KR100586879B1 - A drain ball of drainage structure for public works - Google Patents
A drain ball of drainage structure for public works Download PDFInfo
- Publication number
- KR100586879B1 KR100586879B1 KR1020060018839A KR20060018839A KR100586879B1 KR 100586879 B1 KR100586879 B1 KR 100586879B1 KR 1020060018839 A KR1020060018839 A KR 1020060018839A KR 20060018839 A KR20060018839 A KR 20060018839A KR 100586879 B1 KR100586879 B1 KR 100586879B1
- Authority
- KR
- South Korea
- Prior art keywords
- drainage
- drain
- mesh
- drainage structure
- synthetic resin
- Prior art date
Links
Images
Classifications
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G9/00—Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
- A01G9/02—Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
- A01G9/028—Multi-compartmented pots
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/12—Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
Abstract
본 발명은 토목공사용 배수구조물의 배수재에 관한 것으로, 더욱 상세하게는 토목공사용 배수구조물을 설치하는 경우에 망태의 내부에 삽입되는 배수재를 종래의 자갈이나 잡석 대신에 합성수지재로 형성하며 속이 비고 외주 전체면에 다수개의 배수구멍을 형성한 볼형태로 형성함으로서, 다수의 배수볼 사이에 형성되는 공극이 확대되고 각각의 배수볼에 형성된 다수의 배수구멍에 의해 배수능력이 향상되도록 하며, 상기 배수볼이 속이 빈 합성수지재로 형성됨에 따라 무게가 종래의 자갈이나 잡석 보다 대폭 가벼워서 배수구조물의 설치작업이 간편하고 경제성 있게 작업이 이루어 질 수 있도록 하기 위한 것이다.The present invention relates to a drain material of a civil engineering drainage structure, and more particularly, when installing a civil engineering drainage structure, the drainage material inserted into the inside of the mesh is formed of a synthetic resin material instead of the conventional gravel or rubble, By forming a plurality of drain holes on the surface of the ball form, the voids formed between the plurality of drain balls are enlarged and the drainage capacity is improved by the plurality of drain holes formed in each drain ball, and the drain ball is As it is formed of a hollow synthetic resin material, the weight is significantly lighter than conventional gravel or rubble, so that the installation work of the drainage structure can be easily and economically performed.
본 발명은 망태(1)의 내부에 다수개의 배수재(6)가 삽입되고 망태(1)의 하부에 망체로 된 유공관틀(2)이 설치되며, 이 유공관틀(2)의 내부에는 외주연에 다수개의 집수구멍(3)이 형성된 유공관(4)이 삽입된 토목공사용 배수구조물에 있어서, 상기 배수재(6)는 합성수지재로서 속이 빈 구(球)형태로 형성되며 이 배수재(6)의 전체면에는 다수개의 배수구멍(7)이 관통되게 형성된 것을 특징으로 한다.In the present invention, a plurality of drainage material 6 is inserted into the mesh 1 and a perforated tube frame 2 made of a mesh is installed at the bottom of the mesh 1, and the periphery of the perforated tube frame 2 In a civil engineering drainage structure in which a hole tube 4 having a plurality of collecting holes 3 is inserted, the drainage material 6 is formed of a hollow sphere as a synthetic resin material and the entire surface of the drainage material 6. It is characterized in that a plurality of drain holes 7 are formed to pass through.
토목공사, 배수구조물, 망태, 유공관, 배수재, 배수볼, 배수구멍 Civil construction, drainage structure, mesh, pipes, drains, drain balls, drain holes
Description
도 1은 본 발명에 따른 배수재가 삽입된 배수구조물을 나타내는 사시도.1 is a perspective view showing a drainage structure is inserted drainage according to the present invention.
도 2의 (가)(나)는 본 발명에 따른 배수재의 사시도와 단면도.Figure 2 (a) (b) is a perspective view and a cross-sectional view of the drain material according to the present invention.
도 3은 본 발명에 따른 배수재가 밀집된 상태에서 물이 배수되는 것을 나타내는 작용상태의 단면도.Figure 3 is a cross-sectional view of the operating state showing that the water is drained in a state in which the drainage according to the present invention is concentrated.
도 4의 (가) 내지 (마)는 본 발명에 따른 배수재가 삽입된 배수구조물의 각종 설치상태를 나타내는 설명도이다.4A to 4E are explanatory views showing various installation states of a drainage structure in which a drainage material is inserted according to the present invention.
