KR100650751B1 - Prefabricated aqueduct structure - Google Patents

Prefabricated aqueduct structure Download PDF

Info

Publication number
KR100650751B1
KR100650751B1 KR1020050075264A KR20050075264A KR100650751B1 KR 100650751 B1 KR100650751 B1 KR 100650751B1 KR 1020050075264 A KR1020050075264 A KR 1020050075264A KR 20050075264 A KR20050075264 A KR 20050075264A KR 100650751 B1 KR100650751 B1 KR 100650751B1
Authority
KR
South Korea
Prior art keywords
pair
prefabricated
waterway structure
grooves
side panels
Prior art date
Application number
KR1020050075264A
Other languages
Korean (ko)
Inventor
한일욱
Original Assignee
주식회사 하은산업
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 하은산업 filed Critical 주식회사 하은산업
Priority to KR1020050075264A priority Critical patent/KR100650751B1/en
Application granted granted Critical
Publication of KR100650751B1 publication Critical patent/KR100650751B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B5/00Artificial water canals, e.g. irrigation canals

Abstract

A prefabricated channel structure is provided to make conveyance and construction easy by making a channel structure in the prefabricated type and to resist external force by engaging with soil. A prefabricated channel structure is formed by coupling a pair of wall units to a floor unit. Hereon the wall unit comprises a front panel(110) formed in the rugged shape to reduce the velocity of flowing water and to let aquatic life escape from the channel structure and provided with cogged joints(111,111') to engage with neighboring front panels, a pair of side panels(120,120') formed in the stepped shape to form a multistage structure by piling up other wall units and provided with through holes(122,122') to house soil at construction and insertion grooves(123') to insert horizontal beams, and a pair of rear panels(130,130') connected with a pair of side panels in the opposite direction; and the floor unit comprises a floor(210) provided with long grooves(230'), and a pair of side walls(220,220') connected to both ends of the floor and provided with a pair of grooves(221',222') to house side panels of a pair of wall units and grooves(223,223') to engage with soils.

Description

조립식 수로 구조물 {PREFABRICATED AQUEDUCT STRUCTURE}Prefabricated waterway structures {PREFABRICATED AQUEDUCT STRUCTURE}

도 1은 조립식 수로 구조물의 벽면체의 앞면을 도시하는 도면1 shows a front face of a wall of a prefabricated waterway structure;

도 2는 조립식 수로 구조물의 벽면체의 뒷면을 도시하는 도면2 shows the back side of the wall of the prefabricated waterway structure;

도 3은 조립식 수로 구조물의 바닥면체를 도시하는 도면3 shows a bottom face of a prefabricated waterway structure.

도 4는 조립식 수로 구조물의 바닥면체와 벽면체가 결합되는 상태를 도시하는 도면4 is a view showing a state in which the bottom surface and the wall surface of the prefabricated waterway structure is coupled;

도 5는 조립식 수로 구조물의 조립상태를 도시하는 도면5 is a view showing an assembled state of the prefabricated waterway structure.

도 6은 조립식 수로 구조물의 타 실시예를 도시하는 도면6 illustrates another embodiment of the prefabricated waterway structure.

도 7은 조립식 수로 구조물의 세로 보를 도시하는 도면7 shows a longitudinal beam of a prefabricated waterway structure.

본 발명은 조립식 수로 구조물에 관한 것이다.The present invention relates to a prefabricated waterway structure.

종래 인공 수로 구조물의 경우, U자 형상 단면을 가지는 단위체를 복수 배열하여 수로관을 형성하고 있다. 그런데 이러한 각 단위체의 부피는 매우 크기 때문에, 수로관의 운반이 어렵고 또한 시공에 있어서 용이하지 않은 문제점이 있었다. In the conventional artificial waterway structure, a plurality of units having a U-shaped cross section are arranged to form a waterway tube. However, since the volume of each unit is very large, it is difficult to transport the water pipe and there is a problem that is not easy in construction.

