable '' of Japanese Patent Publication No. SO 50-14810 forms a synthetic resin layer made of polyethylene or the like on the outer circumference of a PC steel wire cable composed of several strands of steel wire, and covers the synthetic resin layer coated on both ends of the PC steel wire cable. Remove and expose several strands of steel wire, and press and fix the sleeve (steel pipe) to the outside of the exposed multiple strand steel wire, and form a screw part on the outer circumference of the sleeve (steel pipe) to fasten the washer and the nut (screw coupling) It is.

이는 강선은 강도가 매우 강하므로 여러 가닥의 강선을 슬리브(강관)에 삽입하여 슬리브(강관)을 강력한 압력(힘)으로 압착하여 고정시키더라도 내부의 강선들은 점 접촉에 의해 서로 간에 접속되므로 불안정한 상태로 결착되는 문제가 있고, 슬리브(강관)의 내부에 삽입되어 결착되는 각 강선들은 불안정한 결착상태에 의해 장기간 설치하게 되면 진동 등에 의해 결착상태가 약화 되어 틈이 발생하면서 이탈되는 현상도 발생하게 된다.This is because the steel wire is very strong, so even if multiple strands of wire are inserted into the sleeve (steel pipe) and the sleeve (steel pipe) is pressed and fixed with a strong pressure (force), the internal steel wires are connected to each other by point contact, so it is unstable. There is a problem of binding, and each steel wire is inserted into the sleeve (steel pipe) to be bound by a long time due to the unstable binding state, the binding state is weakened by vibrations, etc., the gap is generated while the gap occurs.

뿐만 아니라 PC강선케이블의 양단으로 노출되는 강선을 압착하고 있는 슬리 브(강관)는 후방이 개방형으로 되어 있고, 슬리브(강관)와 합성수지층과의 사이에는 공간이 발생하므로, 이들 개방부와 틈 사이로 유입되는 습기에 의해 강선에 녹이 발생하여 결속력을 약화시키게 되는 문제가 있다.In addition, the sleeve (steel pipe) that compresses the steel wire exposed to both ends of the PC steel wire cable has an open type at the rear, and a space is generated between the sleeve (steel pipe) and the synthetic resin layer. There is a problem that rust occurs in the steel wire by the incoming moisture, which weakens the binding force.

상기와 같은 문제를 해소하기 위하여 본인은 도 1에 예시된 바와 같은 특허출원 제10-2005-22041호의 타이케이블 결속장치(10)를 제안하였다.In order to solve the above problems, I propose the tie-cable binding device 10 of Patent Application No. 10-2005-22041 as illustrated in FIG.

이는 타이케이블(1)을 와이어강선(3)이 내장된 여러 가닥의 PC강연선(2)으로 형성하고, 각 PC강연선(2)의 각 단부에는 어댑터(20)와 밀폐링(21)을 끼워 결속헤드(12)의 결속홈(14)에 삽입(결합)시킨 상태에서 결속헤드(12)의 외면을 압착하여 타이케이블결속금구(11)에는 각 PC강연선(2)의 단부와 어댑터(20)를 일체형으로 결속시키며, 흙막이판을 지지하는 H빔(7)의 장착공(7-1)에는 타이케이블결속금구(11)의 후단에 형성된 볼트부(13)를 지지구(15)와 함께 삽입하여 H빔(7)의 후면에서 너트(16)를 체결하여 장착하며, 너트(16)의 외측에는 보호캡(18)을 결합시켜 주도록 된 것이다.It forms a tie cable (1) with a plurality of strands of PC strands (2) with a built-in wire steel wire (3), the adapter 20 and the sealing ring (21) is tied to each end of each PC strand (2) The outer surface of the binding head 12 is crimped in the state of being inserted (engaged) into the binding groove 14 of the head 12, and the tie cable binding bracket 11 has an end portion and an adapter 20 of each PC strand wire 2 attached thereto. The bolt hole 13 formed at the rear end of the tie-cable binding bracket 11 is inserted together with the supporter 15 in the mounting hole 7-1 of the H-beam 7, which is integrally bound and supports the retaining plate. The nut 16 is fastened and mounted at the rear of the H beam 7, and the protective cap 18 is coupled to the outside of the nut 16.

그러나, 이는 각 PC강연선(2)의 단부에 어댑터(20)와 밀폐링(21)을 각각 끼워 주어야 하는 다소의 번거로움이 있고, 타이케이블결속금구(11)의 내부에 형성되는 결속홈(14)이 너무 짧게 선단부에만 형성되어 있으므로 어댑터(20)와 밀폐링(21)이 끼워진 각 PC강연선(2)의 단부가 짧게 삽입되어 결속력이 떨어질 염려가 있으며, 각 PC강연선(2)의 단부에 결합된 어댑터(20)를 강력하게 압착시키지 않으면 결속력이 떨어질 염려가 있다.However, this is a little cumbersome to insert the adapter 20 and the sealing ring 21 at the end of each PC strand (2), respectively, the binding groove (14) formed inside the tie cable ties (11). ) Is formed too short at the distal end portion, the end of each of the PC strand (2) in which the adapter 20 and the sealing ring (21) is inserted is inserted short, there is a fear that the binding force is dropped, coupled to the end of each PC strand (2) If the adapter 20 is not strongly compressed, the binding force may be reduced.

본 발명은 상기와 같은 문제를 해소할 수 있도록 개선된 타이케이블 결속장치를 제공하려는 것이다.The present invention is to provide an improved tie-cable binding device to solve the above problems.

본 발명은, 흙벽 면에 설치되는 흙막이판에서 대향하는 흙막이판의 사이에 설치되어 흙막이판을 지지하는 타이케이블(Tie Cable)에 있어서, 타이케이블을 형성하는 여러 가닥의 PC강연선의 단부를 일체로 하여 압착클립의 내부에 끼우고 압착하여 일체형으로 형성하고, 각 PC강연선의 단부가 일체로 결합된 압착클립을 결속헤드의 결속홈에 깊게 삽입(결합)시킨 상태에서 결속헤드의 선단부 외면을 압착하여 타이케이블결속금구의 내부에 각 PC강연선의 단부와 압착클립을 일체형으로 결속시키며, 흙막이판을 지지하는 H빔의 장착공에는 타이케이블결속금구의 후단에 형성된 볼트부를 지지구와 함께 삽입하여 H빔의 후면으로 돌출되는 너트를 체결하여 장착하며, 너트의 외측에는 보호캡을 결합시켜서 된 타이케이블 결속장치를 제공하려는 것이다.The present invention is a tie cable provided between the opposing earth plate in the earth plate installed on the earth wall surface to support the earth plate, wherein the ends of several strands of PC strands forming the tie cable integrally The inside of the crimping clip and crimp to form a unitary body.In the state where the crimping clip combined with the ends of each PC strand is integrally inserted into the binding groove of the binding head, the outer surface of the binding head is crimped. Tie the end of each PC strand and the crimping clip in one piece inside the tie cable ties, and insert the bolt formed at the rear end of the tie cable ties together with the support in the mounting hole of the H-beam supporting the retaining plate. The fastening nut is mounted to the rear, and the outer side of the nut is to provide a tie cable binding device by combining a protective cap.