〈도면의 주요 부분에 대한 부호의 설명〉<Explanation of symbols for main parts of drawing>
1 : 망태 2 : 유공관틀 3 : 집수구멍1: Manta 2: Perforated tube frame 3: Collection hole
4 : 유공관 5 : 배수구조물 6 : 배수재4: drain pipe 5: drainage structure 6: drainage
7 : 배수구멍 8 : 운동장 9 : 옹벽7: Drainage hole 8: Playground 9: Retaining wall
10 : 지하구조물 11 : 경사지10: underground structure 11: slope
본 발명은 토목공사용 배수구조물의 배수재에 관한 것으로, 더욱 상세하게는 토목공사용 배수구조물을 설치하는 경우에 망태의 내부에 삽입되는 배수재를 종래의 자갈이나 잡석 대신에 합성수지재로 형성되며 속이 비고 외주 전체면에 다수개의 배수구멍을 형성한 배수볼을 삽입시킴으로서, 다수의 배수볼 사이에 형성되는 공극이 확대되고 각각의 배수볼에 형성된 다수의 배수구멍에 의해 배수능력이 향상되도록 하며, 상기 배수볼이 속이 빈 합성수지재로 형성됨에 따라 무게가 종래의 자갈이나 잡석 보다 대폭 가벼워서 배수구조물의 설치작업이 간편하고 경제성 있게 작업이 이루어 질 수 있도록 하기 위한 것이다.The present invention relates to a drain material of a civil engineering drainage structure, and more specifically, when installing a civil engineering drainage structure, the drainage material inserted into the mesh is formed of a synthetic resin material instead of the conventional gravel or rubble, and the entire outer circumference By inserting a drain ball formed with a plurality of drain holes on the surface, the air gap formed between the plurality of drain balls is enlarged and the drainage capacity is improved by a plurality of drain holes formed in each drain ball, and the drain ball is As it is formed of a hollow synthetic resin material, the weight is significantly lighter than conventional gravel or rubble, so that the installation work of the drainage structure can be easily and economically performed.
일반적으로 옹벽, 석축, 교대 등과 같은 토목구조물이나 운동장과 같은 평지 및 절개지의 경사지 및 성토작업의 토목공사시에는 지하수나 빗물을 배수하려 토목시설에 작용하는 수압 및 침하를 방지하고, 토목시설물의 손괴를 방지하기 위하여 반드시 배수구조물을 시공하게 된다.In general, during civil works of civil structures such as retaining walls, masonry, shifts, and flat and incision sites such as sports grounds, and landfill work, it is necessary to prevent groundwater or rainwater from acting on civil engineering facilities to prevent water pressure and settlement, and To prevent this, the drainage structure must be constructed.
상기와 같은 토목공사시에 시공하게 되는 종래의 일반적인 배수구조물은 상부 외주 전체면에 다수개의 집수구멍을 형성한 유공관이 철망으로 형성된 유공관틀의 내부에 삽입되며, 이 유공관틀이 배수구조물을 설치하는 가장하부에 매설되고, 이 유공관틀의 상부에는 철망으로 된 망태의 내부에 다수개의 자갈이나 잡석이 채워진 돌망태가 얹혀져서 배수구조물이 이루어지게 되고, 이와 같은 배수구조물이 도 4에서 보는 바와 같이 운동장의 지중이나, 옹벽의 뒷채움, 지하구조물의 측벽, 경사지의 지중에 매설되게 된다.The conventional general drainage structure to be constructed during the civil engineering as described above is inserted into the perforated pipe frame formed by the wire mesh of the perforated pipe formed with a plurality of collecting holes in the entire upper peripheral surface, the perforated pipe frame is the most to install the drainage structure It is buried in the lower part, and the upper part of the perforated pipe frame is a gabion filled with a plurality of gravel or rubble on the inside of the mesh of wire mesh to form a drainage structure, and such drainage structure is shown in FIG. 4. However, it is buried in the back fill of the retaining wall, the side walls of the underground structure, and the ground of the slope.
상기와 같이 각종 토목구조물에 상기와 같은 배수구조물이 설치 시공되어 있는 경우에 지하수나 빗물이 망태 내부의 자갈이나 잡석 등의 배수재사이의 틈새로 스며들게 되고, 이렇게 배수재 사이로 스며는 물은 하측으로 흘러내리면서 유공관으로 모여서 유공관과 외측으로 길게 연결된 배수시설로 배수되어 상기와 같은 토목구조물이 지하수나 빗물에 의해 손괴되는 것을 예방하게 되는 것이다.When the above drainage structures are installed and installed in various civil structures as described above, groundwater or rainwater will seep into the gaps between drainage materials such as gravel and rubble inside the mesh, and the water seeping through the drainage will flow down While being gathered into the perforated pipe and drained to the drainage facility connected to the perforated pipe long outside, the civil engineering structures as described above are prevented from being damaged by groundwater or rainwater.