또한 종래 인공 수로 구조물은 시공후 그 단위체가 토사 등(토사, 굵은 모 래, 자갈, 흙 등을 포함하는 개념이다. 이하 같다)의 침하 등에 견디지 못하고 비틀리거나 침해되는 경우가 있기 때문에 별도의 이음부재가 필요하는 등 구조적인 문제점 및 시공상 어려움을 모두 가지고 있었다.In addition, the conventional artificial waterway structure is a separate joint member because the unit after the construction may not be able to endure the settlement of earth and sand (soil, coarse sand, gravel, soil, etc.). It had both structural problems and construction difficulties.

본 발명은 이러한 문제점을 해결하기 위해 도출된 것으로서, 운반 및 시공이 용이하고 또한 구조적으로 튼튼한 조립식 수로 구조물을 제공하는 것을 그 목적으로 한다.SUMMARY OF THE INVENTION The present invention has been made to solve this problem, and an object thereof is to provide a prefabricated waterway structure that is easy to transport and construct and which is structurally robust.

이러한 목적을 달성하기 위해, 본 발명에 의하면, 좌우 한 쌍의 벽면체 및 이를 수용하는 바닥면체를 포함하는 조립식 수로 구조물로서, 좌우 한 쌍의 벽면체가, 양 측단에 맞물림부가 각각 형성된 전면패널과, 전면패널의 양 측단보다 안쪽에서부터 후방으로 연설되며, 중앙부에 관통공이 형성되어 있는 한 쌍의 사이드패널과, 한 쌍의 사이드패널로부터 서로 대향하는 방향으로 외측으로 연설되는 한 쌍의 배면패널을 각각 포함하고, 바닥면체가, 좌우 한 쌍의 벽면체의 전면패널을 수용하도록 양 측에 전후방향의 긴 홈이 각각 형성되어 있는 바닥부와, 바닥부의 양 측단에 연설되며 좌우 한 쌍의 벽면체의 사이드패널을 수용하는 한 쌍의 홈을 각각 구비하는 한 쌍의 측벽을 포함하는 조립식 수로 구조물을 제공한다. In order to achieve the above object, according to the present invention, as a prefabricated waterway structure comprising a pair of left and right wall surface and a bottom surface for accommodating the same, a pair of left and right wall surface, the front panel is formed, respectively engaging portions on both sides, It includes a pair of side panels that extend from the inside to the rear of both front ends of the front panel, and a pair of side panels each having a through hole formed in the center, and a pair of rear panels that extend outwardly in a direction facing each other from the pair of side panels. The bottom surface of the left and right sides of the pair of wall surfaces, the bottom portion is formed in each of the front and rear long grooves on both sides to accommodate the front panel of the left and right pair of wall surface, both sides of the bottom portion A prefabricated waterway structure is provided that includes a pair of sidewalls each having a pair of grooves for receiving a panel.

한편, 본 발명의 조립식 수로 구조물에 의하면, 이 좌우 한 쌍의 벽면체의 한 쌍의 사이드패널의 상면에는 전면패널쪽 부분이 높고 배면 패널쪽 부분이 낮은 단차가 형성되어 있다.On the other hand, according to the prefabricated waterway structure of the present invention, a high level of the front panel side and a low side of the rear panel side are formed on the upper surface of the pair of side panels of the pair of left and right wall surfaces.

또한, 본 발명의 조립식 수로 구조물에 의하면, 좌우 한 쌍의 벽면체의 한 쌍의 사이드패널의 상면에 제1의 보 삽입용 홈이 각각 형성되어 있다.Moreover, according to the prefabricated channel structure of this invention, the 1st beam insertion groove | channel is respectively formed in the upper surface of a pair of side panels of a pair of left and right wall surfaces.

더욱이, 본 발명의 조립식 수로 구조물은, 제1의 보 삽입용 홈에 삽입되는 제1의 가로 보를 더 포함하고 있다.Furthermore, the prefabricated waterway structure of the present invention further includes a first horizontal beam inserted into the first beam insertion groove.

한편, 본 발명의 조립식 수로 구조물에 의하면, 좌우 한 쌍의 벽면체의 한 쌍의 사이드패널은 그 중앙부에 각각 관통공을 구비하고 있다.On the other hand, according to the assembled channel structure of the present invention, the pair of side panels of the pair of left and right wall surfaces are provided with through-holes in the center thereof, respectively.

또한, 본 발명의 조립식 수로 구조물에 의하면, 관통공의 하단에 제2의 보 삽입용 홈이 각각 형성되어 있다. In addition, according to the prefabricated channel structure of the present invention, the second beam insertion groove is formed at the lower end of the through hole, respectively.

