KR100696022B1 - Build apparatus and construction for ship at the same time using launching barge and launching transfer structure - Google Patents

Build apparatus and construction for ship at the same time using launching barge and launching transfer structure Download PDF

Info

Publication number
KR100696022B1
KR100696022B1 KR1020050067911A KR20050067911A KR100696022B1 KR 100696022 B1 KR100696022 B1 KR 100696022B1 KR 1020050067911 A KR1020050067911 A KR 1020050067911A KR 20050067911 A KR20050067911 A KR 20050067911A KR 100696022 B1 KR100696022 B1 KR 100696022B1
Authority
KR
South Korea
Prior art keywords
launching
deck
support
stern
bow
Prior art date
Application number
KR1020050067911A
Other languages
Korean (ko)
Other versions
KR20070013529A (en
Inventor
정이용
김인태
정진식
이철우
이상진
Original Assignee
대우조선해양 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 대우조선해양 주식회사 filed Critical 대우조선해양 주식회사
Priority to KR1020050067911A priority Critical patent/KR100696022B1/en
Publication of KR20070013529A publication Critical patent/KR20070013529A/en
Application granted granted Critical
Publication of KR100696022B1 publication Critical patent/KR100696022B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63CLAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
    • B63C5/00Equipment usable both on slipways and in dry docks
    • B63C5/02Stagings; Scaffolding; Shores or struts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63CLAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
    • B63C3/00Launching or hauling-out by landborne slipways; Slipways
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63CLAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
    • B63C5/00Equipment usable both on slipways and in dry docks
    • B63C5/02Stagings; Scaffolding; Shores or struts
    • B63C2005/022Shores or struts, e.g. individual oblique support elements for stabilizing hulls in dry-docks

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Load-Engaging Elements For Cranes (AREA)
  • Drying Of Solid Materials (AREA)

Abstract

본 발명은 해상의 진수바지와 육상의 진수이송구조를 이용한 선박 건조장치 및 공법에 관한 것이다.The present invention relates to a ship construction apparatus and construction method using the launching pants of the sea and the launching structure of the land.

본 발명은 육상과 인접한 해상 안벽에 계류된 진수바지데크(10) 상면에 설치되어 선박의 선미부(B) 저면 양측의 내,외측을 지지하기 위해 진수바지데크(10) 상면에 목재반목이 안착 설치되는 받침치구(60)와, 상기 받침치구(60)의 안쪽에 설치되어 진수바지데크(10)의 길이방향으로 평행한 상태로 설치되며 진수바지데크(10) 상면에 선미부(B)의 지지를 위한 목재반목이 안착 설치되는 상협하광 형태의 그릴리지빔(50)과, 상기 그릴리지빔(50)의 안쪽에 설치되며 선미부(B)의 저면 중앙부를 지지하기 위해 상면에 목재반목이 안착 설치되는 고정반목과, 선수부(A)를 선미부(B) 건조와 함께 동시에 건조하기 위해 상기 진수바지데크(10)의 일측이 안벽에 밀착된 육상에서 진수바지데크(10)의 그릴리지빔(50) 연장선상에 설치되어 건조된 선수부(A)를 진수바지데크(10)쪽으로 안내 이동시켜 주기 위해 선수부(A)의 저면에 밀착 설치되는 진수이송부(20)와, 상기 진수이송부(20) 내,외측에 설치되어 제작기간 중 선수부(A) 지지후 이를 진수바지데크(10)쪽으로 이동을 시작함과 동시에 선수부(A)의 저면에서 자동분리 가능하게 설치되는 슬라이딩반목(30)과, 상기 슬라이딩반목(30)의 양측에 설치되어 선미부(B)의 내,외측을 지지하기 위해 진수바지데크(10) 상면에 목재반목이 안착 설치되는 받침치구(60)와, 진수이송부(20)의 후단에 설치되어 선수부(A) 건조후 이를 진수바지데크(10)쪽으로 이동시키기 위해 선수부(A)의 후방에 밀착되는 헤드블록(41) 및 상기 헤드블록(41)의 후방에 설치되는 그립퍼어셈블리(42), 구동유닛(43), 트랜스포머(44) 등을 포함하는 일련의 그리퍼잭장치(40)로 구성되는 해상의 진수바지와 육상의 진수이송구조를 이용한 선박 건조장치에 있어서,The present invention is installed on the upper surface of the launching deck deck (10) moored to the sea quay adjacent to the land and wood veneer is seated on the upper surface of the launching deck deck (10) to support the inside and outside of both sides of the bottom of the stern portion (B) of the ship The supporting jig 60 to be installed, and the inside of the supporting jig 60 is installed in a parallel state in the longitudinal direction of the launch bar deck 10 and the stern portion (B) on the upper surface of the launch bar deck (10) Wood-ribbed beams of the upper side down light type is installed on the wooden beams for support, and installed on the inside of the grille beam 50, the wood boards on the upper surface to support the bottom center of the stern (B) The fixed beam that is seated and installed, and the side of the stern (B) to dry at the same time to dry at the same time one side of the launch bark deck 10 in close contact with the inner wall of the draw barge deck 10 of the grillage beam (50) The bow part (A) installed on the extension line and dried Hex transfer part 20 is installed in close contact with the bottom of the bow portion (A) in order to guide the movement to, and installed on the inside, the outside of the launcher transport portion 20 is supported by the bow portion (A) during the production period and launching pants deck (10) At the same time, it starts to move toward the side and at the bottom of the bow (A) is installed on the sliding banche 30 and the sliding banche 30, which is installed on both sides of the stern (B) to support the inside and outside In order to move to the launching deck deck (10) after the bow (A) is installed in the rear end of the support jig 60 and the launching unit 20 is installed on the upper surface of the launching deck deck (10) A series of gripper jacks including a head block 41 in close contact with the rear of the bow portion A and a gripper assembly 42, a drive unit 43, a transformer 44, and the like installed at the rear of the head block 41. The launching pants of the sea composed of the device 40 and the launching structure of the land Yonghan in shipbuilding device,

상기 진수이송부(20)는 진수바지데크(10)의 그릴리지빔(50)과 육상에서 일직선 상으로 연결 가능하게 스키드웨이(21)를 설치하고 상기 스키드웨이(21)의 상면에 테프론패드(22)를 등간격으로 설치하며 상기 테프론패드(22)의 상면에 팀버(23)를 설치하여 상면에 러버시트(25)가 부착된 사다리꼴 형태의 런치러너(24)를 상기 팀버(23)의 상면에 안착 설치하여 조립 구성하고 상기 슬라이딩반목(30)은 상면에 경사면을 갖는 하부서포트(32)를 지지프레임(31)의 상부에 안착 설치하고 하부서포트(32)가 설치된 지지프레임(31)의 일측에 받침대(34)를 고정하며 상기 하부서포트(32)의 일측과 받침대(34) 사이를 연결대(33)로 상호 연결하여 하부서포트(32)의 상면에 이와 대응되는 경사면을 갖는 상부서포트(35) 및 상부서포트(35)의 상면에 목재반목을 순차 설치하되, 상부서포트(35)의 일측 및 하부서포트(32)의 상면에 연결후 절단되는 고정플레이트(36)를 설치하여 조립하는 것이 특징이다.The launching unit 20 is installed on the skidway 21 so as to be connected in a straight line with the grille beam 50 of the launching deck 10, the teflon pad 22 on the upper surface of the skidway 21 ) Is installed at equal intervals and the timber 23 is installed on the upper surface of the Teflon pad 22 so that the rubber runner 25 is attached to the upper surface of the timber 23. The seating installation is assembled and configured, and the sliding board 30 is installed on the upper side of the support frame 31 with the lower support 32 having an inclined surface on the upper surface and installed on the upper side of the support frame 31. An upper support 35 having an inclined surface corresponding to the upper surface of the lower support 32 by fixing the pedestal 34 and interconnecting one side of the lower support 32 to the pedestal 34 with a connecting rod 33; Wood lumber is installed on the upper surface of the upper support (35) sequentially, the upper support ( It is characterized by installing and mounting the fixing plate 36 which is cut after being connected to the upper surface of one side and the lower support 32 of 35).

