KR100666597B1 - Structure of setting a tile and method thereof - Google Patents

Structure of setting a tile and method thereof Download PDF

Info

Publication number
KR100666597B1
KR100666597B1 KR1020040023858A KR20040023858A KR100666597B1 KR 100666597 B1 KR100666597 B1 KR 100666597B1 KR 1020040023858 A KR1020040023858 A KR 1020040023858A KR 20040023858 A KR20040023858 A KR 20040023858A KR 100666597 B1 KR100666597 B1 KR 100666597B1
Authority
KR
South Korea
Prior art keywords
tile
support member
dry
floor
construction method
Prior art date
Application number
KR1020040023858A
Other languages
Korean (ko)
Other versions
KR20050098584A (en
Inventor
정기환
Original Assignee
정기환
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 정기환 filed Critical 정기환
Priority to KR1020040023858A priority Critical patent/KR100666597B1/en
Publication of KR20050098584A publication Critical patent/KR20050098584A/en
Application granted granted Critical
Publication of KR100666597B1 publication Critical patent/KR100666597B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/02Flooring or floor layers composed of a number of similar elements
    • E04F15/024Sectional false floors, e.g. computer floors
    • E04F15/02447Supporting structures
    • E04F15/02452Details of junctions between the supporting structures and the panels or a panel-supporting framework
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/02Flooring or floor layers composed of a number of similar elements
    • E04F15/024Sectional false floors, e.g. computer floors
    • E04F15/02447Supporting structures
    • E04F15/02494Supporting structures with a plurality of base plates or like, each base plate having a plurality of pedestals upstanding therefrom to receive the floor panels

Abstract

본 발명은 건식 타일 설치구조 및 시공방법에 관한 것으로, 바닥에 배관 또는 전선을 개재할 수 있는 상태로 다수 개 설치되며 플라스틱, 철재, 목재 또는 시멘트 등의 재질로 이루어지는 지지부재의 상부에 타일을 올려 조립함으로써 시공에 많은 시간을 필요로 하지 않고 시공법도 간편하며, 세라믹 재질의 타일을 사용함으로써 견고하고 표면에 다양한 문양을 새겨 미감을 좋게 하도록 하는 건식 타일 설치구조 및 시공방법을 제공한다.The present invention relates to a dry tile installation structure and construction method, a plurality of installed in the state that can be interposed through the pipe or wire on the floor and put the tile on the top of the support member made of a material such as plastic, steel, wood or cement By assembling, it does not require much time for construction, and the construction method is simple, and it provides a dry tile installation structure and construction method that uses a ceramic tile to make a good aesthetic by engraving various patterns on the surface.

타일, 건식 시공, 지지부재Tile, dry construction, support member

Description

건식 타일 설치구조 및 시공방법{structure of setting a tile and method thereof} Dry tile installation structure and construction method

도 1a는 본 발명의 제 1실시예에 따른 타일 지지용 지지부재의 평면도.1A is a plan view of a support member for tile support according to a first embodiment of the present invention.

도 1b는 본 발명의 제 1실시예에 따른 지지부재에 타일을 설치한 상태의 단면도.1B is a cross-sectional view of a state in which tiles are installed in a support member according to a first embodiment of the present invention.

도 2a는 본 발명의 제 2실시예에 따른 타일 지지용 지지부재의 평면도.Figure 2a is a plan view of a support member for supporting tiles according to a second embodiment of the present invention.

도 2b는 본 발명의 제 2실시예에 따른 지지부재에 타일을 설치한 상태의 단면도.Figure 2b is a cross-sectional view of the tile installed on the support member according to a second embodiment of the present invention.

도 3a는 본 발명의 제 3실시예에 따른 타일 지지용 지지부재의 평면도.Figure 3a is a plan view of a support member for tile support according to a third embodiment of the present invention.

도 3b는 본 발명의 제 3실시예에 따른 지지부재에 타일을 설치한 상태의 단면도. Figure 3b is a cross-sectional view of the tile installed on the support member according to a third embodiment of the present invention.

도 4는 본 발명에 따른 건식 타일 시공도.Figure 4 is a dry tile construction according to the present invention.