더욱이, 본 발명의 조립식 수로 구조물은, 제2의 보 삽입용 홈에 삽입되는 제2의 가로 보를 더 포함하고 있다. Furthermore, the prefabricated waterway structure of the present invention further includes a second horizontal beam inserted into the second beam insertion groove.

또한, 본 발명의 조립식 수로 구조물은, 일단에 제2의 가로 보의 중앙위치에 끼워맞춰지는 부분을 가지며 타단에 보강용 부분이 형성되어 있는 긴 바의 형태인 세로 보를 더 포함하고 있다.In addition, the prefabricated waterway structure of the present invention further includes a longitudinal beam in the form of an elongated bar having a portion fitted at a central position of the second horizontal beam at one end and a reinforcing portion formed at the other end.

한편, 본 발명의 조립식 수로 구조물에 의하면, 바닥면체의 한 쌍의 측벽에는 토사 맞물림용 홈이 형성되어 있다.On the other hand, according to the prefabricated waterway structure of the present invention, grooves for soil engagement are formed in the pair of side walls of the bottom surface.

또한, 본 발명의 조립식 수로 구조물에 의하면, 바닥면체의 바닥부의 전후방향 일단부에는 연결용 단차부가 형성되어 있다.In addition, according to the prefabricated waterway structure of the present invention, the connecting step is formed at one end in the front-rear direction of the bottom of the bottom surface.

또한, 본 발명의 조립식 수로 구조물에 의하면, 바닥면체의 바닥부에는 하나 이상의 관통공이 형성되어 있는 것을 특징으로 하는 조립식 수로 구조물.In addition, according to the prefabricated waterway structure of the present invention, the prefabricated waterway structure, characterized in that at least one through-hole is formed in the bottom portion of the bottom surface.

이하 도면에 도시된 본 발명의 실시예에 따라 본 발명을 보다 구체적으로 설 명한다.Hereinafter, the present invention will be described in more detail according to an embodiment of the present invention shown in the drawings.

도 1 및 도 2에는 본 발명의 벽면체(100)가 도시되어 있는데, 이 벽면체(100) 한 쌍이 후술하는 바닥면체(200)에 결합되어 조립식 수로 구조물을 형성하게 된다.1 and 2, the wall surface 100 of the present invention is shown, a pair of the wall surface 100 is coupled to the bottom surface 200 to be described later to form a prefabricated waterway structure.

벽면체(100)는 전면패널(110), 한 쌍의 사이드 패널(120, 120') 및 한 쌍의 배면패널(130, 130')로 이루어지는 콘트리트 구조물이다. The wall surface 100 is a concrete structure composed of the front panel 110, a pair of side panels 120 and 120 ′, and a pair of rear panels 130 and 130 ′.

먼저 전면패널(110)은 조립식 수로 구조물의 측면이 되는 부분으로서, 상하방향으로 긴 홈이 형성되어 있는 요철의 형상으로 되어 있다. 따라서 수로 구조물을 통해 물이 흘어갈 때 유속이 감소되어 개구리 등의 수생동물이 수로 구조물 밖으로 탈출할 수 있도록 한다. First, the front panel 110 is a portion that becomes the side of the prefabricated waterway structure, and has a shape of irregularities in which long grooves are formed in the vertical direction. Therefore, the flow rate is reduced when water flows through the waterway structure to allow aquatic animals such as frogs to escape the waterway structure.

한편 전면패널(110)의 양 측단에는 맞물림부(111, 111')가 각각 형성되어 있어서, 수로 구조물로 인공 수로를 시공할 때 서로 인접하는 전면패널이 맞물려 유지되도록 한다. Meanwhile, engaging portions 111 and 111 ′ are formed at both side ends of the front panel 110, respectively, so that the front panels adjacent to each other are engaged with each other when constructing an artificial water channel with the waterway structure.