또한, 본 발명은 육상과 인접한 안벽에 진수바지데크(10)를 계류하여 상기 진수바지데크(10)의 상면에 외측으로부터 목재반목이 진수바지데크(10) 상면에 안착된 받침치구(60)를 설치하며 상기 받침치구(60)의 안쪽에 설치되고 진수바지데크(10)의 길이방향으로 평행한 상태로 설치되고 진수바지데크(10) 상면에 선미부(B)의 지지를 위한 목재반목이 안착 설치되는 상협하광 형태의 그릴리지빔(50)을 설치함과 동시에 상기 그릴리지빔(50)의 안쪽에 설치되어 선미부(B)의 저면 중앙부를 지지하기 위해 상면에 목재반목이 안착 설치되는 고정반목을 설치하되, 상기 받침치구(60) 및 그릴리지빔(50) 그리고 고정반목이 설치된 진수바지데크(10)에서 선미부(B)를 건조하는 선미부 건조단계와; 상기 진수바지데크(10)의 일측이 안벽에 밀착된 육상에서 진수바지데크(10)의 그릴리지빔(50) 연장선상에 설치되어 건조된 선수부(A)를 진수바지데크(10)쪽으로 안내 이동시켜 주기 위해 선수부(A)의 저면에 진수이송부(20)를 밀착 설치하고 상기 진수이송부(20) 내·외측에 설치되어 건조기간 중 선수부(A)를 지지하고 이를 진수바지데크(10)쪽으로 이동을 시작함과 동시에 선수부(A)의 저면에서 자동 분리 가능하게 슬라이딩반목(30)을 설치하며 상기 슬라이딩반목(30)이 양측에 설치되어 선수부(A)의 내·외측을 지지하기 위해 진수바지데크(10) 상면에 목재반목이 안착 설치되는 받침치구(60)를 설치함과 아울러 진수이송부(20)의 후단에 설치되어 선수부(A) 건조후 이를 진수바지데크(10)쪽으로 이동시키기 위해 선수부(A)의 후방에 밀착되는 헤드블록(41) 및 상기 헤드블록(41)의 후방에 설치되는 그립퍼어셈블리(42), 구동유닛(43), 트랜스포머(44) 등을 포함하는 일련의 그리퍼잭장치(40)를 설치하되, 상기 진수이송부(20) 및 슬라이딩반목(30) 그리고 받침치구(60)의 상부에서 선수부(A)를 건조하는 선수부 건조단계와; 상기 선수부(A)를 선미부(B) 건조와 함께 동시에 육상에서 건조하고 진수바지데크(10)에서 건조된 선박의 선미부(B)를 먼저 진수하여 이를 플로팅도크(70)에 리도킹하는 선미부(B) 리도킹단계와; 상기 육상에서 선미부(B)와 함께 동시에 건조된 선수부(A)를 그리퍼잭장치(40)를 이용하여 이를 진수바지데크(10)로 이송하는 선수부(A) 이송단계와; 상기 진수바지데크(10)로 이송된 선수부(A)를 진수하여 플로팅도크(70)에 선박의 선수부(A)와 선미부(B)를 상호 연결하여 동시에 선박 건조를 완료하는 선수부 및 선미부 연결단계;로 이루어지는 것을 특징으로 하는 해상의 진수바지와 육상의 진수이송구조를 이용한 선박 건조공법도 함께 제공한다.In addition, the present invention mooring the launching deck deck 10 on the inner wall adjacent to the land and the support jig 60 seated on the upper surface of the launching deck deck 10 from the outside on the upper surface of the launching deck deck 10 Installed on the inside of the support jig 60 and installed in parallel to the longitudinal direction of the launching deck deck 10, wood veneer for the support of the stern (B) on the upper surface of the launching deck deck 10 is seated At the same time as the installation of the grille beam 50 of the upper side down light type is installed in the inside of the grille beam 50 is fixed to the wood paneling is installed on the upper surface to support the bottom center portion of the stern (B) A stern part drying step of installing stern, drying the stern part (B) from the support jig (60) and the grilling beam (50) and the fixed barge deck (10); One side of the launching bar deck 10 is installed on the grille beam 50 extension line of the launching bar deck 10 on the land in close contact with the inner wall guides the dried bow portion (A) toward the launching bar deck 10 The launching unit 20 is installed in close contact with the bottom of the bowing unit A and installed inside and outside the launching unit 20 to support the bowing unit A during the drying period and move it toward the launching bar deck 10. At the same time, a sliding banquet 30 is installed at the bottom of the bow part A so as to be automatically detached, and the banquet deck 30 is installed at both sides to support the inside and the outside of the bow A. (10) Installing the support jig 60 is installed on the top surface of the wood paneling, and installed at the rear end of the launching unit 20, the bow section (A) after drying the bowing section (10) to move it toward the launching deck deck (10) The head block 41 and the head close to the rear of A) A series of gripper jack devices 40 including a gripper assembly 42, a driving unit 43, a transformer 44, and the like, which are installed at the rear of the deblock 41, are installed, but the launching unit 20 and sliding are provided. A bow part drying step of drying the bow part A from the upper part of the ban wood 30 and the support jig 60; The stern for drying the fore part (A) together with the stern part (B) at the same time on the land and launching the stern part (B) of the ship constructed in the launching deck deck (10) first and redocking it to the floating dock (70). (B) re-docking step; A bow portion (A) transfer step of transferring the bow portion A, which is simultaneously dried together with the stern portion B on the land, to the launching bar deck 10 by using the gripper jack device 40; By connecting the bow portion (A) and the stern portion (B) of the ship to the floating dock 70 by launching the bow portion (A) transferred to the launching deck deck (10) at the same time to connect the bow portion and stern portion to complete the ship construction It also provides a ship building construction method using the launching sea pants and the launching structure of the land characterized in that consisting of;

본 발명은 선박의 선미부를 진수바지 위에서 별도로 건조하여 진수한 다음 이를 플로팅도크에 리도킹시키고 이와 함께 선박의 선수부를 육상에서 동시 건조한 상태에서 이를 진수이송구조를 이용하여 진수바지로 이동시킨 후 다시 진수시켜 플로팅도크에서 선박의 선수부와 선미부를 최종 결합하게 되는 동시 선박 건조장치 및 공법이 제공됨에 따라 선박의 건조 비용절감 및 공기단축 그리고 드라이 도크의 한계성을 극복할 수 있고 진수바지의 활용을 극대화 할 수 있을 뿐만 아니라 특히, 축 타계를 육상에서 사전 설치 후 탑재하는 공법을 적용할 수 있게 됨에 따라 최소의 비용으로 선박의 생산량을 증대시킬 수 있는 장점이 있다. In the present invention, the stern part of the ship is separately dried and launched on the launching bar and then redocked to a floating dock, and together with the ship's bow at the same time, the ship is moved to the launching bar using the launching transport structure at the same time. The ship's construction equipment and construction method, which finally combines the bow and stern of the ship in the floating dock, can reduce the ship's construction cost, shorten the air and limit the dry dock and maximize the utilization of launching pants. In addition, there is an advantage in that it is possible to increase the production of the ship at a minimum cost, as it is possible to apply the method of mounting the axial helm pre-installed on land after installation.

Description

해상의 진수바지와 육상의 진수이송구조를 이용한 동시 선박 건조장치 및 공법{Build apparatus and construction for ship at the same time using launching barge and launching transfer structure}Build apparatus and construction for ship at the same time using launching barge and launching transfer structure}

도 1a는 본 발명을 위해 수륙 양쪽에서 선박의 선수부와 선미부를 동시에 건조하고 있는 상태를 나타낸 평면구성도 Figure 1a is a plan view showing a state in which the bow portion and the stern portion of the ship at the same time in both landed for the present invention

도 1b는 도 1a의 측면구성도FIG. 1B is a side view of FIG. 1A

도 1c는 본 발명에 의해 1차 진수 후 선박의 선수부와 선미부가 플로팅도크에서 연결되어 있는 상태를 평면구성도Figure 1c is a plan view showing a state in which the bow portion and the stern portion of the ship is connected in the floating dock after the first launching according to the present invention

도 2a는 본 발명을 위해 육상의 진수이송부에 의해 선수부가 건조되는 상태를 정면구성도Figure 2a is a front configuration view of the state in which the bow portion is dried by the launching unit of the land for the present invention

도 2b는 본 발명을 위해 해상의 진수바지에 의해 선미부가 건조되는 상태를 나타낸 정면구성도Figure 2b is a front configuration diagram showing a state in which the stern portion is dried by the launching pants of the sea for the present invention

도 3a는 본 발명을 위해 육상의 선수부의 건조가 완료되어 진수바지쪽으로 이송되기 직전의 상태를 나타낸 평면구성도Figure 3a is a plan view showing a state immediately before the construction of the foreshore portion of the land for transport to the launching pants for the present invention

도 3b는 도 3a의 측면구성도 3B is a side view of FIG. 3A

도 4a는 본 발명 진수이송부의 분리사시도Figure 4a is an exploded perspective view of the launching unit of the present invention

도 4b는 도 4a의 정면구성도4B is a front configuration diagram of FIG. 4A

도 5a는 본 발명 진수이송부의 평면구성도Figure 5a is a plan view of the launching unit of the present invention

도 5b는 본 발명 진수이송부의 측면구성도Figure 5b is a side configuration diagram of the present invention launching unit

도 6a는 본 발명에 적용되는 슬라이딩반목이 선수부의 저면에 밀착상태로 설치된 상태를 나타낸 정면구성도Figure 6a is a front configuration showing a state in which the sliding banyan applied to the present invention is installed in close contact with the bottom of the bow portion

도 6b는 본 발명을 위해 슬라이딩반목이 일측으로 이동되어 선수부 바닥사이에 갭이 발생된 상태를 나타낸 정면구성도6b is a front configuration diagram showing a state in which a gap is generated between the bottom of the bow portion by moving the sliding object to one side for the present invention;

도 7a는 본 발명에 적용되는 그리퍼잭장치의 평면구성도Figure 7a is a plan view of a gripper jack device applied to the present invention

도 7b는 도7b의 측면구성도FIG. 7B is a side view of FIG. 7B

도 8은 본 발명을 위해 육상에서 선수부 건조시 크레인을 이용하여 블록을 탑재하는 상태를 나타낸 정면구성도8 is a front configuration diagram showing a state in which a block is mounted using a crane during the construction of the foreshore for the present invention

도 9는 본 발명을 위해 해상에서 선미부 건조시 크레인을 이용하여 블록을 탑재하는 상태를 나타낸 정면구성도Figure 9 is a front configuration diagram showing a state in which the block is mounted using a crane when the stern at sea for drying the present invention

도 10은 본 발명을 위해 육상에서 엔진룸 및 축 타계 설치/조립하여 진수바지에 별로로 탑재하고 있는 상태를 나타낸 정면구성도 10 is a front configuration diagram showing a state in which an engine room and a shaft manufactory are installed / assembled in the launch pants as stars for the present invention.

