KR100691656B1 - anchor having umbrella ribs for repairing destroyed parts of underwater concrete structure and method for repairing destroyed parts using the anchor - Google Patents

anchor having umbrella ribs for repairing destroyed parts of underwater concrete structure and method for repairing destroyed parts using the anchor Download PDF

Info

Publication number
KR100691656B1
KR100691656B1 KR1020020058860A KR20020058860A KR100691656B1 KR 100691656 B1 KR100691656 B1 KR 100691656B1 KR 1020020058860 A KR1020020058860 A KR 1020020058860A KR 20020058860 A KR20020058860 A KR 20020058860A KR 100691656 B1 KR100691656 B1 KR 100691656B1
Authority
KR
South Korea
Prior art keywords
umbrella
concrete structure
anchor
fracture surface
length
Prior art date
Application number
KR1020020058860A
Other languages
Korean (ko)
Other versions
KR20040027113A (en
Inventor
이화선
Original Assignee
주식회사 엠티마스타
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 엠티마스타 filed Critical 주식회사 엠티마스타
Priority to KR1020020058860A priority Critical patent/KR100691656B1/en
Publication of KR20040027113A publication Critical patent/KR20040027113A/en
Application granted granted Critical
Publication of KR100691656B1 publication Critical patent/KR100691656B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0203Arrangements for filling cracks or cavities in building constructions
    • E04G23/0211Arrangements for filling cracks or cavities in building constructions using injection
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G9/00Forming or shuttering elements for general use
    • E04G9/02Forming boards or similar elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

본 발명에 따른 육상 및 수중에 설치된 콘크리트 구조물의 파단면 보수를 위한 우산살 앵커 및 이를 이용한 파단면 보수공법은, 콘크리트 구조물의 열화로 인하여 파단된 부위를 보수하기 위하여 파단면에 우산살 앵커를 설치한 후에 타설되는 몰탈과 부착력을 증대시켜 보수효과를 높이기 위하여 설치한 우산살 앵커는 몸체 전체에 나사홈이 형성된 중앙 지지봉에 나사로 체결된 지지너트 주위에 다수개 설치된 우산살과 우산살을 서로 연결하는 연결재로 이루어진 우산살 앵커와 이를 이용한 파단면 보수공법은 콘크리트 구조물의 열화부분을 확인하여 치핑 부위를 마킹하는 단계; 마킹된 치핑 부위를 완전히 치핑처리하는 단계; 다수의 우산살 앵커를 상기 파단면 부분에 설치하는 단계; 다수의 우산살 앵커가 설치된 파단면 부위에 몰탈로 채움하여 미장을 완료하는 단계; 미장을 완료한 콘크리트 구조물의 파단면 부위를 미려하게 마감정리하는 단계를 거치는 경우는 육상에 설치된 콘크리트 구조물의 파단면을 보수하는 것이며, Umbrella anchor for repairing the fracture surface of the concrete structure installed on the land and water according to the present invention and the fracture surface repair method using the same, to install the umbrella anchor anchor on the fracture surface to repair the fractured area due to deterioration of the concrete structure Umbrella anchors installed to increase the repair effect by increasing mortar and adhesion after being poured are connected to each other by connecting a plurality of umbrellas and umbrellas installed around the support nuts fastened with screws to the central support rods where the thread grooves are formed throughout the body. Umbrella anchor made of a connecting material and the fracture surface repair method using the same step of identifying the chipping site by identifying the deterioration of the concrete structure; Fully chipping the marked chipping site; Installing a plurality of umbrella anchors in the fracture surface portion; Filling the fracture surface portion with a plurality of umbrella anchor anchors with mortar to complete the plastering; In the case of finishing the trimmed surface of the fractured surface of the finished concrete structure, the fractured surface of the concrete structure installed on the land is repaired.

수중에 설치된 수중 콘크리트 구조물의 파단면을 보수할 경우에는 수중 콘크리트 구조물의 열화부분을 확인하여 치핑 부위를 마킹하는 단계; 마킹된 치핑 부위를 완전히 치핑처리하는 단계; 다수의 우산살 앵커를 상기 파단면 부분에 설치하는 단계; 그 중심부에는 노즐이 설치되고, 가장자리에는 다수의 볼트삽입공이 형성되어 있는 판재형 거푸집을 세트 앵커 볼트를 이용하여 수중 콘크리트 구조물의 파단면 부분에 고정하는 단계; 거푸집 위에 다수의 막대부재를 보강 설치하는 단계; 거 푸집과 콘크리트면의 경계부위를 완전히 씰링하는 한편, 거푸집에 몰탈 주입 및 에어 배출을 위한 2개의 호스를 각각 설치하는 단계; 상기 2개의 호스를 이용하여 거푸집 내부의 물을 빼내고, 내부를 건조시키는 단계; 거푸집 중심부의 노즐을 통해 거푸집 내부에 중성화방지제 및 방청제를 살포하는 단계; 거푸집 내부에 몰탈을 충전하고, 호스 및 노즐을 밀봉 절단한 후 마감 처리하는 단계를 포함한다.When repairing the fracture surface of the underwater concrete structure installed in the water to check the deterioration of the concrete structure marking the chipping site; Fully chipping the marked chipping site; Installing a plurality of umbrella anchors in the fracture surface portion; A nozzle is installed at a center thereof, and a plate-shaped formwork having a plurality of bolt insertion holes formed at an edge thereof is fixed to a fracture surface portion of the underwater concrete structure using a set anchor bolt; Reinforcing and installing a plurality of rod members on the formwork; Completely sealing the boundary between the formwork and the concrete surface, and installing two hoses each for mortar injection and air discharge in the formwork; Draining the water inside the formwork using the two hoses and drying the inside; Spraying anti-neutralizing agent and anti-rusting agent in the formwork through the nozzle in the formwork center; Filling the mold with mortar, sealing and cutting the hoses and nozzles, and then finishing.

Description

콘크리트 구조물의 파단면 보수를 위한 우산살 앵커 및 이를 이용한 파단면 보수공법{anchor having umbrella ribs for repairing destroyed parts of underwater concrete structure and method for repairing destroyed parts using the anchor} Anchor having umbrella ribs for repairing destroyed parts of underwater concrete structure and method for repairing destroyed parts using the anchor}             

도 1은 본 발명의 우산살 앵커를 보여 주는 도면.       1 is a view showing the umbrella anchor anchor of the present invention.

도 2는 도 1의 우산살 앵커의 우산살 설치를 상세하게 보여 주는 상세도면.       Figure 2 is a detailed view showing in detail the installation of the umbrella of the umbrella anchor of Figure 1;

도 3은 본 발명에 따른 콘크리트 구조물의 파단면 보수공법에 따라 콘크리트 구조물의 치핑 부위에 스텐레스 우산살 앵커를 설치한 상태를 보여주는 도면.Figure 3 is a view showing a state in which a stainless steel umbrella anchor installed on the chipping site of the concrete structure according to the fracture surface repair method of the concrete structure according to the present invention.

도 4는 본 발명에 따른 콘크리트 구조물의 파단면 보수공법에 따라 치핑 부위에 설치될 거푸집의 제작 상태를 보여주는 도면.Figure 4 is a view showing the manufacturing state of the formwork to be installed in the chipping site according to the fracture surface repair method of the concrete structure according to the present invention.

도 5는 본 발명에 따른 콘크리트 구조물의 파단면 보수공법에 따라 거푸집을 치핑 부위에 설치한 상태를 보여주는 도면.5 is a view showing a state in which the formwork is installed in the chipping site according to the fracture surface repair method of the concrete structure according to the present invention.

도 6은 도 4의 거푸집을 설치함에 있어서, 거푸집과 콘크리트면 사이에 고무 패킹을 개재하여 거푸집을 설치하는 과정을 보여주는 도면.6 is a view showing the process of installing the formwork through the rubber packing between the formwork and the concrete surface in installing the formwork of FIG.