한 쌍의 사이드패널(120, 120')은 전면패널(110)의 양 측단보다 안쪽에서부터 후방으로 연설되어 있다. 이 사이드패널(120, 120')의 상면에는 전면패널(110)쪽 부분이 높고 배면패널(130)쪽 부분이 낮은 단차가 형성되어 있어서 시공시 그 윗단에 다른 벽면체(100)를 쌓아 정렬하여 일종의 호안 구조물 형태로 다단식 구조물을 형성할 수 있도록 되어 있다. 또한 사이드패널(120, 120')의 중앙부에는 관통공(122, 122')이 형성되어 있어서 시공시 토사 등을 수용하여 이 토사 등과 맞물려 견고하게 유지된다.The pair of side panels 120 and 120 ′ are spoken from the inside to the rear of both side ends of the front panel 110. On the upper surface of the side panels (120, 120 '), a high step portion of the front panel 110 side and a low step portion of the rear panel 130 side are formed, so that the other wall surface 100 is stacked and aligned on the upper end during construction. It is possible to form a multi-stage structure in the form of a shoreline structure. In addition, through-holes 122 and 122 'are formed in the central portion of the side panels 120 and 120' so as to receive soil and the like during construction and to be firmly engaged with the soil and the like.

한편, 사이드패널(120, 120')의 상면에는 제1의 보 삽입용 홈(121, 121')이 각각 형성되어 있고, 관통공(122, 122')의 하단에는 제2의 보 삽입용 홈(123, 123')이 각각 형성되어 있다. 따라서, 도 3에 도시하는 바와 같이 인접하는 벽면체의 홈에 가로 보(301, 302)를 가로질러 끼워넣으면 인접하는 양 벽면체 간의 연결을 보다 견고히 할 수 있다. On the other hand, first beam insertion grooves 121 and 121 'are formed in the upper surfaces of the side panels 120 and 120', respectively, and second beam insertion grooves are formed in the lower ends of the through holes 122 and 122 ', respectively. 123 and 123 'are formed, respectively. Therefore, as shown in FIG. 3, when the horizontal beams 301 and 302 are inserted into the grooves of the adjacent wall surfaces, the connection between the adjacent wall surfaces can be more firmly established.

한 쌍의 사이드패널(120, 120')에는 한 쌍의 배면패널(130, 130')이 서로 대향하는 방향으로 외측으로 연설되어, 시공시 토사 등이 채워지면 배면패널(130, 130')이 토사 등과의 견고하게 맞물려 유지될 수 있다. 도시된 바와 같이 배면패널(130, 130')은 위에서 본 단면이 사다리꼴 형상으로 사이드패널(120, 120')과의 모서리 부분이 보다 두껍게 되어 있어서, 강도 보강의 효과가 있다.When the pair of side panels 120 and 120 'are paired with the rear panels 130 and 130' outwardly facing each other, when the earth and sand are filled during construction, the rear panels 130 and 130 ' It can be firmly engaged with earth and sand. As shown, the rear panels 130 and 130 'have a trapezoidal cross-sectional view as viewed from above, and the edge portions of the rear panels 130 and 130' are thicker, thereby enhancing the strength.

벽면체(100)의 한 쌍의 사이드패널(120)의 상면에는 제1의 보 삽입용 홈(121, 121')이 각각 형성되어 있고, 관통공(122, 122')의 하단에 제2의 보 삽입용 홈(123, 123')이 각각 형성되어 있어서, 가로 보(301, 302)를 삽입하여 벽면체간의 연결을 보강할 수 있다. 이에 대하여는 후술한다.The first beam insertion grooves 121 and 121 'are formed in the upper surface of the pair of side panels 120 of the wall surface 100, respectively, and the second holes are formed at the lower ends of the through holes 122 and 122'. The beam insertion grooves 123 and 123 'are formed, respectively, so that the horizontal beams 301 and 302 can be inserted to reinforce the connection between the wall bodies. This will be described later.