*도면의 주요부분에 대한 부호의 설명** Explanation of symbols for main parts of drawings *

10: 지지부재 12a,12b,12c: 몸체 10: support member 12a, 12b, 12c: body

14: 고정돌기 16: 요철부 14: fixing projection 16: uneven portion

17b,17c: 수용홈 18b,18c: 체결홈17b, 17c: receiving groove 18b, 18c: fastening groove

19: 체결구 20: 타일19: Fastener 20: Tile

삭제delete

본 발명은 건식 타일 설치구조 및 시공방법에 관한 것으로, 보다 상세하게는 바닥에 배관 또는 전선을 개재할 수 있는 상태로 다수 개 설치된 지지부재의 상부에 타일을 올려 조립함으로써 시공에 많은 시간을 필요로 하지 않고 시공법도 간편하며, 세라믹 재질의 타일을 사용함으로써 견고하고 표면에 다양한 문양을 새겨 미감을 좋게 하도록 하는 건식 타일 설치구조 및 시공방법에 관한 것이다.The present invention relates to a dry tile installation structure and a construction method, and more particularly, it requires a lot of time for construction by assembling the tile on the upper part of the support member installed in a plurality of state in the state that can be interposed pipe or wire on the floor. The construction method is simple, and it is related to a dry tile installation structure and a construction method of using a ceramic tile to make a good aesthetic by engraving various patterns on the surface.

일반적으로, 건물이나 주택의 욕실 및 화장실 내부에는 타일로서 미장 처리되는데, 이런 타일은 원형 또는 다각형의 판의 형상을 가지며 고온에서 배벌하여 제조된다.In general, the interior of bathrooms and toilets in buildings or houses are plastered as tiles, which have the shape of a plate of circular or polygonal shape and are produced by heating at high temperatures.

매끈한 정면이 사람이 바라볼 수 있는 쪽에 위치하고, 정면보다 덜 매끈한 배면을 콘크리트 벽체에 부착된다.A smooth facade is located on the human side and a less smooth back is attached to the concrete wall.

이와 같이, 양생된 콘크리트 벽체에 타일을 부착하는 시공방법을 일반적으로 '습식 시공'이라 한다. As such, the construction method of attaching the tile to the cured concrete wall is generally referred to as 'wet construction'.

이런 습식시공 방식은 시멘트와 모래에 물을 혼합하여(이와 같이 혼합된 것을 몰탈이라고 칭하며 이하 몰탈로 표기함) 바닥에 깔고 그 위에 타일을 부착하든지 또는 타일 접착용 본드를 사용하여 바닥과 타일을 접착시키는 것이다. This wet construction method involves mixing water with cement and sand (this mixture is called mortar, hereinafter referred to as mortar) and laying it on the floor or attaching a tile on it, or using a tile bonding bond to bond the floor to the tile. It is to let.

그러나, 시공된 타일을 교체하는 경우에는 시공된 타일뿐만 아니라 바닥에 부착된 몰탈을 제거하여 다시 몰탈을 바르고 타일을 시공해야 하기 때문에 기 시공된 타일과 몰탈을 제거하는데 막대한 인건비가 소요되고 제거시에 발생하는 폐기물은 처리비용을 떠나 환경 오염을 초래하는 문제점이 있었다.However, when replacing the installed tiles, it is necessary to remove the mortar attached to the floor as well as the applied tile, and to apply the mortar again and install the tile, which requires a huge labor cost to remove the installed tile and mortar. Waste generated has a problem of causing environmental pollution leaving treatment costs.

또한, 종래의 습식 부착 방법은 타일 시공 시에 타일의 줄눈을 맞추고 수평을 잡아야하기 때문에 숙련된 전문 시공자에 의해 시공을 하여야 하므로 시공비가 많이 들게 되고 또한 사용된 몰탈에는 수분이 함유되어 있어 소정의 건조시간(하절기 : 2-3일, 동절기 : 4-5일 이상)을 필요로 하여 즉시 사용이 불가능한 문제점이 있었다.In addition, in the conventional wet attachment method, since the joints of the tiles should be aligned and leveled during the construction of the tiles, the construction should be carried out by a skilled professional contractor, which requires a lot of construction costs. It required a time (summer: 2-3 days, winter: 4-5 days or more), there was a problem that can not be used immediately.

본 발명은 상기와 같은 문제점을 해결하기 위해 안출한 것으로, 본 발명의 목적은 바닥에 경질의 지지부재를 평평하게 깔고 그 위에 세라믹 재질의 타일을 고정되게 안착함으로써 시공시간을 줄일 수 있고, 세라믹 재질의 타일을 사용함으로써 내구성을 증가시키며, 표면에 좋은 미감을 위해 다양한 문양을 새길 수 있는 건식 타일 설치구조 및 시공방법을 제공함에 있다.
The present invention has been made to solve the above problems, the object of the present invention is to lay a hard support member on the floor flat and to reduce the construction time by fixing a ceramic tile fixed thereon, ceramic material The use of tiles increases durability and provides a dry tile installation structure and construction method that can engrave various patterns for good aesthetics on the surface.