본 발명의 다른 목적은, 타이케이블의 각 PC강연선을 타이케이블결속금구에 결속시킬 때에 각 PC강연선의 단부를 압착클립의 내부에 일괄하여 삽입시켜 압착하여 줌으로서 PC강연선의 단부를 일체형으로 형성하고, 일체형으로 된 PC강연선의 선단에 결합되어 압착된 압착클립을 타이케이블결속금구의 내부에 깊게 장전시키고 타이케이블결속금구의 선단부 외주를 강력하게 압착하여 줌으로서 공극을 없애 PC강연선을 강력하게 결속시킬 수 있고, 압착클립의 내면과 외면에 돌기를 각각 형성하여 줌으로서 PC강연선을 강력하게 결속시킬 수 있으며, 타이케이블결속금구의 후 단에 형성된 볼트부를 지지구와 함께 삽입하여 H빔의 후면에서 너트를 체결하여 줌으로서 타이케이블결속금구에 결속된 타이케이블의 여러 가닥 강선을 강력하게 설치하고 타이케이블의 각 PC강연선이 이탈되는 것을 방지할 수 있도록 된 타이케이블 결속장치를 제공하려는데 있다.Another object of the present invention is to integrally form the ends of the PC strands by integrally inserting the ends of each PC strands into the inside of the crimping clips and compressing them when the PC strands of the tie cables are fastened to the tie cable ties. Load the crimping clip, which is combined to the tip of the integrated PC strand, deeply into the inside of the tie cable ties, and press the outer periphery of the tip of the tie cable ties so that it tightly binds the PC strands by eliminating voids. It is possible to strongly bind PC strands by forming projections on the inner and outer surfaces of the crimping clip, and insert the bolt formed at the rear end of the tie cable binding bracket together with the support to insert the nut from the back of the H beam. Tightly install the multiple strands of the tie cable tied to the tie cable tie bracket by tightening The aim is to provide a tie-cable ties to prevent each strand of PC cable from breaking out.

본 발명의 또 다른 목적은, PC강연선의 단부에 결합된 캡과 외부에 씌워진 PVC와의 경계선상에서 이들의 외측에 끼워진 압착클립을 압착하고, 압착클립이 장입된 타이케이블결속금구의 선단부 외주를 압착하여 이중으로 결속시켜 줌으로서 압착력을 한층 강화시키고, 외기 및 습기가 PC강연선의 단부와 어댑터로 침투하지 않도록 하여 PC강연선의 단부에 녹이 발생하는 것을 방지하면서 결속상태를 지속적으로 유지시킬 수 있도록 된 타이케이블 결속장치를 제공하려는데 있다.Still another object of the present invention is to compress the crimping clips fitted on the outside of the caps joined to the ends of the PC strand and the PVC covered on the outside, and crimp the outer periphery of the distal end of the tie cable fastening bracket with the crimping clips inserted Tie cable that doubles the binding to strengthen the compressive force and prevents the outside air and moisture from penetrating into the end of the PC strand and the adapter to prevent rust from occurring at the end of the PC strand and to maintain the binding state. It is to provide a binding device.

본 발명의 상기 및 기타 목적은, The above and other objects of the present invention,

여러 가닥의 PC강연선(2)이 PE관(4)의 내부에 매입되어 형성된 타이케이블(1)의 선단을 결속헤드(12)의 내부에 삽입시킨 것에 있어서, In inserting the tip of the tie cable 1 formed by embedding several strands of PC strand 2 into the PE pipe 4 into the binding head 12,

상기 타이케이블(1)을 형성하는 각 PC강연선(2)의 선단을 삽입하여 외면을 압착시키고, 결속헤드(12)의 결속홈(14)에 삽입시킨 일체형압착클립(20)과;An integral crimping clip (20) inserted into the distal end of each of the PC strands (2) forming the tie cable (1) to crimp the outer surface and inserted into the binding groove (14) of the binding head (12);

결속홈(14)을 결속헤드(12)와 볼트부(13)의 내부까지 깊숙이 형성하여 PC강연선(2)의 선단에 압착된 일체형압착클립(20)을 삽입시키고, 결속헤드(12)의 외면을 압착하며, 볼트부(13)에 너트(16)를 체결하여 H빔(7)에 장착 고정시킨 타이케이블결속금구(11)와;The binding groove 14 is deeply formed to the inside of the binding head 12 and the bolt portion 13 to insert the integrated pressing clip 20 pressed into the tip of the PC strand 2, and the outer surface of the binding head 12. A tie cable fastening bracket (11) fastened to the bolt portion (13) by fastening the nut (16) and fixed to the H beam (7);

타이케이블결속금구(11)의 볼트부(13)에서 결속헤드(12)의 후단에 억류되도록 너트(16)의 전방에 끼워지는 지지구(15)와;A supporter 15 fitted to the front of the nut 16 so as to be held in the rear end of the binding head 12 in the bolt portion 13 of the tie cable binding bracket 11;

밀폐링(17)을 개입시켜 너트(16)의 외측에 밀폐되게 결합시킨 보호캡(18);을 포함하여 형성한 것을 특징으로 하는 타이케이블결속장치(10-1)에 의해 달성된다.It is achieved by the tie-cable binding device (10-1), characterized in that it comprises a; protective cap (18) coupled to the outside of the nut 16 to be sealed through the sealing ring (17).

본 발명의 상기 및 기타 목적과 특징은 첨부된 도면에 의거한 다음의 상세한 설명에 의해 더욱 명확하게 이해할 수 있을 것이다.The above and other objects and features of the present invention will be more clearly understood by the following detailed description based on the accompanying drawings.

