KR100603072B1 - Tongs device of a block - Google Patents

Tongs device of a block Download PDF

Info

Publication number
KR100603072B1
KR100603072B1 KR1020040065504A KR20040065504A KR100603072B1 KR 100603072 B1 KR100603072 B1 KR 100603072B1 KR 1020040065504 A KR1020040065504 A KR 1020040065504A KR 20040065504 A KR20040065504 A KR 20040065504A KR 100603072 B1 KR100603072 B1 KR 100603072B1
Authority
KR
South Korea
Prior art keywords
link
block
connecting shaft
tongs
present
Prior art date
Application number
KR1020040065504A
Other languages
Korean (ko)
Other versions
KR20060017008A (en
Inventor
이병철
Original Assignee
(주)신우콘크리트산업
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)신우콘크리트산업 filed Critical (주)신우콘크리트산업
Priority to KR1020040065504A priority Critical patent/KR100603072B1/en
Publication of KR20060017008A publication Critical patent/KR20060017008A/en
Application granted granted Critical
Publication of KR100603072B1 publication Critical patent/KR100603072B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/42Gripping members engaging only the external or internal surfaces of the articles
    • B66C1/422Gripping members engaging only the external or internal surfaces of the articles actuated by lifting force
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/42Gripping members engaging only the external or internal surfaces of the articles
    • B66C1/44Gripping members engaging only the external or internal surfaces of the articles and applying frictional forces
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C3/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith and intended primarily for transmitting lifting forces to loose materials; Grabs
    • B66C3/04Tine grabs

Abstract

본 발명은 블록 파지장치에 관한 것이며, 그 목적은 자중과 마찰, 키를 이용하여 배면 토압을 견딜 수 있도록 고중량으로 설계되어 하천의 호안이나 제방, 도로의 법면 등에 시공하게 되는 블록을 손쉽게 집어 비탈면에 효과적으로 옮겨 시공하여 시공 효율을 높일 수 있는 블록 파지장치를 제공함에 있다.The present invention relates to a block gripping device, the purpose of which is designed to be heavy weight to withstand the back earth pressure by using the weight, friction, keys, easy to pick up the block to be installed on the slopes of rivers, embankments, road surfaces, etc. An object of the present invention is to provide a block gripping apparatus that can be effectively moved to improve construction efficiency.

상기 목적달성을 위한 본 발명은 X링크 연결축(21)에 의해 중심부가 연결되며 외측으로 고정돌기(23)가 형성되어 있는 제 1X링크(20) 및 제 2X링크(20a)와, 상기 제 1X링크(20) 및 제 2X링크(20a)의 양측 상단부를 연결해주는 링크연결축(22)에 결합되고 중심부가 힌지작동 되도록 상부링크 연결축(11)으로 연결되어 있는 제1상부링크(10) 및 제2상부링크(10a)와, 상기 제 1X링크(20) 및 제 2X링크(20a)의 양측 하단부에 수직방향으로 설치되어 서로마주 보도록 위치하고 상호 간격조정을 통해 블록(100)을 파지하는 제1집게부(30) 및 제2집게부(30a)와, 상기 제1상부링크(10) 및 제2상부링크(10a)에 힌지작동 되도록 설치되어, 고정돌기(23)에 걸려지는 고정걸이(50)에 관한 것을 그 기술적 요지로 한다.The present invention for achieving the above object is connected to the center by the X-link connecting shaft 21 and the fixed projection 23 is formed on the outside, the first X link 20 and the second X link 20a, and the first X A first upper link 10 coupled to the link connecting shaft 22 connecting the upper ends of both sides of the link 20 and the second X link 20a and connected to the upper link connecting shaft 11 so that the center is hinged; A first upper part 10a and first lower ends of both the first X link 20 and the second X link 20a installed in the vertical direction to face each other, and to hold the block 100 by mutually adjusting the distance; Fixing hook 50 which is installed to be hinged to the tongs 30 and the second tongs 30a, and the first upper link 10 and the second upper link 10a, is caught on the fixing projection 23 We make thing about) the technical gist.