한편, 도 3 및 도 4에 도시된 바와 같이, 바닥면체(200)는, 바닥부(210)와 이 바닥부(210)의 양 측단에 연성되는 한 쌍의 측벽(220, 220')으로 이루어져 있다. 이 바닥부(210)에는 좌우 한 쌍의 벽면체의 전면패널을 수용하도록 양 측에 전후방향의 긴 홈(230, 230')이 각각 형성되어 있다. 한편 한 쌍의 측벽(220, 220')은 좌우 한 쌍의 벽면체의 사이드패널을 수용하는 한 쌍의 홈(221, 222; 221' 222')을 각각 구비한다. 3 and 4, the bottom surface 200 includes a bottom portion 210 and a pair of side walls 220 and 220 ′ formed at both side ends of the bottom portion 210. have. Longer grooves 230 and 230 'in the front and rear directions are formed on both sides of the bottom portion 210 so as to accommodate the front panel of the pair of left and right wall surfaces. On the other hand, the pair of side walls 220 and 220 'includes a pair of grooves 221 and 222 and 221' and 222 'respectively receiving side panels of the left and right pairs of wall surfaces.

바닥면체(200)의 한 쌍의 측벽(220, 220')에는 토사 맞물림용 홈(223, 223')이 각각 형성되어 있어서 시공후 구조물이 토사 등에 맞물려 움직이지 않도록 하는 역할을 한다. Soil engaging grooves 223 and 223 'are formed in the pair of side walls 220 and 220' of the bottom surface 200, respectively, and serve to prevent the structure from being engaged with the soil after construction.

바닥면체(200)의 바닥부(210)의 전후방향 일단부에는 연결용 단차부(240)가 형성되어 있어서 바닥면체간의 연결을 보강할 수 있다. 또한 바닥부(210)에는 관통공(250)이 하나 이상 형성되어 있어서, 지하수 유입 및 식생공간의 기능을 수행한다.A connection step 240 is formed at one end in the front-rear direction of the bottom portion 210 of the bottom face 200 to reinforce the connection between the bottom faces. In addition, at least one through hole 250 is formed in the bottom portion 210 to perform the function of inflow of groundwater and vegetation space.

다음으로 본 발명의 시공방법에 대하여 설명한다.Next, the construction method of this invention is demonstrated.

먼저 설치지점의 기초 지질의 특성을 확인하고, 기초 바닥을 고르는 등 기초 저면을 고르는 작업을 한다.First, check the characteristics of the foundation geology at the installation site, and select the bottom of the foundation, such as selecting the bottom of the foundation.

이 기초 저면에 바닥면체(200)의 연결용 단차부에 새로운 바닥면체(200)의 단부를 얹어 놓는 방식으로 바닥면체(200)의 복수개를 길게 연결시킨다. The plurality of the bottom surface 200 is long connected by placing the end of the new bottom surface 200 on the connection step of the bottom surface 200 on the bottom of the base.

다음 도 4에 도시된 바와 같이, 이 바닥면체(200)의 한 쌍의 측벽(220, 220')의 한 쌍의 홈(221, 222; 221' 222')에 벽면체(100)의 한 쌍의 사이드패널(120, 120')을 끼워 넣고, 또한 바닥면체(200)의 바닥부(210)의 전후방향의 긴 홈(230, 230')에 벽면체(100)의 전면패널(110)을 끼워 넣는 방식으로, 벽면체(100)를 바닥면체(200)에 연결시킨다. 이에 의해 바닥면체(200)에 연결된 벽면체(100)가 그 바닥면체(200)의 연결단부(240)에 놓어진 새로운 바닥면체(200)의 단부를 누르기 때문에 바닥면체(200) 간의 연결도 보다 견고해진다.Next, as shown in FIG. 4, a pair of wall faces 100 in a pair of grooves 221, 222; 221 ′ 222 ′ of a pair of side walls 220, 220 ′ of the bottom face 200. Inserting the side panels 120 and 120 'of the front panel 110 of the wall surface 100 into the long grooves 230 and 230' in the front and rear directions of the bottom portion 210 of the bottom surface 200. By fitting, the wall surface 100 is connected to the bottom surface 200. As a result, the wall surface 100 connected to the bottom surface 200 presses an end portion of the new bottom surface 200 placed on the connection end 240 of the bottom surface 200. To be solid.