도 7 및 도 8은 본 발명에 따른 콘크리트 구조물의 파단면 보수공법에 따라 거푸집의 설치 후, 거푸집 위에 보강용 막대 부재를 설치한 상태를 보여주는 도면.7 and 8 are views showing a state in which the reinforcing rod member is installed on the formwork after the formwork is installed according to the fracture surface repair method of the concrete structure according to the present invention.

도 9는 본 발명에 따른 콘크리트 구조물의 파단면 보수공법에 따라 보강용 막대 부재의 설치 후, 콘크리트면과 거푸집의 경계부위를 씰링한 상태를 보여주는 도면.9 is a view showing a state of sealing the boundary between the concrete surface and the formwork after the installation of the reinforcing rod member according to the repair method of the fracture surface of the concrete structure according to the present invention.

도 10은 본 발명에 따른 콘크리트 구조물의 파단면 보수공법에 따라 거푸집 내부의 물을 빼내고 건조시키는 과정을 보여주는 도면.10 is a view showing a process of extracting and drying the water inside the formwork according to the fracture surface repair method of the concrete structure according to the present invention.

도 11은 본 발명에 따른 콘크리트 구조물의 파단면 보수공법에 따라 도 10의 건조 후, 거푸집 내부에 몰탈을 충전한 상태를 보여주는 도면.11 is a view showing a state in which the mortar is filled in the formwork after drying of FIG. 10 according to the fracture surface repair method of the concrete structure according to the present invention.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

10... 우산살 앵커 11...중앙 지지봉10 ... umbrella anchor 11 ... center support rod

12... 나사홈 13... 지지너트12.Screw groove 13 ... Support nut

14... 우산살 15... 연결재14 ... umbrellas 15 ... connector

16... 외측 우산살 길이 17... 내측 우산살 길이 16 ... outer umbrella length 17 ... inner umbrella length

101...콘크리트 구조물 103... 거푸집101 ... concrete structure 103 ... formwork

104...볼트삽입공 105... 노즐 삽입공104 ... Bolt insert hole 105 ... Nozzle insert hole

106...세트 앵커 볼트 107... 고무 패킹 106 ... set anchor bolts 107 ... rubber packing

108...막대 부재 109,110... 호스108 ... bar member 109,110 ... hose

111...몰탈 주입기 115... 스프레이 노즐 111 ... mortar injector 115 ... spray nozzle

본 발명은 콘크리트 구조물의 파단면 보수를 위한 우산살 앵커 및 이를 이용한 파단면 보수공법에 관한 것으로서, 특히 콘크리트 구조물의 파단면에 우산살 앵커를 설치한 후에 타설되는 몰탈과 부착력을 증대시켜 보수효과를 높이기 위하여 몸체 전체에 나사홈이 형성된 중앙 지지봉에 나사로 체결된 지지너트 주위에 다수개 설치된 우산살과 우산살을 서로 연결하는 연결재로 이루어진 우산살 앵커를 파단면에 설치하고 몰탈을 파단면에 충전하여 미장을 완료하여 파단면을 보수하는 육상에 설치된 콘크리트 구조물의 경우와 수중에 설치된 콘크리트 구조물의 경우에는       The present invention relates to an umbrella bar anchor for repairing a fracture surface of a concrete structure and a fracture surface repair method using the same, and in particular, after the installation of the umbrella anchor anchor on the fracture surface of the concrete structure to increase the mortar and adhesion to be poured after repairing effect To increase the height, install an umbrella bar anchor made of a plurality of umbrella bars and a connecting member connecting the umbrella bars to the support nut fastened with screws to the central support bar with the screw groove formed on the whole body. In the case of concrete structures installed on land that have completed plastering to repair the fracture surface, and concrete structures installed underwater

상기 우산살 앵커를 파단면에 설치하고 섬유와 에폭시의 합성재질로 제작된 거푸집을 수중 콘크리트 구조물의 파단면(치핑부위)에 설치하고, 그 내부를 건조시킨 후 몰탈을 충전함으로써 파단면을 효과적으로 견고하게 보수할 수 있는 콘크리트 구조물의 파단면 보수를 위한 우산살 앵커와 이를 이용한 보수공법에 관한 것이다.The umbrella anchor is installed on the fracture surface, and the formwork made of synthetic material of fiber and epoxy is installed on the fracture surface (chipping area) of the underwater concrete structure, and after drying the inside, the fracture surface is effectively secured by filling mortar. The present invention relates to an umbrella anchor for repairing a fracture surface of a concrete structure that can be easily repaired, and a repair method using the same.

일반적으로, 콘크리트 구조물은 육상과 수중에 설치되는데 육상에 설치된 콘크리트 구조물의 경우 오염된 대기에 의해 산성화된 우수와 하절기와 동절기의 외기의 온도차가 반복됨으로서 콘크리트 표면을 점차 열화시켜 부식을 발생시키거나 산성화된 우수에 의해 백화현상을 거쳐 노후화가 진전되어 콘크리트의 강도가 급격히 저하되어 구조물의 취약성을 나타내게 된다. 이러한 부위를 보수하여야 하는데 기존 콘크리트와 보수 몰탈과의 부착력, 강도등에 취약점을 보이고 있어 신중한 보수방법이 요구되고 있다. 한편, 수중에 설치된 콘크리트 구조물의 경우에는 물이라는 매체에 그 구조물 몸체의 전부 혹은 일부가 늘 침잠되어 있어서, 물의 빠 른 흐름에 의한 접촉마찰이나 파도 등에 의한 부딪힘, 그리고 수압 등에 의해 끊임없이 외부적으로 외력을 받고 있다. 따라서, 수중 콘크리트 구조물에 있어서, 물에 의해 가장 집중적으로 외력을 당하는 부위나 가장 취약한 부분은 서서히 열화되어 점차 치핑(chipping) 현상이 발생하게 된다. 이러한 치핑 현상을 조기에 발견하여 그에 대한 적절한 조치를 취하지 않을 경우 콘크리트 구조물의 강도는 급격히 저하되고, 마침내 붕괴라는 최악의 사태에 이르게 된다. 육상 또는 수중에 설치되어 있는 콘크리트 구조물중 수중에 설치되어 있는 콘크리트 구조물의 경우 그 상황적 특성 때문에 유지 및 보수가 결코 수월하지가 않다. 즉, 물이라는 방해물을 극복하고, 원하는 작업을 수행해야 하므로 기술적으로, 비용적으로, 많은 어려움이 수반되고, 또한 무엇보다도 안전사고까지 각별히 고려해야 하기 때문에 작업에 있어서 더욱 신중을 요하고 있다.        In general, concrete structures are installed on land and in water. In the case of concrete structures installed on land, the concrete surface is gradually deteriorated by corrosion and acidification due to recurring temperature difference between the rainwater acidified by the polluted atmosphere and the outdoor air in summer and winter. Aging progresses through aging and the aging progresses, and the strength of concrete decreases rapidly, indicating the fragility of the structure. This part needs to be repaired. However, since it shows weakness in the adhesion and strength between the existing concrete and the repair mortar, a careful repair method is required. On the other hand, in the case of concrete structures installed underwater, all or part of the body of the structure is always submerged in the medium of water, and the external force is constantly externally affected by contact friction, bumps caused by waves, and water pressure due to rapid flow of water. Is getting. Therefore, in the underwater concrete structure, the most intensely affected areas or the most vulnerable parts by the water is gradually degraded, the chipping phenomenon occurs gradually. If this chipping phenomenon is not detected early and appropriate action is taken, the strength of the concrete structure is drastically lowered and finally leads to the worst case of collapse. In the case of concrete structures installed on land or in water, concrete structures installed in water are not easy to maintain and repair due to their situational characteristics. In other words, because it is necessary to overcome the obstacles of water and perform the desired work, technical, cost, and many difficulties are involved, and above all, safety accidents require special consideration because they require special consideration.

본 발명은 이상과 같은 사항을 감안하여 창출된 것으로서, 콘크리트 구조물의 파단면을 효과적으로 견고하게 보수할 수 있는 육상 및 수중에 설치된 콘크리트 구조물의 파단면 보수를 위한 우산살 앵커 및 이를 이용한 파단면 보수공법을 제공함에 그 목적이 있다.
The present invention was created in view of the above-mentioned matters, an umbrella anchor for repairing a fracture surface of a concrete structure installed on land and underwater, which can effectively repair a fracture surface of a concrete structure, and a fracture surface repair method using the same. The purpose is to provide.