블록, 제1,2상부링크, 제1,2X블록, 제1,2집게부, 고무패드, 고정걸이Block, 1st, 2nd upper link, 1st, 2X block, 1st, 2nd clamp, rubber pad, fixed hook

Description

블록 파지장치{Tongs device of a block} Tongs device of a block}             

도 1 은 본 발명의 상세한 구조를 나타낸 사시도,1 is a perspective view showing a detailed structure of the present invention,

도 2 는 본 발명의 상세한 구조를 나타낸 평면도,2 is a plan view showing a detailed structure of the present invention,

도 3 은 본 발명의 상세한 구조를 나타낸 정면도,3 is a front view showing a detailed structure of the present invention,

도 4 는 본 발명의 상세한 구조를 나타낸 측면도,4 is a side view showing a detailed structure of the present invention;

도 5 는 본 발명의 작동상태를 나타낸 사시도,5 is a perspective view showing an operating state of the present invention,

도 6 은 본 발명의 작동상태를 나타낸 평면도,6 is a plan view showing an operating state of the present invention,

도 7 은 본 발명의 작동상태를 나타낸 정면도,7 is a front view showing an operating state of the present invention,

도 8 은 본 발명의 작동상태를 나타낸 측면도,8 is a side view showing an operating state of the present invention;

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

(10) : 제1상부링크 (10a) : 제2상부링크(10): first upper link (10a): second upper link

(11) : 상부링크 연결축 (12) : 웨이트(11): upper link connecting shaft (12): weight

(13) : 걸림부 (20) : 제1X링크(13): Hanging part 20: 1X link

(20a) : 제2X링크 (21) : X링크 연결축(20a): 2nd X link (21): X link connecting shaft

(22) : 링크 연결축 (23) : 고정돌기(22): link connecting shaft (23): fixed protrusion

(24)(25) : 누름부 (30) : 제1집게부(24) (25): Pressing part (30): First clip part

(30a) : 제2집게부 (40) : 받침블록(30a): second clip unit (40): support block

(41) : 고무패드 (42) : 걸림날(41): rubber pad (42): locking blade

(43) : 위치고정 손잡이 (50) : 고정걸이(43): position fixing handle (50): fixed hook

(51) : 고정걸이 손잡이 (100) : 블록(51): fixed hook handle 100: block

본 발명은 블록 파지장치에 관한 것으로, 보다 상세하게는 링크구조 및 상기 링크구조에 연결되는 집게를 이용하여 링크의 회전에 의한 집게의 작동으로 블록을 손쉽게 잡아 도로의 법면이나 하천의 호안 및 제방에 손쉽게 축조할 수 있는 블록 파지장치에 관한 것이다.The present invention relates to a block gripping apparatus, and more particularly, by using the link structure and the forceps connected to the link structure to easily hold the block by the operation of the forceps by the rotation of the link to the road surface or river banks and banks The present invention relates to a block gripping apparatus that can be easily constructed.

통상 블록은 하천의 호안이나, 제방 도로의 법면을 보호하기 위하여 축조된다. 이러한 블록은 자중과 블록 상호간의 마찰 및 연결키를 이용하여 배면 토압을 견딜 수 있도록 설계된다.Blocks are usually constructed to protect the banks of rivers and the slopes of embankment roads. These blocks are designed to withstand the back earth pressure by using friction and connecting keys between the weight and the blocks.

상기와 기능을 블록에 부가하기 위해서는 블록의 중량이 커지도록 설계 되어야 한다. 이로 인하여 블록의 조립시공시 블록의 무게 때문에 작업자가 직접 파지하여 운반을 해야 하지만 블록에 별도의 손잡이 등이 형성되어 있지 않고 고중량이 라 시공효율이 저하되는 문제점이 발생한다.In order to add the above and functions to the block, the weight of the block must be designed to be large. Because of this, when the assembly of the block due to the weight of the block, the operator must grip and transport directly, but there is a problem that the construction efficiency is lowered due to the high weight and no handle is formed on the block.

이와 같은 문제점을 해결할 수 있도록 본 발명자는 2개의 바 중심부가 힌지축으로 교차되어 연결 구성되는 X링크를 이용하여 상기 X링크의 하측으로 집게부를 설치해 힌지축에 의한 X링크의 회전을 통해 집게부로 블록을 파지할 수 있도록 블록 파지장치를 구성하였다.In order to solve this problem, the present inventors install a tong portion below the X link using an X link in which two bar centers are connected to each other by a hinge axis to block the tongs through rotation of the X link by the hinge axis. The block holding device is configured to hold.