<도면의 주요부분에 대한 부호의 설명><Description of Symbols for Main Parts of Drawings>

10 : 진수바지데크 20 : 진수이송부10: launching pants deck 20: launching transport unit

21 : 스키드웨이 22 : 테프론패드21: skidway 22: teflon pad

23 : 팀버 24 : 런치러너23: Timber 24: Launch Runner

25 : 러버시트 30 : 슬라이딩반목25: rubber seat 30: sliding wood

31 : 지지프레임 32 : 하부서포트31: support frame 32: lower support

33 : 연결대 34 : 받침대33: connecting rod 34: stand

35 : 상부서포트 36 : 고정플레이트35: upper support 36: fixed plate

40 : 그리퍼잭장치 41 : 헤드블록 40: gripper jack device 41: head block

42 : 그립퍼어셈블리 43 : 구동유닛 42: gripper assembly 43: drive unit

44 : 트랜스포머 50 : 그릴리지빔 44: transformer 50: grillage beam

60 : 받침치구 70 : 플로팅도크 60: support jig 70: floating dock

본 발명은 해상의 진수바지와 육상의 진수이송구조를 이용한 선박 건조장치 및 공법에 관한 것이다.The present invention relates to a ship construction apparatus and construction method using the launching pants of the sea and the launching structure of the land.

본 발명은 선박의 선미부를 진수바지 위에서 별도로 건조하여 진수한 다음 이를 플로팅도크에 리도킹시키고 이와 함께 선박의 선수부를 육상에서 동시 건조한 상태에서 이를 진수이송구조를 이용하여 진수바지로 이동시킨 후 다시 진수시켜 플로팅도크에서 선박의 선수부와 선미부를 최종 결합하게 되는 동시 선박 건조장치 및 공법이 제공됨에 따라 선박의 건조 비용절감 및 공기단축 그리고 드라이 도크의 한계성을 극복하여 진수바지의 활용을 극대화 하며 특히, 축 타계를 육상에서 사전 설치 후 탑재하는 공법을 적용 할 수 있도록 하여 최소의 비용으로 선박의 생산량을 크게 증대시킬 수 있도록 한 것이다.In the present invention, the stern part of the ship is separately dried and launched on the launching bar and then redocked to a floating dock, and together with the ship's bow at the same time, the ship is moved to the launching bar using the launching transport structure at the same time. The ship's construction equipment and construction method, which finally combines the bow and stern of the ship in the floating dock, are provided to maximize the utilization of launching pants by reducing the ship's construction cost, shortening the air and limiting the dry dock. It is possible to apply the construction method of pre-installation of manuscripts on land so that ship production can be greatly increased at minimum cost.

종래에는 선박의 건조를 위해 드라이도크에서 제작하는 공법을 주로 하고 있 으나 최근들어 일부 선박을 육상에서 건조하는 공법도 개발되어 적용되고 있다.Conventionally, a method of manufacturing a dry dock is mainly used for the construction of a ship, but recently, a method of building some ships on land has also been developed and applied.

그러나 상기 육상에서 선박을 전적으로 건조하여 진수 바지로 이동 하는 데에는 수많은 하이드로 잭이 이용되고 그에 따르는 부대 장치들이 과도하게 요구되기 때문에 상기 하이드로 잭 설치/제거에 따르는 다양한 문제점이 노출되고 있는 실정이며 그에 따르는 설치비용도 과다하게 소요되고 있다. However, various hydro jack installation / removal is exposed because numerous hydro jacks are used and the accompanying devices are excessively required to completely dry the ship and move to the launch pants on the land. The cost is excessive.

상기와 같이 선박을 육상에 건조하기 위해 수많은 하이드로 잭을 사용하는 것은 선박을 육상에서 건조하여 진수바지로 이동시 선박에 집중하중이 가해지는 것을 방지하고 선박의 데미지 발생을 완화해 주는 역할을 하기 때문에 불가피하게 적용되고 있는 실정이다.Using a number of hydro jacks to build a ship on land as described above is inevitable because it serves to prevent the concentrated load on the ship and to reduce the damage of the ship when the ship is built on land and moved to launching pants. It is being applied.

상기 육상 선박 건조방법은 축타계 설치에 대한 문제점 때문에 선박건조를 진수바지에서 할 수 없었을 뿐만 아니라 수많은 하이드로 시스템 조립 방법과 추가 보완해야 하는 작업들이 많아 경제적 비용부담이 많이 필요한 공법이며 진수바지도 차기호선 진수까지 사용하지 못하는 등 다양한 문제점들이 존재하고 있는 공법이기도 하다.The above-mentioned shipbuilding method was not only able to build ships in launching pants because of the problems with the installation of the system, but also many methods of assembling hydro systems and additional work to be supplemented. It is also a method that has various problems such as not being able to use the hexadecimal.

본 발명은 선박의 선미부를 진수바지 위에서 별도로 건조하여 진수한 다음 이를 플로팅도크에 리도킹시키고 이와 함께 선박의 선수부를 육상에서 동시 건조한 상태에서 이를 진수이송구조를 이용하여 진수바지로 이동시킨 후 다시 진수시켜 플로팅도크에서 선박의 선수부와 선미부를 최종 결합하게 되는 동시 선박 건조장치 및 공법이 제공됨에 따라 선박의 건조 비용절감 및 공기단축 그리고 드라이 도크의 한계성을 극복하여 진수바지의 활용을 극대화하며 특히, 축 타계를 육상에서 사전 설치 후 탑재하는 공법을 적용 할 수 있도록 하여 최소의 비용으로 선박의 생산량을 크게 증대시킬 수 있도록 함을 목적으로 한다.In the present invention, the stern part of the ship is separately dried and launched on the launching bar and then redocked to a floating dock, and together with the ship's bow at the same time, the ship is moved to the launching bar using the launching transport structure at the same time. The ship's construction equipment and construction method, which finally combines the bow and stern of the ship in the floating dock, are provided to maximize the utilization of launching pants by reducing the ship's construction cost, shortening the air and limiting the dry dock. The purpose of this is to make it possible to apply the method of pre-installation and loading of manuscripts on land so that ship production can be greatly increased at minimum cost.

이를 위해 본 발명은 육상과 인접한 해상 안벽에 계류된 진수바지데크 상면에 설치되어 선박의 선미부 저면 양측의 내,외측을 지지하기 위해 진수바지데크 상면에 목재반목이 안착 설치되는 받침치구와, 상기 받침치구의 안쪽에 설치되어 진수바지데크의 길이방향으로 평행한 상태로 설치되며 진수바지데크 상면에 선미부의 지지를 위한 목재반목이 안착 설치되는 상협하광 형태의 그릴리지빔과, 상기 그릴리지빔의 안쪽에 설치되며 선미부의 저면 중앙부를 지지하기 위해 상면에 목재반목이 안착 설치되는 고정반목과, 선수부를 선미부 건조와 함께 동시에 건조하기 위해 상기 진수바지데크의 일측이 안벽에 밀착된 육상에서 진수바지데크의 그릴리지빔 연장선상에 설치되어 건조된 선수부를 진수바지데크쪽으로 안내 이동시켜 주기 위해 선수부의 저면에 밀착 설치되는 진수이송부와, 상기 진수이송부 내,외측에 설치되어 제작기간 중 선수부 지지후 이를 진수바지데크쪽으로 이동을 시작함과 동시에 선수부의 저면에서 자동분리 가능하게 설치되는 슬라이딩반목과, 상기 슬라이딩반목의 양측에 설치되어 선미부의 내,외측을 지지하기 위해 진수바지데크 상면에 목재반목이 안착 설치되는 받침치구와, 진수이송부의 후단에 설치되어 선수부 건조후 이를 진수바지데크쪽으로 이동시키기 위해 선수부의 후방에 밀착되는 헤드블록 및 상기 헤드블록의 후방에 설치되는 그립퍼어셈블리, 구동유닛, 트랜스포머 등을 포함하는 일련의 그리퍼잭장치로 구성되는 해상의 진수바지와 육상의 진수이송구조를 이용한 선박 건조장치에 있어서,To this end, the present invention is installed on the upper surface of the launching deck deck moored to the sea quay adjacent to the land and the support jig is installed on the top surface of the launching deck deck to support the inner and outer sides of the bottom of the stern bottom of the ship, It is installed inside the supporting jig and is installed in parallel with the launching deck deck in the longitudinal direction, and the wood beams of the upper and lower beams are installed on the launching deck deck to support the stern portion, and the grille beam of the grille beam Fixed wood installed on the inside to support the center of the bottom of the stern, the wood is fixed on the upper surface of the banjo and the stern deck to dry at the same time to dry at the same time the launching pants on the land close to the quay It is installed on the grillage beam extension of the deck to guide the dried bow to the launching deck. The launching unit, which is installed in close contact with the bottom, is installed on the inside and outside of the launching unit, and is supported by the bow during the production period, and then starts moving toward the launching deck. Installed on both sides of the sliding panel to support the inside and outside of the stern part, the supporting jig is installed on the upper surface of the launch barge deck, and is installed at the rear end of the launch port, and the bow section to move it to the launch bar deck after drying. Vessel drying apparatus using a marine launching pants and a land transporting structure consisting of a series of gripper jack devices including a head block closely attached to the rear of the head block and a gripper assembly installed on the rear of the head block, a drive unit, a transformer, and the like. To