상기의 목적을 달성하기 위하여 본 발명은 육상 및 수중에 설치된 콘크리트 구조물의 파단면부위에 보수를 실시할 수 있도록 구성된 것으로서 본 발명에 따른 콘크리트 구조물의 파단면 보수를 위한 우산살 앵커와 이를 이용한 파단면 보수공법은, 콘크리트 구조물의 열화로 인하여 파단된 부위를 보수하기 위하여 파단면에 우산살 앵커(10)를 다수개 설치한 후에 타설되는 몰탈과 부착력을 증대시켜 보수효과를 높이기 위하여 설치한 우산살 앵커(10)는 몸체 전체에 나사홈(12)이 형성된 중앙 지지봉(11)에 다수개 설치된 나사로 체결된 각형의 지지너트(13) 주위에 다수개 설치된 우산살(14)과 우산살(14)을 서로 연결하는 연결재(15)로 이루어진 우산살 앵커(10)와 이를 이용하여 콘크리트 구조물의 파단면을 보수하기 위한 공법에 있어서,        In order to achieve the above object, the present invention is configured to perform repair on the broken surface portion of the concrete structure installed on land and water, the umbrella anchor for repairing the fracture surface of the concrete structure according to the present invention and the fracture surface using the same Repairing method is to install a plurality of umbrella anchor anchor 10 on the fracture surface to repair the site broken due to deterioration of the concrete structure, the umbrella anchor anchor installed to increase the repair effect by increasing mortar and adhesion strength 10 is a plurality of Umbrella 14 and Umbrella 14 installed around the support nut 13 of the square fastened with a plurality of screws installed in the central support rod 11 formed with a screw groove 12 in the entire body. In the construction method for repairing the fracture surface of the concrete structure using the umbrella anchor anchor 10 made of a connecting material (15) connected to each other,

육상에 설치된 콘크리트 구조물의 경우에는       In the case of concrete structures installed on land

(a) 보수 대상의 상기 콘크리트 구조물의 열화부분을 직접 육안으로 확인하고, 치핑 부위를 마킹하는 단계;       (a) visually identifying the deteriorated portion of the concrete structure to be repaired and marking a chipping site;

(b) 브레이커를 이용하여 상기 마킹된 치핑 부위를 일정 영역만큼 완전히 치핑처리하는 단계;       (b) completely chipping the marked chipping area by a predetermined area using a breaker;

(c) 콘크리트 구조물 몸체에의 새로운 부재의 확실한 접착을 위해 상기 다수개의 우산살 앵커를 상기 파단면 부분에 적당한 간격으로 설치하는 단계;        (c) installing the plurality of umbrella anchors at appropriate intervals in the fracture surface portion for secure adhesion of the new member to the concrete structure body;

(d) 상기 다수의 우산살 앵커가 설치된 파단면 부위에 몰탈로 채움하여 미장을 완료하는 단계; 및        (d) filling the fracture surface with the plurality of umbrella anchors with mortar to complete plastering; And

(e) 미장을 완료한 콘크리트 구조물의 파단면 부위를 미려하게 마감정리하는 단계로 이루어지는 것을 특징으로 하고 있다.       (e) It is characterized by consisting of the step of finishing the beauty of the fracture surface of the finished concrete structure.

이때 우산살 앵커는 파단면 부위에 충전되는 몰탈과의 부착력을 높이기 위하여 설치하는 것으로서 파단면에 접착제를 도포한 후에 상기 우산살 앵커를 설치하여 몰탈을 파단면에 충전 미장할 수도 있다.        In this case, the umbrella anchor may be installed to increase the adhesion force with the mortar to be filled in the fracture surface portion, and after the adhesive is applied to the fracture surface, the umbrella anchor may be installed to fill the mortar with the fracture surface.

한편, 수중에 설치된 콘크리트 구조물의 경우에는        On the other hand, in the case of concrete structures installed underwater

(a) 보수 대상의 상기 수중 콘크리트 구조물의 열화부분을 직접 잠수하여 육안으로 확인하고, 치핑 부위를 마킹하는 단계;       (a) visually submerging the deteriorated portion of the underwater concrete structure to be repaired and visually marking the chipping site;

(b) 수중용 브레이커를 이용하여 상기 마킹된 치핑 부위를 일정 영역만큼 완전히 치핑처리하는 단계;       (b) completely chipping the marked chipping site by an area using an underwater breaker;

(c) 수중 콘크리트 구조물 몸체에의 새로운 부재의 확실한 접착을 위해 상기 다수개의 우산살 앵커를 상기 파단면 부분에 적당한 간격으로 설치하는 단계;        (c) installing the plurality of umbrella anchors at appropriate intervals in the fracture surface portion for secure adhesion of the new member to the underwater concrete structure body;

(d) 수압에 견딜 수 있는 정도의 강도와 어느 정도의 휨성을 갖는 판재형 거푸집을 상기 파단면 부분보다 상대적으로 크게 제작하고, 거푸집의 가장자리에는 거푸집을 수중 콘크리트 구조물에 고정시키기 위한 다수의 볼트삽입공을 형성하며, 거푸집의 중심부위에는 스프레이 노즐의 삽입을 위한 노즐삽입공을 형성하여, 그 노즐삽입공에 노즐을 설치하는 단계;       (d) A plate-shaped formwork having strength and a degree of deflection to withstand hydraulic pressure is made relatively larger than the fracture surface portion, and a plurality of bolt inserts are formed at the edge of the formwork to fix the formwork to the underwater concrete structure. Forming a ball, forming a nozzle insertion hole for inserting the spray nozzle on the center of the formwork, and installing the nozzle in the nozzle insertion hole;

(e) 상기 거푸집을 파단면 부분에 대고 거푸집의 가장 자리에 형성된 다수의 볼트삽입공에 대응하여 수중 콘크리트 구조물의 콘크리트 면에 구멍을 각각 형성한 후, 세트 앵커 볼트를 각각 설치하여 거푸집을 콘크리트 구조물의 파단면 부분에 고정하는 단계;        (e) Forming holes in the concrete surface of the underwater concrete structure corresponding to the plurality of bolt insertion holes formed at the edge of the form by placing the formwork on the fracture surface portion, and then install the set anchor bolts respectively to form the formwork Fixing to the fracture surface portion of the;

(f) 상기 설치된 거푸집 위에 보수재 주입시 압력에 의한 외부쪽으로의 휨 현상을 막기 위하여 상기 거푸집 위에 다수의 막대부재를 서로 일정 간격 이격하여 각각 설치하는 단계;        (f) installing a plurality of rod members spaced apart from each other at regular intervals on the formwork to prevent warpage to the outside due to pressure when water is injected into the installed formwork;

(g) 수중용 에폭시 퍼티를 사용하여 거푸집과 콘크리트면의 경계부위를 완전히 씰링하는 한편, 거푸집의 소정 부위에 몰탈 주입 및 에어 배출을 위한 2개의 호스를 각각 설치하는 단계;       (g) completely sealing the boundary between the formwork and the concrete surface using an underwater epoxy putty, while respectively installing two hoses for mortar injection and air discharge at predetermined portions of the formwork;

(h) 상기 2개의 호스 설치가 완료되면, 외압이 없는 상태에서 충분한 시간 동안 자연 양생시키는 단계;        (h) upon completion of the installation of the two hoses, natural curing for a sufficient time in the absence of external pressure;

(i) 상기 양생 후, 2개의 호스중 일측 호스에 에어를 주입하여 타측 호스로 거푸집 내부의 물을 빼내고, 마침내 타측 호스로 에어가 나올 때 그 타측 호스를 막아 거푸집 내부의 압력을 높이고, 그 상태에서 에어의 유출 여부를 확인하는 단계;        (i) After curing, inject air into one of the two hoses to drain the water inside the form with the other hose, and when the air finally comes out with the other hose, block the other hose to increase the pressure inside the form, and then Checking whether air is leaked from the air;