첨부된 도면 도 2 내지 도 6은 본 발명에 따른 타이케이블결속장치(10-1)의 구체적인 실현 예를 보인 것으로서, 도 2 내지 도 3c는 본 발명의 분해 사시도 및 결속과정을 보인 예시도이고, 도 4 내지 도 5c는 본 발명의 다른 실시 예를 보인 분해 사시도 및 결속과정을 보인 예시도이며, 도 6은 본 발명에서 일체형압착클립과 개별형압착클립의 다른 실시 예를 보인 사시도이다.2 to 6 are views showing a specific implementation of the tie cable binding device 10-1 according to the present invention, Figures 2 to 3c is an exemplary view showing an exploded perspective view and the binding process of the present invention, 4 to 5c is an exemplary view showing an exploded perspective view and a binding process showing another embodiment of the present invention, Figure 6 is a perspective view showing another embodiment of the integral compression clip and the individual compression clip in the present invention.

도 2 내지 도 3c에 예시된 본 발명에 따른 타이케이블결속장치(10-1)는, 타이케이블(1)을 형성하는 PC강선(2)들의 선단이 일체로 삽입되어 압착되는 일체형압착클립(20)과, PC강선(2)들의 선단이 삽입되어 압착된 일체형압착클립(20)이 내부에 깊숙이 삽입(장전)되어 압착 억류되며 H빔(7)에 장착되는 타이케이블결속금구(11)와, H빔(5)의 전면에서 타이케이블결속금구(11)의 볼트부(13)에 결합되는 지지구(15)와, 타이케이블결속금구(11)의 볼트부(13)에 나사 결합 되는 너트(16)의 외측에 결합되는 보호캡(18)으로 형성하였다.In the tie cable binding device 10-1 according to the present invention illustrated in FIGS. 2 to 3 c, an integrated crimping clip 20 in which the ends of the PC steel wires 2 forming the tie cable 1 are integrally inserted and compressed. ), And the tie cable ties (11), which are inserted into the end of the PC steel wires (2) and crimped integrally compressed clip (20) deeply inserted (loaded) inside the crimp detention and mounted on the H beam (7), The nut 15 which is screwed to the support part 15 which is coupled to the bolt part 13 of the tie-cable fastening tool 11 at the front surface of the H beam 5, and the bolt part 13 of the tie-cable fastening tool 11 ( It was formed as a protective cap 18 is coupled to the outside of the 16).

타이케이블(1)을 형성하는 PC강선(2)들의 선단이 일괄 삽입되어 외면이 압착되는 일체형압착클립(20)은; 금속재질을 이용하여 원통형으로 형성하여 PC강선(2)들의 선단을 일체(일괄)로 삽입시킬 수 있도록 하였고, PC강선(2)들의 선단을 삽입시킨 상태에서 외주를 압착하여 일체형으로 형성하도록 하였다.The integrated crimping clip 20 in which the front ends of the PC steel wires 2 forming the tie cable 1 are inserted in a batch is pressed; It was formed in a cylindrical shape using a metal material so that the ends of the PC steel wires (2) can be inserted integrally (collectively), and the outer circumference was crimped in a state where the tips of the PC steel wires (2) were inserted to form a single body.

C강선(2)들의 선단이 삽입되어 압착된 일체형압착클립(20)이 내부 깊숙이 삽입(장전)되어 압착 억류되고 H빔(7)에 장착되는 타이케이블결속금구(11)는; 결속헤드(12)와 볼트부(13)를 일체로 형성하되 이들의 내부에는 결속헤드(12)측으로 개방되는 결속홈(14)을 깊게 형성하였고, 결속헤드(12)의 선단 면에는 단턱돌부(12-1)를 형성하였으며, 볼트부(13)의 외주를 결속헤드(12)의 외주보다 다소 작게 형성하여 결속헤드(12)의 배면 외주에 환상단턱(12-2)이 형성되도록 하였으며, 볼트부(13)에는 너트(16)를 나사 결합하였다.The tie-cable fasteners 11 into which the end of the C steel wires 2 are inserted and pressed are inserted into the integrated clip (20) and inserted into (loading) deeply, pressed and detained, and mounted to the H beam 7; The binding head 12 and the bolt portion 13 are integrally formed, but deeply therein, a binding groove 14 is formed deep in the binding head 12, and a stepped protrusion is formed on the front end surface of the binding head 12. 12-1), and the outer circumference of the bolt portion 13 is formed to be somewhat smaller than the outer circumference of the binding head 12 so that the annular stepped jaw 12-2 is formed on the outer circumference of the back of the binding head 12. The nut 13 was screwed on the part 13.

타이케이블결속금구(11)를 형성하는 볼트부(13)의 외측에 끼워져 결합 되는 지지구(15)는; 볼트부(13)의 외측에 끼워 결합되는 지지관(15-2)의 선단 외주에 지압판(15-1)을 일체로 형성하여, 지지관(15-2)을 H빔(7)에 뚫어진 장착공(7-1)에 삽입시킬 수 있도록 하였고, 지압판(15-1)이 H빔(7)의 전면에 밀착되어 걸리도록 하였다.The support 15 is fitted to the outer side of the bolt portion 13 to form the tie cable ties (11); The pressure bearing plate 15-1 is integrally formed on the outer periphery of the tip of the support tube 15-2, which is fitted to the outside of the bolt portion 13 so that the support tube 15-2 is drilled in the H beam 7. It was to be inserted into the ball (7-1), the pressure plate (15-1) was to be in close contact with the front of the H beam (7).

볼트부(13)에 결합 되는 보호캡(18)은; 일측으로 개방되는 원통형으로 형성하였고, 내주의 선단에는 밀폐링안치환상홈(18-1)을 형성하였으며, 그 밀폐링안치환상홈(18-1)에는 오링과 같은 밀폐링(17)을 결합하여 장전시키도록 하였다.The protective cap 18 is coupled to the bolt portion 13; It was formed in a cylindrical shape to be opened to one side, and the sealing ring inner ring annular groove (18-1) was formed at the tip of the inner circumference, the sealing ring inner ring ring groove (18-1) by combining a sealing ring 17 such as O-ring It was loaded.