본 발명은 상기와 같은 종래의 문제점을 해결하기 위하여 창출되는 것으로, 자중과 마찰, 키를 이용하여 배면 토압을 견딜 수 있도록 고중량으로 설계되어 하천의 호안이나 제방, 도로의 법면 등에 시공하게 되는 블록을 손쉽게 집어 비탈면에 효과적으로 집어서 옮겨 시공하여 시공 효율을 높일 수 있는 블록 파지장치를 제공함을 목적으로 한다.
The present invention is created in order to solve the above-mentioned conventional problems, it is designed with a heavy weight to withstand the back earth pressure by using the weight, friction, and keys to construct a block to be installed on the banks of rivers, embankments, road surfaces, etc. It is an object to provide a block holding device that can be easily picked up and moved to the slope effectively to increase the construction efficiency.

상기 목적을 달성하기 위한 본 발명은 X링크 연결축에 의해 중심부가 연결되고, 양측상단부가 링크연결축으로 연결되어 있으며 중심부의 외측으로 고정돌기가 형성되어 있는 제 1X링크 및 제 2X링크와, 상기 링크연결축에 양단부가 결합되어 제1,2 X링크의 상부에 위치하고 중심부가 힌지작동 되도록 상부링크 연결축으로 연결되어 있는 제1상부링크 및 제2상부링크와, 상기 제 1X링크 및 제 2X링크의 양측 하단부에 수직방향으로 설치되어 서로 마주보도록 위치하고 상호 간격조정을 통해 블록을 파지하는 제1집게부 및 제2집게부와, 상기 상부링크 연결축에 힌지작동 되도록 설치되어, 고정돌기에 걸려지는 고정걸이로 구성된 것을 특징한다.The present invention for achieving the above object is connected to the center by the X-link connecting shaft, both the upper end is connected to the link connecting shaft and the first X link and the second X link is formed with a fixing projection to the outside of the center, and A first upper link and a second upper link coupled to both ends of the link connecting shaft and connected to the upper link connecting shaft to be positioned at an upper portion of the first and second X links and hinged at the center thereof, and the first X link and the second X link. The first and second tongs, which are installed in the vertical direction on both sides of the lower end to face each other and hold the blocks by adjusting the mutual spacing, are installed to hinge on the upper link connecting shaft, It is characterized by consisting of a fixed hanger.

이하, 본 발명에 대하여 구성 및 작용을 첨부도면과 연계하여 상세히 설명한다.Hereinafter, the configuration and operation of the present invention will be described in detail with reference to the accompanying drawings.

도 1 은 본 발명의 상세한 구조를 나타낸 사시도이고, 도 2 는 본 발명의 상세한 구조를 나타낸 평면도이며, 도 3 은 본 발명의 상세한 구조를 나타낸 정면도이고, 도 4 는 본 발명의 상세한 구조를 나타낸 측면도로서, 본 발명은 고중량의 블록을 파지하여 작업자가 원하는 위치에 블록이 축조되도록 안착시켜주는 것이다.1 is a perspective view showing a detailed structure of the present invention, Figure 2 is a plan view showing a detailed structure of the present invention, Figure 3 is a front view showing a detailed structure of the present invention, Figure 4 is a side view showing a detailed structure of the present invention As is, the present invention is to grip the block of heavy weight to allow the block to be built in the desired position by the operator.