(j) 상기 확인 결과 에어의 유출이 없으면, 상기 일측 호스로 에어를 주입하고 타측 호스로 에어가 빠져나올 수 있도록 하여, 새로운 에어를 일정 시간 동안 거푸집 내부에 통과시켜 거푸집 내부를 건조시키는 단계;        (j) if there is no outflow of air as a result of the check, injecting air into the one hose and the air to escape to the other hose, the new air is passed through the inside of the formwork for a predetermined time to dry the formwork interior;

(k) 상기 건조가 완료되면, 상기 단계 (d)에서 설치한 스프레이 노즐을 이용하여 중성화방지제 및 방청제를 거푸집 내부에 살포하는 단계;       (k) when the drying is completed, spraying the anti-neutralizing agent and the anti-rusting agent into the formwork using the spray nozzle installed in the step (d);

(l) 상기 두 개의 호스중 타측 호스에 몰탈 주입기를 연결하고, 압력을 체크하면서 서서히 몰탈을 주입하여 일측 호스로 주입된 몰탈이 다시 토출되면, 두 개의 호스를 동시에 견고하게 밀봉하는 단계; 및       (l) connecting the mortar injector to the other hose of the two hoses, and slowly injecting mortar while checking the pressure, and when the mortar injected into the one hose is discharged again, sealing the two hoses at the same time; And

(m) 상기 두 개의 호스의 밀봉 후, 외압이 없는 상태에서 충분히 양생시킨 뒤 각 호스 및 노즐을 절단하고, 그 부위를 몰탈로 마감 처리하는 단계를 포함하는 점에 그 특징이 있다.       (m) After sealing the two hoses, it is characterized in that it comprises the steps of curing each hose and nozzle after curing sufficiently in the absence of the external pressure, and finishing the site with mortar.

여기서, 상기 단계 (e)에서, 세트 앵커 볼트를 이용하여 거푸집을 콘크리트 구조물의 파단면 부분에 고정함에 있어서, 바람직하게는 세트 앵커 볼트에 고무 패킹을 끼운 후, 거푸집을 앵커 볼트에 체결하여 고정시킨다. 이와 같이 고무 패킹을 끼우는 것은 앵커 볼트 주변의 씰링 불량을 방지하기 위한 것이다.       Here, in the step (e), in fixing the formwork to the fracture surface portion of the concrete structure using the set anchor bolt, and preferably after the rubber packing is fitted to the set anchor bolt, the formwork is fastened to the anchor bolt to fix it . The fitting of the rubber packing in this way is to prevent the sealing failure around the anchor bolt.

또한, 상기 단계 (j)의 건조 작업에 있어서, 염분이 있는 지역일 경우에는 염분이 없는 물로 거푸집 내부를 통과시켜 파단면 내면부에 묻어 있는 염분을 씻어낸 후, 에어 주입에 의한 건조 작업을 수행한다.       In addition, in the drying operation of step (j), in the case of a salty area, after passing through the formwork with salt-free water to wash the salts on the inner surface of the fracture surface, and then perform the drying operation by air injection. do.

<실시예><Example>

이하 첨부된 도면을 참조하면서 본 발명의 실시예를 상세히 설명한다.       Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

본 발명에 따른 콘크리트 구조물의 파단면 보수를 위한 우산살 앵커 및 이를 이용한 파단면 보수공법에 따라, 도 1과 도 2에 도시된 바와 같이 몸체 전체에 나사홈(12)이 형성된 중앙 지지봉(11)에 나사로 체결된 각형의 지지너트(13) 주위에 다수개 설치된 우산살(14)과 우산살(14)을 서로 연결하는 연결재(15)로 이루어진 우산살 앵커(10)를 파단면에 현장 여건에 따라 다수개 설치한다. 이때 우산살 앵커(10)의 재질은 철재, 스테인레스, 프라스틱 재질을 선택적으로 사용할 수 있다.       In accordance with the umbrella anchor for repairing the fracture surface of the concrete structure according to the invention and the fracture surface repair method using the same, as shown in Figure 1 and 2, the central support rod 11 is formed with a screw groove 12 in the entire body On the site of the broken umbrella anchor anchor (10) made of a connecting member (15) connecting the plurality of umbrellas (14) and the umbrellas (14) installed around the rectangular support nut (13) fastened with screws Install several. At this time, the material of the umbrella anchor anchor 10 may be selectively used steel, stainless, plastic material.

또한, 중앙 지지봉(11) 주위에 설치된 나사홈(12)은 지지너트(13)의 중앙에 형성된 홈내에 나사홈을 설치하여 중앙 지지봉(11)의 나사홈(12)과 나사로 체결하여 원하는 중앙 지지봉(11)의 위치에 설치하도록 하기 위함이다. 지지너트(13)는 각이진 너트를 사용하는데 각진면에 일체로 우산살(14)과 연결재(15)를 일체로 연결설치 하는 것이며 지지너트(13)는 육각형, 오각형등 그 형태는 설치되는 현장 여건에 따라 선택적으로 사용한다. 우산살(14)과 연결재(15)는 파단면에 우산살 앵커(10)를 설치하고 몰탈을 타설할 때 몰탈과 부착력을 보다 더 증대시키기 위하여 설치하는 것이데 설치 개수는 현장의 여건에 따라 선택적으로 설치한다. 또한, 우산살(14)의 굵기는 1.5㎜와 2.0㎜를 사용하는데 우산살(14)의 굵기가 1.5㎜인 경우에는 우산살(14)과 우산살(14) 사이에 설치되는 연결재(15)에 의해 설정되는 우산살(14)의 간격은 우산살(14)의 길이를 총 25㎜로 하는 경우 내측 우산살 길이(17)를 20㎜로 하고, 외측 우산살 길이(16)를 5㎜하여 연결재(15)를 설치하고, 우산살(14)의 길이를 총 50㎜로 하는 경우 외측 우산살 길이(16)를 20㎜하고, 내측 우산살 길이(17)를 30㎜하여 연결재(15)를 설치하고, 우산살(14)의 길이를 총 75㎜로 하는 경우 외측 우산살 길이(16)를 35㎜로 하고, 내측 우산살 길이(17)를 40㎜하여 연결재(15)를 설치하고, 우산살(14)의 길이를 총 100㎜로 하는 경우 연결재(15)를 2개 설치하는데 외측 우산살 길이(16)를 40㎜로 하고, 내측 우산살 길이(17)를 20㎜로 하되 내측과 외측 우산살 길이(17,16)의 중간의 길이를 40㎜가 되게 연결재(15)를 설치한다. 또한, 우산살(14)의 굵기를 2.0㎜로 하는 경우에는 우산살(14)과 우산살(14)의 연결을 위한 연결재(15)를 2개 설치하는데 우산살(14)의 길이를 총 125㎜로 하는 경우, 외측 우산살 길이(16)를 50㎜하고, 내측 우산살 길이(17)를 25㎜하되 내측과 외측 우산살 길이(17,16)의 중간의 길이를 50㎜가 되게 연결재(15)를 설치하며, 우산살(14)의 길이를 총 150㎜로 하는 경우, 외측 우산살 길이(16)를 50㎜하고, 내측 우산살 길이(17)를 50㎜하되 내측과 외측 우산살 길이(17,16)의 중간의 길이를 50㎜가 되도록 연결재(15)를 설치한 우산살 앵커(10)를 파단면 부위에 설치하여 보수를 하게 된다. 이를 이용하여 보수공사를 시행하게 되는 과정을 살펴보면, 육상에 설치된 콘크리트 구조물의 파단면 부위에 대한 보수방법은 먼저 보수 대상의 콘크리트 구조물의 열화부분을 직접 육안으로 확인하고, 치핑 부위를 마킹하게 된다. 그런 후, 브레이커(breaker)를 이용하여 상기 마킹된 치핑 부위를 일정 영역만큼 완전히 치핑 처리한 후에 상기 다수의 우산살 앵커가 설치된 파단면 부위에 몰탈로 채움하여 미장을 완료하고 미장을 완료한 콘크리트 구조물의 파단면 부위를 미려하게 마감정리하는 단계를 거쳐 육상에 설치된 콘크리트 구조물의 파단면에 대한 보수작업이 완료하게 된다.       In addition, the screw groove 12 installed around the central support rod 11 is installed in the groove formed in the center of the support nut 13 to be screwed with the screw groove 12 of the central support rod 11 to the desired center support rod. This is to install at the position of (11). The support nut 13 uses an angled nut. The support nut 13 is integrally connected to the angular surface, and the support nut 13 is connected to the installation material. The support nut 13 is hexagonal, pentagonal, etc. Optional use depending on the conditions. Umbrella 14 and the connecting member 15 is installed to increase the mortar and adhesive force when installing the umbrella anchor anchor 10 on the fracture surface and when mortar is poured, the number of installation is optional depending on the conditions of the site Install it. In addition, when the thickness of the umbrella (14) uses 1.5mm and 2.0mm, when the thickness of the umbrella (14) is 1.5mm, the connecting member 15 is installed between the umbrella (14) and the umbrella (14) When the length of the umbrella string 14 is 25 mm in total, the interval between the umbrella strings 14 to be set by the inner umbrella string length 17 is 20 mm, and the outer umbrella string length 16 is 5 mm. When the connecting member 15 is provided and the length of the umbrella string 14 is 50 mm in total, the length of the outer umbrella string 16 is 20 mm, the length of the inner umbrella string 17 is 30 mm, and the connecting member 15 is formed. When the length of the umbrella string 14 is set to 75 mm in total, the length of the outer umbrella string 16 is set to 35 mm, the length of the inner umbrella string 17 is 40 mm, and the connecting member 15 is installed. When the length of the flesh 14 is 100 mm in total, two connecting members 15 are installed, but the length of the outer umbrella flesh 16 is 40 mm, and the length of the inner umbrella flesh 17 is 20 mm. Umbrella length (1 The connection member 15 is provided so that the intermediate length of 7,16 may be 40 mm. In addition, in the case where the thickness of the umbrella meat 14 is 2.0 mm, two connecting members 15 for connecting the umbrella meat 14 and the umbrella meat 14 are installed, but the length of the umbrella meat 14 is 125 in total. In the case of mm, the length of the outer umbrella string length 16 is 50 mm and the length of the inner umbrella string length 17 is 25 mm, while the length between the inner and outer umbrella length lengths 17 and 16 is 50 mm. 15), if the length of the umbrella (14) to 150mm in total, the length of the outer umbrella meat 16, 50mm, the length of the inner umbrella meat (17) 50mm, but the length of the inner and outer umbrella meat The umbrella anchor 10 provided with the connecting member 15 is installed at the fracture surface area so that the intermediate length of the 17 and 16 is 50 mm. Looking at the process of performing the repair work using this, the repair method for the fracture surface area of the concrete structure installed on the ground first checks the deterioration part of the concrete structure to be repaired with the naked eye and marks the chipping site. Then, the chipping chipping part is completely chipped by a predetermined area using a breaker, and then filled with a mortar on the fracture surface part where the plurality of umbrella anchors are installed, to finish plastering and finish plastering. After finishing the trimmed surface, the repair work on the fractured surface of the concrete structure installed on the land is completed.