상기한 목적을 달성하기 위한 본 발명은 바닥에 다수 개를 수평되게 구비하며 각각의 상면에 방사상으로 고정돌기를 돌설한 지지부재 및 상기 고정돌기의 사이에 해당되는 상기 지지부재 각각에 일부를 안착하여 정렬되는 타일을 포함하여 이루어진 건식 타일 설치구조에 있어서, 상기 지지부재에 수용홈을 형성하여 바닥 내부의 전선 또는 배관을 수용하는 것을 특징으로 하는 건식 타일 구조를 제안하려는 것이다.The present invention for achieving the above object is provided with a plurality of horizontally on the floor and each of the support member protruding radially fixed projections on the upper surface and each of the support members corresponding to between the fixing projections by seating part In the dry tile installation structure comprising a tile to be aligned, it is to propose a dry tile structure characterized in that the receiving member is formed in the support member to accommodate the wire or pipe inside the floor.

삭제delete

또한, 본 발명은 견고성을 증가시키고, 표면에 자유롭게 다양한 문양을 새겨 미감을 좋게 하기 위해 세라믹 재질인 타일을 특징으로 한다.In addition, the present invention features a tile made of a ceramic material in order to increase the rigidity, and freely carved various patterns on the surface to improve aesthetics.

그리고, 본 발명은 바닥면을 수평되게 시공하는 수평잡기 공정과, 상기 바닥면에 격자 모양으로 마킹하는 기준선잡기 공정과, 상기 바닥면에 마킹된 선을 따라 방사상으로 고정돌기를 돌출 형성한 지지부재를 수평하게 설치하는 지지부재 설치 공정과, 상기 고정돌기 사이에 해당되는 상기 지지부재의 상면에 타일의 서로 다른 모서리 부위를 동시에 안착하여 정렬하는 타일 설치 공정을 포함하여 이루어지는 건식 타일 시공방법에 있어서, 상기 지지부재 설치 공정과 타일 설치 공정 사이는 필요에 따라 전선 또는 배선을 상기 지지부재에 형성된 수용홈에 삽입, 설치하는 전선 또는 배관 설치 공정을 부가하는 것을 특징으로 하는 건식 타일 시공방법을 제안하려는 것이다.The present invention provides a horizontal grabbing process for horizontally constructing the bottom surface, a baseline grabbing process for marking the bottom surface in a lattice shape, and a supporting member protruding radially fixed protrusions along a line marked on the bottom surface. In the dry tile construction method comprising a support member installation step of installing the horizontal and a tile installation step of seating and aligning different corner portions of the tile at the same time on the upper surface of the support member corresponding to the fixing projections, Between the support member installation process and the tile installation process is to propose a dry tile construction method characterized in that the wire or pipe installation process for inserting and installing the wire or wiring into the receiving groove formed in the support member as needed. .

이하, 본 발명의 바람직한 실시예를 첨부한 도면을 참조하여 더욱 상세히 설명한다.Hereinafter, with reference to the accompanying drawings, preferred embodiments of the present invention will be described in more detail.

도 1a, 도 2a 및 도 3a는 본 발명의 여러 실시예에 따른 타일 지지용 지지부재의 평면도이고, 도 1b, 도 2b 및 도 3b는 본 발명의 여러 실시예에 따른 지지부재에 타일을 설치한 상태의 단면도이다.1A, 2A, and 3A are plan views of tile support members according to various embodiments of the present invention, and FIGS. 1B, 2B, and 3B are views of installing tiles on support members according to various embodiments of the present invention. It is a cross section of the condition.

그리고, 도 4는 본 발명에 따른 건식 타일 시공도이다.And, Figure 4 is a dry tile construction according to the present invention.

도시된 바와 같이, 본 발명에 따른 건식 타일 설치구조는 바닥에 다수 개 설치되며 상부에 고정돌기(14)를 다수 개 돌설한 지지부재(10)와, 상기 지지부재(10)의 고정돌기(14) 사이에 각각의 모서리 일부를 지지하는 타일(20)로 이루어진다.As shown, the dry tile installation structure according to the present invention is installed on the floor and a plurality of support members 10 protruding a plurality of fixing projections 14 on the top, and fixing projections 14 of the support member 10 In between) is composed of a tile 20 for supporting a portion of each corner.