그 후, 서로 인접하는 벽면체(100)의 제1의 보 삽입용 홈(121, 121') 및 제2 의 보 삽입용 홈(123, 123')에 가로 보(301, 302)를 가로질러 끼워넣어 인접하는 양 벽면체 간의 연결을 보다 견고히 한다. 또한 도 5에 도시된 바와 같이 가로 보(302)에, 도 7에 도시된 바와 같이, 일단에 제2의 가로 보(302)의 중앙위치에 끼워맞춰지는 부분(403)을 가지며 타단에 보강용 부분(402)이 형성되어 있는 긴 바(401)의 형태인 세로 보(400)가 설치된다. Thereafter, the first beam insertion grooves 121 and 121 'and the second beam insertion grooves 123 and 123' of the wall surface 100 adjacent to each other cross the horizontal beams 301 and 302. By inserting them into a stronger connection between two adjacent walls. In addition, as shown in FIG. 5, the horizontal beam 302 has a portion 403 fitted at a central position of the second horizontal beam 302 at one end as shown in FIG. A longitudinal beam 400 in the form of an elongated bar 401 in which a portion 402 is formed is provided.

그 후 토사 등을 벽면체(100)의 상면의 높이까지 덮어주면 조립식 수로관의 시공이 완료되게 되며, 관통공(122, 122'), 토사 맞물림용 홈(223, 223'), 가로 보(301, 302) 및 세로보(400) 등이 토사에 꽉 맞물림으로써 구조물이 외력에 대해 움직이지 않고 확실히 유지될 수 있다. Then, when the soil is covered to the height of the upper surface of the wall surface 100, the construction of the prefabricated water pipe is completed, the through-holes (122, 122 '), the earth and sand engaging grooves (223, 223'), horizontal beam (301) , 302) and stringers 400, etc. are tightly engaged with the soil so that the structure can be securely maintained without moving against external forces.

한편 도 6에 도시된 바와 같이 벽면체(100)의 상면의 단차의 아래단 높이까지 토사 등을 메우고 다진 후, 이 위에 새로운 벽면체(100)를 이음매가 서로 엇갈리는 방식으로 쌓게 되면 일종의 호안 구조물 형태로 다단식으로 구조물을 형성할 수 있다. 이 때 아랫단의 벽면체(100)와 윗단의 벽면체(100) 사이에는 토사 등이 드러나게 되는데, 이 부분에 풀이나 나무 등의 식재가 가능하여 식생공간으로서 기능하게 된다. On the other hand, as shown in Figure 6, after filling the earth and sand to the height of the lower end of the step of the upper surface of the wall surface 100, the new wall surface 100 is stacked on top of each other in such a way that the seams alternate with each other to form a kind of relief structure The structure can be formed in multiple stages. At this time, the earth and sand are exposed between the wall surface 100 of the lower end and the wall surface 100 of the upper end, and planting of grass, trees, etc. is possible at this part, thereby functioning as a vegetation space.

본 발명에 의하면 수로 구조물이 조립식으로 되어 있기 때문에 운반 및 시공이 용이하다. 또한 서로 맞물리는 구조로 되어 있어 구조적으로 튼튼하며, 토사 등을 메우고 다지면 복잡한 형상의 구조가 토사와 맞물리게 되어 외력에 견디는 힘이 크다.According to the present invention, since the channel structure is prefabricated, it is easy to transport and construct. In addition, the structure is interlocked with each other structurally strong, and when the soil is filled and chopped, the complex shape of the structure is meshed with the earth and sand to endure a large force.

한편 바닥면체의 바닥부에는 관통공이 하나 이상 형성되어 있어서 지하수 유입 및 식생공간의 기능을 수행할 수 있고, 다단식으로 벽면체를 쌓는 경우에는 아랫단 벽면체와 윗단 벽면체 사이에 풀이나 나무 등의 식재가 가능한 부분을 형성할 수 있어서, 환경친화적인 수로 구조물을 얻을 수 있다.On the other hand, at least one through hole is formed at the bottom of the bottom surface to perform the function of groundwater inflow and vegetation space, and in the case of stacking the wall surface in a multi-stage manner, a plant such as grass or a tree is placed between the lower wall surface and the upper wall surface. Can form a possible portion, it is possible to obtain an environmentally friendly channel structure.