그러나, 종래의 배수재는 위에서도 언급한 바와 같이 크기가 일정하지 아니한 자갈이나 잡석을 망태 내부에 채워 넣음에 따라 아래와 같은 문제점이 발견되게 되었다.However, in the conventional drainage material, as described above, the following problems are found as filling the inside of the mesh with gravel or rubble having a non-uniform size.
즉, 망태의 내부에 삽입되는 자갈이나 잡석이 크기가 일정하지 않음은 물론이고, 그 생김새도 들쭉날쭉 제멋대로 형성되어 있음에 따라 배수능력이 그다지 좋지 못할 뿐만 아니라, 들쭉날쭉한 자갈이나 잡석 사이에 형성되는 작은 틈새에 크기가 작은 돌멩이와 토사가 채워지면서 배수의 효율이 저하되어 배수가 제대로 이루어지지 못하게 되는 문제가 발생되게 되었다.In other words, the pebbles or rubble inserted into the inside of the mesh does not have a constant size, and the appearance is also jagged, so the drainage capacity is not very good, and small formed between the jagged gravel or rubble As small gaps and soils are filled in the gaps, the efficiency of drainage is reduced and drainage is not performed properly.
그리고, 종래의 자갈이나 잡석이 망태에 채워진 돌망태는 그 무게가 매우 무거우므로 크레인과 같은 대형중장비를 이용해야 했고, 대형중장비로 자갈이나 잡석이 채워진 돌망태를 들어 올리거나 이동시킬 때 망태가 뜯어지지 않도록 보다 굵은 철사를 이용한 망태를 사용해야 하므로 공사기간이 길어지고, 공사비용이 상승되며 중장비로 작업시 중량의 무게로 인하여 안전사고의 위험성도 높아지게 되는 문제를 아울러 지니고 있었다.In addition, the conventional gabion filled with gravel or rubble has a very heavy weight, so it is necessary to use a large heavy equipment such as a crane, and when the lifting or moving a gabion filled with gravel or rubble with a large heavy equipment, the mesh cannot be torn off. In order to avoid the use of thicker wire mesh, the construction period is longer, the cost of construction is increased, and the risk of safety accidents is also increased due to the weight of heavy materials when working with heavy equipment.
본 발명은 상기의 문제점을 해결하기 위하여 망태의 내부에 삽입되는 배수재를 종래의 자갈이나 잡석 대신에 합성수지재로 형성하며 속이 비고 외주 전체면에 다수개의 배수구멍을 형성한 배수볼을 삽입시킴으로서, 다수의 배수볼 사이에 형성되는 공극이 확대되고 각각의 배수볼에 형성된 다수의 배수구멍에 의해 배수능력이 향상되도록 하며, 상기 배수볼이 속이 빈 합성수지재로 형성됨에 따라 무게가 종래의 돌멩이 보다 대폭 가벼워서 중장비의 작업이 필요없이 배수구조물의 설치작업이 간편하고 경제성 있게 작업이 이루어 질 수 있도록 하는 것을 기술적 과제로 한다.The present invention is to solve the above problems by forming a drainage material inserted into the mantle of synthetic resin material instead of the conventional gravel or rubble, and by inserting the drainage ball formed a plurality of drainage holes on the entire outer peripheral surface, The voids formed between the drainage balls are enlarged, and the drainage capacity is improved by a plurality of drainage holes formed in each drainage ball. As the drainage balls are formed of a hollow synthetic resin material, the weight is significantly lighter than that of conventional stones. The technical task is to allow easy and economical installation of drainage structures without the need for heavy equipment.
상기의 목적을 달성하기 위한 본 발명은, 망태의 내부에 다수개의 배수재가 삽입되고 망태의 하부에 망체로 된 유공관틀이 설치되며, 이 유공관틀의 내부에는 외주연에 다수개의 집수구멍이 형성된 유공관이 삽입된 토목공사용 배수구조물에 있어서, 상기 배수재는 합성수지재로서 속이 빈 구(球)형태로 형성되며 이 배수재의 전체면에는 다수개의 배수구멍이 관통되게 형성된 것을 특징으로 한다.In order to achieve the above object, the present invention, a plurality of drainage material is inserted into the inside of the mannet and the bottom of the mantle is installed in the perforated tube frame made of a mesh, the perforated tube formed in the outer periphery a plurality of collecting holes in the outer periphery In the inserted civil engineering drainage structure, the drainage material is formed in a hollow sphere shape as a synthetic resin material, characterized in that formed on the entire surface of the drainage material through a plurality of drainage holes.