이와 같은 본 발명은 소정의 간격으로 위치하고 중심부가 X링크 연결축(21)으로 연결되어 있는 제 1X링크(20) 및 제 2X링크(20a)와, 상기 제 1X링크(20a) 및 제 2X링크(20a)의 상부에 위치하고 중심부가 힌지 작동되도록 상부링크 연결축(11)에 의해 연결되어 있는 제1상부링크(10) 및 제2상부링크(10a)와, 상기 제1,2 X링크(20)(20a)의 양측 하단부에 수직방향으로 설치되어 서로마주 보도록 위치하고 상호 간격조정을 통해 블록을 파지하는 제1집게부(30) 및 제2집게부(30a)와, 상기 제1,2 상부링크(10)(10a)의 외측으로 힌지작동 되도록 설치되고, 제 1,2X링크(20)(20a)의 외측에 걸려져 제1,2 상부링크(10)(10a)와 제 1,2X링크(20)(20a) 간의 간격을 조절해주는 한쌍의 고정걸이(50)로 구성된다.In the present invention, the first X link 20 and the second X link 20a, which are positioned at predetermined intervals and connected to the X link connecting shaft 21, the first X link 20a and the second X link ( The first upper link 10 and the second upper link 10a and the first and second X links 20, which are located on the upper portion of the upper portion 20a and are connected by the upper link connecting shaft 11 so that the center is hinged. First and second tongs (30a) and the second tongs (30a) and the first and second upper links (30a) which are installed in the lower end of the both sides of the (20a) in the vertical direction and face each other and grip the block through mutual adjustment 10) It is installed so as to hinge out of the 10a, and is caught on the outside of the first, second, and second links 20, 20a and the first and second upper links, 10, 10a, and the first, second, and first links. It consists of a pair of fixed hook (50) for adjusting the interval between the (20a).

여기서 상기 제 1,2X링크(20)(20a)와 제1,2상부링크(10)(10a)는 그 양측 단부가 링크 연결축(22)에 의해 연결되어 상호 연동된다. 또한 상기 제 1,2X링크 (20)(20a)의 X링크 연결축(21) 외측으로 고정돌기(23)가 돌출되어 있어 제1,2상부링크(10)(10a)의 고정걸이(50)가 걸려지게 된다.Here, the first and second X links 20 and 20a and the first and second upper links 10 and 10a are connected to each other at both ends thereof by a link connecting shaft 22. In addition, the fixing projections 23 protrude outward from the X-link connecting shaft 21 of the first and second X links 20 and 20 a, and thus, the fixing hooks 50 of the first and second upper links 10 and 10 a. Will be caught.

또한 상기 제1,2X링크(20)(20a)의 하부에는 블록의 파지시 블록을 보다 안전하게 파지할 수 있도록 블록의 상부를 눌러주는 누름부(24)(25)가 설치되어 있다.In addition, the lower portion of the first, 2X link 20, 20a is provided with a pressing portion 24, 25 for pressing the upper portion of the block to securely grip the block when the block is held.

한편 상기 상부링크 연결축(11)을 기준으로 하여 제1,2상부링크(10)(10a)의 상부에 안착되어, 하측방향으로 하중을 가해주는 웨이트(12)가 설치된다.On the other hand, the weight 12 is mounted on the upper portion of the first and second upper links 10, 10a on the basis of the upper link connecting shaft 11 to apply a load in the downward direction.

또한 상기 상부링크 연결축(11)의 상부에는 크레인등의 인양장치(도시없음)가 걸려질 수 있도록 걸림부(13)가 형성되어 있다.In addition, the upper portion of the upper link connecting shaft 11 has a locking portion 13 is formed so that the lifting device (not shown) such as a crane can be caught.

한편 상기 제1,2 집게부(30)(30a)의 내측 하부에는 파지되는 블록의 바닥면을 받쳐줄 수 있도록 걸림날(42)을 구비한 받침블록(40)이 다수개 설치되고, 상기 받침블록(40)에는 파지되는 블록의 파손을 방지하기 위하여 고무패드(41)가 부착되어 있다.Meanwhile, a plurality of support blocks 40 having locking edges 42 are installed on the inner lower portion of the first and second tongs 30 and 30a to support the bottom surface of the block to be gripped. A rubber pad 41 is attached to the 40 to prevent breakage of the block to be held.

또한 상기 제1,2 집게부(30)(30a)에는 인장장치에 의해 블록을 들어 소정의 위치에 블록을 축조할 경우 작업자가 원하는 위치에 블록을 안착시킬 수 있도록 외측으로 위치고정 손잡이(43)가 설치되어 있다.In addition, the first and second tongs (30) (30a) to the outer position fixing handle 43 so that the operator can rest the block in the desired position when the block is built in a predetermined position by lifting the block by a tensioning device Is installed.