상기 진수이송부는 진수바지데크의 그릴리지빔과 육상에서 일직선 상으로 연결 가능하게 스키드웨이를 설치하고 상기 스키드웨이의 상면에 테프론패드를 등간격으로 설치하며 상기 테프론패드의 상면에 팀버를 설치하여 상면에 러버시트가 부착된 사다리꼴 형태의 런치러너를 상기 팀버의 상면에 안착 설치하여 조립 구성하고 상기 슬라이딩반목은 상면에 경사면을 갖는 하부서포트를 지지프레임의 상부에 안착 설치하고 하부서포트가 설치된 지지프레임의 일측에 받침대를 고정하며 상기 하부서포트의 일측과 받침대 사이를 연결대로 상호 연결하여 하부서포트의 상면에 이와 대응되는 경사면을 갖는 상부서포트 및 상부서포트의 상면에 목재반목을 순차 설치하되, 상부서포트(35)의 일측 및 하부서포트(32)의 상면에 연결후 절단되는 고정플레이트(36)를 설치하여 조립하는 것을 특징으로 하는 해상의 진수바지와 육상의 진수이송구조를 이용한 선박 건조장치를 제공하고자 한다.
또한, 본 발명은 육상과 인접한 해상 안벽에 진수바지를 계류하여 상기 진수바지데크 상면에 외측으로부터 목재반목이 진수바지데크 상면에 안착된 받침치구를 설치하며 상기 받침치구의 안쪽에 설치되고 진수바지의 길이방향으로 평행한 상태로 설치되고 진수바지데크 상면에 선미부의 지지를 위한 목재반목이 안착 설치되는 상협하광 형태의 그릴리지빔을 설치함과 동시에 상기 그릴리지빔의 안쪽에 설치되어 선미부의 저면 중앙부를 지지하기 위해 진수바지데크 상면에 목재반목이 안착 설치되는 고정반목을 설치하되, 상기 받침치구 및 그릴리지빔 그리고 고정반목이 설치된 진수바지에서 선미부를 건조하는 선미부 건조단계와; 상기 진수바지의 일측이 안벽에 밀착된 육상에서 진수바지의 그릴리지빔 연장선상에 설치되어 건조된 선수부를 진수바지쪽으로 안내 이동시켜 주기 위해 선수부의 저면에 진수이송부를 밀착 설치하고 상기 진수이송부 내측에 설치되며 선수부 지지후 이를 진수바지쪽으로 이동을 시작함과 동시에 선수부의 저면에서 분리가능하게 슬라이딩반목을 설치하며 상기 슬라이딩반목의 양측에 설치되어 선미부의 최외곽을 지지하기 위해 진수바지데크 상면에 목재반목이 안착 설치되는 받침치구를 설치함과 아울러 진수이송부의 후단에 설치되며 선수부 건조후 이를 진수바지쪽으로 이동시키기 위해 선수부의 후방에 밀착되는 헤드블록 및 상기 헤드블록의 후방에 설치되는 그립퍼어셈블리, 구동유닛, 트랜스포머 등을 포함하는 일련의 그리퍼잭장치를 설치하되, 상기 진수이송부 및 슬라이딩반목 그리고 받침치구의 상부에서 선수부를 건조하는 선수부 건조단계와; 상기 선수부를 선미부 건조와 함께 동시에 건조하고 진수바지에서 건조된 선박의 선미부를 진수하여 이를 플로팅도크에 리도킹하는 선미부 리도킹단계와; 상기 육상에서 선미부와 함께 동시에 건조된 선수부를 그리퍼잭장치를 이용하여 이를 진수바지로 이송하는 선수부 이송단계와; 상기 진수바지로 이송된 선수부를 진수하여 플로팅도크에서 선박의 선수부와 선미부를 상호 연결하여 동시에 선박 건조를 완료하는 선수부 및 선미부 연결단계;로 이루어지는 것을 특징으로 하는 해상의 진수바지와 육상의 진수이송구조를 이용한 선박 건조공법도 함께 제공함으로서 상기 목적을 달성하고자 한다.
The launching unit is provided with a skidway so that the launch beam can be connected to the grille beam of the launching deck in a straight line. The trapezoidal launch runner with a rubber seat mounted on the upper surface of the timber is assembled and assembled, and the sliding object is installed on the upper part of the supporting frame by installing a lower support having an inclined surface on the upper surface of the supporting frame. Fixing the pedestal on one side and interconnecting the connection between one side and the pedestal of the lower support as the upper support of the upper support and the upper surface of the upper support and the upper support having a slope corresponding to the upper surface of the upper support (35) Fixed plate which is cut after being connected to one side and upper surface of the lower support 32 To provide a ship construction apparatus using the launching pants and the launching structure of the land characterized in that the installation and assembly (36).
In addition, the present invention mooring the launching pants on the sea quay adjacent to the land to install a support jig seated on the upper surface of the launch bark decking wood timber from the outside on the launching deck deck upper side and installed on the inside of the support jig It is installed in parallel in the longitudinal direction and installed on the upper surface of the launching deck deck a wooden beam for the support of the stern part, and the grill beam of the upper side down light type is installed inside the grill beam and at the center of the bottom of the stern part. A stern part drying step of installing a fixed bancture on which wood lumber is installed on an upper surface of the launching bar deck to support the stern in the launching bar where the support jig and the grill beam and the fixed banx are installed; One side of the launching pants are installed on the grille beam extension line of the launching pants on the land closely adhered to the quay wall to install the launching unit closely to the bottom of the bowing part to guide and move the dried bow to the launching unit, and inside the launching unit It is installed and starts to move toward the launching bar after supporting the bow and at the same time installs the sliding banjo detachably from the bottom of the bow and is installed on both sides of the sliding banjo to support the outermost part of the stern to the wood bank deck The seating jig is installed at the rear of the launch unit, and is installed at the rear end of the launching unit, and the head block closely attached to the rear of the fore part to move it toward the launching pants after the construction of the bow and the gripper assembly and the driving unit installed at the rear of the head block. Set up a series of gripper jacks, including transformers, transformers, etc. But, bow drying step of drying unit was from the top of the jinsuyi send and sliding antagonism and support fixture; A stern portion redocking step of simultaneously drying the bow portion with the stern portion drying and launching the stern portion of the ship constructed in the launching pants and redocking the stern portion to the floating dock; A bow portion conveying step of conveying the bow portion which is simultaneously dried together with the stern portion in the land by using a gripper jack device; Launching the seam pants and land-based launching unit comprising the bow and stern connecting step of connecting the bow and stern parts of the ship to the floating dock and completing the ship at the same time. By providing a ship construction method using a structure also to achieve the above object.