도 4 내지 도 5c에 예시된 본 발명에 따른 타이케이블결속장치(10-1)는, 일체형압착클립(20)의 내부에는 별도로 형성된 개별압착클립(21)을 구비하였고, 일체형압착클립(20)의 내부에 삽입되는 PC강선(2)들 중에서 어느 하나의 PC강선(2)의 선단에 개별압착클립(21)을 끼워 압착하였으며, 개별압착클립(21)이 선단에 끼워진 PC강선(2)이 일체형압착클립(20)의 내부 중앙에 위치하도록 한 상태에서 일체형압착클립(20)을 압착하여 일체형으로 형성하였으며, 다른 나머지는 도 2 내지 도 3c에 예시된 것과 동일하게 형성하였다.The tie-cable binding device 10-1 according to the present invention illustrated in FIGS. 4 to 5c has an individual crimping clip 21 formed separately inside the integral crimping clip 20, and the integral crimping clip 20 is provided. Among the PC steel wires (2) inserted into the inside of the PC steel wire (2) by inserting the individual crimping clip (21) by crimping, the individual crimping clip (21) is inserted into the PC steel wire (2) In the state to be located in the inner center of the integral pressing clip 20, the integral pressing clip 20 was formed into a single body, and the rest was formed in the same manner as illustrated in Figures 2 to 3c.

도 6은 본 발명에 따른 타이케이블결속장치(10-1)에 사용되는 일체형압착클립(20)과 개별형압착클립(21)의 다른 실시 예를 보인 것이다.Figure 6 shows another embodiment of the integrated pressing clip 20 and the individual pressing clip 21 used in the tie cable binding device 10-1 according to the present invention.

일체형압착클립(20)과 개별형압착클립(21)을 형성하는 원통관에는 상단 또는 하단으로 개방되는 여러 개의 절개공간부(20-3)(21-3)를 반복적으로 형성하되 인접하는 절개공간부(20-3)(21-3)는 절개위치가 서로 반대방향을 향하도록 하였고, 내주와 외주에는 내측돌기(20-1)(21-1)와 외측돌기(20-2)(21-2)를 반복적으로 형성하였다.In the cylindrical tube forming the integral compression clip 20 and the individual compression clip 21, a plurality of incision space portions 20-3 and 21-3 that are opened at the top or the bottom are repeatedly formed, but adjacent incision spaces are formed. The parts 20-3 and 21-3 have the incision positions facing in opposite directions, and the inner and outer circumferences of the inner protrusions 20-1 and 21-1 and the outer protrusions 20-2 and 21-2. 2) was formed repeatedly.

이하, 사용(설치)상태를 설명한다.The use (installation) state will be described below.

본 발명에 따른 본 발명에 따른 타이케이블결속장치(10-1)는 다음과 같이 실시하여 설치한다.The tie cable binding device 10-1 according to the present invention according to the present invention is installed as follows.

일정한 길이로 재단(절단)된 타이케이블(1)의 양단을 타이케이블결속금구(11)에 장착 고정하여야 한다.Both ends of the tie cable (1) cut (cut) to a fixed length shall be fixed to the tie cable tie bracket (11).

타이케이블(1)에서 PE관(4)의 양단을 절개 전개하여 매설된 PE강연선(2)들이 노출되도록 한다.Both ends of the PE pipe 4 are cut and deployed in the tie cable 1 so that the embedded PE strands 2 are exposed.

도 2에 예시된 바와 같이 일체형압착클립(20)만을 이용하고자 할 경우에는 다음과 같이 실시한다.If you want to use only the integral crimping clip 20 as illustrated in Figure 2 is carried out as follows.

도 3a에 예시된 바와 같이, 노출된 각 PE강연선(3)들의 단부를 일체형압착클립(20)의 내부에 삽입하고 일체형압착클립(20)의 외주를 압착하여 일체형으로 형성하고, PE강연선(2)의 선단이 삽입 압착된 일체형압착클립(20)을 도 3b에 예시된 바와 같이 타이케이블결속금구(11)의 내부에 깊숙이 형성된 결속홈(13)에 삽입하여 장전시키며, 이 상태에서 결속헤드(12)의 외측(외주)을 프레스장치와 같은 압착장치에 의해 결속헤드(12)의 외주를 압착하여 일체형으로 형성한다.As illustrated in FIG. 3A, the exposed ends of each of the PE strands 3 are inserted into the integrated crimping clip 20, and the outer circumference of the integrated crimping clip 20 is crimped to be integrally formed, and the PE strands 2 are formed. Inserted and crimped with the integrated crimping clip 20 inserted and inserted into the binding groove 13 deeply formed inside the tie-cable binding bracket 11, as illustrated in FIG. 3B, and the binding head (in this state). The outer periphery of 12) is formed in one piece by pressing the outer periphery of the binding head 12 by a crimping device such as a press device.

또한 도 4에 예시된 바와 같이 일체형압착클립(20)과 개별압착클립(21)을 이용하고자 할 경우에는 다음과 같이 실시한다.In addition, when using the integrated pressing clip 20 and the individual pressing clip 21 as illustrated in Figure 4 is carried out as follows.

도 5a에 예시된 바와 같이, 노출된 각 PE강연선(3)들 중에서 중앙에 위치하는 PE강연선(3)의 단부에 개별형압착클립(21)을 끼우고 그 개별형압착클립(21)과 나머지 PE강연선(3)들의 단부를 일체형압착클립(20)의 내부에 삽입하되, 개별형압착클립(21)이 중앙에 위치하도록 하고, 일체형압착클립(20)의 외주를 압착하여 일체형으로 형성한다.
PE강연선(2)의 선단이 삽입 압착된 일체형압착클립(20)을 도 4b에 예시된 바와 같이 타이케이블결속금구(11)의 내부에 깊숙이 형성된 결속홈(13)에 삽입하여 장전시키고, 이 상태에서 결속헤드(12)의 외측(외주)을 프레스장치와 같은 압착장치에 의해 결속헤드(12)의 외주를 압착하여 일체형으로 형성한다.
As illustrated in FIG. 5A, the individual crimping clips 21 and the rest of the individual crimping clips 21 are inserted at the ends of the PE strands 3 located in the center among the exposed PE strands 3. The ends of the PE strands (3) are inserted into the integrated compression clip 20, so that the individual compression clip 21 is located in the center, and the outer circumference of the integrated compression clip 20 is formed in an integral form.
An integrated crimping clip 20 in which the tip of the PE strand 2 is inserted and pressed is inserted into the binding groove 13 deeply formed inside the tie cable binding bracket 11, as shown in FIG. 4B, and loaded. The outer periphery (outer periphery) of the binding head 12 is press-bonded by a pressing device such as a press device to form an integral body.