한편 상기 고정걸이(50)에는 고정걸이(50)를 고정돌기(23)에 걸어주는 작업을 작업자가 조절할 수 있도록 고정걸이 손잡이(51)가 설치되되, 상기 고정걸이 손잡이(51)는 위치고정 손잡이(43)에 연결되어 있다.On the other hand, the fixed hook 50 is provided with a fixed hook handle 51 so that the operator can adjust the operation to hang the fixed hook 50 to the fixing protrusion 23, the fixed hook handle 51 is fixed to the position Connected to (43).

또한 상기 고정걸이(50)는 제1,2X링크(20)(20a)의 고정돌기(23)에 상호 역방향으로 걸려지도록 설치되어 고정걸이(50)가 고정돌기(23)에서 손쉽게 이탈되는 것 을 방지한다.In addition, the fixing hook 50 is installed to be caught in the opposite direction to the fixing projections 23 of the first, 2X link 20, 20a, so that the fixing hook 50 is easily separated from the fixing protrusion 23. prevent.

상기와 같은 구성에 의하여 본 발명의 작동상태를 설명하면 다음과 같다.Referring to the operating state of the present invention by the above configuration as follows.

도 5 는 본 발명의 작동상태를 나타낸 사시도이고, 도 6 은 본 발명의 작동상태를 나타낸 평면도이며, 도 7 은 본 발명의 작동상태를 나타낸 정면도이고, 도 8 은 본 발명의 작동상태를 나타낸 측면도로서,5 is a perspective view showing an operating state of the present invention, Figure 6 is a plan view showing an operating state of the present invention, Figure 7 is a front view showing an operating state of the present invention, Figure 8 is a side view showing an operating state of the present invention. as,

먼저 제1,2상부링크(10)(10a)에 설치된 걸림부(13)에 인양장치를 설치하여 블록(100)으로 이동시킨 후 위치고정 손잡이(43)를 잡고 제1,2집게부(30)(30a)의 내측으로 블록(100)이 위치하도록 조절 한다.First, the lifting device is installed on the locking portion 13 installed on the first and second upper links 10 and 10a to move to the block 100, and then the first and second tongs 30 are held by the position fixing knob 43. Adjust so that the block 100 is located inside the (30a).

이때 상기 제1,2집게부(30)(30a)의 걸림날(42)이 블록(100)의 하부면을 받쳐 주도록 걸려지게 하고, 상기 고정걸이 손잡이(51)를 조절하여 고정걸이(50)를 고정돌기(23)에서 이탈시켜 제1,2상부링크(10)(10a)와, 제1,2X링크(20)(20a) 간의 간격조절이 가능하도록 한다.At this time, the engaging blade 42 of the first and second tongs (30) (30a) is hooked to support the lower surface of the block 100, the fixed hook handle (51) by adjusting the fixed hook (50) It is separated from the fixing projections 23 to enable the interval adjustment between the first and second upper links 10 and 10a, and the first and second X links 20 and 20a.

이렇게 제1,2상부링크(10)(10a)와, 제1,2X링크(20)(20a)의 간격조절이 가능하도록 한 후 제1,2집게부(30)(30a)로 블록(100)의 하부를 걸어주게 되면, 인양장치를 상부로 작동하여 블록(100)을 들어올린다.Thus, the first and second upper links 10 and 10a and the first and second X links 20 and 20a can be adjusted so that the first and second pincers 30 and 30a block 100 can be adjusted. When the lower part of the) is lifted, the lifting device is operated upward to lift the block 100.

이를 보다 상세히 설명하면 제1,2상부링크(10)(10a)가 상부링크 연결축(11)에 의해 힌지 작동되어 중심부가 상부로 올려지게 되고, 상기 제1,2상부링크(10)(10a)와 링크연결축(22)으로 연결된 제1,2X링크(20)(20a)의 상측이 연동되어 상부로 올려짐에 따라 제1,2X링크(20)(20a)의 하측에 연결된 제1,2집게부(30)(30a) 가 하부 중심방향으로 모여지면서 블록(100)을 견고히 파지하게 된다.In more detail, the first and second upper links 10 and 10a are hinged by the upper link connecting shaft 11 so that the central portion thereof is raised upward, and the first and second upper links 10 and 10a are connected to each other. ) And the first and second connected to the lower side of the first and second X links 20 and 20a as the upper side of the first and second X links 20 and 20a connected by the link connecting shaft 22 are raised upward. As the tongs 30 and 30a are gathered in the lower center direction, the block 100 is firmly gripped.