또한, 수중에 설치된 콘크리트 구조물의 파단면에 대한 보수방법은        In addition, the repair method for the fracture surface of the concrete structure installed underwater

먼저 담수 및/또는 염수(해수)에 설치된 보수 대상의 수중 콘크리트 구조물의 열화부분을 직접 잠수하여 육안으로 확인하고, 치핑 부위를 마킹하게 된다. 그런 후, 수중용 브레이커(breaker)를 이용하여 상기 마킹된 치핑 부위를 일정 영역만큼 완전히 치핑 처리한다.  First, the deteriorated part of the underwater concrete structure to be repaired installed in fresh water and / or brine (sea water) is directly submerged to check with the naked eye and to mark the chipping site. Thereafter, the marked chipping site is completely chipped by a predetermined area using an underwater breaker.

치핑 처리가 완료되면, 도 3에 도시된 바와 같이, 콘크리트 구조물 (101) 몸체에의 새로운 부재의 확실한 접착을 위해 다수의 상기 우산살 앵커(10)를 상기 파단면 부분에 적당한 간격으로 설치한다. 여기서, 이와 같이 상기 우산살 앵커(10)를 사용하는 것은 후술되는 거푸집 내에 충전되는 보수 몰탈과의 부착력 강화를 위 한 것으로서 접착제와 같이 사용할 수 있다.When the chipping process is completed, as shown in FIG. 3, a plurality of the umbrella anchor anchors 10 are provided at appropriate intervals in the fracture surface portion for reliably bonding the new member to the concrete structure 101 body. Here, the use of the umbrella anchor anchor 10 in this way can be used as an adhesive for strengthening the adhesion with the repair mortar to be filled in the mold to be described later.

상기 우산살 앵커(10)의 설치가 완료되면, 도 4 및 도 5에 도시된 바와 같이, 수압에 견딜 수 있는 정도의 강도와 어느 정도의 휨성( 콘크리트 구조물에의 적용 부위가 곡면일 경우에도 어려움없이 적용할 수 있도록 하기 위한 것임)을 갖는 판재형 거푸집(103)을 상기 파단면 부분(치핑 부위)(103c)보다 상대적으로 크게(예를 들면, 치핑부위보다 10% 정도 크게) 제작한다. 여기서, 이와 같은 판재형 거푸집(103)의 재질로는 섬유와 에폭시의 합성재질이 사용된다. 이는 설치 지역이 수중이라는 특수 상황을 고려하여 물에 의해 부식되거나 열화되는 일이 없이 거의 영구적인 내구력을 갖도록 하기 위한 것이다.When the installation of the umbrella anchor anchor 10 is completed, as shown in Figs. 4 and 5, the degree of strength and a certain degree of bendability to withstand hydraulic pressure (even when the application site to the concrete structure is curved surface The plate-shaped formwork 103 having the sheet-shaped formwork 103 is made relatively larger (eg, about 10% larger than the chipping portion) than the fracture surface portion (chipping portion) 103c. Here, as the material of the sheet-like formwork 103, a synthetic material of fiber and epoxy is used. This is to ensure that the installation area is almost permanently durable without being corroded or degraded by water, taking into account the special circumstances of underwater.

이렇게 하여, 판재형 거푸집(103)의 제작이 완료되면, 거푸집(103)의 가장자리에는 거푸집(103)을 수중 콘크리트 구조물(101)에 고정시키기 위한 다수의 볼트삽입공 (104)을 형성(예를 들면, 직경 20mm의 관통공을 100mm∼200mm의 간격으로 천공)하고, 거푸집(103)의 중심부위에는 노즐삽입공(105)을 형성하여 스프레이 노즐 (115)을 그 노즐삽입공(105)에 삽입, 설치한다. 이때, 노즐(115)의 연결측 단부는 막아둔다.In this way, when the production of the plate-shaped formwork 103 is completed, a plurality of bolt insertion holes 104 are formed at the edge of the formwork 103 to fix the formwork 103 to the underwater concrete structure 101 (for example, For example, a through-hole having a diameter of 20 mm is drilled at intervals of 100 mm to 200 mm, and a nozzle insertion hole 105 is formed on the center of the die 103 to insert the spray nozzle 115 into the nozzle insertion hole 105. Install. At this time, the connection side end part of the nozzle 115 is closed.

볼트삽입공(104)의 형성 및 노즐(115)의 설치가 완료되면, 상기 거푸집(103)을 파단면 부분에 대고 거푸집(103)의 가장 자리에 형성된 다수의 볼트삽입공(104)에 대응하여 수중 콘크리트 구조물(101)의 콘크리트면에 구멍(101h)을 각각 형성한 후, 세트 앵커 볼트(106)(도 6 참조)를 각각 설치하여 거푸집(103)을 수중 콘크리트 구조물(101)의 파단면 부분에 고정한다.When the formation of the bolt insertion hole 104 and the installation of the nozzle 115 are completed, the die 103 is placed against the fracture surface portion to correspond to the plurality of bolt insertion holes 104 formed at the edge of the die 103. After the holes 101h are formed in the concrete surface of the underwater concrete structure 101, the set anchor bolts 106 (see FIG. 6) are respectively installed to form the die 103 at the fracture surface portion of the underwater concrete structure 101. Secure in.