이하, 본 발명에 따른 토목공사용 배수구조물의 배수재에 대하여 첨부된 도면 도 1 내지 도 4를 참고하여 설명하면 다음과 같다.Hereinafter, with reference to the accompanying drawings, Figures 1 to 4 for the drainage of the civil engineering drainage structure according to the present invention.
본 발명은 망태(1)의 내부에 다수개의 배수재(6)가 삽입되고 망태(1)의 하부에 망체로 된 유공관틀(2)이 설치되며, 이 유공관틀(2)의 내부에는 외주연에 다수개의 집수구멍(3)이 형성된 유공관(4)이 삽입된 토목공사용 배수구조물(5)에 있어서, 상기 배수재(6)는 합성수지재로서 속이 빈 구(球)형태로 형성되며 이 배수재(6)의 전체면에는 다수개의 배수구멍(7)이 관통되게 형성된 것이다. 이때 배수재(6)의 표면을 매끈하게 형성하는 것이 바람직하다.In the present invention, a plurality of
상기 배수재(6)는 다른 말로 배수볼이라 칭할 수도 있으며, 이러한 배수재 (6)가 삽입된 배수구조물(5)은 도 4의 (가)에서 보는 바와 같이 운동장(8)의 지중에 매설되거나, 도 4의 (나)와 같이 옹벽(9)의 뒷채움식으로 설치될 수 있고, 도 4의 (다)와 같이 지하구조물(10)의 측벽과, 도 4의 (라) 및 (마)에 도시된 경사지(11)의 지중에 설치되는 것임을 밝혀둔다.The
상기와 같이 구성되어 있는 본 발명의 작용 관계를 도 1 내지 도 4를 참고하여 설명하면 다음과 같다.Referring to Figures 1 to 4 the working relationship of the present invention configured as described above is as follows.
본 발명에 의한 배수재(6)가 삽입된 배수구조물(5)을 도 4의 (가) 내지 (마)와 같이 운동장(8), 옹벽(9)의 뒷면, 지하구조물(10)의 측벽, 경사지(11)에 설치하게 되면, 지하수나 빗물이 망체로 된 망태(1)를 통하여 망태(1) 내부로 유입되게 되며, 이렇게 망태(1) 내부로 유입된 물은 구형체로 형성되어 공극이 확대된 배수재(6) 사이의 공극을 통하여 하측으로 신속하게 흘러내려가게 된다.As shown in (a) to (e) of FIG. 4, the drainage structure 5 into which the
이때 물이 흘러 내려가는 것은 각각의 배수재(6)의 외주면 외측에서 흘러나려가는 것과, 배수재(6)에 형성된 다수개의 배수구멍(7)을 통하여 속이 빈 배수재(6)의 내부공간으로 흘러 들어가다가 외측으로 빠져나가는 두 가지의 경로를 통하여 하측으로 배수되므로, 망태(1)로 유입되는 물이 망태(1) 하부의 유공관틀(2) 측으로 신속하게 배수되게 되는 것이다.At this time, the water flows down from the outer circumferential surface of each
상기와 같이 유공관틀(2)로 흘러내리는 물은 유공관(4)에 형성된 다수개의 집수구멍(3)을 통하여 유공관(4)의 내부로 유입되고, 이렇게 유공관(4)의 내부로 유입되는 물은 길게 연결된 또 다른 유공관(4)과 외측의 배수관을 통하여 배수시설로 배수되게 되는 것이다.As described above, the water flowing into the perforated
그리고, 상기 다수개의 배수재(6)는 구형태로 형성되면서 합성수지재로서 표면이 매끈하게 형성됨에 따라 다수개의 배수재(6)측으로 유입되는 물에 입자가 작은 토사가 유입되는 경우에도 배수재(6) 사이의 공극을 메우는 현상이 종래의 자갈이나 잡석보다 덜하여 배수효율이 대폭 향상되게 되는 것이다.In addition, the plurality of
또한, 본 발명에 의한 배수재(6)는 위에서도 설명하였지만 속이 비나 합성수지재로서 형성되어 있어서, 망태(1)에 다수개의 배수재(6)이 담긴 배수구조물(5)의 무게가 가벼워서 대형중장비를 사용하지 않고 인력만으로도 이동과 시공이 가능하여 작업시간을 단축시키고, 안전사고의 발생을 최소화할 수 있으며, 공사비용도 대폭 절감시킬 수 있게 되는 것이다.In addition, although the
상기와 같이 본 발명의 토목공사용 배수구조물의 배수재는, 배수재를 종래의 자갈이나 잡석 대신에 합성수지재로 형성하며 속이 비고 외주 전체면에 다수개의 배수구멍을 형성한 볼 형태로 형성함으로서, 다수의 배수재 사이에 형성되는 공극이 확대되고 각각의 배수재에 형성된 다수의 배수구멍에 의해 배수능력이 향상되는 효과와, 상기 배수재가 속이 빈 합성수지재로 형성됨에 따라 무게가 종래의 자갈 또는 잡석 보다 대폭 가벼워서 배수구조물의 설치작업이 간편한 잇점과, 성토부위에 지하배수효율이 극대화 되고 시공비를 절감하는 효과와, 안전사고의 발생을 최소화하는 등의 매우 특출한 효과가 있는 것이다.As described above, the drainage material of the civil engineering drainage structure of the present invention is formed of a synthetic resin material in place of the conventional gravel or rubble, and the hollow material is formed in the form of a ball in which a plurality of drainage holes are formed on the entire outer circumferential surface thereof. The voids formed therebetween are enlarged and the drainage capacity is improved by a plurality of drainage holes formed in each drainage material, and the weight of the drainage structure is significantly lighter than conventional gravel or rubble as the drainage material is formed of a hollow synthetic resin material. The installation work is easy and the underground drainage efficiency is maximized in the fill area, the construction cost is reduced, and the occurrence of safety accidents is very special.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020060018839A KR100586879B1 (en) | 2006-02-27 | 2006-02-27 | A drain ball of drainage structure for public works |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020060018839A KR100586879B1 (en) | 2006-02-27 | 2006-02-27 | A drain ball of drainage structure for public works |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20060024839A KR20060024839A (en) | 2006-03-17 |