이때 블록(100)은 걸림날(42)에 의해 하부면이 받쳐지고 고무패드(41)에 의해 외부면이 보호되어 파손되지 않도록 들려지게 된다.In this case, the block 100 is supported by the locking blade 42 to be supported by the lower surface, and the outer surface is protected by the rubber pad 41 to be heard so as not to be damaged.

한편 이렇게 파지된 블록(100)을 축조하고자 하는 위치에 안착되도록 인양장치를 이용하여 이동시킨 후 축조하고자 하는 위치에 안착시키되, 원하는 위치에 안착시켜주기 위해서 작업자는 위치고정 손잡이(43)를 잡고 원하는 위치에 블록(100)이 안착되도록 위치를 조절하여 안착시킨다.Meanwhile, the gripped block 100 is moved using a lifting device so as to be seated at a position to be built, and then seated at a position to be built, in order to be seated at a desired position. Position the seat 100 by adjusting the position so that the block 100 is seated in the position.

이렇게 블록(100)이 소정의 위치에 안착되면 제1,2상부링크(10)(10a)의 상부에 설치된 웨이트(12)의 무게에 의해 자동으로 제1,2상부링크(10)(10a)가 하측으로 하강하고 이와 연동되어 제1,2X링크(20)(20a)가 작동되며 이에 따라 제1,2집게부(30)(30a)가 벌어져 블록(100)에서 분리되게 된다.When the block 100 is seated at a predetermined position, the first and second upper links 10 and 10a are automatically driven by the weight of the weight 12 installed on the first and second upper links 10 and 10a. Is lowered downwards and interlocked with the first and second X links 20 and 20a to thereby separate the first and second tongs 30 and 30a from the block 100.

이와 같은 본 발명은 상기와 같은 방법으로 다수의 블록을 빠른시간 내에 작업자가 원하는 위치로 손쉽게 축조할 수 있다.In the present invention as described above, a plurality of blocks can be easily constructed at a desired position by a worker in a short time.

본 발명은 상술한 특정의 바람직한 실시예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형실시가 가능한 것은 물론이고, 그와 같은 변경은 청구범위 기재의 범위 내에 있게 된다.The present invention is not limited to the above-described specific preferred embodiments, and various modifications can be made by any person having ordinary skill in the art without departing from the gist of the present invention claimed in the claims. Of course, such changes will fall within the scope of the claims.

상기와 같은 구성 및 작용에 의해 기대할 수 있는 본 발명의 효과는, 고중량의 블록을 손쉽게 파지하여 빠른시간 내에 작업자가 원하는 위치에 축조할 수 있어 작업능률이 향상되고, 고무패드로 측면을 보호한 생태로 블록을 파지하기 때문에 블록 파지시에 발생되는 블록 파손의 우려를 없애주어 공사비용을 절약하게 되며, 별도의 구동장치가 없이 인양장치의 인양만으로 블록을 손쉽게 파지할 수 있는 매우 유용한 발명이다.













The effect of the present invention can be expected by the configuration and action as described above, the gripping block easily can be built in the desired position within a short time to improve the work efficiency, ecological protection of the side with a rubber pad Since the furnace block is gripped, the construction cost is eliminated by eliminating the fear of block breakage that occurs when the block is held, and it is a very useful invention that can easily grip the block only by lifting the lifting device without a separate driving device.