Claims (11)

좌우 한 쌍의 벽면체 및 이를 수용하는 바닥면체를 포함하는 조립식 수로 구조물로서, A prefabricated waterway structure including a pair of left and right wall surface and a bottom surface for receiving the same, 상기 좌우 한 쌍의 벽면체가, 양 측단에 맞물림부가 각각 형성된 전면패널과, 상기 전면패널의 양 측단보다 안쪽에서부터 후방으로 연설되며, 중앙부에 관통공이 형성되어 있는 한 쌍의 사이드패널과, 상기 한 쌍의 사이드패널로부터 서로 대향하는 방향으로 외측으로 연설되는 한 쌍의 배면패널을 각각 포함하고,The pair of left and right wall surfaces, the front panel each having an engaging portion at both side ends, a pair of side panels that are spoken from the inside to the rear than both side ends of the front panel, the through-hole is formed in the center, the pair A pair of rear panels each extending outwardly in a direction facing each other from a side panel of 상기 바닥면체가, 상기 좌우 한 쌍의 벽면체의 상기 전면패널을 수용하도록 양 측에 전후방향의 긴 홈이 각각 형성되어 있는 바닥부와, 상기 바닥부의 양 측단에 연설되며 상기 좌우 한 쌍의 벽면체의 사이드패널을 수용하는 한 쌍의 홈을 각각 구비하는 한 쌍의 측벽을 포함하는 것을 특징으로 하는 조립식 수로 구조물.The bottom surface has a bottom portion in which longitudinal grooves in the front and rear directions are formed on both sides, respectively, so as to receive the front panel of the left and right pair of wall surfaces, and the left and right pairs of wall surfaces being addressed to both side ends of the bottom portion. And a pair of sidewalls each having a pair of grooves for receiving side panels of the sieve. 제 1 항에 있어서, 상기 좌우 한 쌍의 벽면체의 한 쌍의 사이드패널의 상면에는 전면패널쪽 부분이 높고 배면 패널쪽 부분이 낮은 단차가 형성되어 있는 것을 특징으로 하는 조립식 수로 구조물.2. The prefabricated waterway structure according to claim 1, wherein a step is formed on the upper surface of the pair of side panels of the pair of left and right wall bodies and the lower portion of the rear panel side is high. 제 1 항 또는 제 2 항에 있어서, 상기 좌우 한 쌍의 벽면체의 한 쌍의 사이드패널의 상면에 제1의 보 삽입용 홈이 각각 형성되어 있는 것을 특징으로 하는 조립식 수로 구조물.The prefabricated waterway structure according to claim 1 or 2, wherein a first beam insertion groove is formed on an upper surface of the pair of side panels of the pair of left and right wall surfaces, respectively. 제 3 항에 있어서, 제1의 보 삽입용 홈에 삽입되는 제1의 가로 보를 더 포함하는 것을 특징으로 하는 조립식 수로 구조물.4. The prefabricated waterway structure of claim 3 further comprising a first transverse beam inserted into the first beam insertion groove. 제 1 항에 있어서, 상기 좌우 한 쌍의 벽면체의 한 쌍의 사이드패널은 그 중앙부에 각각 관통공을 구비하고 있는 것을 특징으로 하는 조립식 수로 구조물.2. The prefabricated waterway structure according to claim 1, wherein the pair of side panels of the pair of left and right wall surfaces are provided with through holes in the center thereof, respectively. 제 5 항에 있어서, 상기 관통공의 하단에 제2의 보 삽입용 홈이 각각 형성되어 있는 것을 특징으로 하는 조립식 수로 구조물.6. The prefabricated waterway structure according to claim 5, wherein second beam insertion grooves are formed at lower ends of the through holes, respectively. 제 6 항에 있어서, 상기 제2의 보 삽입용 홈에 삽입되는 제2의 가로 보를 더 포함하는 것을 특징으로 하는 조립식 수로 구조물.7. The prefabricated waterway structure of claim 6 further comprising a second transverse beam inserted into the second beam insertion groove. 제 7 항에 있어서, 일단에 상기 제2의 가로 보의 중앙위치에 끼워맞춰지는 부분을 가지며 타단에 보강용 부분이 형성되어 있는 긴 바의 형태인 세로 보를 더 포함하는 것을 특징으로 하는 조립식 수로 구조물.8. The prefabricated waterway structure of claim 7 further comprising a longitudinal beam in the form of a long bar having a portion fitted at a central position of the second horizontal beam at one end and a reinforcing portion formed at the other end. . 제 1 항에 있어서, 상기 바닥면체의 상기 한 쌍의 측벽에는 토사 맞물림용 홈이 형성되어 있는 것을 특징으로 하는 조립식 수로 구조물.The prefabricated waterway structure according to claim 1, wherein the pair of side walls of the bottom face is formed with a soil engaging groove. 제 1 항에 있어서, 상기 바닥면체의 상기 바닥부의 전후방향 일단부에는 연결용 단차부가 형성되어 있는 것을 특징으로 하는 조립식 수로 구조물.The prefabricated waterway structure according to claim 1, wherein a connection step is formed at one end in the front-rear direction of the bottom of the bottom surface. 제 1 항에 있어서, 상기 바닥면체의 상기 바닥부에는 하나 이상의 관통공이 형성되어 있는 것을 특징으로 하는 조립식 수로 구조물.The prefabricated waterway structure according to claim 1, wherein at least one through hole is formed in the bottom portion of the bottom surface.
KR1020050075264A 2005-08-17 2005-08-17 Prefabricated aqueduct structure KR100650751B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020050075264A KR100650751B1 (en) 2005-08-17 2005-08-17 Prefabricated aqueduct structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020050075264A KR100650751B1 (en) 2005-08-17 2005-08-17 Prefabricated aqueduct structure