이때, 상기 지지부재(10)는 플라스틱, 스틸, 목재 또는 시멘트 등 다양한 재질로 이루어질 수 있다.At this time, the support member 10 may be made of various materials such as plastic, steel, wood or cement.

도 1a 및 도 1b에 도시된 바와 같이, 본 발명의 제 1실시예에 따른 지지부재(10)는 바닥으로부터 소정 높이를 갖는 몸체(12a)와, 상기 몸체(12a)의 상부면에 다수 개 돌설된 고정돌기(14)로 이루어진다.As shown in Figure 1a and Figure 1b, the support member 10 according to the first embodiment of the present invention is a body 12a having a predetermined height from the bottom and a plurality of protrusions on the upper surface of the body 12a It consists of a fixed projection (14).

상기 몸체(12a)는 원형 또는 다각형 형상을 하고 있으나, 본 발명에서는 편의상 원형으로 도시한다.The body 12a has a circular or polygonal shape, but is shown in the present invention as a circle for convenience.

상기 몸체(12a)는 외측면에 요철부(16)를 두어 다수 개의 몸체(12a)를 요철부(16)끼리의 결합으로 정렬할 수 있도록 한다.The body 12a has a concave-convex portion 16 on the outer side to align the plurality of bodies 12a by the combination of the concave-convex portions 16.

이때, 상기 몸체(12a)는 다양한 재질로 이루어질 수 있으나, 상부에서 누르는 가압력을 견딜 수 있도록 중실(中實)로 하며, 상대적으로 가벼워 쉽게 들어 설치할 수 있도록 플라스틱 재질로 이루어지는 것이 바람직하다.At this time, the body (12a) may be made of a variety of materials, it is preferable to be made of a solid material (solid) to withstand the pressing pressure from the upper, and made of a plastic material so that it is relatively light and easy to install.

또한, 상기 몸체(12a)는 바닥면의 상부에 한 층을 이루도록 다수 개 정렬되는데, 바닥면에 고정되도록 각각을 앵커볼트(도시하지 않음)로 바닥과 체결할 수 있으나, 측면에 요철부(16)를 두어 인접한 몸체(12a)끼리 결합되도록 한다.In addition, the body 12a is arranged to form a plurality of layers on the top of the bottom surface, each can be fastened to the bottom with an anchor bolt (not shown) so as to be fixed to the bottom surface, uneven portion 16 ) So that adjacent bodies 12a are coupled to each other.

그리고, 상기 몸체(12a)의 상부면에는 다수 개의 고정돌기(14)를 돌설한다.And, the upper surface of the body 12a protrudes a plurality of fixing projections (14).

한편, 상기 지지부재(10)의 몸체에는 타일(20)이 안착된다.
여기서, 상기 지지부재(10)는 바닥에 다수 개 고정 설치되는데, 바둑판 형상으로 설치되는 것이 바람직하다.
상기 타일(20)은 통상 사각 형상으로서, 사각 형상을 이루는 4 개의 지지부재(10)에 각 모서리를 지지하도록 설치된다.
이때, 상기 타일(20)은 지지부재(10)의 상면에 4 방향으로 돌출된 각 고정돌기(14)의 사이에 위치하도록 하여 밀림현상을 방지한다.
특히, 상기 고정돌기(14)는 방사상으로 다수 개 돌출되어도 되나, 4방향으로 돌출되는 것이 바람직하다.
Meanwhile, the tile 20 is seated on the body of the support member 10.
Here, the support member 10 is fixed to a plurality of floors, it is preferable to be installed in a checkerboard shape.
The tile 20 is generally rectangular in shape and is installed to support each corner on four support members 10 forming a square shape.
At this time, the tile 20 is located between each of the fixing projections 14 protruding in four directions on the upper surface of the support member 10 to prevent the sliding phenomenon.
In particular, although a plurality of fixing protrusions 14 may protrude radially, it is preferable to protrude in four directions.

여기서, 상기 타일(20)은 끝단 내부에 고정돌기(14)의 상부를 수용함으로써 고정돌기(14)의 직접적 노출을 방지하도록 하는 것이 바람직하다.Here, the tile 20 is preferably to prevent the direct exposure of the fixing projections 14 by accommodating the upper portion of the fixing protrusions 14 inside the ends.

삭제delete

삭제delete

삭제delete

또한, 상기 타일(20)은 세라믹 재질로 이루어진다.In addition, the tile 20 is made of a ceramic material.