본 발명은 육상과 인접한 해상 안벽에 계류된 진수바지데크(10) 상면에 설치되어 선박의 선미부(B) 저면 양측의 내,외측을 지지하기 위해 진수바지데크(10) 상면에 목재반목이 안착 설치되는 받침치구(60)와, 상기 받침치구(60)의 안쪽에 설치되어 진수바지데크(10)의 길이방향으로 평행한 상태로 설치되며 진수바지데크(10) 상면에 선미부(B)의 지지를 위한 목재반목이 안착 설치되는 상협하광 형태의 그릴리지빔(50)과, 상기 그릴리지빔(50)의 안쪽에 설치되며 선미부(B)의 저면 중앙부를 지지하기 위해 상면에 목재반목이 안착 설치되는 고정반목과, 선수부(A)를 선미부(B) 건조와 함께 동시에 건조하기 위해 상기 진수바지데크(10)의 일측이 안벽에 밀착된 육상에서 진수바지데크(10)의 그릴리지빔(50) 연장선상에 설치되어 건조된 선수부(A)를 진수바지데크(10)쪽으로 안내 이동시켜 주기 위해 선수부(A)의 저면에 밀착 설치되는 진수이송부(20)와, 상기 진수이송부(20) 내,외측에 설치되어 제작기간 중 선수부(A) 지지후 이를 진수바지데크(10)쪽으로 이동을 시작함과 동시에 선수부(A)의 저면에서 자동분리 가능하게 설치되는 슬라이딩반목(30)과, 상기 슬라이딩반목(30)의 양측에 설치되어 선미부(B)의 내,외측을 지지하기 위해 진수바지데크(10) 상면에 목재반목이 안착 설치되는 받침치구(60)와, 진수이송부(20)의 후단에 설치되어 선수부(A) 건조후 이를 진수바지데크(10)쪽으로 이동시키기 위해 선수부(A)의 후방에 밀착되는 헤드블록(41) 및 상기 헤드블록(41)의 후방에 설치되는 그립퍼어셈블리(42), 구동유닛(43), 트랜스포머(44) 등을 포함하는 일련의 그리퍼잭장치(40)로 구성되는 해상의 진수바지와 육상의 진수이송구조를 이용한 선박 건조장치에 있어서,
상기 진수이송부(20)는 진수바지데크(10)의 그릴리지빔(50)과 육상에서 일직선 상으로 연결 가능하게 스키드웨이(21)를 설치하고 상기 스키드웨이(21)의 상면에 테프론패드(22)를 등간격으로 설치하며 상기 테프론패드(22)의 상면에 팀버(23)를 설치하여 상면에 러버시트(25)가 부착된 사다리꼴 형태의 런치러너(24)를 상기 팀버(23)의 상면에 안착 설치하여 조립 구성하고 상기 슬라이딩반목(30)은 상면에 경사면을 갖는 하부서포트(32)를 지지프레임(31)의 상부에 안착 설치하고 하부서포트(32)가 설치된 지지프레임(31)의 일측에 받침대(34)를 고정하며 상기 하부서포트(32)의 일측과 받침대(34) 사이를 연결대(33)로 상호 연결하여 하부서포트(32)의 상면에 이와 대응되는 경사면을 갖는 상부서포트(35) 및 상부서포트(35)의 상면에 목재반목을 순차 설치하되, 상부서포트(35)의 일측 및 하부서포트(32)의 상면에 연결후 절단되는 고정플레이트(36)를 설치하여 조립하는 것을 특징으로 한다.
The present invention is installed on the upper surface of the launching deck deck (10) moored to the sea quay adjacent to the land and wood veneer is seated on the upper surface of the launching deck deck (10) to support the inside and outside of both sides of the bottom of the stern portion (B) of the ship The supporting jig 60 to be installed, and the inside of the supporting jig 60 is installed in a parallel state in the longitudinal direction of the launch bar deck 10 and the stern portion (B) on the upper surface of the launch bar deck (10) Wood-ribbed beams of the upper side down light type is installed on the wooden beams for support, and installed on the inside of the grille beam 50, the wood boards on the upper surface to support the bottom center of the stern (B) The fixed beam that is seated and installed, and the side of the stern (B) to dry at the same time to dry at the same time one side of the launch bark deck 10 in close contact with the inner wall of the draw barge deck 10 of the grillage beam (50) The bow part (A) installed on the extension line and dried Hex transfer part 20 is installed in close contact with the bottom of the bow portion (A) in order to guide the movement to, and installed on the inside, the outside of the launcher transport portion 20 is supported by the bow portion (A) during the production period and launching pants deck (10) At the same time, it starts to move toward the side and at the bottom of the bow (A) is installed on the sliding banche 30 and the sliding banche 30, which is installed on both sides of the stern (B) to support the inside and outside In order to move to the launching deck deck (10) after the bow (A) is installed in the rear end of the support jig 60 and the launching unit 20 is installed on the upper surface of the launching deck deck (10) A series of gripper jacks including a head block 41 in close contact with the rear of the bow portion A and a gripper assembly 42, a drive unit 43, a transformer 44, and the like installed at the rear of the head block 41. The launching pants of the sea composed of the device 40 and the launching structure of the land Yonghan in shipbuilding device,
The launching unit 20 is installed on the skidway 21 so as to be connected in a straight line with the grille beam 50 of the launching deck 10, the teflon pad 22 on the upper surface of the skidway 21 ) Is installed at equal intervals and the timber 23 is installed on the upper surface of the Teflon pad 22 so that the rubber runner 25 is attached to the upper surface of the timber 23. The seating installation is assembled and configured, and the sliding board 30 is installed on the upper side of the support frame 31 with the lower support 32 having an inclined surface on the upper surface and installed on the upper side of the support frame 31. An upper support 35 having an inclined surface corresponding to the upper surface of the lower support 32 by fixing the pedestal 34 and interconnecting one side of the lower support 32 to the pedestal 34 with a connecting rod 33; Wood lumber is installed on the upper surface of the upper support (35) sequentially, the upper support ( It is characterized in that by installing the fixing plate 36 is cut after being connected to the upper surface of one side and the lower support 32 of 35).

또한, 본 발명은 육상과 인접한 해상 안벽에 진수바지데크(10)를 계류하여 상기 진수바지데크(10) 상면에 외측으로부터 목재반목이 진수바지데크(10) 상면에 안착된 받침치구(60)를 설치하며 상기 받침치구(60)의 안쪽에 진수바지데크(10)의 길이방향으로 평행한 상태로 설치되고 상면에 선미부(B)의 지지를 위한 목재반목이 안착 설치되는 상협하광 형태의 그릴리지빔(50)을 설치함과 동시에 상기 그릴리지빔(50)의 안쪽에 설치되어 선미부(B)의 저면 중앙부를 지지하기 위해 상면에 목재반목이 안착 설치되는 고정반목을 설치하되, 상기 받침치구(60) 및 그릴리지빔(50) 그리고 고정반목이 설치된 진수바지데크(10)에서 선미부(B)를 건조하는 선미부 건조단계와; 상기 진수바지데크(10)의 일측이 안벽에 육상에서 진수바지데크(10)의 그릴리지빔(50) 연장선상에 설치되어 건조된 선수부(A)를 진수바지데크(10)쪽으로 안내 이동시켜 주기 위해 선수부(A)의 저면에 진수이송부(20)를 밀착 설치하고 상기 진수이송부(20) 내측에 설치되며 선수부(A) 지지후 이를 진수바지데크(10)쪽으로 이동을 시작함과 동시에 선수부(A)의 저면에서 자동분리 가능하게 슬라이딩반목(30)을 설치하여 상기 슬라이딩반목(30)의 양측에 설치되어 선미부(B)의 내,외측을 지지하기 위해 진수바지데크 (10)상면에 목재반목이 안착 설치되는 받침치구(60)를 설치함과 아울러 진수이송부(20)의 후단에 설치되며 선수부(A) 건조후 이를 진수바지데크(10)쪽으로 이동시키기 위해 선수부(A)의 후방에 밀착되는 헤드블록(41) 및 상기 헤드블록(41)의 후방에 설치되는 그립퍼어셈블리(42), 구동유닛(43), 트랜스포머(44) 등을 포함하는 일련의 그리퍼잭장치(40)를 설치하되, 상기 진수이송부(20) 및 슬라이딩반목(30) 그리고 받침치구(60)의 상부에서 선수부(A)를 건조하는 선수부 건조단계와; 상기 선수부(A)를 선미부(B) 건조와 함께 동시에 건조하고 진수바지데크(10)에서 건조된 선박의 선미부(B)를 진수하여 이를 플로팅도크(70)에 리도킹하는 선미부(B) 리도킹단계와; 상기 육상에서 선미부(B)와 함께 동시에 건조된 선수부(A)를 그리퍼잭장치(40)를 이용하여 이를 진수바지데크(10)로 이송하는 선수부(A) 이송단계와; 상기 진수바지데크(10)로 이송된 선수부(A)를 진수하여 플로팅도크에서 선박의 선수부(A)와 선미부(B)를 상호 연결하여 동시에 선박 건조를 완료하는 선수부 및 선미부 연결단계;로 이루어지는 것을 특징으로 하는 해상의 진수바지와 육상의 진수이송구조를 이용한 선박 건조공법도 함께 제공한다.
도면중 미설명 부호 (80)은 엔진룸, (90)은 크레인을 나타낸다.
In addition, the present invention mooring the launching pants deck 10 on the sea quay adjacent to the land and the support jigs 60 seated on the upper surface of the launching deck deck 10 from the outside on the launching deck deck 10 upper surface It is installed and installed in the state parallel to the longitudinal direction of the launching deck deck 10 in the inner side of the support jig 60, the upper side down light grille type of wood veneer is installed to support the stern portion (B) on the upper surface While installing the beam 50 and at the same time is installed inside the grilling beam 50 to install a fixed banshin wood is installed on the top surface to support the bottom center portion of the stern (B), the support jig 60 and the stern portion drying step of drying the stern portion (B) in the launching bar deck 10, the grillage beam 50 and the fixed board is installed; One side of the launching pants deck 10 is installed on the grille beam 50 extension line of the launching pants deck 10 on the inner wall on the inner wall to guide and move the dried bow portion (A) toward the launching pants deck (10) To the bottom of the bow portion (A) is installed in close contact with the launching unit 20 and installed inside the launching unit 20, and after the bow (A) support it starts moving toward the launching deck (10) and at the same time the bow (A) Sliding wood 30 is installed on both sides of the sliding wood 30 so as to be automatically separated from the bottom of the) is installed on both sides of the sliding wood 30 to support the inside and outside of the stern portion (B) wood boarding wood on the upper deck deck (10) The seating jig (60) to be installed is installed and installed at the rear end of the launching unit (20) and close to the rear of the bow (A) to move it toward the launching deck (10) after drying the bow (A). The head block 41 and the rear of the head block 41 is installed A series of gripper jack devices 40 including a gripper assembly 42, a driving unit 43, a transformer 44, and the like are installed, but the launching unit 20 and the sliding object 30 and the supporting jig 60 are installed. A bow part drying step of drying the bow part A from an upper portion of the bow part; The bow portion (A) is dried together with the stern portion (B) drying at the same time and the stern portion (B) for launching the stern portion (B) of the vessel dried in the launching deck deck (10) and redocking it to the floating dock (70). Redocking step; A bow portion (A) transfer step of transferring the bow portion A, which is simultaneously dried together with the stern portion B on the land, to the launching bar deck 10 by using the gripper jack device 40; Connecting the bow part and the stern part by simultaneously connecting the bow part A and the stern part B of the ship in a floating dock by launching the bow part A transferred to the launching deck deck 10; It also provides a ship construction method using the launching pants of the sea and the launching structure of the land characterized in that it is made.
In the figure, reference numeral 80 denotes an engine room, and 90 denotes a crane.