여기서, 상기 세트 앵커 볼트(106)를 이용하여 거푸집(103)을 수중 콘크리트 구조물(101)의 파단면 부분에 고정함에 있어서, 바람직하게는 도 6에 도시된 바와 같이, 세트 앵커 볼트(106)에 고무 패킹(107)을 끼운 후, 거푸집(103)을 세트 앵커 볼트(106)에 체결하여 고정시킨다. 이와 같이 고무 패킹(107)을 끼우는 것은 세트 앵커 볼트(106) 주변의 씰링 불량을 방지하기 위한 것이다. 도 6에서 참조 부호 106n은 너트, 106w는 와셔를 각각 나타낸다. Here, in fixing the formwork 103 to the fracture surface portion of the underwater concrete structure 101 by using the set anchor bolt 106, preferably as shown in Figure 6, to the set anchor bolt 106 After inserting the rubber packing 107, the formwork 103 is fastened to the set anchor bolt 106 to be fixed. The fitting of the rubber packing 107 in this way is to prevent the sealing failure around the set anchor bolt 106. In Fig. 6, reference numeral 106n denotes a nut and 106w denotes a washer, respectively.

이렇게 하여 거푸집(103)의 설치가 완료되면, 도 7 및 도 8에 도시된 바와 같이, 그 거푸집(103) 내부에 보수재(몰탈)를 주입할 시 압력에 의한 외부쪽으로의 휨 현상을 막기 위하여 거푸집(103) 위에 다수의 막대부재(108)를 서로 일정 간격 이격하여 각각 설치한다. 이때, 상기 세트 앵커 볼트(106)를 이용하여 막대부재 (108)를 설치한다. 막대부재(108)의 설치가 완료되면, 도 9에 도시된 바와 같이, 수중용 에폭시 퍼티를 사용하여 거푸집(103)과 콘크리트면의 경계부위를 완전히 씰링하는 한편, 거푸집(103)의 소정 부위에 몰탈 주입 및 에어 배출을 위한 2개의 호스(109)(110)를 각각 설치한다. In this way, when the installation of the formwork 103 is completed, as shown in Figures 7 and 8, when the water injecting the repair material (mortar) in the formwork 103, the formwork to prevent the bending to the outside due to pressure The plurality of rod members 108 are spaced apart from each other by a predetermined interval on the 103. At this time, the rod member 108 is installed using the set anchor bolt 106. When the installation of the rod member 108 is completed, as shown in Figure 9, using the underwater epoxy putty to completely seal the boundary between the formwork 103 and the concrete surface, while at a predetermined portion of the formwork 103 Two hoses 109 and 110 are respectively installed for mortar injection and air discharge.

상기 2개의 호스(109)(110)의 설치가 완료되면, 외압이 없는 상태에서 충분한 시간 동안(24시간 이상) 자연 양생시킨다. 그리고 양생 후, 도 10에 도시된 바와 같이, 2개의 호스(109)(110) 중 일측 호스(109)에 에어를 주입하여 타측 호스(110)로 거푸집(103) 내부의 물을 빼내고, 마침내 타측 호스(110)로 에어가 나올 때 그 타측 호스(110)를 막아 거푸집(103) 내부의 압력을 높이고, 그 상태에서 에어의 유출 여부를 확인한다. 확인 결과, 에어의 유출이 없으면, 상기 일측 호스(109)로 에어를 주입하고 타측 호스(110)로 에어가 빠져나올 수 있도록 하여, 새로운 에어를 일정 시간 동안(최소 30분 이상) 거푸집(103) 내부에 통과시켜 거푸집(103) 내부를 건조시킨다. When the installation of the two hoses (109, 110) is completed, the natural curing for a sufficient time (at least 24 hours) in the absence of external pressure. After curing, as shown in FIG. 10, air is injected into one of the two hoses 109 and 110 to remove the water in the form 103 through the other hose 110, and finally the other side. When air comes out of the hose 110, the other side of the hose 110 is blocked to increase the pressure inside the die 103, and in this state it is checked whether the air leaks. As a result of the check, if there is no outflow of air, the air is injected into the one hose 109 and the air is allowed to come out of the other hose 110, so that the new air is kept for a predetermined time (at least 30 minutes or more). Pass the inside to dry the formwork 103 inside.

여기서, 이상과 같은 건조작업을 수행함에 있어서, 염분이 있는 지역일 경우에는 염분이 없는 물로 거푸집(103) 내부를 통과시켜 파단면 내면부에 묻어 있는 염분을 말끔히 씻어낸 후, 에어 주입에 의한 건조작업을 수행한다. Here, in performing the drying operation as described above, in the case where there is a salinity, after passing through the form 103 with salt-free water to clean the salts buried in the inner surface of the fracture surface, and then dried by air injection Do the work.

상기 건조 작업이 완료되면, 거푸집(103)의 중심부에 이미 설치되어 있던 스프레이 노즐(115)을 이용하여 중성화방지제 및 방청제를 거푸집(103) 내부에 살포한다. 그런 후, 도 11에 도시된 바와 같이, 두 개의 호스중 타측 호스(110)에 몰탈 주입기(111)를 연결하고, 압력을 체크하면서 몰탈을 서서히 계속 주입하여 일측 호스(109)로 주입된 몰탈이 다시 토출되면, 두 개의 호스(109)(110)를 동시에 견고하게 밀봉한다. 그런 다음, 외압이 없는 상태에서 충분히 양생시킨 뒤 각 호스(109) (110) 및 노즐(115)을 절단하고, 그 부위를 몰탈로 마감 처리한다. 이로써 수중 콘크리트 구조물의 파단면에 대한 보수가 완료된다. When the drying operation is completed, the anti-neutralizing agent and the rust preventive agent is sprayed into the form 103 by using the spray nozzle 115 already installed in the center of the form 103. Then, as shown in FIG. 11, the mortar injected into the one side hose 109 by connecting the mortar injector 111 to the other hose 110 of the two hoses, and gradually injecting mortar while checking the pressure When discharged again, the two hoses 109 and 110 are firmly sealed at the same time. Then, after sufficiently curing in the absence of external pressure, each hose 109 (110) and the nozzle 115 are cut, and the part is finished with mortar. This completes the repair of the fracture surface of the underwater concrete structure.

이상의 설명에서와 같이, 본 발명은 육상 및 수중에 설치된 콘크리트 구조물의 파단면에 대하여 보수를 시행할 수 있는 공법으로서 본 발명에 따른 콘크리트 구조물의 파단면 보수를 위한 우산살 앵커 및 이를 이용한 파단면 보수공법은 몸체 전체에 나사홈이 형성된 중앙 지지봉에 나사로 체결된 지지너트 주위에 다수개 설 치된 우산살과 우산살을 서로 연결하는 연결재로 이루어진 우산살 앵커를 파단면에 현장 여건에 따라 다수개 설치한 후에 몰탈로 충전한 후에 미장 마감처리를 통하여 육상에 설치된 콘크리트 구조물의 파단면을 보수하거나, 몸체 전체에 나사홈이 형성된 중앙 지지봉에 나사로 체결된 지지너트 주위에 다수개 설치된 우산살과 우산살을 서로 연결하는 연결재로 이루어진 우산살 앵커를 파단면에 현장 여건에 따라 다수개 설치한 후에 섬유와 에폭시의 합성재질로 제작된 거푸집을 수중 콘크리트 구조물의 파단면(치핑부위)에 완벽한 씰링이 되도록 설치하고, 그 내부를 건조시킨 후 몰탈을 충전하여 파단면을 보수하므로, 담수 및 염수(해수)에 관계없이 수중에 설치된 콘크리트 구조물의 파단면을 효과적으로 보수할 수 있는 장점이 있다.       As described above, the present invention is a construction method that can be repaired for the fracture surface of the concrete structure installed on land and water, umbrella anchor for repairing the fracture surface of the concrete structure according to the present invention and fracture surface repair using the same In the construction method, a plurality of umbrellas anchors made of a plurality of umbrellas installed on the support nut connected to the support nuts fastened with screws to the central support rods with the thread grooves formed on the entire body are connected to each other according to the site conditions. Later, after filling with mortar to repair the fracture surface of the concrete structure installed on the ground, or to install a plurality of umbrellas and umbrellas around the support nuts fastened with screws to the central support rod with a screw groove formed on the whole body A plurality of umbrella anchors made of connecting materials were installed on the fracture surface according to the site conditions. Afterwards, formwork made of synthetic material of fiber and epoxy is installed for perfect sealing on the fracture surface (chipping part) of the underwater concrete structure, and after drying the interior, the fracture surface is repaired by filling mortar, so that fresh water and brine ( Regardless of seawater), there is an advantage that can effectively repair the fracture surface of concrete structures installed underwater.