상기 타일(20)이 세라믹 재질인 이유는 통상의 석고보다 단단하기 때문에 견고성 대비 두께를 줄일 수 있음으로써 층고(層高)를 높이면서 무게를 줄여 들고 이동하기 쉬우며, 표면에 다양한 문양을 새길 수 있어서 미감을 좋게 할 수 있기 때문이다. The tile 20 is made of a ceramic material because it is harder than ordinary gypsum, so that the thickness can be reduced compared to the rigidity, thereby increasing the height of the floor and reducing the weight, making it easier to move, and inscribe various patterns on the surface. Because aesthetics can be good.

도 2a 및 도 2b에 도시된 바와 같이, 본 발명의 제 2실시예에 따른 지지부재(10)는 여러 형상으로 이루어질 수 있는 몸체(12b) 둘레에 수용홈(17b)을 형성한다.As shown in Figures 2a and 2b, the support member 10 according to the second embodiment of the present invention forms a receiving groove 17b around the body 12b that can be made in various shapes.

상기 수용홈(17b)은 바닥에 매설되는 전선 또는 배관(2)을 수용하기 위해 형성된다.The receiving groove 17b is formed to accommodate the wire or the pipe 2 embedded in the floor.

그래서, 상기 몸체(12b)는 단면으로 봤을 때 양측면으로 개방되는 'H'자 형 상이다.Thus, the body 12b is an 'H' shape that is open to both sides when viewed in cross section.

그리고, 상기 몸체(12b)는 상면에 다수 개의 고정돌기(14)를 돌설한다.In addition, the body 12b protrudes a plurality of fixing protrusions 14 on the upper surface.

또한, 상기 몸체(12b)는 하면 둘레에 체결홈(18b)을 형성하여 체결구(19)에 의해 바닥과 체결, 고정된다.In addition, the body 12b is fastened and fixed to the bottom by a fastener 19 by forming a fastening groove 18b around the lower surface.

상기 체결구(19)는 앵커볼트로 하여 체결홈(18b)의 하부에서 상부로 삽입되어 체결되는 것이 바람직하다.The fastener 19 is preferably anchored by being inserted into the upper portion from the lower portion of the fastening groove 18b as an anchor bolt.

그리고, 상기 몸체(12b)는 바닥면과 본드칠로써 고정될 수도 있다.In addition, the body 12b may be fixed by bonding with the bottom surface.

삭제delete

이때, 상기 타일(20)은 일부를 고정돌기(14)의 두께만큼 서로 유격되어 있기 때문에 외부 가압에 의해 타일(20)과 몸체(12b)의 부딪히는 소음은 발생하지 않게 된다.At this time, since the tiles 20 are spaced apart from each other by the thickness of the fixing protrusion 14, the noise of the tiles 20 and the body 12b is not generated by external pressure.

그리고, 상기 타일(20)은 세라믹 재질로 이루어져 가능한 두께를 얇게 할 수 있음으로써 가볍고 층고를 늘릴 수 있으며, 문양을 새길 수 있다.In addition, the tile 20 may be made of a ceramic material, so that the thickness can be as thin as possible, thereby increasing the height of the floor, and carving the pattern.

도 3a 및 도 3b에 도시된 바와 같이, 본 발명의 제 3실시예에 따른 지지부재(10)는 여러 형상의 몸체(12c)에 수직되게 수용홈(17c)을 형성하여 바닥의 내부에서 필요한 공간을 형성할 수도 있다.As shown in FIGS. 3A and 3B, the supporting member 10 according to the third embodiment of the present invention forms a receiving groove 17c perpendicular to the body 12c of various shapes so as to have a necessary space inside the floor. May be formed.

이때, 상기 몸체(12c)의 하부면에는 체결홈(18c)을 형성하여 체결구(19)로써 바닥과 결합될 수도 있고, 본드칠에 의해 바닥에 고정될 수도 있다. At this time, the bottom surface of the body 12c may be coupled to the bottom by a fastener 19 by forming a fastening groove 18c, or may be fixed to the floor by bonding.

그리고, 상기 몸체(12c)의 상면에는 방사상으로 4 개의 고정돌기(14)를 돌설하여 그 위에 안착되는 타일(20)의 모서리를 지지함으로써 타일(20)의 밀림을 방지한다.In addition, the top surface of the body 12c radially protrudes four fixing protrusions 14 to support the edge of the tile 20 seated thereon to prevent the tile 20 from being pushed.

이때, 상기 몸체(12c)와 타일(20)은 상호 면접됨으로써 상호 틈을 발생하지 않아 상부에서 누르는 힘에 의해 상호 부딪히는 소음을 방지하도록 한다.At this time, the body 12c and the tile 20 do not generate a mutual gap by being interviewed with each other so as to prevent noises from colliding with each other by a pressing force from the top.