Claims (4)

X링크 연결축(21)에 의해 중심부가 연결되고, 양측상단부가 링크연결축(22)으로 연결되어 있으며 중심부의 외측으로 고정돌기(23)가 형성되어 있는 제 1X링크(20) 및 제 2X링크(20a)와,The first X link 20 and the second X link having a center connected to each other by an X link connecting shaft 21, both upper ends connected to the link connecting shaft 22, and a fixing protrusion 23 formed outside the center. With 20a, 상기 링크연결축(22)에 양단부가 결합되어 제1,2 X링크(20)(20a)의 상부에 위치하고 중심부가 힌지작동 되도록 상부링크 연결축(11)으로 연결되어 있는 제1상부링크(10) 및 제2상부링크(10a)와,Both ends are coupled to the link connecting shaft 22, and the first upper link 10 connected to the upper link connecting shaft 11 is positioned on the upper part of the first and second X links 20 and 20a and is hinged to the center. ) And the second upper link (10a), 상기 제 1X링크(20) 및 제 2X링크(20a)의 양측 하단부에 수직방향으로 설치되어 서로마주 보도록 위치하고 상호 간격조정을 통해 블록(100)을 파지하는 제1집게부(30) 및 제2집게부(30a)와,The first tongs 30 and the second tongs installed in the lower ends of both sides of the 1X link 20 and the 2X link 20a in the vertical direction to face each other and grip the block 100 by mutually adjusting the distance. Section 30a, 상기 상부링크 연결축(11)에 힌지작동 되도록 설치되어, 고정돌기(23)에 걸려지는 고정걸이(50)로 구성된 것을 특징으로 하는 블록 파지장치.Block holding device, characterized in that the upper link connecting shaft 11 is installed to be hinged, consisting of a fixed hook (50) is caught on the fixing projection (23). 제1항에 있어서,The method of claim 1, 상기 제1집게부(30) 및 제2집게부(30a)의 내측에는 블록(100)의 바닥면을 받쳐줄 수 있도록 하부면에 걸림날(42)을 구비한 받침블록(40)이 다수개 설치되고, 외측으로는 블록(100)의 안착 위치를 작업자가 조절 할 수 있도록 위치고정 손잡이(43)가 설치되는 것을 특징으로 하는 블록 파지장치.Inside the first tongs 30 and the second tongs 30a are installed a plurality of support blocks 40 having a locking edge 42 on the lower surface to support the bottom surface of the block 100. The outer side, the block holding device, characterized in that the position fixing knob 43 is installed so that the operator can adjust the seating position of the block 100. 제1항에 있어서,The method of claim 1, 상기 받침블록(40)에는 블록(100)의 파손을 방지하기 위하여 고무패드(41)가 부착되는 것을 특징으로 하는 블록 파지장치Block holding device, characterized in that the rubber pad 41 is attached to the support block 40 to prevent damage to the block 100 제1항에 있어서,The method of claim 1, 상기 상부링크 연결축(11)을 기준으로 제1상부링크(10)와 제2상부링크(10a)의 상부에 하측방향으로 하중을 가해주는 웨이트(12)가 설치되는 것을 특징으로 하는 블록 파지장치. Block holding device, characterized in that the weight 12 for applying a load in the lower direction on the upper portion of the upper link 10 and the second upper link (10a) based on the upper link connecting shaft (11). .
KR1020040065504A 2004-08-19 2004-08-19 Tongs device of a block KR100603072B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020040065504A KR100603072B1 (en) 2004-08-19 2004-08-19 Tongs device of a block

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020040065504A KR100603072B1 (en) 2004-08-19 2004-08-19 Tongs device of a block

Publications (2)

Publication Number Publication Date
KR20060017008A KR20060017008A (en) 2006-02-23
KR100603072B1 true KR100603072B1 (en) 2006-07-24

Family

ID=37125147

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020040065504A KR100603072B1 (en) 2004-08-19 2004-08-19 Tongs device of a block

Country Status (1)

Country Link
KR (1) KR100603072B1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100758356B1 (en) 2006-09-27 2007-09-14 전형식 Boundary stone establishing structure and method
KR101260955B1 (en) * 2009-06-05 2013-05-06 박병도 clamp for constructing block
KR20160108010A (en) 2015-03-06 2016-09-19 강성록 Heavy clamp device
KR20160108012A (en) 2015-03-06 2016-09-19 강성록 Heavy clamp device
KR101812678B1 (en) * 2016-04-07 2017-12-27 주식회사 전흥기업 Manual lift member with heavy clamp device
KR20210070447A (en) * 2019-12-04 2021-06-15 주식회사 청학 Holding apparatus for boundary stone
KR102422758B1 (en) 2021-12-02 2022-07-21 케이레이저 주식회사 Workpiece gripping machine for laser processing system