삭제delete

삭제delete

삭제delete

이하 본 발명의 작용을 첨부된 도면을 참조로 상세히 설명하면 다음과 같다.Hereinafter, the operation of the present invention will be described in detail with reference to the accompanying drawings.

본 발명은 선박의 선미부(B)를 진수바지데크(10) 위에서 별도로 건조하여 진수한 다음 이를 플로팅도크(70)에 리도킹시키고 이와 함께 선박의 선수부(A)를 육상에서 동시 건조한 상태에서 이를 진수이송구조를 이용하여 진수바지데크(10)로 이동시킨 후 다시 진수시켜 플로팅도크(70)에서 선박의 선수부(A)와 선미부(B)를 최종 결합하여 선박을 완성할 수 있도록 하고 있는 것이다. According to the present invention, the stern portion B of the ship is separately dried on the launching bar deck 10 and then launched, and then redocked to the floating dock 70, and together with the bow portion A of the ship at the same time in a dry state on land. By using the launching transport structure to move to the launching deck deck (10) and to launch again, the floating dock (70) and the stern part (B) of the ship in the final combination to complete the vessel .

본 발명은 도 2a 및 도 2b에서와 같이 육상과 인접한 해상 안벽에 계류된 진수바지데크(10) 상면에 선박의 선미부(B) 저면 양측의 내,외측을 지지하기 위해 진수바지데크 상면에 목재반목이 안착 설치되는 받침치구(60)와, 진수바지데크(10)의 길이방향으로 평행한 상태로 설치되어 진수바지데크(10) 상면에 선미부(B)의 지지를 위한 목재반목이 안착 설치되는 상협하광 형태의 그릴리지빔(50)과, 상기 그릴 리지빔(50)의 안쪽에 설치되며 선미부(B)의 저면 중앙부를 지지하기 위해 상면에 목재반목이 안착 설치되는 고정반목을 각각 설치한 상태로 선박의 선미부(B)를 건조하게 된다. 2a and 2b is a timber on the upper surface of the launch bark deck to support the inner and outer sides of the bottom of the stern portion (B) bottom side of the ship on the upper surface of the launch barge deck (10) moored to the sea quay adjacent to the land Supporting jig (60), which is installed banjo is installed in parallel to the longitudinal direction of the launching deck deck 10, the wood boarding wood for the support of the stern (B) on the upper surface of the launching deck (10) The grille beam 50 of the upper side down light form, which is installed inside the grille ridge beam 50 and fixed wood is installed on the top surface to support the center of the bottom of the stern portion (B) The stern part B of a ship is dried in a state.

또한, 선박의 동시 건조를 위해 이와 인접한 육상에는 진수바지데크(10)의 일측이 안벽에 밀착된 육상에서 진수바지데크(10)의 그릴리지빔(50) 연장선상에 설치되어 건조된 선수부(A)를 진수바지데크(10)쪽으로 안내 이동시켜 주기 위해 선수부(A)의 저면에 밀착 설치되는 진수이송부(20)와, 상기 진수이송부(20) 내측에 설치되며 선수부(A) 지지후 이를 진수바지데크(10)쪽으로 이동을 시작함과 동시에 선수부(A)의 저면에서 자동분리가능하게 설치되는 슬라이딩반목(30)과, 상기 슬라이딩반목(30)의 양측에 설치되어 선미부(B)의 내,외측을 지지하기 위해 진수바지데크(10) 상면에 목재반목이 안착 설치되는 받침치구(60)와, 진수이송부(20)의 후단에 설치되며 선수부(A) 건조후 이를 진수바지데크(10)쪽으로 이동시키기 위해 선수부(A)의 후방에 밀착되는 헤드블록(41) 및 상기 헤드블록(41)의 후방에 설치되는 그립퍼어셈블리(42), 구동유닛(43), 트랜스포머(44) 등을 포함하는 일련의 그리퍼잭장치(40)를 육상에서 설치한 상태에서 선수부(A)를 건조하게 된다. In addition, for the simultaneous construction of the ship on the land adjacent to the launching deck deck 10 on one side of the land closely adhered to the quay wall installed on the grille beam 50 extension line of the launching deck deck 10 (A) In order to guide) to move to the launching deck (10) to the launching unit 20 is installed in close contact with the bottom of the bow (A), and the launching unit (20) is installed inside the bow support (A) after the launching pants At the same time starting to move toward the deck 10 at the same time the sliding banche 30 is installed to be automatically removable from the bottom of the bow (A), and installed on both sides of the sliding banche 30, the inside of the stern (B), To support the outside of the launch barge deck (10) on the upper surface of the timber board is installed on the support jig 60, and the launching port 20 is installed on the rear end of the bow (A) after drying it towards the launching deck deck (10) Head block 41 in close contact with the rear of the bow portion (A) to move And a bow portion A in a state where a series of gripper jack devices 40 including a gripper assembly 42, a driving unit 43, a transformer 44, and the like, which are installed at the rear of the head block 41, are installed on land. ) To dry.

한편, 본 발명은 도 1a 내지 도 1c에서와 같이 상기 선수부(A)를 선미부(B) 건조와 함께 동시에 건조하게 되면 진수바지데크(10)에서 건조된 선박의 선미부(B)를 진수하여 이를 플로팅도크(70)에 리도킹시키게 되며 상기 육상에서 선미부(B)와 함께 동시에 건조된 선수부(A)를 그리퍼잭장치(40)를 이용하여 이를 진수바지데크(10)로 이송시키게 된다. On the other hand, the present invention is to dry the stern portion (A) with the stern portion (B) drying at the same time as shown in Figure 1a to 1c to launch the stern portion (B) of the ship built in the launching deck deck 10 This is to be docked to the floating dock (70), and at the same time the foreshore portion (A) was dried at the same time with the stern portion (B) using the gripper jack device 40 to transfer it to the launching bar deck (10).

상기 선수부(A)가 진수바지데크(10)로 이송되면 상기 이송된 선수부(A)를 다시 진수하여 플로팅도크에서 선박의 선수부(A)와 선미부(B)를 상호 연결하여 동시에 선박 건조를 완료하게 되는 공정으로 진행되는 바, 본 발명은 선수부(A)의 저면에 설치되는 진수이송부(20)가 선수부(A)를 안정되게 지지하고 있을 뿐만 아니라 선수부(A) 건조후 도 7a 및 도 7b에 도시된 그리퍼잭장치(40)의 작동에 의해 선미부(B)가 진수바지데크(10)쪽으로 안전하게 이동할 수 있게 되며 도 6a 및 도 6b에 도시된 슬라이딩반목(30) 역시 선수부(A)의 이동전에 고정플레이트(36)를 간단히 절단하여 주는 것만으로 상부서포트(35)가 경사면을 따라 받침대(34)쪽으로 자연스럽게 슬라이딩 이동되어 상부의 목재반목이 선미부(B)의 저면에서 간단히 이격됨에 따라 선미부(B)의 이송을 더욱 용이하게 할 수 있게 되는 것이다. When the bow portion A is transferred to the launching bar deck 10, the transported bow portion A is launched again to interconnect the bow portion A and the stern portion B of the ship in a floating dock to complete the ship construction at the same time. Proceeding to the process to be carried out, the present invention not only stably supporting the bow portion (A) is the launching portion 20 installed on the bottom of the bow portion (A), but also after drying the bow portion (A) in Figures 7a and 7b By the operation of the gripper jack device 40 shown, the stern portion B can be safely moved toward the launching deck deck 10, and the sliding half 30 shown in FIGS. 6A and 6B also moves the bow portion A. By simply cutting the fixing plate 36 before, the upper support 35 is naturally slid to the pedestal 34 along the inclined surface so that the upper wood lumber is simply spaced apart from the bottom of the stern B. (B) make the transfer easier It is possible to do.

특히, 본 발명은 도 10에 도시된 바와 같이 축 타계 작업을 용이하게 하기 위해 엔진룸을 육상에서 조립하여 크레인으로 간단히 탑재할 수 있도록 함으로서 축 타계 작업을 선행으로 육상에서조립 할 수 있게 됨에 따라 드라이 도크에서 선박을 건조하는 공법 내지는 다수의 하이드로잭과 레일을 사용하여 고가의 비용으로 육상에서 선박 일체를 건조하는 공법과는 과는 달리 보다 효율적으로 선박을 건조할 수 있는 장점이 있다. In particular, the present invention by assembling the engine room on the land to facilitate the shaft manufactory work as shown in FIG. 10 to be easily mounted by a crane as the axial manufactory work can be assembled in advance on land as the dry Unlike the method of building a ship in a dock or a method of building a whole ship on land at a high cost by using a plurality of hydrojacks and rails, the ship can be more efficiently constructed.

이상에서는 본 발명의 바람직한 실시예에 대하여 도시하고 설명하였으나 본 발명은 상기한 실시예에 한정되지 아니하며 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 본 발명이 속하는 분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형 실시가 가능한 것은 물론이고 그와 같은 변경은 기재된 청구범 위 내에 있게 된다. Although the above has been illustrated and described with respect to the preferred embodiment of the present invention, the present invention is not limited to the above-described embodiment without departing from the gist of the present invention claimed in the claims, having ordinary skill in the art to which the present invention pertains. Any modification can be made by any person, and such changes are within the scope of the claims.