또한, 상기 타일(20)은 세라믹 재질로 이루어진다.In addition, the tile 20 is made of a ceramic material.

그리고, 도 1a 내지 도 3b의 몸체(12a,12b,12c)는 필요에 따라 수직되게 잘라서 협소한 바닥의 코너부분에 설치될 수 있다.And, the body (12a, 12b, 12c) of Figures 1a to 3b can be installed in the corner portion of the narrow bottom cut vertically as needed.

한편, 본 발명에 따른 건식 타일 시공방법은 바닥면을 수평되게 시공하는 수평잡기 공정(S10)과, 상기 바닥면에 격자 모양으로 마킹하는 기준선잡기 공정(S20)과, 바닥면에 마킹된 선을 따라 지지부재(10)를 수평하게 설치하는 지지부재(10) 설치 공정(S30)과, 상기 지지부재(10)의 상면에 돌설된 고정돌기(14)의 사이에 타일(20)의 모서리를 위치시켜 측면끼리 접하도록 설치하는 타일 설치 공정(S50)을 포함하여 이루어진다.On the other hand, the dry tile construction method according to the present invention is a horizontal catching step (S10) for constructing the floor horizontally, the baseline catching step (S20) for marking the bottom surface in a grid shape, and the line marked on the floor Position the edge of the tile 20 between the support member 10 installation step (S30) for installing the support member 10 horizontally along the fixing projections 14 protruding on the upper surface of the support member 10 It consists of a tile installation step (S50) to be installed so as to contact the sides.

먼저, 바닥에 타일(20)을 깔기 위해서는 수평잡기 공정(S10)을 행한다.First, in order to lay the tile 20 on the floor, a horizontal grabbing process (S10) is performed.

상기 수평잡기 공정(S10)은 바닥에 미장을 하여 수평을 맞추기 위한 공정이다.The horizontal catching step (S10) is a process for leveling by plastering on the floor.

그리고, 기준선잡기 공정(S20)이 행해지는데, 이는 바닥면에 격자 무늬의 선을 그어 구획하기 위한 공정이다.Then, the baseline grabbing step S20 is performed, which is a step for drawing and dividing a lattice line on the bottom surface.

기준선은 난방 파이프를 깔기 전에 먹줄을 사용하여 바닥에 표시를 하여 주고, 낚시줄과 같이 잘 끊어지지 않는 가벼운 실을 사용하여 그어지게 된다.The baseline is drawn on the floor using a food line before laying the heating pipe, and drawn using a light thread that is hard to break, such as a fishing line.

상기 지지부재 설치 공정(S30)은 기준선잡기 공정(S20)에서 바닥면에 구획된 구획선을 기준으로 평행하거나 수직되게 지지부재(10)를 배열하는 공정이다.The support member installation process (S30) is a process of arranging the support member 10 in parallel or vertically based on the partition line partitioned on the bottom surface in the reference line catching process (S20).

이때, 상기 지지부재(10)는 각각 바닥면에 안착하여 고정시킬 시 수평하지 않게 될 경우 기울어진 하면에 조그만 조각인 피스(piece, 도시하지 않음)를 넣어 받침으로써 수평을 유지하도록 한다.At this time, the support member 10 is to maintain the horizontal level by placing a small piece (piece, not shown) on the inclined lower surface when it is not horizontal when seated and fixed to the bottom surface, respectively.

또한, 상기 타일 설치 공정(S50)은 바닥면에 일정한 간격으로 배열된 지지부재(10)의 상면에 방사상으로 돌설된 고정돌기(14)의 사이사이에 타일(20)의 모서리 일부를 위치시킴으로써 타일(20)을 설치하게 된다.In addition, the tile installation step (S50) is a tile by placing a part of the corner of the tile 20 between the fixing projections 14 radially protruding on the upper surface of the support member 10 arranged at regular intervals on the floor surface 20 will be installed.

이때, 상기 타일(20)은 지지부재(10)의 상면과 완전히 면접하도록 하고, 이웃하는 타일(20)끼리는 측면끼리 접하도록 지지부재(10)를 배열하여 틈의 발생을 방지한다.At this time, the tile 20 is completely interviewed with the upper surface of the support member 10, and neighboring tiles 20 to arrange the support member 10 so as to contact the sides to prevent the occurrence of a gap.