Claims (9)

몸체 전체에 나사홈이 형성된 중앙 지지봉에 나사로 체결된 각형의 지지너트 주위에 다수개 설치된 우산살과 우산살을 서로 연결하는 연결재로 이루어진 것을 특징으로 하는 콘크리트 구조물의 파단면 보수를 위한 우산살 앵커.        Umbrella anchor anchor for repairing the fracture surface of the concrete structure, characterized in that made of a connecting member connecting the plurality of umbrellas and umbrellas installed around the support nut of the rectangular shape fastened with screws to the central support rod formed with a screw groove on the entire body. 제 1항에 있어서        The method of claim 1 상기 우산살은 굵기가 1.5㎜인 경우에 우산살과 우산살 사이에 설치되는 연결재에 의해 설정되는 우산살의 간격은 우산살의 길이를 총 25㎜로 하는 경우 내측 우산살 길이를 20㎜로 하고, 외측 우산살 길이를 5㎜하여 연결재를 설치하는 것을 특징으로 하는 콘크리트 구조물의 파단면 보수를 위한 우산살 앵커.        When the thickness of the umbrella flesh is 1.5mm, the spacing of the umbrella meat set by the connecting member installed between the umbrella meat and the umbrella meat is 20 mm when the length of the umbrella meat is 25 mm in total. Umbrella anchor for repairing the fracture surface of the concrete structure, characterized in that the installation of the connecting material by the length 5mm umbrella. 제 1항에 있어서        The method of claim 1 상기 우산살은 굵기가 1.5㎜인 경우에 우산살과 우산살 사이에 설치되는 연결재에 의해 설정되는 우산살의 간격은 우산살의 길이를 총 50㎜로 하는 경우 외측 우산살의 길이를 20㎜하고, 내측 우산살의 길이를 30㎜하여 연결재를 설치하는 것을 특징으로 하는 콘크리트 구조물의 파단면 보수를 위한 우산살 앵커.        The thickness of the umbrella flesh is set by the connecting member installed between the umbrella flesh and the umbrella flesh when the thickness is 1.5mm, the length of the outer umbrella flesh 20mm, the inner umbrella Umbrella anchor for repairing the fracture surface of the concrete structure, characterized in that the connecting material is installed by the length of the 30 mm. 제 1항에 있어서        The method of claim 1 상기 우산살은 굵기가 1.5㎜인 경우에 우산살과 우산살 사이에 설치되는 연결재에 의해 설정되는 우산살의 간격은 우산살의 길이를 총 75㎜로 하는 경우 외측 우산살 길이를 35㎜로 하고, 내측 우산살 길이를 40㎜하여 연결재를 설치하는 것을 특징으로 하는 콘크리트 구조물의 파단면 보수를 위한 우산살 앵커.        When the thickness of the umbrella flesh is 1.5mm, the spacing of the umbrella meat set by the connecting member installed between the umbrella meat and the umbrella meat is 35mm when the length of the umbrella meat is a total of 75mm, Umbrella anchor for repairing the fracture surface of the concrete structure, characterized in that the installation of the connecting material by the length of the umbrella flesh 40mm. 제 1항에 있어서       The method of claim 1 상기 우산살은 굵기가 1.5㎜인 경우에 우산살 길이를 100㎜로 하는 경우 연결재를 2개 설치하며 우산살과 우산살 사이에 설치되는 연결재에 의해 설정되는 우산살의 간격은 외측 우산살 길이를 40㎜로 하고, 내측 우산살 길이를 20㎜로 하되 내측과 외측 우산살의 중간의 길이를 40㎜가 되게 연결재를 설치하는 것을 특징으로 하는 콘크리트 구조물의 파단면 보수를 위한 우산살 앵커.       When the length of the umbrella flesh is 1.5 mm in thickness when the length of the umbrella flesh is 100 mm, two connecting members are installed, and the distance between the umbrella meats set by the connecting member installed between the umbrella meat and the umbrella meat is 40 mm. An umbrella bar anchor for repairing the fracture surface of a concrete structure, wherein the length of the inner umbrella is 20 mm, and the connecting member is installed so that the length of the inner and outer umbrellas is 40 mm. 제 1항에 있어서        The method of claim 1 상기 우산살은 굵기가 2.0㎜인 경우에 우산살 길이를 125㎜로 하는 경우 연결재를 2개 설치하며 우산살과 우산살 사이에 설치되는 연결재에 의해 설정되는 우산살의 간격은 외측 우산살 길이를 50㎜하고, 내측 우산살 길이를 25㎜하되 내측과 외측 우산살의 중간의 길이를 50㎜가 되게 연결재를 설치하는 것을 특징으로 하는 콘크리트 구조물의 파단면 보수를 위한 우산살 앵커.        When the length of the umbrella flesh is 2.0 mm when the length of the umbrella flesh is 125 mm, two connecting members are installed, and the distance between the umbrella flesh set by the connecting member installed between the umbrella meat and the umbrella meat is 50 mm. ㎜ and 25mm of the length of the inner umbrella, but the anchor of the anchor anchor for repairing the fracture surface of the concrete structure, characterized in that the connecting material is installed so that the length of the middle of the inner and outer umbrella is 50mm. 제 1항에 있어서        The method of claim 1 상기 우산살은 굵기가 2.0㎜로 하는 경우에 우산살 길이를 총 150㎜로 하는 경우 연결재를 2개 설치하며 우산살과 우산살 사이에 설치되는 연결재에 의해 설정되는 우산살의 간격은 외측 우산살 길이를 50㎜하고, 내측 우산살 길이를 50㎜하되 내측과 외측 우산살의 중간의 길이를 50㎜가 되게 연결재를 설치하는 것을 특징으로 하는 콘크리트 구조물의 파단면 보수를 위한 우산살 앵커.        When the length of the umbrella flesh is 2.0 mm, when the length of the umbrella flesh is 150 mm, the length of the umbrella flesh is 2 mm. To 50mm, the length of the inner umbrella, 50mm, but the length of the middle and the inner side of the outer umbrella, the installation of the umbrella anchor for repairing the fracture surface of the concrete structure, characterized in that the installation to be 50mm. 삭제delete (a) 보수 대상의 상기 콘크리트 구조물의 열화부분을 직접 육안으로 확인하고, 치핑 부위를 마킹하는 단계;     (a) visually identifying the deteriorated portion of the concrete structure to be repaired and marking a chipping site; (b) 브레이커를 이용하여 상기 마킹된 치핑 부위를 일정 영역만큼 완전히 치핑처리하는 단계;     (b) completely chipping the marked chipping area by a predetermined area using a breaker; (d) 다수의 우산살 앵커가 설치된 파단면 부위에 몰탈로 채움하여 미장을 완료하는 단계;     (d) filling the fracture surface with a plurality of umbrella anchors with mortar to complete plastering; (e) 미장을 완료한 콘크리트 구조물의 파단면 부위를 미려하게 마감정리하는 단계로 이루어진 콘크리트 구조물의 파단면을 보수하는 방법에 있어서,     (e) In the method of repairing the fracture surface of the concrete structure consisting of the step of finishing and finishing the fracture surface area of the finished concrete structure, 상기 (b)단계와 (d)단계 사이에 (c)단계인 콘크리트 구조물 몸체에 새로운 부재의 확실한 접착을 위해 우산살과 우산살을 연결하는 연결재와, 상기 우산살 굵기에 따라 연결재의 설치위치를 다양하게 한 우산살 앵커를 상기 파단면 부분에 적당한 간격으로 다수개 설치하는 단계로 이루어진 것에 특징이 있는 콘크리트 구조물의 파단면 보수를 위한 우산살 앵커를 이용한 파단면 보수공법.      (B) Between the step (d) and the step (c) to the concrete structure body of the connecting member for connecting the umbrella member and the umbrella flesh for the secure adhesion of the new member, and the installation position of the connecting member according to the thickness of the umbrella Breaking surface repair method using the umbrella anchor anchor for repairing the fracture surface of the concrete structure, characterized in that the step of installing a plurality of various anchor anchors at appropriate intervals in the fracture surface portion.
KR1020020058860A 2002-09-27 2002-09-27 anchor having umbrella ribs for repairing destroyed parts of underwater concrete structure and method for repairing destroyed parts using the anchor KR100691656B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020020058860A KR100691656B1 (en) 2002-09-27 2002-09-27 anchor having umbrella ribs for repairing destroyed parts of underwater concrete structure and method for repairing destroyed parts using the anchor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020020058860A KR100691656B1 (en) 2002-09-27 2002-09-27 anchor having umbrella ribs for repairing destroyed parts of underwater concrete structure and method for repairing destroyed parts using the anchor