본 발명은 선박의 선미부를 진수바지 위에서 별도로 건조하여 진수한 다음 이를 플로팅도크에 리덱킹시키고 이와 함께 선박의 선수부를 육상에서 동시 건조한 상태에서 이를 진수이송구조를 이용하여 진수바지로 이동시킨 후 다시 진수시켜 플로팅도크에서 선박의 선수부와 선미부를 최종 결합하게 되는 동시 선박 건조장치 및 공법이 제공됨에 따라 선박의 건조 비용절감 및 공기단축 그리고 드라이 도크의 한계성을 극복할 수 있고 진수바지의 활용을 극대화 할 수 있을 뿐만 아니라 특히, 축 타계를 육상에서 사전 설치후 탑재하는 공법을 적용 할 수 있게 됨에 따라 최소의 비용으로 선박의 생산량을 증대시킬 수 있는 장점이 있다. The present invention is to dry separately after launching the stern part of the ship on the launching bar, and then re-indexing it to a floating dock and moving it to the launching bar using the launching transport structure at the same time with the ship's bow at the same time on the ground The ship's construction equipment and construction method, which finally combines the bow and stern of the ship in the floating dock, can reduce the ship's construction cost, shorten the air and limit the dry dock and maximize the utilization of launching pants. In addition, there is an advantage in that it is possible to increase the production of the ship at a minimum cost, as it is possible to apply the method of mounting the axial helm pre-installed onshore.

Claims (4)

육상과 인접한 해상 안벽에 계류된 진수바지데크(10) 상면에 설치되어 선박의 선미부(B) 저면 양측의 내,외측을 지지하기 위해 진수바지데크(10) 상면에 목재반목이 안착 설치되는 받침치구(60)와, 상기 받침치구(60)의 안쪽에 설치되어 진수바지데크(10)의 길이방향으로 평행한 상태로 설치되며 진수바지데크(10) 상면에 선미부(B)의 지지를 위한 목재반목이 안착 설치되는 상협하광 형태의 그릴리지빔(50)과, 상기 그릴리지빔(50)의 안쪽에 설치되며 선미부(B)의 저면 중앙부를 지지하기 위해 상면에 목재반목이 안착 설치되는 고정반목과, 선수부(A)를 선미부(B) 건조와 함께 동시에 건조하기 위해 상기 진수바지데크(10)의 일측이 안벽에 밀착된 육상에서 진수바지데크(10)의 그릴리지빔(50) 연장선상에 설치되어 건조된 선수부(A)를 진수바지데크(10)쪽으로 안내 이동시켜 주기 위해 선수부(A)의 저면에 밀착 설치되는 진수이송부(20)와, 상기 진수이송부(20) 내,외측에 설치되어 제작기간 중 선수부(A) 지지후 이를 진수바지데크(10)쪽으로 이동을 시작함과 동시에 선수부(A)의 저면에서 자동분리 가능하게 설치되는 슬라이딩반목(30)과, 상기 슬라이딩반목(30)의 양측에 설치되어 선미부(B)의 내,외측을 지지하기 위해 진수바지데크(10) 상면에 목재반목이 안착 설치되는 받침치구(60)와, 진수이송부(20)의 후단에 설치되어 선수부(A) 건조후 이를 진수바지데크(10)쪽으로 이동시키기 위해 선수부(A)의 후방에 밀착되는 헤드블록(41) 및 상기 헤드블록(41)의 후방에 설치되는 그립퍼어셈블리(42), 구동유닛(43), 트랜스포머(44) 등을 포함하는 일련의 그리퍼잭장치(40)로 구성되는 해상의 진수바지와 육상의 진수이송구조를 이용한 선박 건조장치에 있어서,Mounted on the upper surface of the launching deck deck (10) moored to the sea quay adjacent to the land, the timber board is installed on the upper surface of the launching deck (10) to support the inside and outside of both sides of the bottom of the stern (B) of the ship. Jig 60 and the inside of the support jig 60 is installed in a parallel state in the longitudinal direction of the launching deck deck 10 and for supporting the stern (B) on the upper surface of the launching deck (10) The wood beams are installed in the upper and lower beam-type grille beams 50 and the wood beams are installed on the inner side of the grille beams 50 to support the center of the bottom surface of the stern portion B. Grille beam 50 of the launch barge deck 10 on the ground where one side of the launch barge deck 10 is in close contact with the quay wall to dry the fixed half and the bow portion (A) with the stern (B) drying at the same time Guides the bow portion (A) installed on the extension line toward the launching deck (10) It is installed on the bottom of the bow portion (A) in close contact with the launcher transport part 20, and installed inside and outside the launcher transport part 20 is supported by the bow portion (A) during the production period to the launching deck deck (10) In order to support the inside and outside of the stern portion (B) is installed on both sides of the sliding banche 30 and the sliding banche 30 which is installed at the same time and automatically removable from the bottom of the bow portion (A) The support jig 60 is installed on the upper surface of the launching deck deck 10, and installed on the rear end of the launching conveying unit 20, the bow section (A) after the bow portion to move to the launching deck deck (10) A series of gripper jack devices including a head block 41 closely attached to the rear of A) and a gripper assembly 42, a drive unit 43, a transformer 44, and the like installed at the rear of the head block 41 ( A line using the launching pants of the sea composed of 40) and the launching structure of the land In the drying apparatus, 상기 진수이송부(20)는 진수바지데크(10)의 그릴리지빔(50)과 육상에서 일직선 상으로 연결 가능하게 스키드웨이(21)를 설치하고 상기 스키드웨이(21)의 상면에 테프론패드(22)를 등간격으로 설치하며 상기 테프론패드(22)의 상면에 팀버(23)를 설치하여 상면에 러버시트(25)가 부착된 사다리꼴 형태의 런치러너(24)를 상기 팀버(23)의 상면에 안착 설치하여 조립 구성하고 상기 슬라이딩반목(30)은 상면에 경사면을 갖는 하부서포트(32)를 지지프레임(31)의 상부에 안착 설치하고 하부서포트(32)가 설치된 지지프레임(31)의 일측에 받침대(34)를 고정하며 상기 하부서포트(32)의 일측과 받침대(34) 사이를 연결대(33)로 상호 연결하여 하부서포트(32)의 상면에 이와 대응되는 경사면을 갖는 상부서포트(35) 및 상부서포트(35)의 상면에 목재반목을 순차 설치하되, 상부서포트(35)의 일측 및 하부서포트(32)의 상면에 연결후 절단되는 고정플레이트(36)를 설치하여 조립하는 것을 특징으로 하는 해상의 진수바지와 육상의 진수이송구조를 이용한 선박 건조장치.The launching unit 20 is installed on the skidway 21 so as to be connected in a straight line with the grille beam 50 of the launching deck 10, the teflon pad 22 on the upper surface of the skidway 21 ) Is installed at equal intervals and the timber 23 is installed on the upper surface of the Teflon pad 22 so that the rubber runner 25 is attached to the upper surface of the timber 23. The seating installation is assembled and configured, and the sliding board 30 is installed on the upper side of the support frame 31 with the lower support 32 having an inclined surface on the upper surface and installed on the upper side of the support frame 31. An upper support 35 having an inclined surface corresponding to the upper surface of the lower support 32 by fixing the pedestal 34 and interconnecting one side of the lower support 32 to the pedestal 34 with a connecting rod 33; Wood lumber is installed on the upper surface of the upper support (35) sequentially, the upper support ( A ship drying apparatus using the launching barge of the sea and the launching structure of the land, characterized in that the installation and assembly of the fixed plate 36 is cut and connected to the upper surface of one side and the lower support (32) of 35). 삭제delete 삭제delete 육상과 인접한 해상 안벽에 진수바지데크(10)를 계류하여 상기 진수바지데크 (10) 상면에 내,외측으로 부터 목재반목이 상면에 안착된 받침치구(60)를 설치하며 상기 받침치구(60)의 안쪽에 설치되고 진수바지데크(10)의 길이방향으로 평행한 상태로 설치되고 상면에 선미부(B)의 지지를 위한 목재반목이 안착 설치되는 상협하광 형태의 그릴리지빔(50)을 설치함과 동시에 상기 그릴리지빔(50)의 안쪽에 설치되어 선미부(B)의 저면 중앙부를 지지하기 위해 진수바지데크(10) 상면에 목재반목이 안착 설치되는 고정반목을 설치하되, 상기 받침치구(60) 및 그릴리지빔(50) 그리고 고정반목이 설치된 진수바지데크(10)에서 선미부(B)를 건조하는 선미부 건조단계와; 상기 진수바지데크(10)의 일측이 안벽에 밀착된 육상에서 진수바지데크(10)의 그릴리지빔(50) 연장선상에 설치되어 건조된 선수부(A)를 진수바지데크(10)쪽으로 안내 이동시켜 주기 위해 선수부(A)의 저면에 진수이송부(20)를 밀착 설치하고 상기 진수이송부(20) 내,외측에 설치되며 선수부(A) 지지후 이를 진수바지데크(10)쪽으로 이동시킴과 동시에 선수부(A)의 저면에서 자동분리 가능하게 슬라이딩반목(30)을 설치하며 상기 슬라이딩반목(30)의 양측에 설치되어 선미부(B)의 내,외측을 지지하기 위해 진수바지데크(10) 상면에 목재반목이 안착 설치되는 받침치구(60)를 설치함과 아울러 진수이송부(20)의 후단에 설치되어 선수부(A) 건조후 이를 진수바지데크(10)쪽으로 이동시키기 위해 선수부(A)의 후방에 밀착되는 헤드블록(41) 및 상기 헤드블록(41)의 후방에 설치되는 그립퍼어셈블리(42), 구동유닛(43), 트랜스포머(44) 등을 포함하는 일련의 그리퍼잭장치(40)를 설치하되, 상기 진수이송부(20) 및 슬라이딩반목(30) 그리고 받침치구(60)의 상부에서 선수부(A)를 건조하는 선수부 건조단계와; 상기 선수부(A)를 선미부(B) 건조와 함께 동시에 건 조하고 진수바지데크(10)에서 건조된 선박의 선미부(B)를 진수하여 이를 플로팅도크(70)에 리도킹하는 선미부(B) 리도킹단계와; 상기 육상에서 선미부(B)와 함께 동시에 건조된 선수부(A)를 그리퍼잭장치(40)를 이용하여 이를 진수바지데크(10)로 이송하는 선수부(A) 이송단계와; 상기 진수바지데크(10)로 이송된 선수부(A)를 진수하여 플로팅도크에서 선박의 선수부(A)와 선미부(B)를 상호 연결하여 동시에 선박 건조를 완료하는 선수부 및 선미부 연결단계로 이루어지는 것을 특징으로 하는 해상의 진수바지와 육상의 진수이송구조를 이용한 선박 건조공법.Mooring the launching deck deck (10) on the sea quay adjacent to the land by installing a support jig (60) seated on the upper surface of the wood bark deck from the inside, the outside on the launching deck deck (10) and the support jig (60) Installed in the inner side of the launching deck deck 10 is installed in parallel with the longitudinal direction and the wood beam for the support of the stern portion (B) is installed on the upper surface of the grille beam 50 of the upper side down light type is installed At the same time installed in the inside of the grilling beam 50 to support the center of the bottom surface of the stern portion (B) to install a fixed banshin wood is installed on the top surface of the launching deck deck 10, but the support jig 60 and the stern portion drying step of drying the stern portion (B) in the launching bar deck 10, the grillage beam 50 and the fixed board is installed; One side of the launching bar deck 10 is installed on the grille beam 50 extension line of the launching bar deck 10 on the land in close contact with the inner wall guides the dried bow portion (A) toward the launching bar deck 10 The launching unit 20 is installed in close contact with the bottom of the bowing unit A and installed inside and outside the launching unit 20. After supporting the bowing unit A, it moves to the launching deck deck 10 and at the same time, the bowing unit. On the bottom of (A) is installed a sliding banche 30 so as to be automatically separated and installed on both sides of the sliding banche 30 to support the inside and outside of the stern part (B) on the upper surface of the barge deck 10 In addition to installing the support jig 60 is installed wood timber is installed in the rear end of the launching conveying unit 20, after the fore part (A) to dry and to move it toward the launching deck deck (10) to the rear of the bow (A) Installed in close contact with the head block 41 and the head block 41 A series of gripper jack devices 40 including a gripper assembly 42, a driving unit 43, a transformer 44, and the like, wherein the launching unit 20 and the sliding board 30 and the supporting jig 60 are installed. A bow part drying step of drying the bow part A from the upper part of the head; The stern part (A) is dried together with the stern part (B) drying at the same time and the stern part (B) of the ship constructed in the launching deck deck (10) to launch and re-docking it to the floating dock (70) B) redocking step; A bow portion (A) transfer step of transferring the bow portion A, which is simultaneously dried together with the stern portion B on the land, to the launching bar deck 10 by using the gripper jack device 40; The bow portion and the stern portion connecting step of simultaneously completing the ship construction by interconnecting the bow portion (A) and the stern portion (B) of the ship in a floating dock by launching the bow portion (A) transferred to the launching deck deck (10) Ship building method using the launching pants of the sea and the launching structure of the land characterized in that the.
KR1020050067911A 2005-07-26 2005-07-26 Build apparatus and construction for ship at the same time using launching barge and launching transfer structure KR100696022B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020050067911A KR100696022B1 (en) 2005-07-26 2005-07-26 Build apparatus and construction for ship at the same time using launching barge and launching transfer structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020050067911A KR100696022B1 (en) 2005-07-26 2005-07-26 Build apparatus and construction for ship at the same time using launching barge and launching transfer structure