그리고, 상기 타일(20)의 수평이 맞지 않을 경우에는 하면에 상술한 피스를 타일(20)의 기울어진 부분의 하면에 삽입하여 수평을 유지하도록 한다.When the tiles 20 are not horizontal, the above-described piece is inserted into the bottom surface of the inclined portion of the tile 20 to maintain the level.

또한, 상기 타일(20) 한 장의 크기보다 작은 모서리 부분은 타일을 크기에 맞게 잘라서 지지부재(10) 상에 안착하거나, 몰탈로 채우거나 또는 몰딩처리한다.In addition, the edge portion smaller than the size of a single piece of the tile 20 is cut to fit the size of the tile to be seated on the support member 10, filled with mortar or molded.

한편, 상기 지지부재 설치 공정(S30)과 타일 설치 공정(S50) 사이에는 필요에 따라 전선 또는 배관(2)을 지지부재(10)에 형성된 수용홈(17b,17c)에 삽입, 설치하는 전선 또는 배관 설치 공정(S40)이 부가된다.On the other hand, between the support member installation step (S30) and the tile installation step (S50) the wire or pipe (2) is inserted into the receiving grooves (17b, 17c) formed in the support member 10, if necessary, or Piping installation process (S40) is added.

상기 전선 또는 배관 설치 공정(S40)은 바닥의 내부에 전선 또는 배관(2)을 매설할 경우에 행해지는 선택적인 공정이다.The wire or pipe installation step S40 is an optional step performed when the wire or pipe 2 is embedded inside the floor.

도 4에서 제시되지 않은 도면부호는 도 1a 내지 도 3b를 참조하여 제시한 것이다.Reference numerals not shown in FIG. 4 are given with reference to FIGS. 1A to 3B.

상기한 바와 같이 본 발명에 따른 건식 타일 설치구조 및 시공방법은 습식 타일 설치에 비해 폐기물의 발생 및 철거 시에 발생되는 분진 등의 환경 문제를 발생치 않고, 몰탈 건조시킬 필요가 없기 때문에 공사기간의 단축을 기하며, 시공비를 절감할 수 있는 효과가 있다.As described above, the dry tile installation structure and construction method according to the present invention do not cause environmental problems such as dust generated during generation and removal of waste compared to the wet tile installation, and do not need to be mortar-dried. To shorten, there is an effect that can reduce the construction cost.

그리고, 본 발명의 건식 타일 설치구조는 타일을 깨끗한 상태로 들어서 재활용할 수 있기 때문에 경제적인 효과도 있다.In addition, the dry tile installation structure of the present invention is economical because the tile can be recycled in a clean state.

또한, 본 발명에 사용되는 타일은 세라믹 재질로써 종래보다 두께를 줄일 수 있어서 상대적으로 경량이기 때문에 사고의 위험을 줄일 수 있고, 층고를 높일 수 있는 효과가 있다.In addition, the tile used in the present invention is a ceramic material can be reduced in thickness than the prior art because it is relatively lightweight, reducing the risk of accidents, there is an effect that can increase the height of the floor.

그리고, 본 발명의 지지부재는 바닥에 종래의 고가(高價)인 패널을 사용하지 않기 때문에 시공비를 줄일 수 있으며, 필요한 만큼 절단해서 사용가능하기 때문에 코너 부분에 설치도 용이한 효과가 있다.In addition, since the support member of the present invention does not use a conventional expensive panel at the bottom, the construction cost can be reduced, and since it can be cut and used as necessary, it is also easy to install at the corner portion.

Claims (6)