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR2020020029030U Division KR200298127Y1 (en) 2002-09-27 2002-09-27 anchor having umbrella ribs for repairing destroyed parts of underwater concrete structure

Publications (2)

Publication Number Publication Date
KR20040027113A KR20040027113A (en) 2004-04-01
KR100691656B1 true KR100691656B1 (en) 2007-03-09

Family

ID=37329706

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020020058860A KR100691656B1 (en) 2002-09-27 2002-09-27 anchor having umbrella ribs for repairing destroyed parts of underwater concrete structure and method for repairing destroyed parts using the anchor

Country Status (1)

Country Link
KR (1) KR100691656B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101701089B1 (en) * 2016-06-01 2017-01-31 이동우 Method of repairing and reinforcing damaged part of concrete structure using assemblable anchor and panel
KR102268630B1 (en) * 2020-11-16 2021-06-23 주식회사 미래건설안전 Section recovery method using composite anchors with wire anchors
KR200496301Y1 (en) * 2022-06-30 2022-12-26 주식회사 콘크리닉이앤씨 Pre-press Anchor for repair and reinforcement of concrete structure

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100715179B1 (en) * 2006-07-10 2007-05-08 (주)넥트 Hybrid repair mortar mixing method
KR100777795B1 (en) * 2006-11-15 2007-11-22 주식회사 젠트로 Reinforcement assembly of concrete and construction method thereof
KR100761515B1 (en) * 2006-12-27 2007-09-27 (주)국민산업 The sea structure repair / reinforcement method of having used compound fiber board
KR100940937B1 (en) * 2009-08-31 2010-02-08 (주)우암건설 Concrete structure repairing method
KR102065962B1 (en) * 2019-09-03 2020-01-14 주식회사 고보코리아 Method for repairing wall

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08152015A (en) * 1994-11-29 1996-06-11 Nittoc Constr Co Ltd Shearing bolt for repiaring and reinforcing face of slope and inner peripheral surface of tunnel
KR20040004731A (en) * 2002-07-05 2004-01-14 주식회사 엠티마스타 Method for repairing the chipped portion of underwater concrete structures

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08152015A (en) * 1994-11-29 1996-06-11 Nittoc Constr Co Ltd Shearing bolt for repiaring and reinforcing face of slope and inner peripheral surface of tunnel
KR20040004731A (en) * 2002-07-05 2004-01-14 주식회사 엠티마스타 Method for repairing the chipped portion of underwater concrete structures

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101701089B1 (en) * 2016-06-01 2017-01-31 이동우 Method of repairing and reinforcing damaged part of concrete structure using assemblable anchor and panel
KR102268630B1 (en) * 2020-11-16 2021-06-23 주식회사 미래건설안전 Section recovery method using composite anchors with wire anchors
KR200496301Y1 (en) * 2022-06-30 2022-12-26 주식회사 콘크리닉이앤씨 Pre-press Anchor for repair and reinforcement of concrete structure

Also Published As

Publication number Publication date
KR20040027113A (en) 2004-04-01

Similar Documents

Publication Publication Date Title
KR100714437B1 (en) Water leakage induction method of construction for expansion joint and crack of concrete structure
KR100691656B1 (en) anchor having umbrella ribs for repairing destroyed parts of underwater concrete structure and method for repairing destroyed parts using the anchor
KR101752396B1 (en) Water leakage induction method of construction for expansion joint and crack of Concrete structure
KR20160046750A (en) An expansion joint preventing water leakage in the underground structure&#39;s connecting part and constructing method thereof
KR100452622B1 (en) Method for repairing the chipped portion of underwater concrete structures
KR200298127Y1 (en) anchor having umbrella ribs for repairing destroyed parts of underwater concrete structure
JPH11193640A (en) Repairing method of existing concrete structure and construction method of newly provided concrete structure
KR100724694B1 (en) Plastic molding box
KR100655850B1 (en) the packer for repairing crack in concrete body
KR200292723Y1 (en) Apparatus for repairing the chipped portion of underwater concrete structures
KR102083378B1 (en) Reinforcement member and construction method to reinforce concrete box
KR20110006178A (en) Caisson lower-end water cut-off system
KR100867414B1 (en) Precasted concrete retaining wall with tension
KR100310457B1 (en) Waterproofing method of concrete structure
KR100380564B1 (en) Reinforcing sheet adhesion apparatus using specific pipe type anchor
KR200279966Y1 (en) A Precast Concrete Product for Reinforced Earth Retaining-Wall
KR200469296Y1 (en) Coating structure for water tank
CN110952414B (en) Highway expansion joint sealing protection method
JP4942033B2 (en) A net for visually checking the deterioration of concrete structures such as road bridges, viaducts, overpasses, and tunnels and preventing concrete lump fall.
KR20050034978A (en) Waterproof, repair and reinforcement of flat, curved and rectangular structures
KR20050109181A (en) Encasement method for repairing or reinforcing structures in the water and a repairing or reinforcing member used therein
KR100378208B1 (en) Repair Stuff for Water Leakage Prevention and Repair Method of Tunnel
KR100867170B1 (en) The concrete structure protective material for which filling mortar and synthetic resin sheet were used and this construction technique
KR101586801B1 (en) Appatatus for rpair and reinforcement of concrete structure and method for rpair and reinforcement using the same
KR200333765Y1 (en) Structure gap allophone

Legal Events

Date Code Title Description
A201 Request for examination
N231 Notification of change of applicant
E902 Notification of reason for refusal
AMND Amendment
E90F Notification of reason for final refusal
AMND Amendment
E801 Decision on dismissal of amendment
E601 Decision to refuse application
J201 Request for trial against refusal decision
AMND Amendment
B601 Maintenance of original decision after re-examination before a trial
E801 Decision on dismissal of amendment
J301 Trial decision

Free format text: TRIAL DECISION FOR APPEAL AGAINST DECISION TO DECLINE REFUSAL REQUESTED 20050613

Effective date: 20061030

Free format text: TRIAL NUMBER: 2005101003768; TRIAL DECISION FOR APPEAL AGAINST DECISION TO DECLINE REFUSAL REQUESTED 20050613

Effective date: 20061030

S901 Examination by remand of revocation
GRNO Decision to grant (after opposition)
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130326

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20140123

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20150116

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20160218

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20180205

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20190703

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20200205

Year of fee payment: 14