Publications (2)

Publication Number Publication Date
KR20070013529A KR20070013529A (en) 2007-01-31
KR100696022B1 true KR100696022B1 (en) 2007-03-16

Family

ID=38013211

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050067911A KR100696022B1 (en) 2005-07-26 2005-07-26 Build apparatus and construction for ship at the same time using launching barge and launching transfer structure

Country Status (1)

Country Link
KR (1) KR100696022B1 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100914385B1 (en) * 2007-08-29 2009-08-28 에스티엑스조선주식회사 Method to load big size block to floating dock and rendezvous on the sea for erection using the same
KR200475336Y1 (en) * 2013-03-28 2014-11-25 대우조선해양 주식회사 Pad Device of Skid Member
CN104229099B (en) * 2014-09-15 2016-09-28 南通中远船务工程有限公司 A kind of ocean engineering ship carries the system and method for lower water
KR102576354B1 (en) * 2018-09-21 2023-09-11 한화오션 주식회사 Manufacturing method for liquefied natural gas carrier
KR102576353B1 (en) * 2018-09-21 2023-09-11 한화오션 주식회사 Manufacturing method of liquefied natural gas carrier
CN114475970B (en) * 2021-12-28 2024-08-16 海洋石油工程(青岛)有限公司 Semi-submersible platform lower floating body docking limiting process and special hydraulic limiter thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6018480A (en) 1983-07-08 1985-01-30 Hitachi Zosen Corp Method of remodeling two tankers into coupled type carrier ship/floating dock
JPS60135396A (en) 1983-12-23 1985-07-18 Tomoegumi Giken:Kk Pusher
KR20030083938A (en) * 2002-04-23 2003-11-01 삼성중공업 주식회사 Shipbuilding method on floating dock
KR100424201B1 (en) * 2001-05-10 2004-03-24 대우조선해양 주식회사 A procedure of constructing ship by skidding super block and its skidding system
KR20050119530A (en) * 2004-06-16 2005-12-21 주식회사 한진중공업 Ship construction method by underwater mounting

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6018480A (en) 1983-07-08 1985-01-30 Hitachi Zosen Corp Method of remodeling two tankers into coupled type carrier ship/floating dock
JPS60135396A (en) 1983-12-23 1985-07-18 Tomoegumi Giken:Kk Pusher
KR100424201B1 (en) * 2001-05-10 2004-03-24 대우조선해양 주식회사 A procedure of constructing ship by skidding super block and its skidding system
KR20030083938A (en) * 2002-04-23 2003-11-01 삼성중공업 주식회사 Shipbuilding method on floating dock
KR20050119530A (en) * 2004-06-16 2005-12-21 주식회사 한진중공업 Ship construction method by underwater mounting

Also Published As

Publication number Publication date
KR20070013529A (en) 2007-01-31

Similar Documents

Publication Publication Date Title
KR100696022B1 (en) Build apparatus and construction for ship at the same time using launching barge and launching transfer structure
TWI314536B (en) Method for building ship on ground and launching ship using skid launching system
KR100809539B1 (en) Method of constructing Ship using Barge
KR101731878B1 (en) Method of inclining test for semi-submergible RIG
KR102436714B1 (en) Vessel hull for use as a hull of a floating hydrocarbon storage and/or processing plant, method for producing such a vessel hull, vessel comprising such a vessel hull, as well method for producing such a vessel having such a vessel hull
KR101865164B1 (en) Separable type offshore structures installation vessels and method of operating the same
US20080264322A1 (en) Configurable Multi-Function Vessel
EP3221213B1 (en) A submersible vessel for dry docking a vessel
CN102356021B (en) For loading and transport the slippery boots assembly of macrostructure
US6347909B1 (en) Method to transport and install a deck
US20080196655A1 (en) Vessels
KR101864144B1 (en) Offshore structure installation ship
AU2010216206B2 (en) Skid beam assembly for loading and transporting large structures
KR101750322B1 (en) Mounting method in semi-submersible floating production unit
KR100835493B1 (en) A shipbuilding method using three-point contact skids
JPS61202998A (en) Block device for dock
GB2144680A (en) Method and apparatus for vessel repair
KR20170030200A (en) Offshore structure installation vessel
KR100914843B1 (en) Method for constructing body block of ship using submarine-barge
KR102260244B1 (en) Offshore structure installation vessel
GB2186527A (en) Platform topsides removal vessel
KR20120075784A (en) Full tandem construction method in dock
SU1076521A1 (en) Method and apparatus for sliding a support unit onto paired transportation pontoons
RU2476346C1 (en) Method of unit building of ship with plug-in freight tanks
OA20621A (en) A submersible vessel for dry docking a vessel.

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130304

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20140220

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20150302

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20160223

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20170303

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20180308

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20190306

Year of fee payment: 13