바닥에 다수 개를 수평되게 구비하며 각각의 상면에 방사상으로 고정돌기를 돌설한 지지부재 및 상기 고정돌기의 사이에 해당되는 상기 지지부재 각각에 일부를 안착하여 정렬되는 타일을 포함하여 이루어진 건식 타일 설치구조에 있어서,A dry tile installation comprising a plurality of horizontally provided on the floor and comprising a support member which radially protrudes the fixing projections on each of the upper surfaces, and tiles aligned with a part of each of the supporting members corresponding to the fixing projections. In structure, 상기 지지부재는 바닥 내부의 전선 또는 배관을 수용하도록 수용홈을 형성하는 것을 특징으로 하는 건식 타일 구조.The support member is a dry tile structure, characterized in that to form a receiving groove to accommodate the wires or pipes in the bottom. 제 1항에 있어서,The method of claim 1, 상기 지지부재는 외측 둘레에 요철부를 두어 상호 결합되거나 체결구 또는 본드칠에 의해 바닥과 결합되는 것을 특징으로 하는 건식 타일 구조.The support member has a concave-convex portion on the outer periphery dry tile structure, characterized in that coupled to the floor by fasteners or bonds. 삭제delete 제 1항에 있어서,The method of claim 1, 상기 타일은 세라믹 재질인 것을 특징으로 하는 건식 타일 구조.The tile is a dry tile structure, characterized in that the ceramic material. 바닥면을 수평되게 시공하는 수평잡기 공정과, 상기 바닥면에 격자 모양으로 마킹하는 기준선잡기 공정과, 상기 바닥면에 마킹된 선을 따라 방사상으로 고정돌기를 돌출 형성한 지지부재를 수평하게 설치하는 지지부재 설치 공정과, 상기 고정돌기 사이에 해당되는 상기 지지부재의 상면에 타일의 서로 다른 모서리 부위를 동시에 안착하여 정렬하는 타일 설치 공정을 포함하여 이루어지는 건식 타일 시공방법에 있어서,A horizontal grabbing process for horizontally installing the bottom surface, a baseline grabbing process for marking the bottom surface in a lattice shape, and horizontally installing a support member protruding radially fixed protrusions along a line marked on the bottom surface; In the dry tile construction method comprising a support member installation step and a tile installation step of seating and aligning different edge portions of the tile at the same time on the upper surface of the support member corresponding to the fixing projections, 상기 지지부재 설치 공정과 타일 설치 공정 사이에는 필요에 따라 전선 또는 배선을 상기 지지부재에 형성된 수용홈에 삽입, 설치하는 전선 또는 배관 설치 공정이 부가되는 것을 특징으로 하는 건식 타일 시공방법.Between the support member installation process and the tile installation process, dry tile construction method characterized in that the wire or pipe installation process for inserting and installing the wire or wiring into the receiving groove formed in the support member as necessary. 삭제delete
KR1020040023858A 2004-04-07 2004-04-07 Structure of setting a tile and method thereof KR100666597B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020040023858A KR100666597B1 (en) 2004-04-07 2004-04-07 Structure of setting a tile and method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020040023858A KR100666597B1 (en) 2004-04-07 2004-04-07 Structure of setting a tile and method thereof

Publications (2)

Publication Number Publication Date
KR20050098584A KR20050098584A (en) 2005-10-12
KR100666597B1 true KR100666597B1 (en) 2007-01-09

Family

ID=37278009

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020040023858A KR100666597B1 (en) 2004-04-07 2004-04-07 Structure of setting a tile and method thereof

Country Status (1)

Country Link
KR (1) KR100666597B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101347934B1 (en) 2012-10-29 2014-01-07 박재민 Angle unit for wall construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101347934B1 (en) 2012-10-29 2014-01-07 박재민 Angle unit for wall construction

Also Published As

Publication number Publication date
KR20050098584A (en) 2005-10-12

Similar Documents

Publication Publication Date Title
US6857248B2 (en) Panel, a kit and a method for forming a masonry wall
US7779602B2 (en) Snap together floor structure
US3740911A (en) Brick veneer wall construction
JP2014231733A (en) Execution method for waterproof sheet
KR100666597B1 (en) Structure of setting a tile and method thereof
KR100916326B1 (en) Flooring structure and construction method using it
JP2008127984A (en) Floor tile laying method
CN107268844B (en) Mounting method of assembled wall
KR100884779B1 (en) Flooring structure and construction method using it
KR100634983B1 (en) Assembly type Ondol panel and construction method using the same
JP2786412B2 (en) Exterior panel covering structure of concrete building and covering construction method
KR20040094466A (en) Dry execution method of toilet works
KR100469471B1 (en) Floor and its construction method
TWM561109U (en) Prefabricated panel for external wall of building
JP5485231B2 (en) Floor panel and floor panel manufacturing equipment
JP2010265716A (en) Bathroom component body and installation method for bathroom unit
KR100689026B1 (en) Concrete Crack Prevention Device
KR200407071Y1 (en) Concrete Crack Prevention Device
JP2780541B2 (en) Composite wall panel molding method
CN205000588U (en) Movable floorboard
JPS634753Y2 (en)
KR101192632B1 (en) Siding panel combination structure for closing of building exterior
BR102017014700A2 (en) floor laying method that facilitates subsequent removal
JPH1150648A (en) Construction material
JPH027922Y2 (en)

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee
R401 Registration of restoration
FPAY Annual fee payment

Payment date: 20121031

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20140102

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20141230

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20160129

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20171219

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20181226

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20191216

Year of fee payment: 14