Publications (1)

Publication Number Publication Date
KR100650751B1 true KR100650751B1 (en) 2006-11-27

Family

ID=37713906

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050075264A KR100650751B1 (en) 2005-08-17 2005-08-17 Prefabricated aqueduct structure

Country Status (1)

Country Link
KR (1) KR100650751B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200446577Y1 (en) * 2007-10-26 2009-11-11 주식회사 하은산업 A prefabricated channel
KR102124342B1 (en) * 2019-06-24 2020-06-18 이양석 A gravitationally rusted vegetation panel that can be planted in a prefabricated part of the cut ground

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH032024U (en) * 1989-05-27 1991-01-10
KR200349427Y1 (en) 2004-01-28 2004-05-04 주식회사 나노텍코리아 A concrete structure to construct a watercourse

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH032024U (en) * 1989-05-27 1991-01-10
KR200349427Y1 (en) 2004-01-28 2004-05-04 주식회사 나노텍코리아 A concrete structure to construct a watercourse

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200446577Y1 (en) * 2007-10-26 2009-11-11 주식회사 하은산업 A prefabricated channel
KR102124342B1 (en) * 2019-06-24 2020-06-18 이양석 A gravitationally rusted vegetation panel that can be planted in a prefabricated part of the cut ground

Similar Documents

Publication Publication Date Title
US20040161307A1 (en) Hybrid retaining wall system
KR200381301Y1 (en) fabricate block for constructing breast wall
KR100650751B1 (en) Prefabricated aqueduct structure
JPS58120924A (en) Block for assembling retaining wall
KR20060059409A (en) Fabricate block for constructing breast wall
KR100794221B1 (en) Retaining wall for planting
US6213689B1 (en) Construction unit for a retaining wall and a method for constructing the retaining wall
KR200429936Y1 (en) A revetment block for vertical type
CN110306588B (en) Panel module unit for reinforced earth retaining wall and reinforced earth retaining wall
KR100696297B1 (en) Prefabricated revet construction
KR200183206Y1 (en) Block for breastwall
KR100607605B1 (en) an environmental wall with various batter
KR20100100294A (en) Installation structure of block type breast wall and its construction method
KR100746128B1 (en) a block including planting space and construction method using the same
US6120215A (en) Breast wall construction
JP2002327444A (en) Earth retaining concrete block
KR100593181B1 (en) A terrace-revetment unit and a process of construction unsing the same
KR101089356B1 (en) The installation method for reinforcing block of retaining wall type
KR200410582Y1 (en) Framework for water's edge
JP4400767B2 (en) Retaining wall structure for earth retaining
KR102511386B1 (en) Connecting structure of reinforced wall using reinforced block and constructing method thereof
KR100770559B1 (en) Retaining wall building fabric
KR20030013138A (en) Filling crushed stone type retainingwall
KR20060082388A (en) Fabricate block for constructing breast wall
KR20090084568A (en) A wall engineering works construction concrete block structure

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20121119

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20131120

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20141120

Year of fee payment: 9

LAPS Lapse due to unpaid annual fee