즉, PE강연선(2)의 선단이 삽입된 일체형압착클립(20)의 외측(외주)을 압착장치에 의해 압착시키면, 일체형압착클립(10) 및 개별형압착클립(21)에 의해 일차 압착된 PE강연선(2)과 일체형압착클립(10)은 압착되는 타이케이블결속금구(11)의 결속헤드(12)에 의해 재차 압착되어 결속홈(13)에 공극(공간)이 발생하지 않도록 밀접한 상태를 유지하게 되고, 압착 고정된 일체형압착클립(20)과 결속홈(13)의 내부에는 외기 및 습기가 침투하지 못하게 되므로 매입된 와이어강선(2)이 부식되는 것을 방지할 수 있게 된다.That is, when the outer side (outer periphery) of the integrated pressing clip 20, the tip of the PE strand 2 is inserted by a pressing device, the primary pressing by the integrated pressing clip 10 and the individual pressing clip 21 The PE strand 2 and the integral crimping clip 10 are crimped again by the binding head 12 of the tie-cable fastening tool 11 to be crimped so that the PE stranded wire 2 and the integral crimping clip 10 are in close contact with each other so that no gap (space) occurs in the binding groove 13. It will be maintained, and the inside of the fixed pressing clip 20 and the binding groove 13 is fixed, so that the outside air and moisture does not penetrate, it is possible to prevent the embedded wire steel wire 2 to corrode.

특히, 도 6에 예시된 바와 같이, 여러 개의 절개공간부(20-3)(21-3)가 서로 반대방향으로 형성되고, 내주와 외주에 내측돌기(20-1)(21-1)와 외측돌기(20-2)(21-2)가 반복적으로 형성된 일체형압착클립(20)과 개별형압착클립(21)을 사용하여 타이케이블(1)을 압착 결속시키게 되면, 절개공간부(20-3)(21-3)에 의해 외관의 지름이 좁아지면서 압착되므로 와이어강선(2)들을 더욱 강력하게 압착시킬 수 있게 된다.In particular, as illustrated in FIG. 6, a plurality of incision spaces 20-3 and 21-3 are formed in opposite directions, and inner protrusions 20-1 and 21-1 are formed on the inner and outer circumferences. When the tie cable 1 is press-bonded by using the integral pressing clip 20 and the individual pressing clip 21 in which the outer protrusions 20-2 and 21-2 are repeatedly formed, the incision space portion 20- 3) (21-3) it is possible to compress the wire steel wires (2) more strongly because the narrow diameter of the appearance is compressed.

특히, 일체형압착클립(20)을 압착시키면, 외주에 형성된 외측돌기(21-2)들은 결속헤드(12)의 결속홈(13)의 내주에 매입되면서 견실하게 고정되고, 내주에 형성된 내측돌기(20-1)들은 그 내부에 매입된 PE강연선(2)의 외면에 부분적으로 박히면서 PE강연선(2)들을 견실하게 억류시키게 된다.
또 개별형압착클립(21)이 압착되면, 내주에 형성된 내측돌기(21-1)가 그 내부에 삽입된 PE강연선(2)에 박히면서 억류시키게 되고, 외주에 형성된 외측돌기(21-3)들에는 그 외측에 위치하는 PE강연선(2)들의 외면이 부분적으로 박히면서 억류된다.
Particularly, when the integrated pressing clip 20 is compressed, the outer protrusions 21-2 formed on the outer circumference are firmly fixed while being embedded in the inner circumference of the binding groove 13 of the binding head 12, and the inner protrusions formed on the inner circumference ( 20-1) are partly embedded in the outer surface of the PE strands (2) embedded therein to reliably detain the PE strands (2).
When the individual type pressing clip 21 is compressed, the inner protrusion 21-1 formed in the inner circumference is lodged in the PE strand 2 inserted therein, and detained, and the outer protrusion 21-3 is formed in the outer circumference. In the field, the outer surface of the PE strands (2) located on the outside is partially stuck while being detained.

따라서 여러 개의 절개공간부(20-3)(21-3)가 서로 반대방향으로 형성되고, 내주와 외주에 형성된 내측돌기(20-1)(21-1)와 외측돌기(20-2)(21-2)가 서로 반대방향을 향하도록 형성된 일체형압착클립(20)과 개별형압착클립(21)을 사용하여 타이케이블(1)을 결속시키게 되면 PE강연선(2)들을 더욱 강력하게 결속시킬 수 있게 된다.Therefore, a plurality of incision spaces (20-3) (21-3) are formed in opposite directions to each other, the inner protrusions 20-1 (21-1) and the outer protrusions (20-2) formed on the inner and outer circumference ( When the tie cable (1) is bound by using the integrated pressing clip (20) and the individual pressing clip (21) formed so that 21-2) face each other in the opposite direction, PE strands (2) can be more strongly bound. Will be.

타이케이블결속금구(11)의 볼트부(13)에 지지구(15)를 결합시키되, 지압판(15-1)이 결속헤드(12)를 향하도록 삽입하여 결합시키고, 지지구(15)가 결합된 볼트부(13)를 H빔(7)에 뚫어진 장착공(7-1)에 삽입하여 지지구(15)의 지지관(15-2)이 H빔(7)의 장착공(7-1)에 삽입되도록 하며, H빔(7)의 후면(외측)으로 노출(돌출)되는 볼트부(13)에 너트(16)를 나사 결합하여 타이케이블결속금구(11)를 H빔(7)에 고정시킨다.The support 15 is coupled to the bolt portion 13 of the tie cable binding bracket 11, and the pressure plate 15-1 is inserted to face the binding head 12, and the support 15 is coupled. The bolts 13 are inserted into the mounting holes 7-1 drilled through the H beams 7 so that the support pipes 15-2 of the supporters 15 are fitted to the H beams 7-1. And the nut 16 is screwed into the bolt portion 13 that is exposed (projected) to the rear side (outside) of the H beam 7 so that the tie-cable ties 11 are connected to the H beam 7. Fix it.

볼트부(13)에 너트(16)를 나사 결합하여 타이케이블결속금구(11)를 H빔(7)에 고정시킨 상태에서 볼트부(13)와 너트(16)의 외측에는 보호캡(18)을 결합시켜 주는데, 보호캡(18)의 내주면 선단에 형성된 밀폐링안치환상홈(18-1)에 오링과 같은 밀폐링(17)을 장전한 상태에서 결합시켜 줌으로서, 밀폐링(17)이 너트(16)의 외면에 밀접하게 접속되어 밀폐상태를 유지하게 된다.The nut 16 is screwed to the bolt portion 13 to fix the tie cable binding bracket 11 to the H beam 7, and the protective cap 18 is disposed on the outside of the bolt portion 13 and the nut 16. The coupling ring, by coupling the sealing ring 17 such as an O-ring to the sealing ring rest annular groove (18-1) formed at the tip of the inner circumferential surface of the protective cap 18, the sealing ring (17) is It is closely connected to the outer surface of the nut 16 to maintain a sealed state.