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100920133B1 (en) * 2008-11-11 2009-10-06 국방과학연구소 Connecting device and lifting machine having the same
CN109319656A (en) * 2018-09-28 2019-02-12 杭州腾飞链条管业有限公司 A kind of semi-automatic stone tongs of new type high temperature
KR102281415B1 (en) * 2021-03-25 2021-07-26 현대스텐레스철강(주) Heavy goods transport jig

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH065341Y2 (en) * 1990-10-16 1994-02-09 貞一 小林 Automatic lock device for suspension machine
JPH0628541Y2 (en) * 1990-02-28 1994-08-03 株式会社石畑型枠 Reversing type pincer
JPH08208175A (en) * 1995-02-06 1996-08-13 Nichiriyoku:Kk Hanger for gravestone installation
JPH11165977A (en) 1997-12-05 1999-06-22 Sumitomo Densetsu Co Ltd Heavy load clamping device
KR200204489Y1 (en) 2000-06-23 2000-11-15 김종운 Crane of gripper

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0628541Y2 (en) * 1990-02-28 1994-08-03 株式会社石畑型枠 Reversing type pincer
JPH065341Y2 (en) * 1990-10-16 1994-02-09 貞一 小林 Automatic lock device for suspension machine
JPH08208175A (en) * 1995-02-06 1996-08-13 Nichiriyoku:Kk Hanger for gravestone installation
JPH11165977A (en) 1997-12-05 1999-06-22 Sumitomo Densetsu Co Ltd Heavy load clamping device
KR200204489Y1 (en) 2000-06-23 2000-11-15 김종운 Crane of gripper

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100758356B1 (en) 2006-09-27 2007-09-14 전형식 Boundary stone establishing structure and method
KR101260955B1 (en) * 2009-06-05 2013-05-06 박병도 clamp for constructing block
KR20160108010A (en) 2015-03-06 2016-09-19 강성록 Heavy clamp device
KR20160108012A (en) 2015-03-06 2016-09-19 강성록 Heavy clamp device
KR101812678B1 (en) * 2016-04-07 2017-12-27 주식회사 전흥기업 Manual lift member with heavy clamp device
KR20210070447A (en) * 2019-12-04 2021-06-15 주식회사 청학 Holding apparatus for boundary stone
KR102362928B1 (en) * 2019-12-04 2022-02-17 주식회사 청학 Holding apparatus for boundary stone
KR102422758B1 (en) 2021-12-02 2022-07-21 케이레이저 주식회사 Workpiece gripping machine for laser processing system

Also Published As

Publication number Publication date
KR20060017008A (en) 2006-02-23

Similar Documents

Publication Publication Date Title
KR100603072B1 (en) Tongs device of a block
US7673918B2 (en) Self-opening tong lifting device
KR101262957B1 (en) Boundary stone tongs
KR101103938B1 (en) Hoist and Moving apparatus of Heavy weight
JP6739236B2 (en) Sheet pile clamp
KR100819469B1 (en) Quick coupler for heavy equipment
CA2915438A1 (en) Post puller and related method using a lifting action of a working machine to actuate cam-shaped grippers of the post puller
KR20160149892A (en) Boundary stone forceps device
CN211547221U (en) Lump material paving device
KR20100135379A (en) Boundary stone clamp
JP2961066B2 (en) Stone grabber and masonry method
US1728084A (en) Grapple
KR100825488B1 (en) Apparatus for gripping object
CN210012558U (en) Curb hoist and mount handling tool car
JP6833595B2 (en) Lifting device and its lifting method
JP5599100B2 (en) Block mat suspension and block mat laying method using the suspension
JPH09151073A (en) Suspender for platelike material
CN216004908U (en) Balanced lifting device of coiled material
CN216403580U (en) Brick lifting appliance
KR20080109113A (en) Sheet pile pulling machine
JP2594579B2 (en) Adjustable hanging tool
JP2020090343A (en) Hanging jig
CN216005141U (en) Manual lifting appliance for trench cover plate
CN214611089U (en) Building pipeline hoist device
JPH11280004A (en) Sleeper lifting implement

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20120731

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20130812

Year of fee payment: 8

LAPS Lapse due to unpaid annual fee