KR100586879B1 true KR100586879B1 (en) | 2006-06-08 |
Family
ID=37130544
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020060018839A KR100586879B1 (en) | 2006-02-27 | 2006-02-27 | A drain ball of drainage structure for public works |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100586879B1 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100641032B1 (en) * | 2006-05-24 | 2006-11-02 | 주식회사 용마엔지니어링 | Method and structure for draining underground water of poor subsoil |
KR101482855B1 (en) * | 2013-05-21 | 2015-01-15 | 원유진 | Method for constructing groundwater storage of heating and cooling system using geothermal heat |
-
2006
- 2006-02-27 KR KR1020060018839A patent/KR100586879B1/en not_active IP Right Cessation
Also Published As
Publication number | Publication date |
---|---|
KR20060024839A (en) | 2006-03-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6335569B2 (en) | Ground preparation method and ground structure | |
KR20050012882A (en) | Drainage structure of an incline area | |
CN102482871A (en) | Liquid run-off disposal system | |
US20120301227A1 (en) | Foundation pile and installing method thereof | |
JP2011032695A (en) | Rainwater subterranean infiltration facility | |
KR100586879B1 (en) | A drain ball of drainage structure for public works | |
KR20090105254A (en) | Integrated type infiltration sump | |
KR100718722B1 (en) | Drain system for an incline | |
CN112343654A (en) | Maintainable drainage system for extremely water-rich stratum tunnel and tunnel | |
CN209603202U (en) | Basement anti-floating discharge structure | |
KR20150065477A (en) | Side gutter for mountain ridge and construction method | |
JP6037770B2 (en) | Drainage system and drainage method | |
CN212104113U (en) | Anchor pile and soil nail wall combined retaining structure | |
KR101773329B1 (en) | Strike type drain structure body for ground and construction method thereof | |
KR100257083B1 (en) | Dry method or rubber gasket apparatus of a pier of a bridge | |
KR100621364B1 (en) | A collect water equipment and the construction method of a collect water equipment | |
JP2007092293A (en) | Burial structure of manhole conduit | |
KR20120139874A (en) | Drainage system for soft ground using open channel and water-permeable drainage member | |
KR200259242Y1 (en) | Underwater handing structure of swampy land | |
KR100666102B1 (en) | Vertical type basement drainage system | |
JP6626692B2 (en) | Manhole and its installation structure | |
CN206052679U (en) | A kind of foundation structure | |
CN207227978U (en) | A kind of landfill yard guide french drain pipeline configuration | |
CN219386394U (en) | Miniature steel pipe bored concrete pile barricade | |
CN215165658U (en) | Pile-pipe-net combined type foundation pit slope protection device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
A302 | Request for accelerated examination | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20130523 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20140515 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20150526 Year of fee payment: 10 |
|
LAPS | Lapse due to unpaid annual fee |