상기와 같이 볼트부(13)에 너트(16)를 나사 결합하여 타이케이블결속금구(11)를 H빔(7)에 고정시키고 볼트부(13)의 외측에 보호캡(18)을 결합시켜 줌으로서, 도 3c에 예시된 바와 같이 대향하는 H빔(7)의 사이에 타이케이블(1)의 설치를 완료하게 된다.As described above, the nut 16 is screwed to the bolt part 13 to fix the tie cable binding bracket 11 to the H beam 7, and the protection cap 18 is coupled to the outside of the bolt part 13. As shown in FIG. 3C, the installation of the tie cable 1 is completed between the opposing H beams 7.

결속헤드(12)의 결속홈(14)에 삽입 장전된 일체형압착클립(20)와 밀폐링(21) 및 와이어강선(2)은 결속헤드(12)의 외주를 압착하여 결속홈(13)에 공극(공간)이 발생하지 않도록 밀접한 상태로 압착되므로, 결속홈(13)에는 외기 및 습기가 침투하지 못하여 매입된 어댑터(20)와 와이어강선(2)의 부식을 방지할 수 있게 된다.The integral compression clip 20, the sealing ring 21, and the wire steel wire 2 inserted and loaded into the binding groove 14 of the binding head 12 compress the outer circumference of the binding head 12 to the binding groove 13. Since it is compressed in a close state so that voids (spaces) do not occur, it is possible to prevent corrosion of the adapter 20 and the wire steel wire 2 that are buried because the external air and moisture do not penetrate the binding groove 13.

또한, 볼트부(13)와 너트(16)의 외측에 결합되는 보호캡(18)은 밀폐링안치환상홈(17-1)에 장전된 밀폐링(16)이 보호캡(18)의 내주 면과 너트(16)의 외면에 밀접하게 접속되어 밀폐상태를 유지하게 되므로, 외기 및 습기가 보호캡(18)의 내부로 유입되는 것을 차단하여 볼트부(13)와 너트(16)에 녹이 발생하는 것을 방지할 수 있게 된다.In addition, the protective cap 18 coupled to the outside of the bolt portion 13 and the nut 16 is a sealing ring 16 loaded in the sealing ring annular annular groove 17-1 is the inner peripheral surface of the protective cap 18 Since it is closely connected to the outer surface of the nut and the nut 16 to maintain a closed state, rust is generated in the bolt portion 13 and the nut 16 by blocking outside air and moisture from entering the inside of the protective cap 18. Can be prevented.

상기와 같이 본 고안에 따른 타이케이블결속장치(10)를 이용하여 대향하는 H빔(7)의 사이에 장착하여 타이케이블(1)을 설치한 상태에서 타이케이블(1)을 회수(철수)하고자 할 때에는, H빔(7)의 외측에서 보호캡(17)을 제거하고, 볼트부(13)에 나사 결합된 너트(16)를 제거하여 줌으로서, 타이케이블결속장치(10)와 H빔(7)의 결속상태를 해제시킬 수 있다.To recover (withdraw) the tie cable (1) while the tie cable (1) is installed by mounting between the opposing H beam (7) using the tie cable binding device 10 according to the present invention as described above In this case, by removing the protective cap 17 from the outside of the H beam 7 and removing the nut 16 screwed to the bolt portion 13, the tie cable binding device 10 and the H beam ( The binding state of 7) can be released.

보호캡(18)과 너트(16)를 제거한 상태에서 지지구(15)의 지지관(15-2)에 삽입된 볼트부(13)를 인출하여 제거하고, 이어서 지지구(15)를 H빔(7)의 장착공(7-1)에서 제거하여 줌으로서, 타이케이블결속장치(10-1)를 이용하여 H빔(7)에서 완전히 분리시킬 수 있게 된다.With the protective cap 18 and the nut 16 removed, the bolt portion 13 inserted into the support tube 15-2 of the support 15 is taken out and removed, and then the support 15 is H-beamed. By removing from the mounting hole 7-1 of (7), the tie-cable binding device 10-1 can be used to completely separate from the H beam 7.

이와 같이 본 발명에 따른 타이케이블결속장치(10-1)는 타이케이블결속금구(11)의 볼트부(13)를 H빔(7)에 장착시키거나 장착상태를 해제시켜 분리하여 줌으 로서 타이케이블(1)을 설치하거나 설치상태에서 철수하는 것을 용이하게 실시할 수 있는 것이다.As described above, the tie cable binding device 10-1 according to the present invention attaches the bolt portion 13 of the tie cable binding bracket 11 to the H beam 7 or releases the tie state to separate the tie cable. (1) Installation or withdrawal from installation can be easily carried out.

상기에서 본 발명의 특정한 실시 예에 대하여만 설명 및 도시되었지만, 보 발명의 기술사상범위 내에서 다양한 변형 및 수정할 수 있음은 당업자에 있어 명백한 것이며, 이러한 변형 및 수정이 첨부된 특허청구범위에 속함은 당연한 것이다.Although described and illustrated only with respect to specific embodiments of the invention above, it will be apparent to those skilled in the art that various modifications and variations can be made within the technical spirit of the invention, and such modifications and modifications belong to the appended claims. It is natural.

본 발명에 따른 타이케이블 결속장치는, 흙벽 면에 설치되는 흙막이판에서 대향하는 흙막이판의 사이에 설치되는 타이케이블(Tie Cable)에 있어서, 타이케이블을 형성하는 여러 가닥의 PC강연선의 단부를 일체로 하여 압착클립의 내부에 끼우고 압착하여 일체형으로 형성하고, 각 PC강연선의 단부가 일체로 결합된 압착클립을 결속헤드의 결속홈에 깊게 삽입(결합)시킨 상태에서 결속헤드의 선단부 외면을 압착하여 타이케이블결속금구의 내부에 각 PC강연선의 단부와압착클립을 일체형으로 결속시키며, 흙막이판을 지지하는 H빔의 장착공에는 타이케이블결속금구의 후단에 형성된 볼트부를 지지구와 함께 삽입하여 H빔의 후면으로 돌출되는 너트를 체결하여 장착하며, 너트의 외측에는 보호캡을 결합시켜 주도록 된 것으로서, 타이케이블의 각 PC강연선을 타이케이블결속금구에 결속시킬 때에 각 PC강연선의 단부를 압착클립의 내부에 일괄하여 삽입시켜 압착하여 줌으로서 PC강연선의 단부를 일체형으로 형성하고, 일체형으로 된 PC강연선의 선단에 결합되어 압착된 압착클립을 타이케이블결속금구의 내부에 깊게 장전시키고 타이케이블결속금구의 선단부 외주를 강력하게 압착하여 줌으로서 공극을 없애 PC강연선을 강력하게 결속시킬 수 있으며, 압착클립의 내면과 외면에 돌기를 각각 형성하여 줌으로서 PC강연선을 강력하게 결속시킬 수 있으며, 타이케이블결속금구의 후단에 형성된 볼트부를 지지구와 함께 삽입하여 H빔의 후면에서 너트를 체결하여 줌으로서 타이케이블결속금구에 결속된 타이케이블의 여러 가닥 강선을 강력하게 설치하고 타이케이블의 각 PC강연선이 이탈되는 것을 방지할 수 있는 것이다.The tie cable binding device according to the present invention is a tie cable provided between the opposing earth plate in the earth plate installed on the earth wall surface, the end of several strands of PC strands forming the tie cable integrally The inner end of the binding head is crimped by inserting it into the inside of the pressing clip, pressing it to form a single piece, and inserting the pressing clip in which the ends of each PC strand are integrally inserted into the binding groove of the binding head. Tie the end of each PC strand and the crimping clip together in one piece inside the tie cable ties, and insert the bolt formed at the rear end of the tie cable ties together with the support in the mounting hole of the H-beam supporting the retaining plate. Tighten the nut protruding from the rear side of the nut and attach the protective cap to the outside of the nut. When binding to the tie cable ties, the ends of each PC strand are inserted into the crimp clip collectively and compressed to form the ends of the PC strands in one piece.The ends of the PC strands are integrally formed and joined to the ends of the integral PC strands. The clip is loaded deep into the inside of the tie cable ties, and the outer circumference of the tie cable ties is pressed strongly so that the PC strands can be strongly bound by eliminating voids and forming projections on the inner and outer surfaces of the crimp clip, respectively. It is possible to bind PC strands strongly by zooming, and by inserting the bolt part formed at the rear end of the tie cable binding bracket together with the support and tightening the nut at the back of the H beam, it is possible to connect the various types of tie cables that are tied to the tie cable binding bracket. Strong installation of stranded wires and prevents each PC stranded wire in a tie cable from falling off. Will.

또 본 발명은, PC강연선의 단부에 결합된 캡과 외부에 씌워진 PVC와의 경계선상에서 이들의 외측에 끼워진 압착클립을 압착하고, 압착클립이 장입된 타이케이블결속금구의 선단부 외주를 압착하여 이중으로 결속시켜 줌으로서 압착력을 한층 강화시키고, 외기 및 습기가 PC강연선의 단부와 어댑터로 침투하지 못하도록 하여 PC강연선의 단부에 녹이 발생하는 것을 방지하면서 결속상태를 지속적으로 유지시킬 수 있는 것이다.In addition, the present invention, crimping the crimping clip fitted to the outside of the cap coupled to the end of the PC strand and the PVC covered on the outside, and crimping the outer peripheral portion of the end of the tie-cable ties that the crimping clip is inserted into a double binding By further strengthening the compressive force and preventing the outside air and moisture from penetrating into the end of the PC strand and the adapter to prevent rust from occurring at the end of the PC strand can maintain the binding state.

Claims (4)

여러 가닥의 PC강연선(2)이 PE관(4)의 내부에 매입되어 형성된 타이케이블(1)의 선단을 결속헤드(12)의 내부에 삽입시킨 것에 있어서, In inserting the tip of the tie cable 1 formed by embedding several strands of PC strand 2 into the PE pipe 4 into the binding head 12, 상기 타이케이블(1)을 형성하는 각 PC강연선(2)의 선단을 삽입하여 외면을 압착시키고, 결속헤드(12)의 결속홈(14)에 삽입시킨 일체형압착클립(20)과;An integral crimping clip (20) inserted into the distal end of each of the PC strands (2) forming the tie cable (1) to crimp the outer surface and inserted into the binding groove (14) of the binding head (12); 결속홈(14)을 결속헤드(12)와 볼트부(13)의 내부까지 깊숙이 형성하여 PC강연선(2)의 선단에 압착된 일체형압착클립(20)을 삽입시키고, 결속헤드(12)의 외면을 압착하며, 볼트부(13)에 너트(16)를 체결하여 H빔(7)에 장착 고정시킨 타이케이블결속금구(11)와;The binding groove 14 is deeply formed to the inside of the binding head 12 and the bolt portion 13 to insert the integrated pressing clip 20 pressed into the tip of the PC strand 2, and the outer surface of the binding head 12. A tie cable fastening bracket (11) fastened to the bolt portion (13) by fastening the nut (16) and fixed to the H beam (7); 타이케이블결속금구(11)의 볼트부(13)에서 결속헤드(12)의 후단에 억류되도록 너트(16)의 전방에 끼워지는 지지구(15)와;A supporter 15 fitted to the front of the nut 16 so as to be held in the rear end of the binding head 12 in the bolt portion 13 of the tie cable binding bracket 11; 밀폐링(17)을 개입시켜 너트(16)의 외측에 밀폐되게 결합시킨 보호캡(18); 을 포함하여 형성한 것을 특징으로 하는 타이케이블 결속장치.A protective cap 18 which is hermetically coupled to the outside of the nut 16 through the sealing ring 17; Tie cable binding device characterized in that it comprises a. 청구항 1에 있어서, 일체형압착클립(20)의 내부에는 개별형압착클립(21)을 더 구비하여 PC강연선(2) 중에서 어느 하나의 선단을 개별형압착클립(21)에 삽입시킨 것; 을 특징으로 하는 타이케이블 결속장치.The method according to claim 1, wherein the inside of the integrated pressing clip 20 is further provided with a separate pressing clip 21 to insert any one end of the PC strand (2) into the individual pressing clip (21); Tie cable ties device characterized in that. 청구항 2에 있어서, PC강연선(2)의 선단이 삽입된 개별형압착클립(21)은, 일체형압착클립(20)의 내부 중앙에 위치시키고 그 주위에 나머지 PC강연선(2)을 배치시킨것; 을 특징으로 하는 타이케이블 결속장치.        The method according to claim 2, wherein the individual crimping clip (21) inserted into the front end of the PC strand (2) is located in the inner center of the integral crimping clip (20) arranged around the remaining PC strand (2); Tie cable ties device characterized in that. 청구항 1 또는 청구항 2에 있어서, 결속헤드(12)의 결속홈(14)에 삽입 장전되는 일체형압착클립(20)과 개별형압착클립(21)은;The method of claim 1 or 2, wherein the integrated pressing clip 20 and the individual pressing clip 21 is inserted into the binding groove 14 of the binding head 12; 일체형압착클립(20)과 개별형압착클립(21)을 형성하는 각 원통에 상단 또는 하단으로 개방되는 여러 개의 절개공간부(20-3)(21-3)를 반복적으로 형성하되 인접하는 절개공간부(20-3)(21-3)는 절개위치가 서로 반대방향을 향하도록 한 것과;Repeatedly forming a plurality of incision space portions 20-3 and 21-3 that are opened at the top or bottom of each cylinder forming the integral compression clip 20 and the individual compression clip 21, but are adjacent to each other. The parts 20-3 and 21-3 are arranged so that the incision positions face in opposite directions to each other; 각 원통의 내주와 외주에는 내측돌기(20-1)(21-1)와 외측돌기(20-2)(21-2)를 반복적으로 형성한 것; 을 특징으로 하는 타이케이블 결속장치.An inner protrusion 20-1, 21-1 and an outer protrusion 20-2, 21-2 formed on the inner and outer circumferences of each cylinder repeatedly; Tie cable ties device characterized in that.
KR1020060078751A 2006-08-21 2006-08-21 A Tie Cable Binding Device KR100699334B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020060078751A KR100699334B1 (en) 2006-08-21 2006-08-21 A Tie Cable Binding Device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020060078751A KR100699334B1 (en) 2006-08-21 2006-08-21 A Tie Cable Binding Device

Publications (1)

Publication Number Publication Date
KR100699334B1 true KR100699334B1 (en) 2007-03-23

Family

ID=41564438

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020060078751A KR100699334B1 (en) 2006-08-21 2006-08-21 A Tie Cable Binding Device

Country Status (1)

Country Link
KR (1) KR100699334B1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100949160B1 (en) 2008-03-21 2010-03-25 심석래 A Tie Cable Binder For Tie Cable Binding Device
KR200448943Y1 (en) 2008-02-04 2010-06-09 김창근 Clip-type press bushing for capping end part of steel wire
KR101303393B1 (en) * 2012-12-04 2013-09-05 주식회사 디에스글로벌이엔씨 Tie cable fixing apparatus
KR101420763B1 (en) 2012-12-17 2014-07-18 (주)가온 Earth anchor and ground reinforcing structure using it
KR101566252B1 (en) 2014-03-06 2015-11-05 심석래 tie cable connecting apparatus
KR200490984Y1 (en) 2018-11-28 2020-02-03 이동석 Assembly type bath prop

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR19990045101A (en) * 1998-11-07 1999-06-25 허인구 Removable Civil Anchor
KR20000007547U (en) * 1998-10-01 2000-05-06 최영근 Compression Removal Anchors
JP2002146783A (en) 2000-11-08 2002-05-22 Kowa Sangyo Kk Screw type anchorage device for anchor mountable at arbitrary location, and method and structure for anchoring the anchor
KR20040006552A (en) * 2002-07-12 2004-01-24 (주) 코리아에스이 Compressive Bearing Type Ground Anchor
KR100527389B1 (en) 2003-03-20 2005-11-09 심석래 Rock Anchor

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000007547U (en) * 1998-10-01 2000-05-06 최영근 Compression Removal Anchors
KR19990045101A (en) * 1998-11-07 1999-06-25 허인구 Removable Civil Anchor
JP2002146783A (en) 2000-11-08 2002-05-22 Kowa Sangyo Kk Screw type anchorage device for anchor mountable at arbitrary location, and method and structure for anchoring the anchor
KR20040006552A (en) * 2002-07-12 2004-01-24 (주) 코리아에스이 Compressive Bearing Type Ground Anchor
KR100527389B1 (en) 2003-03-20 2005-11-09 심석래 Rock Anchor

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200448943Y1 (en) 2008-02-04 2010-06-09 김창근 Clip-type press bushing for capping end part of steel wire
KR100949160B1 (en) 2008-03-21 2010-03-25 심석래 A Tie Cable Binder For Tie Cable Binding Device
KR101303393B1 (en) * 2012-12-04 2013-09-05 주식회사 디에스글로벌이엔씨 Tie cable fixing apparatus
KR101420763B1 (en) 2012-12-17 2014-07-18 (주)가온 Earth anchor and ground reinforcing structure using it
KR101566252B1 (en) 2014-03-06 2015-11-05 심석래 tie cable connecting apparatus
KR200490984Y1 (en) 2018-11-28 2020-02-03 이동석 Assembly type bath prop

Similar Documents

Publication Publication Date Title
KR100699334B1 (en) A Tie Cable Binding Device
MXPA01010484A (en) Post-tension anchor seal cap.
KR100876902B1 (en) Sealing structure for anchor with removable tensioning steel wires
KR101713525B1 (en) Chiropractors permanent anchor friction
KR100741405B1 (en) A tie cable
JP4257216B2 (en) Device for fixing corrosion prevention tension members, especially inclined ropes for inclined rope bridges, to buildings
JPH0240813B2 (en)
CN212376149U (en) Connector for connecting unbonded prestressed steel strands in post-cast strip
KR100712476B1 (en) A rock anchor for multistage grouting
KR100586078B1 (en) Internal fixture of tension wire removal type ground anchorage
KR101861142B1 (en) Pullout Behavior Analysis for Frictional Combined Ground Anchor
KR20160066766A (en) Frictional combined ground anchor
KR200400693Y1 (en) Inner inserted staying tool for ground anchor
KR101805170B1 (en) Combination type anchor assembly having friction tensile type and wedge pressure type anchorage, and constructing method thereof
KR100823603B1 (en) Casket anchor
KR20120052059A (en) Establishment method using embedded reinforcement strand and fixing apparatus with flange
KR100949160B1 (en) A Tie Cable Binder For Tie Cable Binding Device
KR200240313Y1 (en) Removable anchor with wedge for removable anchor
EP3128095B1 (en) Post tensioned tendon and method of coupling
KR20090039260A (en) The removable soil nailing structuer of using prestress
KR200392215Y1 (en) Steel wire prestress head
KR20020014647A (en) apparatus and method for removal anchor using double anchor head
KR200282686Y1 (en) Wedge for inner anchoring device capable of removing tension member of ground anchor
JP3827609B2 (en) PC steel wire fixing tool grout cover
KR101032149B1 (en) Apparatus removing a strand of the earth anchor and method removing the strand

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20100317

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20130320

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20160317

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20190320

Year of fee payment: 13